Vol. 154 No.

4 April 2010

Wind Destroyed and Now Powers Greensburg, Kansas

Biomass Cofiring at OPG Benchmarking Nuclear Plant Staff RO Plant Treats Brackish Water Optimize Fleet Operations

Fired Package Boilers / Wasteheat Boilers / HRSG Maintenance & Service Strategies / Boiler Repair Services / SCR and CO Systems

Some folks called it the devils rope, but theres no denying that barbed wire revolutionized the American west in the 1860s. And RENTECH Boiler Systems has revolutionized the boiler industry with its direct fired boilers, headered membrane waterwall design, and customer service. We think you will cotton to our boilers because they will lower operating costs, reduce shutdowns and cut emissions. So carve G.T.T. (gone to Texas) on your door and head to Abilene to discover solutions to your boiler needs.

WWW.RENTECHBOILERS.COM

BOILERS FOR PEOPLE WHO KNOW AND CARE


circle 1 on reader service card

Established 1882 Vol. 154 No. 4

April 2010

ON THE COVER

Greensburg, Kansas, was destroyed by an EF5 tornado on May 4, 2007 . The town has since rebounded and now faces a promising future as a model of sustainability. Citizens are rebuilding the town, literally from the ground up, using modern energy efficiency techniques and renewable power sources, including wind, photovoltaic, and geothermal technologies. Photo source: National Renewable Energy Laboratory

COVER STORY: REnewables


24 Wind Destroyed and Now Powers Greensburg, Kansas
When a tornado flattened Greensburg in 2007, residents resolved to rebuild the town and make it stronger than ever. Three years later, it is well on its way to becoming a showcase for energy efficient buildings and 100% renewable energy power supplies. The master plan not only puts Greensburg on the forefront of sustainable design and energy practices but also ensures a livable community for future generations.

24

SPECIAL REPORT
Cofiring Biomass
Ontarios plan to phase out coal-fired generation by the end of 2014 has prompted Ontario Power Generation to take the lead in evaluating its fuel-switching options. Its testing program has identified a number of issues that require attention and investment to enable safe, commercial operation with 100% biofuels. Its experience also points to possible physical equipment modifications and operational changes that might be required of other plants considering this switch.

30 OPG Charts Move from Coal to Biomass

FEATURES
BENCHMARKING

42 Benchmarking Nuclear Plant Staffing


Survey data provided exclusively to POWER by the EUCG Nuclear Committee provides valuable top-line results about how the industry continues to do more with less. Youll find trends for average number of workers per plant, generating cost per worker, staffing levels per unit of installed capacity, worker productivity, and more.

30

System Planning
Whether you are responsible for a fleet of two or 20 power generating units, the ability to operate and dispatch those resources in the most cost-effective way demands that you engage in short- and mid-term optimizationfirst at the plant level and then at the fleet level. Begin with a bottom-up approach that leverages one optimization tool that every fleet already has at its disposal.

46 A Primer on Optimizing FOperations

PLANT DESIGN
If someone told you that replacing plain condenser tubes with advanced technology condenser tubes would cost more but would pay for itself in just weeks, would you consider the option? The detailed economic analyses and demonstrations of performance improvements provided in this article should give you good reason to answer, Yes.

51 Enhanced Condenser Tube Designs Improve Plant Performance

51
1

April 2010 POWER

www.powermag.com

WATER TREATMENT

56 Sub-Sea Water Treatment System Provides Reliable Supply for the Huarun Power Plant
As water supplies around the world become more constrained with growing populations and industrial development, the use of water for power generation will continue to attract greater scrutiny. Plants in China are developing one solution to the problem by using a two-step process that turns brackish water sources into boilerfriendly water supplies.

Large Valve Inventory


61
TRANSMiSSioN & DiSTRibuTioN

61 Smart Grid: on the Money


Aside from the entrenched roadblocks to siting new transmission lines in the U.S., another barrier to developing a stronger, smarter grid is the conundrum of who should pay for improvements and how. One way to make the case for the cost is to demonstrate the benefits of grid improvements. A new project estimating tool may help make that case. Meanwhile, other countries are getting smarter grids faster and beginning to reap the benefits.

DEPARTMENTS
6 Whats bugging Me 8 10 11 12 12 12 14
GLobAL MoNiToR SPEAKiNG oF PoWER

u.S. Spins Nuclear Wheels as other Nations Roll out New Plants initial Experiments Meet Requirements for Fusion ignition From GHG to useful Materials Marines Get Power from Waves Permeable uK Granite is Good News for Geothermal Energy Dish Stirling Solar Plant Debuts PoWER Digest
FoCuS oN o&M

16 Deciphering Desuperheater Failures 19 Competitive Maintenance Strategies, Part ii 22 Gridlock Continues for Grid Policy
By Brian R. Gish of Davis Wright Tremaine

LEGAL & REGuLAToRY

64 NEW PRoDuCTS

72 Rethinking the Power industrys Dash to Gas


By Bert Kalisch, president and CEO of the American Public Gas Association

CoMMENTARY

WWW.PETROVALVE.COM (800) 255-9527 SALES@PETROVALVE.COM


circle 2 on reader service card 2 www.powermag.com

POWER April 2010

Meeting the Energy Challenge One Power Plant at a Time


While others are talking about clean-energy solutions, Shaw is building some of the most efcient
power plants in the worldincluding the nations rst new nuclear plants in 30 years, featuring Westinghouses AP1000 design. Along with providing cleaner sources of energy through nuclear power, Shaw uses advanced gas turbine, air quality control and clean coal technologies to construct cutting-edge fossil-red power plants.

For clean, safe, economical power, choose excellence. Choose Shaw.

www.shawgrp.com
24M112008D

circle 3 on reader service card


23M102009D

Visit POWER on the web: www.powermag.com Subscribe online at: www.submag.com/sub/pw

Editorial & Production

Editor-in-Chief: Dr. Robert Peltier, PE 480-820-7855, editor@powermag.com Managing Editor: Gail Reitenbach, PhD Senior Editor: Angela Neville, JD Contributing Editors: Mark Axford; David Daniels; Steven F . Greenwald; Jim Hylko; Kennedy Maize; Dick Storm; Dr. Justin Zachary Senior Writer: Sonal Patel Graphic Designer: Joanne Moran Senior Production Manager: George Severine, gseverine@accessintel.com Marketing Director: Jamie Reesby Marketing Manager: Holly Rountree

POWER (ISSN 0032-5929) is published monthly by Access Intelligence, LLC, 4 Choke Cherry Road, Second Floor, Rockville, MD 20850. Periodicals Postage Paid at Rockville, MD 20850-4024 and at additional mailing offices. POSTMASTER: Send address changes to POWER, P .O. Box 2182, Skokie, IL 60076. Email: powermag@halldata.com. Canadian Post PM40063731. Return Undeliverable Canadian Addresses to: Station A, P .O. Box 54, Windsor, ON N9A 6J5. Subscriptions: Available at no charge only for qualified executives and engineering and supervisory personnel in electric utilities, independent generating companies, consulting engineering firms, process industries, and other manufacturing industries. All others in the U.S. and U.S. possessions: $69 for one year, $109 for two years. In Canada: US$74 for one year, US$114 for two years. Outside U.S. and Canada: US$169 for one year, US$279 for two years (includes air mail delivery). Payment in full or credit card information is required to process your order. Subscription request must include subscriber name, title, and company name. For new or renewal orders, call 847-763-9509. Single copy price: $25. The publisher reserves the right to accept or reject any order. Allow four to twelve weeks for shipment of the first issue on subscriptions. Missing issues must be claimed within three months for the U.S. or within six months outside U.S. For customer service and address changes, call 847-7639509 or fax 832-242-1971 or e-mail powermag@halldata .com or write to POWER, P .O. Box 2182, Skokie, IL 60076. Please include account number, which appears above name on magazine mailing label or send entire label. Photocopy Permission: Where necessary, permission is granted by the copyright owner for those registered with the Copyright Clearance Center (CCC), 222 Rosewood Drive, Danvers, MA 01923, 978-750-8400, www.copyright.com, to photocopy any article herein, for commercial use for the flat fee of $2.50 per copy of each article, or for classroom use for the flat fee of $1.00 per copy of each article. Send payment to the CCC. Copying for other than personal or internal reference use without the express permission of TradeFair Group Publications is prohibited. Requests for special permission or bulk orders should be addressed to the publisher at 11000 Richmond Avenue, Suite 500, Houston, TX 77042. ISSN 0032-5929. Executive Offices of TradeFair Group Publications: 11000 Richmond Avenue, Suite 500, Houston, TX 77042. Copyright 2010 by TradeFair Group Publications. All rights reserved.

Advertising Sales

North American Offices Southern & Eastern U.S./Eastern Canada/ Latin America: Matthew Grant, 713-343-1882, mattg@powermag.com Central & Western U.S./Western Canada: Dan Gentile, 512-918-8075, dang@powermag.com International Offices UK/Benelux/Scandinavia/Germany/ Switzerland/Austria/Eastern Europe: Petra Trautes, +49 69 5860 4760, ptrautes@accessintel.com Italy/France: Ferruccio Silvera, +39 (0) 2 284 6716, ferruccio@silvera.it Spain/Portugal: Vibeke Gilland, +34 91 553 42 06, vibeke.gilland@publistar-es.com Japan: Katsuhiro Ishii, +81 3 5691 3335, amskatsu@dream.com India: Faredoon B. Kuka, 91 22 5570 3081/82, kuka@rmamedia.com South Korea: Peter Kwon, +82 2 416 2876, +82 2 2202 9351, peterhkwon@hanmail.net Turkey: Muge Senel, +90 212 327 2464, muge@gbreports.com Thailand: Nartnittha Jirarayapong, +66 (0) 2 237-9471, +66 (0) 2 237 9478 Malaysia: Tony Tan, +60 3 706 4176, +60 3 706 4177 , nmedia@tm.net.my Classified Advertising Diane Hammes, 713-343-1885, dianeh@powermag.com POWER Buyers Guide Sales Diane Hammes, 713-343-1885, dianeh@powermag.com

AUDIENCE DEVELOPMENT
Audience Development Manager: Terry Best Fulfillment Manager: George Severine

Customer Service
For subscriber service: powermag@halldata.com, 800-542-2823 or 847-763-9509 Electronic and Paper Reprints: Lori Noffz, lorri.noffz@ygsgroup.com, 717-505-9701, x104 List Sales: Statlistics, Jen Felling, j.felling@statlistics.com, 203-778-8700 All Other Customer Service: 713-343-1887

Business Office
TradeFair Group Publications, 11000 Richmond Avenue, Suite 500, Houston, TX 77042 Publisher: Brian K. Nessen, 713-343-1887 , briann@tradefairgroup.com President: Sean Guerre

ACCESS INTELLIGENCE, LLC

4 Choke Cherry Road, 2nd Floor, Rockville, MD 20850 301-354-2000 www.accessintel.com Chief Executive Officer: Donald A. Pazour Exec. Vice President & Chief Financial Officer: Ed Pinedo Exec. Vice President, Human Resources & Administration: Macy L. Fecto Divisional President, Business Information Group: Heather Farley Senior Vice President, Corporate Audience Development: Sylvia Sierra Senior Vice President & Chief Information Officer: Robert Paciorek Vice President, Production & Manufacturing: Michael Kraus Vice President, Financial Planning & Internal Audit: Steve Barber

www.powermag.com

POWER April 2010

BECHTEL

BECHTELTHE NEW COLOR OF GREEN

AT BECHTEL we are powering the planet. With 65 years of experience and innovation, we are helping customers provide solutions for the 21st centuryfrom renewable energy, to cutting-edge fossil technology, to the next generation of nuclear power. When it comes to power projects, no one offers greater teamwork, experience, service, or dependability than Bechtel.

Frederick, Maryland USA bechtel.com


San Francisco Houston London Brisbane

BECHTEL POWER

circle 4 on reader service card

SPEAKING OF POWER

Whats Bugging Me

m often asked about my source of ideas for this space each month. I have two primary sources of subject material. First, I read the industry news every day and save those items that either annoy or agitate me. At the end of the month, I go over the list, often a long one, and pick the one item that immediately motivates me to take virtual pen to paper. This month, no single item emerged as the topic for my bully pulpit, so I present a potpourri of loosely connected topics for your consideration. (It should be noted that other things bug other members of the editorial staff; were a diverse group and do not always agree about industry issues.)

leap defies gravity. In a similar fashion, a pro-nuclear group sent out a press release calling for 40 new nuclear plants by 2035 titled Nuclear Power: A Green Technology. Theres an old tailors adage, modified slightly for the occasion: If a man wants a green suit, turn on a green light. Marketeers: Green is going out of fashion this year.

Green Jobs Are a Chimera

Foreign Corporate Influences

The American Clean Energy and Security Act (H.R. 2454), a.k.a. Waxman-Markey, is frozen in the U.S. Senate, and the recent climategate revelations will help keep it in the deep freeze. However, several enormous non-U.S.-based engineeredequipment conglomerates continue to support lobbying organizations that seek passage of this legislation. The email stream is unending. Why is that? Could it be that Waxman-Markey manufactures new and potentially lucrative business opportunities that will surely ship fat profits earned in the U.S. (your tax dollars) overseas? Another interesting press release arrived this month from the Investigative Reporting Workshop. That group found that 79% of the more than $2 billion in stimulus payments for wind turbine equipment so far went to foreign manufacturers. Both trends are a slap in the face of U.S. manufacturers.

An online story at fastcompany.com in January 2009 presented the magazines list of the top 10 green jobs in the coming decade: farmer, forester, solar power installer, energy efficiency builder, wind turbine fabricator, conservation biologist, green MBA and entrepreneur, recycler, sustainability systems developer (IT geek), and urban planner. Stimulus funds were advertised as an investment in new green jobs, but federal government stimulus funds are by design short-lived, and the hype of green jobs has subsided. I dont see millions of newly formed, highly paid green jobs but rather a natural progression of existing jobs in transitional industriesredeploying existing, not new, skills according to market forces. Instead, how about building a few nuclear plants each year that will generate tens of thousands of new jobs along the entire nuclear supply chainjobs that will last for generations. Those are the kind of baseload jobs this country requires.

industry and resigned their membership in mid-February. I hope the remaining members will again put shareholders and consumers ahead of politics or market advantage. In my estimation, the organizations that remain in USCAP are merely engaged in rent-seekingattempting to game the regulatory system to predetermine market winners and losers in a potential trillion dollar carbon market. Calpine finally sealed a deal with the California Energy Commission for construction of its new Russell City Energy Center, a 600-MW combined-cycle plant located near San Francisco. You may ask, Whats so interesting about another combinedcycle plant? Calpine voluntarily asked for and received a permit to emit CO2 from the facility. Calpine spokesman Don Neal said, Our idea was that we wanted to undertake a process for establishing (Russell City) that would be identical to what the EPA will require. Last time I checked, the Environmental Protection Agency had yet to begin writing rules for combustion turbine CO2 limits, and its carbon rulemaking will be years in the making, if it ever happens. To meet the new limits, I expect Calpine will try to minimize cycling and part-load operation, preferring baseload whenever possible; will judiciously perform the necessary operation and maintenance activities to ensure high combustion turbine efficiency; and will use the supplemental burners sparingly. But wait, thats how combined-cycle owners already operate their plants.

Carbon Bragging Rights

Making Markets

Every Media Release Is Now Greenwashed

The number of organizations cloaking themselves in green to shape market perceptions is increasing every month. One of my favorite press releases was a company that sells recycled motor and industrial oil burner systems. The fuel for the boiler burners was described as renewable, making the oil burning system a green technology. This logic
6

First, the United States Climate Action Partnership (USCAP) wrote the white paper that later morphed into the capand-trade program in Waxman-Markey. Now the group has announced a renewed effort to kick-start the stalled legislation by initiating a new PR campaign. The USCAP campaign will include a series of advertisements focusing on the connection between action on climate and energy legislation and U.S. jobs, the economy, and energy security. What they failed to note is that BP America, ConocoPhillips, and Caterpillar finally recognized that the groups agenda is unfair to American

www.powermag.com

Your Concerns?

The second source of ideas for this column is reader email. Will you share with me what concerns or excites you about the power industry? Send your short list to me at robertp@powermag.com. Keep it short, factual, and focused, and I promise to print the most interesting submissions. Dr. Robert Peltier, PE, is POWERs editor-in-chief.
POWER April 2010

GE Energy

NOW SHOWING
Cleaner burning coal technology is here, and innovation from GE Energy is playing a leading role. IGCC offers a power solution that taps the globes abundant coal supply, while reducing emissions and enabling carbon capture retrofit. The largest cleaner coal facility in the world, Duke Energys 630MW IGCC Edwardsport, Indiana, power plant ( now under construction ), is advancing the evolution of proven IGCC technology to the next stage. GE Energys commitment to sustainable solutions is helping to transform coal into a star attraction. Visit us at ge-energy.com/gasification to find out more.

circle 5 on reader service card

U.S. Spins Nuclear Wheels as Other Nations Roll Out New Plants

President Barack Obamas January State of the Union speech called for incentives to make clean energy profitablemainly through the construction of a new generation of nuclear power plants. That comment, an apparent effort to reach out to Republican members of Congress, drew furious applause. Within three weeks, the presidents backing of nuclear power had already made a significant impact on the U.S. nuclear sector. In the week following the presidents speech, the administrations freshly unveiled Fiscal Year 2011 budget request for the Department of Energy highlighted a tripling of nuclear loan guarantees$36 billion added to the $18.5 billion allotted by the Energy Policy Act of 2005 and $2 billion that was subsequently added for fuel cycle facilities. Energy Secretary Steven Chu went on record to say that the guarantees could support the construction of seven to 10 new reactors and promised that the first of two conditional offers would be made soon. And it was: With much fanfare, the president in midFebruary announced conditional commitment for an $8.33 billion loan guarantee to Southern Co. for its expansion of Plant Vogtle in Georgia. The budget also indicated the administrations commitment to entirely withdraw the Yucca Mountain application from the Nuclear Regulatory Commission (NRC)an effort that has cost some $9 billion since its inception in 1982. At the end of January, the DOE announced the formation of a Blue Ribbon commission, a 15-member body expected to provide, within two years, recommendations for developing a long-term platform to manage used nuclear fuel and nuclear waste. On March 3, the administration did in fact file a motion to withdraw the Yucca Mountain license application. Despite the open question of what to do with nuclear waste, on March 8, Secretary Chu announced awards of approximately $40 million in total to two international teams led by Pittsburgh-based Westinghouse Electric Co. and San Diegobased General Atomics for conceptual design and planning work for the Next Generation Nuclear Plant (NGNP). The results of this work will help the administration determine whether to proceed with detailed efforts toward construction and
8

demonstration of the NGNP. If successful, the NGNP Demonstration Project will demonstrate high-temperature gas-cooled reactor technology that will be capable of producing electricity as well as process heat for industrial applications and will be configured for low technical and safety risk with highly reliable operations. U.S. Nuclear Plans in Reverse. Could these rapid-fire developments perk up the fading dream of a U.S. nuclear renaissance? It is too soon to tell, though momentum has been building in the opposite direction. In January, for example, Progress Energy suspended plans for four new Florida reactors, after a state commission denied requests for electricity rate hikes. Last August, the Tennessee Valley Authority scrapped plans for three new reactors in Alabama and delayed a fourth by at least four years. Reactors have also been canceled in Texas, Missouri, and Idaho, and applications for combined construction and operation licenses have been suspended in Mississippi, Louisiana, and New York. Of the 26 new applications submitted to the NRC since 2007, nine have been canceled or suspended indefinitely, and 10 more have been delayed by one to five years. Also, the White House has proposed barring the DOE from research on fast breeder reactors that could recycle our repository of spent nuclear fuel. Energy Daily, a sister publication of POWER, reported on January 15 that the plan drew protests from Energy Secretary Steven Chu that such prohibitions will have broad adverse effects, including hurting the U.S. nuclear industrys renaissance; crimping U.S. ability to influence other countries fast reactor designs to address proliferation concerns; and taking away nuclear waste disposal options that might be considered by the administrations planned blue-ribbon panel on alternatives to the Yucca Mountain repository. In a letter from Chu to the Office of Management and Budget dated Dec. 22, Chu said that he strongly disagree[s] with the policy direction [proposed by OMB] concerning allowable nuclear energy R&D activities. Other Nations Are Lapping the U.S. Meanwhile, a global nuclear revival is well under way. From China to Brazil, more than 50 reactors are being built around the world, another 130 or more are planned to come online during the next 10 years, and more than 200 are further back in the pipeline, according to the World Nuclear Association. Several countries are quietly, but steadily,

www.powermag.com

1. Fast and furious. This 500-MW prototype fast breeder reactor is being built at Kalpakkam, in Tamil Nadu state, by federal enterprises Bharatiya Nabhikiya Vidyut Nigam (BHAVINI), Indira Gandhi Centre for Atomic Research, and the Nuclear Power Corp. of India. On Dec. 5, 2009, the stainless steel main vessel was lowered into the safety vessel. The main vessel12.9 meters in diameter, 12.94 meters high, and weighing 206 metric tons will house the third and smallest inner vessel and associated components. The project has reportedly been delayed; it will now come online in 2011. Courtesy: BHAVINI

pushing agendas to make nuclear power a major part of their future energy supplies. India Betting on Local Talent. India is a prime example. That countrys efforts to keep up with its frenzied economic development include plans to build up to 20,000 MW in new nuclear capacity by 2020, and 63,000 MW by 2032. Those plans rely largely on indigenous designs; the country with meager uranium reserves has been pressing on with a unique longterm program that pushes for research and development of nuclear reactors using all three main fissionable materials: uranium-235, plutonium, and uranium-233. The three-pronged program, developed largely during the countrys almost 30-year-long isolation from international nuclear trade,
POWER April 2010

circle 6 on reader service card

also factors in Indias abundant reserves of thorium, which constitute 25% of the worlds total reserves. Five reactors, of both indigenous and foreign design, are under construction, including a 500-MW prototype fast breeder reactor. That project, which is being built at Kalpakkam, near Chennai, in Tamil Nadu state, was expected to come online at the end of 2010, though it could be delayed a couple of months or up to a year, an unnamed source told the Business Standard in February. The delays are being blamed on the lengthy commissioning of equipment that is being made for the first time, the source said. The main vessel was recently installed at the project, which is being spearheaded by federal research enterprise Bharatiya Nabhikiya Vidyut Nigam (Figure 1). Meanwhile, the country keeps rolling out new plants. This February, for example, state-owned Nuclear Power Corp. of India Ltd. put into commercial operation a fifth unit at the Rajasthan Atomic Power Project, a 202-MW pressurized heavy water reactor (PHWR). A sixth unit at that plant, also a 202-MW PHWR, is currently undergoing testing, with commissioning expected this March (after this issue goes to press). The two reactors will bring the total number of operating nuclear reactors in India to 19 for a combined generating capacity of some 4,700 MW. Will South Korea Come in Third? South Korea is also positioning itself in the nuclear spotlight. Its most recent unit, Ulchin 6, came online in 2005, and the country hopes to provide 45% of its electricity from nuclear power by 2015. But it is also looking beyond its borders to build new plants. Korea Electric Power Corp. (KEPCO) is in talks with multiple countries to explore exporting its nuclear plant construction ca-

pabilities. In March it signed a cooperative protocol to to establish a nuclear power plant in the northern Turkish province of Sinop. The World Nuclear Organization notes that, following the sale of four nuclear reactors to the United Arab Emirates, the South Korean Ministry of Knowledge Economy declared in January 2010 that it hoped to export 80 nuclear power reactors worth $400 billion by 2030, in the course of becoming the worlds third-largest supplier of such technology, with a 20% share of the world market, behind the U.S. and France or Russia. One new customer could be the Philippines. In light of a power crisis in Mindanao (the second-largest of the islands) early this year caused by lack of hydro resources, several parties are suggesting that the country protect itself against overreliance on hydropower by considering other energy sources, including nuclear. The Manila Times reported that President Gloria Arroyo has expressed interest in acquiring two reactors from South Korea. On Mar. 2 a letter from President Arroyo to President Lee Myungbak asked South Korea to sign a deal to sell two partially built Korean-built reactors, originally intended for North Korea, to the Philippines rather than selling the parts piecemeal. Presidential candidate Gilbert Teodoro Jr. has pointed out that Filipinos used to operate nuclear plants in Korea and Japan, so they should be able to do so in their own country.

Initial Experiments Meet Requirements for Fusion Ignition

Scientists at Lawrence Livermore National Laboratorys National Ignition Facility (NIF) in California speculate that a prototype nuclear fusion power plant could be operational within a decade, thanks to a test of the worlds largest laser array that confirmed a technique called inertial fusion ignition is feasible. Their first experiments have demonstrated a unique physics effect that bodes well for NIFs success in generating a self-sustaining nuclear fusion reaction. Fusion energy is what powers the sun and stars. In inertial confinement fusion (ICF) experiments, the energy of 192 powerful laser beams is fired into a pencil erasersized cylinder called a hohlraum, which contains a tiny spherical target filled with deuterium and tritium, two isotopes of hydrogen (Figures 2 and 3). Rocket-like compression of the fuel capsule forces the hydrogen nuclei to combine, or fuse, releasing many times more energy than the laser energy that was required to spark the reaction. The interplay between the NIFs high-energy laser beams and the hot plasma in NIF fusion targets, known as laser-plasma in-

2. Precision alignment.

A National Ignition Facility technician checks the target positioner, which precisely centers the target inside the target chamber before each experiment and serves as a reference to align the laser beams. Source: Lawrence Livermore National Laboratory

circle 7 on reader service card 10 www.powermag.com

POWER April 2010

This artists rendering shows a target pellet (the white ball) inside a hohlraum capsule with laser beams entering through openings on either end. The beams compress and heat the target to the necessary conditions for nuclear fusion to occur. Source: Lawrence Livermore National Laboratory

3. Tiny target.

teractions (LPI) has long been regarded as a major challenge in ICF research because of the tendency to scatter the laser beams and dissipate their energy. But during a series of test shots using heliumand hydrogen-filled targets last fall, NIF researchers were able to use LPI effects to their advantage to adjust the energy distribution of NIFs laser beams. The experiments resulted in highly symmetrical compression of simulated fuel capsulesa requirement for NIF to achieve its goal of fusion ignition and energy gain when ignition experiments begin later this year. In a Science Express article, Siegfried Glenzer, NIF plasma physics group leader, ICF Program Director Brian MacGowan, and their NIF colleagues reported that self-generated plasma-optics gratings on either end of the hohlraum tune the laser power distribution in the hohlraum, producing symmetric X-ray drive. Glenzer said the gratings act like tiny prisms, redirecting the energy of some of the laser beams just as a prism splits and redirects sunlight according to its wavelength. The test shots proved the NIFs ability to deliver sufficient energy to the hohlraum to reach the radiation temperaturesmore than 3 million degrees Centigradeneeded to create the intense bath of X-rays that compress the fuel capsule. When NIF scientists extrapolate the results of the initial experiments to higher-energy shots on fullsized hohlraums, they think they will be able to create the necessary hohlraum conditions to drive an implosion to ignition.

Could the transformation of carbon dioxide (CO2) into carbonates and oxides solve the problem of greenhouse gas emissions (GHG) from fossil-fired power plants? Some
April 2010 POWER

From GHG to Useful Materials

companies are betting that such processes could make everyone happy and even create new profits. Buzz has been growing about this approach, though the concept has been around for many years. Indian scientists, for example, have been looking at bacteria that can be used as enzymes to convert CO2 into calcium carbonate (CaCO3), which has multiple uses. Meanwhile, companies around the worldincluding Carbon Sense Solutions Inc. (Canada), Novacem (UK), Calix (Australia), and C-Fix (The Netherlands)have been working on processes that use CO2 to create minerals and materials that have market value. Above-ground sequestration of CO2 would seem to be simpler and more reliable than storing the gas below the planets surface, because you can see and monitor its location. There are, of course, other ways to sequester CO2 emissions above ground, such as in forests, but sequestration in the biosphere doesnt last indefinitely, and the capture mechanism is vulnerable to wildfires. Recently, two companies announced strides toward commercially viable sequestration of the GHG in solid, inert forms. Their efforts were among a dozen projects selected to receive funding from the American Recovery and Reinvestment Act of 2009 (ARRA) under the competitive Carbon Capture and Sequestration from Industrial Sources and Innovative Concepts for Beneficial CO2 Use grant administered by the Department of Energy and the National Energy Technology Laboratory (DOE/NETL). Skyonic Corp. was awarded $3 million in ARRA funds. Its patent-pending SkyMine process can capture CO2 emissions from coal-burning power generators and other stationary emitters and mineralize the gas into stable baking soda (NaHCO3). The company says the process can be profitable, as the feedstocks are inexpensive and available, and the byproducts are widely used and comparatively expensive. The federal grant, plus private investment, will fund Phase 1 of the commercial Capitol-SkyMine project to be located at the Capitol Aggregates Ltd. cement plant in San Antonio, Texas. Phase 1 will fund modeling, simulation, design, costing, and procurement activities in preparation for construction of the plant this year. The company says that the CapitolSkyMine plant is targeted to capture 75,000 metric tons of CO2 from flue gas emitted by the cement plant and mineralize the CO2 emissions as baking soda, while offsetting an additional 200,000
www.powermag.com

metric tons of CO2 in the manufacture of benign chemical byproducts. The plant is expected to operate at a profit, due to the sale of these byproducts. The mineralized NaHCO3 will be used in several industrial applications and tested as feedstock for bio-algae fuels. The company says that Capitol-SkyMine will also neutralize acidrain emissions and reduce mercury and heavy metals emissions. Another company engaged in recycling CO2, Calera Corp., was called out in a March Thomas Friedman New York Times editorial. Calera will receive $1,681,377 in DOE ARRA funds. In December, Calera Corp. and Bechtel Power Corp. announced an alliance in which the two companies will develop and build facilities using Caleras patented process to repurpose CO2 emitted by coal- or gas-fired power plants. The process captures CO2 from raw flue gas in water and then converts the GHG into calcium and magnesium carbonates for use in manufacturing carbon-negative products such as sand, aggregate (Figure 4), supplementary cementitious materials, and cement, as well as freshwater. Bechtel noted that although challenges remain to bring the process to commercial scale, they are less daunting than those facing alternative carbon sequestration approaches. Friedman quoted Ian Copeland, presiThis sample of supplemental cementitious material (SCM) blended with portland cement and Calera aggregate uses CO2 recycled by the Calera process. SCM is used to replace cement in concrete mixtures. Each pound of cement replaced with Calera SCM means 1.5 pounds of CO2 not released to the atmosphere. Courtesy: Calera Corp.

