132/33 kV Transformer Bay at Lamki S/S

FIELD TEST REPORT OF POWER TRANSFORMER Test Date:

1. Equipment Detail
Equipment Circuit Position Manufacturer Serial No Vector Group Type of Cooling Rated Power : 132/33 kV Power Transformer : 132/33 kV Transformer Bay : : : : :

1.1 General check


SN 1 2 3 4 5 6 Test Items Inspection Secondary Wiring Tightness Equipment and Structure Earthing Results Remarks

Ratio Selection Spare Core


Polarity Oil leakage Oil Level

As per NEA requirement All spare core are short circuited

Between Min and Max position

1.2 Insulation Resistance Test


Connection HV-E HV-LV LV-E IR Value (5000V) M - 1 Min IR Value (5000V) M - 3 Min Remarks

1.3 BDV Test


Sample Top Bottom Reading - 1 Reading -2 Average

1.4 Turn Ratio Tester


Tap no. Primary Voltage Actual Ratio Observed Ratio Percentage Error 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 Remarks

Field Test Report of 132 kV Power Transformer

Page 1 of 3

132/33 kV Transformer Bay at Lamki S/S

1.5 Vector Group Test Test Items Measured Voltage Verifying condition Result 1V-2V 1W-2W Ok 1V-2W 1W-2V Power Transformer Vector Group Testing (YNyn0) : R-r Shorted Tap position = 9 , three phase voltage applied on the primary side.

R R Y B N r y b n
X

Y
X

B
X

N
X

r
X

y
X

b
X

X X

X X X

X X X X

X X X X X

X X X X X X

1.6 Short Circuit Test R-Y-B-N Supplied and r-y-b-n shorted


Tap Position 1 Primary Current R= Y= B= N= R= Y= B= N= R= Y= B= N= Primary Voltage RN= YN= BN= Secondary Current r= y= b= n= r= y= b= n= r= y= b= n=
Field Test Report of 132 kV Power Transformer Page 2 of 3

Remarks

RN= YN= BN=

17

RN= YN= BN=

132/33 kV Transformer Bay at Lamki S/S

1.7 Winding Temperature Setting


S.N 1 2 3 4 Test Item Setting Fan Group -1 Fan Group -2 Alarm Trip Remarks

1.8 Oil Temperature Setting


S.N Test Item 1 Alarm 2 Trip Setting Remarks

1.9 Bushing Current Transformer


Phase Ratio R Y B N HV Side Ratio Measured Polarity Remark

Phase Ratio r y b n Ratio Measured

LV Side Polarity

Remark

Tested by:

Witnessed by:

HTSG

... Nepal Electricity Authority

Field Test Report of 132 kV Power Transformer

Page 3 of 3