0 Basic
Provisioning Processes
Module Objectives
At the end of this module the trainee should be able to: Provision adjacency changes instantly to network using Optimizer Explain the necessary RAC tools and processes for checking the consistency and provisioning the plan to the network
Provisioning Processes
How to implement adjacency changes directly to network? Provisioning process
New adjacencies to be created Actual adjacencies to be deleted Adjacency object parameter changes
Additional tools are not needed Temporary plan is created and provisioned to the network Provisioning process visible in CM Operations Manager Progress visible in Task Management (Tools menu) Process is started for the selected adjacencies in the Browser, or on the Map
For public us e IPR applies 5 Noki a Si emens N etwor ks Presentation / PLe / 23.8.2010
Provision Instantly
Use File->List Planned Elements to list the changed adjacencies (created, modified, deleted) to the Browser, or select from the Map
Provisioning Processes
How to implement adjacency changes directly to network? Provisioning process
Provisioning
OPT DB CM DB
Plan
Foreign cluster CM data Other vendor CM data Local cluster CM data
Plan
Foreign cluster CM data Other vendor CM data Local cluster CM data
xml
Vendor X cluster
Modify Plan (optional) Check Plan Prepare Plan (automatic) Transfer plan to NW
End
Task Management
Check the Task Management
to see the last CM Data Refresh to see progress and results of the
imports, exports, measurement retrievals, and instant adjacency provisionings
CM Analyser
Check Target
Select Rule(s)
Check Results
CM Operations Manager
Provisioning Options
If you want to provision the plan in parts unselect Entire Plan box Tooltips provide help in the details of the Operations
Monitoring Progress
Summary
Instant Adjacency Provisioning available in Optimizer List planned adjacencies to Browser Select and use pop up menu -> Provision Instantly Follow the progress in the Administration workspace Provisioning Process Export plan from Optimizer to CM plan database View and modify plan in CM Editor Check plan in CM Analyser Prepare and Provision the plan in CM Operations Manager