Carrier HAP Hourly Analysis Program Training

By Rothman Loh Senior Manager, Plan & Spec

Copyright Carrier Corp. 2005

Carrier Hourly Analysis Program

Copyright Carrier Corp. 2005

Internal Heat Load


People Lights Other Electric Schedules Miscellaneous

Copyright Carrier Corp. 2005

External Heat Load


Transmission External Loads
Transmission Roof Wall Window Glass Solar loads

Solar

Infiltration
Transmission

Copyright Carrier Corp. 2005

Building Load
Transmission

Solar

Infiltration
Cooling Loads
Roof Sunlit Wall Window (Solar) Lights People Equipment Infiltration Ventilation

People Lights Equipment


Transmission

Copyright Carrier Corp. 2005

HAP Energy Modeling Building Block Approach


A Sum of the Building to Estimate Operating Costs Miscellaneous Building Energy Consumption Utility Rate Structures Applied Energy Reports in Dollars A Way to Model Multiple Alternatives in Design

BUILDING PLANT EQUIPMENT AIR SYSTEMS ZONES SPACES ELEMENTS

Copyright Carrier Corp. 2005

Plant Energy Modeling


Plants
Generic Chiller Boiler

Copyright Carrier Corp. 2005

Plant Energy Modeling


Chillers & Cooling Towers Used in energy analysis calculations.

Copyright Carrier Corp. 2005

Building Properties Energy Modeling


Outside Plantroom Factors Calculations

Copyright Carrier Corp. 2005

8760 Hour by Hour Analysis


True 24x7-Hour by Hour Energy Analysis Single Page Overview For Quick Review Detailed Weather Profiles - Tabular or Graphical Any Range of Days

Copyright Carrier Corp. 2005

Annual Cost Summary


Annual Operating Costs segregated by components ie. Chiller Plant Airside Pumps Lightings Lifts Miscellaneous

Copyright Carrier Corp. 2005

Detailed Report on Annual Components Cost

Copyright Carrier Corp. 2005

Detailed Report on the Billing and Components Cost


Annual Operating Costs can be further analysed in monthly basis

Copyright Carrier Corp. 2005

Leadership In Energy and Environmental Design, USA (LEED)

LEED provides a roadmap for measuring and documenting success for every building type and phase of a building lifecycle. Specific LEED programs include:
1. 2. 3. 4. 5. 6. 7. 8. New Commercial Construction and Major Renovation projects Existing Building Operations and Maintenance Commercial Interiors projects Core and Shell Development projects Homes Neighborhood Development Guildlines for Multiple Buildings and On-Campus Building projects LEED for Schools

Copyright Carrier Corp. 2005

Carrier Hourly Analysis Program

Thank You!