You are on page 1of 31

WEIRS

http://osp.mans.edu.eg/tahany/weirs1.htm

Hydraulic Design Structural Design Floor Design Detailed Drawings Solved Example

1 of 31

5/6/2013 8:21 PM

WEIRS

http://osp.mans.edu.eg/tahany/weirs1.htm

Proper distribution of water carried by a main canal among the branch canals depending upon it

Reducing the hydraulic slope (gradient) in a canal (if canal water slope is greater than the allowable water slope)

Reducing head on existing structures

Collecting sediments at US of structures (sand strap)

2 of 31

5/6/2013 8:21 PM

WEIRS

http://osp.mans.edu.eg/tahany/weirs1.htm

Distance between weirs

ac = L * Slope (before) ab = L * Slope (after)

rise (R) = ac ab = L {Slope (before) slope (after)}

L = distance between weirs

3 of 31

5/6/2013 8:21 PM

WEIRS

http://osp.mans.edu.eg/tahany/weirs1.htm

L = R / (natural slope required slope)

4 of 31

5/6/2013 8:21 PM

WEIRS

http://osp.mans.edu.eg/tahany/weirs1.htm

5 of 31

5/6/2013 8:21 PM

WEIRS

http://osp.mans.edu.eg/tahany/weirs1.htm

Classification According to Dimensions of Cross Section

Classification According to Position of Down-Stream Water Level

a) Free- Overfall Weir (Clear-Overfall)

Q = 2/3 Cd B (2g) 0.5 H1.5 DSWL is lower than crest level Q is independent of DSWL QH

6 of 31

5/6/2013 8:21 PM

WEIRS

http://osp.mans.edu.eg/tahany/weirs1.htm

b) Submerged Weir

Q = 2/3 Cd B (2g) 0.5 H1.5 + Cd B h1 (2gh2)0.5

DSWL is higher than weir crest

Q H, h1, h2

7 of 31

5/6/2013 8:21 PM

WEIRS

http://osp.mans.edu.eg/tahany/weirs1.htm

I. Hydraulic Design (determination of crest level and (weir length according to head II. Structural Design (Empirical Dimensioning check of (stability

Velocity of Flow: Must cause minimum Loss in Head Or minimum Heading Up

Flow of Water in a Channel is controlled either by:

A Weir

or

A Regulator

8 of 31

5/6/2013 8:21 PM

WEIRS

http://osp.mans.edu.eg/tahany/weirs1.htm

For lands having steep slopes For lands having mild slopes or flat lands

1- Clear Over fall Weir


Q = 2/3 Cd B (2g) 0.5 H 1.5

2 Submerged Weir
Q = 2/3 Cd B (2g) 0.5 h21.5 + Cd B h1 (2*g*h2) 0.5

3 BroadCrested Weir
Q = 1.71 Cd B H 1.5

4 Fayum Type Weir


Q = 1.65 B H 1.5

5 Standing Wave Weir

9 of 31

5/6/2013 8:21 PM

WEIRS

http://osp.mans.edu.eg/tahany/weirs1.htm

Q = 2.05 B H 1.5

1 The super structure

Scour may be defined as deepening and widening of water channel under the influence of the flowing water with high velocities.

The scour continues until the energy of the flowing water reaches the normal channel energy.

10 of 31

5/6/2013 8:21 PM

WEIRS

http://osp.mans.edu.eg/tahany/weirs1.htm

11 of 31

5/6/2013 8:21 PM

WEIRS

http://osp.mans.edu.eg/tahany/weirs1.htm

A weir on solid rock (impervious foundation) does not need long apron (Floor), but needs sufficient width b to resist soil stresses.

12 of 31

5/6/2013 8:21 PM

WEIRS

http://osp.mans.edu.eg/tahany/weirs1.htm

A weir on pervious soil needs length L to:

a) Cover percolation length, b) Resist scour from falling water

is the flow of water under the ground surface due to an applied differential head

(creep length) is the length to dissipate the total hydraulic pressure on the structure

(Piping) is to carry away (wash) soil particles with flowing water below the ground surface causing collapse or failure of the above structure

13 of 31

5/6/2013 8:21 PM

WEIRS

http://osp.mans.edu.eg/tahany/weirs1.htm

14 of 31

5/6/2013 8:21 PM

WEIRS

http://osp.mans.edu.eg/tahany/weirs1.htm

(after which undermining occurs)

1- Measure Q for different heads 2- H1 ----- Q1, v1= Q1 / A H2 ------Q2, v2. (k determined) 3- H..Hn varies until Hcritical (soil particles begin to move)

Vcritical = Qcritical / A

vcr

vcr = k Hcr / L = K icr

L = K Hcr / vcr

k = vcr L / Hcr Soil Clean gravel Clean sand Fine sand + silt Clay

= Qcr L / A Hcr K (cm / min) 5000 50 50 0.05 0.05 0.00005 < 0.00005 Type of flow Turbulent Turbulent or laminar Laminar Always laminar

