1

CH: 14.750

S.No
1

Description
EW
Hard Soil
Soft Rock
Hard Rock

Unit

Qtty

2
CH: 6.150

Qtty

3
CH: 0.175

Qtty

4
CH: 7.276

Qtty

5
CH: 7.426

Qtty

6
CH: 0.150

Qtty

Cum
Cum
Cum

213.877
427.754
1497.141

127.180
254.360
890.261

104.694
209.387
732.855

27.856
55.712
194.991

65.695
131.390
459.864

23.385
46.770
163.695

Sub Structure
P.C.C
M 15 Conc

Cum
Cum

69.274

54.847

49.206

11.517

17.662

7.168

Super Structure
M 15
M 20
M 25

Cum
Cum
Cum

481.066

320.681

268.667

90.622

198.421

55.556

Wearing Coat M20 Cum

8.405

6.397

9.122

2.163

2.992

0.714

HYSD Steel

Kg

7
CH: 1.113

Qtty

8
CH: 2.137

Qtty

9
CH: 0.200

Qtty

10
CH: 0.625

Qtty

11
CH: 0.735

Qtty

12
CH: 0.893

Qtty

53.824
107.648
376.769

46.243
92.486
323.701

25.771
51.543
180.399

20.824
41.648
145.768

20.109
40.217
140.760

20.081
40.163
140.570

14.031

13.543

7.721

6.640

6.959

6.959

155.410

187.566

63.491

46.860

55.092

55.088

1.105

1.589

0.849

0.759

0.719

0.713

13
CH: 0.450

TOTALS

Qtty
17.236 766.775
34.471 1533.551
120.650 5367.427

6.502

272.027

50.036 2028.557

0.660

36.187

Name of the Project : Indira Sagar Project Canal-Phase III


KUWA BRACH CANAL
7.0 M CHUTE FALL AT KM 14.750 KM

DETAILED MEASUREMENT
S. NO

DESCRIPTION

Unit

No
Top

LEVEL
Bottom

in mts

in mts

Length

Width

Depth /
Height

in mts

in mts

in mts

1.00 Earth work in Excavation


A

Excavation
U/S wing returns
Body wall (2 - 2) to (3 - 3)

At Cistern

D/S wing returns

2.00
2.00
2.00
2.00
2.00
1.00
1.00
1.00
1.00
1.00
2.00

182.69
182.69
182.69
182.69
182.69
182.69
182.69
182.69
182.69
182.69
182.69

179.66
177.46
177.25
173.05
170.99
171.37
171.37
171.37
171.37
171.37
170.99

4.25
4.71
4.71
4.71
4.71
2.51
2.50
2.50
2.50
2.50
14.24

1.94
2.93
2.93
2.93
2.93
1.60
1.60
1.60
1.60
1.60
2.94

3.03
5.23
5.44
9.64
11.70
11.32
11.32
11.32
11.32
11.32
11.70

2.00
2.00
4.00
1.00
1.00
1.00
1.00
1.00
1.00
2.00

179.96
179.96
177.76
171.67
171.67
171.67
171.67
171.67
170.99
171.29

179.66
179.66
177.46
171.37
171.37
171.37
171.37
171.37
170.69
170.99

1.99
2.26
4.71
2.51
2.50
2.50
2.50
2.50
0.38
14.24

1.94
1.94
2.93
1.60
1.60
1.60
1.60
1.60
1.60
2.94

0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30

2.00

182.69

179.96

4.10

1.07

2.73

177.76
177.76
171.29
171.29
179.96
171.67
171.67

4.41

1.57

4.38

4.41
14.39
4.00
28.89
1.60

1.57
1.57
2.40
1.60
2.79

4.40
4.40
0.23
0.23

Hard Soil
Soft Rock
Hard Rock
2.00 Earth Filling
3.00 CC-M15 in Foundation
U/s Wing and Return (sec1-1) Base
U/s Wing and Return (sec1-1) Base
Body Wall Sec (2-2), sec(3-3)
At Cistern

2.00

D/s Cut off wall


D/S wing returns
4.00 CC- M15 Super Structure
U/s Wing and Return (sec1-1) Trapezoidal
Body Wall (sec2-2, sec3-3)

2.00

3.00

Body Wall (sec2-2, sec3-3)


D/s Wing and Return (sec1-1) Trapezoidal
Apron at crest
apron at chute portion
apron at end sill triangular portion
Deduction
Chute Block
Basin Block

