mLITASY SPSCIFICATIOB T2X&PMONS SST TA-1( )/PT This epaoificatdon 18 approved for uee by all the Oepartslentof Oefenee. 1. SCOPE t.alephone Department-e and Ascnciee of

covare one Qpe of portable sound pwared 1.1 T&3 13pecif ieation set designated ea 7elephone Set TA-1( )/FT.

2.

APPLICASU

MCUMBtf2S

2.1 The following docuimnte, of the ieaue in effaot on the date of of t&ie epecificeincitation for bide or request for propoeal, form a pert tlon to the extent epecified herein. S?%CIPICATIOWS
@,

PEmslu T-T-872 MB-P-71 QQ-S-781 PPP-E5S5 PPP-S-601 PPP-S-621 PPP-S-636 Ppp-F-320 PPP-T-76 PPP-T-97 Tvlne, Cottm, Wrapping Wood

Pellet, %tariela-handlhg,

Strapping, Steel, Plat and Seela Sex, Wood, Wirebound hces, Wood, Cleetcd-Plywood bee, S&s, Wood, Nailed and Lock-Comer Fiber

Fiberboard, Corrugat.ad and Solld Sheet Stock Tape, Preeenre-Seneitive Adheeive Paper Water Reeietant

TePe, Preeeure-.%neitive Adheeive, Filament Reinforced PsC 90s

Source: http://www.assistdocs.com -- Downloaded: 2010-08-17T04:53Z Check the source to verify that this is the current version before use.

MIL-T-13626B(EL) SPECIFICATIONS (Contd) MILITARY mL-P-116 MIL-P-13.268 Preservation, Methods of Parts, Materials, and Recesses Electronics Equipment Marking of Electronic Items Finishes for Ground Signal Equipment Plastic Molding Material Polyurethane Fosm Used in

ia~M-13231 MILF-lb072 mL-P-196h& MIL-P-26slh STANDARDS MIL-STD-105

Sampling tiocedures and Tables for Inspection by Attributes Marking for Shipment and Storage Pallatized and Containerized Unit I.oade bO inch X ~8 Inch Pallets, Skida, Runners or Pallet Type Ease Teet M?thods for Electronic and Electrical Conponent Parts Wired Equipment, Classification of Visual end Mechanical Defect Standard Requirements for Electronic Equipment Environmental Test Methods

MtL-STD-129 MILSTD-1.b7

MIL-STD-202

,.
. .. .,.:.

MIL-STD-252

MtL-sTD-L511
~L-STD-810 DRAWINOS

ELECTRONICS COMMAND SC-DL-M399


,.

Telephone Set TA-1( )/PT

NAVY sK-N-8611 Simulated Gun Blast Equipment

Source: http://www.assistdocs.com -- Downloaded: 2010-08-17T04:53Z Check the source to verify that this is the current version before use.

. .

MIbT-13626B(EL) (Copies of document-e required by contractors in connection with specific procurement functione should be obtained from the procurement actitity or ea directed by the contracting officer). ,3. REQUIRE}ENfS 3.1 Firet Article. When epecified in the contract or purchaee order, the ehell furnieh Firet A%icle unite in accordance with b.3.

contractor

3.2 Construction. The equipment shall be constructed in accordance with the requiramente of tile specificationend Drawing and Data Liet SC-DL-168899 (including the requiremante for parta, meteriale, end processee thereon) (See L.&).
3.3 Parta, Materiele, and Proceeees, Oenerel. In addition to the requtieumnte of thie specification, the requirement of KIL-P-11268, including the selection requirement therein, ehell apply (See k .b). 3.b Finieh. The equipnnnt eha~ be finished in accordance with KIL-F-3.k072 and the equipment drawinga (See ~ .h).

3.5

Markirq

3.5.1 Oeneral. Marking shall conform ta Specification MXL-M-13231. Front panel marking hell be Oroup 1 ea described in that specification (See &.&). 3.5.2 Visibility. Wherever practical, parte ehe3.1be so mounted that their identification markinge will be readily visible with minimun disaeeembly of the equipment. 3.5.3 be eerially numbered. Serial Numbere. The equipment ehal.1

3.6 Interchangeability. Like unite, aesembliee, eubaesemblles ad replaceable parte ehall conform to Requirement 7 of MIL-STD-IA5L (See II .8). 3.7 Preconditioning. The equiprmnt ehall be capable of meeting the requireranta herein, without subsequent proceeding, after subjection to the bounca preconditioning of 4.6. 3.8 E1.eotric&l Eamhone Element TA-IJ8( )/PT

3.8.1

3.8.1.1 Frequency Reeponee. The reeponee of the earphone element throughout the voice frequency ra e ehall be greater or equal to that level .pecified in Figure 1 (See% .9.1). edanca. The input i edence of the earphone element at 1000 Ha *ohus (See L.9.X. 3

::~~e

Source: http://www.assistdocs.com -- Downloaded: 2010-08-17T04:53Z Check the source to verify that this is the current version before use.

