You are on page 1of 3

HALLIBURTON

FRAC Tank Trailer Equipment # 10046873-310025062


Record PM Meter reading (Verify meter functions properly)

CL-GL-HAL-IEM-PMcZ08A Shop Location and # DATE (ddMMMyyyy)

Process Owner: Global Equipment Maintenance Manager Approver: Larry Deweese Page 1 of 3

Preventive Maintenance Check Sheet Revision Date: 05/14/2013

HALLIBURTON
FRAC Tank Trailer 27 28 29 30 31 32 33 CL-GL-HAL-IEM-PM-ZOSA CH
.

BRAKES Check all brake components Check brake lining condition & thickness y.." min (6.35mm) Check brake hoses for certified markings and conditions Ensure all hoses from valves to spring brakes are wrapped with protective material Check condition of glad hands Check brake hoses for routing and supports every 15 inches Perform DOT brake function test (Tractor Protection Valve Test) or (Simulate with Shop Air by removing the shop air quickly from the Red (supply) Glad Hand and identifying the proper operation of the systems control valves) Check brake adjustments using travel method and record measurement RF RM LM RR LR

./

'V
;/

-:

o~

34

<= Front of Trailer


LF TIRES AND WHEELS Inspect wheel hubs and seals, check oil level Check wheel bearings for excessive play. (Wheel must be off the ground with brakes released) Check tires per regulatory requirements Torque all wheels to manufacturers specifications Cast Spoke Wheel 200-250 ft-Ib Double Cap Nut Disc Wheel (inner and outer) 450-500 ft-Ib Hub Piloted Wheel Mounting (Single Flanged Cap Nut) 450-500 ft-Ib Check wheels, rims and mounting Ensure tire pressure is at recommended pressure and record pressure and tread depth (min 2/32")
Pressure Tread Depth Pressure Tread Depth Pressure

CH

35 36 37 38

v'

39 40

Tread Depth

<= Front of Trailer

RFO RFI LFI LFO

RMO RMI LMI LMO

RRO RRI LRI LRO

q o Pit
S) l)

'),JJ/'tl.

2Ai> """'V'
l.t) i"_

;)

'otrl~
CH

41 42 43

ENVIRONMENTAL Dispose of all waste properly. Ensure all spills are cleaned up and properly contained. REQUIRED PAPER WORK Check regulatory documents and decals per State and/or Country Requirements (DOT, CVIP, MMS Coast Guard, etc.) Verify that proper company logos and decals are installed as per the Branding initiative. Verify that the SAP equipment number is clearly marked on the unit (see the ESG Branding web page for guidelines). a
b

../

V
,

44

Record date of DOT/CVIP and/or state annual inspection sticker (if applicable). Replace sticker if within 90 days of expiration date. Was a new DOT/CVIP sticker applied? (Circle response) Signature:

l4'~I.3
Yes

Date No Date

c
45 46 47

Install new sticker to indicate when the next PM is due Record date when next PM is due. Record hours/miles/km when next PM is due.

7/<6[13

p
r

Date

Hour/Miles/KM

Process Owner: Global Equipment Maintenance Manager Approver: Larry Deweese Page 2 of 3

Preventive Maintenance Check Sheet Revision Date: 05/14/2013

HALLIBURTON
FRAC Tank Trailer

CL GL HAL IEM PM Z08A

- -

- -

LIST ALL REPAIRS THA T WERE FOUND DURING THE INSPECTION. THIS LIST WILL BE USED AS A TOOL TO RESCHEDULE ANY REPAIRS THAT WERE FOUND DURING PM INSPECTION. 1 IV lVV' (,wI,J J,~ -

r::>

c ~

d4-~V--

~lOs

Mechanic name: Repair date: 2

Approval acquired: Maintenance order #:

Itch--

~(J}S

1-tvJL

~QV
v

~
~

to

d... <J e...

tU-. V

Mechanic name: Repair date:


3

Approval acquired: Maintenance order #:

{f(..t <0-4 ,A \ etg_ ~


v

tt 4J 4'4~t
v

()1tJ>( ICL"'_
Approval acquired:

I I

Mechanic name: Repair date:


4

to.

'_Ib..._
v

C~,~

A Icu..

Maintenance order #:

H~

hl.GC!...~

o.J~'~

V
Approval acquired: Maintenance order #:

Mechanic name: Repair date:

5,.. .M

V\.~

d-lo.J>
\)

Jge'Tt\. S I CO-

~
Approval acquired: Maintenance order #:

Mechanic name: Repair date:


6

Mechanic name: Repair date:


7

Approval acquired: Maintenance order #:

Mechanicname: Repair date:


8

Approval acquired: Maintenance order #:

Mechanic name: Repair date: 9 Mechanic name: Repair date: 10 Mechanic name: Repair date: Report any errors found on check sheet to supervisor

Approval acquired: Maintenance order #:

Approval acquired: Maintenance order #:

Approval acquired: Maintenance order #:

Process Owner: Global Equipment Maintenance Manager Approver: Larry Deweese Page 3 of 3

Preventive Maintenance Check"Sheet Revision Date: 05/14/2013