You are on page 1of 6

Current Organization: Corporate Ispat & Alloy Ltd (Abhijeet Group) Designation: Deputy Manager Electrical Current CTC:

: 6.8L Pa Based @ Bhubaneshwar

C/o Dr. P.K Dehuri, Quarter No -5R - 3, OUAT Colony, Unit - 8, Bhubaneswar, Orissa +91 9386819971;+919937137181 biswajit_bantu@rediffmail.com ; biswajitmenduli@gmail.com

BISWAJIT MENDULI

10+ Years of accomplished experience; strong credentials in delivering outstanding performances with effective application of planning & technical skills

PROJECT, MAINTENANCE & OPERATIONS PROFESSIONAL ELECTRICAL ENGINEERING

PROFILE Technically competent Electrical Engineer with a distinguished career donning leadership roles in the areas of Installation, Commissioning, Erection, Operations & Maintenance of Plant Equipments and Electrical Systems. Currently spearheading with Corporate Ispat & Alloy Ltd and Corporate Power Ltd. (Abhijeet Group) as Dy. Manager (Electrical) . Professional competencies in executing erection & commissioning, start-up & annual shut downs and implementing Preventive & Scheduled Maintenance of the Electrical Transmission & Distribution System, Sub-station, Transformers Electrical Motors and Heavy Equipment etc. Experience in installation, testing, commissioning, operations & maintenance of HT & LT breakers (up to 400KV). 400KV Transmission line & switchyard including bay isolator, sf6 breakers (400KV), lightning arrestor. Relay panel, MCC, PCC panel control circuitry problem solving ability & VVF drive maintenance. Bus relay system. Transformers up to 315MVA, bus duct, NGR, LA PT in shut down basis maintenance. Adept in conducting Plant Safety Inspection to observe the physical conditions of work & work practices; adequate understanding in the areas of Quality Management System, concepts & application of ISO, Occupational Health & Safety Assessment, and Energy Conservation. capable of tracking jobs, PM & Breakdown Notifications, Maintenance Schedules, Service Orders, Material Reservations, Service Entry etc. Strong leadership traits with the ability to bring out the best in others while creating a healthy and friendly work environment.

Current Organization: Corporate Ispat & Alloy Ltd (Abhijeet Group) Designation: Deputy Manager Electrical Current CTC: 6.8L Pa Based @ Bhubaneshwar

CAREER PATH Presently working with Abhijeet Group in the field of project execution of 4@270 MW and 2.5 MTPA integrated Steel plant. Dec 2010 to till date with Abhijeet Group. Position Held: Dy.Manager Electrical Working in Corporate Ispat & Alloy Ltd and Corporate Power Ltd. (Abhijeet Group) as Dy. Manager (Electrical) from Dec 2010 to till date. Responsibilities:Look after all Planning, Erection & commissioning of following projects, 4@270 MW thermal power plant. Basic and detail engineering, procurement action and vendor drawing review of 11kV power system for Lighting purpose of Green Field Project Abhijeet Group. Basic and detail engineering, procurement action and vendor drawing review of 33/.415kV Sub Station for construction power system for Steel plant & Power plant. (2x60TPH WHRB & 1X140TPH CFBC CPP with 2.5 MTPA integrated Steel Plant. Construction and monitoring
of E.H.T construction works b)Earth Mat design of 400/220/132 KV Electrical substation. Associated with earth mat design of 1 no of 400/220 KV S/S c) Procurement of Transformer and preparation of technical specification and tender document d) Design of Transmission line and Sub Station e) Operation and Maintenance of 132/33/11KVE.H.T Substation &132/33KV Switching Substation f) Maintenance of system stability analyzing load flow studies g) Safety and protection of Electrical Equipment and personnel . Earthing earth resistivity measurements earth network impedance calculations transmission line structure earthing designs. Specification for HV and MV switchgear equipment Specification for power transformers station transformers Specification for auxiliary equipment Specification for civil works Substation layouts Evaluation of the submitted tender documents.

General Information: Preparation of primary/detailed Engineering for EHV AIS substation. Tasks: Project execution.
Activities Involve. 1. Layout Engineering preparation of section layout, earthing layout etc. . Engineering calculation : Short Circuit Force, DSLP, Bus-Bar sizing, Earthing, Sag-Tension, CT/PT application check, Battery sizing, HT/LT Cable sizing, Transformer sizing, Lux level calculation, Relay setting and co-ordination. Review of Primary, Secondary and Auxiliary system drawing Awareness with various test requirement w.r.t. national and international standards.

Preparation of electrical single line diagrams, DC schematics, wiring diagrams, SCADA and annunciation diagrams for 132,220 kV circuit breakers, medium voltage switchgear and station control panels (control, protection, mimic panels, SCADA IFC panels) of General Switchgear and Controls, power station and 132kV twin bus substation at Abhijeet Group. Period: December 2010 to till date Project: 2X 30 MW coal fired captive power plant and 132kV switchyard for Corporate Ispat Alloys Ltd. Duties and responsibilities:

Current Organization: Corporate Ispat & Alloy Ltd (Abhijeet Group) Designation: Deputy Manager Electrical Current CTC: 6.8L Pa Based @ Bhubaneshwar
The job included detail engineering for the power plant and 132kV switchyard for interconnection with Jharkhand State Electricity Board grid, key one line diagrams, relay & metering one line diagrams, electrical equipment layouts, cable routing drawings, HV/EHV schematic drawings, cable schedules and interconnection diagrams etc.

