Plant area: TURBINE Testing Schedule : TURBINE ON BARRING GEAR. SLNO 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 PLANT DETAILS OBJECTIVE PROPOSAL SERVICES REQUIRED SAFETY PERECAUTIONS EMERGENCY PROCEDURE STAE OF THE PLANT TEST METHOD COMPLETION CRITERIA APPENDICES a. TECHNICAL SPECIFICATION b. DRAWING c. LOG SHEET

Station: NTPC- Simhadri

BHEL Ref No.PS-DC-186-500-100 NTPC Ref no SIM/1/TS/2/100

Sheet 2 of 12

Plant area: TURBINE Testing Schedule : TURBINE ON BARRING GEAR SLNO 1.0 1.1 PLANT DETAILS: Turbine and Generator Train is supported on 6 No of bearings, thurst bearing at HP rear. Oil pumps for lubrication consisting of 2 Nos Aux. Oil pumps, one No. of DC EOP and one number Main oil pump with connected pipe lines. Jacking oil pumps two AC driven one DC driven with connected pipe lines. Oil tank to hold the required quantity of oil. Auxiliary oil pumps, Jacking oil pumps and oil vapour exhaust fans 2 nos are mounted on the top of oil tank. Level gauge and probes are installed to indicate and give alarm whenever the level variation is there from low to high. One number duplex filter is there in the oil line to thrust bearing to prevent the solid partides more than 37 mic. entering into the thrust bearing. One number bucket filter is installed inside the oil tank. Throttles are there to regulate the oil flow into the bearings and one throttle at discharge of pumps to adjust the oil pressure of lub oil header.

STATUS

1.2

1.3

1.4 1.5

1.6

1.7

1.8 1.9

Signatures NTPC BHEL

Station: NTPC- Simhadri

BHEL Ref No.PS-DC-186-500-100 NTPC Ref no SIM/1/TS/2/100

Sheet 3 of 12

Plant area: TURBINE Testing Schedule : TURBINE ON BARRING GEAR SLNO 1.10 Two numbers of coolers are there to maintain the lub oil temperature along with temperature control valve. One number oil turbine is mounted on the IP rear coupling to run the shat system at low speed during startup and shutdown of turbine. Provision for hand baring is also available. One number pressure relief valve in the Jop line. One number NRV in Jop line going to each bearing.

STATUS

1.11

1.12 1.13

Signatures NTPC BHEL

Station: NTPC- Simhadri

BHEL Ref No.PS-DC-186-500-100 NTPC Ref no SIM/1/TS/2/100

Sheet 4 of 12

Plant area: TURBINE Testing Schedule : TURBINE ON BARRING GEAR SLNO 2.0 OBJECTIVE: To rotate the turbine rotor system continuously on low speed during start up and shutdown of the machine. This is to over come the break away torque during startup and enable uniform cooling of the rotor system during shutdown to prevent distortion of rotor.

STATUS

Signatures NTPC BHEL

Station: NTPC- Simhadri

BHEL Ref No.PS-DC-186-500-100 NTPC Ref no SIM/1/TS/2/100

Sheet 5 of 12

Plant area: TURBINE Testing Schedule : TURBINE ON BARRING GEAR SLNO 3.0 PROPOSAL: To run the barring gear for 8 hours continuously for observing the performance.

STATUS

Signatures NTPC BHEL

Station: NTPC- Simhadri

BHEL Ref No.PS-DC-186-500-100 NTPC Ref no SIM/1/TS/2/100

Sheet 6 of 12

Plant area: TURBINE Testing Schedule : TURBINE ON BARRING GEAR SLNO 4.0 4.1 4.2 4.3 4.4 4.5 4.6 4.7 4.8 4.9 4.10 4.11 4.12 SERVICES REQUIRED: Auxiliary oil pump DC Emergency oil pump Jack oil pumps AC & DC oil Vapour fans Power and control supply for the above. Gate valve gearing with power supply. Cooling water to oil coolers. Availability of oil temperature controller. Required operating personnel. Availability of fire fighting system. Proper lighting arrangement in all the floors. All working areas shall be free of debris.

STATUS

Signatures NTPC BHEL

Station: NTPC- Simhadri

BHEL Ref No.PS-DC-186-500-100 NTPC Ref no SIM/1/TS/2/100

Sheet 7 of 12

Plant area: TURBINE Testing Schedule : TURBINE ON BARRING GEAR SLNO 5.0 SAFETY PRECAUTIONS:

STATUS

5.1 5.2 5.3

Availability of first Aid kit. Group carryingout the operation shall be aware of the procudure. The other agencies working in the operating area shall be cautioned about the activity.