2.00

1.00
2.00
1.00
1.00
1.00

182.69
181.59
175.69
175.69
180.19
180.49
173.34

1.00
1.00

3.00
2.00

171.98
172.30

171.37
171.37

-0.30
-0.30

0.37
0.48

0.61
0.93

1.00

171.67

171.52

35.02

1.60

0.15

5.00 CC -M 20
Wearing Coat

: Indira Sagar Project Canal-Phase III

UWA BRACH CANAL


UTE FALL AT KM 14.750 KM
DETAILED MEASUREMENTS
Quantity

Remarks

in Cum

49.93
144.35
150.01
266.07
322.79
45.35
45.26
45.26
45.26
45.26
979.24
2138.77
213.88 cum
427.75 cum
1497.14 cum
1497.14 cum

2.32
2.63
33.12
1.18
1.18
1.18
1.18
1.18
0.18
25.12
69.27 cum
23.93
181.33
60.67
198.59
2.16
10.40
4.46
-0.20
-0.27
481.07 cum

8.41 cum

Name of the Project : Indira Sagar Project Canal-Phase III


KUWA BRACH CANAL
4.50M CHUTE FALL AT KM 6.150KM

DETAILED MEASUREMEN
S. NO

DESCRIPTION

Unit

No
Top

LEVEL
Bottom

in mts

in mts

Length

Width

Depth /
Height

in mts

in mts

in mts

1.00 Earth work in Excavation


A

Excavation
U/S wing returns
Body wall (2 - 2) to (3 - 3)

At Cistern

D/S wing returns

2.00
2.00
2.00
2.00
2.00
1.00
1.00
1.00
1.00
2.00

196.29
196.29
196.29
196.29
196.29
196.29
196.29
196.29
196.29
196.29

2.00
2.00
4.00
1.00
1.00
1.00
1.00
1.00
2.00

193.56
193.56
192.06
188.07
188.07
188.07
188.07
187.39
187.69

193.26
191.76
190.25
188.75
187.39
187.24
187.47
187.67
187.87
187.39

4.25
3.31
3.31
3.31
3.31
2.97
2.50
2.50
2.50
12.39

1.94
2.62
2.62
2.62
2.62
1.60
1.60
1.60
1.60
2.76

3.03
4.53
6.04
7.54
8.90
9.04
8.82
8.62
8.41
8.90

193.26
193.26
191.76
187.24
187.47
187.67
187.87
187.47
187.39

1.99
2.26
3.31
2.97
2.50
2.50
2.50
0.38
12.39

1.94
1.94
2.62
1.60
1.60
1.60
1.60
1.60
2.76

0.30
0.30
0.30
0.83
0.60
0.40
0.20
-0.08
0.30

Hard Soil
Soft Rock
Hard Rock
2.00 Earth Filling
3.00 CC-M15 in Foundation
U/s Wing and Return (sec1-1) Base
U/s Wing and Return (sec1-1) Base
Body Wall Sec (2-2), sec(3-3)
At Cistern

2.00

D/s Cut off wall


D/s Wing MinSection (sec 4-4)
4.00 CC- M15 Super Structure
U/s Wing and Return (sec1-1) Trapezoidal

2.00

196.29

193.56

4.10

1.07

2.72

Body Wall (sec2-2, sec3-3)

2.00

3.00

1.41

3.85

2.00

1.00
2.00
1.00
1.00
1.00

192.06
192.06
187.69
187.69
193.56
188.07
188.07

3.01

Body Wall (sec2-2, sec3-3)


D/s Wing and Return (sec1-1) Trapezoidal
Apron at crest
apron at chute portion
apron at end sill triangular portion
Deduction
Chute Block
Basin Block

196.29
195.54
191.79
191.79
193.79
194.09
189.44

3.01
12.54
4.00
21.19
1.60

1.41
1.48
2.40
1.60
1.88

4.10
4.10
0.23
0.23

1.00
1.00

2.00
2.00

188.44
188.74

187.24
187.47

-0.30
-0.30

0.37
0.50

1.20
1.26

1.00

188.07

187.92

26.65

1.60

0.15

5.00 CC -M 20
Wearing Coat

Indira Sagar Project Canal-Phase III

UWA BRACH CANAL


UTE FALL AT KM 6.150KM
DETAILED MEASUREMENTS
Quantity

Remarks

in Cum

49.93
78.42
104.47
130.53
153.98
42.98
35.26
34.46
33.66
608.11
1271.80
127.18 cum
254.36 cum
890.26 cum
890.26 cum

2.32
2.63
20.77
3.92
2.38
1.58
0.78
-0.05
20.51
54.85 cum
23.93
97.97
34.70
151.94
2.16
7.63
3.00
-0.27
-0.38
320.68 cum

6.40 cum

Name of the Project : Indira Sagar Project Canal-Phase III


KUWA BRACH CANAL
3.50 M CHUTE FALL AT KM 0.175KM

DETAILED MEASUREMEN
S. NO

DESCRIPTION

Unit

No
Top

LEVEL
Bottom

in mts

in mts

Length

Width

Depth /
Height

in mts

in mts

in mts

1.00 Earth work in Excavation


A

Excavation
U/S wing returns
Body wall (2 - 2) to (3 - 3)