Site visits and reports Site commissioning Control the design, development and modification of electrical drawings and prepare technical documentation for client review, construction and "as built] construction management and supervision contract coordination procurement of material and equipment inspection and testing of material and equipments

KOREA PLANT SERVICES March 2008-Nov 2010 Assistant Manager Operations & Maintenance Department 9x135 M.W CPP Vedanta Alumina Ltd.Jharsuguda Supervising Preventive Operation & Maintenance of Switchyard & Switchgear. Troubleshooting day-to-day engineering jobs and implementing system improvement suggestions provided by Discipline Head. Demonstrating excellent people management skill and involved in day-to-day manpower distribution during shutdown. Conducting routine checking as per daily schedule. Contributing to increase throughout by rapidly diagnosing and correcting issue that impacted the performance. Ensuring adherence to Safety standards in all functional areas and implementing measures for enhancing safety levels. Implementing preventive, planned and predictive maintenance practices to ensure maximum uptime of the machines. Planning, analyzing & conceptualizing the basic requirements while setting up the technical infrastructure of the unit with cost efficiency, time management & manpower planning for the execution. SEPCO III(SEPCO ELECTRIC POWER CONSTRUCTION CORPORATION)

VEDANTA ALUMINA LIMITED, JHARSUGUDA Oct 2006 - Feb 2008 Electrical Engineer Construction Department(Construction Work of 29 Bays 220KV including 9 Nos 180 MVA GT,5 Nos 40 MVA ST &9 Nos 16 MVA UAT Erection &Commissioning) Strategically planned and analyzed the basic requirements while setting up the technical infrastructure of the project and reviewed all the project proposals. Worked closely with Designers, Engineers, and Architects to ensure projects were built in accordance with contract documents. Deftly implemented cost rationalization measures to maintain overall competitiveness. Handled management of facilities/infrastructure to ensure cost effective workability. Erection & assembling of all the equipments at 220 KV Electrical Switchyard & power transformers. Erection of all type of panel of 220 KV of switchyard. Testing and commissioning of all electrical equipment and transformer at switchyard. Coordinated with client and contractors. Executed work on site as per schedule and drawing..

Current Organization: Corporate Ispat & Alloy Ltd (Abhijeet Group) Designation: Deputy Manager Electrical Current CTC: 6.8L Pa Based @ Bhubaneshwar
Modification of plan as per the site requirement Making an important role for planning & scheduling the site work & perform construction review.

ORISSA POWER TRANSMISSION CORPORATION LIMITED Feb 2004 Sep 2006 Engineer Operations & Maintenance Department 400/220/132 K.V Grid Sub Station Carried out reading periodical observation of import and export power. Handled operation during load shedding and necessary switching operation. Studied voltage & frequency control according to availability of base tariff. Analyzed reading & periodically compared imported power against exported power to determine transmission & transformer losses to detected abnormalities. Carried out switching operation necessary on the transmission system. Load flow studies such as voltage & frequency control according to availability of base Tariff. Outgoing voltage to the distribution system maintained at 33.5 KV at all times by operation of transformer tap changers. Monitored & carried out voltage control as required to maintain acceptable voltage levels on outgoing circuit. Breaker maintenance (SF6 & VCB) overhauling of SF 6 Breaker poles and drives; current & voltage transformer. Maintained isolators which included double break centre rotating horizontal swing. Maintained transformers which included BDV of oil (PI Value & general maintenance done). Maintained transmission line which included check tower for corrosion of Galvanized steel tower member & take remedial action; Cleaned insulator periodically. Inspection of earthlings, replacement of crack insulators and tightening of clamp & fixtures periodically. Feb 2002 Jan 2004

ALFA TRANSFORMERS LIMITED, BHUBANESHWAR IC Testing & Quality Assurance Engineer

Ensured timely preparation of regular ISO documentations & MIS report preparation, concerning preventive maintenance and to handle ongoing project activities Propagated Quality Circle movement and developed quality culture in the work force to achieve quality leadership in the industry. Successfully testing transformers ranging from 10 KVA, 12 KV class to 10,000 KVA 36 KV Class. Conducted Routine test of Measurement of winding resistance, Measurement of voltage ratio & check voltage vector relationship, Measurement of no load loss & load loss, Measurement of Insulation Resistance, Dielectric test of oil & Induced over voltage withstand test.

Current Organization: Corporate Ispat & Alloy Ltd (Abhijeet Group) Designation: Deputy Manager Electrical Current CTC: 6.8L Pa Based @ Bhubaneshwar
Conducted Type test of Air pressure test and temperature Rise test. Defined operational parameters and ensured strict adherence thereto to generate maximum operational efficiency.

ACADEMIC CREDENTIALS Bachelor of Engineering Electrical; 2001 Utkal University, Orissa 63% Class XII; 1997 CHSE Orissa, Bhubaneswar 60% Class X; 1995 BSE Orissa, Cuttack 68% Technical Skills MS Office, MS Word, MS Excel, PowerPoint & All flavors of window TRAININGS & SEMINARS Industrial Safety Industrial Management Seminar Date of Birth: 10 July, 1980; Languages Known: English, Hindi and Oriya.

Current Organization: Corporate Ispat & Alloy Ltd (Abhijeet Group) Designation: Deputy Manager Electrical Current CTC: 6.8L Pa Based @ Bhubaneshwar

.:

You might also like