,,.

MIL-T-13626B(EL) 3.8.1.3 Overload. There shall be no evidence of rattling or distorttin in the earphone element when driven at a level of 5 rawthroughout tie freqnency range from 500 to 25OO Sz. 3.8.1.11 Imeulation Racist.ante. The elerant shall have a minimum insulation resistance of 5 Megohms between terminal and franm when measured at 500 volts D.C. (See k.11.1). 3.8.1.5 %gnetic Stebtiity. The frequency responee of the element ehall not have changed more than b db when subjected to the tests of 4.11.2. 3.8.2 ~crophone Element TA-121( )/FT

3.8.2.1 Frequenq Response. The response of the microphone in the voice frequeocy ran e s e greatir than or equal to that specified In Figure 2 (See I4.1O.1. f b
&8&2:W;ee The out ut izpedance of the ~crophone at 1000 Hz shall lb.10.2Y. . , ,.

3,8.2.3 Insulation Resistance. The microphone shall have a mini.mum insulation resistance of 5 Me ohm between terminal and frazm then nmaeured at 500 volts d.c. (See h.11.lf . 3.8.2.4 lk~etic Stablli not have changed more than the tests of 14.11.2.
db from the initial response U&M

The frequency reeponee of the microphone shall eubjected to

3.8.3 Telephone Set TA-1( )/PT


Men teeted b 3.8.3.1 Oanerator Output. of the generator lever shall produce a zdm over a eimulet,ed k miles of UD-1( )TT field accordance with IJ .12.1, operation of 30 vrms, 20 ; 5 Hz output wire into a 1700 ohm load.

(See 4.12.1). 3.8.3.2 Ring %neitivi~. The audible and vis.~ signale shall operate with a minimum input,of 30 vrma at aIW frequency between 15 and 25 Ss. (See 4.X2.2). 38.3.3 ?~.. The input impedance of the combined signal circuit at 20 Hz shall be 1 00 : 100 ohm. (See &.12.3). 3.8.3.4 Insulation Resistance. AU metal parts intended to be insulated from each other ehall have a minimum insulation resistance of 10Q Hazohma at 5CU volts do. (See k.12.k). 3.8.3.5 when test2%t2%&Tw%H5R<ha
h

provide satisfactory performance

Source: http://www.assistdocs.com -- Downloaded: 2010-08-17T04:53Z Check the source to verify that this is the current version before use.

,.

141 L-T-u626B(sL)
@

3.9 service Conditions. The eqniprnnt ehall rmet the folloulng service Conditione. 3.9.1 Tcmverature 3.9.1.1 b. rnnt e~=et
3.9.1.2 iii mant shclZ%t h.

hti ad 8fter teat.ing KM Speoified in b.23.1, ti tlterequlranmnta of Table 1.


During and after * reqtienmte teetlog ae apeoified in 4.13.2, of Table 1. tie

equip-

equip.

T-

Barpholm Slalmnt TA-118( )m


3.8.1.1 3.8.1.2

Frequency Responee Impedance Mior@l one Slenent TA-121( )/FT

3.8.2.1

Frequency Reaponce Impedance Tale@ one Set TA-1( )/PT

3.8.2.2

3.8.3,1 3.8.3.2 3.8.3.S

(lcneratorOutput R.iogSanaitdvity @Xational

Zi2mktE~?d&~~%%??Z:tn~AzbEi22i

cuelllng, or deterioration of partu and materiala, and ehall bet nxmta of 3.8.3.1, 3.8.3.2 aud 3.8.3.5. h addiuon, the phone elementu ehall =e$ the re~irementm Of 3.8.1.1 and%: 3. c~letion of the hnmld.ityteet.

the requlre%!*cr

3.9.3 Altitade (E.levation~. The equipuent shall ehou no evidcnoe of damege or deterioration in performance at altitudes up to 10,000 feet ahove sea level after e~rage at altitudee np b 25,0w feet tive em level(See A.15). . The enuimmnt carrying oaae shall ehou no 3.9.b Makege(Immreion atepeclfied-in-b.18. evidence of leakage aftJ taat.lng 3.9.5 Bounce and
Shook.

Source: http://www.assistdocs.com -- Downloaded: 2010-08-17T04:53Z Check the source to verify that this is the current version before use.

J!ILT-13626B(JYJ)
teeting ee epecified in h .16, tbe 3.9.5.1 Sounae, Iaoae CerKO. Fo.@wing equipment ahdl met the requirement of Table 1.