At Cistern

D/S wing returns

2.00
2.00
2.00
2.00
2.00
1.00
1.00
1.00
1.00
1.00
2.00

207.09
207.09
207.09
207.09
207.09
207.09
207.09
207.09
207.09
207.09
207.09

2.00
2.00
4.00
1.00
1.00
1.00
1.00
1.00
2.00

204.16
204.16
203.01
200.07
200.07
200.07
200.07
199.39
199.69

2.00

203.86
202.71
201.55
200.40
199.39
199.41
199.59
199.76
199.96
199.41
199.39

4.54
2.61
2.61
2.61
2.61
2.32
2.00
2.00
3.00
0.23
11.54

2.06
2.58
2.58
2.58
2.58
2.70
2.70
2.70
2.70
2.70
2.64

3.22
4.38
5.54
6.69
7.69
7.68
7.50
7.33
7.13
7.68
7.69

203.86
203.86
202.71
199.41
199.59
199.76
199.96
199.41
199.39

1.99
2.55
2.61
2.32
2.00
2.00
3.00
0.23
11.54

2.06
2.06
2.58
2.70
2.70
2.70
2.70
2.70
2.64

0.30
0.30
0.30
0.66
0.48
0.31
0.11
-0.02
0.30

207.09

204.16

4.39

1.13

2.93

203.01
203.01
199.69
199.69
204.16
200.07
200.07

2.31

1.39

3.79

2.31
11.39
5.40
17.66
2.70

1.39
1.42
2.70
2.70
0.94

3.90
3.90
0.23
0.23

Hard Soil
Soft Rock
Hard Rock
2.00 Earth Filling
3.00 CC-M15 in Foundation
U/s Wing and Return (sec1-1) Base
U/s Wing and Return (sec1-1) Base
Body Wall Sec (2-2), sec(3-3)
At Cistern

2.00

D/s Cut off wall


D/s Wing MinSection (sec 4-4)
4.00 CC- M15 Super Structure
U/s Wing and Return (sec1-1) Trapezoidal
Body Wall (sec2-2, sec3-3)

2.00

3.00

Body Wall (sec2-2, sec3-3)


D/s Wing and Return (sec1-1) Trapezoidal
Apron at crest
apron at chute portion
apron at end sill triangular portion
Deduction
Chute Block
Basin Block

2.00

1.00
2.00
1.00
1.00
1.00

207.09
206.51
203.59
203.59
204.39
204.69
201.04

1.00
1.00

4.00
3.00

200.44
200.70

199.41
199.59

-0.30
-0.30

0.37
0.50

1.03
1.11

1.00

200.07

199.92

22.52

2.70

0.15

5.00 CC -M 20
Wearing Coat

Indira Sagar Project Canal-Phase III

UWA BRACH CANAL


HUTE FALL AT KM 0.175KM
DETAILED MEASUREMENTS
Quantity

Remarks

in Cum

60.33
58.99
74.54
90.10
103.63
48.08
40.47
39.56
57.71
4.66
468.87
1046.94
104.69 cum
209.39 cum
732.86 cum
732.86 cum

2.46
3.15
16.16
4.10
2.57
1.65
0.85
-0.01
18.28
49.21 cum
29.02
73.04
25.01
125.99
3.28
10.73
2.54
-0.46
-0.50
268.67 cum

9.12 cum

Name of the Project : Indira Sagar Project Canal-Phase III


KUWA BRACH CANAL
3.50 M CHUTE FALL AT KM 7.276 KM ON D1

DETAILED MEASUREMEN
S. NO

DESCRIPTION

Unit

No
Top

LEVEL
Bottom

in mts

in mts

Length

Width

Depth /
Height

in mts

in mts

in mts

1.00 Earth work in Excavation


A

Excavation
U/S wing returns
Body wall (2 - 2) to (3 - 3)

