1.- DATOS PARA EL DISEO


- Sobrecarga S/C 1 Techo

300 Kg/m =

0.30

Ton/m

- Sobrecarga S/C 2 Techo

300 Kg/m =

0.30

Ton/m

- Sobrecarga S/C 3 Techo

300 Kg/m =

0.30

Ton/m

- Sobrecarga S/C 4 Techo

300 Kg/m =

0.30

Ton/m

- Sobrecarga S/C 5 Techo

300 Kg/m =

0.30

Ton/m

- Resitencia a la Compresin del Concreto


f'c =
- Capacidad Admisible del Terreno q ad =

Kg/cm =
2.00 Kg/cm =

0.21
Ton/cm
20.00 Ton/m

2.- PLANTA GENERAL


15.20
4.98

4.98

C-4

C-2

C-2

C-4
4.0

C-2

C-2

Portico

C-4

Portico

Portico

Portico

8.00

C-4

4.0

A1

Porticos
3.- PREDIMENSIONAMIENTO DE LOSAS ALIGERADAS
t

L
25

4.98
25

0.199

= 0.20 mts.

(1 techo)

4.- METRADO DE CARGAS PARA PREDIMENSIONAMIENTO


1 TECHO

2 TECHO

CARGA MUERTA :
- Peso Aligerado de 0.20: m.300 Kg/m

- Peso Tijeral

150

Kg/m

- Peso de Acabados

: 100

"

- Peso de Acabados

50

"

- Peso de Tabiqueria

: 150

"

- Peso de Tabiqueria

100

"

Consultor: Arq. Eduardo Enrique Piana Sessarego

UNIVERSIDAD DE HUANUCO
FACULTAD
: INGENIERIA
ESC. ACAD. PROF. : INGENIERIA CIVIL
CURSO
: CONCRETO ARMADO I

MEMORIA DE CLCULO
- Peso de Columnas

: 100

- Peso de Vigas

: 100
"
= 750 Kg/m

WD

"

- Peso de Columnas

100

"

- Peso Vigas Viga

:
=

100
500

"
Kg/m

WD =

300

Kg/m

WD

CARGA VIVA :
- Sobrecarga S/C W D = 200 Kg/m

- Sobrecarga S/C

CARGA TOTAL :
w1 =

950 Kg/m

w2 =

800

Kg/m

w1 =

0.95 Ton/m

w2 =

0.80

Ton/m

5.- PREDIMENSIONAMIENTO DE ELEMENTOS ESTRUCTURALES


5.1.- PREDIMENSIONAMIENTO DE COLUMNAS (tipos C-2 y C-4)
Segn el criterio japones (zonas muy sismicas) se analizara la columna C-2, considerada la ms crtica.

TIP
O
DE
COL
UM
NA

NU
M.
DE
PIS
OS

AREA

FACTOR

Pu

Ps=K.Pu

(Ton/m2)

(Ton)

(Ton)

TRIBUTARIA
(m2)

C-2 ###

19.96

1.25

0.95 94.81

118.51 ###

C-4 ###

9.98

1.50

0.95 47.41

71.11 ###

f'c

bD

(Ton/cm2)

(cm2)

(cm)

(cm)

0.21 2257.4

40

56

0.21

35

50

1693

5.2.- PREDIMENSIONAMIENTO DE VIGAS


Porticos
h

L
12
B
20

8.00
12
4.98
20

0.67

= 0.70 mts.

###

= 0.30 mts.

Entonces = ### x

(mnimo)

0.70

Muros PortantesVIGA-2
h

L
12
B
20

4.98
12
8.00
20

0.42

0.40

Entonces = 0.40 x

Consultor: Arq. Eduardo Enrique Piana Sessarego

= 0.50 mts.

= 0.30 mts.

0.50

(mnimo)

5.3- PREDIMENSIONAMIENTO DE ZAPATA DE Z1 (Columna C1)


Para disear la zapata calculamos con los predimensionamientos de los elementos estrructurales calculados

PISO CONSTRUIDO
N=0, S=1
CUARTO
0 AREA TRIBUTARIA
TERCER
0
Ancho
Largo
SEGUNDO
1
(m)
(m)
PRIMERO
1
3.55
5.80

Area
(m2)
20.59

SEGUNDO PISO

AnchoPeralte, hDensidad Longitud


(m)
(m)
(Tn/m3,m2)
(m)
TECHO (2 )
0.15
VIGAS (2)
0.30
0.70
2.40
3.55
0.30
0.40
2.40
5.80
0.00
0.00
0.00
0.00
MUROS (2 )
0.20
2.20
0.10
3.55
0.20
2.20
0.10
5.80
0.25
0.00
0.10
0.00
ACABADOS (2 )
0.10
COLUMNAS (2 )
0.30
0.30
2.40
3.00
0.00
0.00
0.00
0.00
SOBRECARGA (2 )
0.30

Peso
(Tn)
3.09
1.79
1.67
0.00
0.78
1.28
0.00
2.06
0.65
0.00
6.18

PRIMER PISO

Peso
(Tn)
6.18
1.02
2.92
0.00
0.78
1.28
0.00
2.06
0.65
0.00
6.18

AnchoPeralte, hDensidad Longitud


(m)
(m)
(Tn/m3,m2)
(m)
TECHO (1 )
0.30
VIGAS (1)
0.30
0.40
2.40
3.55
0.30
0.70
2.40
5.80
0.00
0.00
0.00
0.00
MUROS (1 )
0.20
2.20
0.10
3.55
0.20
2.20
0.10
5.80
0.20
0.00
0.10
0.00
ACABADOS (1 )
0.10
COLUMNAS (2 )
0.30
0.30
2.40
3.00
0.00
0.00
0.00
0.00
SOBRECARGA (1 )
0.30
PD =
PL =

Consultor: Eduardo Enrique Piana Sessarego

26.20 Tn
12.35 Tn

3.09 Tn

3.46 Tn

2.06 Tn
2.06 Tn
0.65 Tn
6.18 Tn

6.18 Tn

3.95 Tn

2.06 Tn
2.06 Tn
0.65 Tn

Peso Propio
Peso de Servicio

6.18 Tn

DATOS
PD =

26.20 Tn

Peso Propio

PL =

12.35 Tn

Peso de Servicio

st =

2.00 Kg/cm2

Resistencia del suelo

Df =

1.50 m

Profundidad de cimentacin

NPT =

0.15 m

hf =

1.65 m

fc z =

210 Kg/cm2

Fy =

4,200 Kg/cm2

Calidad de concreto en la zapata

gm =

2.10 Tn/m3

Peso Especifico del suelo

S/C =

250 Kg/m2

Sobrecarga del piso

Limite de fluencia

Dimensionar la columna por :


n=

0.25

P = PD + PL
Ps = 1.25*P
fc=

210 Kg/cm2

b D =

P=

38.55 Tn

Ps =

48.19 Tn

Calidad del concreto de la columna

Ps
n fc

bD =

0.09 m2 (DISEO)

bD =

0.09 m2

b=

0.30 m

D=

0.30 m

Ag =

s n = s t - g m hf - S / C
Az = P/ s n

sn =
Az =

Usar :

900.00 cm2 (ARQUITECTURA )


16.29 Tn/m2
2.37 m2

Lado =

1.54 m

T=

1.60 m

S=

1.60 m

Usar :

Az =

2.56 m2

Comprobando :

Lv1 =

0.65 m

Ok !!!!!!!!!!!

Lv2 =

0.65 m

Pu =

57.68 Tn

REACCION NETA DEL TERRENO


Pu = 1.4*PD + 1.7*PL
W NU =

Pu / Az =

W NU =

DIMENSIONAMIENTO DE LA ALTURA hz DE LA ZAPATA

Consultor: Eduardo Enrique Piana Sessarego

22.53 Tn/m2

Por Punzamiento

CONDICION DE DISEO : Vu / f =Vc

Vu

(Pu

f =

- Wu (D + d )(b + d ))

b c = Dmayor / Dmenor

0.53

L L L (1)
bc=

1.00 < 2.00

vc = 1.06 fc
Vc = 1.06

fc

bo d

L L L L (2)
(1) = (2)

Donde :
bo = 2(D+d)+2(b+d)
bo = 2(b + D + 2d)
d=

0.2397

0.0000

Vu

Vc

Vu > Vc

0.2397

51.1172

42.1281 Ok

0.2397

51.1174

42.1256 Ok

0.2397

51.1177

42.1230 Ok

0.2397

51.1179

42.1205 Ok

0.2397

51.1181

42.1179 Ok

0.2397

51.1184

42.1154 Ok

0.2396

51.1186

42.1129 Ok

0.2396

51.1189

42.1103 Ok

0.2396

51.1191

42.1078 Ok

0.2396

51.1194

42.1053 Ok

0.2396

51.1196

42.1027 Ok

d=
r=
Diametro Acero =

0.24 m ...( I )
0.075 m
1/2

0.0127

El perlate de la zapata debe ser capaz de permitir el desarrollo de refuerzo en comprensin del
refuerzo de la columna.(ACI-12.3.2)

