101.01.1.001
ARTICLE DESCRIPTION
Reserved Item!!!!!! Excavation carried out by any means and in any terrain. euro (four /19) Excavation performed by any means and in any terrain. euro (four /87) Excavation at fixed section by any means and in any terrain. euro (eight /55) Backfilling with materials from the excavations. euro (four /27) Abutment with sand pipes and wells. euro (thirty-six /74) Transport of waste material and debris of up to 5 Kms from the site. euro (three /22) Transport of waste material and soil from excavation, demolition site or waste materials for greater distance than 5 km from euro (two /67) Concrete (lean mix) for non-military facilities in soprafondazione. euro (one hundred and thirty-six /19) Concrete for reinforced structures. euro (one hundred and four /47) Wooden Formwork for reinforced concrete structure support and bracing. euro (twenty-four /68) Rebars for Steel reinforced concrete structures with improved adherence euro (one /34) Steel grid consisting of welded steel bars with improved adherence. euro (one /34) Flat roof or inclined to mixed structure. euro (twenty-one /22) Prestressed concrete beams. euro (seven /57) Roofing including large wood warping (trusses with struts, chain wood, monaco and struts) and small warping purlin. euro (fifty-three /72) Mantle of large tiles including ridge tiles, headsets for ventilation of the attic, snow, etc. .. euro (twenty-five /49) Small warp for construction of the roof covering. euro (five) Wooden planks of fir pitched roof (2.5 to 3.00 cm thick). euro (twenty-six) Screed mix of sand and cement mortar. euro (eleven /12) Waterproof covering made of prefabricated bituminous membrane reinforced elastomer. euro (twenty-six /06) Waterproof covering made of prefabricated bituminous membrane reinforced with elasto fiberglass mat and polyethylene film euro (fifteen /70) Dry-laid polypropylene towel to protect the sheathing with joints overlapped by 10 cm. euro (two /95) Fabric (geotextile) in dry-laid nonwoven fabric with joints overlapped by 10 cm. euro (two /68) Insulation outer coat on the outside wall already plastered. euro (seventeen /22) Extruded polystyrene insulation panels. euro (twenty /14) Aerated concrete subfloor insulation in place since flattened and leveled. euro (nine /92) Rain Pipe (pre-painted galvanized steel, copper) circular or square. euro (thirteen /48) Rain Pipe Terminal in profiled iron square section tubular or circular. euro (twenty-eight /50) Gutter (prepainted galvanized steel, copper), smooth or contoured.
Unit of measurement
Price
m3
4.19
101.01.1.005
m3
4.87
101.01.1.009
m3
8.55
101.02.1.002
m3
4.27
101.02.1.005
m3
36.74
101.03.1.001
m3
3.22
101.03.1.002
m3*km
2.67
103.01.1.001
m3
136.19
103.01.1.005
m3
104.47
103.02.1.001
24.68
103.03.1.003
kg
1.34
103.03.1.004
kg
1.34
103.04.1.001
21.22
103.05.1.006
7.57
103.06.1.003
53.72
103.06.1.005
25.49
103.06.1.007
5.00
103.06.1.008
26.00
103.07.1.009
11.12
104.01.1.014
26.06
104.01.1.021
15.70
104.01.1.034
2.95
104.01.1.035
2.68
104.02.1.001
17.22
104.02.1.002
20.14
104.02.1.009
9.92
104.03.1.001
13.48
104.03.1.019
each
28.50
104.03.1.023
euro (fourteen /09) 104.03.1.032 Flashings (prepainted galvanized steel, copper). euro (ten /40) Union lead to release stormwater. euro (three /55) Polymer concrete drainage pit. euro (one hundred and eleven /56) Scaffolding for the first month or part month. euro (three /53) Scaffolding for each month or part month following the first. euro (thirty-four /14) Scaffolding Plank (work plans, sottoponti, valances, toe, etc.) for the first month or part month. euro (sixteen /25) Scaffolding Plank (work plans, sottoponti, valances, toe, etc.) for each month or part month following the first. euro (two /16) Screening of scaffolding with straw mats, plastic sheets and the like. euro (three /56) Provisional fence construction (Hmin m 2.00) and metal supports in the stakes of wood or pipe scaffolding. Including bracing, euro (seventeen /30) Provisional construction fence blind with wooden planks (m Hmin 4.00) with supports in beams of fir or metal scaffolding. euro (seventeen /53) Provisional yard fence with mesh HDPE bright