At Cistern

D/S wing returns

2.00
2.00
2.00
2.00
2.00
1.00
1.00
1.00
1.00
1.00

193.12
193.12
193.12
193.12
193.12
193.12
193.12
193.12
193.12
193.12

2.00
4.00
1.00
1.00
1.00
1.00
1.00
2.00

191.35
190.31
187.74
187.74
187.74
187.74
187.22
187.37

2.00
3.00

191.20
190.16
189.13
188.10
187.22
187.32
187.44
187.57
187.69
187.22

2.38
2.67
2.67
2.67
2.67
1.62
1.62
1.62
1.62
6.61

1.27
1.74
1.74
1.74
1.74
0.80
0.80
0.80
0.80
1.86

1.93
2.96
3.99
5.02
5.91
5.81
5.69
5.56
5.44
5.91

191.20
190.16
187.32
187.44
187.57
187.69
186.47
187.22

2.38
2.67
1.62
1.62
1.62
1.62
0.23
6.61

1.27
1.74
0.80
0.80
0.80
0.80
0.80
1.86

0.15
0.15
0.43
0.31
0.18
0.06
0.75
0.15

193.12

191.35

2.23

0.69

1.78

190.31
190.31
187.37
191.35
187.74
187.74

2.37

0.92

2.55

2.00
1.00
1.00
1.00

193.12
192.60
190.12
191.57
191.87
188.72

8.83
2.90
13.73
0.80

0.98
2.10
0.80
0.96

2.76
0.23
0.23

2.00
1.00

187.95
188.13

187.32
187.44

-0.30
-0.30

0.37
0.50

0.63
0.70

1.00

187.74

187.59

18.03

0.80

0.15

Hard Soil
Soft Rock
Hard Rock
2.00 Earth Filling
3.00 CC-M15 in Foundation
U/s Wing and Return (sec1-1) Base
Body Wall Sec (2-2), sec(3-3)
At Cistern

2.00

D/s Cut off wall


D/s Wing MinSection (sec 4-4)
4.00 CC- M15 Super Structure
U/s Wing and Return (sec1-1) Trapezoidal
Body Wall (sec2-2, sec3-3)
D/s Wing and Return (sec1-1) Trapezoidal
Apron at crest
apron at chute portion
apron at end sill triangular portion
Deduction
Chute Block
Basin Block

5.00 CC -M 20
Wearing Coat

2.00

1.00
1.00

Indira Sagar Project Canal-Phase III

UWA BRACH CANAL


E FALL AT KM 7.276 KM ON D1
DETAILED MEASUREMENTS
Quantity

Remarks

in Cum

11.62
27.35
36.90
46.44
54.61
7.50
7.35
7.18
7.02
72.60
278.56
27.86 cum
55.71 cum
194.99 cum
194.99 cum

0.91
5.55
0.55
0.39
0.23
0.07
0.13
3.69
11.52 cum
5.42
33.19
47.65
1.37
2.47
0.77
-0.14
-0.10
90.62 cum

2.16 cum

Name of the Project : Indira Sagar Project Canal-Phase III


KUWA BRACH CANAL
5.00 M CHUTE FALL AT KM 7.426KM ON D1

DETAILED MEASUREMEN
S. NO

DESCRIPTION

Unit

No
Top

LEVEL
Bottom

in mts

in mts

Length

Width

Depth /
Height

in mts

in mts

in mts

1.00 Earth work in Excavation


A

Excavation
U/S wing returns
Body wall (2 - 2) to (3 - 3)

At Cistern

D/S wing returns

2.00
2.00
2.00
2.00
2.00
1.00
1.00
1.00
1.00
2.00

189.97
189.97
189.97
189.97
189.97
189.97
189.97
189.97
189.97
189.97

2.00
4.00
1.00
1.00
1.00
1.00
1.00
2.00

188.20
186.60
182.34
182.34
182.34
182.34
181.82
181.97

2.00
3.00

188.05
186.45
184.86
183.26
181.82
181.60
181.76
181.92
182.09
181.82

2.38
3.59
3.59
3.59
3.59
2.00
2.00
2.00
2.28
8.43

1.27
1.99
1.99
1.99
1.99
0.80
0.80
0.80
0.80
1.86

1.93
3.52
5.12
6.71
8.16
8.38
8.22
8.06
7.88
8.16

188.05
186.45
181.60
181.76
181.92
182.09
180.67
181.82

2.38
3.59
2.00
2.00
2.00
2.28
0.23
8.43

1.27
1.99
0.80
0.80
0.80
0.80
0.80
1.86

0.15
0.15
0.75
0.59
0.43
0.26
1.15
0.15

189.97

188.20

2.23

0.69

1.78

186.60
186.60
181.97
188.20
182.34
182.34

3.29

1.05

2.97

2.00
1.00
1.00
1.00

189.97
189.17
184.97
188.42
188.72
183.57

11.57
2.90
20.09
0.80

1.81
2.10
0.80
1.51

3.01
0.23
0.23

2.00
1.00

182.51
182.72

181.60
181.76

-0.30
-0.30

0.37
0.50

0.92
0.96

1.00

182.34

182.19

24.94

0.80

0.15

Hard Soil
Soft Rock
Hard Rock
2.00 Earth Filling
3.00 CC-M15 in Foundation
U/s Wing and Return (sec1-1) Base
Body Wall Sec (2-2), sec(3-3)
At Cistern