Permeability : (hydr. Conductivity)

Ability of fluid to move in the soil under certain head (dimensions of velocity)

v=ki i=H/L v porosity + arrangement of grains

Seepage or percolation below weirs on previous soils:

a weir may be subject to failure from under seepage

15 of 31

5/6/2013 8:21 PM

WEIRS

http://osp.mans.edu.eg/tahany/weirs1.htm

water head will force (push) the water to percolate through the soil voids if water velocity at D.S. end is not safe (> v critical) then undermining occurs, i.e. water at exit will carry away soil particles

v = k I (Darcy,s law) = k dP / dl = k H / L

In practice: icr = vcr / k

is unknown

Therefore we carry the 2nd experiment

e = voids ratio e = vv/ vs

e = (1 vs) / vs = (1 / vs) 1

Or 1+e = 1 / vs

or

vs = 1 / (1+e)

Upward force = H * A

16 of 31

5/6/2013 8:21 PM

WEIRS

http://osp.mans.edu.eg/tahany/weirs1.htm

Downward force = (net weight) = sp. Gr. Wt. Of soil under water

=(

-1) A L / (1+e) -1) A L / (1 + e) can be determined

for stability: H. A. = ( H / L = icr = (

- 1) / (1 + e) L = H / icr

Safe percolation length Or L = H / icr (F.S.)


cr

Soil Fine gravel Coarse sand Fine sand Silt & clay

icr 0.25 0.20 0.20 0.17 0.17 0.14 0.14 0.12

F.S. 4 5 56 67 78

If I > icr undermining (piping) i.e. water has v >> to carry away soil particles

The length of the seepage path transversed by the water is known as the length of creep

(percolation length).

Bligh supposed that the dissipation of head per unit length of creep is constant throughout the seepage path. CB = Bligh coefficient of percolation C B = V/K

Percolation length is the path length from (a) to (b) LBligh = CBligh . H

17 of 31

5/6/2013 8:21 PM

WEIRS

http://osp.mans.edu.eg/tahany/weirs1.htm

L` = 2 t + L If L` > LB (Design is safe, no possibility of undermining) If L` < LB (Design is unsafe, undermining occurs, leads to failure)

L` = L + 2 t + 2 S1 + 2 S2 L` LB (design is safe, no possibility of undermining)

L` < LB (design is unsafe, undermining occurs, leads to failure)

Lane suggested that a weight of three should be given to vertical creep and a weight of one to horizontal creep. LL = CL H Lane percolation length L` = 1/3 L (horizontal) + L (vertical)

18 of 31

5/6/2013 8:21 PM

WEIRS

http://osp.mans.edu.eg/tahany/weirs1.htm

L` = 1/3 L + 2 t + 2 S1 + 2 S2

19 of 31

5/6/2013 8:21 PM

WEIRS

http://osp.mans.edu.eg/tahany/weirs1.htm

Distance between sheet piles a-a and b-b

d1 + d2

Water percolation length takes the right path -----safe

20 of 31

5/6/2013 8:21 PM

WEIRS

http://osp.mans.edu.eg/tahany/weirs1.htm

Distance between sheet piles a-a & b-b < d1 + d2; Water percolation length takes a short cut from a to b; Actual percolation length is smaller than designed unsafe

H = USHWL DSHWL H = USLWL DSLWL H = Crest level DSBL

(1) (2) (3)

Design head H is the biggest of (1), (2), and (3)

21 of 31

5/6/2013 8:21 PM

WEIRS

http://osp.mans.edu.eg/tahany/weirs1.htm

t1 = 0.5 1.0 m t2 is taken 2.0 m t3 = t2 / 2 1m

assumed or t2 = 0.8 (H)0.5

and l1 is assumed (1-2) H L2 = is determined according to weir type LScour = Cs (Hs) 0.5 Or LScour = 0.6 CB (Hs) 0.5 (3-8) m

Hs = USHWL DSBL Yc = Scour head; Yc = critical depth

22 of 31

5/6/2013 8:21 PM

WEIRS

http://osp.mans.edu.eg/tahany/weirs1.htm

&

q=Q/B

where B is the weir length; q is the discharge per unit length

L` = l1 + l2 + ls + 2 t2 LB = CB . H if L` LB no need for sheet pile

If L` < LB unsafe; use sheet pile Depth of sheet piles = (LB L`) / 2 Sheet pile depth m

HD h2 = H t1/CB l1 / CB t2 = t / (m) * Factor of safety t2 = F.S. [ h2 / (m)] m.; m = 2.2 t/m3

23 of 31

5/6/2013 8:21 PM

WEIRS

http://osp.mans.edu.eg/tahany/weirs1.htm

t2 = 1.3. [ h2 / (m)] then t3 = t2/2 1 m. then the head h3 which corresponds to floor then get distance x

t3 = F.S. [ h3 / (m)] m thickness t3 L3 = CB * h3 = x + t3

The aprons are of plain concrete blocks of about 1.5 * 1 * 0.75 m deep For small structure blocks of about 1 * 0.75 * 0.5 m deep may be used The blocks are placed in rows with (70 100) mm open joints filled with broken stone. An inverted filter of well graded gravel and sand is placed under the blocks in order to prevent the loss of soil through the joints

24 of 31

5/6/2013 8:21 PM

WEIRS

http://osp.mans.edu.eg/tahany/weirs1.htm

25 of 31

5/6/2013 8:21 PM

WEIRS

http://osp.mans.edu.eg/tahany/weirs1.htm

A canal (A) is divided into two branches (i & ii).The discharge of branch (i)=2Q of branch (ii) at all times. Two weirs have to be constructed at the entrance of each canal .