FoU.udng tieting ea epecified in b.17, 3.9.5.2 =Ock, DroP mmt eha.U meet the &uiremits of Teble I.

the

e@p-

3.9.6 Slaet. Following teeting ee specified in &.19, the frequenoy reep~~~e ~o~ @ ~cro@~e ek=mte (3.8.1.1 end 3.8.2.1) ehall not have ahanged by =re tbn 3 db. 3.10 .Sforknumhi . The equipnmnt ehell be ~ufactured end a&en@led in accortiaquirauent 9 of IfHA1D-@ end the applicable portions of the following paregrephe: In UIL-P-l126S General requirement for plaetic.material end plaetic parte . Wiring end cabling, inOMding: Slack ProteotiQn Clearance splicing Connection, general Oronnding, ge~ral ~eldiog on wire end oable Soldering and brezing I

.Clquling
@neral

of

Uqita

i f.
1,

Recplreqenta for eeouring of perte

Proceee for uelding

Sel.f-tapp*

ecreue

Cleening prior to welding ~. QUALMT ASSURANCE PSOVISIONS

b.1 ReeDo M ibility for Inmection. Unleee otieruiee eped.fied in the :contraot or poroheee order, the contractor ie reeponeible for tie performrequirement ee epecified herein. Sxoept ee other:ence of all inspection wise epeclfied in the contract or purohaee order, the contractor IOVYuee his
6 9

Source: http://www.assistdocs.com -- Downloaded: 2010-08-17T04:53Z Check the source to verify that this is the current version before use.

141 M-1.3626 B(EL)


@

own or any other facilities euitable for the performance of the inspection requirements epecified herein, unleea disapproved by the governmnt. the government reeerveethe right ti perform my of the inapaotione eet forth in the specification where eucb inepectione are deemsd neceseary h aeeure supplies and eervice conform @ prescribed requiremante. 14.2 Classification of Inepectiona. The inepeotion requiraaente epecified hereAo are Cbsif ied aa folloue:
a. kirat

Article Inspection (See 4.3). Doee not include

preparation

for dalivery. b. c. Inepectione covered by subeidiery dooucxmte (See b.~). Quality confonosnce inepection9:

(1) Q@ity conformance inspection of equipment before preparation for delivary (See b.5). (2) Qud.ity Conformance inspection of preparation for delivazy . (See b.~). 11.3 Firet Article. Unleee otherwiee epecified in the contraot or purchaee order, the Firet Article inepeotion eha.11be performed by the contractor.
4.3.1 First Article Unite. The contractor ehall furnieh the number of Firet Article unite in accordance with tie follouing:

a.
b.

Tuo (2) each Telephone Sete TA-1( )/P2


Tw (2)

each Sarphone S.lenmte TA-116( )/PT

c.

Tuo (2) each Microphone Elemente TA-121( )/PT

~.3.2 Fiaut Article Inepection. The Firet Article inspection ehall conaiet . of tlm inapectione epecified in Table 11, and eball be perforcmd in the onier epecified therein. 4.3.3 First titicle hate. The Firet Articla teet plan and teat reprt(s ) ehall be ae required in tie contract or purcbeao order.

b .b I.nexactione Covered by Subeidiary

Docuimnt4. The fol.lwing eball be inspected under the applicable eubeidiary docunmnte ae part of the inepecticn required by thie epectiication, end the inspection requirement epecified in th contract or purchese order.

Source: http://www.assistdocs.com -- Downloaded: 2010-08-17T04:53Z Check the source to verify that this is the current version before use.

, I ,
I

1 lUL-T-13626B(SL) mm
Conetructlon

RSQUE+S.D 3.2 3.3 :3.4 3;5 :TABIZII :First Article Inspection

Par*, *terials and Proceesea Finleh Marking

m Inep. covered by aubeidiary documente Bounce Preconditioning

Reqmt

. InaP b.h

Unite All

3.7

b.6

All.

Group A Inspection Group B Inspection &oup C Inepeotion Blast Teat

See Table III See Table IV

All All

See Table V 3.9.6 I ib,19 ~ unit 2

Conformance Inepection of Eaulpment Sefore Preparation for e contractor ehall perform the inepectione specified in L.4, =k.?l through ~.5.3. Thie does not relieve the contractor of his reeponeibility for performing any additional I.napeation which ie and tm aeeure coiqll~e neceemry to control the quali~ of the praduot with all epeoification reqeiramente.
@A1.ity

b.s

: i$.5 .1

Ckaup A Inspection. Sach unit on contract or purchaee order eball ~be inepect.ad for conformance ta the inapectione epecified In Table III. ,Discrete lobe ehall be formed fram unite that Daae this inmectian. Factare of lot conrooe ition not defined herein: or in the cbntraot or nnrchaee order, ehall he In accordance with UIL-STD-105. Sach lot ehall ~a e&jed. to eemp~ inapeotion, utilizing the procedure of MIL-STD-105, uning the general Anapeotion levele, and ACILISindicated in Table III.
UP A. Group A I.napeotion aball be &.5.l.l order of Impaction Within (tro perfonaed in an order aatiefaot.cnyto the governrmnt, except that the operational in &.lZ.5 ehall be .laet. 8

Source: http://www.assistdocs.com -- Downloaded: 2010-08-17T04:53Z Check the source to verify that this is the current version before use.