4. From gas to solid.

11

dent of Bechtel Renewables and New Technology as saying: The fundamental chemistry and physics of the Calera process are based on sound scientific principles and its core technology and equipment can be integrated with base power plants very effectively. Calera says that based upon pilot scale data, its process can also easily achieve SO2 capture efficiencies in the range of 95% to 98% and can capture other components with aqueous solubility, including mercury, trace metals, NO2, ammonia, HF, and HCl.

Marines Get Power from Waves

Ocean Power Technologies Inc. (OPT) announced on Feb. 1 that it had successfully deployed one of its PowerBuoy wave energy devices about a mile offshore from a U.S. Marine Corps Base on the island of Oahu in Hawaii (Figure 5). The device generates up to 40 kW of power from the rise and fall of waves, and since its deployment in December 2009, it has been generating power within specifications. OCT built and will operate the device as part of a program with the U.S. Navy, which is testing OPTs wave power technology. (To comply with Executive Order 13423, federal agencies must ensure that at least half of all renewable energy required under the Energy Policy Act of 2005 comes from new renewable sources developed after January 1, 1999.) The company has been awarded $380,000 for the PowerBuoys commissioning and in-ocean operation. Last November, OPT announced the completion of trials of its Underwater Substation Pod (USP) in waters off Spain. The USP is designed to help collect and network power and data generated by up to 10 of its PowerBuoys for transmission to a shore-based electricity grid by one subsea power cable. The OPT test is part of a growing drive to harness ocean energy for renewable power. In late November 2009, Aquamarine

Power launched what it said was the worlds largest working wave energy device, known as the Oyster at the European Marine Energy Centre in Orkney, Scotland (see Global Monitor, Dec. 2009 online). Meanwhile, in Norway, Statkraft has opened the worlds first osmotic power prototype, which generates power by exploiting the energy available when freshwater and seawater are mixed (see Global Monitor, Feb. 2010). A new report from Pike Research concludes that if the hydrokinetic trials now under way globally succeed, the ocean could yield as much as 200 GW of power by 2025. If these pioneering projects do not prove feasible, however, marine renewable energy might reach no more than 25 GW global capacity by 2025. The report assesses the market potential for five types of marine and hydrokinetic energy technologies: ocean wave, tidal stream, river hydrokinetic, ocean current, and ocean thermal energy. It notes that these technologies are On the verge of widespread commercialization, with the U.K., U.S., and Canada in the lead.

Permeable UK Granite Is Good News for Geothermal Energy

5. Marine waves benefit Marines. Ocean Power Technologies PowerBuoy wave energy converter off the coast of Hawaii is providing power to a U.S. Marine Corps base. By design, the PowerBuoy sits primarily below the sea surface when deployed, resulting in minimal visual impact. Courtesy: Ocean Power Technologies Inc.

In mid-February, the Geological Society of London raised the hopes of those promoting geothermal energy when results of exploratory drilling in Weardale, County Durham, revealed record levels of permeability in granite. Although the results are promising for the development of geothermal energy, they may have less welcome implications for the safe disposal of radioactive waste in deep repositories. Scientists from Newcastle University were investigating potential sources of geothermal energy, which is becoming increasingly popular in the search for low-carbon energy resources. Granite can be particularly useful, as it can be rich in radioactive elements that generate heat as they decay. The permeability of the rock is important, as heat is extracted by pumping a working fluid such as water into the rock and drawing it back up again. Professor Paul Younger, who led the research, said that Hydrogeologists have traditionally viewed granite as poorly permeable, but his team decided to challenge that assumption and found the highest permeability ever recorded for a granite anywhere in the world. The results were obtained by pumping naturally occurring saline groundwater from an exploratory borehole and monitoring the change in water levels. A permeability of almost 200 darciesa unit of permeabilitywas recorded, far higher than most prolific oil and gas reservoirs. The scientists believe the find is not unique to the Weardale granite, as there are similar granites worldwide that may display equally high levels of permeability. High natural permeability means less cost for hydraulic stimulation. However, the research also means that caution needs to be taken when selecting sites for nuclear waste disposal. Granite is a popular rock in which to site repositories, and the higher-thanexpected permeability of this rock suggests that safety estimates previously made may have to be reconsidered.

Dish Stirling Solar Plant Debuts

In late January, a 1.5-MW concentrating solar power (CSP) plant began providing power to Salt River Project customers in Greater Phoenix, Ariz. Though small, the plant, developed by Tessera Solar and Stirling Energy Systems (SES), is seen as a prelude to 1,500-MW projects that are due to break ground in California and Texas later this year. The Maricopa Solar power plant (Figure 6) is the first commercial project for the SunCatcher CSP technology designed and
12

www.powermag.com

POWER April 2010

Introducing a breakthrough in LM2500 engine depot services.


Chromalloy opens up a new option in LM2500 depot services with an independent, cost-conscious alternative to the OEM. We now operate a full capability, 111,000 square foot depot facility in San Diego, California. Our services combine more than 30 years experience in gas turbine MRO with unmatched technological advancements and a global repair network. This unique combination enables us to provide end-to-end depot services that are more responsive, customer-driven and capable of reducing costs. Break free with the independent optionChromalloySM depot services.

To learn more, visit chromalloy.com

Coatings / Repairs / Parts

circle 8 on reader service card

6. Focused energy. The 1.5-MW Maricopa Solar power plant is the first to use Stirling Energy Systems Stirling dish technology, which will be deployed at 1,500-MW plants in California and Texas. Courtesy: Stirling Energy Systems

manufactured by SES. The facility uses 60 SunCatcher Stirling dishes. Each 25-kW SunCatcher consists of a 38-foot mirrored parabolic dish combined with an automatic tracking system to collect and focus the suns energy onto a Stirling engine to convert the solar thermal energy into electricity. SES says that SunCatcher has a number of advantages, including the highest solar-to-grid electric efficiency, zero water use for power production, a modular and scalable design, low capital cost, and minimal land disturbance. The technology was designed and developed in the U.S. through a public-private partnership with the Department of Energy. The SunCatchers used at Maricopa Solar were manufactured and assembled in North America, mostly in Michigan by automotive suppliers.

Siemens Hands Over 870-MW Dutch Gas Plant. Siemens Energy on Feb. 12 handed over the 870-MW Sloecentrale combinedcycle power plant to the joint venture of Dutch company Delta Energy and Electricit de France. The natural gasfired plant in the Dutch town of Vlissingen-Oost reportedly has an efficiency of 59% and uses a state-of-the-art burner technology to keep nitrogen oxide emissions below 15 ppm. The plant is designed for 250 starts per year and is capable of supplying power to the grid within 30 to 40 minutes, Siemens said. Sloecentrale comprises two single-shaft plants, in which the main components are arranged on a single line of shafting. Siemens built the plant as a turnkey project and supplied the main componentstwo SGT5-4000F gas turbines, two SST55000 steam turbines, two hydrogen-cooled generators, and all the electrical and instrumentation and control equipment. The company also signed a long-term service agreement for the main components. Norway Pledges Funds to Develop Worlds Largest Wind Turbine. Enova, an entity owned by Norways petroleum and oil industry ministry, on Feb. 12 announced it would provide Bergenbased company Sway AS with NOK 137 million (US$23 million) to demonstrate what it called the worlds largest turbine by 2011. Standing 162.5 meters tall, the 10-MW turbine will have a rotor diameter of 145 meters. The turbines concept was developed by Sway in cooperation with Norwegian technology firm Smartmotor AS, and it involves reducing turbine weight and the number of moving parts, as well as the use of a gearless generator system.
14

POWER Digest

The prototype will be tested on land in ygarden, southwestern Norway, for two years before being installation the North Sea as part of a Sway project that involves floating turbines. eSolar and Ferrostaal to Deploy Solar Tower Projects in Spain, UAE, and South Africa. California-based solar thermal power technology maker eSolar and Ferrostaal on Feb. 18 said they had struck a deal to jointly deploy turnkey solar power projects in Spain, the United Arab Emirates (UAE), and South Africa. Under the agreement, eSolar will provide solar field and receiver technology, while Ferrostaal will provide the power block as well as manage the overall realization as general contractor, including financing activities. The companies will use eSolars Sierra SunTower, a 5-MW commercial-scale solar power plant that uses mirrors to reflect sunlight onto a tower. B&W Pilot Test of RSAT Carbon Capture Technology Successful. Babcock and Wilcox Power Generation Group (B&W PGG) on Feb. 1 said that researchers had successfully captured CO2 emissions from a pilot-scale, coal-fired boiler using advanced solvents and a proprietary CO2-capture process developed at the companys research center in Barberton, Ohio. During the demonstration on flue gas from a coal-fired boiler at the companys Regenerable Solvent Absorption Technology (RSAT) Pilot Plant, researchers were able to continuously remove more than 90% of the CO2 from the Small Boiler Simulator IIs flue gas stream using a fully integrated RSAT process. The RSAT process uses a liquid solvent in an absorber vessel to remove CO2 from a plants flue gas stream. B&W PGG researchers are now evaluating proprietary solvents and characterizing their performance at this scale, the company said. Pilot-scale testing of solvents began at the B&W Research Center in June 2009 and will continue throughout 2010. MAN Diesel Wins Major Equipment Contract for Brazil Diesel Plants. MAN Diesel, the Augsburg-based manufacturer of largebore diesel engines, in early February said it had won a contract worth 300 million from Brazilian company Grupo Bertin to supply electromechanical equipment for six diesel power plants. These components include 120 large-bore diesel engines and generators, which together will form the heart of the plants. Wrtsil Wins Contract for 119-MW Heavy Fuel Oil Plant in Greece. Wrtsil in December won a contract to supply equipment and engineering for the 119-MW South Rhodes Power Station proposed for the island of Rhodes in Greece. The plant, expected to become fully operational during the second half of 2011, will generate electricity for the islands grid from seven Wrtsil 18V46 engines running on heavy fuel oil. The order was placed by Terna S.A., which has been awarded the overall project contract by Public Power Corp. S.A., the national electricity utility of Greece. Foster Wheeler to Design, Supply Equipment for 1,200-MW Vietnamese Coal Plant. Foster Wheeler AG announced on Feb. 9 that a subsidiary of its Global Power Group has been awarded a contract by Lilama Corp., a Vietnamese EPC contractor, to design and supply two steam surface condensers and auxiliary equipment for the Vung Ang Thermal Power Plant in Vietnam. The two-unit 1,200-MW coal-fired power plant will be located in Ha Tinh province on the north central coast of Vietnam. The project is being built by investments from the Vietnam National Oil and Gas Group as part of the governments National Power Development Plan for the 20062015 period. Commercial operation of the first unit is scheduled for the second quarter of 2012. The second unit is expected to come online in the first quarter of 2013. By Senior Writer Sonal Patel and Managing Editor Gail Reitenbach.
POWER April 2010

www.powermag.com

WITHOUT

TOTAL INTEGRATION,
EVEN THE MOST COMPATIBLE PARTS DONT ALWAYS FIT.
Only Cleaver-Brooks offers single source and single responsibility for every aspect of your industrial steam system projects, from burner to stack, custom built to fulll your needs. Our Nebraska boilers, NATCOM burners and Energy Recovery HRSGs have long been the industry benchmarks for quality and engineering. When theyre incorporated into a complete system built, managed and maintained by us, you are getting the best solution, the best efciency, and the lowest emissions possible.

cleaverbrooks.com/engineered 402.434.2000

2009 Cleaver-Brooks, Inc.


circle 9 on reader service card

Deciphering Desuperheater Failures

The combined portion of a combined-cycle plant is the heat-recovery steam generator (HRSG) that generates high-pressure and high-temperature steam and the steam turbine generator that expands the steam to produce electricity. Integrating the HRSG and steam turbine with the combustion turbine is a key challenge for plant designers, as each system has differing operating profiles, operational constraints, and design requirements. The combustion turbine can rapidly start, yet the rate of heating the large mass of metal tubes in the HRSG limits the combustion turbine start-up ramp rate. Some plants have resorted to temperature matching distributed control system software routines that carefully manage the turbine exhaust gas temperature during start-up to protect HRSG tubes and components. Likewise, the temperature, pressure, and rate of HRSG steam production is often limited by the start-up ramp rate of the steam turbine. Many Operating Problems Most commercial combined-cycle plants were designed and constructed for baseload service where rapid start-ups and shutdowns were infrequent. When natural gas prices rose, many of these plants were relegated to summer cycling servicesome twice a dayfollowed by months of inactivity during the winter when demand for electricity eases. During the 1990s, the design and operating temperature requirements for desuperheaters used in HRSGs to condition the steam supplied to the steam turbine increased from below 900F to over 1,050F. In most cases, probe style desuperheaters (also called attemperators) were not designed to deal with these elevated steam temperatures, much less the added thermodynamic stresses that came with cycling service. Component problems in the main and reheat steam systems were some of the first to experience potentially catastrophic operational problems in these high-temperature steam systems. The favored design approach for matching steam temperatures with those required by the steam turbine is to insert a desuperheater between primary and secondary superheater and reheater sections in the HRSG. When the desuperheater is not operating correctly, prolonged exposure to the higher-than-specified steam temperatures in the reheater and superheater can damage expensive equipment and lead to unsafe op16

erating conditions for tubes and surrounding components. Not only are bent or cracked pipes extremely dangerous, but plants forced to shut down for costly repairs will lose electricity sale revenue and may be required to purchase expensive replacement power. The desuperheater operates by injecting condensate into high-temperature steam to precisely match the steam temperatures required by the steam turbine. This temperaturematching function is most important during system start-up and shutdown to prevent large temperature gradients in the HRSG or steam turbine steam supply. When the desuperheater fails to temper the steam correctly, even a single large overspray excursion can damage steam turbine internals, cause costly tube leaks, and significantly reduce the steam turbine efficiency. Wet steam can also quench regions of the steam pipes, causing additional, long-term problems. Heavy desuperheater sprays during start-up can, over time, initiate cracking in HRSG tube joints or even distort the shape of tube banks. Prolonged operation outside the design-operating envelope will produce accelerated fatigue damage to the pressure parts. Some plant designs have also incorporated a desuperheater after the secondary superheater pass to reduce heavy sprays by the first desuperheater and to trim the steam temperature prior to entering the steam turbine. These superheater and reheater attemperators are exposed to temperatures routinely over 1,000F and have exhibited seat leakage and nozzle cracking; in some cases they have even contributed to premature failure of the surrounding pipe. Low-load operation is also problematic. A typical industrial combustion turbines exhaust temperature remains well above the design steam temperature even at low loads. Also, with lower gas flows, the heat transfer usually moves forward in the superheater section, where the exhaust gas first contacts heating surface. This design peculiarity means that heavy spraying of the superheated steam to maintain design steam conditions has on occasion allowed wet steam to enter the steam turbine. The same is true for the reheaters, assuming they are not designed to operate dry during start-up. Wet steam can enter the cold reheat lines of the HRSG, causing the same type of steam turbine problems. Minimum Design Criteria A well-designed desuperheater will produce atomized water droplets that are completely

www.powermag.com

vaporized before entering the superheater or reheater header and will produce an atomization pattern that completely fills the pipe to eliminate bypassing and formations of thermal gradients. Properly installed desuperheaters should also be installed in a straight section of piping with two to eight diameters upstream and 12 to 20 diameters downstreamnot always possible in todays very compact plant designs, but nevertheless, this remains a good design criteria. Ensuring that no water droplets remain in the steam is paramount. During operation, 15 degrees of superheat is desirable, 50 degrees is best, downstream of the desuperheater. Also, the thermocouple providing the temperature signal to the desuperheater should be mounted downstream of the desuperheater, perhaps as far as 25 feet away, where all the water should have been evaporated. Finally, good design practice is to include a drip leg to eliminate any condensate buildup in the steam header and to slope the header away from the desuperheater. Good operating practice is to closely monitor the desuperheater during those periods when sprays should be secured. Few desuperheaters are capable of full shutoff after a few years of service. ASME Section I of the boiler code provides guidelines for these and additional design requirements. New Desuperheater Option Tyco Flow Control has developed a new desuperheater valve for combined-cycle power plants that addresses each of these operating concerns, especially for plants when steam temperatures exceed 1,000F with excursions up to 1,150F. The first installation of the Yarway TempLow HT technology desuperheater recently completed a five-year run at Iberdrolas Santurce Plant located in Vizcaya, Spain. Tyco Flow Control recognized the challenge emerging in the marketplace as more and more plant managers expressed their frustration with standard construction desuperheaters failing above 1,000F and the costs and operating penalties that created for them. The company decided to take a step back to research a safe, cost-effective, and scalable solution. The company embarked on a three-year study with the goal of bringing a new product to market that could function successfully at 1,150F, and the risk paid off. The design of the new desuperheater began with the assumption that it must continuously operate at steam temperaPOWER April 2010

circle 10 on reader service card

Inspection of Both Desuperheaters after Five Years of Service


during the superheater inspection began with removal of the actuator. Part of the main steam lagging also was removed for proper access to the lower nuts of the steam flange connection. Courtesy: Tyco Flow Control

Step 1: Superheater desuperheater disassembly. The desuperheater installed

scratches showed up on the cylindrical part of the spray cylinder, and visual inspection led to the conclusion that these were most likely mechanical fissures. A nondestructive examination (NDE) test would confirm that observation. Courtesy: Tyco Flow Control

Step 6: Reheat desuperheater disassembly. There was much more access to

the reheat desuperheater given the larger size of its pipe32-inch outer diameter (OD) than the superheat pipe (18-inch OD). The liquid on the bolting is WD-40 used as a rust solvent. Courtesy: Tyco Flow Control

Step 4: NDE test. Next, a dye penetrant

NDE test was performed on the entire assembly. The investigation showed that zero cracks or imperfections were present in the spray cylinder, the flange area, and the nozzle area. Courtesy: Tyco Flow Control

Bolts from the steam flange were removed, and the unit was raised from its stub connection. A visual inspection did not reveal any cracks or imperfections. The flanged upper part of the spray cylinder was in perfect condition as well as the sealing indication of the RTJ groove. Courtesy: Tyco Flow Control

Step 2: Remove for inspection.

Step 5: Return to service. Plant management decided to reinstall the unit with no further dismantling or testing. Plant records showed excellent temperature control and smooth responsiveness over the entire operating range since start-up, five years earlier. The offset from setpoint was never more than 4C on a controller over a 600C span. All operating and mechanical inspection results showed that a complete overhaul was not required. The desuperheater was then reinstalled and returned to service. Courtesy: Tyco Flow Control

Step 7: Remove for inspection. The spray cylinder shows considerably more corrosion than the superheat unit because the unit is fabricated from a ferritic steel that is prone to oxidation. The superheat unit is constructed from F91. Courtesy: Tyco Flow Control

Step 3: Visual inspection. The splash pattern around the nozzles is typical of probe type spray units. Because the plant was standing idle for some days, oxidation of the magnetite had occurred. Some small

Step 8: Visual inspection. The flanged upper part also revealed no imperfections during visual inspection. Courtesy: Tyco Flow Control

18

www.powermag.com

POWER April 2010

Step 9: NDE test. The reheat unit sub-

sequently was cleaned and a dye penetrant check investigation was performed. The dye check revealed no imperfections or linear indications, showing the unit was in perfect condition. Courtesy: Tyco Flow Control

tures above 1,000F. Tyco selected metallurgy for the probe, seating design, and water delivery system to work up to 1,150F. The device was also designed to fit into any combined-cycle plant as a new or retrofit solution. The valve also meets all U.S. and international codes, making it a truly international solution. Tyco also maintains that, although other probe style desuperheaters require inspection and perhaps replacement every two years, the TempLow HT design will last for many more years. A recent inspection of an early installation in Spain after five years of service with no maintenance and zero leakage appears to confirm Tycos claims (see sidebar). Desuperheater Case Study The 400-MW Santurce Plant is one of three Iberdrola combined-cycle plants placed in service in 2004 (see Arcos de la Frontera Grupo III Combined-Cycle Plant, Cdiz, Spain in the August 2006 issue of POWER). Santurce is a single-shaft combined-cycle plant based on a GE 9001FA combustion turbine, a three-pressure Kawasaki HRSG, and a GE steam turbine. The primary fuel is natural gas with a heavy fuel backup. The three-pressure HRSG mixes steam from the reheat with the intermediate-pressure (IP) steam, and the low-pressure (LP) steam turbine receives steam from the IP turbine plus the LP steam generating circuit. The high-pressure (HP) steam operates at 1,700 psig/1,094F; the IP section operates at 700F. The two Yarway desuperheaters are installed in both the crossover between the HP superheater sections and in the cold reheat return line. After five years of operation, the plant reports not one single leak, damaged probe, cracked nozzle, or pipe damage directly caused by operation of the desuperheater. Also, the desuperheater was able to sustain 1,150F steam temperatures without degradation. Avoiding unexpected outages to repair the desuperheater has paid good dividends to the plant given that each outage day penalizes the plant $200,000 to $250,000 in lost revenue. Cycling Plant Operation According to Plant Director Pavel J.F. Rodriguez, the plant emissions-limited minimum load case for the plant is 230 MW. When operating between 230 MW and 280 MW, the outlet temperature of the combustion turbine is at its peak and attemperation in both the superheat and reheat lines is required. Above 280 MW to approximately 300 MW, attemperation may be required intermittently, although when is difficult to

predict. Above 300 MW, the desuperheaters are in the closed position. The steam pipe connection on the superheat and reheat desuperheater is 4-inch with a 1-inch water supply connection. The superheat steam line is an 18-inch OD pipe. The reheat steam line is 32-inch OD pipe. The sidebar provides a photo essay of the first inspection of both desuperheaters after five years of service, in May 2009. Based on the inspection reports, these units have at least another two years of life remaining for a total of seven years of cycling service without major maintenancea remarkable record. The first five photos are of the superheat desuperheater, and the second five photos are of the reheat desuperheater. Contributed by Tyco Flow Control

Competitive Maintenance Strategies, Part II

Step 10: Return to service.

Again, all operating and mechanical inspection results showed that a complete overhaul was not required. The desuperheater was then reinstalled and returned to service. Courtesy: Tyco Flow Control

Nearly every combined-cycle operator recognizes that cycling reduces the life expectancy of hot-gas-path components in combustion turbines. Often overlooked, however, is that the same phenomenon affects the heat-recovery steam generator (HRSG). In fact, the greater physical size, elevated gas temperature, and higher steam conditions in todays HRSGs have disproportionately increased thermal stresses and fatigue damage, particularly in the superheater section. Not surprisingly, improvements made in the design stage offer the greatest benefits in extending cyclic life. However, existing plants also can reduce fatigue through equipment modifications, such as relatively minor changes to drain piping and drain valves, and by changing start-up and shutdown procedures. Following are some specific improvements that you can make at your plant. Drain Piping and Valve Improvements Carefully Size Drains. Generously size the HRSG drains to permit removal, at high temperature and pressure, of the large quantities of condensate that collect in the lower headers of superheaters during coast down and prestart purge. If condensate at saturation temperature is not removed prior to reestablishing high-pressure (HP) steam flow on a hot HRSG, a condensate quench occurs in outlet headers and steam pipes. Restarts shortly after a combustion turbine trip are a particularly nasty source of quench damage. Designers and operators often overlook the damaging fatigue effects of condensate quenching. Superheater drains at some installations are not designed for, and cannot be used during, shutdowns and hot restarts.
19

April 2010 POWER

www.powermag.com

At other installations, the drains are available, but operators fail to use them correctly. At still other plants, the drains are inadequately sized to handle the substantial quantities of condensate. Regardless of the reason, failure to remove condensate from superheater headers obstructs steam flow during the next start-up. This produces a significant temperature differential between adjacent tubes and raises thermal stresses. Failures caused by this condensate-quench phenomenon have occurred after only 300 cycles. Also, the substantial quantities of condensate in the superheater tubes should be drained during the combustion turbine coast down to further minimize thermal stresses. Superheater drain valves should be motorized to permit convenient, remote operation. In addition, where automated sequence controls and interlocks are available, the motorized drain valves should be automated. Install Stack Dampers. Install dampers in the HRSG exhaust to restrict convection flow through the unit and to maintain HP steam pressure as high as possible. HRSGs without exhaust or stack dampers depressurize within a few hours after shutdown;

thus almost every restart is from cold conditions. On a P91 header, a cold start will cause about 20 times more fatigue damage than a well-designed hot start; on a P22 header, cold-start fatigue damage may be 30 to 40 times that caused by a hot start. Include Inspection Access. Provide convenient access for internal inspection. Fatigue cracks usually initiate inside tubes and headers. Some HRSGs have no facility or space to inspect header internals; thus, fatigue damage will not be evident until a crack propagates all the way through the header wall. If internal cracks are detected early, their growth rate can be monitored and replacement components procured in advance, keeping outage time to a minimum. Change Your Shutdown Procedures. Many combined-cycle stations base operating procedures on the ideal requirements for the combustion or steam turbine. Operators of existing HRSGs may substantially lower HRSG thermal stresses simply by changing these procedures. Unfortunately, these procedures often cause severe fatigue damage in the HRSG. Most operators believe that rapid start-ups are what damage HRSG compo-

nents, but shutdownsboth routine and emergencycan be more damaging. The shutdown procedure is usually intended to keep superheater-outlet steam temperature as high as possible to permit fast reloading of the steam turbine after an overnight or weekend shutdown. In this procedure, combustion turbine exhaustgas temperature and steam flow are both reduced rapidly during unloading, so that when combustion turbine firing stops, only moderate reduction in superheateroutlet steam temperature has occurred and the majority of the header remains near maximum steam temperature. However, as cooler air is delivered from the combustion turbine compressor during coast down and HRSG purging, condensate rapidly develops in the superheater tubes and then runs down into hotter headers, causing these sections to quench to saturation temperature. This leads to substantial thermal stresses at the inner surface of the headers. A better procedure for normal shutdown is to ramp down the superheater outlet steam temperature during gas turbine unloading, prior to tripping the combustion turbine. One original equipment manufac-

Do you need On-Site Scanning?


Our services include: Scanning engineering drawings CAD/Vector Conversion Scanning O&M manuals using High Speed scanning equipment Scanned data corrections, taxonomy and database support We work within your existing framework and operating preferences to turn your paper information into a valuable electronic tool. Your plant data is more useable NOW!
And without waiting for (or paying for) an enterprise solution. (Which well leave on site if you wish!)

UTILITY HRSG! PACKAGED BOILERS! COMBINED EXPERTISE! VICTORY ENERGY!


