Install 2G BTS cabin at temporary place and complete the power cables, prepare the jumpers.
Third Day:
Fourth Day:
Power on HW BTS, and Check BTS inner cables wether install as QC standard.
Fifth Day:
5/8/2013
Page2of5
144165673.xls.ms_office
Security Level:
MOS
Feedback Result
Install MW equipment (local site and opposite site, IDU in temporary space)
Third Day:
Prepare all the BTS cables(power cable, ground cable, transmission cable, jumper) in the right place
Fourth Day:
Fifth Day:
5/8/2013
Page3of5
144165673.xls.ms_office
Security Level:
Install MW equipment (local site and opposite site, IDU in temporary space)
Third Day:
Prepare all the BTS cables(power cable, ground cable, transmission cable, jumper) in the right place
Fourth Day:
Fifth Day:
5/8/2013
HUAWEI Confidential
Page4of5
144165673.xls.ms_office
Security Level:
MOS
Feedback Result
Install 2G BTS cabin at temporary place and complete the power cables, prepare the jumpers.
Third Day:
Fourth Day:
Fifth Day: