Question text Functional testing procedure includes: a)Equivalence Class Partitioning b)Boundary Value Analysis c)Cause-Effect Graphing Select one: a. a,b b. b,c c. a,c d. all of them
Question 2 Complete Mark 1.00 out of 1.00

Flag question

Question text Major steps of design methodology are: a)Restate the problem as a data flow graph b)Identify the input and output data elements

c)First-level factoring d)Factoring of input output and transforms branches Select one: a. a,b b. b,c c. c,d d. all of them
Question 3 Complete Mark 1.00 out of 1.00

Flag question

Question text A DFD provides information about the timing and ordering of processes. Select one: True False
Question 4 Complete Mark 1.00 out of 1.00

Flag question

Question text Risk Exposure is defined by the relationship: Select one: a. RE = Prob (U O) - Loss (U O) b. RE = Prob (U O) * Loss (U O) c. RE = Prob (U O) + Loss (U O) d. RE = Prob (U O) / Loss (U O)
Question 5

Complete Mark 1.00 out of 1.00

Flag question

Question text Equation to determine the initial effort Ei in person-months: Select one: a. Ei = a + (KDLOC)b b. Ei = a - (KDLOC)b c. Ei = a * (KDLOC)b d. Ei = b * (KDLOC)a
Question 6 Complete Mark 1.00 out of 1.00

Flag question

Question text Every requirement specified in SRS document should have only one interpretation. Select one: True False
Question 7 Complete Mark 1.00 out of 1.00

Flag question

Question text ____deals with development of the next level product.

Select one: a. Risk Analysis b. Planning c. Engineering d. Customer Evaluation


Question 8 Complete Mark 1.00 out of 1.00

Flag question

Question text Some of the specific SQM processes are defined as: a)Quality assurance process b)Verification process c)Validation process d)Review process Select one: a. a,b b. c,d c. a,d,c d. all of them
Question 9 Complete Mark 1.00 out of 1.00

Flag question

Question text If the sentence contains words like 'first ", "next", "when", it relates to: Select one: a. logical cohesion. b. temporal cohesion

c. both of them d. none of them


Question 10 Complete Mark 0.00 out of 1.00

Flag question

Question text The term "benchmarking" means: Select one: a. Comparing with past data from your organization b. Comparing with the results of a market survey c. Comparing with the results of a customer survey d. None of the above
Question 11 Complete Mark 1.00 out of 1.00

Flag question

Question text The inspection exit decision must correspond to one of the following criteria: a)Accept with no, or at most minor, reworking b)Accept with rework verification c)Re-inspect Select one: True False
Question 12 Complete Mark 1.00 out of 1.00

Flag question

Question text ____ is incremental software development process model. Select one: a. Renew Application Development (RAD) b. Recovery Application Development (RAD) c. Rapid Application Development (RAD) d. Random Application Development (RAD)
Question 13 Complete Mark 1.00 out of 1.00

Flag question

Question text Testing fundamentals are: a)error b)fault c)failure d)success Select one: a. b,c,d b. a,b,c c. a,b,d d. a,c,d
Question 14 Complete Mark 1.00 out of 1.00

Flag question

Question text Greater the number of bindings between two modules, the higher the inter connection between these modules. Select one: True False
Question 15 Complete Mark 0.00 out of 1.00

Flag question

Question text In code reading we start from the abstract description of a program and move toward an detail of program. Select one: True False
Question 16 Complete Mark 1.00 out of 1.00

Flag question

Question text The cost of the hardware continues to decrease while increasing the speed and storage capacity. Select one: True False

Question 17 Complete Mark 1.00 out of 1.00

Flag question

Question text In ___top-level problem solving and internal team coordination are managed by a team leader. Select one: a. Democratic decentralized team b. Controlled decentralized team c. Controlled centralized team d. Democratic centralized team
Question 18 Complete Mark 1.00 out of 1.00

Flag question

Question text Example for logic and control defects within a code are: a)infinite loops b)unreachable code c)incorrect predicate d)improper nesting of loops Select one: a. a,b b. a,b,c c. b,c,d d. all of them
Question 19 Complete Mark 1.00 out of 1.00

Flag question

Question text Software Quality Management (SQM) Techniques can be categorized in ____ ways. Select one: a. 2 b. 3 c. 4 d. 5
Question 20 Complete Mark 1.00 out of 1.00

Flag question

Question text Problem decomposition, sometimes called partitioning. Select one: True False
Question 21 Complete Mark 1.00 out of 1.00

Flag question

Question text Desirable properties for a software system design are: a)Verifiability b)Completeness

c)Consistency d)Efficiency Select one: a. a,b b. b,c c. c,d d. all of them


Question 22 Complete Mark 1.00 out of 1.00

Flag question

Question text CASE is a software engineering tool. Select one: True False
Question 23 Complete Mark 0.00 out of 1.00

Flag question

Question text Coupling decreases with the complexity and obscurity of the interface between modules. Select one: True False
Question 24 Complete Mark 0.00 out of 1.00

Flag question

Question text SRS helps the clients and users to understand their precise requirements. Select one: True False
Question 25 Complete Mark 1.00 out of 1.00

Flag question

Question text Model of software project metrics suggests that every project should measure: a)Inputs b)Outputs c)Process d)Results Select one: a. a,b,c b. b,c,d c. a,c,d d. a,b,d
Question 26 Complete Mark 0.00 out of 1.00

Flag question

Question text

Risk management technique regarding developing the wrong user interface involves: Select one: a. Cost designing b. Prototyping c. Teambuilding d. Benchmarking
Question 27 Complete Mark 1.00 out of 1.00

Flag question

Question text COCOMO model means: Select one: a. Confidential Cost Model b. Constructive Cost Model c. Constructive Consolidated Model d. Conjecture Cost Model
Question 28 Complete Mark 1.00 out of 1.00

Flag question

Question text Categories of software maintenance are: a)Corrective b)Adaptive c)Perfective Select one: a. a & b

b. b & c c. a & c d. a, b & c


Question 29 Complete Mark 1.00 out of 1.00

Flag question

Question text Main aims of the software process model are: a)Descriptive b)Prescriptive c)Explanatory Select one: a. a&b b. b & c c. a&c d. a,b &c
Question 30 Complete Mark 1.00 out of 1.00

Flag question

Question text Software audit is done to provide: Select one: a. independent evaluation b. regulations c. procedures d. all of them

Question 31 Complete Mark 1.00 out of 1.00

Flag question

Question text Process Design Language (PDL) is one way in which the design can be communicated precisely. Select one: True False
Question 32 Complete Mark 1.00 out of 1.00

Flag question

Question text Process maturity level includes: a) Peer reviews b) Intergroup coordination c) Software product engineering d) Integrated software management Select one: a. a,b,c b. b,c,d c. a,d,c d. all of them
Question 33 Complete Mark 1.00 out of 1.00

Flag question

Question text The key goals of software processes are: a)Effectiveness b)Maintainability c)Predictability Select one: a. a&b b. b & c c. a&c d. a,b &c
Question 34 Complete Mark 1.00 out of 1.00

Flag question

Question text ____provides explanations about the rationale of processes. Select one: a. Descriptive b. Prescriptive c. Explanatory d. Predictive
Question 35 Complete Mark 1.00 out of 1.00

Flag question

Question text Data dictionary is a repository of various ___ defined in a DFD. Select one: a. process flows b. data flows c. logic flow d. external elements
Question 36 Complete Mark 1.00 out of 1.00

Flag question

Question text Which of the following is not a defect metric? Select one: a. Location b. Cause c. Time to fix d. all of them
Question 37 Complete Mark 1.00 out of 1.00

Flag question

Question text Software testing is used to identify: a)correctness b)completeness c)security d)quality Select one:

a. a,b b. a,b,c c. b,c,d d. all of them


Question 38 Complete Mark 1.00 out of 1.00

Flag question

Question text Scenario and Prototype are the common methods of requirements validation. Select one: True False
Question 39 Complete Mark 0.00 out of 1.00

Flag question

Question text The major issues of project plan are: a)Cost estimation b)Schedule and milestones c)Personnel plan d)Software quality assurance plans Select one: a. a,b b. b,c c. a,b,d d. all of them

Question 40 Complete Mark 0.00 out of 1.00

Flag question

Question text There are two common abstraction mechanisms for software systems Select one: a. Functional & process abstraction. b. Data & process abstraction. c. Functional & data abstraction. d. External and internal abstraction
Question 41 Complete Mark 1.00 out of 1.00

Flag question

Question text DFDs that are hierarchically organized are called leveled DFDs. Select one: True False
Question 42 Complete Mark 1.00 out of 1.00

Flag question

Question text

Modifying existing standards to better match the need of a project or environment is: Select one: a. Definition b. Standard for a standard c. Tailoring d. Customization
Question 43 Complete Mark 1.00 out of 1.00

Flag question

Question text The types of reviews and audits are as follows: a)Management reviews b)Technical reviews c)Inspections d)Walk-throughs Select one: a. a,b b. b,c c. a,d d. all of them
Question 44 Complete Mark 1.00 out of 1.00

Flag question

Question text In software project management equation for effort estimation is: Select one: a. EFFORT = b * SIZE a

b. EFFORT = a * SIZE b c. EFFORT = b / SIZE a d. EFFORT = b + SIZE a


Question 45 Complete Mark 1.00 out of 1.00

Flag question

Question text Project risks threaten the viability of the software. Select one: True False
Question 46 Complete Mark 1.00 out of 1.00

Flag question

Question text A data flow can take place between external entity to process. Select one: True False
Question 47 Complete Mark 1.00 out of 1.00

Flag question

Question text Static techniques of program verification involve actual program execution on actual numeric data. Select one: True False
Question 48 Complete Mark 1.00 out of 1.00

Flag question

Question text SRS provides a reference for validation of the final product. Select one: True False
Question 49 Complete Mark 0.00 out of 1.00

Flag question

Question text The ____ structures a team loosely and depends on individual initiative of the team members. Select one: a. closed paradigm b. random paradigm c. open paradigm d. synchronous paradigm
Question 50 Complete

Mark 1.00 out of 1.00

Flag question

Question text Project risks threaten the project plan. Select one: True False
Question 51 Complete Mark 1.00 out of 1.00

Flag question

Question text In DFD, data items that flow between external entities are identified by unique names. Select one: True False
Question 52 Complete Mark 1.00 out of 1.00

Flag question

Question text Decision tables are nonprocedural specification of decision rules. Select one: True

False
Question 53 Complete Mark 1.00 out of 1.00

Flag question

Question text A test plan should contain the following: a)Test unit specification b)Features to be tested c)Approach for testing d)Test deliverables Select one: a. a,b,c b. b,c,d c. a,c,d d. all of them
Question 54 Complete Mark 1.00 out of 1.00

Flag question

Question text Planning for software quality involves defining the required product in terms of its quality characteristics. Select one: True False
Question 55 Complete Mark 1.00 out of 1.00

Flag question

Question text The functional testing procedure is ____ testing. Select one: a. exhaustive b. random c. black box d. green box
Question 56 Complete Mark 1.00 out of 1.00

Flag question

Question text Different approaches of structural testing are: a)Control flow based testing b)Data flow based testing c)Process flow based testing d)Mutation testing Select one: a. a,b,c b. b,c,d c. a,c,d d. a,b,d
Question 57 Complete Mark 1.00 out of 1.00

Flag question

Question text System Test Plan will not include: Select one: a. Approach b. Pass/Fail criteria c. Risks d. Suspension and Resumption criteria
Question 58 Complete Mark 1.00 out of 1.00

Flag question

Question text The DFD that shows major processes is called top-level DFD. Select one: True False
Question 59 Complete Mark 1.00 out of 1.00

Flag question

Question text To represent the dependencies, PERT charts are used. Select one:

True False
Question 60 Complete Mark 1.00 out of 1.00

Flag question

Question text A cost-schedule-milestone graph represents the planned cost of different milestones. Select one: True False
Question 61 Complete Mark 1.00 out of 1.00

Flag question

Question text Each cycle of a spiral model contains ___ major activities. Select one: a. 2 b. 4 c. 3 d. 5
Question 62 Complete Mark 1.00 out of 1.00

Flag question

Question text The desirable information in the prologue are: a)Module functionality b)Parameter and their purpose c)Assumptions about the inputs d)Global variables accessed and/or modified in the module Select one: a. a,b,c b. b,c,d c. b,c d. all of them
Question 63 Complete Mark 1.00 out of 1.00

Flag question

Question text Industry standard on software quality is CMMi. Select one: True False
Question 64 Complete Mark 1.00 out of 1.00

Flag question

Question text

Top-Down and Bottom-Up approaches are incremental. Select one: True False
Question 65 Complete Mark 1.00 out of 1.00

Flag question

Question text The reasons for having reviews or inspections are: a)Defect removal b)Productivity increase c)Provide information for project monitoring Select one: a. a,b b. b,c c. a,c d. all of them
Question 66 Complete Mark 1.00 out of 1.00

Flag question

Question text The design phase is usually divided into : Select one: a. System Design b. Detailed Design c. all of them

d. none of them
Question 67 Complete Mark 1.00 out of 1.00

Flag question

Question text The requirements phase typically consists of: Select one: a. Problem or requirement analysis b. Requirements specification c. Requirements validation d. all of them
Question 68 Complete Mark 1.00 out of 1.00

Flag question

Question text Components of an SRS are: a)Functional Requirements b)Performance Requirements c)Design Constraints d)External Interface Requirements Select one: a. a,b b. a,c c. c,d d. all of them
Question 69 Complete

Mark 1.00 out of 1.00

Flag question

Question text Levels of cohesion are: a)Coincidental b)Logical c)Temporal d)Procedural Select one: a. a,b b. b,c c. c,a d. all of them
Question 70 Complete Mark 1.00 out of 1.00

Flag question

Question text ISO/IEC has defined three related models of software product quality. Select one: True False
Question 71 Complete Mark 1.00 out of 1.00

Flag question

Question text For complex problems, divide-&- conquer strategy is used. Select one: True False
Question 72 Complete Mark 1.00 out of 1.00

Flag question

Question text The inputs for forming the test plan are: a)Project plan b)Requirements document c)System design document Select one: a. a,b b. b,c c. a,c d. all of them
Question 73 Complete Mark 1.00 out of 1.00

Flag question

Question text Detailed design verification methods are: a)Design Walkthroughs b)Critical design Review c)Consistency Checkers Select one:

a. a,b b. b,c c. a,c d. all of them


Question 74 Complete Mark 0.00 out of 1.00

Flag question

Question text ____traces what actually happens during a process. Select one: a. Descriptive b. Prescriptive c. Explanatory d. Predictive
Question 75 Complete Mark 1.00 out of 1.00

Flag question

Question text Defect Removal Efficiency (DRE) is representaed by: Select one: a. DRE = E*(E + D) b. DRE = E/(E + D) c. DRE = E/(E - D) d. DRE = E/(E * D)
Question 76

Complete Mark 1.00 out of 1.00

Flag question

Question text The important qualities of software product are: Select one: a. Correctness b. Reliability c. Robustness d. all of them
Question 77 Complete Mark 1.00 out of 1.00

Flag question

Question text In dynamic methods of program verification program is executed on some test data. Select one: True False
Question 78 Complete Mark 1.00 out of 1.00

Flag question

Question text The purpose of code review process is to detect defects in the code.

Select one: True False


Question 79 Complete Mark 1.00 out of 1.00

Flag question

Question text Coupling and cohesion are two modularization criteria. Select one: True False
Question 80 Complete Mark 1.00 out of 1.00

Flag question

Question text The following can be considered to measure quality: Select one: a. Customer satisfaction b. Defects c. Rework d. All of the above
Question 81 Complete Mark 0.00 out of 1.00

Flag question

Question text The most common approach for verification is: a)design reviews b)inspections Select one: a. a b. b c. a,b d. none of them
Question 82 Complete Mark 1.00 out of 1.00

Flag question

Question text The ability to encourage technical people to produce their best ability. Select one: a. Organization b. Motivation c. Ideas d. Innovation
Question 83 Complete Mark 1.00 out of 1.00

Flag question

Question text Software engineering is the systematic approach to the development, maintenance and retirement of the software. Select one: True False
Question 84 Complete Mark 1.00 out of 1.00

Flag question

Question text Software development activity consists of requirement analysis and specification. Select one: True False
Question 85 Complete Mark 1.00 out of 1.00

Flag question

Question text "status = satisfied + quantity" is an example of: Select one: a. data b. data dictionary c. dictionary d. data representation
Question 86 Complete Mark 1.00 out of 1.00

Flag question

Question text Risk components are defined in the following manner: a)Performance risk b)Cost risk c)Support risk d)Schedule risk Select one: a. a,b b. b,c c. a,d d. all of them
Question 87 Complete Mark 1.00 out of 1.00

Flag question

Question text The equation for an organic type of software is: Select one: a. M = 1.5 E .38 b. M = 2.5 E .36 c. M = 3.5 E .38 d. M = 2.5 E .38
Question 88 Complete Mark 1.00 out of 1.00

Flag question

Question text Software Quality Requirements involves: a)Influence Factors b)Dependability c)Integrity Levels of Software Select one: a. a,b b. b,c c. a,c d. all of them
Question 89 Complete Mark 1.00 out of 1.00

Flag question

Question text Context diagram treats entire system as a single process with all its inputs, outputs. Select one: True False
Question 90 Complete Mark 1.00 out of 1.00

Flag question

Question text

Specific process areas related to quality management are: a)Process and product quality assurance b)Process verification c)Process validation Select one: a. a,b b. b,c c. a,c d. all of them
Question 91 Complete Mark 1.00 out of 1.00

Flag question

Question text Project indicators enable a software project manager to: a)assess the status of an ongoing project b)track potential risks c)uncover problem areas before they go "critical" d)adjust work flow or tasks Select one: a. a,b,c b. a,b,d c. b,c,d d. all of them
Question 92 Complete Mark 0.00 out of 1.00

Flag question

Question text _____deals with determination of objectives, alternatives and constraints.

Select one: a. Risk Analysis b. Planning c. Engineering d. Customer Evaluation


Question 93 Complete Mark 1.00 out of 1.00

Flag question

Question text In static techniques of program verification, the program is not compiled and executed. Select one: True False
Question 94 Complete Mark 1.00 out of 1.00

Flag question

Question text The purpose of a management review is to monitor progress, determine the status of plans and schedules. Select one: True False
Question 95 Complete Mark 1.00 out of 1.00

Flag question

Question text Quality Control is set of activities designed to evaluate a developed working product. Select one: True False
Question 96 Complete Mark 0.00 out of 1.00

Flag question

Question text _____model combines the best features of both classic life cycle and prototyping. Select one: a. Prototype Model b. Waterfall Model c. Iterative Enhancement Model d. Spiral Model
Question 97 Complete Mark 0.00 out of 1.00

Flag question

Question text Process model are: a)Waterfall Model b)Prototype model

c)Iterative Enhancement Model d)Spiral Model Select one: a. a&b b. b,c & d c. a,b,c &d d. a,c&d
Question 98 Complete Mark 1.00 out of 1.00

Flag question

Question text Software Quality Measurement is done by: Select one: a. Statistical tests b. Trend analysis c. Prediction d. all of them
Question 99 Complete Mark 1.00 out of 1.00

Flag question

Question text Finite automata consist of state and input data streams. Select one: True False
Question 100

Complete Mark 1.00 out of 1.00

Flag question

Question text Total Quality Management (TQM) process involves Plan, Do, Check. Select one: True False Finish review
Skip Quiz navigation

Question1This pageQuestion2Question3Question4Question5Question6Question7Question8Question9Question10Question11Questi on12Question13Question14Question15Question16Question17Question18Question19Question20Question21Questio n22Question23Question24Question25Question26Question27Question28Question29Question30Question31Question 32Question33Question34Question35Question36Question37Question38Question39Question40Question41Question4 2Question43Question44Question45Question46Question47Question48Question49Question50Question51Question52 Question53Question54Question55Question56