orange oval mesh supported by posts galvanized. euro (ten /57) Tuff masonry, brick, stone, etc. .. euro (one hundred and eighty-one /16) Exterior walls consist of double walls with air chamber interposed. euro (ninety /10) Partition bricks. euro (twenty-five /55) Plasterboard partition. euro (thirty-six /04) Hornet's nest made with stone (volcanic, limestone). euro (sixty-six /04) Crawl space performed with plastic elements in the shape of a dome (igloo). euro (twenty-one /75) Internal plaster on flat surfaces. euro (eleven /04) Plaster of flat external surfaces. euro (eleven /57) Ceilings (aluminum slats, panels made of mineral fiber, gypsum). euro (thirty-three /41) Ceiling gypsum board in place with metal structure in galvanized steel sheet. euro (twenty-four /82) Parquet floor. euro (ninety-five /48) Brick floor. euro (fifty-two /97) Floor tile. euro (thirty-three /28) Marble floor. euro (one hundred and two /75) Floor tiles. euro (thirty-six /15) Lead polishing floors (marble, jet, bollettonato, terrazzo, marmettoni). euro (seven /01) Coating the inner walls in single firing. euro (twenty-eight /02) Cladding of external walls (with strips of cooked, Trani stone slabs, travertine, etc..). euro (thirty-four /94) Interior wall cladding with marble slabs.
14.09
10.40
104.03.1.034
kg
3.55
104.03.1.106
each
111.56
105.02.1.002
3.53
105.02.1.003
34.14
105.02.1.006
16.25
105.02.1.007
2.16
105.02.1.008
3.56
105.02.1.019
17.30
105.02.1.020
17.53
105.02.1.021
10.57
106.01.1.001
m3
181.16
106.01.1.033
90.10
106.02.1.005
25.55
106.02.1.030
36.04
106.03.1.003
m3
66.04
106.03.1.006
21.75
107.01.1.011
11.04
107.01.1.012
11.57
107.02.1.001
33.41
107.02.1.007
24.82
108.01.1.001
95.48
108.01.1.002
52.97
108.01.1.003
33.28
108.01.1.004
102.75
108.01.1.005
36.15
108.01.1.051
7.01
108.02.1.001
28.02
108.02.1.007
34.94
108.02.1.031
euro (ninety /72) 108.03.1.075 Marble Slab (white, Trani, travertine, bardiglio basaltino, etc..). euro (one hundred and fifty-two /31) Ceramic Skirting tiles euro (five /50) Skirting in wood of any essence. euro (ten /43) Skirting tiles. euro (fourteen /91) Skirting in terracotta. euro (five /39) Marble baseboard. euro (eleven /04) Main entrance door with one or two leaves. euro (two hundred and twenty-three /53) Interior door or two doors. euro (one hundred and fifty-two /71) Glazed to one or more doors. euro (one hundred and ninety /48) Shutter doors with fixed or folding. euro (eighty-eight /43) Shutter doors or roller shutters. euro (two hundred and thirty-three /97) Box for chip guard for roller shutter. euro (one hundred and ten /81) Counter of wood raw Spruce. euro (ten /20) Security door. euro (five hundred and forty-five) Sheet steel roller shutter slats. euro (sixty-seven /94) Supporting metal structure inside sliding door secured by clamps, including demolition, building works completion and finishing euro (one hundred and thirty) Wooden sliding door cabinet with paneled door. euro (two hundred and eleven) Flap for single car garage with ceiling tracks in hot galvanized steel complete with special lock closure with multiple functions .. euro (sixty-six /56) Interior fire doors approved and certified REI REI 30 or 60. euro (six hundred and thirty-five /34) Steelwork of any section and dimension realized with simple elements. euro (three /45) Metal structural section and of any size, for frame structures, with the use of hot-rolled profiles of the series IPE, HE. euro (three) Delete fixed with scores in simple geometric designs. euro (three /11) Gates open at scores with simple geometric designs. euro (three /73) Railings for balconies and stairs scores with simple geometric designs. euro (three /85) Small hardware (clamps, ties, etc..) Including masonry. euro (two /66) Compensation for performance of hot dip galvanizing. euro (one /16) Water and sanitary system, including network load cold water. euro (one hundred and sixty-four /58) Water and sanitary system comprising the power distribution network of hot water. euro (one hundred and eighty-two /15) Water and sanitary system including drainage system. euro (one hundred and seventy-three /47) Toilet bowl and its accessories.