J41L-T-3.3626B(13L) TABLE III


I OrouP

A Ineueotion
Au

IneD
Vialull

mum
Jbohanioal

IneD

Major

Jilnor

3 lot

k.7

mctrioal TA-11.8()/m Iapedance TA-321( )/FT l.npedance TA-1( )/PT Oanerator Output Ring &@3itiVitiy Input ImpedanDe Operational

3.8.1.2

b.9.2

l%-

3.8.2.2

L.1O.2

s-

3.8.3.1 3.8.3.2 3.8.3.3 3.8.3.5

4.12.1 $.:.2 L:3.2: J

l% for the mup 1%

shall normally be yrfomed ~5i~tiOrOUR B Inaoection. OrOUP B it16p80tioD that have paused Oroup A inapeation ad on sties selaoted from un.itathat have M&m aubjeoted W ~ mt the OrouD A tiDeotion. Thie inepeotion ehall amfonn to Table IV and to the ep~oial Gapeotion levd.e of Table 1 of ~L-STD-l@.

L.5.2.1 OrouP B saawu 47 Plaae. The Oroup B 8ampling plane, for the AQLle listed in Tabla IV, ehall be M follows t

A&

Inmeation Lavel

lJ.5.2.2 Ordar of InexotAon Mtiin Oroup B. Oroup B inspection ehall be parfonaad in en order e.stiefaotoryta * govelllmnt.

OrouP

B SneDeotion Recx@ a Ib.9.l b.9.3 Ib.11.l lb.11.2 ) AQL

XoaP ?A-llLl ( )/m


Frequency Raeponse

Overload Insulation-Resietanoe Mgnetio stability

3.8.1.1 3.8.1.3 3,8.1.& 3.8.1.5 9

k$ for the group

Source: http://www.assistdocs.com -- Downloaded: 2010-08-17T04:53Z Check the source to verify that this is the current version before use.

MILT-13626B(EL) Group B InaPection (Contd) IOSD TA-I.21( Yn


Frequency

Reqmt 3.8.2.1 3.8.2.3 3.8.2.h

InaP b.los & . .1

AQL 45 for
the

Reeponae Insulation Resistance Wgnetio Stability

group

TA-1( )/FT Interchangeability Leakage(humsreion) Ineul.atlon Resistance

3.6 3.9.4 3.8.3.~

.~:!8 4.12.&

6.5.% lJ$ k%

11.5.3 Group C Inspection. Group C inspection ehall be ~rformed on units that have paesed Group A and Group B inspection. The inspection shall coneist of the inapactione epecified in Table V. Samplee ehall be selected in accordance with 11.5.3 .1. L.5.3.1 SamDling for Group C Inspection. Two sample units of telephone eete, earphone elements, and microphone elamente eball be eelected at random for each group of inepaction, es applicable, in Table V, every tuo mcnthe or SCCIunite or fraction thereof produced, whichever cccure firet. The firet semplee ehall be eelected from the first production lot. 4.5.3.2 Order of Inspection Within GrouD C. performed in the order specified in Table V. Group C Inspection shall be ?

h.5.3.3 GroUP C Failuree. Actions required relative to Group C failuree shell be aa epecified In the contract or purchaae order. ~.5 .b Reinfection of C~orminR Group C SamPle Unite. Unleee .otherwiee .~~cified, s~le ~te W* have been subjected to andpaaeed Group C ~action may be accepted on contract provided .@.l .damege. ia.,+pair?d and @e eample tite are reeubjetted t6 and paas tbe leakage (immareion) test of b.18 and Group A inspect.ion, in that order. TASIJIV 13rouuC lnapection ImP TA-1( )/PT Lou Temperature High Temperature Humidity Altitude Sounce Drop Reomt 3.9.1.1 3.9.1.2 3.9.2 3.9.3 3.9.5.1 3.9.5.2 10 InaP Unit 1 unit 2 2 .? 1 .

1: IJ.13.1 ~.13.2 .::- 2 :.$ . ..3.. : l% b: .5

Source: http://www.assistdocs.com -- Downloaded: 2010-08-17T04:53Z Check the source to verify that this is the current version before use.