THINK
Shop-assembled and modular designs to optimize constructability Advanced in-house engineering Heavy-industrial and utility grade Highly developed performance modeling Custom applications

THINK

THINK

THINK

10701 E. 126th St. N., Collinsville, OK 74021 918.274.0023

ATLANTA NEW YORK SAN FRANCISCO INDIANAPOLIS CINCINNATI RUSSELSHEIM HYDERABAD SINGAPORE TOKYO COLOMBO VANCOUVER circle 11 on reader service card 20

www.VictoryEnergy.Com
|

circle 12 on reader service card Advertiser: Victory Energy Operations, LLC Contact: Charles Swallow, 918.382.4840, cswallow@victoryenergy.com www.powermag.com POWER April 2010 Title: Think Victory Energy Ad Specs: 1/4 page ad, 4-color (CMYK) Publication: Power Magazine - 2010

turer recommends a ramp rate of 14F/min to a steam temperature of about 700F. By the time condensate begins to collect in the header, the bulk temperature of the header has been reduced further to about 60F above saturation temperature. This may extend the subsequent hot restart time after an overnight shutdown from a typical 60 minutes to 75 minutes, but it reduces fatigue damage by as much as 50%. Rewrite Start-up Procedures, Too. A procedure sometimes used for hot starts deliberately lowers HP steam pressure prior to the restart. This practice is intended to reduce throttling at the steam turbine during start-up, and thereby shorten the start-up time. Nevertheless, by lowering HP steam pressure, the superheater is cooled to a lower saturation temperature, which results in a more damaging step increasefrom saturation temperature up to combustion turbine exhaust temperatureimmediately after steam flow is established. To reduce thermal stresses in the superheater during hot starts, the step change should be minimized. This can be accomplished by maintaining pressure, thus saturation temperature, as high as possible in the superheater. In addition, combustion turbine exhaust temperature should be kept as low as possible when steam flow is first established. Note that combustion turbines equipped with inlet guide vanes (IGVs) tend to produce higher gas temperatures during start-up than those without IGVs. After steam flow is established, subsequent combustion-turbine ramp-up should be slow enough to maintain the temperature gradients induced by the initial step change. Inject Cost Consciousness into Valve Maintenance Program Goals of any valve program should be to reduce long-term costs of valve maintenance, improve valve operation and reliability, and improve plant operation. To achieve these goals, the program should address valve stem packing, leak detection, steam-trap diagnostics, predictive operation, matching valve class with application, individual valve problems, and standardized valves. Preferably, one valve specialist should be assigned to coordinate the program. Packing Improvements. Tremendous changes have occurred in valve stem packing over the past decade. Opportunities for savings are numerous. Packing sets with fewer packing rows perform better than old sets with more rows because packing consolidates less over time, resulting in fewer leaks and repacks. Packing sets for high-pressure valves should be converted
April 2010 POWER

to five-row sets with three active sealing rows and two containment, anti-extrusion rows. These changes to existing valve packing sets should first be made to all high-pressure valves. Torquing the packing to calculated values leads to consistently good seals on valves. Of course, torque wrenches should be checked regularly and calibrated, if necessary. Live loadingwhich involves installing Belvoir washers on the packing bolts to maintain the calculated preload on stem packing even when some consolidation occursshould be considered for critical valves or valves that have exhibited problems in the past. This will allow for a considerable amount of packing consolidation before problems occur. Valve Leak Detection. If accurate valve leakage information is available, you can rely on valve condition monitoring and eliminate most, if not all, preventive maintenance. Thermography and acoustic devices have been used for leak detection, but they are not always reliable indicators. Many valves were found to be in good condition when disassembled even though these techniques identified leakage. Fortunately, new valve leak detector technology has been developed that uses acoustic signatures captured by sensors, massaged by proprietary signal processing software, followed by computer analysis. The presence of acoustic signals in a particular frequency spectrum can be used as a predictive measure for steam leaks and for other failure mechanisms. The latest instruments can be added to the plants local area network if continuous monitoring of certain equipment is desired. This one improvement has allowed maintenance departments to plan their work much more effectively and has in many cases eliminated preventive maintenance. The coordination of leak-test efforts is critical to the entire valve program. Identifying and testing whole systemswhich would include the boiler vents and drains, boiler feed system, auxiliary steam system, and moreis recommended. Other valves can be tested by a thorough, organized approach to the various piping systems in a plant before planned outages. Possible annual saving at a comparable power plant is $250,000 to $350,000. Steam-Trap Maintenance. Steam traps are not a high priority at many plants, typically because unit reliability is more important than plant efficiency.Steam traps are essentially valves that open and dose automatically. Many problems were experienced with high-energy steam traps because inverted steam traps lost their
www.powermag.com

prime. The prime is a water seal in the trap that keeps steam from leaking straight through. The industry has been aware of this problem for some time and suppliers are reacting. You may have to replace existing steam traps with ones better suited to specific operating conditions. The valve leak detector mentioned above can be useful in identifying leaking traps or traps that are not performing as designed. For a comparably sized power plant, annual saving of $80,000 to $120,000 are possible by addressing steam-trap problems. Predicting Valve Operation. Improving plant operability and reliability requires that personnel be able to predict whether valves will operate properly as needed and whether the valve will seal tightly against the expected pressure differential when closed. Motor-operated-valve (MOV) diagnostic equipment and services have been used for some time in the nuclear industry. A diagnostic service provides information on the valve/operator/motor set condition, and setup and assists in corrections, if necessary. When the valve and operator are in good condition and set up correctly, diagnostic systems then provide the information needed to predict reliable operation and tight shutoff. Note that the price of the diagnostic equipment and the amount of training required to reliably test MOVs and stay proficient in equipment use are high. If only a few valves on each unit are to be tested, contracting out this service is probably more cost-effective. Other noncritical MOVs should be stroked regularly so that the operations personnel are comfortable with relying on the valve to operate when needed. Standardize Valves. At many plants, numerous types of valves are installed in similar service. Maintenance personnel are often unfamiliar with procedures that apply to each type. Parts and packing inventories increase and become more complicated. Personnel obtaining valves from stock become unfamiliar with the applicable temperatures/pressures of the different valves. Standardizing valves to be used in like services reduces inventory requirements, increases familiarity with valve maintenance, and streamlines maintenance efforts. Recent (2009) changes in ASME B16.34 code have resulted in corresponding changes in the applicable pressure/temperature combinations of many valves. Some codes no longer apply. Some common valves can no longer be purchased and installed unless they are upgraded to meet the new code. Dr. Robert Peltier, PE, editor-in-chief.
21

Gridlock Continues for Grid Policy


By Brian R. Gish
arly last year, there were promising signs that electric transmission line construction would be facilitated by the convergence of the new administrations emphasis on developing remote renewable generation resources, proposed legislative provisions expanding federal siting authority, and the granting by the Federal Energy Regulatory Commission (FERC) of generous cost-of-service returns on such investments. However, the stars did not align for transmission policy in 2009 as had been hoped, and the forecast is cloudy.

The

Siting Issues Remain Unresolved

One of the main disincentives to transmission line development is the long and costly siting process for new lines that have to cross multiple states, because each state has the right to stall or veto the line. Unfortunately, the U.S. Supreme Court on Jan. 19 declined to hear an appeal of a 2009 decision of the U.S. Court of Appeals for the 4th Circuit that interpreted Section 216 of the Federal Power Act in a way that diminished its usefulness for facilitating transmission siting. Section 216, added by the Energy Policy Act of 2005, instructs the Department of Energy to designate national interest corridors where there is transmission congestion, which it has done for a section of the eastern and southwest United States. Section 216 provides FERC with backstop siting authority for proposed transmission projects in such corridors under circumstances where states could not or would not grant a siting permit on reasonable terms. The 4th Circuits split 2 to 1 decision construed Section 216 to forbid FERC from exercising backstop siting authority when a state commission denies a siting permit, while acknowledging that FERC is granted such authority when a state commission delays action or unreasonably conditions a permit. In the curious decision, the majority held that Section 216 unambiguously withholds FERCs authority in the case of a state denial, whereas the dissent held that the statute unambiguously grants FERC such authority. A broad coalition of the energy industryincluding the Edison Electric Institute, the American Public Power Association, and the National Rural Electric Cooperative Associationfiled a Petition for Certiorari with the Supreme Court to overturn the decision. The petition was supported by amicus briefs by the four previous FERC chairmen and the U.S. Chamber of Commerce. Although FERC strongly disagreed with the Fourth Circuits interpretation, the U.S. solicitor general decided against filing an individual Supreme Court Petition on behalf of FERC. The solicitor generals response to the petition agreed that the 4th Circuits decision was erroneous and was potentially harmful energy policy. However, the solicitor general argued against the court hearing the case on several procedural grounds, including these:
22

uncertain standing of the state commissions and environmental groups to bring the 4th Circuit challenge because they had not established that their injury was actual or imminent. The uncertain ripeness of the case for the courts consideration because FERCs action did not command anyone to do anything or refrain from any action. The chance that FERC could render a decision that was not consistent with the 4th Circuits holding in a specific state permit denial case arising outside of the 4th Circuit, thus paving the way for another court of appeals to opine on the meaning of Section 216. The Supreme Courts refusal to hear the appeal says nothing about the merits of the 4th Circuit decision or any other issue, as the Supreme Court takes very few cases. However, allowing the 4th Circuits decision to stand may force transmission developers to consider whether they should propose costly projects if they

The Supreme Courts refusal to hear the appeal says nothing about the merits of the 4th Circuit decision or any other issue.
believe it possible that a state will reject the project and FERC has no backstop authority in that situation. Attempting to challenge the 4th Circuits decision in another forum would take several years and great expense, with no assurance of the outcome.

Other Issues Persist

Meanwhile, the legislative proposals that had been introduced in 2009 to provide FERC more specific federal backstop siting authority were included in the controversial climate change legislation, which has become bogged down for other reasons. In addition, some eastern states have protested legislation that would aid the building of transmission lines from midwest wind farms to their region because they fear the lines may undermine efforts to build local renewable resources. Moreover, the battle over who pays for new lines intensified during 2009 with legislative proposals to limit cost allocation to those receiving measurable benefits from a line. And there is an additional battle brewing as to whether transmission planning should be done at a national or local level. Some progress is being made on developing new lines in sparsely populated areas. However, the same conflicting political forces that have frustrated much transmission development for the past 20 years appear likely to continue doing so, at least until the next major blackout forces compromises to be made. Brian R. Gish (briangish@dwt.com) is of counsel in Davis Wright Tremaines Energy Practice Group.
POWER April 2010

www.powermag.com

P E O P L E

P R O C E S S E S

T E C H N O L O G Y

General Physics has provided the material to gain and maintain the knowledge needed for our new and incumbent workers. Their reputation as a World Class provider of web-based material has served us well for over 15 years.
Kenneth Anderson, Master Trainer, OGE Energy Corporation

Power
we provide you with

learning
www.gpilearnwbt.com 888.843.4784 gpilearnwbt@gpworldwide.com

GPiLEARN is the industry leader in online plant training. At General Physics Corporation,

access to thousands of lessons and exams that

will lower operating costs while providing employee training anytime, anywhere. From apprentice to seasoned employee, our power plant experts partner with you to create a blended training program. Put our experience to work for you.

Offices in: North America Latin America Europe Asia

circle 13 on reader service card

RENEWABLES

Wind Destroyed and Now Powers Greensburg, Kansas


Greensburg was destroyed by an EF5 tornado on May 4, 2007. Instead of abandoning the Kansas town, the community quickly embraced the task of rebuilding it from the ground up, maximizing the use of renewable energy sources and energy efficient building techniques. Rebuilding continues, but the future of Greensburg has never been stronger.
By Lynn Billman, National Renewable Energy Laboratory

n 2007, a massive tornado touched down in the south-central Kansas town of Greensburg, destroying 95% of the town and killing 11 people. It could easily have been the end of the 1,400-resident rural farming town that was already in decline, but instead, the disaster brought the town together in an effort to make Greenburgs future a green one. The U.S. Department of Energy (DOE) and its National Renewable Energy Laboratory (NREL) provided technical assistance to the community while dozens of other agencies and entities at all levels contributed many additional forms of support. As a result, the city of Greensburg and its many partners are rebuilding the town from top to bottom using the latest energy efficiency and renewable energy technologies. In addition to installing several ground source heat pump systems and small photovoltaic systems, the town is constructing a wind farm that will supply enough wind energy to power every house, business, and municipal and county building.

Before

Courtesy: Federal Emergency Management Agency

After

Too Tough to Die


Within days after the tornado, experts from the DOE, NREL, and other agencies came together with state and local officials and residents to help answer the big question: What will become of Greensburg? While the town was evacuated for three months, residents scattered and businesses evaluated their losses. No one was sure how many would return to rebuild. The planning process that grew out of that first tent meeting just snowballed, said Daniel Wallach, executive director and founder of Greensburg GreenTown, a grassroots community-based nonprofit formed after the tornado hit. Community, family, prosperity, environment, affordability, growth, renewal, water, health, energy, wind in the built environmentthese were all values that were identified that would construct a framework in which to move forward for Greensburg. As the residents of Greensburg focused their energies on rebuilding, they kept these
24

Courtesy: Greensburg GreenTown

values in mind, and their vision took shape. The City Council passed a resolution requiring all new city buildings larger than 4,000 square feet to meet U.S. Green Building Council Leadership in Energy Efficiency and

www.powermag.com

Design (LEED) Platinum certification and reduce energy consumption by 42% as compared to standard buildings. They set a goal of using 100% renewable energy for their new town. And they included brand-new
POWER April 2010

renewables
technologies, such as light-emitting diode (LED) streetlamps, to reduce energy use. Greensburg is becoming a net-zero-energy community with regard to its electricityan energy efficient community that generates as much electricity from renewable energy as it uses. It sets a new standard, not just for its own citizens, but for other rural and urban communities as well (Figure 1). that destroyed their town, the townspeople have embraced it as the foundational building block of their new community, even donning t-shirts with the phrase coined by Greensburg GreenTown: GreensburgA Wind-Wind Situation. The town is already home to a 50-kW turbine at the new hospital, two smaller turbines at the BTI-Greensburg John Deere dealership, and three small turbines at the 5.4.7 Arts Center. The new school also plans to install a 50-kW turbine. Construction is also under way for the Greensburg Wind Farm, which will consist of 10 Suzlon 1.25-MW wind turbines with a capacity of 12.5 MW of renewable powerenough energy to power 4,000 modest homes. It is planned for completion

First in Green Lighting


One of the towns first completed green projects illuminates the downtown sidewalks and streets every night. Greensburg is the first city in the U.S. to use LED lamps for 100% of its street lighting. By replacing the existing 303 sodium vapor lights with LED fixtures, Greensburg improved outdoor lighting energy efficiency by 40% and reduced the cost of related energy and maintenance by an estimated 70%. As an added bonus, the new lamps reduce nighttime light pollution by focusing light where it is neededon the ground rather than in the night sky.

1. Plan for the future. A Greensburg master development plan was developed to guide
the citys recovery and growth over the next 20 years. Source: City of Greensburg, Kansas

A Wind-Wind Situation
One of the most remarkable aspects of the Greensburg project is the towns commitment to renewable energy and, in particular, wind. Far from distrusting the force

Green-Powered Government and Businesses


The 95-year-old Kiowa County Courthouse (Greensburg is the Kiowa County seat), one of the few structures left standing after the tornado, has been renovated with sustainable features and is striving for LEED Gold certificationan especially admirable goal, because the facility is being modified rather than replaced. Today, the building is one of the greenest historic buildings in the country thanks to extensive use of reclaimed materials, state-of-the-art windows, and native landscaping (Figure 2). The courthouse uses a specialized multistage heat pump system that extracts both heat and cooling from the ground through a series of thirty-two 300-ft vertical wells. The ground source heat pumps are rated based on size, with an energy efficiency ratio ranging from 14.1 to 18.7 for cooling and a coefficient of performance ranging from 3.1 to 3.8 for heating. The heat pumps utilize high-efficiency motors and fans and exhaust energy recovery ventilators supply outdoor air to each heat pump. rebounding from the tornado or starting from scratch. Like all larger structures owned by the city of Greensburg, the facility is built to LEED Platinum standards. A 6.8-kW photovoltaic system supplies approximately 10% of the buildings total energy needs. The Business Incubator also features a specialized ground-source heat pump system that extracts both heat and cooling from the ground through 21 vertical well shafts, 340 feet deep each. As in the courthouse system, heat pumps are rated based on size; their energy efficiency ratings range from 14.1 to 18.7 for cooling while coefficients of performance range from 3.1 to 3.8 for heating. High-performance building materials provide maximum insulation and protection from high winds. Natural light illuminates most of the interior space, which minimizes the need for artificial lights. Water from sinks and showers is recycled and used to flush toilets. The recycled water (gray water) is supplemented by rainwater, which is collected and stored during rainstorms.

2. Better than new. The Kiowa County Courthouse, originally built in 1914, was one of the few buildings not destroyed by the tornado. However, its glass-block windows were broken, the roof was blown off, and the interior was extensively water damaged. The tornado also picked up a vehicle from the nearby police impounds lot and crashed it through the roof. The building has since been completely renovated. Courtesy: Kansas Geological Society

Growing Businesses with Green Power


The two-story SunChips Business Incubator is home to temporary, low-cost office space for as many as 10 small businesses

April 2010 POWER

www.powermag.com

25

renewables
in the spring of 2010. The town expects to consume about a quarter of the electricity produced by the wind farm for its homes, businesses, and government buildings; the rest will be sold to the Kansas Power Pool, which is purchasing power from the project (Figure 3). With its 40 member cities and strong interest in increasing renewable energy in its generation mix, the Kansas Power Pool was a natural partner for the city of Greensburg. When the wind isnt blowing and the turbines cant generate electricity, the Kansas Power Pool will energize the town with as much clean power as possible from other sources, including hydropower, to work toward the communitys goal of being powered entirely by renewable sources. Greensburg will also own all the renewable energy credits from the electricity used by the city. Other Greensburg Wind Farm partners include John Deere Renewable Energy, the owner and operator that led the project and provided an equity investment. It will also maintain the wind farm. Native Energy, a Vermont-based company, furnished a portion of the upfront financing as part of its mission to help finance sustainable power projects that benefit family farms, community-based operations, and Native American projects. Native Energy is selling the renewable energy credits from the project so that anyone can own part of the Greensburg Wind Farm (see www. nativeenergy.com). The total cost of the wind farm is projected to be $23.3 million. The remainder of the project financing is coming from the U.S. Department of Agriculture (USDA). In October 2009, Secretary Tom Vilsack announced a $17.4 million loan to the project through the USDA Rural Development program. John Deere Renewable Energy anticipates that the system will be paid off in under 12 years. This project will not only enhance our countrys long-term energy security by producing clean, renewable energy, but will also create green jobs and generate income in the local community, said Vilsack. Greensburg stands out as an example of the promise and potential in communities throughout the country. Vilsack isnt the only administration official fond of the project. In his first address to a joint session of Congress, President Barack Obama said, Greensburg . . . is being rebuilt by its residents as a global example of how clean energy can power an entire communityhow it can bring jobs and businesses to a place where piles of bricks and rubble once lay.

Economic Development
In addition to powering the town, wind energy has become an important economic development strategy for Greensburg. Take, for example, Kelly and Mike Estes, owners of the BTI-Greensburg John Deere dealership, a prominent local business. The Estes brothers used a wind turbine to power the construction site when rebuilding their business, which now includes two wind turbines (4.2 kW and 1.9 kW) that provide electricity to the facility, offsetting an estimated 8% of the building load (Figure 4). The Estes brothers had such a positive experience with Endurance Wind Energy, the Canadian company that built their larger turbine, that they saw a new business opportunity. BTI Equipment became the exclusive North American distributor for Endurance and formed BTI Wind Energy. In their first nine months of business, they built a North American dealer network across 32 states and four Canadian provinces, resulting in 120 new windrelated North American jobs (including wind specialists, service technicians, and installers). Nearly 300 existing sales representatives are learning the new business of wind energy. In the ag business we are pretty reliant on weather and crop for our survival, Kelly Estes said. If we lose a crop or freeze or drought, then its real hard for our type of business to survive, so we were looking for something sustainable. You can harvest the wind pretty well year round.

High-Performance School of the Future


In 2007, the year of the tornado, the Greenburg high school received the Governors Award for ranking as one of the top 5% of the states schools. The new high-performance school building will be worthy of the students high academic performance. Projected for completion in time for the school year starting in September 2010, the two-story, 120,000-squarefoot facility will consolidate grades K-12 in a single campus designed to be the states first LEED Platinum school. It will include state-of-theart classrooms, a library, an interactive learning center, science labs, two gyms, a cafeteria and kitchen, art and music areas, courtyards, two playgrounds, a football stadium, plus track and field facilities. This new school will replace the total square footage of all the previous school buildings, combining all grade levels in a single facility. It will serve up to about 375 students (the school currently is serving about 220 students), allowing for the towns future growth. Key green features include the extensive use of daylighting (natural light) to ensure that artificial lighting is seldom necessary in most rooms. Heating and cooling will be handled by geothermal heat pumps that take advantage of the difference between the earths and the airs temperatures. The pumps circulate water from below the earths surface to warm interior air in winter and cool it in summer. An onsite wind turbine will meet about 25% of the facilitys electricity needs and will be backed up by a hydrogen-powered fuel cell. Rainwater is transported through the roof lines, stored in cisterns, and used to irrigate the grounds. When completed, the school will be a great improvement over the one permanent campus structure known as the caf-a-gym-atorium and the temporary classrooms that the students have been in since the 20072008 school year.

Green Buildings in Greenburg


Greensburg residents have taken sustainability to heart, hearth, and home. Busi-

3. Harness the wind.

Greensburg is using wind-generated electricity to supply much of the citys needs. The citys goal is to become electricity self-sufficient. Excess wind power generated is sold to the Kansas Power Pool. Courtesy: Joah Bussert, Greensburg GreenTown

26

www.powermag.com

POWER April 2010

Learn more at www.penncrusher.com/positive

The Posimetric Feeder. The First and Only

Displacement Feeder.

3 - 2,000 TPH HIGH AVAILABILITY

TROUBLE FREE LOW HORSEPOWER

ONE MOVING PART LOW MAINTENANCE

Pennsylvania Crushers Posimetric feeders are found in demanding environments such as power plants and cement plants around the world. Our Positive Displacement technology solves material handling challenges where access is difficult, when down time for maintenance is costly, or where accurate feed rate and distribution are most critical. Positive Displacement feeding technology has been proven on materials ranging from coal, limestone, culm, crushed stone, shale, sand, roofing granules and wood chips. If you have a feeding application, consider the positive benefit you could realize with Positive Displacement feeding.

For more information contact Bob Chase - bchase@penncrusher.com Pennsylvania Crusher Corporation PO Box 100 Broomall, PA 19008 (610) 544-7200
Posimetric is a registered trademark of GE Energy (USA) LLC.
circle 14 on reader service card

A K-Tron Company

renewables
4. Deere wind. BTI-Greensburg, the local John Deere dealership, uses two wind turbines (4.2 kW and 1.9 kW) to provide about 8% of the facilitys electricity requirements. Courtesy: BTI-Greensburg 5. Energy efficient building designs. As part of the Greensburg master de-

velopment plan, all city-owned buildings over 4,000 square feet must be LEED Platinum in design and construction, including Greensburgs new City Hall building, shown here under construction. The new building design also integrates photovoltaic panels, geothermal technology, reclaimed brick, and recycled wood and other materials. Courtesy: City of Greensburg, Kansas

nesses like banks, car dealerships, and funeral homes, along with churches and a lodge have rebuilt using environmentally friendly materials and are saving energy and water. Per capita, the city has the highest concentration of LEED Gold and Platinum buildings in the U.S. As noted earlier, the city of Greensburg passed a resolution that all city-owned buildings over 4,000 square feet would be certified LEED Platinum. Completed in May 2009, the citys Business Incubator not only achieved LEED Platinum status with greater than 50% energy savings, but it also became the first LEED Platinum certified municipal building in Kansas (Figure 5). Other public and commercial buildings, such as the Greensburg School and the Kiowa County Memorial Hospital (see sidebars), are striving for LEED Platinum status; if awarded, the hospital will be the first critical access hospital in the nation to achieve the LEED Platinum rating. Greensburg is also home to the 5.4.7. Arts Center, the first LEED Platinum building in Kansas. Greensburgs business community is rebuilding with a major focus on energy efficiency and green building principles as well. The new John Deere dealership is a LEED Platinum building and has become the model for all future John Deere dealerships across the nation. In addition, the towns grocery store, banks, churches, car dealership, senior center, and many other buildings are rebuilding green. Of the 180 new homes that received building permits between May 2007 and March 2009, the designs of 95 were evaluated and should use 40% less energy on average than
28

standard homes built to the International Energy Conservation Code (IECC) 2003 (with 2004 Supplement). This is an outstanding level of energy efficiency, especially considering that most were built by individual home owners and builders. Two multi-family projects for affordable housing were also in the range of 40% to 50% energy savings. Prairie Pointe Townhomes, a new 32-unit complex for low-income renters, was awarded the first residential LEED Platinum rating in Kansas. Wichita, Kansasbased Mennonite Housing Rehabilitation Services, which helps low-income individuals build affordable, single-family homes with so-called

sweat equity, built 20 highly energy efficient homes and plans to build 30 more using design recommendations from NREL.

Children Today, Greensburgs Leaders Tomorrow


If anything can forecast the lasting success of Greensburgs bold vision, its the way the towns young people envision their own futures. Greensburgs enthusiasm for renewable energy and energy efficiency has inspired young people, fed by extensive education and outreach efforts at several levels to give youth the opportunity to understand, embrace, and champion the alternatives to petroleum.

Clean, Green Medical Care


Slated for completion in March 2010, Greenburgs new hospital facility combines all medical services in a single, highly energy efficient structure that is striving to be the first critical access hospital in the country to meet LEED Platinum standards. The whole building has high R-value insulation and features a dual ventilation system that prevents the exchange of air between the emergency and isolation rooms and the rest of the hospital, along with seamless floors and countertops that make cleaning easier and more thorough. Highly efficient T5 fluorescent and compact fluorescent luminaires maximize energy efficiency without sacrificing visual comfort or patient care. LED sources for accent lighting, exterior walkways, and parking lot lighting provide energy efficient illumination, while light-sensing dimmers and motion sensors minimize artificial light use. Daylighting in common spaces, corridors, patient rooms, and administration areas illuminates 75% of the interior. High-performance, low-E, doubleglazed windows allow natural light to offset electrical lighting. An onsite, grid-tied, 50-kW wind turbine generates 220,000 kWh annually to partially offset the hospitals energy use. A rain filtration and storage system supplies recycled (gray) water to irrigate the property and flush the buildings toilets.

www.powermag.com

POWER April 2010

renewables
In addition to being designed to LEED Platinum standards, the K-12 campus and school building in Greensburg will become teaching tools. The school is expanding its curricula on energy and green technologies with hands-on educational experiences to help students understand the real world of energy and sustainability. The town is also encouraging youth to take leadership roles: under the sponsorship of Greensburg GreenTown, the communitys high school students operate a Green Club. tomers here to see sustainable building products and all kinds of eco-friendly businesses. We want to be a living laboratory. Greensburg also hopes to attract companies that can draw on the resources of the prairie for a variety of green purposes, from research to entrepreneurial manufacturing. The town might very well meet its goals: Greensburgs hard work and small-town values have struck a chord with both the national and international community. And what did this do for the American taxpayers who funded the DOE and NREL to help Greensburg? First, NREL and its subcontractors provided unique and valuable assistance to influence, design, and implement energy aspects of the overall community direction and dozens of individual projects. This included all aspects of energy: energy portions of the new community master plan; energy efficiency strategies and tactics for residential and commercial buildings; specific information and design assistance for many individual buildings and homes; feasibility studies and recommendations for using wind, solar, and biomass technologies within the community; analysis and recommendations on advanced vehicles and

For More Information

Seeing Green for the Long Term


Right after the tornado, one of the local visionaries, Daniel Wallach, started the nonprofit organization Greensburg GreenTown to assist the city with its green vision and advocate for sustainable rebuilding and growth. Nearly three years later, Greensburg GreenTown is still a major spark plug in keeping the vision alive and growing. Along with its precedent-setting policies and heroic efforts to embrace sustainability, Greensburg has high hopes for how others will respond to the community. Wed like to see Greensburg become the ecotourism capital of the world, said Mayor Bob Dixson. Companies can bring their cus-

U.S. Department of Energy Greensburg website: www.eere.energy.gov/ buildings/greensburg Greensburg Sustainable Building Database: http://greensburg.buildinggreen .com Greensburg GreenTown: www.greensburggreentown.org City of Greensburg: www.greensburgks .org

fuels for transportation; and assistance with outreach and community education. Second, this extensive effort was well documented publicly and within the DOE and NREL so that the lessons learned in the first three years of building a green Greensburg could be applied to similar communities across the U.S.and perhaps the world.

Lynn Billman (lynn.billman@nrel.gov) is a senior project leader for the National Renewable Energy Laboratory.

Material Handling for Biomass Power Generation


Biomass Handling Equipment Complete Engineered Systems Pulverized Coal Boiler Conversions CFB Boiler Feed Systems

U N I T E D STATES STATES UNITED

C ANADA CANADA

SW EDEN SWEDEN

Silos Wood Hogs Disc Screens Open Storage Closed Storage Truck Dumpers Chain Conveyors Bucket Elevators Screw Conveyors Screw Reclaimers Pneumatic Conveying
SWEDEN: Stockholm Jeffrey Rader AB Domnarvsgatan 11, 163 53 SPNGA Stockholm, Sweden Phone: +46 8 56 47 57 47 Fax: +46 8 56 47 57 48

See our Biomass video at www.jeffreyrader.com/videoB


USA: CORPORATE HEADQUARTERS Jeffrey Rader Corporation 398 Willis Road Woodruff, SC, USA 29388 Phone: 864.476.7523 Fax: 864.476.7510 CANADA: Montreal, Quebec Jeffrey Rader Canada 2350 Place Trans-Canadienne Dorval, Quebec H9P 2X5 Canada Phone: 514.822.2660 Fax: 514.822.2699 CANADA: Vancouver, BC Jeffrey Rader Canada Unit 2, 62 Fawcett Road Coquitlam, BC V3K 6V5 Canada Phone: 604.299.0241 Fax: 604.299.1491

For information on how Jeffrey Rader Corporation can solve your Biomass Handling needs, visit us at www.jeffreyrader.com/pow
circle 15 on reader service card April 2010 POWER

www.powermag.com

29

COFIRING BIOMASS

OPG Charts Move from Coal to Biomass


In response to Ontarios provincial regulatory mandates to phase out the use of coal by the end of 2014, Ontario Power Generation (OPG) is exploring its capability to employ biomass feedstocks to displace coal in some units within the OPG thermal fleet. The primary fuels employed during the respective trials at its Nanticoke and Atikokan Generating Stations have been agricultural by-products and commercial grade wood pellets. The Canadian utility has learned valuable lessons about fuel supply and logistics, and the technical challenges of safely handling and firing high levels of biomass.
By Les Marshall, Chris Fralick, and Daryl Gaudry, Ontario Power Generation

s part of its strategy to reduce greenhouse gas emissions, the Ontario provincial government adopted a regulation in 2007 that will phase out the generation of electricity from coal in Ontario Power Generations (OPG) coal-fired generating stations by Dec. 31, 2014. The government has also identified interim targets that will limit carbon dioxide (CO2) emissions from OPGs coal-fired fleet to two-thirds below 2003 levels by 2011. OPG has an installed capacity of 21,748 MW, consisting of a diversified generation mix in 2008 of 45% nuclear, 34% hydro, and 21% fossil-fueled electricity. OPG operates five fossil-fueled stations (four coal-fired and one gas/oil) with an installed capacity of 8,177 MW and co-owns two other gasfired stations. In 2007, OPG installed a direct injection system for agro-biomass with a capacity of 50 MWe at its 3,640-MW Nanticoke Generating Station (GS). However, much of the success of the current program has entailed the use of the dedicated mill concept, in which wood pellets are processed through the existing coal pulverizers, without coal, and are subsequently conveyed to the furnace with the existing firing systems. In 2008, proof-of-concept testing was conducted at OPGs Atikokan GS to assess the feasibility of operating the 227-MW lignite boiler with various percentages of biomass, specifically pelletized wood. The Atikokan program also employed the dedicated milling concept. This article discusses the lessons learned from the projects at both plants and what OPGs future aspirations are as far as converting from coal to biomass as its major fuel source.
30

1. Leading the way. The Nanticoke Generating Station is located on the north shore of Lake Erie. Both it and its sister facility, the Atikokan Generating Station, are pioneering the use of biomass as a renewable energy source for their operations. Courtesy: Ontario Power Generation

Regulatory Environment
At the federal level, the Canadian government has indicated an intention to regulate greenhouse gases on an intensity basis. It has also indicated that it will align with the U.S. system, which is likely to be a cap-and-trade system. In February 2009, the Ontario government also announced its Green Energy Act (Bill 150), aimed at expanding renewable energy generation and strengthening the provinces commitment to energy conservation. The new procurement mechanism for new renewable energy will be delivered through a feedin tariff, modeled after the successful policies of Germany and France. Since 2005, OPG and, in particular, the

www.powermag.com

Nanticoke GS, have been investigating the use of biomass as a coal offset option. However, as a result of the recent regulatory directive to phase out coal, the replacement of coal with biomass in some of its coal units has become the focus of OPGs biomass program at its coal-fired generating stations. Compared to some renewable energies such as wind and solar, biomass has the added benefit of being dispatchable, which means that it is capable of responding to the changing load demand when needed. Other benefits related to a large-scale biomass industry in Ontario are the synergies with agriculture and forestry sectors and the favorable economics of using existing provincial assets (the coal plants).
POWER April 2010

COFIRING BIOMASS
A comparison of cofired fuels. Source: Ontario Power Generation
Parameter Carbon Hydrogen Nitrogen Sulfur Oxygen Ash Moisture Fixed carbon Volatile matter Ash Moisture Higher heating value Units % % % % % % % % % % % MJ/kg Btu/lb Powder River Basin 51.18 3.49 0.66 0.23 12.70 4.51 27.20 37.50 30.80 4.50 27.20 20.50 8,800 Eastern bituminous 72.57 4.98 1.22 0.85 5.70 8.59 6.00 53.00 32.41 8.59 6.00 30.20 12,400 Wheat shorts 41.82 5.46 2.59 0.21 32.88 4.24 12.80 17.88 65.08 4.24 12.80 16.70 7,200 Wood pellets 50.50 6.00 0.15 0.01 40.50 0.33 5.52 12.50 81.65 0.33 5.52 19.30 8,297

2. Dedicated injection systems.

Ultimate analysis (as-fired)

The direct injection system, which uses granular agricultural biomass as a fuel source, was placed into service in 2007 . The facility consists of two dedicated injection systems, each with a storage silo, screw feeder, rotary air lock, injection blower, and transport lines. Courtesy: Ontario Power Generation

Proximate analysis (as-fired)

The guiding principles for OPGs biomass testing program are as follows:

OPG does not use food products fit for human consumption. OPG only uses biomass extracted using sustainable practices (as defined by the United Nations Framework Convention on Climate Change). OPG intends to maximize the use of existing assets.