90.72
152.31
108.04.1.002
5.50
108.04.1.007
10.43
108.04.1.010
14.91
108.04.1.012
each
5.39
108.04.1.013
11.04
109.01.1.001
223.53
109.01.1.007
152.71
109.01.1.017
190.48
109.01.1.020
88.43
109.01.1.022
233.97
109.01.1.030
110.81
109.01.1.032
10.20
109.02.1.006
545.00
109.02.1.008
67.94
109.06.1.001
130.00
109.06.1.002
211.00
109.06.1.003
66.56
109.06.1.004
635.34
110.01.1.001
kg
3.45
110.01.1.004
kg
3.00
110.01.1.009
kg
3.11
110.01.1.013
kg
3.73
110.01.1.017
kg
3.85
110.01.1.025
kg
2.66
110.01.1.031
kg
1.16
111.01.1.011
each
164.58
111.01.1.013
each
182.15
111.01.1.026
each
173.47
111.01.1.046
euro (one hundred and fifty-nine /84) 111.01.1.048 Bidets and accessories. euro (one hundred and fifty-seven /62) Sink and accessories. euro (one hundred and thirty-two /55) Bathtub and related accessories. euro (three hundred and thirty-four /21) Dish for shower and related accessories. euro (two hundred and twenty-nine /80) Sink and accessories. euro (two hundred and twenty-two /10) Wash basin and related accessories. euro (one hundred and eighty-three /15) Urinal and accessories. euro (two hundred and thirty-one /48) Urinal partition wall dividing suspended. euro (seventy-two /18) Shower 2 doors. euro (four hundred and ninety-eight /10) Polished chrome plated brass tap. euro (fourteen /45) Brass valve euro (eighteen /27) Heavy chrome plated brass tap for washing machines. euro (twelve /80) Bronze gate valve with handwheel. euro (twelve /24) Water Meter euro (twenty-six /71) Vertical electric water heater. euro (two hundred and forty-one /56) Step light with switch to control / switch / switch / relay. euro (forty /84) Point taken 10A/16A/bipasso. euro (forty-two /05) Equipotential ground for the connection of the pipes for loading and unloading of sanitary appliances. euro (fifty-six /22) Shielded cable for telephone and intercom systems. euro (two /04) Junction box complete with cover. euro (three /76) Plastic Switch box for socket and any control element. euro (three /05) Line switch breaker. euro (fifteen /82) Circuit breaker breaker breaker. euro (fifty-five /23) Transformer for doorbell. euro (twenty-three /17) Framework consisting of mounting box, the front panel with door, media and profiles. euro (fifteen /47) Ring at low voltage. euro (fifty-five /14) Digital intercom for each apartment. euro (one hundred and seventy-nine /82) Complete Switch of plaque. euro (twelve /49) Diverter complete with cover plate. euro (thirteen /29) Inverter complete with cover plate.