(9
InaP TA-118( )/~ Law Temperature High Temperature TA-121( )/FT Law Temperature High Temperature

KILT.13626B(BL) (Mc.upC hepection(~td) Reamt 3.9.1.1 3.9.1.2 li.13.l lJ.13.2 unit 1 1 2 unit 2 1 2

3.9.1.1 3.9.1.2

1$.13.1 h.13.2

1 2

1 2

&.6 Reconditi oninR Sounce. The unit shall be placed in ite normal operating poeition on the table of the Package Teeter, Type lDOD-SC, ae made by the L.A.B. Corporation, Skaneatele9, N. Y., or equal. The package teeter, shafte in phaae, ehall have a epeed euch that it is $xX, possible t.ainsert a l/32 inch thick etrip of material under one corner or edge to a diatanca of 3 inches ae the unit bounces. The unit ahal.1be subjected ,to tAia preconditioning for 1 minute. After bounce preconditioning; the unit ehall not be repaired, aligned, cleaned, or otherwise changed prior ta subjection to I.napection. L.7 Visual and Pbchanical Inspection of Equipment. Squipuent ahdl examined for the defecta Mated in MIIATD-252. be

b.8 Inmection for Dimensional IntercIianiceabiliq. The dinmneione Mated below shall be gaged or akmeured to det+rmine confornuuiceto the phyeical I.nterchangeabili@ requirement of 3.6. When a listed dimeneion ia not within epecified or deeign I.imita,it ehall be considered a &or defect. a. External and internal dimeneio~ of caeee, covere, nnd insertable ect mating of parte. aaeembliee, when such di.mnaiona a.ff b. Dimenelone of cavitlea, when such dinrxmione affect ineertion of itelne. c. Location of hinges and faetenere on eeperable parta or aaaembl.iee which mat mete, such aa ceeee, covers, and mountinge. d. Location of connector, lockinE Dine. fnetenere. slides. and mountinge which receive mati.ng-partao~ plug~in assemblies and &jor unite; and location of the mating parts on the plug-in eeaembly or =jor unit. e.
&.9 k.9.1

Size and form of epecial thraada. Teete for TA-118( )/PT

Electrical

Preauency Respomee. Connect the equipment a.eshown in Figure 3. Set tie audio oscillator to 3C0 Hz, .I.2 vnzs or VTVM 1. The m.lcrcphone and output circuit ehdl be calibrated to maaeurw tie sound preeeure level vltM.n the 6CC cavity. Record the sound pressure level for compliance d th U

Source: http://www.assistdocs.com -- Downloaded: 2010-08-17T04:53Z Check the source to verify that this is the current version before use.

I ;MIL-f-l3626B(EL) !3.8.1.1. Repeat the procedure with the oecillatar set at LOO, ~00, 600, i8co, 1000, H50, 1500, 1750, IQOO, 2250, 25@~ 2750) 3~, 3250, 35~, ~37.50,IL,ooHz.
~ 4.9.2

connect thtie u.ipmant as shown in Figure b. set the ~ volts on the VTVM. Replace the afuphone ( audio oscillator h 1000 Hz, . ,element with a decade resistor and vary the resistance until the VTVM again Ireads .C6 volts. Record the value of the decade reeietcr for compliance \with 3.8.1.2.
Impedance.

~b.9.3 Overload. Connect the earphcne element to an aUdiO osci~ator Ed of 5 IW, &oughOut tJI~ frequency range from SW to 2~00 /at a power lSVEl Inz. ehal.1 be no evidence of rattling or dSetortion when the unit ie Iheld yn close proximity to the SSr;

I&.10

Electrical Teete for TA-121( )/FT.

~~.I.o.l Frequency Reeponae. Connect the equipment as ehcwn in Figure 5 with ~S1 closed. Position tie microphone elsmsnt I./binch directly in front of }the driver cnit with the diaphragm of the microphone parallel ta the diaphragm of the driver. The driver unit shall be calibrated h provide a ~ sound preesure of 28 dynaa/cm2 at 300 Sz at the face of the microphone ~ ;l:y; . Record the voltage acrcee the 600 ohm resietir for compliance with Repeat the procedure with the reference sound preseure and the {~i~e~ ~requancy eet eucceeaivsly at ~, 503, 600, 800, 1000, 1.250,1500, !1750, 2000, 2250, 2500, 2750, 3000, 325o, 3500, 375o, and l@OO Hz. ~14.10.2 Impedance. Connect the equipment as shown in Figure 5 with S1 open. ,Peaitionthe microphone as in ~.10.l and adjust the output of the oscillator tie decade ; until the VTVM reads ,C6 volti at 1000 Hz. Close S1 end adjuet meaietor until the VTV?4 reads .03 volts. Record the value of the reeietance for compliance with 3,8.2.2. ~.11 Electrical Teats for TA-IJ8( )/PT and TA-121()/PT

1$.11.1 Insulation Resiet.ante. The elements ehall be teeted.in accordance iwitb teet condition B, Mathod 302 of MIL-STD-202. Measurements shall be ,Men between a termlna.1and the .covarmounting ecrew. There shall be no ! evidence of arcing or breakdown.
!

b.11.2 lhgnetic Stability. Record the frequency reaponee of the units under teet (See 4.9.1 and l&.lo.1). The units shall then be eubjected ta 6 $ uccesaive discharge of opposite polarity applied from terminal to terzdnal from a 10 microfarad capacitor charged to 3.30volte. Following thie pro~edure, the frequency response shall not have changed more than 4 db from !theinitial response.
i

p.12

Electrical Teats for TA-1( )/PT 12


?

Source: http://www.assistdocs.com -- Downloaded: 2010-08-17T04:53Z Check the source to verify that this is the current version before use.

.-

IIILT-13626B(EL) ~ .M.1 Oenerator Ootput. Connect tbe equipment ae ahonn in Figure 6. for conphmce Cperate tbe generator lever and meaaura tie generator ou@ut Vlth 3.8.3.1. &.L2.2 Funs sanaitivit~. Conneot tie telephone eet to en audio oecllla~r . Sat md.lble coatrol to maximum. Verify that tbe eet at 30 vrnkv, audible and vieud eignale operate. Repeat the procedure with the oscillator eat at 20 Ma and 25 %.

ku%ka%s%20%y% :A%%Hr%w&L%%w&hE vlti e decade raaiator and vary tbe reslatance until the VTV?Ia@n reada 30 vnm. Record the valne of the decade resi.etorfor conplianoe with 3.8.3.3. f$.12.& Inenk@on Resietxuwe. Tbe eqoipnmnt eha.11be tested in accordance ehall be vith taa~ condition B, Ullxl302 of KIL-STD-202. MaaeurarOmt.4 takanbatvaen aacb Mm terminal md tbe caae.

IL.12.5

Operational. Connect the fOlloving teatu:

t- TA-1( )/P2

telqbnea

together and perfm

t&e genaratir a. Operate and visual signale operate on variable from loud to low, ad vlsaal eignal ohal.1r+maln en Repeat the prooadum with.the

lever on unit 1 and verify that tbe aodlble unit 2. The eudibla EIignolvoluw ahdl be shall be Inandlble in tie off poeition. The ontil tha push-to-talk ovitcb ie dapraeeed. unite reversed.

b. With tbe pub-to-talk avitcb depreeeed sidatone ehall be notid on eaoh onlt. c. h.13 Betab.Meh a two-my aonvereation betuaan tit 1 aad unit 2.

Temaretoro fast.

h.13.1 Lm Tenwratoro. fhe aqulpmnt L?ha.Ube toabd in accordame with HJod cedum 1, of HIL-BTD-81O. The etorage tmperaturo eha.11be taipemtaro oball bo -65%. -80 %*hfor ~ ~oriod of 2& honrn, ond the opemtlng

b.13.2 H@
5011, 150%.

Te~mturo. Tbe equlpmnt eha.11be tcstad in ffioordance with Tho operating tompemturo ohall be %ocedaro 1, of %kSTD-810.

h.~ Kunidi Toot. fhe oqalpnsantoholl bo teatod in accordance with %~od-*e I*, of MIMKI-810. Kcamromnte all be raede W tie perlodo ahon tie figom for tbe oycle.
~.x Altitude Teat. Tbe oqulpmnt oholl be tooted in aooordance with I, of MIL-STD-810, oxocpt the operating altitude %thod 500.1, Procodure ehall be 10,OCO feat above mm levaL ad the stirege altitude shell be 25,000 feet above oee level. Conneot the oqaipmnt in accordance with 13

o /

Source: http://www.assistdocs.com -- Downloaded: 2010-08-17T04:53Z Check the source to verify that this is the current version before use.

MIL-T-13626B(EL) Figure 8 nnd parform a i talk-th.runteet on tie tal~hone. Following the altitude test,perfonc the aparational inspection of &.12.5. 4.16 Bounce, Locee Cargo Test. The equipment ehall be teeted in accordance with Method 51b.2, Procedure XI, Part 2 of HIL-STD-81O. h.17 shock, Drop Teet. The equipment ehall be teetad in accordance with Method 516*2, Procedure II of ~L-STD-810. 4.18 Leakage (hcereion) Teet. The equipmant carrying caee ehall be tested in accordance with Method 512.1, Procedure I, of MIL-STD-81.O. &.19 Slast Teet. The telephone eet ehall be mounted on the carriage of the US Navy Simulated @n sleet Equipment in accordance with Bureau of Shipe Drawing SK-N-86h with the front edge in the teet plane and ite tie coincident with that of the axplosion chamber. The equipment shall be eubjaetad to 30 rounde of blaet at a peak pressure of 9.5 rounds per square inch. Following the test, maaeure the fre~ency raaponee of the mlcrcphona and earphone elements for compliance wltb 3.9.6.

k.20 Quality

Inspection of Preparation for Del.ivq PreparaConformance tion for dal.lvaryehall be inapacted in accordance with HIL-P-11~ to ccnfomanoe to the requlramante of Section 5.

5.

PREPARATION FCElDELIVERY Preservation and packaging aha.11be level

.5.1 beeervation and Packagi A or C, ae specified (See 6.1


5.1.1 Iavel A.

Telephone Set TA-1( )/PT aha.11. be cleaned in accordance 5.1.1.1 Clew. with proceee C-1 of HIL-P-116. Telephone Set TA-1( )/~ shall be dried in accordance with 5.1.1.2 u. applicable procedure of MPP-116. 5.1.1.3 Preservation ADD1.icatAon. None required. packagiog shall be in accordance with the CC, apecffied herein. Each technical literature chall be

5.1.1.b Unit Packatz ~. ~t nwthcde prescribed in HIL-P-IJ6

5.1.1.4.1 Technical Literature. p@aged method IC-1.

Source: http://www.assistdocs.com -- Downloaded: 2010-08-17T04:53Z Check the source to verify that this is the current version before use.

l..
HIM-13626 B(BL)

5.1.1 .b.2 Tale@xma Set TA-1( )/PT. Saoh tdaphom eat au ~ i~viaa followe: Seoore the set uiWn the caae, dnally pack~ cloao tbe cover and ssure uith feetenare provided. Fold the canying etmp in proportionate d.imnaiona end tie ulth t.uino ccdonaing to T-T-871, Type L. Cushion each cane on dl aurfacae with ca.llaor prideor both fabricated of fiberboard conforming to PPP-F-320, type CF, class waatber-resietant, varie~ SW, grade W6C, deeigned ta protect all projection and abaorb ti ah~k of impact in handLing and tranait. AO an alternate, cushioning material may be fabricated of plaatic =lding material conforming @ RILP1~ or polyurethane foam confonzing to MILl!-2651&. Pleoe the cuabioned item uitbin a clone-fitting fiberboard box conforming b PPP-s-636, W6c. Place the tdmical literature, peclmged aa epecified in 5.1.l.~.l on top of tie contiti, directAy ender the lid of W box. Cloee the box in accordance with the appendix of the box specification. 5.1.2 Level C. Sach Telephone Sat TA-1( )/FT ehall be preaermd end WMed in a ~r tit _ effti adeq~ta protection cgninat p4yeicol and en-onzmntel damge during ehiprant, handling and Linitad intrcnait storage.

5.2 packing. Pacldng shall be level A, B or C no epacified. ~oDing containers for all levala shall be capable of etacki-ig end support-Gg anper~oaed lcade during ohipmant and e~rage without dameging the contdnor(s) or i~ contents (See 6.1).
5.2.1 LOvd A.

A quantity of Telephone Set TA-1( )/P2, packaged 5.2.1.1 Conaolidaticn. aa epacifled in 5.1, shall be packed tithin n close-fitting fiberboard box conforming to PPP-%636, type CF, claea weather-resiotnnt. hx cloaara shall be ee epecified in the appendix of the bnx epeoification. To facilitate palletiaatinn, fiberboard boxes ehall be onifonz in aiae and contain equal qnantitiee of the packaged itvme ta tba greateet extent practicable.
S.2.1.2 Pallatined had. A quanti~ of containara, packed aa specified in I, con fbrud.ng to HIL-STD-lk7 5.2.1.1, shall be plac~ on a pallet, 10zA me except that the pallet ehall be eoftvood confomning to m-p-n, typoIV, size 2. A fiberboard cap aball be ezployed over tie load having two aidea extandlng aun the.etacked load at leaet 12 inches to accommodate marking reqairementa. The cap eha.11be fabrioztad of fiberboard confomziog to PPP-F-320, claaa ueether-resietant, @a or V3C. The load shall bebonded b the pallet by etrapping oonforniog to W-B-781, ~ 1, finieh A or Ohrink film.

--

5.2.1.3 baa Than Pallstized bad. When quentitiea per deetinatiaa are less than a pallet load, the containers packed ae apeoified in 5,2.1.1 ehell be waterproofad, with tape conforming to PPP-T-76, in acwrdance uitb the taping requiramenta of the appe~ of tIm box apaoification. A qaantity 15

Source: http://www.assistdocs.com -- Downloaded: 2010-08-17T04:53Z Check the source to verify that this is the current version before use.

r
I

. .
KWT-13626B(EL) 0! \

I
\

of the waterproofed containers shall be packed within a oloee-fitting bnx conforming to PPP-B-601, overeaaatype; PPP-B-621, .vWle b, cl.a.es 2; or groae weight exceeds 2C0 pounda, etyle 2 or 3, 019s9 3. hben * k PPP-&585, or the contaher length and width le ~8 x 2& inchee or more and the weight axcaada MO pounda, 3 x ~ inch ekida, laid flat, shall be applied in accord~ ance uith the requiramanta of the container specification, or if not epeciwill adequately support the ~. fled inthe specification, in a manner Wch ~tam and faeilitata the uae of material handling equipment. Cloeure and , etrapping ehall be in accordance with the applicable container apacification or appendix thereto except that metal strapping shall conform to GQ-S-781, j type S,,finiab A. \ \

I
I

.1

t
~ ;
$

5.2.2

L9Vd. B.