Consultor: Eduardo Enrique Piana Sessarego

ldc = 0.08 d b

Fy
fc'

ldc 0.004 d b Fy

l dc =

0.29 m ...( I I )

l dc =

0.21 m ......( I I I )

Escogemos el maximos valor entre los valores de (I), (II) y (III)


Tenemos :

d=

0.29 m

h = d+r

h=

0.37 m

Usar :

h=

0.40 m

Usar :

d=

0.32 m

VERIFICACION POR CORTE


Vdu = (Wu*S)(Lv-d)
Vn = Vdu / f

Vc = 0.53 fc bd

Vdu =

11.95 Tn

Vn =

14.05 Tn

Vc =

39.16 Tn

Vn < Vc ? CONFORME
DISEO POR FLEXION

Mu =

1
(W u S) L2v
2

Mu =

f =

0.90

As =

Mu

a (cm)

As (cm)

a(cm)

6.37

7.0251

1.0331

6.4268

0.9451

6.4178

0.9438

6.4176

0.9438

6.4176

0.9438

6.4176

0.9438

6.4176

0.9438

a =

a
f F y(d - )
2
As Fy
.85 fc S

7.62 Tn-m

As =

6.42 cm2

As min =

9.18 cm2

As =

9.18 cm2

VERIFICACION DE As_minimo

As

min

= rtem bd
Usar ;

D (Pgda)

cm

cm2

Usar acero de :

3/8

0.95

0.71

Diametro =

1/2

1.27

1.27

Area =

5/8

1.59

1.98

3/4

1.91

2.85

n=

5.07

s=

2.54

s =

S - 2r - f
n -1

Consultor: Eduardo Enrique Piana Sessarego

Usar :

1/2 "
1.27 cm
1.27 cm2
7.20 Und.
23.18 cm

7 Acero1/2@ 0.23

0.23

7 Acero1/2@

0.30

1.60

0.30
Malla de Acero1/2@ 0.23

1.60

5.4.- VERIFICACION DIMENSIONAMIENTO DE CIMIENTOS CORRIDOS


El predimensionamiento de este elemento se realiza usando las cargas totales (muerta + viva) de
servicio y la presin admisible del terreno. El anlisis es por metro lineal de cimiento (B = 1.00 mt.)
Las cargas actuantes se muestran en el siguiente cuadro:
PISO ANCHO TRIBUT W D

WL

PD

PL

(m2)

(Ton/m2)

(Ton/m2)

(Ton)

(Ton)

(Ton)

0.00

0.50

0.30

0.00

0.00

1
Totales

0.00

0.75

0.20

0.00
0.00

0.00
0.00

0.00

Tenemos :

B =

Usar:

Consultor: Eduardo Enrique Piana Sessarego

P
qn

P=
qn =

0.00 Ton
20.00 Ton/m2

B=

0.00 m

B=

0.40 m (Minimo)

B=

0.40 m

PREDIMENSIONAMIENTO DE ZAPATA Z-2 (Columna C-2)


Para disear la zapata calculamos con los predimensionamientos de los elementos
estrructurales calculados
DATOS
CM =

72.92 Tn

Carga muerta

CV =

35.32 Tn

Carga viva

PS =

81.74

Peso de servicio

st =

2.00 Kg/cm2

Resistencia del suelo

Df =

1.50 m

Profundidad de cimentacin

NPT =

0.15 m

hf =

1.65 m

fc z =

210 Kg/cm2

Fy =

4,200 Kg/cm2

gm =

2.10 Tn/m3

Peso Especifico del suelo

S/C =

250 Kg/m2

Sobrecarga del piso

A=

Ps
Resiatenci a del suelo

A=

81.74 ton
2.00 kg/m2

Dimensionar la columna por :

Consultor: Eduardo Enrique Piana Sessarego

Calidad de concreto en la zapata


Limite de fluencia

A=

4.09 m2

L=
L=

2.02 m
2.02 m

n=

0.25

P = PD + PL
Ps = 1.25*P
fc=

210 Kg/cm2

38.55 Tn

Ps =

48.19 Tn

Calidad del concreto de la columna

Ps
n fc

b D =

P=

bD =

0.09 m2 (DISEO)

bD =

0.09 m2

b=

0.30 m

D=
Ag =

s n = s t - g m hf - S / C

0.30 m
900.00 cm2 (ARQUITECTURA )

sn =

Az = P/ s n

Az =

16.29 Tn/m2
2.37 m2

Lado =

1.54 m

T=

1.60 m

S=

1.60 m

Usar :

Az =

2.56 m2

Comprobando :

Lv1 =

0.65 m

Ok !!!!!!!!!!!