each
159.84
each
157.62
111.01.1.050
each
132.55
111.01.1.056
each
334.21
111.01.1.060
each
229.80
111.01.1.070
each
222.10
111.01.1.073
each
183.15
111.01.1.075
each
231.48
111.01.1.077
each
72.18
111.01.1.090
each
498.10
111.01.1.151
each
14.45
111.01.1.152
each
18.27
111.01.1.153
each
12.80
111.01.1.155
each
12.24
111.01.1.158
each
26.71
111.01.1.174
each
241.56
111.02.1.004
each
40.84
111.02.1.010
each
42.05
111.02.1.012
each
56.22
111.02.1.024
2.04
111.02.1.027
each
3.76
111.02.1.033
each
3.05
111.02.1.037
each
15.82
111.02.1.041
each
55.23
111.02.1.043
each
23.17
111.02.1.045
each
15.47
111.02.1.047
each
55.14
111.02.1.058
each
179.82
111.02.1.059
each
12.49
111.02.1.061
each
13.29
111.02.1.062
euro (nineteen /71) 111.02.1.063 Jack (current, TV, phone) full of plaque. euro (thirteen /42) Electrical system for elevator system. euro (one thousand and seventy-nine /49) Core cable insulated with PVC. euro (four /22) Disperser pipe for earthing steel with electrolytic copper plating. euro (twenty-one /91) Connection terminal for earth. euro (fourteen /84) Pipes Protective insulated PVC ducting for electrical installations built. euro (eleven /24) Differential "lifesaver" to be coupled to the switch breaker. euro (four hundred and seventeen /77) Installation of heating for residential use, including all the plant components and masonry necessary. euro (thirteen /70) Boiler / generator to supply heating and hot water production. euro (one thousand six hundred and eleven /43) Collector for heating distribution circuit (boiler outlet from the collector and the collector back to the boiler). euro (eighteen /91) Terminal heat source (radiator modular, panel, heater, fan, heater, etc..). euro (two hundred and eighty-nine /23) Cooling only cold hard wall, fitted with inverter control. euro (five thousand two hundred and eight /32) Circulation pump for hot water. euro (three hundred and nineteen /77) Valve (ball, flow, butterfly valves, check valves, etc..). euro (seven /51) Holder. euro (seven /16) Closed expansion tank pressurized. euro (one hundred and thirty-four /23) Primary air conditioning system for treatment. euro (eight thousand three hundred and ten /76) Exhaust fan to tower. euro (four hundred and ninety-nine /15) Adjustable speaker cones. euro (one hundred and twenty /27) Outlet nozzle or recovery. euro (twelve /08) Air channels. euro (four /24) Automatic type elevator system. euro (twenty-nine thousand and twenty-eight /95) Premium to the ski lift to stop any more or less decrease for each stop. euro (one thousand eight hundred and fifty /98) Union of lead for connecting vessels toilets and vent pipes. euro (three /55) Insulated pipe for fluid distribution. euro (three /31) Painting of interior surfaces. euro (four /53) Painting of external surfaces. euro (four /94) Finish paint oleosintetica in current colors of iron works. euro (one /55) Glass (shiny, white, colored, striped, netted) on any frame. euro (nineteen /37) Glass camera.
each
19.71
each
13.42
111.02.1.065
each
1 079.49
111.02.1.067
4.22
111.02.1.071
each
21.91
111.02.1.073
each
14.84
111.02.5.001
11.24
111.02.5.043
each
417.77
111.03.1.001
vpp
13.70
111.03.1.009
each
1 611.43
111.03.1.012
each
18.91
111.03.1.014
each
289.23
111.03.1.021
each
5 208.32
111.03.5.056
each
319.77
111.03.5.064
each
7.51
111.03.5.067
each
7.16
111.03.5.135
each
134.23
111.03.5.167
each
8 310.76
111.03.5.179
each
499.15
111.03.5.191
each
120.27
111.03.5.193
each
12.08
111.03.5.202
4.24
111.04.1.001
each
29 028.95
111.04.1.003
each
1 850.98
111.05.1.024
kg
3.55
111.07.1.001
3.31
112.01.1.005
4.53
112.01.1.007
4.94
112.03.1.013
1.55
113.02.1.001
19.37
113.02.1.041
