You are on page 1of 2

MTA Design Workshop No.

01 - 12 May 2013
Description Action By Designer Comments

Storm Water drainage at the aircraft stand


1.1 Refer to drawing no MTC C 05 AS L1.0 6.01 B. 311 which is directly connected to the storm water main network , what is the L&T scope as 100 mm pipe line is not appear in the current BOQ . Confirmation of Storm water network slope and Design slope Range in drawing no MTC C 05 AS L1.0 6.01 B. 303 is: a. Pipe line slope between Pits no Nj10&NJ11is 0.05% b. 300 Dia. Pipeline slope between Pits no NJ10&NJ9 is 0.07% c. 900 Dia. Pipe line slope between Pits no NJ6&NJ 3 is 0.08% Structure /Pipe line Connection Details refer to drawings no MTC C 05 AS l.6 .347&348 &350 NACO Coordinate with MTB contractor as per sequence of installation and type of material being used. No specific design detail is provided. Follow Standards NACO

1.2

1.3

NACO

No specific design detail provided. Contractor to follow pipe manufacturer requirements and to propose details subject to NACO's approval. Approved shop drawings of GUS to be followed by L&T. Any deviations observed at site to be picked up on receiving handing over. CMA is preparing a formal handing over procedure for as built GUS utilities to L&T through KBR/ADAC.

1.4

Process for confirming tie in levels for drainage outlets.

NACO

Electrical
2.1

MV
i 22kV MV Switchgear consists of 2 different SLDs, one from KPF-NACO for 5 S/S (SS1154, 1155,1156,1157,1158) feeding remote stands & one from SCI (Stanley, S/S 1164), specifically for S/S 1164, but both having a common Specification- 26 13 00 R0 Spec asks for Indicating instruments whereas there are no dedicated CT cores for the same in SLD provided in SCI (Stanley). Spec. 26 13 00 & E-05-PPDG-0006 (IFC) SLD from KPF-NACO does not indicate a BB VT, whereas SLD from SCI (Stanley) does. E-05PPDG-011 & MTC E 10 AS L1.0 6.00 22.070 (IFC) SLD from KPF-NACO indicates a dedicated VT in the Transformer I/C. MTC E 10 AS L1.0 6.00 22.070 (IFC) Requirement of 87L(Line Differential) relays on each & every O/G feeder, all the S/S are in a ring, but KPF SLD does not ask for a 87L. E-05-PPDG-0006 & E-05-PPDG-011 & MTC E 10 AS L1.0 6.00 22.070 (IFC) Requirement of Synchro check facility in each & every S/S. KPF SLD does not ask for it whereas SCI (Stanley) does. E-05-PPDG-0006 &MTC E 10 AS L1.0 6.00 22.070 (IFC) Requirement of PMU (Power monitoring unit). Type & make if required. What type of alarm does the alarm block indicate? E-05-PPDG-0006 (IFC) NACO/SCI NACO will check for compliance of their design with Stanley SLD. The NACO S/S 1154, 1155, 1156, 1157 and 1158 are in the same loop as S/S 1164, Loop 11/9 as shown on SCI drawing E-05-PPDG-001. The SCI specifications are to be leading. Follow ADDC Requirements. New drawing to be issued within a week as part of revised IFC. NACO will check for compliance of their design with Stanley SLD. NACO to include VT as per SCI design (E-05-PPDG-001) on drawing MTC-E-10-AS-__-L1.0-6.00-22.070. L&T to expand the question and raise as a query. NACO will check for compliance of their design with Stanley SLD. NACO to include 87L (Line Differential) on drawing MTC-E-10-AS-__-L1.0-6.00-22.070. NACO will check for compliance of their design with Stanley SLD. NACO to include for Synchro Check Facility on drawing MTC-E-10-AS-__-L1.0-6.00-22.070. Will be included in Revised IFC. LDN has been resubmitted by Stanley to ADDC. L&T to take the Design NOC of Stanley and apply for the Construction NOC. Halcrow is the ADDC approved consultant used by Stanley.