Signatures NTPC BHEL

Station: NTPC- Simhadri

BHEL Ref No.PS-DC-186-500-100 NTPC Ref no SIM/1/TS/2/100

Sheet 8 of 12

Plant area: TURBINE Testing Schedule : TURBINE ON BARRING GEAR SLNO 6.0 6.1 EMERGENCY PROCEDURE: The operating personnel shall be aware of steps to be taken during power supply failure and oil pumps tripping. They shall also be aware of the procedure to be followed in case of accident involving injury to personnel. They shall intimate the abnormal condition of the equipments to shift incharge.

STATUS

6.2

6.3

Signatures NTPC BHEL

Station: NTPC- Simhadri

BHEL Ref No.PS-DC-186-500-100 NTPC Ref no SIM/1/TS/2/100

Sheet 9 of 12

Plant area: TURBINE Testing Schedule : TURBINE ON BARRING GEAR SLNO 7.0 7.1 7.2 7.3 7.4 7.5 7.6 7.7 7.8 7.9 STATE OF THE PLANT: Any one of AOPs is in service and the other is kept on standby. DC emergency oil pump is on auto mode. Any one of JOPs is in service and the other is kept on standby. DC Jop is kept on auto mode. Oil temperature controller is put on auto. Coolers are charged with cooling water. All instrumentations are kept in service. Machine is ready for bearing gear operation. Open and close limit switches of gate valve gearing is set and the operation of valve is checked. Throttles in the lub oil line to individual bearing are set for its required flow. Turbovisory instruments are calibrated & ready for barring operation.

STATUS

7.10

Signatures NTPC BHEL

Station: NTPC- Simhadri

BHEL Ref No.PS-DC-186-500-100 NTPC Ref no SIM/1/TS/2/100

Sheet 10 of 12

Plant area: TURBINE Testing Schedule : TURBINE ON BARRING GEAR SLNO 8.0 8.1 METHOD: Set the throttle for the oil system to maintain the lub oil header pressure to the required valve. Set the throttles in the lub oil lines to individual bearings to maintain the required flow to the bearings. Ensure the oil flow through view glass in the return line. SGC of oil system is commissioned. SLC of pumps is commissioned and the auto change over of oil pumps is established. Check the functioning of oil temperature controller Adjust the pressure control valve in the Jop discharge line to maintain the required header pressure. Check the SLC operation of Jack oil pumps. Stop the Jack oil pump and mount dial gauges on the shaft nearer to the bearings. This is to measure the lift of the shaft with Job. Start one Jop and notedown the lift of the shaft at each bearing. If the lift is zero at any one of bearings adjust the isolating valve in the Jop lines to bearings to alter the lift oil pressure and initiate the lift. The lift should be at least 0.02 mm min, & 0.1 mm mas. Mum. Do hand barring and it should rotate freely. If it is found difficult, check the lift again at all the bearings and improve the same if it is zero at any of bearings.

STATUS

8.2

8.3 8.4

8.5 8.6

8.7 8.8

8.9

8.10

Signatures NTPC BHEL

Station: NTPC- Simhadri

BHEL Ref No.PS-DC-186-500-100 NTPC Ref no SIM/1/TS/2/100

Sheet 11 of 12

Plant area: TURBINE Testing Schedule : TURBINE ON BARRING GEAR SLNO 8.11 Hookup the interlock and protection for barring gear and check the same. Put the machine on baring gear first by opening the gate valve gearing and then starting the Jop. The speed of the shaft system shall increase and attain the specified speed. Check for any rubbing of seals and sound in the bearings by means of hearing rod. If no sound is heared, allow it to run for some time. Stop the bearing gear by closing the gate valve gearing and note down the coasting down time. Again open the gate valve gearing and run the barring gear for 8 hrs to check its performance. Notedown the following readings every hour. 1. 2. 3. 4. 5. 6. 7. 8. Lub oil header pressure Lub oil temperature Thrust position. Bearing and shaft vibration Speed Bearing babbit temperature. Jop header pressure and the same at individual bearing. Return oil temperature.

STATUS

8.12

8.13

8.14

8.15

8.16

8.17

Signatures NTPC BHEL

Station: NTPC- Simhadri

BHEL Ref No.PS-DC-186-500-100 NTPC Ref no SIM/1/TS/2/100

Sheet 12 of 12

Plant area: TURBINE Testing Schedule : TURBINE ON BARRING GEAR SLNO 9.0 COMPLETION CRITERIA: If the above parameters for 8 hrs. barring is found normal, the trial run of barring gear operation is successful.

STATUS

Signatures NTPC BHEL

TURBINE ON BARRING GEAR

Station: NTPC- Simhadri

BHEL Ref No.PS-DCNTPC Ref no SIM/

Sheet 2 of

Plant area: TURBINE Testing Schedule : TURBINE ON BARAING GEAR SLNO

STATUS

Signatures NTPC BHEL

You might also like