euro (thirty-six /71) 114.02.1.001 Anticapillar base layer to the measured mechanical rolling including: mixed with pit stabilized. euro (nineteen /80) Formation of road embankment with material from borrow pits including mechanical compaction. euro (twenty /99) Compaction by suitable mechanical means constipating of the laying of foundations of embankments or road. euro (two /08) Street Foundation in soil or limestone mixed with natural binder particle size stabilized by compaction. euro (seven /33) Asphalt concrete for the base layer made of a material lithoid. euro (one /49) Asphalt concrete for link layer (binder). euro (one /51) Coat of asphalt wear (pad). euro (one /53) Paved with paving stones. euro (one hundred and seventy /53) Paving stone cubes (Vesuvius, porphyry, etc..) In place on a bed of dry sand. euro (eighty /71) Flooring Pietrini common type of cement. euro (forty-four /66) Tiling of natural asphalt. euro (thirty-eight /26) Concrete paving blocks, interlocking, supplied and installed on substrates of sand or gravel. euro (thirty-nine) Weld pietrarsa. euro (fifty-five /94) Precast Concrete Kerb euro (twenty-nine /85) Tubular steel pole for road lighting outreach with single connection box for electrical connection. euro (four hundred and seventy-seven /05) Street lighting luminaire with lamp encased in polypropylene. euro (four hundred and thirty-six /02) Reactor into the air to sodium vapor lamp. euro (fifty /84) Ignitor for sodium vapor lamp. euro (forty-four /37) Equipment protection and control. euro (two thousand) Rope bare copper. euro (three) Seamless steel pipe for drinking water pipes on a bed of sand / gravel and abutment, and covering with sand / gravel. euro (sixteen /19) Rigid PVC piping buried on a bed of sand / gravel and abutment, and covering with sand / gravel. euro (eleven /55) Check valve. euro (one hundred and eleven /74) High density polyethylene pipe bed of sand / gravel and abutment and covering with sand / gravel. euro (twenty-seven /43) Circular concrete pipe vibrated bed of sand / gravel and abutment and covering with sand / gravel. euro (twenty-nine /48) Tubing for fuel gas distribution pipelines. euro (twenty-one /13) Shut-off valve to throttle gas system. euro (ninety-six /95) Dielectric joint for pipes gas plant. euro (one hundred and thirty-five /41) Corrugated pipes, IMQ approved for channeling power and telephone lines. euro (three /56) Well of the fitting.
36.71
m3
19.80
114.02.1.003
m3
20.99
114.02.1.004
2.08
114.02.1.005
7.33
114.03.1.001
mxcm
1.49
114.03.1.003
mxcm
1.51
114.03.1.005
mxcm
1.53
114.03.1.007
170.53
114.03.1.009
80.71
114.03.1.012
44.66
114.03.1.014
38.26
114.03.1.016
39.00
114.04.1.001
55.94
114.04.1.006
29.85
114.05.1.001
each
477.05
114.05.1.017
each
436.02
114.05.1.021
each
50.84
114.05.1.025
each
44.37
114.05.1.026
each
2 000.00
114.05.1.027
3.00
115.02.1.001
16.19
115.02.1.006
11.55
115.02.1.027
each
111.74
115.03.1.008
27.43
115.03.1.015
29.48
115.04.1.001
21.13
115.04.1.016
each
96.95
115.04.1.021
each
135.41
115.05.1.008
3.56
115.06.1.001
euro (forty-five /67) 115.06.1.005 Recess. euro (fifty-eight) Additional ring. euro (thirty /49) Cast iron manhole cover. euro (one /97) Cast iron grates and drains. euro (one /96) Sump. euro (one hundred and fifty-six /17) Valve. euro (one hundred and fifty-eight /06) Land from cultivation, stretched and molded with operation manual / mechanical. euro (forty-one /55) Formation of turf including cleaning, digging, harrowing, rolling, etc. .. euro (four /88) Supply and planting of trees, including digging the hole, reinforcement, fertilization etc. .. euro (two hundred and thirty-eight /85) Bench. euro (four hundred and fifty-four /50) Waste storage basket. euro (seventy-six /57) Small fountain euro (seven hundred and sixty /66) Complete demolition by mechanical means, vacuum for full, manufactured with any structure. euro (thirteen /55) Demolition of masonry straight or curved and of any shape or thickness. euro (seventy-nine /28) Total or partial demolition of concrete of any shape or thickness. euro (one hundred and five /56) Demolition of partitions of