2.00

D/s Cut off wall


D/s Wing MinSection (sec 4-4)
4.00 CC- M15 Super Structure
U/s Wing and Return (sec1-1) Trapezoidal
Body Wall (sec2-2, sec3-3)
D/s Wing and Return (sec1-1) Trapezoidal
Apron at crest
apron at chute portion
apron at end sill triangular portion
Deduction
Chute Block
Basin Block

5.00 CC -M 20
Wearing Coat

2.00

1.00
1.00

Indira Sagar Project Canal-Phase III

UWA BRACH CANAL


E FALL AT KM 7.426KM ON D1
DETAILED MEASUREMENTS
Quantity

Remarks

in Cum

11.62
50.29
73.08
95.87
116.52
13.40
13.14
12.89
14.38
255.74
656.95
65.69 cum
131.39 cum
459.86 cum
459.86 cum

0.91
8.57
1.19
0.94
0.68
0.47
0.21
4.70
17.66 cum
5.42
61.30
125.86
1.37
3.62
1.21
-0.20
-0.14
198.42 cum

2.99 cum

Name of the Project : Indira Sagar Project Canal-Phase III


KUWA BRACH CANAL
4.50 M CHUTE FALL AT KM 0.150 KM ON D2

DETAILED MEASUREMEN
S. NO

DESCRIPTION

Unit

No
Top

LEVEL
Bottom

in mts

in mts

Length

Width

Depth /
Height

in mts

in mts

in mts

1.00 Earth work in Excavation


A

Excavation
U/S wing returns
Body wall (2 - 2) to (3 - 3)

At Cistern

D/S wing returns

2.00
2.00
2.00
2.00
2.00
1.00
1.00
1.00
1.00
2.00

188.12
188.12
188.12
188.12
188.12
188.12
188.12
188.12
188.12
188.12

2.00
4.00
1.00
1.00
1.00
1.00
1.00
2.00

187.00
185.64
182.08
182.08
182.08
182.08
181.56
181.71

2.00
3.00

186.85
185.49
184.13
182.77
181.56
181.67
181.75
181.84
181.93
181.56

1.34
2.52
2.52
2.52
2.52
1.00
1.00
1.00
1.58
4.73

0.88
1.50
1.50
1.50
1.50
0.25
0.25
0.25
0.25
1.35

1.28
2.64
4.00
5.36
6.57
6.46
6.38
6.29
6.20
6.57

186.85
185.49
181.67
181.75
181.84
181.93
180.37
181.56

1.34
2.52
1.00
1.00
1.00
1.58
0.23
4.73

0.88
1.50
0.25
0.25
0.25
0.25
0.25
1.35

0.15
0.15
0.42
0.34
0.25
0.16
1.19
0.15

188.12

187.00

1.19

0.49

1.13

185.64
185.64
181.71
187.00
182.08
182.08

2.22

0.80

2.15

2.00
1.00
1.00
1.00

188.12
187.44
183.62
187.22
187.52
182.87

6.80
1.38
14.45
0.25

1.15
2.10
0.25
0.62

1.92
0.23
0.23

2.00
1.00

182.14
182.26

181.67
181.75

-0.30
-0.30

0.33
0.13

0.48
0.51

1.00

182.08

181.93

19.03

0.25

0.15

Hard Soil
Soft Rock
Hard Rock
2.00 Earth Filling
3.00 CC-M15 in Foundation
U/s Wing and Return (sec1-1) Base
Body Wall Sec (2-2), sec(3-3)
At Cistern

2.00

D/s Cut off wall


D/s Wing MinSection (sec 4-4)
4.00 CC- M15 Super Structure
U/s Wing and Return (sec1-1) Trapezoidal
Body Wall (sec2-2, sec3-3)
D/s Wing and Return (sec1-1) Trapezoidal
Apron at crest
apron at chute portion
apron at end sill triangular portion
Deduction
Chute Block
Basin Block

5.00 CC -M 20
Wearing Coat

2.00

1.00
1.00

Indira Sagar Project Canal-Phase III

UWA BRACH CANAL


E FALL AT KM 0.150 KM ON D2
DETAILED MEASUREMENTS
Quantity

Remarks

in Cum

3.01
19.85
30.10
40.35
49.47
1.61
1.59
1.57
2.45
83.84
233.85
23.39 cum
46.77 cum
163.70 cum
163.70 cum

0.35
4.52
0.10
0.08
0.06
0.06
0.07
1.92
7.17 cum
1.31
22.79
29.95
0.65
0.81
0.16
-0.09
-0.02
55.56 cum

0.71 cum

Name of the Project : Indira Sagar Project Canal-Phase III


KUWA BRACH CANAL
5.00 M CHUTE FALL AT KM 1.133KM ON D5

DETAILED MEASUREMEN
S. NO

DESCRIPTION

Unit

No
Top

LEVEL
Bottom

in mts

in mts

Length

Width

Depth /
Height

in mts

in mts

in mts

1.00 Earth work in Excavation


A

Excavation
U/S wing returns
Body wall (2 - 2) to (3 - 3)