Nanticokes Early Biomass Project


The Nanticoke Generating Station (Figure 1) is equipped with eight units, each with a nominal rating of 500 MW. The boilers are of the opposed-fired configuration, originally designed to fire a mid-sulfur bituminous coal. Currently, the Nanticoke boilers fire a furnace blend of 80% (by energy) Powder River Basin subbituminous coal with 20% low-sulfur eastern bituminous coal (see table). The units are equipped with five 10E10 ball-race pulverizers. All five mills are required for full load. In 2005, Nanticoke was approached by the Ontario Ministry of Agriculture, Food and Rural Affairs and the Ontario Millers Association regarding the possibility of displacing some portion of its coal-fired generation with biomass. In 2006, Nanticoke conducted its first proof-of-concept biomass injection test using wheat shorts, a by-product of the milling of wheat to flour (see table). A single truckload of wheat shorts was brought to the site, and the integrated compressor on the truck was used to convey the biomass into the outlet pipes of a single pulverizer (mill 4E). This configuration was very rudimentary, but
April 2010 POWER

the results were encouraging enough to merit a series of follow-up tests in 2007, using a pair of blower trucks, each injecting wheat shorts into one of the two mill outlet lines of pulverizer 4E. The initial test program provided the first results to OPG regarding the impact of biomass use on the firing systems and acid gas emissions. However, due to the nature of the truck unloading method (compartmentalized biomass, gravity fed to an onboard blower), it was difficult to control the biomass injection rate and avoid line pluggage. In addition, this mode of operation was limited in both capacity and duration. The need for a larger, engineered system was recognized in order to better demonstrate the potential of biomass at Nanticoke.

Nanticokes Direct Injection System


The direct injection system was placed into service in 2007. The facility consists of two dedicated injection systems, each with a storage silo, screw feeder, rotary air lock, injection blower, and transport lines (Figure 2). The biomass transport lines are 8-inch pipes that connect to the pulverizer outlet lines of mill 4E. As before, the use of biomass is intended to specifically displace bituminous coal. The capacity of each silo is 69 megagrams (Mg) and the maximum injection rate of each system is 16 Mg/hour. The total biomass input of 32 Mg/hour can produce up to 50 MW of electrical output. The installation includes fundamental safety systemselectrical grounding for truck unloading, dust collection, and explosion ventingand the operation of the injection is interlocked with the target mill and boiler protections. The blower serving each injection line
www.powermag.com

provides about 6 Mg/hour of transport air to convey up to 16 Mg/hour of granular biomass. During testing, the associated mill is operated in manual mode, at 50% of its normal coal feed rate. The primary air (PA) to this mill is also placed in manual to allow for additional primary airflow to properly transport the coal/biomass mixture downstream of the pulverizer. Relatively high airflows have been employed to provide a level of margin against saltation (dropout) when conveying the coal/biomass mixture in the burner lines. The blend of 50% bituminous coal (by energy) and 50% biomass input on this burner row produces stable burner flames without the need for auxiliary gas support. In addition to the net reductions in CO2 emissions, the largest impacts have been in the area of acid gas emissions. The reduction in the total fuel sulfur contentby displacing bituminous coal with biomassresulted in the expected drop in SO2 emissions. For the Nanticoke case, with a 10% wheat shorts input, corrected SO2 emissions were seen to drop by approximately 10%. NOx production is a much more complex issue. Previous utility experience with biomass cofiring has produced both increases and reductions in NOx emissions. A number of technical issues were encountered with the direct injection system. First, operational sustainability proved to be more difficult to achieve than anticipated. This was primarily due to the design reliance on blower trucks to provide a continuous supply
31

COFIRING BIOMASS
of biomass. Availability of blower trucks and variability in the condition of the onboard blower proved to be significant impediments. Second, the system is not equipped with milling capability and can therefore not process pelletized fuel. As the biomass program evolved, it became more apparent that developing the capability to handle pelletized fuel was essential. Fuel supply economics and flexibility as well as higher generation levels (vs. cofiring) required pelletized fuel. ferential across the pulverizer was about 20C, confirming that only a modest level of drying was necessary with the relatively dry pellets. The test proceeded uneventfully until the delivered wood pellet supply was consumed. At this point, a standard pulverizer cleaning cycle was started. At Nanticoke, this millclearing cycle involves a full 20 minutes of operation with maximum cold primary airflow in order to blow the mill clear. In practice, this typically only requires between 5 to 10 minutes. However, following a wood pellet test, this clearing operation was seen to require more than 60 minutes. It is thought that there was insufficient lift velocity in the mill body to effectively remove the larger wood particles from the mill. This has obvious impacts on the flexibility of the unit and may also represent a potential safety concern if the recirculating wood dust in the mill begins to generate heat via friction. The effective throughput of a mill handling wood pellets is limited by the available cold PA capacity. The Nanticoke PA system operates at 15 kPa, but the mills are equipped with relatively small tempering air ducts. Modifications to reduce the mill differential and to expeditiously transport the wood particles from the mill are currently under study. MW from wood and 30 MW from gas. High hot reheat steam temperatures were observed, especially at lower loads. It was necessary to intentionally depress the main steam temperature setpoint in order to bring the reheat temperatures under control. The impact on the air heaters was much more dramatic. The use of cold PA in all of the mills created a significant energy imbalance at the PA heater. This has an obvious negative impact on boiler fuel efficiency, but, more importantly, the elevated temperatures are approaching the limits of some downstream components in the electrostatic precipitator (ESP) and the stack. NOx emissions were basically unchanged from the base case with coal (at lower excess air). The test data indicate that there is certainly room to lower excess air with wood firing, but the current controls configuration does not allow this due to a low windbox pressure limit. Management of dust levels during pellet unloading and conveyance to the coal bunkers was a significant health and safety concern. Through the dedicated milling trials, we found that different wood pellets have very different dusting propensities, despite similar chemical properties. Consequently, a number of measures were implemented to mitigate the health and safety concerns from dust, including:

Nanticokes Direct Milling Program


Direct injection biomass systems are among the most effective way to employ significant volumes of biomass via cofiring. However, it is expected that commercial operation will require that the biomass is densified in some form to facilitate long-distance transportation. The Nanticoke team examined ways that commercial grade wood pellets (see table) could be directly used within the existing systems. This review determined that several European utilities possessed experience with handling wood pellets in modified coal pulverizers. OPG refers to this technique as the dedicated milling concept to differentiate it from the more familiar co-milling of biomass and coal. In the dedicated milling concept, pure wood pellets are handled with the existing coal-handling systems (conveyors, bunkers, and gravimetric feeders) and are introduced into the pulverizers on a pure basiswithout coal. The trials to date at Nanticoke have been conducted on unmodified pulverizers. However, the method does require at least two significant operational changes. First, the PA employed for wood milling must be relatively cold, as biomass releases volatile matter at significantly lower temperatures than coal. The Nanticoke trials used a target mill inlet temperature of 65C to address this issue. The second change relates to the required minimum primary airflow that can both effectively fluidize the wood dust in the mill and provide stable pneumatic transport downstream in the burner lines. This aspect of the Nanticoke program commenced with a proof-of-concept test on one pulverizer, using a single truckload (35 Mg) of commercial grade wood pellets. The initial unloading of the truck into an emergency reclaim hopper produced a significant quantity of dust, most of which appeared to have been generated during transportation to the site. Downstream of this point, the pellets were conveyed by the existing coal-handling systems without any major issues. The mill required a longer time period (about 30 minutes) to stabilize, and the final mill differential pressure was higher (similar to full mill load on coal). The temperature dif32

Nanticokes Testing Shifts away from Cofiring with Coal


With the adoption of the coal phase-out regulation in 2007, OPGs testing program changed from focusing on cofiring with coal to determining generation capability without the use of coal. A series of wood pellet tests had been conducted at the Nanticoke GS on different mill configurations and with various throughputs and test durations. In 2008 all of the Unit 4 mills were individually tested with pellets to confirm and address any anomalies with the equipment. In November 2008, Nanticoke conducted the first test of a full boiler operating on biomass fuel. This larger trial was conducted at a load of 175 MW with initial operation on coal. A transition to wood firing was made over the course of the test as the coal in the bunkers was exhausted. As before, the gas igniters were maintained in service for wood firing. The low load point was chosen, as the team expected that PA capacity would be the first limit encountered, and this was indeed the case. With all five mills in service on wood pellets, the maximum total biomass furnace input was 104 Mg/hr. Note that the gas igniters provided a significant quantity of energy at their minimum (default) settings. In this case, wood energy represented some 82% of the total furnace input with the balance from natural gas. In simple terms, prorating these inputs yields electrical outputs of about 145

www.powermag.com

The application of a light steam to the pellets at transfer points. Management of the dust with typical coal dust suppression was a challenge due to the fact that the pellets needed to be kept dry to avoid pluggage. The use of vacuum trucks at coal transfer chutes as a rudimentary dust extraction tool. Limiting access to the coal conveyor gallery and the use of respirators and personal air quality monitors (O2, CO, and CH4) for required personnel. The use of area dust monitoring throughout the pellet transfer process.

Atikokan Generating Stations Test Program


Following the lead of the Nanticoke GS, the Atikokan GS began setting up its own test program related to using pelletized biomass as a fuel source. The Atikokan GS is located in northwest Ontario and is equipped with a single Babcock & Wilcox natural circulation boiler of the opposed-fired design. Five MPS 75G roll-race pulverizers supply fuel to a total of 15 dual-register low-NOx burners. The boiler is equipped with a single regenerative secondary air heater and a dedicated PA heater. Two cold side ESPs provide particulate capture. The unit is rated at 227 MW with
POWER April 2010

One of the largest contributors to carbon emissions is the generation of electricity from coal.

Process Economics Program Report: Advanced Carbon Capture


A great deal of attention has been given in recent years to the effects of carbon emissions on climate change. SRI Consulting's (SRIC) techno-economic report Advanced Carbon Capture examines the technology and economics of three processes for capturing 90% of the carbon emissions from electric power generation using supercritical pulverized coal. SRIC's Process Economics Program (PEP) report Advanced Carbon Capture examines in detail three post combustion scrubbing technologies: conventional monoethanolamine (MEA), advanced amine, and chilled ammonia. Analysis is conducted based on new plant construction at 550 MW net power output. All three of these processes have technical and economic issues that must be overcome before they can be implemented at scale. On a levelized cost basis with 90% CO2 capture and compression, MEA scrubbing adds 4.5/KWh, while the advanced amine and chilled ammonia processes each add 4.1/KWh to the cost of power generation. The Advanced Carbon Capture report is essential information for technical and business managers involved in the generation of electricity from coal. For more information and to purchase this report, contact Angela Faterkowski, +1 281 203 6275, afaterkowski@sriconsulting.com or visit our website.

www.sriconsulting.com/PEP
Smart Research. Smart Business.

MENLO PARK

HOUSTON

BEIJING

NEW DELHI

RIYADH

SEOUL

TOKYO

ZRICH

COFIRING BIOMASS
3. Pellet power. Wood pellets are shown
being unloaded at the Atikokan Generating Station during the initial test, which occurred in January 2008. Courtesy: Ontario Power Generation

4. A long climb. The wood pellets are moved at the Atikokan facility on the tripper belt. Courtesy: Ontario Power Generation

5. Baptism by fire. This photo shows the unloading of the wood pellets via the bottom hoppers of the grain cars. After being unloaded at the Atikokan Generating Station, the pellets underwent wood firing as part of a test program. Courtesy: Ontario Power Generation

main steam and hot reheat temperatures of 538C. Low load steam temperature control is facilitated by flue gas recirculation. The Atikokan GS fires lignite coal from western Canada, delivered by rail and received at a rotary car dumper. The Atikokan pulverizers are of the rollrace design, originally designated MPS 75G. These mills have a baseline coal capacity of 40.8 Mg/h when grinding coals with a Hardgrove Index of 50 to a bulk fineness level of 70% passing 200 mesh. All of the Atikokan mills are equipped with the original static classifiers. Over the course of this test program, some of the mills were retrofitted with rotating throats. These modifications from the original static throats were conducted as part of a maintenance upgrade but also resulted in additional valuable observations.

Atikokans Dedicated Milling Concept


A small team was organized to assess the ability of the Atikokan boiler to handle pelletized biomass via the dedicated milling concept. Coal pulverizers have been modified to handle wood pellets on a commercial basis in at least three cases: Hasselby (Sweden), Avedore 2 (Dong Energy, Denmark), and Amer 9 (Essent, Netherlands). The Atikokan team incorporated the observations from these projects as well as their own internal experience with this technique at the OPG Nanticoke GS. When using roll-race or ball-race pulverizers to grind biomass pellets, the utility operator must consider three critical issues:

into its constituent dust. It is critical that the dust used to form the biomass pellets is of a suitable particle size distribution to allow for stable pneumatic transport and efficient combustion. Higher primary air requirements. It is reasonable to assume that the much larger wood particlesin the 1 to 3 mm range will require higher line velocities than are employed for pulverized coal to avoid dropout in the burner lines. OPG has employed the Rizk correlation to determine the saltation velocity limits for a variety of fuel/air ratios and a range of particle sizes. Cold primary air. Biomass has been shown to release significant quantities of volatile matter at temperatures as low as 200C. At Atikokan, it was decided to use cold PA to avoid the issue of early volatile matter release. Mill inlet temperatures are held in the 50C to 70C range for dedicated milling of wood pellets. This has been found to be more than adequate to perform the limited degree of drying necessary with processed wood pellets.

Given the very low sulfur content of wood, a significant reduction in SO2 emissions was observed, as expected. However, it is notable that the full benefit of the lower-sulfur fuel blend did not become apparent until the mill fully stabilized on wood. The final key observation from this initial short test was the relatively long clean-out cycle required to clear the mill of wood dust at the conclusion of testing. This phenomenon had been previously observed during dedicated milling trials at the Nanticoke GS. This represents a potential safety concern over the long term if friction within this large recirculating bed were to generate enough heat to pose a fire hazard.

Atikokans Process Optimization


The next single mill test series in March 2008 had three main objectives:

Atikokans First Proof-of-Concept Test


In January 2008 the first proof-of-concept test at Atikokan was conducted. This test employed only a single truckload of commercial grade wood pellets. Approximately 26 metric tons of pellets were delivered to the site in super sacs. A simple cutting tool was used to empty the pellets into a reclaim hopper, where they were processed using the existing coal-handling system without any issues (Figures 3 and 4). This first test was conducted at a wood pellet flow of 5 kg/s (18 Mg/h) with a cold primary airflow of 20 kg/s. The pulverizer differential pressure while operating with wood was observed to be much higher than that for lignite, and the period for stabilization was also longer. The PA header pressure was increased from 10.5 kPa to 11.5 kPa to maintain the target airflow.

www.powermag.com

Complete displacement of coal on a single burner rowsuch as a 20% furnace energy input level. Operation without the need for natural gas support for flame stability. Assess the sensitivity of NOx emissions to the higher burner nozzle velocities associated with the firing method. The larger fuel demands of this test required that the wood pellets be delivered by rail. To protect the pellets from the elements, covered grain cars were used to deliver pellets to the site. As a result, the normal rotary dumper could not be used (Figure 5). This larger delivery of wood pellets allowed for a longer test at the target feed rate. Mill #3 was operated with a throughput of 6.8 kg/s (24.5 Mg/h) for this testequivalent to 20% of the furnace energy input. Cold primary airflow was again maintained at a base value of 20 kg/s. Mill differential was very stable under these conditions.
POWER April 2010

Limited size reduction. Coal pulverizers depend on fracture mechanics to grind coals to particle sizes in the 75-micron neighborhood. However, the fibrous nature of biomass materials does not lend itself to this mechanism. The grinding elements in a traditional coal mill can be expected to reduce the biomass pellet back

34

COFIRING BIOMASS
In general, the flame conditions on the burners firing wood were observed to be bright but somewhat detached from the burner nozzle. With the mill stabilized, the operations staff began to make stepwise adjustments to the airflow and spin vane settings on these burners. The final objective considered during this test involved NOx emissions. Previous cofiring trials in the U.S. and Europe tend to show a modest but repeatable reduction in NOx emissions when cofiring with wood. Furthermore, the level of the NOx reduction tends to increase with an increase in the wood energy input. However, the observations with wood cofiring at the Atikokan GS are that for biomass input levels in the 20% range, NOx emissions are mostly unchanged when compared with the baseline lignite performance, with one exception. Corrected NOx emissions did drop approximately 10% with a 10% reduction in the primary airflow to the dedicated wood pulverizer in conjunction with operational adjustments to the associated burner row. A single burner row represents about 20% of the furnace energy input. perature to increase to almost the same level. Long-term operation with such elevated temperatures might create issues for induced fan shaft growth and the integrity of the stack liner and associated components. Wood Pulverizer Trip and Restart. Another key issue when considering a complete fuel conversion of this type regards the implications of a pulverizer trip on wood fuel. Mill #3 was tripped from very high load (8.6 kg/s) and subsequently restarted with a deep bed of wood dust around the grinding elements. Aside from a brief spike in the mill motor current (this also occurs during a restart with lignite) the restart proceeded smoothly and the mill returned to normal operation on wood without any further issues. Steam Temperatures. The previous trials at relatively modest levels (<20%) of wood input did not result in significant impact on the boilers thermal performance. However, at wood energy input of 67% and 100%, both the main steam and hot reheat steam temperatures were observed to be well below their design values on coal. This is the expected trend for the fuels involved, but the magnitude of the temperature depression was rather surprising. Primary Air System Limitations. The capacity of the existing PA system was found to be marginal at full unit load on 100% wood pellet firing. The cold primary airflow available to each mill was approximately 18 kg/ssome 10% below the target value. Pulverizer Throats. As part of an existing maintenance upgrade program, Atikokan GS has been replacing the original equipment manufacturer static throats in the pulverizers with a third-party rotating throat design. In general terms, those mills with rotating throats operate with about half the pulverizer differential of a static throat. The rotating throat also appears to stabilize faster, and there is a small benefit in a reduced time for the clearing cycle. NOx Emissions. As noted previously, the various cofiring trials at Atikokan yielded fairly flat results with respect to NOx reductions. NOx was shown to be sensitive to the high transport velocities used in the test program, but the final results were generally similar to those for the base lignite coal. However, operation with higher levels of cofiring and with 100% wood firing resulted in a definite change in NOx performancefrom 0.79 kg/MWh to 0.53 kg/MWh. The baseline NOx rate for Atikokan firing lignite at MCR is 1.50 kg/MWh. The value of 0.53 kg/MWh is equivalent to other OPG units with selective catalytic reduction technology installed. Heat Rate. Low final steam temperatures and elevated flue gas exit temperatures both have an obvious negative impact on the heat
www.powermag.com

rate of the unit. The expected degradation in heat rate is on the order of ~4%.

Challenges Related to Complete Conversion from Coal to Wood


The Atikokan biomass test program has included operational trials with up to 633 MJ/s of wood input. This is a remarkable achievement for an unmodified pulverized coal (PC)fired boiler, but a number of issues will require attention and investment to enable safe, commercial operation. Any fuel conversion might require physical equipment modifications in addition to changes in operation. The complete conversion from coal to wood for a utility PCfired boiler is expected to result in a number of unique challenges, discussed below. Safe Material Handling. Later in 2008 the Atikokan plant experienced a dust explosion while bunkering wood pellets in preparation for further tests. Review of this incident has lead OPG to conclude that major modifications to coal-handling systems must be made in order to ensure the safe handling of biomass fuels. Specific findings include these:

Atikokans Attempts at 100% Wood Firing


In July 2008, a series of tests were conducted at the Atikokan GS with the ultimate objective of assessing the units potential to operate on 100% wood pellet fuel. A number of significant observations were made during this program and are discussed in the following sections. Startup with Wood. During the previous single mill trials, boiler load was always carried with the remaining four mills operating with coal. The July 2008 test program included trials with all five mills firing wood pellets, making the transition from coal to wood firing rather challenging. The test team determined that starting the unit on wood fuel (following initial firing on natural gas) would solve these logistical difficulties and provide important information as well. The mill coordination curves were modified for future tests to allow for better control during both startup and stable operation. Air Heater Mass/Energy Balance. The use of cold PA on a single mill has a noticeable impact on the heat transfer performance of the primary air heater (PAH). With all five mills operating on essentially cold PA, system performance was seen to degrade dramatically. Operating at unit MCR on pure wood, the PAH gas outlet temperature was seen to increase by more than 40C, to approximately 200C, and then stabilize at this level following adjustment of the gas-balancing damper. The additional gas flow to the secondary air heater (SAH) caused the outlet gas temApril 2010 POWER

Receiving systems should include the capability to screen deliveries of pellets to remove dust and fines that might have been generated during transportation. Fire and explosion detection and suppression systems are needed. A thorough review of the design and limitations of existing bunkers, conveyors, and transfer points is necessary. In addition to the dusting risks associated with use of coal conveyor systems, other techniques used for the bulk solids handling of a fuel like wood pellets are quite different from those traditionally used by utility sites with coal. Possible considerations include the following:

The need to protect the pellets from the elements during transportation to the site and during long-term storage. Including provisions for significant covered storage in the site design.
Firing Systems. In addition to the mandatory retrofit of additional safety systems, several other areas of operation would require further attention to fully employ the dedicated milling concept on a commercial basis:

Modifications that promote the expeditious removal of wood from the mill and reduce the volume of recirculating product in the pulverizer. Further study into the minimum safe velocity required for effective pneumatic transportation.
35

COFIRING BIOMASS
necessary to improve steam temperature performance (possibly including a materials upgrade to address corrosion). The air Corrosion. Corrosionvia KCl forma- heater mass imbalance will need to be adtionis a known concern for pure wood com- dressed, but it may not be feasible to simply bustion. Much of the current research on this convert the existing PA heater into a second topic involves the lack of sufficient sulfur to pro- SAH. mote formation of the less-aggressive K2SO4. It Emissions Controls. The SO2 and may prove to be sufficient to merely dope the heavy metal emissions related to wood firpellets with a sulfur-bearing compound. ing are naturally very low. The NOx perBoiler Performance. Changes to the formance observed during the Atikokan NOTE: Images are hires ready. Trim: 4.5625 x 7.5 _POWER MAG 4C superheater/reheater tube banks may be trials is also very encouraging, possibly

Modification or complete replacement of the burners.

eliminating the need for additional NOx controls. The OPG experience at Atikokan regarding wood ash collection in a cold side ESP has been good.

Looking Forward
OPGs biomass test program at the Nanticoke and Atikokan Generating Stations is part of the overall development of biomass as a fuel to replace coal in some of its coal-fired generating units. To further develop the business case for the biomass option, OPGs biomass program is focused on the following:

GEOTHERMAL SOLAR BIOMASS WASTE HEAT WIND

PUT THE POWER Of THE THERMINOL PERfORMANCE CREW TO WORK fOR ALTERNATIVE ENERGY.
In the heat transfer fluid race the competition can get pretty heated. Thats why you need the Therminol Heat Transfer Fluid Performance Crew working for you. From start to finish, the Therminol TLC Total Lifecycle Care team of seasoned professionals is ready to support you with everything you need to win. For your people, we provide start-up assistance, operational training and a technical service hotline. For your facility, we offer system design, quality Therminol products, sample analysis, flush fluid & refill and a fluid trade-in program*. We provide everything you need to keep your heat transfer system at peak performance throughout its lifecycle. So join the winning team. In North America call 1-800-426-2463 or in Europe 32.10.48.15.47. Youll see no other heat transfer fluid delivers more proven comprehensive performance than Therminol.

Determination of unit conversion modifications (including all safety measures) and unloading and storage facilities required for commercial scale operation. Assessment of different biomass fuels (energy crops, agricultural by-products, wood), including analysis of balance-ofplant combustion-related issues through pilot scale experiments. Fuel supply chain analysis, including biomass availability (both agricultural and wood-based) and transportation logistics. Analysis of the complete economic model associated with the development of the biomass option (including capital costs and revenue structure). Complete greenhouse gas life cycle analyses of biomass (both agricultural and wood-based) compared to coal. Stakeholder involvement through continuing to work closely with the various government sectors (Ministry of Energy and Infrastructure; Ministry of Northern Development, Mines, and Forestry; Ministry of Agriculture, Food, and Rural Affairs; and Ministry of Environment) and an extensive stakeholder network. The development of a biomass industry in Ontario represents an exciting opportunity for OPGs coal fleet. The biomass program has the potential to contribute to the expansion of Ontarios renewable energy portfolio by contributing dispatchable, renewable biomass energy.

Therminol TLC Total Lifecycle Care is a complete program of products and services from Solutia designed to keep your heat transfer system in top operating condition through its entire lifecycle.
Solutia Inc. 2008. Therminol , TLC Total Lifecycle Care and Solutia and INFINITY LOGO are trademarks of Solutia Inc, registered in the U.S. and in other countries. *Available only in North America.

www.therminol.com

Les Marshall (les.marshall@opg.com) is the senior technical officer at Ontario Power Generation (OPG) in Nanticoke, Ontario, Canada. Daryl Gaudry (daryl. gaudry@opg.com) is the production supervisor of operations at OPGs Atikokan Generating Station in Atikokan, Ontario. Chris Fralick (chris.fralick@opg.com) was formerly the manager of chemical and environmental services at the Nanticoke Generating Station and is currently production manager at OPGs Thunder Bay Generating Station.
POWER April 2010

CIRCLE 16 ON READER SERVICE CARD 36 SOLT-9403_PowerAd.indd 1

www.powermag.com

3/5/10 9:30 AM

REGISTER NOW
ELECTRIC INDUSTRYS #1 EVENT
Electricity issues make national news every day. Federal initiatives and economic stimulus funds are directed toward renewable energy, transmission expansion, smart grid, carbon capture and storage, energy efficiency and electric vehicles. Climate and energy continue to be discussed in Congress. All of these issues and more are on the agenda for the Edison Electric Institutes Annual Convention in Hollywood, FL, June 13-16.
T arget the industrys most important strategic topics at the Critical Issue Forums. Hear headline-making speakers at the General Sessions. S tay on the cutting edge with the latest technologies, products and services at the Expo. Network with industry leaders and your peers. Enjoy a spectacular evening of Florida fun and seafood at the Grand Event.

for the

Get a clear view of the electricity issues transforming the nation


At the Critical Issue Forums with industry executives, youll get a clear view of the electricity issues transforming our energy future. Last year, more than 50 CEOs and senior executives addressed the forums. This year, topics you can explore include The Smart Grid Today Energy Storage Options Solar Energy Success Stories Electric Vehicle Impacts Carbon Capture and Storage Integrating Renewable Energy Energy Efficiency as a Business Electric Industry Partnerships Moving Forward on Nuclear Assessing Electric Business Options

Join other leaders as they address Americas electric future!


