You are on page 1of 10

MOL.19951031.

0115

Design Analysis Cover Sheet

CRWMS/M&O

Complete only applicable items.

I Page:

1 Of:

10

2. DESIGN ANALYSIS TITLE

ZOMPRESSED AIR SYSTEMKONDENSATE RECEIVER TANK FOUNDATIONS


3. DOCUMENT IDENTIFIER

BABBDF000-01717-0200-00001REV OO
5. TOTAL ATTACHMENTSINO.

5. TOTAL PAGES

4. REV. NO.

YONE

__

--

IESF

--

Print Name
3. Originator

I lo

100
7. SYSTEM ELEMENT

OF PAGES IN EACH

Signature

Date

M. Gomez

4?#4s

3. Checker

J. Salchak

10. Lead Discipline Engineer


~

~~

1 1. Department Manager
12. REMARKS

QAP-3-8

0492 (Rev. 03/14/84)

Design Analysis Revision Record

CR WMS/M&O

Complete only applicable items.

WBS:
QA:

*Ah

Page:

3. DOCUMENT IDENTIFIER

4. REVISION NO.

BABBDF000-01717-0200-00001 REV 00

00

10

00

~~~~

QAP-3-0

7. Pages Deleted

0. Pages Added

5. Revision No.

2 Of:

10

8. Description of Revision

Original Issue

____-

0487 (Rev. 03/10/941

CALC No.: BABBDF000-01717-0200-00001 Rev. 00


Page: 3 of 10
Title: Compressed Air System/Condensate Receiver Tank Foundations

1. PURPOSE
The purpose of this analysis is to design structural foundations for the Compressed Air System
(CAS), and the Condensate Receiver Tank. This analysis is in support of design drawing
BABBDFOO-0 1717-21 0 - 2 3 017.

2. QUALlTY ASSURANCE
The items considered within this analysis relate to temporary equipment foundations not included
on the Q-list. There are no Q-Controls associated with this analysis.

3. METHOD
The equipment foundation shall be designed in Section 10 using standard foundation design hand
calculations. The vertical loads will reflect Mechanical requirements. Lateral loads will be
calculated using applicable codes. The soil bearing and foundation stresses will be analyzed using
accepted engineering mechanics. The foundation will be designed using the Strength Design
Method.

4. CODES AND STANDARDS


4.1

U.S. DEPARTMENT OF ENERGY (DOE):


DOE 6430.1A7
dated April 6, 1989

4.2

AMERICAN CONCRETE INSTITUTE (ACI):


ACI 318-89

4.3

Building Code Requirements for Reinforced Concrete

AMERICAN NATIONAL STANDARD INSTlTUTE, INC./AMERICAN SOCIETY


OF CIVIL ENGINEERS (ANSUASCE):
ANSYASCE 7-88

4.4

General Design Criteria

Minimum Design Loads for Buildings and Other Structures

UNIFORM BUILDING CODE (UBC):

mc, 1991
4.5

AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC):


AISC, 9th Edition

Manual of Steel Construction, Allowable Stress Design

CALC No.: BABBDF000-01717-0200-00001 Rev. 00


Title: Compressed Air SystedCondensate Receiver Tank Foundations
Page: 4 of 10
4.6

AMERICAN WELDING SOCIETY (AWS)


AWS D1.1-94

Structural Welding Code-Stee1

5. DESIGN INPUTS
5.1

Exploratory Studies Facility (ESF) Basis for Design (BFD) Document, Package lD,
Section 7.2.4.6 Surface Compressed Air System (BAB000000-01717-63OO-OOUO2, Rev. 05)

6. CRITERIA
6.1

The Exploratory Studies Facility Design Requirements (ESFDR) (YMP/CM-0019, Rev. 1)

6.2

ESF BFD Document, Package 1D (BAB000000-01717-6300-00002, Rev. 05)

6.3

Determination of Importance Evaluation for ESF North Portal Pad (BABB00000-017170200-0000 Rev. 04)

7. ASSUMPTIONS
None used.

8. REFERENCES