At Cistern

D/S wing returns

2.00
2.00
2.00
2.00
2.00
1.00
1.00
1.00
2.00

182.71
182.71
182.71
182.71
182.71
182.71
182.71
182.71
182.71

2.00
4.00
1.00
1.00
1.00
1.00
1.00
1.00
2.00

181.38
179.74
175.33
175.33
175.33
175.33
175.33
174.80
174.95

2.00
3.00

181.23
179.59
177.94
176.30
174.80
174.60
174.75
175.00
174.80

1.67
3.59
3.59
3.59
3.59
2.00
2.00
2.00
8.22

1.00
1.74
1.74
1.74
1.74
0.30
0.30
0.30
1.86

1.48
3.12
4.77
6.41
7.91
8.11
7.96
7.71
7.91

181.23
179.59
174.60
174.75
175.00
175.07
175.07
173.61
174.80

1.67
3.59
2.00
2.00
2.00
2.07
3.07
0.23
8.22

1.00
1.74
0.30
0.30
0.30
0.30
0.30
0.30
1.86

0.15
0.15
0.73
0.58
0.33
0.26
0.26
1.20
0.15

182.71

181.38

1.52

0.65

1.33

179.74
179.74
174.95
181.38
175.33
175.33

3.29

0.92

2.56

2.00
1.00
1.00
1.00

182.71
181.88
177.71
181.61
181.91
176.76

11.36
1.73
19.92
0.30

1.66
1.43
0.30
2.04

2.76
0.23
0.23

1.00
1.00

175.49
175.33

174.60
174.75

-0.30
-0.30

0.16
0.27

0.89
0.57

1.00

175.33

175.18

24.55

0.30

0.15

Hard Soil
Soft Rock
Hard Rock
2.00 Earth Filling
3.00 CC-M15 in Foundation
U/s Wing and Return (sec1-1) Base
Body Wall Sec (2-2), sec(3-3)
At Cistern

2.00

D/s Cut off wall


D/s Wing MinSection (sec 4-4)
4.00 CC- M15 Super Structure
U/s Wing and Return (sec1-1) Trapezoidal
Body Wall (sec2-2, sec3-3)
D/s Wing and Return (sec1-1) Trapezoidal
Apron at crest
apron at chute portion
apron at end sill triangular portion
Deduction
Chute Block
Basin Block

5.00 CC -M 20
Wearing Coat

2.00

1.00
1.00

Indira Sagar Project Canal-Phase III

UWA BRACH CANAL


E FALL AT KM 1.133KM ON D5
DETAILED MEASUREMENTS
Quantity

Remarks

in Cum

4.91
38.98
59.53
80.08
98.76
4.86
4.77
4.62
241.72
538.24
53.82 cum
107.65 cum
376.77 cum
376.77 cum

0.50
7.50
0.44
0.35
0.20
0.16
0.23
0.08
4.59
14.03 cum
2.61
46.47
103.91
0.55
1.34
0.61
-0.04
-0.05
155.41 cum

1.10 cum

Name of the Project : Indira Sagar Project Canal-Phase III


KUWA BRACH CANAL
3.00 M CHUTE FALL AT KM 2.137 KM ON M-3 D-1

DETAILED MEASUREMEN
S. NO

DESCRIPTION

Unit

No
Top

LEVEL
Bottom

in mts

in mts

Length

Width

Depth /
Height

in mts

in mts

in mts

1.00 Earth work in Excavation


A

Excavation
U/S wing returns
Body wall (2 - 2) to (3 - 3)