Lv2 =

0.65 m

Pu =

57.68 Tn

Usar :

REACCION NETA DEL TERRENO


Pu = 1.4*PD + 1.7*PL
W NU =

Pu / Az =

W NU =

22.53 Tn/m2

DIMENSIONAMIENTO DE LA ALTURA hz DE LA ZAPATA


Por Punzamiento

CONDICION DE DISEO : Vu / f =Vc

Vu

(Pu

- Wu (D + d )(b + d ))

Consultor: Eduardo Enrique Piana Sessarego

f =

L L L (1)

0.53

Vu

(Pu

- Wu (D + d )(b + d ))

b c = Dmayor / Dmenor

L L L (1)
bc=

1.00 < 2.00

vc = 1.06 fc
Vc = 1.06

fc

bo d

L L L L (2)
(1) = (2)

Donde :
bo = 2(D+d)+2(b+d)
bo = 2(b + D + 2d)
d=

0.2397

0.0000

Vu

Vc

Vu > Vc

0.2397

51.1172

42.1281 Ok

0.2397

51.1174

42.1256 Ok

0.2397

51.1177

42.1230 Ok

0.2397

51.1179

42.1205 Ok

0.2397

51.1181

42.1179 Ok

0.2397

51.1184

42.1154 Ok

0.2396

51.1186

42.1129 Ok

0.2396

51.1189

42.1103 Ok

0.2396

51.1191

42.1078 Ok

0.2396

51.1194

42.1053 Ok

0.2396

51.1196

42.1027 Ok

d=
r=

0.24 m ...( I )
0.075 m

Diametro Acero =

1/2

0.0127

El perlate de la zapata debe ser capaz de permitir el desarrollo de refuerzo en comprensin del
refuerzo de la columna.(ACI-12.3.2)

ldc = 0.08 d b

Fy
fc'

ldc 0.004 d b Fy

l dc =

0.29 m ...( I I )

l dc =

0.21 m ......( I I I )

Escogemos el maximos valor entre los valores de (I), (II) y (III)


Tenemos :

d=

0.29 m

h = d+r

h=

0.37 m

Usar :

h=

0.40 m

Usar :

d=

0.32 m

VERIFICACION POR CORTE


Vdu = (Wu*S)(Lv-d)

Consultor: Eduardo Enrique Piana Sessarego

Vdu =

11.95 Tn

Vn = Vdu / f

Vc = 0.53 fc bd

Vn =

14.05 Tn

Vc =

39.16 Tn

Vn < Vc ? CONFORME
DISEO POR FLEXION

Mu =

1
(W u S) L2v
2

Mu =

f =

0.90

As =

Mu

a (cm)

As (cm)

a(cm)

6.37

7.0251

1.0331

6.4268

0.9451

6.4178

0.9438

6.4176

0.9438

6.4176

0.9438

6.4176

0.9438

6.4176

0.9438

a =

a
f F y(d - )
2
As Fy
.85 fc S

7.62 Tn-m

As =

6.42 cm2

As min =

9.18 cm2

As =

9.18 cm2

VERIFICACION DE As_minimo

As

min

= rtem bd
Usar ;

D (Pgda)

cm

cm2

Usar acero de :

3/8

0.95

0.71

Diametro =

1/2

1.27

1.27

Area =

5/8

1.59

1.98

3/4

1.91

2.85

n=

2.54

5.07

s=

0.23

S - 2r - f
n -1
Z

7 Acero1/2@

s =

0.30

Usar :

1/2 "
1.27 cm
1.27 cm2
7.20 Und.
23.18 cm

7 Acero1/2@ 0.23

1.60

0.30
Malla de Acero1/2@ 0.23

1.60

5.4.- VERIFICACION DIMENSIONAMIENTO DE CIMIENTOS CORRIDOS


El predimensionamiento de este elemento se realiza usando las cargas totales (muerta + viva) de

Consultor: Eduardo Enrique Piana Sessarego

servicio y la presin admisible del terreno. El anlisis es por metro lineal de cimiento (B = 1.00 mt.)
Las cargas actuantes se muestran en el siguiente cuadro:
PISO ANCHO TRIBUT W D

WL

PD

PL

P
(Ton)

(m2)

(Ton/m2)

(Ton/m2)

(Ton)

(Ton)

0.00

0.50

0.30

0.00

0.00

1
Totales

0.00

0.75

0.20

0.00
0.00

0.00
0.00

0.00

Tenemos :

B =

Usar:

Consultor: Eduardo Enrique Piana Sessarego

P
qn

P=
qn =

0.00 Ton
20.00 Ton/m2

B=

0.00 m

B=

0.40 m (Minimo)

B=

0.40 m