8.1

Geotechnical Recommendations for Design, North Ramp Surface Facility, Exploratory


Studies Facility, Yucca Mountain Project, Nevada, SCP No. 8.3.1.14.2. (March 19, 1993)

9. COMPUTER PROGRAMS
None used.

10. DESIGN ANALYSIS

10.1 This analysis was initially performed under Revision 0, ICN 1 of the ESFDR, with Seismic
Zone 4. Revision 0, ICN 2 of the ESFDR revised the lowered criteria to Seismic Zone 3.
The initial design is conservative, with foundation sizes based on physical requirements.
Therefore, the analysis will reflect the higher criteria of Zone 4.
10.2 Allowable Soil Pressure = 2,000 psf

(See Reference 8.1)

CALC No.: BABBDFOOO-01717-0200-00001


Rev. 00
Title: Compressed Air Systedcondensate Receiver Tank Foundations
Page: 5 of 10
10.3 Passive Soil Pressure = 350 psf per
foot of depth

(See Reference 8.1)


f

10.4 Concrete Properties


A. Compressive Strength (f'c) = 4,000 psi
B. Concrete weight = 150 pcf

10.5 Reinforcing Steel Yield Strength (fy) = 60 ksi


(Reference pages 6, 7, 8, and 9 for hand calculations)

PACE N O . & W U

YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT


CMllan Radioactive Waste Management System
Management & Operating Contractor

W B S NOd.2.6.

7-4-W

DATE:

REV HD:

I-pQgDYYXCi
CHECKED BY:
CHECKED DATE:

1
2
3

..
.
...
..
.
.
..............................
..
..
..

..

.. ...........................................................
..
.
.
..
..
..
..

.
/

.
..
..
.
.
.
..
..
.
.
.
.......................................................
.

..

..

..

..

..
.

..

..
..

..
..

..
..

r
a

...

10

...

11

...

12

...

13
14
15

...
...
...
...
...
...
...
...
...
..
..
..
..
..
..
..
..
..
...............................................................................
.
.
.
.
.
.
.
.
.

...
.

.
_.
....

. ..
.

. ..
..

16

. ..
..
.

. ..
..
.

. ..
..

. ..
..

.
.

...

.
.
.
....... ....... ..... .....

.
. ............
.
.,........
I

ir
...
.

..
.

..
....
....................
..
.

19

............. .......... ......... ..j.........


.
.
.
.

20
21

..
...
..

..
..
.

18

....
.

...

..
.
...............................
...
....
....
....
.

..
..
..
..
..
..
.
I
:
..
.I. ..........I ................................
..
.:.
.
....... ............... .......
................
.
.
..
..
.
.
.
.
.
..
..
..
.
.
.
...
...
....
..
..
..
..
..
..
..
..
..
..
..
..
..
..
.
.
.
.
.
.
.
.
..
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
....<..........> ........;....... .i.........:.........;........< .........:.........;........< ......... > ........ i ........ < ........
j .......
i ....... i........:........ i .......i........j ...............4........;...............
;................. ;......
..
..
..
..
..
..
. . . . . . . . . . . . . . .. . .. . .. . ..
.. . . . . . . . . . . . .
.. . .. . .. . . .
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.

;. ;. .i

..

..

..

22
23
24

25
26

..

21

..

..

..

..

..
..

20

..

..

..

..

..

..

..

..

..

..

..

..

..

..
..

..
..

..
..

..

29
30
31

32

33
34
1

..
..

..
..

..
..

..

..
..

..
..

..
..

..
..

..
..
5

..
..
6

..
..
7

..
..
8

....;.......4 ........