At Cistern

D/S wing returns

2.00
2.00
2.00
2.00
2.00
1.00
1.00
1.00
1.00
2.00

189.25
189.25
189.25
189.25
189.25
189.25
189.25
189.25
189.25
189.25

2.00
4.00
1.00
1.00
1.00
1.00
1.00
2.00

187.48
186.30
183.27
183.27
183.27
183.27
182.75
182.90

2.00
3.00

187.33
186.15
184.96
183.78
182.75
182.74
182.88
183.02
183.15
182.75

2.38
2.67
2.67
2.67
2.67
2.00
2.00
2.00
2.14
8.29

1.27
1.80
1.80
1.80
1.80
0.50
0.50
0.50
0.50
2.22

1.93
3.11
4.29
5.47
6.51
6.52
6.38
6.24
6.11
6.51

187.33
186.15
182.74
182.88
183.02
183.15
182.35
182.75

2.38
2.67
2.00
2.00
2.00
2.14
0.23
8.29

1.27
1.80
0.50
0.50
0.50
0.50
0.50
2.22

0.15
0.15
0.54
0.40
0.26
0.13
0.40
0.15

189.25

187.48

2.23

0.69

1.78

186.30
186.30
182.90
187.48
183.27
183.27

2.37

0.95

2.66

2.00
1.00
1.00
1.00

189.25
188.66
186.25
187.70
188.00
184.85

10.50
2.60
15.55
0.50

2.02
2.10
0.50
2.50

3.36
0.23
0.23

1.00
1.00

183.63
183.85

182.74
182.88

-0.35
-0.41

0.35
0.41

0.89
0.98

1.00

183.27

183.12

21.18

0.50

0.15

Hard Soil
Soft Rock
Hard Rock
2.00 Earth Filling
3.00 CC-M15 in Foundation
U/s Wing and Return (sec1-1) Base
Body Wall Sec (2-2), sec(3-3)
At Cistern

2.00

D/s Cut off wall


D/s Wing MinSection (sec 4-4)
4.00 CC- M15 Super Structure
U/s Wing and Return (sec1-1) Trapezoidal
Body Wall (sec2-2, sec3-3)
D/s Wing and Return (sec1-1) Trapezoidal
Apron at crest
apron at chute portion
apron at end sill triangular portion
Deduction
Chute Block
Basin Block

5.00 CC -M 20
Wearing Coat

2.00

1.00
1.00

Indira Sagar Project Canal-Phase III

UWA BRACH CANAL


ALL AT KM 2.137 KM ON M-3 D-1
DETAILED MEASUREMENTS
Quantity

Remarks

in Cum

11.62
29.81
41.16
52.50
62.41
6.52
6.38
6.24
6.52
239.29
462.43
46.24 cum
92.49 cum
323.70 cum
323.70 cum

0.91
5.76
0.54
0.40
0.26
0.13
0.04
5.52
13.54 cum
5.42
35.88
142.32
1.23
1.75
1.25
-0.11
-0.16
187.57 cum

1.59 cum

Name of the Project : Indira Sagar Project Canal-Phase III


KUWA BRACH CANAL
4.50 M CHUTE FALL AT KM0.200 KM ON M-5 D-10

DETAILED MEASUREMEN
S. NO

DESCRIPTION

Unit

No
Top

LEVEL
Bottom

in mts

in mts

Length

Width

Depth /
Height

in mts

in mts

in mts

1.00 Earth work in Excavation


A

Excavation
U/S wing returns
Body wall (2 - 2) to (3 - 3)

At Cistern

D/S wing returns

2.00
2.00
2.00
2.00
2.00
1.00
1.00
1.00
1.00
2.00

170.45
170.45
170.45
170.45
170.45
170.45
170.45
170.45
170.45
170.45

2.00
4.00
1.00
1.00
1.00
1.00
1.00
2.00

169.34
167.94
164.28
164.28
164.28
164.28
163.75
163.90

2.00
3.00

169.19
167.79
166.40
165.00
163.75
163.82
163.90
163.99
164.08
163.75

1.34
2.52
2.52
2.52
2.52
1.00
1.00
1.00
2.11
5.26

0.88
1.51
1.51
1.51
1.51
0.30
0.30
0.30
0.30
1.44

1.26
2.65
4.05
5.45
6.69
6.63
6.54
6.45
6.36
6.69

169.19
167.79
163.82
163.90
163.99
164.08
162.72
163.75

1.34
2.52
1.00
1.00
1.00
2.11
0.23
5.26

0.88
1.51
0.30
0.30
0.30
0.30
0.30
1.44

0.15
0.15
0.46
0.38
0.29
0.20
1.04
0.15

170.47

169.34

1.19

0.49

1.13

167.94
167.94
163.90
169.34
164.28
164.28

2.22

0.81

2.17

2.00
1.00
1.00
1.00

170.47
169.77
165.97
169.57
169.87
165.22

7.33
1.49
15.64
0.30

1.24
1.13
0.30
0.88

2.07
0.23
0.23

2.00
1.00

164.35
164.48

163.82
163.90

-0.35
-0.60

0.39
0.60

0.53
0.58

1.00

164.28

164.13

18.87

0.30

0.15

Hard Soil
Soft Rock
Hard Rock
2.00 Earth Filling
3.00 CC-M15 in Foundation
U/s Wing and Return (sec1-1) Base
Body Wall Sec (2-2), sec(3-3)
At Cistern

2.00

D/s Cut off wall


D/s Wing MinSection (sec 4-4)
4.00 CC- M15 Super Structure
U/s Wing and Return (sec1-1) Trapezoidal
Body Wall (sec2-2, sec3-3)
D/s Wing and Return (sec1-1) Trapezoidal
Apron at crest
apron at chute portion
apron at end sill triangular portion
Deduction
Chute Block
Basin Block