ii

SCI

iii

NACO/SCI

iv

NACO

NACO/SCI

vi

NACO/SCI

vii

SCI

One of the PTC, Ref. 1412 as attached mention protection shown in this SLD has been reviewed viii & approved by ADDC, suggesting that only Stanleys design is approved by ADDC. RFC-1412, Item No. 91 (IFC) 2.2

SCI

DG
i Type of the DGs, indoor or outdoor. Spec 263213, 1.2 Clause B .1 (IFC) SCI Stanley has no DG's. NACO has a DG for the tunnel. Location and type of DG to be finalized as there is no room allocated in SS1164 for a DG. NACO Diesel Generators are outdoor type and will be located adjacent to S/S 1164

ii

If indoor, whether building already exists, dimensions of civil rooms required to design & propose commercial offer for acoustic requirements. Spec 263213, 1.5 Clause C (IFC) Requirement of Nox treatment as mentioned in the Spec. has to be ordered separately, has maintenance is difficult. Spec 263213, 1.2 Clause B .11 (IFC) The requirement for both continuously running at full load & running at 110% overload 1 hr after every 8 hrs is given. Which one is to be followed. Spec 263213, 2.2 Clause B (IFC) The third party testing mentions testing agency to be member of NRTL. Spec 263213,1.8 Clause A (IFC) Remote Monitoring of Generators is required or not. How far will the BMS be located for the communication from Gen Control Panel?

SCI

Not indoor, therefore not applicable.

iii

SCI

NOX treatment. Specifications to be followed.

iv

SCI

Both requirements, continuous running and 110% overload for 1 hour are to be met.

SCI

Testing Agency. Question not clear. Follow contract. Remote monitoring is required by the BMS. Refer to Specification 263213 Clause 1.5.B.5. Connection to be made via communication network in the Substation. NACO will check and confirm the use of Stanley Spec. for SS164 and tunnel. ATS is to be located in the MDB. Refer to drawing MTC-E-10-AT-L1.0-6.00-22.097.

vi

SCI

vii Location of the ATS Panel.

SCI

2.3

1000kVA & 1500kVA Dry type Transformers


i KPF-NACO spec. calls for copper winding, whereas standard ADDC spec asks for aluminum winding. Spec 261216, 2.3 Clause D & ADDC Spec S-AAA-TRAFO-ATR-D Clause 2.2 KPF-NACO calls for 4% Z but standard ADDC practice is 6% for 2000kVA Dry type transformer. LVAC DB short circuit rating is 54kA as per this %Z. Spec 261216, 2.3 Clause B 5 & ADDC Practice The KPF spec calls for a power frequency withstand voltage of 75kV & lightning impulse withstand level of 28kV. Spec 261216, 2.3 Clause B 6 & 7 & ADDC Practice NACO NACO will check with their electrical team and respond. ADDC specifications are to be followed, aluminum windings. NACO will amend specification 261216, Clause 2.3.D.1. ADDC standard practice of 6% Z to be followed. NACO will amend specification 261216, Clause 2.3.B.5. Power frequency withstand voltages to read 28kV and lightning withstand voltage to read 75kV. NACO will amend specification 261216, Clause 2.3.B.6 and 7.

ii

NACO

iii

NACO

Structural Design - Tunnel


3.1 Discuss Details/Requirements for Expansion Joints NACO NACO will check and respond with details.

3.2

Discuss Details of Waterstop at Construction Joints and Expansion Joints.

NACO

" " " "


L&T proposes to make a 5m section as mock-up to get approval of the various finishes, fire board, cable tray etc. Proposal is acceptable.

3.3

Discuss Details/Requirements for Water Proofing - Typical Details.

NACO

3.4

Discuss Type of Concrete Finish required for Tunnel wall, base, slab soffit and slab top.

NACO

3.5

What is the extent of Fire Protection Boards and requirements.

NACO

3.6

Discuss Mockup requirements.

NACO