..
..

..
..

10

..
..

11

12

13

14

..

..
15

16

17

10

..
19

......:.. ..........................:........:........:.........:........: ........:...


.
..
..
..
:.
:.
:.
:.
:.
:.
20

21

22

23

24

25

26

21 28 i

PAGE

YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT

r
m
T
.o
F
U

CMllan Radioacthre Waste ManagementSystem


Management & Operating Contractor

WBS N04.2.6.
DATE:

l-k-=
REV No:

CHECKED BY:
CHECKED DATE:
1

2
3
4
5

6
7

9
10
11
12
13

14
15

16

ir
18

.,,
19

.
..

.
..

.. .............
.
..
.
..
.

.
,
,

..

,
,
,

..

..

..

20

21

. ....... ..,.....
. . .......r . . .. . . ... .

22

23
24

.
. .............
. ..................
.
.
.................

25

26
27

28

...,

.
...

.
...

...

...

..
..
..
. ........ ...... .. ...........

..

29
30
31

32
33
64

...
..

..

..

..

.......... ..
,

PAGE N O . . & C f 1 6

YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT


CMllan Radioacthre Waste ManagementSystem
Management % Operating Contractor

:
WBS NO.1.2.6.

CHECKED BY:

1
2
3

..

..

.,

,.

..

..

..

..

..

..
.

..
.

..

..

..

..

..

..

..

..

...

..
.

..
.

..

..

..

..

..

..

..

. .

. .

. .

. .

.. .

..

5
6

7
8
9
10

11
12
13
14
15
16

17

18
19

20
21
22
23
24
25
26
27
28
29

30

......................................................
.
.
.
.
.
.

31
I

32

..

..

..

..

..

..

53

..

..

..

..

..

..

a4

....

..
....
,

..
....
.

..
....
.

..
.,..
.

..
....
.

...
1

10

..

. . . . . . . . . .

.
.
.
.
.
.
.
.
.
. &"
A
-

11

12

13

14

15

16

17

18

19

20

21 22

23

24

25

26

27

2B

PAGE N O . & W k -

YUCCA MOUNTAIN SITE CHARACTERIWTION PROJECT


Civilian Radloacthre Waste Management System
Management & Operating Contractor

WBS NO4.2.6.

CONTRACT NO. DE-AC01-91RW00

----- REV NO:

DATE:

r3VGJb

1
CHECKED BY:
CHECKED DATE:

..
.
..
..
..
...
..
. ..,........
\.......,........

..
..

..
...
.

.
.

.
...
..

.
...
.

....

..

..

..

...
..
.
..

.
.
.... ..... ...

.... .. . . . . .... ..

.
.,

.
.

..

..
.

.
.

..
.

..

..

..

.
...................

I .

I..

.I

...

..
.

.
..
~-. ~..
..
.
.
...
.............. . ..,. ... ,.. ...............
..
..
.
.
.

.
.

..

.
fG:'i,
, ~ ' M ~ ' w , ,l~i.1
,Te
'
'~ : , ~ o ~
.

..
.
...

..

..I

....,....
.
..l
.

..
.
.
.
.,,,.,,,..,.,.,:
.
.
...
.
.
.

..

.. .

..
.

..
.
.
.

. ,.. ..:

... .! .. . ,

.I

.
. j. .. . ,. ... . . ._ , . ...
., , .
..
.
.
.
.
..
...
,
.
.
.
.
.
.
.
.
I

6
7
8

9
10
11

12
13
14

15
16

17
18

19

20
21
22

23
24

,.

25
$.--

26
2'1
28
29

30
31

32

33
64

..

..

..

..

..

CALC No.: BABBDF000-017 17-0200-00001 Rev. 00


Title: Compressed Air SystemKondensate Receiver Tank Foundations
Page: 10 of 10
11. CONCLUSIONS
11.1 The design shows that a concrete foundation that has minimum dimensions of 17' x 55'
x 1'-8" thick, reinforced with #7 bars @ 12" o/c each way, is adequate to support the CAS
equipment.
11.2 The design shows that a concrete foundation that has minimum dimensions of 16' x 21'
x 1'43'' thick, reinforced with #7 bars @ 12" o/c each way, is adequate to support the
Condensate Receiver Tank.

12. ATTACHMENTS