For convention and hotel registration, discount flights, and programming updates as well as information on exhibiting and sponsoring, visit
Host Company:

www.eei.org/2010

Italy 2010
Italy: a case study in creating diversity
taly is not rich in minerals. There is natural gas in the Po Valley and offshore in the Adriatic Sea, but little coal or oil. The country also has had no nuclear power of its own since shutting down its two working reactors shortly after the Chernobyl accident in 1986. As a result, Italy imports around 86percent of its energy needs, including 93percent of its oil, 91percent of its gas and 15percent of its electricity (2006 figures). This reliance on imports makes Italian electricity around 45percent more expensive than the EU average. As late as the 1990s, Italy obtained around 20percent of its electricity from oil-fired plants. Now, the power mix stands at around 50percent gas, 20percent renewables, 15percent coal, and 15percent Continued on p40

Special Advertising Section

Once heavily dependent on imported oil for its power, Italy has moved successfully into gas and renewables, plans to re-start its nuclear program, and is converting back to coal
SIEMENS

Modern gas: E.ONs 800MWe combined-cycle plant at Livorno Ferraris

A global leader in generation technology


Ansaldo Energia supplies and services complete power plants, as well as components including gas turbines, steam turbines, and generators

nsaldo Energia SpA , a Finmeccanica company, is Italys leading producer of thermoelectric power plants. Ansaldo has an installed capacity of over 177,000MW in

Ansaldo Energia offers its own range of improved low-NOx gas turbines
38

more than 90 countries. The companys main business areas are: turnkey thermal power plants and components (coal and gas, including single and combined cycle); power plant service; nuclear power; and renewables and distributed generation. With the ending of previous licensing agreements, Ansaldo now offers its own line of gas turbines the AE64.3A, AE94.2, and AE94.3A with improved flexibility and maintainability. They feature a new combustion system known as VeLoNOx, based on a partially premixed pilot configuration. The burner, which can achieve less than 15ppm NOx on a wide load range, has been tested for several years on the V/AE94.3A gas turbine. A second generation of VeLoNOx now provides the same low emissions at higher combustion chamber temperatures. Ansaldo Energia has considerable experience with opportunity fuels, including both refinery off-gases with very low heating values and gases containing high proportions of hydrogen. In a recent reorganization the compa
www.powermag.com

nys Dutch and Swiss subsidiaries, working in the Original Service Provider (OSP) service business, have changed their names to Ansaldo Thomassen (ATH) and Ansaldo ESG (AESG) respectively. A subsidiary of the Dutch company, Ansaldo Thomassen Gulf, is opening a new enlarged shop in Abu Dhabi to support all service and maintenance activities in the Middle East area. Service offerings cover spares, repair, maintenance, repowering, requalifications, monitoring and diagnostics, and LTSAs. ATH, ATHG and AESG continue as centres of excellence for GE gas turbines and Alstom steam turbines technologies, respectively. Steam turbine production covers power ratings of 801,200MW. Generator production comprises air-, hydrogen- and water-cooled models for coupling to all turbines supplied by Ansaldo. Traditional subsidiaries of Ansaldo Energia remain Ansaldo Fuel Cells, recently expanded to cover more renewables, and Ansaldo Nucleare. Ansaldo maintains a profitable cooperation with Westinghouse in developing plants based on the AP1000 reactor. www.ansaldoenergia.com
POWER April 2010

We are Energy.
Our engineers build tailor-made plants to generate energy that is safe, clean and always available. Reliable Service activities provide even more guarantees for Customers who strive, like us, to achieve total quality.
www.ansaldoenergia.it

circle 17 on reader service card

Italy special advertising section

Envisioning the power plants of the future


Fabricator STF supplies HRSGs, industrial boilers, heat transfer products, and environmental systems, while its subsidiary BWE builds boilers for the power industry

ince its establishment in 1937 STF SpA has steadily improved both engineering solutions and manufacturing processes for combustion technology. To continue this evolution the company continues to invest heavily in its more than 300 employees, as well as in capital equipment. Strategically located close to Milan, STF is capable of handling the whole project life cycle: from conceptual and detail design, through manufacturing in its own workshops, installation, and servicing. The company offers some 20 systems and products, including complex turnkey systems, for power plants and other industrial applications. STFs mission is to work with the worlds largest generating companies to generate one of our most precious assets: clean energy. Environmental protection plays an important role in STFs product line, and the company offers a full range of air pollution control technologies. In 2002, STF extended its reach through the acquisition of Burmeister & Wain Energy (BWE A/S), based in Copenhagen, Denmark. BWE, with its 150 engineers, is a global

leader in the design and supply of ultrasupercritical boilers in which it boasts the worlds highest combustion efficiency low-NOx burners, air preheaters, and abatement systems for SOx and NOx. BWE was founded in 1843 when a young and enterprising engineer, Hans Heinrich Baumgarten, was awarded a royal license to establish a machine shop in Copenhagen. In 1846 he went into partnership with Carl Christian Burmeister. Baumgarten was succeeded in 1865 by an Englishman, William Wain, who entered the business as a partner. Burmeister & Wain was founded seven years later and became Denmarks largest and most important enterprise in the iron industry, as well as a company of international note. Today BWE sets the benchmark in terms of efficiency and clean burning of the worlds most widely-available fuel: coal. The company carries out complex international engineering projects and delivers highpressure steam boilers for oil, gas, coal and biomass combustion, as well as auxiliary processing and flue gas cleaning plants. BWE engineers, manufactures and operate within emission limits at capacities down to 25percent of full load, allowing it to run overnight without shutting down. Italys dash for gas has been tempered by a large proportion of renewable energy. Most of this comes from hydropower: thanks to the Alps, Italy is a European leader in hydro, with resources comparable to those of France and Sweden. In 2008 Italy was the worlds seventhlargest producer of wind power, with installed capacity of 3.7GW. The country has also invested heavily in solar photovoltaics (PV), and is a pioneer of smart grids. Geothermal heat has been exploited on a small scale for many years, and the Tuscany region aims to become a global centre of excellence in this technology. The governments long-term plan is for 50percent gas, 25percent renewables, and 25percent nuclear but coal-fired generation is not going away any time soon. Facing high oil and gas prices, rising demand before the current recession, concerns over energy security, and a delay before new nuclear capacity comes on line, Italy has joined a European trend to burn more coal. Over the next few years, Italy will more than double its current reliance on coal, to around 33percent. Enel is going even further, with a plan to get 50percent of its power from coal. The company is currently converting a 2GWe

www.powermag.com

erects boiler plants for private and public utility companies and industrial manufacturers, and trains their staff. www.stf.it

Between them, STF and BWE cover a wide range of technologies for combustion and emissions control

Continued from p38 imported nuclear this last, at 6.5GW, making Italy the worlds biggest importer of electricity. Total annual power consumption in 2007 was 309TWh, and installed generating capacity is around 80GWe. Since 2005, Italian power company Enel has held stakes in French and Slovak nuclear plants, giving Italy access to nuclear power without having to site reactors within its own borders. In July 2009 the government announced a renewed commitment to Italian nuclear power, with new plants scheduled for startup around 2020. A typical recent gas-fired project is the 400million, 800MWe Livorno Ferraris CCGT plant in the northern region of Piedmont. Built as a turnkey contract by Siemens, the plant is owned and operated by a joint venture by E.ON Italia and Berner Kraftwerke FMB. Careful attention to visual appearance, including underground cabling, distinguishes the outside of the plant. Inside, the two Siemens SGT54000F gas turbines, two heat-recovery steam generators (HRSGs) supplied by STF SpA, compact Siemens SST55000 steam turbine and aircooled condenser together achieve a thermal efficiency of nearly 57percent. Another notable new CCGT project is the 800MWe plant at Gissi, in central Italy, operated by Abruzzoenergia SpA. With its two Alstom GT26 gas turbines, the plant can
40

plant at Civitavecchia, near Rome, from oil to coal, and says it will do the same with the 2GWe Porto Tolle plant in the Po delta. Enel is Italys largest power producer, with around 40GWe of capacity in Italy, plus almost as much again in other countries. Originally the monopoly generator and distributor, Enel is now one-third owned by the state. With around 12.5GWe of generating capacity, Edison takes second place behind Enel. Half of this capacity comes from Edisons 50percent stake in Edipower, whose assets were sold off (as Eurogen) by Enel in 2000. Italys Fiat and EdF of France own a majority stake in Edison. Eni is a vertically integrated energy giant in which the state has a 30percent interest. Its EniPower subsidiary has around 5.5GWe of gas-fired capacity. Electrabel, part of the Gaz de France/ Suez group, has 3.3GWe of generating capacity in Italy. Terna, originally a wholly-owned subsidiary of Enel, is responsible for most of Italys national grid. Acea is the second-largest grid operator. Among engineering companies in the power sector, the largest is Ansaldo Energia. The company builds gas turbines, steam turbines and generators, and also operates in the nuclear sector. Charles Butcher
POWER April 2010

MAGENTA (MI) - ITALY via Robecco, 20 Tel. +39 02 972091 Fax +39 02 9794977 e-mail: stf@stf.it www.stf.it
circle 18 on reader service card

BURMEISTER & WAIN ENERGY A/S DK - 2820 Gentofte.Denmark jaegersborg Alle 164 Tel. +45 39 45 20 00 Fax +45 39 45 20 05 e-mail: info@bwe.dk www.bwe.dk

BENCHMARKING

Benchmarking Nuclear Plant Staffing


The EUCG Nuclear Committee has collected benchmarking data of U.S. nuclear plant staffing for many years. A summary of this highly desirable data was gleaned from EUCG databases and is now, for the first time, made public through an exclusive agreement with POWER.
By Dr. Robert Peltier, PE
lectricity consumption in the U.S. has decreased during each of the past two yearsthe first time that has happened since 19731975, according to U.S. Energy Information Administration (EIA) data. Historically, electricity consumption has correlated well with the nations gross domestic product (GDP), although electricity used per unit of GDP has been halved since 1970. Surprisingly, this trend seems to explode the long-held tenet that there is a strong statistical link between GDP growth and electricity consumption. The statistical correlation may have weakened, but a certain and economic source of electricity is undoubtedly an essential ingredient for future economic recovery (Table 1). The relationship between todays economic doldrums and electricity consumption patterns remains unclear to analysts planning for future plants. Do the electricity generation data merely reflect this countrys recent reduced industrial production, or do they reflect accelerated adoption of energy efficiency measures, and if so, how much? Have electricity prices, rising more rapidly than wages, forced short-lived conservation on some classes of electricity users? Has the recession inequitably affected electricity-in-

tensive industries, such as concrete and aluminum (down about 17% in 2009 alone), to skew the electricity consumption data? Has outsourcing manufacturing overseas permanently reduced demand in some regions of the U.S.? Resumption of electricity consumption growth will be an early indicator of renewed economic growth, regardless of how elastic the relationship might be.

Give Proper Credit


Reduced electricity usage over the past two years has had an interesting impact on the mix of generation resources. Offsetting a reduction of 7.6% in coal-fired generation during the 12 months prior to October 2009 was an increase in hydroelectric generation over the same period caused by well-aboveaverage rainfall. Low natural gas prices also

Analysis

Table 1. Electricity use closely tracks GDP , although more loosely than in the past. Sources: U.S. Energy Information Administration and the Bureau of Economic
U.S. GDP (billions of constant 2005 dollars)b 12,263.80 12,638.40 12,976.20 13,254.10 13,312.20 12,988.70

Year 2004 2005 2006 2007 2008 2009c

Total generation, thousand MWha 3,970,555 4,055,423 4,064,702 4,156,745 4,110,259 3,950,250

Percentage change from prior year 2.25% 2.14% 0.23% 2.26% 1.12% 3.89%

Percentage change from prior yearb 3.6 3.1 2.7 2.1 0.4 2.4

Notes: a. U.S. Energy Information Administration (EIA). b. Bureau of Economic Analysis, U.S. Department of Commerce. c. Authors projection using actual generation through October 2009 reported by the EIA.

Table 2. Nuclear power remains the leader. Nuclear electricity production has remained rock-solid while other electricity generation technologies have experienced wide production variation. The nuclear industry average capacity factor has remained stable, above 90% for the past several years, far exceeding all other technologies while still maintaining the lowest busbar cost in the industry. Sources: EIA, Nuclear Energy Institute
Nuclear generation, thousand MWha 788,528 781,986 787 ,219 806,425 806,182 804,000 Percentage change from prior year 3.25% -0.83% 0.67% 2.44% 0.03% 0.27% Coal generation, thousand MWha 1,978,301 2,012,873 1,990,511 2,016,456 1,994,385 1,800,000 Percentage change from prior year 0.27% 1.75% 1.11% 1.30% 1.09% 9.75% Natural gas generation, thousand MWha 710,100 760,960 816,441 896,590 876,948 910,000 Percentage change from prior year 9.26% 7 .16% 7 .29% 9.82% 2.19% 3.77% Hydro generation, thousand MWha 268,417 270,321 289,246 247 ,540 248,085 265,000 Percentage change from prior year 2.68% 0.71% 7 .00% 14.42% 0.22% 6.82%

Year 2004 2005 2006 2007 2008 2009


b

Notes: a. U.S. Energy Information Administration (EIA). b. Authors projection using actual generation through October 2009 reported by the EIA.
42

www.powermag.com

POWER April 2010

Benchmarking
added operating hours to combined-cycle plants that have seen limited service during the past few years. Both hydroelectric and gas-fired plants cut into coal-fired generation in 2009, as did off-peak wind generation in some regions of the U.S. In the midst of this uncertainty, nuclear power steadfastly remained the industrys lowest-price generator and most reliable source of baseload electricity (Table 2). One key reason for the solid performance of the nuclear power industry over the past decade is the quality of the plant staffs and their dedication to the safe use of nuclear energy to produce electricity. There is no single statistic available to compare the quality of employees across the nuclear industry, or any industry for that matter, so benchmarking plant staffing is the next best statistic. Its a numbers game with the winner being those plants that can most efficiently use their limited pool of talent. clear Committee as an association of utility professionals representing all 104 nuclear plants in the U.S. as well as those located in China, Canada, France, Japan, Romania, and Spain. The committees primary goal is to benchmark plant metrics for nuclear plant operating cost, staffing, and performance data. Having previously reported on plant operating cost benchmarks, this article continues with U.S. nuclear power industry staffing benchmarks. Before jumping into the data, a few caveats are required. POWER has exclusive access to the EUCG nuclear committee database, but that access has limitations. For example, the data presented do not differentiate between nuclear power technologies, such as pressurized water or boiling water reactors. Also, none of the data have any uniquely identifying information and are as submitted by each plant. Finally, plant staffing data in this article are limited to three categories of workers, although the database has a much more comprehensive breakdown of job categories. Each of the 104 U.S. nuclear power plants is a member of the EUCG, so if your company is a member, the detailed benchmarking data are available to you through your committee representative. The detailed database is a rich repository of benchmarking data and information that can be sliced and diced as your data needs require. The database also has the tools to help you carve out an appropriate peer group of plants for much more detailed benchmarking studies.

Plant Staffing Trends


Average plant staffing at U.S. nuclear power stations peaked in the 1970s and 1980s with

1. Total U.S. nuclear industry average staffing by plant (20042008).

A New Set of Benchmarking Data


Our first nuclear benchmarking article, Benchmarking Nuclear Plant Operating Costs, was published in the November 2009 issue of POWER with the cooperation of the EUCG Nuclear Committee (see sidebar), and we promised more would follow. In that article we introduced the EUCG Nu-

Staffing includes on-site and off-site employees and baseline contractors. The split between worker groups has remained reasonably constant over the past five years of reported data. Source: EUCG 70,000 60,000 Number of FTE staff 50,000 40,000 30,000 20,000 10,000 0 2004 2005 2006 Year 2007 2008 Baseline contracters Utility off-site employees Utility on-site employees

EUCG Nuclear Committee Meets in April


The nuclear committee of the EUCG meets twice a year to share data and industry practices collected through membership surveys. The extensive peer network gives members the opportunity to raise questions or survey other member utilities on key issues between meetings. Standard benchmarking reports are made available to members beginning with the Early Exchange, a high-level view of industry cost trends released in January of each year. That report is followed by plant and unit performance and by nuclear operating costs, capital, and staffing reports released throughout the year. The next committee meeting is scheduled for April 1114, 2009, in St. Louis, Missouri. For more information about the EUCG and the meetings agenda, contact Executive Director Pat Kovalesky at 623-572-4140 or Chair of the Nuclear Committee David Ward (dr.ward@dukeenergy.com), or visit www.eucg.org.

2. Industry average number of workers at U.S. nuclear power plants (20042008). Average plant staffing, including on-site and off-site employees and baseBaseline contracters Utility off-site employees Utility on-site employees

line contractors, has changed less than 1% over the past five years of reported data. Source: EUCG 1,200

Average FTE wokers per plant

1,000 800 600 400 200 0 2004 2005 2006 Year 2007 2008

April 2010 POWER

www.powermag.com

43

Benchmarking
3. Full-time equivalent staffing at each U.S. nuclear power plant in 2008. Source: EUCG
Baseline contracters 3,000 Number of plant FTE workers 2,500 2,000 1,500 1,000 500 0 On-site employees Off-site employees Baseline contractors Utility off-site employees 1st quartile 600 34 27 Utility on-site employees 2nd quartile 723 62 113 3rd quartile 977 83 201

Plant

1,500 workers or more per unit. Coincidentally, the then-moribund industry reported average plant capacity factors hovering around 60% through much of the 1980s. Since 2000, the industry average capacity factor has remained close to 90% following a renaissance in construction and operating and maintenance process improvements implemented in the 1990s. Nuclear refueling outages are also extremely manpower-intensive. In 1991, the industrys average refueling outage duration was 106 days. By 2000, the length of a typical refueling outage was reduced to 44 days; it dropped further, to 38 days, in 2008. Left unanswered is the question of whether staffing at nuclear plants has been cut beyond what was economically justifiedto the point where key capabilities have been compromised. One recent indicator of this latter trend is the rise in the number of worker fatigue incidents since 2000. Because fatigue degrades workers critical skills and abilities, the Nuclear Regulatory Commission (NRC) has taken steps to address worker scheduling, the needs of an aging workforce, highly variable workloads, and factors related to specific tasks in new guidelines covering specific work hour and break limits and minimum day off requirements. The guidelinesNEI06-11, Managing Personnel Fatigue at Nuclear Reactor Sites and NRC RG 5,73, Fatigue Management for Nuclear Power Plant Personnel went into effect on October 1, 2009. Another significant trend in the U.S. nuclear power industry is consolidation of a large number of plants under a single operating company. This approach allows the sharing of best practices and a centralized staff of technical experts while cutting costs. Most plants also endured a period of right sizing in the 1990s to reduce plant nonfuel operating costs, about 50% of which
44

columns may not sum to the column total. Source: EUCG Worker groups Total of on- and off-site employees and baseline contractors On-site employees Off-site employees Baseline contractors

Table 3. Statistical distribution of classes of workers per plant at U.S. nuclear power plants in 2008. Each statistic is calculated independently, thus the
1st quartile 757 600 34 27 2nd quartile 913 723 62 113 3rd quartile 1,131 977 83 201

4. Total U.S. nuclear industry generating cost per full-time equivalent worker in 2008. The statistics are calculated by summing the cost categories of plant sup-

port and other costs, fuel, and capital; that total is then divided by the number of full-time equivalent workers at each nuclear plant (Figure 2). Total generating cost is the sum of plant support and other related costs, plus fuel, plus capital costs, divided by the plants FTE workers. Source: EUCG 1st quartile 2nd quartile 3rd quartile 4th quartile 700,000

Total generating cost ($/FTE)

600,000 500,000 400,000 300,000 200,000 100,000 0

Minimum plant $212,473 $291,901 $354,466 $411,654 Maximum plant $291,008 $352,960 $396,938 $577 ,121 Average plant $259,218 $319,507 $377 ,271 $468,129

Plant

are staffing costs. The operational achievements of the nuclear industry over the past decade are all the more remarkable given that average plant staffing has been reduced by a third or more since 2000. As the total number of nuclear plant workers (Figure 1) and average plant staffing levels (Figure 2) have remained constant over the past few years, outages to replace steam generators and other major plant equipment

www.powermag.com

have increased, as have outages for plant power uprates (see Nuclear Uprates Add Critical Capacity, May 2009). The staffing distribution for all nuclear plants by category is shown in Figure 3. Plant quartile staffing levels are shown in Table 3. Note that all the data reported in this article are calculated as full-time equivalent (FTE) workers. The downside to merely counting FTEs is that this metric does not account for worker
POWER April 2010

Benchmarking
5. Average generating cost of each U.S. nuclear power plant per fulltime equivalent employee (20062008). The statistics are calculated by summing
productivity. The best metric for overall worker productivity must be the quantity of electricity generated by a plant. For the purposes of this discussion, total generating costs are defined as the sum of plant support and other costs, fuel, and capital costs in a year. This definition is consistent with that used in the prior benchmarking article. To calculate the staff productivity metric, the total generating costs are divided by the FTE at a particular plant. Data were then arranged into industry quartiles. Figure 4 illustrates the nuclear industrys staffing productivity for 2008; Figure 5 illustrates the staffing productivity trend over the past three years. The names of the plants in each quartile of these two figures are different and are available only from the original data set provided to the sponsoring organizations. The staffing productivity for all nuclear plants by worker category is shown in Figure 6. Plant quartile staffing levels are shown in Table 4. The data indicate that the productivity of the bottom two quartiles of plants slipped in 2008 while that of the top-quartile plants has remained constant over the reporting period. This trend may show that the large nuclear operating companies have a built-in staff productivity advantage over the smaller nuclear utilities that is growing. In 1991, 101 individual utilities had some ownership interest in a nuclear power plant. Today, the top 10 nuclear utilities own more than 70% of the U.S. nuclear capacity, according to the World Nuclear Association.

the cost categories of plant support and other costs, fuel, and capital; that total is then divided by the number of full-time equivalent workers at each nuclear plant (Figure 2). Source: EUCG 1st quartile 2nd quartile 3rd quartile 4th quartile

Average generating cost, 2006-2008 ($/FTE)

600,000 500,000 400,000 300,000 200,000 100,000 0

Minimum plant Maximum plant Average plant

213,737 291,384 264,244

292,348 323,030 309,482

325,277 365,583 343,063

366,584 520,180 408,313

Plant

Table 4. Benchmarking worker productivity. Statistical distribution of classes of

nuclear workers per unit of installed capacity at U.S. nuclear power plants in 2008. Each statistic is calculated independently, thus the columns will not sum to the column total. The data are shown in FTE workers per MWh of electricity produced. Source: EUCG

Worker groups Total of on- and off-site employees and baseline contractors On-site employees Off-site employees Baseline contractors

1st quartile 0.54 0.45 0.03 0.02

2nd quartile 0.72 0.55 0.05 0.09

3rd quartile 0.93 0.74 0.06 0.16

Dr. Robert Peltier, PE is POWERs editor-in-chief.

6. Annual full-time equivalent staffing at each U.S. nuclear power plant per unit of installed capacity in 2008.
Source: EUCG Baseline contracters 1.80 1.60 1.40 FTE/MW installed capacity 1.20 1.00 0.80 0.60 0.40 0.20 0.00 Plant
April 2010 POWER

Utility off-site employees 1st quartile

Utility on-site employees 3rd quartile 0.74 0.06 0.16

2nd quartile 0.55 0.05 0.09

On-site employees Off-site employees Baseline contractors

0.45 0.03 0.02

www.powermag.com

45

SYSTEM PLANNING

A Primer on Optimizing Fleet Operations


The power industry needs a straightforward definition of fleet optimization and a game plan to achieve the promised economic gains of optimizing. This need has become more urgent because integrating nondispatchable renewable resources requires more complex optimization strategies. The bottom-up approach presented here applies well-understood optimization principles and techniques that will help power producers minimize their fleetwide cost of production, independent of the technologies used to generate electricity.
By Tom Snowdon, Emerson Process Management

f your utility, company, municipality, cooperative, or government agency owns or operates one or more power generating units, then it has a fleet operating in a market. A vertically integrated utility is in essence a market unto itself; its interties with other utility grids, regional transmission organizations (RTOs) and independent system operators (ISOs) can be modeled as virtual units in the utilitys fleet. Each of the competitive wholesale markets run by RTOs and ISOs in the U.S. is also defined as a market with a fleet of generating units competing to supply the demanded energy. Therefore, a company that owns units in PJM and in ISO New England has two fleets. In addition, a unit with more than one owner may be part of many fleets, one for each owner, but each unit typically competes in only one market. For the purposes of this discussion, please assume that our demonstration fleet operates in a single market, such as PJM or MISO.

1. Characterize the test data. The first step is to characterize the important data used to define unit performance. In this example, the amount of excess O2 in the boiler furnace determines the plant heat rate (left) and NOx production (right). Note that its impossible to minimize the plant heat rate and NOx emissions at the same furnace excess O2. Source: Emerson Process Management
10.5 10.4 10.3 10.2 10.1 10.0 9.9 9.8 9.7 0.51 0.5 0.49 0.48 0.47 0.46 0.45 0.44 0.43 0.42 Heat rate (million Btu/MWh)

NOx (lb/million Btu

2 3 Excess O2 (%)

2 3 Excess O2 (%)

mine the fuel cost (left) and the incremental additional cost of NOx, including the cost of allowances, as a function of excess O2 in the boiler furnace. Source: Emerson Process Managemen 26.2 26.0 25.8 25.6 25.4 25.2 25.0 24.8 24.6 24.4 4.00 3.75 $/MWh 0 1 2 3 Excess O2 (%) 4 5 3.50 3.25 3.00 0 1 2 3 Excess O2 (%) 4

2. Find the incremental cost. The same variables used in Figure 1 can be used to deter-

Focus on Lowest Cost


Optimization is the process of minimizing or maximizing some quantity, given a set of relationships between variables and a set of constraints that must be satisfied. Together, the set of relationships and the set of constraints is called an optimization problem. This is a somewhat theoretical definition, but it is a very powerful tool. It means that if you are not seeking to minimize or maximize some quantity, then you are not optimizing. This may seem to be a silly distinction, but it turns out to be important in every optimization problem because of the trade-offs that are inherent in the set of relationships between variables. As an example, consider that you can reduce the amount of NOx produced in a boilers furnace by reducing the amount of excess air used for combustion (Figure 1). As excess air is reduced, a coal-fired boiler produces more un46

$/MWh

burned carbon in the ash. More unburned carbon in the ash means the heat rate has increased or the combustion efficiency has decreased. Therefore, we can tune the combustion to minimize NOx or we can tune the combustion to minimize unburned carbon, but we cant minimize both at the same time. Optimization tools provide us with a methodology to balance competing plant operating practices, such as minimizing NOx and unburned carbon, to achieve

www.powermag.com

the overall lowest cost to a particular boiler and, eventually, to the entire fleet of plants. There are costs associated with creating NOx in a boiler and unburned carbon in the ash. Those costs may come from purchasing or maintaining NOx emission allowances, buying ammonia for selective catalytic reduction (SCR), or limiting a units power output to stay under a NOx cap or rate limit (Figure 2). Quantifying the universe of costs
POWER April 2010

System Planning
the data from Figure 2, an equation for the total cost of production as a function of excess O2 is possible. The minimum production cost defines the optimum setting as 2.26% O2 in the boiler furnace, resulting in a total production cost of $28.01/MWh. Source: Emerson Process Management 30.0 29.0 $/MWh 29

3. Find the optimum settings. With

28.5 28 27 .5 0 1 2 3 4 5

Excess O2 (%)

related to NOx production, for example, may be easy or extremely difficult, but there is no question that system operating costs increase as more NOx is produced (Figure 3). Similarly, there is a cost associated with unburned carbon. The more carbon that is thrown out with the ash, the more it costs in fuel for each megawatt-hour produced. The process of optimizing these competing requirements to the benefit of the entire fleet requires minimizing the total costs associated with NOx and unburned carbon while satisfying all the NOx emissions limits applicable to the unit. The dollar is the conversion factor that allows us to find the sweet spot in this trade-off. A very complicated set of mathematical relationships encompassing many variables (such as NOx production or unburned carbon in the ash) ultimately determines all the costs associated with making electricity at a plant or in a fleet. There is also an extensive set of process constraints (such as annual NOx production limits) that must be satisfied in any optimization problem. In the short term, fleet optimization is a matter of formulating and solving the optimization problem to minimize short-term or variable costs while satisfying all the constraints. In the midterm, there may be other fixed costs associated with short-term optimization. Midterm optimization is the process of minimizing all costs, accounting for these fixed costs in combination with the variable costs.