5.2.2.1 Consolidation. A quantity of Telephone Set TA-1( )/PT, packaged aa epacified in 5.1, shall be packed aa specified in 5.2.1.1. pa.lletia~ Load. A quanti~ of containers, packed ae specified in 5.2.2.1, eball be palletized aa epecified in 5.2.1 .2.

I 5.2.2.2

; ~ t I

5.2.2.3 Lees Than Palletized I.oad. When quantitiae par destination are Mea than a pallet load, the container packed ae specified in 5.2.2.1 ahe.11 be reinforced by preaaure-mnaitive filamnt tape conforniw to PPP-f-97, type IV ae epecified in the appendix of th box epaoifioation. No forther p~k~ ehall be required.

~ 5.2.3 Iavel C.

I 5.2.3.1

Consolidation. A quantity of Telephone Set TA-1( )/PT, packaged .1, eball be paoked ae specified in 5.2.1.1, except that t %~%%~%~s ehall be claae domestic. I 5.2.3.2 Pa3J.etizedLoad. A quantity ofcontainers, packed ae epecified in I 5.2.3.1, sba.11be p@.letized ae specified in,5.2.l.2, except that the I fib~bomd cap shall be claaa domaetlc. ~, 5.2.3.3 ~SS Than Palletized Load. When quantitiae pzr destination ere lees than a pallet load, tie containers packed aa apacified in 5.2.3.1 ehall be ueed ae the chipping container. ifofurther packing shall ba required. In addition t.aany epecial marking required by the contract 5.3 Marki=. ~ or order, interior packagea and exterior shipping containare ehall be marked in accordance with KIL-STD-129.

I
I

6.1

orderi~

Data.

procurement documznta ehould epacify the following: 16

Source: http://www.assistdocs.com -- Downloaded: 2010-08-17T04:53Z Check the source to verify that this is the current version before use.

HILT-13626B(IiL)
,-

a.
Uu3reto.

Title,

number, and dab

of this Specification and q

amandmnt

b.

Type

required. required for ehipuant

(kv% d.

Iavel of packaging and level of packing A, level B or level C). The

particuhr

epaoific paragrapha of Section 5 uhich are applicable b procurement.


tact

the

e. Hhen tba rou@I bandliog f. 6. Marking ad

ie required.

chipping of eamplae.

Place of final inspection.

6.3 (koup C hope ction.


tion of the

at the discreApprovcl to ship my be withheld, govarnmnt, pending th decision from the contreoting officer on the adequacy of corrective motion (See b.5.3.3).

6 .)J lkmnclntare.

~@

The porenthcsee in the n~ncl.oture will bo deleted or repl@ed by a lotter identi~ing the porticulnr design; for axomple: %A-lW/IZ. The contractor ehou.1.d apply for n~lotore in accordance with the applicable clouee in the controct(See 1.1).

6.5 f%rifiootioa ~ ction. Verificd.ion by W gover~nt will be limited h tb arcountdeemad neceaoary to determine co@ianoe with the cootract ond will ba linitod in oeverity to tho definitive quslity easorance provieiono eatnhliabad in thio apecifiootion and tbe contrect. Tho omunt of verificotim inqmotion by t&e government till be adJneted to mko maicmm utilisation of Uta coatrector!s quali~ control eyetem nnd the qnaliti history of the product.
6.6

I&ation of C?pa ration In@eotion. It ie deeireble thot ~e ioapaction (lJ12 5) b at a location that wiU ninimiae flmsd
the cqeipmnt)fM.er

operational

(*iCb =isbt huh &T~ pleted. It ie racmndad inepacted sample onita) be

that tAe entire lot sar+.lad ed inepected iEEEMMate3y prior to

hendling thio iospectAon 18 com(including all previously

p=-

Coatodian : m - (=)

Reparing
~ -

ActivitY

(EL) MO. ssC?5-A231

project

17

Source: http://www.assistdocs.com -- Downloaded: 2010-08-17T04:53Z Check the source to verify that this is the current version before use.

14LT-13626B(EL)

RESPONSE IN db re O.b

DYNES/Cl#

18

Source: http://www.assistdocs.com -- Downloaded: 2010-08-17T04:53Z Check the source to verify that this is the current version before use.

IULT-u626B(KL)

RESFONS

IN db ro X IULL.IVOLT

P
..

Source: http://www.assistdocs.com -- Downloaded: 2010-08-17T04:53Z Check the source to verify that this is the current version before use.

,.

o )

20

Source: http://www.assistdocs.com -- Downloaded: 2010-08-17T04:53Z Check the source to verify that this is the current version before use.

~~T-13626B(BL)

I
@-

i!

B
Ii ii!

u
21
Source: http://www.assistdocs.com -- Downloaded: 2010-08-17T04:53Z Check the source to verify that this is the current version before use.

1
I

~ MILT-13626B(EL)

Source: http://www.assistdocs.com -- Downloaded: 2010-08-17T04:53Z Check the source to verify that this is the current version before use.

. .

23