26 of 31

5/6/2013 8:21 PM

WEIRS

http://osp.mans.edu.eg/tahany/weirs1.htm

Data :- Bed width of canals (i & ii ) - Flood discharge of canal (A) = ( 23.0 & 8.0 ) m . = 105 cum/sec . 45 cum/sec .

- Summer discharge of canal (A) =

- DSHWL in the two canals = ( 11.00 ) - minimum water depth in the two canal branches = 4.0 m . - Difference between H.W.L & L.W.L in canal(A) = .7 m . - Submergence in canal (i) - Bligh coeff. of percolation = = 1/3 16

- Bed level is constant in canal (A) and its branches . - Q = 2 B H1.5 If a Board crested weir is constructed at the entrance of the two branches (i&ii) it is required to :-

1- Crest level of weirs ( i & ii ) . 2- Length of each weir . 3- HWL in canals (A) . 4- LWL in canal (A) & (i) . 5- Design of weir floor for canal (i) by applying Bligh method..

QA = Qi + Qii QA = 2 Qii + Qii At flood QA = 105 = 3 Qii

&

Qi =

2 Qii

Qii = 35 m3/s At summer QA = 45 = 3 Qii

& Qi = 70 m3/s

Qii = 15 m3/s

& Qi = 30 m3/s

27 of 31

5/6/2013 8:21 PM

WEIRS

http://osp.mans.edu.eg/tahany/weirs1.htm

For branch ( i )

Qmax /Qmin

= (2 B H11.5) / (2 B H21.5) = (70/30)2/3

= H12/H22

H1/H2 = (Qmax /Qmin )2/3 H1/H2 = 1.527 H1 - H2 = & .7

H1 = 1.76 H2 (2)

(1)

From (1) & (2) 1.76 H2 - H2 H1 = 1.62 m h1/H1 = 1/3 h1 = 1.62/3 ( 10.46 ) = .7 H2 = .92 m

1- Crest level of weirs ( i & ii ) = 11 - .54 = 2- length of weir (i) Qmax = 70 = 2 B (1.62)1.5 Qmin = 30 = 2 B (.92)1.5 B = 17 m

B = 17 m

B = 17 m Length of weir (ii) Qmax = 35 = 2 B (1.62)1.5 B = 8.5 m

28 of 31

5/6/2013 8:21 PM

WEIRS

http://osp.mans.edu.eg/tahany/weirs1.htm

Qmin = 15 = 2 B (.92)1.5

B = 8.5 m

B = 8.5 m

3- HWL in canals (A) = 10.46 + 1.62 = (12.08)

4- LWL in canal (A) = 10.46 + .92 = (11.38)

h2/H2 = 1/3

& h2 = .92/3 =

.3

LWL in canal (i) = 10.46 + .3 = ( 10.76 )

Design of weir floor for canal (i) by applying Bligh method

BED LEVEL = 10.76 4 = 6.76 HD = 12.08 - 11 = 1.08

HD = 11.38 - 10.76 = .62 HD = 10.46 - 6.76 = 3.7

take

HD = 3.7 m

LB = CB * HD

= 16 * 3.7 = 59.2

Assume L1 =

6m

L2 = 6 m CS = .6 CB & HS = 4.37 & LS = 20 m

LS = CS (HS).5 HS = 12.08 - 6.76 - Ycr Assume t2 = 2 m L\ = 6 + 6 + 20 + 2 * 2 = 36 L\ < LB

unsafe use sheet pile d = (59.2 36) / 2 = 11.6

29 of 31

5/6/2013 8:21 PM

WEIRS

http://osp.mans.edu.eg/tahany/weirs1.htm

Use two sheet pile d =7 m & d = 5 m

h2 = 3.7 - .5/16 6/16- (2*7)/16 = 2.9 t2 = 2.9 * (1.3/1.2) t3 = t2/2 = 1.6 m = 3.1 m > 1 h3 = 1.47 & X = 11.92 m

1.6 = 1.3 * h3/1.2 L3 = 16 * 1.47 = X + 2*5 + 1.6

30 of 31

5/6/2013 8:21 PM

WEIRS

http://osp.mans.edu.eg/tahany/weirs1.htm

31 of 31

5/6/2013 8:21 PM

You might also like