The EMS utilizes a rigorous solution method that guarantees least-cost dispatch of the fleet, given the relationship between cost and load for each unit and a set of constraints describing the minimum load, maximum load, typical ramp rate, start-up time, and a host of other constraints applicable to each unit. In sum, the fleet achieves the minimum cost of production when each unit has optimized to its minimum cost and the fleet as a whole can change its output as required by the changing demand of customers while maintaining a minimized cost dispatch solution. To maintain a combination of operating units (or purchased power) that produces the lowest possible energy cost while following a daily load demand curve is a valuable capability. To illustrate, consider a fleet supplying electricity into a market during a period of rising demand. If a low-cost-of-energy unit cannot keep up with the increasing demand, then a higher-cost-of-energy unit must generate more energy than the least-cost ideal arrangement for the fleet, in order to balance energy supply with demand at every instant in time. Thus, the total cost of energy for the fleet is higher than it would have been if the low-cost unit could keep up with the rate of change of demand. One important observation from this discussion: The fleet can be optimized only when each unit in the fleet is locally optimized throughout its operating range.

included, if applicable. Future carbon cap-andtrade regulations may also create a significant variable cost in the cost to produce electricity. Calculations are further complicated for units located in states that do not have tradable allowances but that do place limits on emissions. The variable or incremental cost to replace power lost when a unit runs up against a NOx limit (whether hourly or daily) is the virtual value of the NOx allowances used. For example, consider Unit #1, which generated 600 MWh over the past hour but would have generated 800 MWh had it not been for a NOx limit. Suppose that Unit #2, with an additional incremental cost of $5.25/MWh, generated the 200-MWh difference. Also, Unit #1 would have made an incremental three pounds of NOx per MWh for a total increment of 600 lb of NOx during the hour. Thus, the ability to emit NOx from Unit #1 is valued as: $5.25/MWh * 200 MWh/600 lb NOx = $1.75 per pound of NOx, or $3,500 per ton of NOx In the optimization of Unit #1, a cost of $3,500 per ton of NOx would be used to find the sweet spot in the combustion optimization trade-off. Continuing with Unit #1, there are many adjustments that an operator or a control system can make to produce the lowest possible cost of electricity, such as damper positions, fan speeds, and burner tilt, to name a few. In the language of optimization science, these are called manipulated variables. Changes in the manipulated variables change the plant dependent variables, such as flue gas oxygen content, steam temperatures, heat transfer surface cleanliness, and the like. Changes in dependent variables usually result in changes to other dependent variables and so on, down a long chain of relationships that ultimately produce a change to the cost of electricity production. The total cost of electricity production is the ultimate dependent variable, and our objective is its minimization. Other disturbance variables such as ambient temperature and humidity, condenser cooling water inlet temperature, and water content of the fuel also produce effects on the dependent variables, and those effects must be characterized in order to achieve our optimization objective. The combination of all the mathematical characterizations of each of these variables is called the objective function. The solution of the objective function yields settings for all of the manipulated variables so that the cost to produce a MWh is minimized (Figure 4).

Short-Term Unit Optimization


We begin optimizing an individual unit based on short-term operating goals. This approach requires definition of all of the relationships between variables that determine plant variable operating costs, within the required operating constraints. For most units, these variable costs of producing electricity include commodities that are either purchased or otherwise procured. Examples include:
Fuel NOx

Use the Existing EMS System


In tackling the fleet optimization problem, begin with a bottom-up approach that leverages one optimization tool that every fleet already has at its disposal. The utilitys or ISOs energy management system (EMS) now dispatches all the power generation resources, regardless of whether they are used in a nonmerchant utility fleet or in a competitive wholesale market.
April 2010 POWER

allowances SCR or selective noncatalytic reduction r agent (ammonia or another reagent) SO2 allowances Flue gas desulfurization (FGD) reagent (limestone, lime, or other chemical consumables) Some units have variable costs associated with the purchase of water used for cooling water and FGD slurry water. The portion of that water that represents a variable cost is typically what is evaporated or otherwise consumed as a function of plant energy (MWh) production. Some locations also inject reagents such as activated carbon to reduce mercury emissions, so those costs should also be
www.powermag.com

The Importance of Data Handling


Any plant performance engineer who tried to tackle unit optimization prior to about 1992
47

SYStem Planning
4. The objective is to minimize cost. The mathematical approach to fleet optimization is to define an objective function that is costminimized. In addition, the program must characterize each dependent variable as a function of manipulated, disturbance, and other dependent variables. The constraints must also be defined as part of the analysis. Source: Emerson Process Management

Manipulated variables damper positions pump speeds valve positions fuel flow rate etc. Disturbance variables
ambient temp. humidity fuel heating value fuel moisture etc.

Constraints
NOx limits temp. differences boiler air requirements etc.

Dependent variables excess O2 steam pressure steam temperature steam flow NOx production SO2 production etc.

Dependent variables
load point boiler efficiency turbine efficiency ammonia required lime required etc.

$ $ $ $ $ $

Dependent variables for fuel for NOx allowances for ammonia for SO2 allowances for lime for etc.

will testify that the multitude of functional relationships between the variables and the continuous data stream required was overwhelming. Fortunately, we now have the computing power necessary, at an affordable cost, to characterize the responses of the dependent variables to changes in the manipulated and disturbance variables, to develop the objective function as a set of mathematical expressions, and to perform the mathematics required to solve these complex equations to determine settings for the manipulated variables every few seconds. In order to minimize the total variable cost, detailed information about the cost of the commodities listed above must be supplied to unit optimization programs. The programs that collect the data and develop the characterizations are called neural networks or artificial intelligence or some variation on that theme. A neural network is a program that gathers data, characterizes responses to manipulations and disturbances, and then uses those characterizations to produce the ideal desired result. In effect, the computer program learns how to respond to complex situations based on historic data. Some newer programs add the capability to recognize when something about the process has changed. When a process variable changes, the program immediately develops new characterizations of the data that are used to immunize the optimization problem against that change going forward.

5. Grade on the curve. Once commodity prices and actual equipment performance are included in the analysis, each units incremental cost curve defines the true cost of production by unit. That data can then be used by the fleet EMS to dispatch the units. Source: Emerson Process Management
Commodity prices

Objective function

Incremental cost curve

Energy management system

Equipment performance

Short-Term Fleet Optimization


Even using state-of-the-art optimization computer programs, characterizing a unit and producing a bulletproof optimizer is not a trivial exercise. However, it is possibleand even
48

reasonably economicaltoday, since robust computer tools are now available. Having characterized the settings (the manipulated variables) required to minimize real-time total cost of production for each unit, the characterization of cost as a function of unit load can be supplied to the fleet EMS (Figure 5). Traditionally, the cost of fuel across the load range has been the only commodity represented in this characterization. With the advent of emissions cap-and-trade systems and the cost of emissions reduction reagents used in SCRs and scrubbers, this one-dimensional approach is no longer adequate. A properly configured unit optimization system should output, or at least provide access to, the necessary information to produce near-realtime characterizations of cost as a function of load that includes all variable costs. Once the settings for the manipulated variables are determined, the EMS then takes care of dispatching each unit at the load necessary to minimize the total real-time cost of the fleet.

www.powermag.com

The first challenge in fleet optimization (as distinct from unit optimization) is to update the EMS with fresh characterizations of the units, whenever its appropriate. This means that each unit optimizer must be able to recognize when something about its objective function has changed enough to cause a change in the unit characterization used by the EMS. Almost any change in the performance of any power plant equipment will cause the objective function to change. Examples include a stuck overfire air damper, a change in boiler feed pump efficiency due to wear, and a leak in a start-up drain valve. Any change in the cost of any of the variable cost commodities also causes the objective function to change. Because these quantities change frequently, the EMS must have near-real-time updates of each units cost characteristics. Unit optimizers or control systems that automatically feed nearreal-time cost characteristics to an EMS are uncommon in the industry, but its imporPOWER April 2010

NomiNate Your PlaNt for a Award


If you know of a plant thats worth bragging about, nominate it for one of POWER magazines annual awards. Plants anywhere in the world have three chances to win!
The Power Plant of the Year award will be presented to a plant that leads our industry in the successful deployment of advanced technology maximizing efficiency while minimizing environmental impact. In short, the Power Plant of the Year, featured in the August issue of POWER, is the best of class over the past year. The Marmaduke Award, named after the legendary plant troubleshooter whose exploits have been chronicled in POWER since 1948, recognizes operations and maintenance excellence at existing power plants. The Marmaduke Award winner will also be profiled in the August issue. Top Plants Awards recognize the best in class over the past year in each of four generation categories: combined-cycle (September), coal-fired (October), nuclear (November), and renewable (December). Award finalists and winners will be selected by the editors of POWER based on nominations submitted by you and your industry peerssuppliers, designers, constructors, and operators of power plants.

Plant of the Year: IllInoIs

MarMaduke award: netherlands

toP Plant, Gas: ItalY

toP Plant, Coal: IndIa

toP Plant, nuClear: south CarolIna

Nominations are due May 24, 2010.


Read about all the 2009 winners and download entry forms from www.powermag.com (under Also from POWER Magazine).

toP Plant, renewables: nevada

SYStem Planning
tant to realize that fleet optimization is performed by the EMS, so real-time, accurate unit incremental cost curves must be provided. A unit that is dispatched by an EMS using an inaccurate incremental cost curve loses money in the market and increases the fleets aggregate cost.

6. Include long-tem effects. Short-term optimization of variable costs often ignores the longer-term effects, such as boiler water wall tube wastage that takes place over years. Operating at low boiler furnace O2 levels accelerates tube wastage (left) and the resultant cost of replacement on an incremental cost basis (right). For this analysis, the tube replacement cost was estimated as $12 million on a 600-MW unit operating at 75% capacity factor. Source: Emerson Process Management
70 Years between tube replacement events 60 40 30 20 10 0 0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 O2 at high load (%) $/MWh 50 0.9 0.8 0.7 0.6 0.5 0.4 0.3 0.2 0.1 0

Midterm Fleet Optimization


Having successfully achieved short-term fleet optimization, we turn our attention to optimization in the midterm. The goal here is to understand how changes in operating procedures might change a units objective function for the better, or might change some operating constraint in a way that produces a lower-cost result from the EMS. The typical trade-off is a rising cost of unit maintenance. A good example is a potentially costly side effect of combustion optimization. Recalling our earlier example, reducing excess O2 can reduce the amount of NOx produced, and we optimized the unit by pushing that benefit until the cost of unburned carbon balances the benefit of reduced NOx. A midterm consequence of this short-term optimization can be an increase in tube wastage caused by alternating oxidizing and reducing atmospheres in the furnace (Figure 6). Some units have experienced a significant increase in tube leaks that increase tube repair maintenance costs and reduce the operating reliability of the entire unit. Also, when a unit is forced offline to repair a tube leak, it misses the opportunity to generate revenue in the market, thereby increasing the fleets reliability costs. These costs are incremental to the cost of operations and maintenance incurred when running with higher O2. Midterm fleet optimization then can be an exercise in the minimization of the costs resulting from short-term optimization added to any incremental maintenance and reliability costs resulting from the short-term optimization. Of course, the main difficulty with midterm optimization is that it takes a while to measure the effects of a given decision. Continuing with our tube leak example, suppose we start with a unit whose water walls are expected to remain serviceable for 30 years of baseload operation, at 3% minimum economizer O2. Suppose further that our efforts at short-term optimization indicate that operating at 2.3% O2 would result in NOx allowance and fuel savings amounting to $850,000 per year. Assume that we know that an outage to replace all of the degraded tubes would cost $12,000,000 in material, labor, replacement power, and all the other associated costs. A hypothetical wastage rate curve allows us to estimate the cost per MWh of the tube wastage as a function of excess O2 (Figure 7).
50

2 3 Excess O2 (%)

With this relationship added to the shortterm optimization problem, we will now control O2 at the point that minimizes the total of the short-term costs of fuel and NOx allowances plus the midterm costs of tube replacement events. A conservative approach in terms of protecting the boiler would be to estimate a high rate of tube wastage, driving the optimization solution away from 2% and closer to 3% O2, at the risk of leaving NOx allowance or fuel money on the table. A more aggressive approach would be to estimate a less conservative wastage effect, driving the solution toward the short-term optimum. Then, taking a short outage every year to perform ultrasonic testing and characterize the wastage rate would provide the information needed to adjust the wastage relationship, leading to a better characterization of tube repair costs and a lower total cost optimum. This sort of process is the essence of a continuous improvement program, approached from a perspective that combines business and engineering sciences. It is applicable to any number of operations versus maintenance trade-off situations, including reduction of minimum load, unit load ramp rate, and cycling operations. With a clear understanding of midterm cost characteristics, the variable cost curves of each unit in a fleet can then be adjusted to reflect both short-term and midterm costs. The update ensures the appropriate unit dispatch order to minimize fleet cost of production over the midterm. This approach also addresses one of the most difficult issues between plant management and dispatch or trading management. Commonly, either the plant gives the dispatcher whatever he wants and then blames erratic dispatch for a high forced outage rate, or the plant constrains dispatch in an effort to minimize damage to the equipment but leaves big money on the table in terms of the ability to minimize fleetwide aggregate cost of production. Midterm fleet optimization offers the mechanism through which

www.powermag.com

point can now be determined by summing the short-term unit optimization data that minimized variable O&M cost (Figure 3) with the midterm fleet optimization that consider fixed O&M costs (Figure 6). Doing so results in an overall production cost optimization strategy that encompasses furnace O2, NOx, and tube wastage. In this example, the optimum furnace O2 is 2.48% at a cost of $28.10/MWh. The estimated interval between tube replacements is 18.43 years. This analysis shows that the unit will save $494,000 per year against the boiler manufacturers suggested 3% furnace O2 setpoint by minimizing the total costs of fuel, NOx allowances, and tube replacements. Source: Emerson Process Management 30.0 29.8 29.6 29.4 29.2 29.0 28.8 28.6 28.4 28.2 28.0

7. Combine long- and short-term costs. The optimum boiler furnace O2 set-

$/MWh

2 3 Excess O2 (%)

the fleetwide lowest total cost set of constraints and operating settings are used by the unit optimizers and the EMS. Some companies have rejected short-term optimization, fearing that the resulting midterm costs might become too high. To reject shortterm optimization on that basis is to reject the notion that there is room to improve the operating economics of the fleet. Midterm optimization provides the means to replace this fear-based decision-making with knowledge-based or at least reason-based decision-making.

Tom Snowdon (thomas.snowdon@ emerson.com) is a performance consultant with the Power & Water Solutions division of Emerson Process Management.
POWER April 2010

PLANT DESIGN

Enhanced Condenser Tube Designs Improve Plant Performance


Enhanced condenser tube designs can significantly improve the heat rate and performance of fossil and nuclear plants. Using the optimum number of tubes and replacement tube sheets will cost more than simply replacing plain tubes. However, the investments simple payback is measured in only weeks, which builds a strong case for using an enhanced tube design as part of your next condenser overhaul.
By Dr. Ralph L. Webb, Penn State University
he vast majority of electric utility plants operate with the Rankine cycle, which uses a turbine-generator to produce electric power. One of the limitations of this cycle is that the condenser cooling water temperature directly affects plant efficiency and the power generated. Colder water during the winter months yields a higher power output and, conversely, plant output is reduced when the condenser water temperature rises during the summer. In addition, plant output is more sensitive to high turbine backpressure (in summer months) than to low backpressure (in winter months). As you will see shortly, the effect of condenser water inlet temperature is strongly influenced by the shape of the turbine backpressure curve, as shown in Figure 1. Note that the smallest incremental improvement occurs at the lowest backpressure, where the curve is reasonably flat. Conversely, the greatest incremental improvement will occur at the higher condenser inlet water temperature conditions. Therefore, fossil and nuclear plants experience the greatest benefit of reduced condenser water temperature in the summer months during peak demand season. In addition to lower cooling water temperatures, advanced technology condenser tubes with special surface geometries on the inner and outer surfaces will yield a higher overall heat transfer coefficient (U) than a plain tube condenser, increasing the heat transfer between the steam and cooling water, and thereby increasing power output and reducing plant heat rate. Such a special surface geometry tube is called an enhanced tube. There are practical and commercially available enhanced condenser tube geometries that will yield a U-value increase of approximately 40%. These tubes are available to any power plant that operates on the Rankine cycle using condenser water from any source (lake, river, or cooling tower). An increased U-value means that a lower turbine backpressure factor (Figure 1) is re-

quired for a given condenser water temperature, resulting in higher plant efficiency and power output.

Enhanced Condenser Tubes


A special enhanced tube called a corrugated tube was used in the U.S. to re-tube existing utility steam condenser bundles at several Ten-

nessee Valley Authority plants in the 1990s. The corrugated tube has a single helix configuration. The specific tubes tested are known as Korodense and were manufactured by Wolverine Tube (Figure 2a). This tube results in a 1.80 factor water-side heat transfer enhancement, 2.25 friction factor increase, and 30% steam side enhancement, relative to a smooth tube.

1. Changes with temperature. This turbine heat rate correction factor curve specifies 3 in. HgA as the standard performance condition. A turbine heat rate factor must be applied when the turbine backpressure changes as a reaction to condenser cooling water temperature changes. Note the differences between the response of a typical fossil and nuclear plant. Source: Dr. Ralph L. Webb
Turbine backpressure (mm Hg abs) 3 40 60 80 100 120

Heat rate at 3 in Hg abs Nuclear 10,040 Btu/kWh (2.942 kW/kW) Fossil 7 ,988 Btu/kWh (2.341 kW/kW)

Turbine heat rate correction factor (%)

2 Nuclear plant

1 Fossil plant

3 Turbine backpressure (inches Hg abs)

April 2010 POWER

www.powermag.com

51

plant design
2. Enhanced condenser tube options. A number of horizontal integral-fin
from Arkansas Nuclear One (ANO-1) Unit 1. The results of that analysis showed that enhanced condenser tubes were economically justified in fossil and nuclear plants. Between 1990 and 1992, additional research under sponsorship of the Electric Power Research Institute and the U.S. Department of Energy resulted in specific enhanced tube geometries for application to electric utility steam condensers. These tubes had enhancement on both the steam and water side. The tubes were designed in partnership with Wieland-Werke AG and Wolverine Tube, which manufactured the prototype tubes for testing. Figure 2 shows the tubes that were manufactured and tested for steamand water-side performance. The previous work has shown that certain enhanced tubes can provide performance and economic benefits for electric utility plant condensers. A recent update of that 1984 analysis using the same ANO-1 data once again illustrates the advantages of enhanced tubes in fossil and nuclear condensers. The following analysis uses data for the Wieland NW-16 tube (Figure 2b). The calculation procedure is included so a plant engineer could reproduce the analysis for a particular plant that might be considering the use of enhanced condenser tubes. by many nuclear and fossil plants in the U.S.

tubes have been developed for steam condensation. Some notable examples are (a) stainless steel Wolverine Korodense, (b) stainless steel Wieland NW-16, (c) copper-nickel Wieland 11-NW, (d) UOP attached particle tube, and (e) Yorkshire MERT (Multiply Enhanced Roped Tube). Courtesy: Dr. Ralph L. Webb
a.

Calculation Procedure
The following sections outline the step-bystep calculation procedure shown in Table 1 for calculating the potential plant efficiency and output that may be obtained from using enhanced turbines in this plant condenser.
Turbine Output and Condenser Load.

b.

c.

Using the heat rate correction factor found in Figure 1 at the plant rating condition, first calculate Qh = 2.942 * 946.3 = 2,784 MW. This heat input is assumed to be constant for the present calculations, where the plant is operating at different condenser saturation pressures (Psat). Calculating the heat rate (HR) at other values of Psat is easily performed using the heat rate correction factor (HRC ) given in Figure 1. Tsat is then found from the steam tables and added to line 2. The condenser heat rejection (Qc) is given by Qc = Qh W, where W is the turbine output power (line 3 in Table 1). At the rated condition 76.2 mm Hg (3 in. Hg), Qc = 2,784 946.3 = 1,837.7 MW. At any known turbine backpressure, the HR = 2.942 * (1 + HRC/100). Using this HR with Qh = 2,784 MW, one may calculate the turbine output (W) and the condenser heat rejection (Qc = Qh W) (line 4).
Objective Function and Constraints.

Nuclear Plant Analyzed


d.

e.

In an article written in 1984, Enhanced Tubes in Electric Utility Steam Condensers in Heat Transfer in Heat Rejection Systems, published by the Heat Transfer Division of the American Society of Mechanical Engineers, I wrote about a simulation analysis of re-tubing an existing plant with various enhanced condenser tube geometries. This analysis included a corrugated tube, and other geometries, whose performance was theoretically estimated. The analysis defined the performance and economic benefits of condensers using enhanced tubes. The analysis was performed using the turbine performance data
52

The analysis was performed for a 946-MWe nuclear plant using design specifications provided by Gilbert Commonwealth Associates (GCA). The plant specification rated the plant at 946.3 MW with 3.0 in HgA turbine backpressure (Psat). The curve nuclear in Figure 1 is the backpressure correction curve used in this analysis. As shown in Figure 1, the rated heat rate (HR = Qh/W) is 2.942 kW/ kW, where Qh is the heat supplied to the reactor and P is the rated plant output. For a fossil plant, the ratio would represent the fuel heat input in equivalent kW units divided by the rated plant output. The condenser used for the example calculations is the ANO-1 condenser, but configured with 23,150, 28.6-mm OD stainless steel tubes 13.4 m long. The condenser water flow rate at the rated condition is 30.65 m3/s based on the GCA design data. The design water velocity is 2.29 m/s. The ANO-1 condenser was originally built with 28.6-mm OD admiralty tubes having 19,608 tubes per condenser shell. The condenser was re-tubed in 1999, which involved complete reconstruction of the four condenser tube bundles that served the two low-pressure turbines. This condenser reconstruction used 25.4-mm OD titanium tubes that were 13.5 m long. However, the stainless steel tubes assumed in this case study are representative of the condenser tubes now used

www.powermag.com

The calculations are performed for two cases: a tube-for-tube replacement and a bundle replacement having NeLe/NpLp = 1 with fixed condenser flow rate where N = the number of condenser tubes, L = the length of the tubes, the subscript p represents the original plain or smooth tubes, and the subscript e represents the enhanced, replacement tubes. For both cases, the constraints are:

Fixed heat input to turbine (Qh). Fixed pumping power (P) and condenser water flow rate ( ). The analysis assumed that the re-tubed condenser uses titanium tubes of the same OD as the original plant design and 0.7mm wall thickness.

By replacing the plain tubes with enhanced tubes, the UA value of the condenser is increased, where A is the heat transfer area and U was defined previously as the overall heat transfer coefficient of the tubes. Because the enhanced tubes have a higher friction factor, and some have a smaller cross-sectional flow area, the balance point on the circulating water head versus flow curve (Figure 3) will occur at a reduced water flow rate for a tube-for-tube replacement. Using the friction factor versus Reynolds number characteristic of a given enhanced tube, the total system friction head (pressure) versus flow characteristic was developed
POWER April 2010

plant design
Table 1. Comparison of enhanced vs. plain tube condenser (bundle replacement). Source: Dr. Ralph L. Webb
January Line 1 2 3 4 5 6 7 8 9 10 Item Tw,in (condenser water inlet temp) Tsat (found using the steam tables at Psat, condenser pressure at Tw,in) Qc (condenser heat rejection) W (turbine output) Wp (pump power) Enet (= W Wp) Eg (= Eg,e Eg,p) N (number of tubes) Ne /Np (no. tubes ratio) Le /Lp (tube length ratio) Units C C MW MW HP MW MW Plain tube 7 .8 40.3 1,835 949 851 948 NA 23,150 NA NA Enhanced tube 7 .8 34.7 1,832 951 851 950 3.2 28,575 1.23 0.81 April and October Plain tube 19.4 49.4 1,846 937 791 937 NA 23,150 NA NA Enhanced tube 19.4 44.8 1,837 946 791 945 9.3 28,575 1.23 0.81 Plain tube 31.7 61.8 1,898 885 742 885 NA 23,150 NA NA July Enhanced tube 31.7 56.2 1,862 921 742 921 36.8 28,575 1.23 0.81

Note: NA = not applicable.

(Figure 3). The pump head versus flow characteristic was curve-fitted to a polynomial. Simultaneous solution of these two equations yielded the condenser water flow rate through the enhanced tube condenser. These figures show the system characteristic for the smooth tube condenser design and the friction head characteristic of system, less the head loss in the condenser tubes. Examination of the pump curves for the two plants shows that the percentage of the total head loss that occurs in the condenser tubes is 45%.
Water-Side Heat Transfer Coefficient.

3. System performance curves. The design pump and system head versus water flow rate for Arkansas Nuclear One, Unit 1 is illustrated. Note that the enhanced tubes have a higher friction factor (caused by a smaller diameter) that reduces the cooling water flow should like numbers of tubes be replaced. In this figure, the original design system friction balance point is off the right side of the figure, at about 600,000 gpm. With a tube-for-tube replacement, the condenser water flow will decrease to approximately 480,000 gpm. Therefore, to maintain like condenser pump system performance, additional enhanced tubes must be added to the condenser. Source: Gilbert Commonwealth Associates
Condenser water flow (m3/min) 200 0 900 MW nuclear plant A=Condenser tubes (smooth) B=External friction Pump curve 14 12 10 30 A 8 6 4 10 B 2 0 0 0 400 600 800 1,000 1,200 1,400 1,600 1,800 16

After calculating the cooling water flow rate, the heat transfer coefficient (hp) on the waterside coefficient of the plain tubes is calculated using the well-accepted Petukhov correlation for plain tubes. The waterside coefficient of the plain tubes is based on test results and is given as the smooth tube value multiplied by an enhancement factor (Ehi = he/hp). Most heat transfer references will provide details on calculating hp. The tube supplier can provide data on he. A value of Ehi = 1.55 is used for the Figure 2b Wieland NW-16 tube. Water-Side Fouling Factor. A value of Rf = 4.4 * 105 m2-K/W (0.00025 hr-ft2/Btu) was used in the calculations. This corresponds to a cleanliness factor of 0.70. Condensation Coefficient. The HEI Standard for Steam Surface Condensers (1995, 2002) outlines a method for calculating the overall single-tube heat transfer coefficient (U) for steam condensation in electric utility steam condensers. The calculated U is in close agreement with that calculated using the horizontal tube Nusselt equation for the steam condensation coefficient, as given in many texts on heat transfer:

40

20

10

20 30 Condenser water flow (gal/min x 104)

40

50

The titanium alloy used here is ASTM B338, having 21.6 W/m-K thermal conductivity. Condensing Temperature (Ts ). The inlet cooling water temperature is known for each month of the year at ANO and therefore the condensing temperature (Tsat) can be determined. The condenser heat rejection (Qc) rate at any Psat is given by
www.powermag.com

where HRC is the heat rate correction factor (%) obtained by curve-fitting the correction factor (Figure 1) as a function of Psat. Condenser Thermal Parameters. The heat exchanger thermal effectiveness () is calculated by = 1 -e-NTU where
53

April 2010 POWER

Head (m water)

Head (ft water)

plant design
Table 2. Annual average plant performance improvement for NW-16 tubes. Source: Dr. Ralph L. Webb
Item Number of tubes Qh (steam heat input) HR correction factor Heat rate (actual) Qc (actual condenser load) W (turbine output at Psat) Wnet (less pump power) Eg (increase net over plain tube) MW % kW/kW MW MW MW MW Units Plain 23,150 2,940 2.12 3.00 1,857 927 926 0 Tube-for-tube replacement 23,150 2,940 1.06 2.97 1,847 936 935 9.87 New bundle with NL = constant 28,575 2,940 0.54 2.96 1,842 941 9,409 14.65

The condenser heat rejection is given by

where Tw,in is known for each month of the year. The calculation procedure requires iteration of Qc and Tsat (which is a direct function of Psat found in the steam tables). To obtain annual average values, this calculation is performed for each month of the year using the known Tw,in for each month of the year. Condenser Pumping Power. Because of the different balance point on the pump curve, the pump power changes. The condenser pumping power (line 5) is given by

Increased Net Generation. Using the calculated values of W and Qc, the incremental generation rate Eg (MW) made possible by the enhanced tube geometries is determined using the calculated values of turbine output (W) and the pumping power (Wp). The new generation output is Wnet = W Wp, assuming the main steam flow is held constant (line 6). The net increased generation rate provided by the enhanced tube condenser (relative to the plain tube condenser) is Eg. The Eg = We Wnet,p, where subscripts e and p refer to the enhanced and plain tube respectively (line 7).

Calculated Results
Calculations were performed for two cases: a tube-for-tube replacement with fixed pumping power and a bundle replacement having NeLe/NpLp = 1 with fixed condenser flow rate and pumping power, as discussed earlier. Tube-for-Tube Replacement. The analysis showed that the tube-for-tube replacement will provide significantly lower Eg than the bundle replacement. This is because the tubefor-tube replacement results in a reduced condenser water flow rate. For the Figure 2b
54

NW-16 tube, the flow rate reduction is 19%. This reduced flow rate causes the condenser to operate at higher thermal effectiveness, which degrades the condenser performance, relative to the second case, which holds water flow rate constant. For the NW-16 tube, the resulting annual average Eg is 9.87 MW. Tube Bundle Replacement. In this case, the total length of all tubes in the enhanced tube condenser is the same as for the plain tube design. However, the design maintains the total water flow rate the same as for the plain tube design by using more tubes (of a shorter length) in the enhanced tube condenser. For the NW-16 tube design, the enhanced tube condenser has 23% more tubes than that in the plain tube condenser (lines 8, 9, 10). Also remember that the condenser inlet water temperature changes for each month of the year. In this analysis, results were calculated for four representative months: January, April, July, and October. These results were then used to obtain the annual average values. The calculated results are shown in Table 1 in the order of the calculation procedure just described. Calculated results are shown for January, April and October (combined because the cooling water inlet temperatures are the same), and July for both the plain and enhanced tube condenser designs. The key performance number shown in Table 1 is Eg, which is the increased net generation rate provided by the enhanced tube condenser design. The greatest Eg occurs in July at 36.8 MW. The smallest Eg occurs in January and is 3.2 MW. The reason the January Eg is so small is because the heat rate curve (Figure 1) is relatively flat at the low condensing pressure (Psat) of January. Hence, the warmer the condenser water inlet temperature, the greater the benefit of enhanced tubes. Table 2 summarizes the annual average values of the performance parameters derived from Table 1 for the different seasons.

using the same total lineal tubing length as is used in the plain tube design (Table 2). However, the enhanced tube bundle will have about 25% more tubes and will provide the same condenser water flow rate as the plain tube design. The full potential of enhanced tubes can only be obtained with a new condenser bundle design. A tube-for-tube replacement results in reduced water flow rate, which diminishes the performance potential. This evaluation assumes that the only cost affected is the cost of the tube bundle; the cost of the condenser shell is not included in the analysis. The capital benefits of the enhanced tube condenser are described by a simple payback analysis. This analysis calculates the simple payback based on:

The capital value of the increased generation rate, assuming a value of $2,000/kW (= 2 106 E). The increased tube cost of the enhanced tube design, relative to the plain tube design given by Table 3 shows the results of the payback analysis. Line 1 shows the increased generation capacity for the enhanced bundle design. The second line shows the capital value of the increased generation capacity (Ccap). Line 3 shows the total tube cost of the plain and enhanced tube bundles (Ct). The cost of plain and enhanced titanium tubes was based on data provided by Plymouth Tube, a manufacturer of titanium tubes. The present analysis is for 28.6-mm OD, 0.7-mm wall titanium tubes. It was also assumed that two-thirds of the tube cost is material and one-third is fabrication. The material costs were then adjusted by multiplying by the diameter ratio (28.6/25.4). Table 3 shows that the material content cost is $10.35/m (or $36.85/kg) at the time this analysis was completed in late 2009. The plain tube fabrication cost was assumed to remain constant. It is conservatively assumed that the fabrication cost of the enhanced tubes is 75% greater than for the plain tubes. This resulted in tube costs of $14.93/m and $18.37/m for the plain and enhanced tubes, respectively. Using the values given above, the tube bundle cost increment for the enhanced condenser tubes, relative to plain tube design (Ct), is

Economic Evaluation
The greatest economic benefit to the plant will occur if the entire tube bundle is replaced

www.powermag.com

This value is shown on Line 4 of Table 3. The simple payback on the increased generation cost for the tube-for-tube replacement is 0.036 years and 0.024 years for the new bundleor just a matter of weeks (line 5). Note that the E value in Table 3 is the net
POWER April 2010

plant design
Table 3. Summary of economic benefits of the NW-16 tube condenser.
Source: Dr. Ralph L. Webb Line Item 1 2 3 4 5 E (incr. generation over plain tube design) Ccap (capital value of increased generation) Ct (total tube cost) Ct (enhanced-plain tubes) Ct/Ccap (simple payback on increased generation) Tube-for-tube replacement 9.87 19.7 x 106 4.63 x 106 5.69 x 106 1.068 x 0.054 106 New bundle with NL = constant 14.65 29.3 x 106 5.70 x 106 1.068 x 106 0.036

Units MW $ $ $ years

Plain tube

increase in turbine generator power over the plain tube design with the condenser water pumping power charged to the plain tube condenser. This is because the enhanced tube condenser has the same condenser water pumping power as the plain tube design. A tube-for-tube replacement will provide only 67% of the economic benefits (Ccap) of the entire tube bundle replacement.