any kind and type, including plaster, paneling or skirting if present. euro (seven /67) Complete demolition of wooden floors, horizontal or inclined, simple and compound of any type. form and light. euro (twenty-three /53) Complete demolition of iron slabs and tiles, horizontal or inclined, of any type, shape and light. euro (twenty /42) Complete demolition of mixed floors in joists of reinforced concrete and brick or block of any type, shape and light. euro (twenty-one /44) Demolition of boulders and slabs of concrete substrate thin. euro (fifty-seven /56) Complete demolition of the road surface by mechanical means: the topcoat (mat), link layer (binder), a layer of bituminous euro (seventy-six /75) Disintegration of floor and wall coverings of any kind. euro (six /23) Plaster removal of any type, inside and outside. euro (seven /12) Disintegration of roofing including roof tiles of any type, small warping and gutters. euro (nineteen /97) Disintegration of crawl spaces and drainage in limestone or volcanic rocks. euro (seventeen /31) Disposal of a paving stone of all shapes and sizes made by mechanical means including bedding layer. euro (twenty /37) Disposal of cords or zanelle of pietrarsa of any shape and size, carried out by mechanical means including the bedding layer. euro (fourteen /27) Removal by mechanical milling of asphalt forming the topcoat (mat). euro (one /02) Removal of iron works (fences, trellises, gates, beams, etc.). euro (zero /23) Removal of fixtures of any kind, including exhibitions, succieli, frames and the like.
each
45.67
each
58.00
115.06.1.007
each
30.49
115.06.1.010
kg
1.97
115.06.1.014
kg
1.96
115.06.1.026
each
156.17
115.06.1.057
each
158.06
116.01.1.001
m3
41.55
116.01.1.003
4.88
116.01.1.004
each
238.85
116.02.1.001
each
454.50
116.02.1.005
each
76.57
116.02.1.007
each
760.66
201.03.1.001
m3
13.55
201.03.1.005
m3
79.28
201.03.1.009
m3
105.56
201.03.1.011
7.67
201.03.1.014
23.53
201.03.1.015
20.42
201.03.1.016
21.44
201.03.1.018
m3
57.56
201.03.1.020
m3
76.75
201.05.1.002
6.23
201.05.1.006
7.12
201.05.1.008
19.97
201.05.1.013
m3
17.31
201.05.1.014
20.37
201.05.1.018
14.27
201.05.1.020
1.02
201.07.1.001
kg
0.23
201.07.1.002
euro (fourteen /06) 201.07.1.009 Removal of conduits of any kind. euro (four /92) Removing skirting boards of any kind. euro (two /19) Prestressed concrete beams with section tipping bridge decks including shipping, handling and assembly on site. euro (two thousand five hundred) Supply of ribbed panels in c.a.v. for formation of walls including shipping, handling and assembly on site. euro (sixty) Lateral barrier / divider type central New Jersey in concrete. euro (seventy-two /44) Earthworks reinforced facing inclined to view, made from layers of geogrids monorientate HDPE. euro (one hundred and thirty-four /94) Channel guard in concrete masonry units including mechanical digging, constipation ground support and locking with steel rods euro (two hundred and nineteen /62) Channel for stormwater runoff consists of tiles in concrete masonry units including excavation, constipation ground support euro (eleven /17) Drainage channel in concrete for the disposal of rain water surface including locking with steel rods fixed in the ground. euro (seventy-nine) Supply and installation of safety barrier for side edge including support posts, bolts, hot dip galvanized and reflectors. euro (thirty-eight /19) Supply and installation of safety barrier divider including support posts, hose, bolts, hot dip galvanized and reflectors. euro (sixty-seven /64) Tempera painting surface preparation included shaving and using the same primer: compensation for two coats to cover. euro (three /86)
14.06
4.92
201.07.1.010
2.19
503.05.0.001
2 500.00
503.05.0.005
60.00
503.05.0.008
72.44
503.05.0.015
134.94
503.05.0.016
219.62
503.05.0.017
11.17
503.05.0.018
79.00
506.01.0.018
38.19
506.01.0.020
67.64
B55010.a
3.86