You are on page 1of 23

NetAct Optimizer 3.

0 Basic
Provisioning Processes

For public us e IPR applies 1 Noki a Si emens N etwor ks

Presentation / PLe / 23.8.2010

Nokia Siemens Networks Academy


Legal notice Intellectual Property Rights
All copyrights and intellectual property rights for Nokia Siemens Networks training documentation, product documentation and slide presentation material, all of which are forthwith known as Nokia Siemens Networks training material, are the exclusive property of Nokia Siemens Networks. Nokia Siemens Networks owns the rights to copying, modification, translation, adaptation or derivatives including any improvements or developments. Nokia Siemens Networks has the sole right to copy, distribute, amend, modify, develop, license, sublicense, sell, transfer and assign the Nokia Siemens Networks training material. Individuals can use the Nokia Siemens Networks training material for their own personal self-development only, those same individuals cannot subsequently pass on that same Intellectual Property to others without the prior written agreement of Nokia Siemens Networks. The Nokia Siemens Networks training material cannot be used outside of an agreed Nokia Siemens Networks training session for development of groups without the prior written agreement of Nokia Siemens Networks.

For public us e IPR applies 2 Noki a Si emens N etwor ks

Presentation / PLe / 23.8.2010

Module Objectives
At the end of this module the trainee should be able to: Provision adjacency changes instantly to network using Optimizer Explain the necessary RAC tools and processes for checking the consistency and provisioning the plan to the network

For public us e IPR applies 3 Noki a Si emens N etwor ks

Presentation / PLe / 23.8.2010

Provisioning Processes
How to implement adjacency changes directly to network? Provisioning process

For public us e IPR applies 4 Noki a Si emens N etwor ks

Presentation / PLe / 23.8.2010

Instant Adjacency Provisioning


Adjacency changes can be provisioned instantly in Optimizer

New adjacencies to be created Actual adjacencies to be deleted Adjacency object parameter changes
Additional tools are not needed Temporary plan is created and provisioned to the network Provisioning process visible in CM Operations Manager Progress visible in Task Management (Tools menu) Process is started for the selected adjacencies in the Browser, or on the Map
For public us e IPR applies 5 Noki a Si emens N etwor ks Presentation / PLe / 23.8.2010

Provision Instantly
Use File->List Planned Elements to list the changed adjacencies (created, modified, deleted) to the Browser, or select from the Map

For public us e IPR applies 6 Noki a Si emens N etwor ks

Presentation / PLe / 23.8.2010

Checking Provisioning Progress


CM Operations Manager: Operation History The color of the adjacency will change to Actual color after the provisioning.

For public us e IPR applies 7 Noki a Si emens N etwor ks

Presentation / PLe / 23.8.2010

Provisioning Processes
How to implement adjacency changes directly to network? Provisioning process

For public us e IPR applies 8 Noki a Si emens N etwor ks

Presentation / PLe / 23.8.2010

Provisioning
OPT DB CM DB

Plan
Foreign cluster CM data Other vendor CM data Local cluster CM data

Plan
Foreign cluster CM data Other vendor CM data Local cluster CM data

xml

Local NetAct cluster

Vendor X cluster

Foreign NetAct cluster

For public us e IPR applies 9 Noki a Si emens N etwor ks

Presentation / PLe / 23.8.2010

Provisioning process using CM applications

Export CM Plan from Optimizer

CM Editor CM Analyser CM Operations Mgr CM Operations Mgr

Modify Plan (optional) Check Plan Prepare Plan (automatic) Transfer plan to NW
End

For public us e IPR applies 10 Noki a Si emens N etwor ks

Presentation / PLe / 23.8.2010

Copying Optimizer Plans to CM Database


Select an Optimizer plan to be copied to RAC database (for provisioning) Click Export CM Plan Plan is visible in CM tools (RAC) after it is exported For successful plan import all objects in the CM plan must have templates assigned Use Refresh Actual if there has been changes since the last synchronisation

For public us e IPR applies 11 Noki a Si emens N etwor ks

Presentation / PLe / 23.8.2010

Task Management
Check the Task Management

to see the last CM Data Refresh to see progress and results of the
imports, exports, measurement retrievals, and instant adjacency provisionings

For public us e IPR applies 12 Noki a Si emens N etwor ks

Presentation / PLe / 23.8.2010

CM Editor Modify Parameters

For public us e IPR applies 13 Noki a Si emens N etwor ks

Presentation / PLe / 23.8.2010

CM Analyser

For public us e IPR applies 14 Noki a Si emens N etwor ks

Presentation / PLe / 23.8.2010

Check Target

For public us e IPR applies 15 Noki a Si emens N etwor ks

Presentation / PLe / 23.8.2010

Select Rule(s)

For public us e IPR applies 16 Noki a Si emens N etwor ks

Presentation / PLe / 23.8.2010

Select Post-Check Actions

For public us e IPR applies 17 Noki a Si emens N etwor ks

Presentation / PLe / 23.8.2010

Check Results

For public us e IPR applies 18 Noki a Si emens N etwor ks

Presentation / PLe / 23.8.2010

CM Operations Manager

For public us e IPR applies 19 Noki a Si emens N etwor ks

Presentation / PLe / 23.8.2010

Provisioning Options
If you want to provision the plan in parts unselect Entire Plan box Tooltips provide help in the details of the Operations

For public us e IPR applies 20 Noki a Si emens N etwor ks

Presentation / PLe / 23.8.2010

Monitoring Progress

For public us e IPR applies 21 Noki a Si emens N etwor ks

Presentation / PLe / 23.8.2010

Summary
Instant Adjacency Provisioning available in Optimizer List planned adjacencies to Browser Select and use pop up menu -> Provision Instantly Follow the progress in the Administration workspace Provisioning Process Export plan from Optimizer to CM plan database View and modify plan in CM Editor Check plan in CM Analyser Prepare and Provision the plan in CM Operations Manager

For public us e IPR applies 22 Noki a Si emens N etwor ks

Presentation / PLe / 23.8.2010

Document change history


Date Version Nam e Change comment

23.8.2010

1.0

PLe

First version for Optimizer 3.0

For public us e IPR applies 23 Noki a Si emens N etwor ks

Presentation / PLe / 23.8.2010

You might also like