Korodense Tube Bundle


A similar analysis was also performed for the Wolverine Korodense tube (Figure 2a). It is interesting to compare the performance and

economics of the Korodense tube condenser with that of the NW-16 tube condenser. Comparison with the NW-16 tube condenser is done for the same number of tubes (28,575) and tube length shown for the new bundle with NeLe = constant, as shown in Tables 2 and 3. The Korodense tube has 20% and 40% higher tube side heat transfer coefficient and friction, respectively, than the NW-16 tube (at the same Reynolds number). However, the steam side enhancement is 25% smaller than provided by the NW-16 tube. The analysis shows that the Korodense tube results in a lower water flow rate for the

same pumping power as the NW-16 and plain tubes. This flow rate reduction reduces the thermal performance. For a Korodense tube condenser with 28,575 tubes, the water flow rate is reduced 8%, relative to the NW-16 and plain tube condensers. The annual average value of E is 24% below that of the NW16 tube condenser, and the simple payback is 0.048 years. For the tube-for-tube replacement case, the annual average value of E is 53% below that of the NW-16 tube condenser, and the simple payback is 0.12 years. Not included in the economic analysis is the cost of plant replacement power during an outage that may extend longer than the outage time required to merely replace plain tubes. However, with the simple payback on the investment measured in weeks, the economics of using enhanced tubes remains exceedingly strong. Seriously interested condenser designers will likely use their own economic analysis to determine the benefits of using enhanced condenser tubes.

Dr. Ralph L. Webb (ralph.webb@psu .edu) is professor emeritus in the Department of Mechanical and Nuclear Engineering at Penn State University. Webb is also the editor-in-chief of the Journal of Enhanced Heat Transfer.

New Edition!

Platts 2010 UDI Whos Who at Electric Power Plants Directory


With the 2010 UDI Whos Who Directory, you can: Connect with key power plant personnel at nearly 3,900 power plant sites across North America Pinpoint the locations of your peers, customers and prospects Make connections to increase the efficiency of your business operations
The UDI Whos Who at Electric Power Plants Directory is the definitive reference for the North America electric power sector and includes: Power plant design characteristics Nearly 8,500 plant management and support contact names, titles, and primary job functions Basic plant operating statistics for more than 1,350 power stations, including: - Generation (MWh) - Availability (%) - Heat rate - Capacity Factor (%) Choose the delivery option that best suits your needs: 4 Directory Only: Identify and find peer installations and prospects for your marketing,  sales and business development teams. 4Directory and Data Package on CD-ROM: Includes spreadsheet data that can be easily imported into standard database and contact management software for analysis and easy creation of electronic contact lists.

To purchase, visit www.udidata.platts.com


North America EMEA +1-800-PLATTS8 (toll-free) +44-(0)20-7176-6111 www.powermag.com +1-212-904-3070 (direct) Latin America +54-11-4804-1890
55

April 2010 POWER

Water treatment

Sub-Sea Water Treatment System Provides Reliable Supply for the Huarun Power Plant
River deltas experience extreme seasonal changes in water quality that perplex conventional water treatment systems. Industrial development in China, including new power plants, has spurred the development of desalination processes that have tamed these brackish water sources to provide a virtually unlimited supply of boiler-quality water.
By Echo Zhao, Dow Water & Process Solutions; Yu Fangbing, Huarun Thermal Power Plant; and Yasushi Maeda, Dow Water & Process Solutions
he rapid development of an industrialized China has quickly increased the demand for pure water. In fact, the demand for industrial pure water a decade ago was 1,139 million m3 (300,892 million gallons) per year, and the Chinese government predicts that 1,839 million m3 per year will be required by 2030. The rising demand for industrial water has overstressed conventional supplies, pushing China to develop desalination technologies to meet its quickly increasing pure water needs. Today, China is a leading user of water desalination technology on a grand scale. River water supplies in the delta regions of China, Vietnam, and Bangladesh and island nations like Singapore and Malaysia have decidedly inconsistent quality. It is common for river delta water to have a total dissolved solids (TDS) content that fluctuates from 80 mg/l to 12,000 mg/l due to the seasonal seawater refilling. This water is generally categorized as high-salinity brackish water (Table 1). Given the interest of these delta regions in developing marginal water resources, a new category of supply water was established. The high-salinity water supplies that lie between freshwater (less than 500 mg/l) and standard seawater (35,000 mg/l) is called sub-sea water. The salinity of the rivers in this part of Asia is highly seasonal. River water salinity is affected by rainfall, especially near the seashore, because of water runoff. However, in the dry seasons, the river water level will fall only to be refilled by seasonal sea or ocean tidewater that pushes up the rivers average salinity. The typical salinity range of a sub-sea water resource is between 2,000 and 8,000 mg/l. Another characterization of sub-sea water: high chloride levels due to refilling that further complicates the water treatment processes. These salinity fluctuations render traditional ion exchange (IX) water treatment processes
56

Table 1. Water quality definitions by TDS level. Source: China Water and Rivers
Commission, June 2000 Water type Freshwater Marginal water Brackish Saline Hypersaline TDS range Less than 500 mg/l (good quality) 5001,500 mg/l (over 1,000mg/l may have excessive scaling, corrosion and unsatisfactory taste) 1,5005,000mg/l More than 5,000mg/l More than 50,000mg/l

1. Processes for treating water. Main desalination processes. Source: Dow Chemical
Distillation 20,000 Seawater RO membranes 8,000 Brackish water RO membranes 50 Low energy BW RO membranes 50 50 Electrodialysis 300 Ion exchange 10 600 Raw water salt concentration (mg/l) 100,000 10,000 2,000 Reverse osmosis (RO) 50,000 12,000 50,000

incapable of stable and reliable operation. Typical IX processes have a very narrow TDS operating band of 10 mg/l up to perhaps 600 mg/l. Reverse osmosis (RO) technology has successfully treated brackish water with salinity in the range of 1,500 mg/l to 5,000 mg/l with high salt rejection (SR). IX also suffers

www.powermag.com

from other operational drawbacks, such as using acid and caustic chemicals for resin regeneration and post-treatment of those wastes, more water for regeneration, and a large area of plant floor space. As a result, RO is now the favored technology in 90% of Chinese industrial desalination plants (Figure 1).
POWER April 2010

Water treatment
Treating Sub-Sea Water
The two-step process for sub-sea water treatment is pretreatment to remove suspended solids followed by desalination to remove dissolved solids in the raw water (Figure 2). Specifically, there are two stages of pretreatment. First, the raw water is pumped into a clarifier. After reacting with flocculants, such as polymerized aluminum chloride (PAC), the suspended solids in the water are reduced to less than 5 mg/l. In the second stage, the water is fed into the second stage of pretreatment, starting with two multimedia filters (MMF) in series to further remove residual impurities, such as suspended solids, colloids, and organics so that the effluents Silt Density Index (SDI) is less than 5. Before the filters, 2 mg/l to 5 mg/l of sodium hypochlorite (NaClO) is added to control bacteria growth. However, if there is not enough budget, or if there is limited space for water treatment equipment, hollow fiber ultrafiltration (UF) may be another effective option in the second-stage pretreatment to protect the RO membranes from suspended solids, bacteria, and nondissolved organics. The SDI of effluent from UF can reach less than 3 mg/l. After the second stage of treatment (filtration or UF), sodium bisulfite (NaHSO3) and an antiscalent are added to remove any residual free chlorine and to avoid scaling of the RO membranes. The water is then filtered to 5 microns, typically in a cartridge filter, and then pumped to the RO units for desalination. In a typical RO unit, 95% to 98% of salt and other solved organics, colloids, and bacteria are removed in the reject water. If the water is for potable use, two or three stages of single-pass RO are used to obtain water of the specified quality. If higher purity water is required for industrial purposes such as boiler water, then a two-pass RO or a twopass RO followed by IX mixed bed and/or continuous electrodeionization (CEDI) will be required. As an example, Yuhuan Water Treatment Corp.located in Yuhuan Town, Wenzhou City, Zhejiang, Chinaowns and operates a desalination potable water plant. The towns sub-sea water TDS is about 2,800 mg/l to 3,800 mg/L at a temperature ranging from 12C (54F) to 17C (63F). During one 101hour operating period, the water feed TDS changed from 5,500 S/cm to 7,000 S/cm (measuring TDS based on conductivity rather than weight). The TDS of the RO permeate or product water also changed from 120S/ cm to 300S/cm. Here, the RO permeate water meets the requirement of the Chinese Standards for Drinking Water Quality of less than 1,000 mg/l TDS. The U.S. TDS limit for
April 2010 POWER

2. Removing water hardness. A typical sub-sea water desalination treatment process.


Source: Zhejiang Hydrotechnics, June 2006

Underwater PAC Clarifier pump dosing

Pretreatment Raw water NaCIO tank boost pump dosing

Mechanical filter

Demineralized water tank

1st pass and 3-stage reverse osmosis

Highpressure pump

Cartridge filter (5 micron)

NaHSO3 & antiscalant dosing

potable water set by the Environmental Protection Agency is 500 mg/l.

RO Makes Power Plant Makeup Water


The Huarun Power Plant (HPP) entered commercial service in 2007 with two pulverized coal boilers each producing 260 tons/hr (573,000 lb/hr) of steam used to generate 360 MW in a pair of like-sized steam turbines. The plant is located in Huangge Town in the Nansha Development Zone, an important hub port at the Pearl River Delta south of Guangzhou City, Guangdong Province, China. HPPs makeup water comes from the Xiao HuLi River, which is close to the South Sea entrance, hence the river waters TDS, chloride, and conductivity increase as a result of seawater refill during the dry season. An RO system was supplied by Nanjing Zhongdianlian Co. designed to produce the necessary boiler makeup water for the two power generation units from the available sub-sea water supply. In Table 2, the TDS record of Xiao HuLi Rivers water shows wide TDS variation, from 80 mg/l to 14,000 mg/l in 2006, and chemical oxygen demand (COD) that ranged from 4.92 mg/l to 39.1 mg/l. The boiler makeup water specification requires water quality of 15 M/cm at 25C (equal to 0.067mhos/ cm), which is more rigorous than the normal boiler makeup water standard (0.15 mhos/ cm); hence, a two-pass RO and CEDI or IX mixed bed was required for this water treatment system (Table 3).
www.powermag.com

Table 2. Xiao HuLi Rivers average water quality record from 2004 to 2006. Source: Dow Water &
Process Solutions Measurement pH Temperature (C) Total hardness (mmol/l) COD (Mn), mg/l BOD5 (mg/l) TDS (mg/l) Silicon (mg/l) Cl(mg/l) Dissolved oxygen (mg/l) SO4 (mg/l) Ca2+ (mg/l) Na+ (mg/l) Mg2+ (mg/l)
2-

Data range 6.927 .69 1535 0.346 4.9239.1 2.5810 8014,000 213 97 ,000 3.274.78 19307 21.262.44 27 ,000 3.3165.25

Table 3. Boiler makeup water requirements of Huarun Power Plant.


Source: Dow Water & Process Solutions Constituent Hardness (mol/l) Sodium (g/l) Requirement 0 <100

Resistance (M/cm @ 15 25C) SiO2 (g/l) <15


57

Water treatment
3. Four-step process.
1015 ppm PAC Raw water Clarifier settling tank Huarun Power Plant water treatment flow diagram. Source: Dow Chemical 25 ppm PAC 5ppm NaCIO Pretreatment storage tanks Multimedia mechanical filter 1st pass RO permeate tank 109 t/h Recovery 75% ARKAL SPIN KLIN cartridge disk filter (100 m) 146 t/h High-pressure pump Cartridge fiter (5 ,) Boost pump Pressurized hollow fiber UF 18 t/h

UF tank

10 t/h

23 ppm NaHSO3

34 ppm antiscalant

1st pass RO: 2X109 t/h (17X6:9X6) NaOh 119 t/h High-pressure pump Concentrate water recirculation Point of use Demineralized pump 2nd pass RO: 2X101 t/h (7X6:4X6) Ammonia Recovery 85%

Concentrate water recirculation

101 t/h

2nd pass RO permeate tank

C-cell boost pump

Demineralized 91 t/h water tank C-cell recovery: 90%

101 t/h Cartridge fiter (5 ,)

Dow Water & Process Solutions

4. The cartridge disk filter.

Courtesy:

Water Treatment Processes


The plant began service in December 2006 with city water transitioning to treat Xiao HuLi River water in February 2007. The water treatment plant is now operated and maintained by Hanchuang (Hubei) Power Plant, a partner company of HPP. The capacity of HPPs water treatment plant is 182 m3/h (~800 gpm) of makeup water. To reduce the first cost of the RO system, a brackish water RO element instead of the sub-sea RO elements were specified. HPP plans to maintain the raw water TDS below 3,000 mg/l because of limitation with the feed high-pressure pump (1.50 Mpa or 217 psi) and the anticorrosion limits of the RO system. However, even after dilution, the highest chloride level still can reach 1,300 mg/l. Therefore, the raw water makeup to the HPP is prepared by a freshwater and sub-sea water mixing system. In this RO design, a Filmtec BW30-365 element is the standard brackish water RO element with 34 m2 (365 ft2) of active membrane area, a nominal permeate flow of 36 m3/d (9,500 gallons/day), and a stabilized salt rejection of 99.5%. Figure 3 shows a flow diagram of the HPP water treatment facility and its water volume balance. The water treatment system consists

www.powermag.com

Water & Process Solutions

5. The pressurized hollow fiber ultrafiltration system. Courtesy: Dow

of two steps of pretreatment and two steps of desalination. Step 1. The first pretreatment step occurs when raw water is pumped into a clarifier settling tank to remove 90% to 95% of suspended solids, colloid, chroma, and turbidity. Meanwhile, 10 ppm to 15 ppm of PAC are added in the front of the clarifier to help coagulation and flocculation. The clarified water then flows to a pretreatment storage tank. Step 2. The second pretreatment process is a series of refined filtration steps. First, 2 ppm to 5 ppm of PAC and 5 ppm of NaClO are dosed to achieve completed flocculation and control bacteria growth. Next, the clarified water is fed into an MMF for further filtration to ensure the effluents qualified turbidity (1 NTU) and SDI (5). Subsequently, the water is filtrated by a cartridge disk filter (CDF) with an average pore size of 100 m (Figure 4) before flowing into the pressurized hollow fiber UF system (Figure 5) that has a total recovery of 90% of entering water. The internal diameter of the pressurized hollow fiber UF is 0.7 mm, and the maximum molecular weight cutoff is 80,000 Dalton. At this stage, the water SDI is controlled to less than 3. Step 3. The desalination process begins when the water is dosed with 3 ppm to 4 ppm of antiscalent and 2 ppm to 3 ppm of NaHSO3,
POWER April 2010

58

Water treatment
and then is fed through a 5-m cartridge filter before being pumped to the RO skid. There are two passes of RO with each two-stage design. The first-pass RO system consists of two independent trains, each with a permeate design flow rate of 109 m3/h (~480 gpm) at a recovery of 75% to 80% (Figure 6). Each train has two stages with 17 and 9 pressure vessels, respectively, and each vessel houses six elements. There are 156 Filmtec BW30 elements installed in the RO 1 train. The designed system salt rejection is 97%. Next, the water is sent to the first RO permeate tank. The permeate water from the first-pass RO is dosed with sodium hydroxide (NaOH) to adjust the pH to 8.0 to 8.8 and then is pumped into the second-pass RO (Figure 7). The second-pass RO (Figure 7) also consists of two independent trains, each with a permeate flow rate of 101 m3/h (~440 gpm) at a recovery of 85%. Each train has two stages with seven and four pressure vessels, respectively, that can be filled with six elements each. The salt rejection from the system is designed as 95%. Afterward, the water is sent to the second-pass RO permeate tank. Step 4. The second step of the desalination processwith the water entering two independent CEDIs with 90% to 92% recovery (Figure 8), and finally, the effluent of CEDI (15 M/cm at 25C)is sent to the demineralized (DI) water storage tank. To meet HPPs boiler water makeup pH requirement of 9.0 to 9.6, ammonia is added to the demineralized water. Meanwhile, all concentrated water from the second pass RO and CEDI will be respectively recycled into the UF tank and the first-pass RO permeate tank for recycling.

6. The first pass of RO unit 1 and unit 2. The water flows from the front to
the back of the photo. Courtesy: Dow Water & Process Solutions

Operational Results Are Excellent


Operational data of the first-pass RO were recorded from February 2007 to July 2007 and normalized by Dows FTNORM program to evaluate the performance of the Filmtec BW30 elements (see sidebar). During the test period, the raw water makeup varied widely, from 92 mg/l to as high as 2,617 mg/l; approximately one-third of the time the water TDS ranged from 520 mg/l to 2,617 mg/l (Table 4). According to the definition of sub-sea water, Xiao HuLis water became the sub-sea water type (TDS level of 2,000 mg/l to 8000 mg/l) on the days of seawater refilling during March 16 to 28, April 14 to 20, and April 22 to 29. At the same time, the temperature changed

7. The second pass of RO unit 1.


Courtesy: Dow Water & Process Solutions

Normalizing RO Performance Data


A reverse osmosis (RO) system is designed to produce a certain permeate or product water flow when supplied by a given feedwater source water quality and a given feed supply pressure. Unfortunately, operating conditions are seldom stable, so RO membrane performance isnt easily measured, because comparing permeate flow and salt passage data at the same conditions is vital. Because this is not always possible, converting the actual data conditions to a set of selected normalized conditions is necessary. To determine if the membrane systems performance has changed over time, normalizing the data is needed to translate performance data measured under actual and varying conditions into theoretical performance data under defined and stable reference conditions. A plot of these normalized performance data will then show the trend of the membrane performance independent of changing operating conditions. It is also useful to determine the cleaning requirements and to judge the system performance with respect to the design values. For example, for best long-term performance we recommend cleaning the membrane when the normalized flow has declined by 10% or the normalized salt passage decreased by more than 5%. ASTM D4516, Standard Practice for Standardizing Reverse Osmosis Performance Data, defines the process of normalizing RO performance data for comparison purposes. However, in practice, most plants are operated not at constant pressure but at constant flow rate. Therefore, it might be more useful to calculate the normalized salt passage with reference to a constant system flow rate rather than to a constant pressure. This way, the result is directly proportional to the salt permeability of the membrane and does not depend on operating parameters. Dow offers a spreadsheet-based program, FTNORM, that provides automatic standardization of operating data. Charts are created showing standardized permeate flow, standardized salt passage/ salt rejection, and differential pressure. The program is free to download at www .dow.com.

ter & Process Solutions

8. The continuous electrodeionization (CEDI) system. Courtesy: Dow Wa-

Table 4. Raw water data record, February to July 2007. Source: Dow
Water & Process Solutions Measurement pH Temperature (C) TDS (mg/l) Cl (mg/l) COD (Mn), mg/l Data 6.957 .72 1933 922,617 281,300 732

April 2010 POWER

www.powermag.com

59

Water treatment
9. Normal system performance. Normalized net driving pressure and pressure drop of
the RO 1 system confirmed that the system was performing as expected. Note the variation of the total dissolved solids in the incoming water. Source: Dow Water & Process Solutions Feed TDS 3,000 2,500 2,000 TDS 1,500 1,000 500 0 -00 n-00 n-00 n-00 b-00 b-00 ar-00 ar-00 ar-00 ar-00 pr-00 an Ja -Ja -Ja -Fe -Fe 1-J 1-M 11-M 21-M 31-M 10-A 1131 21 10 20 Operation time (days) Net driving pressure filmtec RO1 Normalized pressure drop 13 12 11 10 9 7 6 5 4 3 2 1 0

Pressure (bar)

in the RO system. Low PD tells the operator that the feed space is smooth or all the contamination was backwashed out by concentrate water. High PD indicates that there is some fouling present in the RO system that must be removed. Chemical cleaning is recommended to remove the fouling contamination if the PD level is 10% higher than normal value. The normalized pressure drop of RO 1 was measured and recorded during the test period (Figure 9). The initial PD of RO 1 was 1.3 bar. Even with the increase in water temperature and operating hours, RO 1 PD remained stable in the 1.3 bar to 1.4 bar pressure drop range during the test period. The performance of normalized salt passage (SP) and salt rejection (SR) are plotted in Figure 10. The SR remained a conservative 97% during the test period. Both trains SR basically met the required 97%, except the raw water was of the subsea water type from March 16 to 28, April 14 to 20, and April 22 to 29.

10. Salt adverse system. Normalized salt rejection of RO 1 is a measure of the reverse
osmosis system performance. Source: Dow Water & Process Solutions Salt passage filmtec RO1 Salt rejection filmtec RO1

10 9 8 Salt passage (%) 7 6 5 4 3 2 1 0

100 99 98 Salt rejection (%) 97 96 95 94 93 92 91 90

Operation time (days)

from 19C to 33C and the COD level ranged from 7 mg/l to 32 mg/l. Three key results were observed during this testing:

The normalized permeate flow was very consistent, even with such high variation in the TDS feed conditions (Figure 9). Upstream, the water feed TDS fluctuated, as did the RO 1 driving pressure from the end of February to the end of April be-

cause of seawater refilling. After April, we observed the temperature of the feedwater increased from 25C to 33C, the seawater refilling became weak, and the permeate flow of both trains became stable. The RO 1 system operated at 78% to 80% water recovery, meaning that 80 gallons of good product water were produced for every gallon of raw water supplied. Pressure drop (PD) is the signal that indicates how much contamination is present

www.powermag.com

During the periods of seawater refilling (March 16 to 28, April 14 to 20, and April 22 to 29), the sub-sea waters TDS was in the range of 2,023 mg/l to 2,617 mg/l, and the SR of each of the two trains was lower than in other periods. Hence, similar to the trend of the permeate flow rate, both first-pass RO SRs kept fluctuating until May. The initial SR of RO 1 was 98.32%. After contamination of the sub-sea water, the TDS during the period (2,500 ppm to 2,700 ppm from March to April) in the RO 1s SR declined. After May, the two RO trains SR returned to higher than 97.5% when the raw water TDS decreased. By the end of July, the average normalized SR for RO 1 was 98.4%. The integrated membrane process water system at the Huarun Power Plant continues to reliably produce boiler-quality water from river and sub-sea raw makeup water. Lesser-quality water sources will only become more common as high-quality water resources around the world are stressed to supply the needs of the worlds population. The Huarun Power Plant water treatment design illustrates that desalination is a viable option for industrial water supplies in the future.

Fe b 9- -07 Fe 18 b-0 -F 7 e 28 b-0 -F 7 eb 10 -0 -M 7 22 ar-0 -M 7 a 3- r-07 Ap 14 r-0 -A 7 20 pr-0 -A 7 28 pr-0 -A 7 9- pr-0 M 7 17 ay-M 07 25 ay-M 07 ay 2- -07 Ju 14 n-0 -Ju 7 20 n-0 -J 7 27 un-0 -Ju 7 n 4- -07 Ju 13 l-0 -Ju 7 20 l-07 -Ju 25 l-0 -Ju 7 l-0 7

3-

Echo Zhao(ezhao@dow.com) is regional applications development leader, Asia Pacific, Dow Water & Process Solutions. Yu Fangbing is water treatment plant manager, Huarun Thermal Power Plant. Yasushi Maeda (ymaeda@dow.com) is an applications specialist for Ultrapure Water, Dow Water & Process Solutions.
POWER April 2010

60

Transmission & Distribution

Smart Grid: On the Money


How much will a smart grid cost? Its a question that has gained importance in light of massive cost overruns for one highly touted U.S. project.
By Gail Reitenbach, PhD
he U.S. grid, like almost all national grids, requires expansion and upgrading to serve growing electricity demand, accommodate increased renewable generation sources, improve prevention of and response to outages and security threats, and maximize the efficient transmission of electricity. The cost of improving the grid to meet these goals is highsomewhere in the neighborhood of $65 billion to $165 billion over the next decade or two. The cost of doing nothing is higher. Take, for example, reliability, which tends to decrease as demand on the grid increases and variable renewable generation increases. A June 2001 Electric Power Research Institute (EPRI) report, The Cost of Power Disturbances to Industrial & Digital Economy Companies estimated that the annual direct cost of power outages and power quality disturbances for all sectors (not just those in the survey) was between $120 billion and $188 billion. In its 2003 report, Grid 2030, the Department of Energy (DOE) noted that it is estimated that power outages and power quality disturbances cost the economy from $25 [billion] to $180 billion annually. A more recent 2006 study by Lawrence Berkeley National Laboratory researchers, Cost of Power Interruptions to Electricity Consumers in the United States, found that, based on publicly available data and subject to the limitations discussed . . . the economic cost of power interruptions to U.S. electricity consumers is $79 billion annually. Their caveat: Our analysis of the uncertainty in this estimate suggests that the costs could be as high as $135 billion or as low as $22 billion based on the particular sensitivity assumptions we employed. As end users discover new uses for electricityfrom iPads to plug-in hybrid electric vehicles to the manufacturing of solar modulesthe cost of grid disruptions is likely to move higher. And those are just the direct monetary costs of a less-than-optimal grid. Minimizing those costs by building a more robust and smarter grid seems like a good idea to many people. But even setting aside the gnarly political, regulatory, and jurisdictional issues that make grid projects a nightmare in the U.S. in particular, theres another big hairy concern: paying for an improved grid.

1. Cloudy outlook for smart grid acceptance in SmartGridCity.

Boulder, Coloradowhich typically enjoys more than 300 sunny days per yearhas lately been taking a dimmer view of smart grid project activity and costs than it did when the idea was originally rolled out by Xcel Energy. Though all project implementation costs were expected to be funded by the utilitys vendor partners, costs have begun to be passed on to customers via increased rates. Courtesy: Gail Reitenbach

Not-So-Smart Budgeting for SmartGridCity


As a concept without definitive definition (unlike the molecular description of an element like carbon), the smart grid can mean what its users stipulate that it means in a given context. Thats not necessarily a bad thing nor the sign of a conspiracy. Its just that the smart grid is even more complex in its entirety than the Internet. But it does mean that policy makers and the public need to be aware that one utility may use smart grid project as a way to make business-as-usual transmission and distribution upgrades sound more cutting-edge while another utility may use the phrase to describe an experimental research and development (R&D) project that may or may not deliver the desired results. Xcel Energys SmartGridCity is a case in which the implications of large-scale deployment of what is being described as an R&D project are just now coming to light. Xcels SmartGridCity project costs have ballooned from an initial estimate of $15.3 million to $42.1 million. Although the Colorado Public Utilities Commission (PUC) approved a Jan. 1 rate increase affecting all Colorado Xcel customers to cover capital, operation, and maintenance costs of the Boulder, Colo., project (plus a new coalfired generating plant), its still unclear
www.powermag.com

where all $42.1 million are going to come from. In response to the latest cost news, the PUC has required the utility to file for a post-facto certificate of public convenience and necessity, which would give the PUC authority to regulate the smart grid project. It seems this requirement wasnt triggered earlier because Xcel initially described the project as being supported by a consortium of technology and service vendor-collaborators. How much skin any of those vendors actually has in the game is still unclear. In the meantime, Xcel neglected to apply for the first round of smart grid funds made available under the American Recovery and Reinvestment Act of 2009 (ARRA) and was left without a Plan B when the DOE cancelled round two of ARRA smart grid funding opportunities. The Boulder paper, The Daily Camera, cites this explanation for the cost increases from the utility: The company had to install far more underground fiber than initially projected, substantially increasing the cost . . . Xcel officials wrote in a document filed with the utilities commission last May. We also ran into unexpected construction conditions such as having to drill through granite with diamond-tipped drill bits and remove large boulders with cranes and dump trucks. . . .
61

April 2010 POWER

Transmission & Distribution


You read correctly: unexpected boulders in Boulder, which hugs the abrupt uplift of the Rocky Mountains. The Daily Camera quotes Xcel spokesman Tom Henley as saying, SmartGridCity has always been a research and development process, . . . Its a living and breathing laboratory, and weve always said all along that theres parts that will work and parts that wont work. To be fair, thats true of any new technology. What customers may be less willing to accept is that they, rather than shareholders and project technology partners, are now being asked to cover those experimental R&D costs (Figure 1). methodology. In January, EPRI released a report, cofunded by EPRI and the DOE, whose goal is to present a comprehensive set of methods for estimating the benefits and costs of Smart Grid projects. Its important to note that Methodological Approach for Estimating the Benefits and Costs of Smart Grid Demonstration Projects does not itself offer a new estimate for total U.S. smart grid costs. The closest it comes to a grand total is its citation of a 2004 EPRI report that estimated smart grid costs over 20 years at $165 billion. But if $165 billion sounds like a lot, consider that the 2008 report citing that now-six-year-old figure (S. Pullins, Smart Grid: Enabling the 21st Century Economy) pegged the value of smart grid benefits over 20 years at $638 billion to $802 billion. Not a bad return on investment (ROI). Also note that this proposed framework is for estimating the benefits and costs of Smart Grid Demonstration Projects. It is tackling cost and benefit projections for small parts of that elephantine smart grid that no single U.S. entity can create on its own. The meat of the report focuses on the definition of benefits and a sequential, logical process for estimating them. Beginning with the Smart Grid technologies and functions of a project, it maps these functions to the benefits they produce. The goal is that The methods developed in this study will help improve future estimatesboth retrospective and prospectiveof the benefits of Smart Grid investments. These benefits, including those to consumers, society in general, and utilities, can then be weighed against the investments. Such methods would be useful in total resource cost tests and in societal versions of such tests. As such, the report will be of interest not only to electric utilities, but also to a broad constituency of stakeholders. Until this or some other cost/benefit calculation method becomes standard, it will be difficult to compare the ROI of any two proposed or implemented projects for customers (aka, the ultimate cost-bearers), utilities, government grants, or the environment. The EPRI report identifies four categories of benefits: economic, reliability and power quality, environmental, and security and safety. Here are some of the benefits that would accrue to power generators in particular:

A New Approach to Estimating Smart Grid Costs


Though there may never be a way to estimate the full cost of unforeseen circumstances, a new cost estimate framework may help the entities funding projects large and small compare costs and benefits using a common

Copper Clad S.A. de C.V. www.copperclad.com.mx Alumoclad de Mxico S.A. de C.V. www.alumoclad.com.mx

PRODUCTS:
Copper Clad Aluminum (10% and 15%) Copper Clad Steel (21%, 30% and 40%) Copper Ground Rods Aluminum Clad Steel (For ASCR, Guy Strand and OPGW)

CONTACT US:
Pablo Alvarez Siz palvarezsaiz@copperclad.com.mx palvarezsaiz@alumoclad.com.mx Tel. +5214422390375 MEXICO

CIRCLE 19 ON READER SERVICE CARD 62

Optimized Generator Operation: Better forecasting and monitoring of load and grid performance would enable grid operators to dispatch a more efficient mix of generation that could be optimized to reduce cost.
POWER April 2010

www.powermag.com

Transmission & Distribution


Reduced Generation Capacity Investments: Utilities and grid operators ensure that generation capacity can serve the maximum amount of load that planning and operations forecasts indicate. The trouble is, this capacity is only required for very short periods each year, when demand peaks. Reducing peak demand and flattening the load curve should reduce the generation capacity required to service load, and lead to cheaper electricity for customers. Reduced Ancillary Service Cost: Ancillary services including spinning reserve and frequency regulation could be reduced if generators could more closely follow load. Ancillary services are necessary to ensure the reliable and efficient operation of the grid. The level of ancillary services required at any point in time is determined by the grid operator and/or energy market rules. The functions that provide this benefit reduce ancillary cost through improving the information available to grid operators. It will be interesting to see how quickly the use of this approach is adopted and whether or not the DOE uses it to hold grant recipients accountable.

More on Smart Grid Definitions and Developments


For smart grid definitions and overviews of smart grid project activity in the U.S. and around the world, see these stories in our January 2010 issue:
U.S.

testimony as IBM remains the only corporation that provides hardware, software and consulting for smart grid infrastructure projects in China.

Demonstrated Benefits of Smart Grid Costs


For details about costs and benefits of one of the most comprehensive smart grid rollouts, in Italy, see this February interview with Livio Gallo, director of Enels Infrastructure and Networks Division: http:// tinyurl.com/yhejhk5. Enel invested 2 billion (roughly US$2.7 billion) in its sixyear deployment of 32 million electronic meters. Among the benefits to date: a 62% reduction in minutes of service interruption per customer and a 61% reduction in distributor meter management costs per customer. A November 2009 BusinessWeek story reported that the Italian utility is saving $750 million per year as a result of the project. Furthermore, improved data on consumers electricity habits permit Enel to run its power plants more efficiently. Needless to say, this story is far from the final word on smart grid costs. Stay tuned.

Smart Grid Forecast: Flurries of Activity What Do Customers Expect from the Smart Grid? Which Countrys Grid Is the Smartest? borders. Zpryme notes that Just recently, GE aligned itself with Yangzhou, China to construct a smart grid demonstration center. Similar steps forward are being echoed from industry-leading players such as Cisco, Accenture, Hewlett-Packard, ABB, Westinghouse, and Oraclewhich are buying into a generous stake of Chinas smart grid market. Whats more, Business Week recently reported that IBM expects at least $400 million in smart-grid revenues in China over the next four years. Fitting

Gail Reitenbach, PhD is POWERs managing editor.

Governments Pouring Money into Smart Grids


The U.S. government isnt the only one lending a hand to smart national grid projects. According to a Jan. 27 report by Zpryme, China is already outspending the U.S. in terms of federal dollars devoted to smart grid projects. Heres its ranking of 2010 investments (in US$ millions): 1. China: $7,323 2. U.S.: $7,092 3. Japan: $849 4. South Korea: $824 5. Spain: $807 6. Germany: $397 7. Australia: $360 8. UK: $290 9. France: $265 10. Brazil: $204 Granted, China is starting with a blank slate in many respects, whereas the U.S. has a head start. The flip side of that dynamic: The very presence of any existing transmission and distribution infrastructure creates a larger hurdle for grid improvements because it can create a false sense that the status quo is just fine. Meanwhile, U.S. companies are taking note of where R&D and project implementation opportunities liebeyond U.S.
April 2010 POWER

Get ready for the new

energy revolution

The TurboCare Magma 5000 geothermal re-rateable steam turbine provides the flexibility to assure asset performance and value through the life of your geothermal plant.

www.turbocare.com
circle 20 on reader service card 63 3/3/10 9:48:00 PM

www.powermag.com PowerMag_TC_March10.indd 1

new products
Stainless Triplex Plunger Pumps

TO POWER YOUR BUSINESS

CAT PUMPS recently introduced two new stainless steel triplex plunger pumps featuring a 316 stainless steel liquid-end for corrosion resistance. The 7CP6111 and 7CP6171 are designed for pumping liquids like seawater in small seawater reverse osmosis installations, demineralized water for misting, or hot water and sanitizers for sterile cleaning systems. The 7CP stainless steel pumps offer the flexibility of either belt-drive or direct-drive bell housing mounting. Both pumps provide a compact, space-saving footprint and deliver 10.5 gpm of up to 2,000 psi. The 7CP6111 pump (shown here) features a single-shaft, direct drive 1,750 rpm, while the 7CP6171 features a single-shaft belt drive of 1,450 rpm. Preassembled motor pump units are also available with either a 10-hp or 15-hp motor. (www.catpumps.com)

Microprocessor-Based Vibration Amplifier

Rugged Servo Inclinometer

UK-based Sherborne Sensors has introduced the LSI series of closedloop gravity-referenced servo inclinometers to the North American market. The family of inclinometers is specially designed to withstand severe shock and vibration inputs for precise measurements in demanding environments. The series incorporates a unique, flexure-supported torque-balancing system that is rugged enough to withstand shock inputs of up to 1,500 g, but which still provides accuracy and repeatability over a wide operating temperature range. Sensor components and associated electronics are contained within IP64 environmentally sealed housing. Units are available in ranges of 14.5 degrees, 30 degrees, and 90 degrees and offer a high-level, 5-volt analog DC-output signal, proportional to sine of the angle of tilt. LSI series models are fully self-contained and can connect to a DC power source and a readout or control device to form a complete operating system. (www.sherbornesensors.com)

Sensing and monitoring systems supplier Meggitt PLC launched the Endevco model 6634C, a microprocessor-based vibration amplifier that has been designed to condition and display rotating machinery data in simultaneous outputs, such as broadband, acceleration, velocity, and displacement. Model 6634C is designed to accept inputs from a single-ended, differential piezoelectric or ISOTRON (IEPE-type) accelerometer, velocity coil, or remote charge converter. Full-scale AC and DC output ranges, as well as sensitivity, are user-programmable in selectable engineering units, representative of acceleration, velocity, or displacement. Programming is accomplished from the front panel keyboard or optional RS-232 computer interface. Units also have an optional six-pole filter, which may be programmed from the front panel. Up to 10 unique setups can be stored and recalled from the nonvolatile memory, while two TTLcompatible latched alarm outputs provide both warning and alert functions. An optional 19-inch mounting rack from Meggitt Sensing Systems can accommodate up to six units. (www.endevco.com)

64

www.powermag.com

POWER April 2010

NEW PRODUCTS

DC Power Sources for High-Production Welding


ESAB Welding & Cutting Products LAF series of three-phase, fan-cooled DC welding power sources are designed for high-productivity mechanized submerged arc welding or high-productivity GMAW welding. Made for use in combination with ESABs A2-A6 equipment range and the A2A6 Process Controllers (PEK or PEI), LAF welding power sources offer excellent welding characteristics throughout the entire current and voltage range, with particularly good starting and re-ignition properties. These power sources demonstrate good arc stability at both high and low arc voltages, and they can be adjusted and monitored from the front panel of the process controller for easy adjustment of all welding parameters. The welding current range can be extended by connecting two power sources in parallel for the most demanding applications. The power sources are also designed to be used with the fully digital PEK controller for maximum functionality or with the PEI controller with basic functionality for less-demanding applications. Each power source is prepared for communication using most standard protocols, including TCP/IP (LAN), Anybus, Profibus, CAN, or even straight communication with a PLC. (www.esab.com)

Encased High-Speed Imaging Cameras

Universal Input/Output Transmitters

Honeywell has added universal input/output (I/O) transmitters to its family of XYR 6000 wireless products. The transmitters allow manufacturers to wirelessly monitor more plant points with fewer devices. The company says that by transmitting signals from up to three different types of inputsincluding measurement devices with a high-level analog, temperature or milli-volt, or contact-closure switch inputthe XYR 6000 Universal I/O transmitters can help plants save up to 30% in costs over similar devices that can transmit signals from only two inputs. This XYR 6000 family of transmitters is ideal for applications such as wirelessly monitoring level switches, pump status, and system alarms. The devices also carry intrinsically safe approvals from FM Global and the Canadian Standards Association for use in hazardous areas. (www.honeywell.com/ps/wireless)

High-speed imaging systems manufacturer Photron introduced hardware to extend the normal operating temperature range of the Fastcam SA5 and Fastcam SA2 high-speed cameras. The Range Version (RV) is a new sealed case design that makes the camera models impervious to dirt, dust, and sand. Photrons RV option includes two serviceable external fans that direct cooling air over the sealed camera body. This keeps the operating temperature stable and makes it ideal for high-speed imaging in harsh environments. Photrons Fastcam SA5 camera provides up to 7,500 frames per second (fps) at megapixel resolution (1,024 x 1,000), while its SA2 camera delivers up to 1,000 fps at full-pixel resolution (2,000 x 2,000). The cameras are available with an optional DC battery pack and a remote keypad with a built-in LCD viewfinder. (www.photron.com)

Inclusion in New Products does not imply endorsement by POWER magazine.


April 2010 POWER

www.powermag.com

65

Failure to realize its potenti explosive results!

Combustible D

Dont miss PRB Coal


20 0 1 -2010
10th Anniversary

Co-located with ELECTRIC

Look Whos Speaking


Tuesday, May 18, 2010 PRB Keynote: OSHa Today
The Honorable John S. Bresland
Chairman and CEO U.S. Chemical Safety Board
In 2003, the Chemical Safety Board (CSB) launched investigations of three major industrial explosions involving combustible powders. These explosionsin North Carolina, Kentucky, and Indianacost lives and caused numerous injuries and substantial property losses. The CSB responded by launching a nationwide study to determine the scope of the problem and recommend new safety measures for facilities that handle combustible powders. The PRB annual meeting is framed to start with an explanation of the driving reasons for increased rulemaking. Dust explosions kill and injure American workers, destroy jobs and businesses, and shatter communities. This presentation will draw on lessons learned from recent investigations of accidents involving dust. It will also share the CSBs findings and recommendations for the prevention of future dust accidents.

In 2003, the Chemical Safety B investigations of three major involving combustible powders. North Carolina, Kentucky, and In caused numerous injuries and losses. The CSB responded by l study to determine the scope recommend new safety measu handle combustible powders. Th is framed to start with an expl reasons for increased rulemakin and injure American workers businesses, and shatter commun The Honorable will draw on lessons learned from John S. Bresland of accidents involving dust. It wil Chairman and CEO findings and recommendations U.S. Chemical Safety Board future dust accidents David Michaels, PhD, MPH

Assistant Secretary of Labor Occupational Safety & Health

Learn whats currently Learn what's currently on OSHA' working on to protect workers, a on OSHAs agenda, what the electric theyre working on to power generation perspectives on combustible dus protect workers, and how will address current safety & he it may impact the electric perspectives, including a ren power generation industry. enforcement and what new fronti Hear their perspectives on combustible dust. A leader from OSHA will address current safety & health issues, offer their David Michaels, PhD, MPH perspectives, including a renewed emphasis on AssistantSecretary of Labor enforcement and what new frontiers they may Occupational Safety & Health explore.

Additional topics related to boiler & combustion, coal handling, fire & safety can be found online at www.electricpower.com or www.prbcoals.com

www.prbcoals.com
May 18-20, 2010 BaLTImORE, mD

Dust

ial yields

Board (CSB) launched industrial explosions These explosionsin ndianacost lives and d substantial property launching a nationwide of the problem and ures for facilities that he PRB annual meeting lanation of the driving ng. Dust explosions kill s, destroy jobs and nities. This presentation Coal Handling System: Fire Case Study m recent investigations ll also share the CSBs An explosion and resulting fire in a take-up tower for the prevention of and conveyor prompts review of all coal han-

Users Group Annual Meeting


Snapshot of PRB Annual Meeting Topics
NFPA Standards in the Utility Coal Industry
NFPA 850 is a recognized standard addressing fire protection and loss prevention for electric generating plants. Learn about the changes and how NFPA helps you in preventing fires and losses.

POWER 2010

dling procedures and practices.

Coal Tunnel Explosion


A devastating explosion rips through an under-

ground 's agenda, what they're coal reclaim tunnel resulting in extensive and how it maydamage. impact The response, the analysis, and inforindustry. Hear theiron prevention will be shared. mation st. A leader from OSHA Combustible Dust Update ealth issues, offer their newed emphasis on A summary of the latest Combust Dust rulemakiers they may explore. ing efforts.

Risk Tool: Safety & Health, Fire Protection


An overview of a tool intended to enhance the understanding of, and provide direction for, the safe handling and burning of PRB coals.

Combustible Dust Compliance Strategy


Case study of an utility using a combination of employee training and involvement, procedures, and existing risk management approaches to raise awareness and effectively manage dust.

Teachable Moments
When unplanned events occur and the analysis of the event is complete, others may learn how to prevent similar occurrences if the openness to create teachable moments exists. Heres a few:
Flyash silo fire Coal feeder flash fire Combustible dust flash during housekeeping Coal pipe (flash) fire Coal conveyor fire PAC (activated carbon) silo fire

Respirable Dust
Stop the continuation of health hazards at current levels through a discussion that connects combustible dust and EPA compliance expectations to enable a comprehensive and coordinated approach towards safety and health.

to register, contact JiLL DeAn, 713-343-1880, jilld@tradefairgroup.com

or visit www.electricpower.com

Baltimore Convention Center

Power plant Buyers Mart


Need help? Need a job?
SERVICES LINEAL RECRUITING
Contact Lisa Lineal in confidence

www.Lineal.com LisaLineal@Lineal.com

Toll free 877-386-1091


Electric Power Systems & Service Specialists Se habla Espaol

POWERPROFESSIONALS
Opportunities in Operations and Maintenance, Project Engineering and Project Management, Business and Project Development, First-line Supervision to Executive Level Positions. Employer pays fee. Send resumes to:
P.O. Box 87875 Vancouver, WA 98687-7875 email: dwood@powerindustrycareers.com (360) 260-0979 l (360) 253-5292 www.powerindustrycareers.com

BIOMASS COFIRING?
Want to: Store biomass in silos? Store in piles or domes? Automate the reclaim? Control the flow? The answer: Laidig Systems
Generator Outage Measurements
www.laidig.com
READER SERVICE NUMBER 200

READERSERVICENUMBER 202

Seawater Chlorinators

Hard probing &

205-590-3505 sales@maegen.com

3D scanning Short notice Travel anywhere

Titanium Anodes & Cathodes Electrolyzers / Cells


www.tianode.com . info@tianode.com
READERSERVICENUMBER 205

15 kW TO 5.2MW GENERATOR SETS READY TO SHIP WORLDWIDE


www.midamericaengine.com
READERSERVICENUMBER 201 April 2010 POWER

952-884-9648 gksturbine.com
READERSERVICENUMBER 203

GEORGE H. BODMAN, INC.


Chemical cleaning advisory services for boilers and balance of plant systems

GEGU's - 760 KW Caterpillar Model TA 130 LE Lean Burn natural gas fired 480 volts (QTY 2) GTGUs - 35 MW General Electric LM5000 natural gas fired 13,800 volts (QTY 2) BOILERS - 200,000#/HR Combustion Engineering package - 600# steam pressure - gas fired - 25,000#/HR ABCO - 150# steam pressure natural gas and propane fired (QTY 4)
We buy and sell transformers, boilers, steam turbine generator units, gas turbine generator units, diesel engine generator units, etc.

George H. Bodman
Pres. / Technical Advisor BoilerCleaningDoctor.com Office 1-800-286-6069 Office (281) 359-4006 POBox 5758 E-mail: blrclgdr@aol.com Kingwood, TX 77325-5758 Fax (281) 359-4225
READERSERVICENUMBER 204 www.powermag.com

INTERNATIONAL POWER MACHINERY CO.


50 Public Square - Terminal Tower, Suite 834 Cleveland, OH 44113 U.S.A. PH 216-621-9514/FAX 216-621-9515 Email: kernx06@sbcglobal.net Web: www.intlpwr.com
READER SERVICE NUMBER 206 69

PRODUCT

Showcase

Power plant Buyers Mart

READERSERVICENUMBER 207

READERSERVICENUMBER 209

FOR SALE/RENT

24 / 7 EMERGENCY SERVICE BOILERS


20,000 - 400,000 #/Hr. 50 - 25,000 KW 25 - 4000 HP

Need a Thorough Mix?


Ash, coal, sludges, what do You need to mix?

DIESEL & TURBINE GENERATORS GEARS & TURBINES


Air Pre-Heaters Economizers Deaerators Pumps Motors Fuel Oil Heating &Pump Sets Valves Tubes Controls Compressors Pulverizers Rental Boilers & Generators

WE STOCK LARGE INVENTORIES OF:

Get a thorough mix with:


P.O. Box 60 Columbia, TN 38402 USA ph: 931/388-0626 fax: 931/380-0319 www.pugmillsystems.com
READER SERVICE NUMBER 210
READERSERVICENUMBER 212

847-541-5600 FAX: 847-541-1279 WEB SITE: www.wabashpower.com

Pugmill Systems, Inc.

wabash

POWER

EQUIPMENT CO.

444 Carpenter Avenue, Wheeling, IL 60090


READERSERVICENUMBER 208

Classifieds

POWER

To Advertise in

CONDENSER OR GENERATOR AIR COOLER TUBE PLUGS THE CONKLIN SHERMAN COMPANY, INC.

Need Cable? From Stock


Copper Power to 69kv; Bare ACSR & AAC Conductor; Underground UD-P & URD, PILC-AEIC; Interlock Armor to 35kv; Copper Instrumentation & Control; Thermocouple Fax (773) 539-3500 Ph. (800) 227-4292 E-Mail: basicwire@basicwire.com WEB SITE: www.basicwire.com
READER SERVICE NUMBER 213

Easy to install, saves time and money.


ADJUSTABLE PLUGS - all rubber with brass insert. Expand it, install it, reverse action for tight fit. PUSHPULLPLUGS- are all rubber, simply push it in. Sizes 0.530 O.D. to 2.035 O.D. Tel: (203) 881-0190 Fax:(203)881-0178 E-mail: Conklin59@aol.com www.conklin-sherman.com OVER ONE MILLION PLUGS SOLD

CONTACT Diane Hammes


Phone: 713-343-1885 Fax: 832-251-8963

Basic Wire & Cable

dianeh@powermag.com

READERSERVICENUMBER 211

70

www.powermag.com

POWER April 2010

AdVERTiSERS indEx
Enter reader service numbers on the FREE Product Information Source card in this issue.
Page
www.ansaldoenergia.it www.babcock.com www.bechtel.com

Reader Service Number


www.petrovalve.com

Page

Reader Service Number

AnsaldoEnergia . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .39 . . . . . . . . 17 Babcock & Wilcox . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Cover 4 . . . . . . . . 22 Bechtel . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5 . . . . . . . . . 4 Chromalloy . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .13 . . . . . . . . . 8


www.chromalloy.com

Petro-Valve . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2, 10 . . . . . . . 2, 7 Platts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 55


www.udidate.platts.com

Powermatics . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .20 . . . . . . . . 11
www.powermatics.us

Rentech . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Cover 2 . . . . . . . . . 1
www.rentechboilers.com www.shawgrp.com

CleaverBrooks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .15 . . . . . . . . . 9
www.cleaverbrooks.com/engineered

Shaw Group . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3 . . . . . . . . . 3 Solutia Therminol . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .36 . . . . . . . . 16


www.therminol.com www.stf.it

ConocoPhillips Lubricants . . . . . . . . . . . . . . . . . . . . . . . . . . . . .9 . . . . . . . . . 6
www.conocophillipslubricants.com/POWER www.copperclad.com.mx

Copperclad . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .62 . . . . . . . . 19 GE Energy . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .7 . . . . . . . . . 5


www.ge-energy.com/gasification www.gpilearnwbt.com

STF S .p .A . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .41 . . . . . . . . 18 Turbocare . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .63 . . . . . . . . 20


www.turbocare.com

General Physics Corp . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23 . . . . . . . . . 13 Hitachi Power Systems America . . . . . . . . . . . . . . . . . Cover 3 . . . . . . . . 21


www.hitachipowersystems.us www.jeffreyrader.com/videoB www.paharpur.com

Victory Energy . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .20 . . . . . . . . 12


www.VictoryEnergy.com

Jeffrey Rader . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .29 . . . . . . . . 15 Paharpur . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .17 . . . . . . . . 10 Penn Crusher . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .27 . . . . . . . . 14


www.penncrusher.com/positive

CLASSiFiEd AdVERTiSinG
Pages 6970, To place a classified ad, contact: Dianne Hammes, POWER magazine, 713-343-1885, dianeh@powermag.com

Where Does the Industry Find Its Best People?

POWER magazine has served the generation industry for more than 125 years. Now POWER is making it easier than ever for industry professionals to find career opportunities and for hiring authorities to find the best candidates for open positions. The Careers-in-POWER job board on powermag.com allows visitors to post resumes anonymously, view the latest job positions, post job listings, and set up personal job alerts.

JOB SEEKERS:
Access the most recent positions available to engineers, operations and maintenance managers, and corporate and general managers at coal, nuclear, combined-cycle, and alternative power facilities.

EMPLOYERS/RECRUITERS:
Attract highly qualified candidates by posting open positions on the Careers-in-POWER job center. Visit Careers-in-POWER on powermag.com to become part of the fastest growing site dedicated to connecting power generation employers and employees. Contact: Diane Hammes at dianeh@powermag.com; 713-343-1885.

www.CAREERSinPOWER.com
April 2010 POWER

www.powermag.com

71

Commentary

Rethinking the Power Industrys Dash to Gas


By Bert Kalisch
uring a recent meeting of state utility commissioners, the CEO of a Fortune 500 electric power company said natural gas prices promise reliability but always break your heart. What breaks my heart is the electric power industrys ongoing love affair with natural gas. Using natural gas for generating electricity is not the best or highest use for this clean, green, and domestically abundant resource.

Growing Storage Capacity

The ability to store those new gas supplies is increasing, which lessens the need to use the fuel immediately for electric generation. The U.S. has the largest capacity for underground storage of natural gas in the world. Natural gas supply is injected and stored in more than 425 facilities across the country in geologic settings including depleted oil and gas

Focusing on the Best Use for Natural Gas

Our energy system will always require some natural gas to be made into electrons. Today 22% of electricity is generated by natural gas. But any engineer will tell you that the most efficient and carbon friendly way to use natural gas is piping it directly into homes and businesses. Policy makers should seek to design policies that incentivize our reliable energy supplies being put to their highest and best use at reasonable costs. Direct use of natural gas does just that. It is indisputable that for every 100 molecules of methane produced at the wellhead, more than 90 are delivered directly to the stoves burner tops in my Virginia home. On the other hand, electrons generated from fossil fuels are less than 30% efficient. Basic physics tells you that converting energy reduces Btus. In fact, former U.S. Energy Secretary Samuel Bodman said that burning natural gas for electric generation is like washing dishes with a good scotch.

The dash to gas has also led to concern that the infrastructure will not be adequate to handle the increasing demand.
reservoirs, aquifers, and salt caverns (bedded salt formations). Operational underground working gas storage capacity increased by about 100 billion cubic feet (Bcf) from the spring of 2008 to April 2009. In fact, the new total of more than 3.8 tcf was essentially filled prior to the 20092010 winter heating season, resulting in the largest inventory of working gas ever recorded. A very cold start to winter in December 2009 and January 2010 attested to the value of growing storage. Utilities draw 15% to 20% of all gas consumed during the period of November to March from working gas. This flexibility is crucial to meeting heating load peak demands by local gas utility customers, and all customers for that matter. The dash to gas has also led to concern that the infrastructure will not be adequate to handle the increasing demand. Investment in natural gas pipeline infrastructure continues to grow steadily while the industry maintains a strong record of safety. In 2008, an estimated $11.4 billion was invested to complete 84 pipeline projects, adding 44.6 Bcf per day of capacity to the pipeline grid. These figures represent a nearly threefold increase over 2007, when $4.3 billion was spent to complete 50 projects that added 14.9 Bcf per day of capacity to the network.

An Abundant, Clean Energy Source

In the past decade, many electric utilities have dashed to natural gas for its flexibility and cleaner-burning properties in anticipation of a carbon cap. Natural gas is over 50% less carbon intensive than coal. Almost 90% of the U.S. power generation capacity that has been added since 1998 is natural gasfired. Today there are more than 1,700 power plants in the U.S. that generate electricity from natural gas. According to the U.S. Energy Information Administration (EIA) 2010 Short-Term Energy Outlook, over 50% of the expected 23,475 MW of new generation capacity planned in the U.S. will be natural gasfired additions. There is certainly ample gas to meet our future needs. In 2008, the joint government-industry-academic Potential Gas Committee published its highest-ever estimate of domestic natural gas reserves: 2,074 trillion cubic feet (Tcf). This estimate was 35% higher than two years earlier and 77% higher than the estimate made in 1990. The committee reported that approximately 600 Tcf (29%) of the estimated 2,074 Tcf is gas produced by unlocking shale formations. Going forward, the EIA projects that natural gas production from U.S. unconventional resources such as shale will increase 35%, or 3.2 Tcf, through 2030. Our collective goal should be to put these new supplies to their most efficient use and be mindful of overreliance on gas to generate electrons.
72

The Better Option: Direct Use of Natural Gas

Ample indigenous gas resources, record gas storage, and flexible and reliable pipelines all help to make the natural gas system one of the most efficient energy systems in the U.S. We should build on this system by dashing to more direct use of natural gas in homes and businesses. Gas should be a building block of a secure energy future for Americanot a bridge. Bert Kalisch (bkalisch@apga.org) is president and CEO of the American Public Gas Association in Washington, D.C.
POWER April 2010

www.powermag.com

SCR
AQCS BOILERS NUCLEAR TURBINES

... vertically integrated to meet your total power generation and environmental needs.

HITACHI POWER SYSTEMS AMERICA


Mixers Patented Hoo od AIG

SCR HIGHLIGHTS

World leader offering state-of-the-art catalyst and SCR system technology Over 350 systems installed worldwide Supplied catalyst for over 700 units worldwide SCR systems for coal-fired units in the US

Two Layers of Catalyst

The only catalyst manufacturer who offers


Recently developed and now commercially available: CM catalyst for longer service life TRAC (TRiple Action Catalyst) for higher mercury oxidation and lower SO2 conversion for PRB and eastern bituminous fuels

Hitachi Power Systems America, Ltd. 645 Martinsville Road Basking Ridge, NJ 07920 Tel: 908.605.2800