5.00 CC -M 20
Wearing Coat

2.00

1.00
1.00

Indira Sagar Project Canal-Phase III

UWA BRACH CANAL


ALL AT KM0.200 KM ON M-5 D-10
DETAILED MEASUREMENTS
Quantity

Remarks

in Cum

2.97
20.18
30.82
41.45
50.95
1.99
1.96
1.94
4.03
101.42
257.71
25.77 cum
51.54 cum
180.40 cum
180.40 cum

0.35
4.57
0.14
0.11
0.09
0.12
0.07
2.27
7.72 cum
1.31
23.29
37.54
0.38
1.06
0.27
-0.14
-0.21
63.49 cum

0.85 cum

Name of the Project : Indira Sagar Project Canal-Phase III


KUWA BRACH CANAL
4.50 M CHUTE FALL AT KM0.625 KM ON M-4 D-10

DETAILED MEASUREMEN
S. NO

DESCRIPTION

Unit

No
Top

LEVEL
Bottom

in mts

in mts

Length

Width

Depth /
Height

in mts

in mts

in mts

1.00 Earth work in Excavation


A

Excavation
U/S wing returns
Body wall (2 - 2) to (3 - 3)

At Cistern

D/S wing returns

2.00
2.00
2.00
2.00
2.00
1.00
1.00
1.00
2.00

167.95
167.95
167.95
167.95
167.95
167.95
167.95
167.95
167.95

2.00
4.00
1.00
1.00
1.00
1.00
2.00

166.83
165.51
162.06
162.06
162.06
161.54
161.69

2.00
3.00

166.68
165.36
164.03
162.71
161.54
161.71
161.81
161.90
161.54

1.34
2.52
2.52
2.52
2.52
1.00
1.00
1.76
3.91

0.88
1.48
1.48
1.48
1.48
0.30
0.30
0.30
1.26

1.28
2.60
3.92
5.24
6.41
6.24
6.14
6.05
6.41

166.68
165.36
161.71
161.81
161.90
160.40
161.54

1.34
2.52
1.00
1.00
1.76
0.23
3.91

0.88
1.48
0.30
0.30
0.30
0.30
1.26

0.15
0.15
0.36
0.26
0.17
1.14
0.15

167.95

166.83

1.19

0.49

1.13

165.51
165.51
161.69
166.83
162.06
162.06

2.22

0.79

2.12

2.00
1.00
1.00
1.00

167.95
167.29
163.45
167.05
167.35
162.70

5.98
1.49
14.31
0.30

1.06
1.13
0.30
0.41

1.76
0.23
0.23

4.00
2.00

162.10
162.20

161.71
161.81

-0.35
-0.60

0.39
0.60

0.40
0.39

1.00

162.06

161.91

16.86

0.30

0.15

Hard Soil
Soft Rock
Hard Rock
2.00 Earth Filling
3.00 CC-M15 in Foundation
U/s Wing and Return (sec1-1) Base
Body Wall Sec (2-2), sec(3-3)
At Cistern

2.00

D/s Cut off wall


D/s Wing MinSection (sec 4-4)
4.00 CC- M15 Super Structure
U/s Wing and Return (sec1-1) Trapezoidal
Body Wall (sec2-2, sec3-3)
D/s Wing and Return (sec1-1) Trapezoidal
Apron at crest
apron at chute portion
apron at end sill triangular portion
Deduction
Chute Block
Basin Block

5.00 CC -M 20
Wearing Coat

2.00

1.00
1.00

Indira Sagar Project Canal-Phase III

UWA BRACH CANAL


ALL AT KM0.625 KM ON M-4 D-10
DETAILED MEASUREMENTS
Quantity

Remarks

in Cum

3.01
19.31
29.14
38.97
47.69
1.87
1.84
3.20
63.21
208.24
20.82 cum
41.65 cum
145.77 cum
145.77 cum

0.35
4.46
0.11
0.08
0.09
0.08
1.48
6.64 cum
1.31
22.20
22.38
0.38
0.97
0.12
-0.22
-0.28
46.86 cum

0.76 cum

Name of the Project : Indira Sagar Project Canal-Phase III


KUWA BRACH CANAL
3.50 M CHUTE FALL AT KM0.735 KM ON SM-3-M-3-D-1

DETAILED MEASUREMEN
S. NO

DESCRIPTION

Unit

No
Top

LEVEL
Bottom

in mts

in mts

Length

Width

Depth /
Height

in mts

in mts

in mts

1.00 Earth work in Excavation


A

Excavation
U/S wing returns
Body wall (2 - 2) to (3 - 3)

At Cistern

D/S wing returns

2.00
2.00
2.00
2.00
2.00
1.00
1.00
1.00
1.00
2.00

176.62
176.62
176.62
176.62
176.62
176.62
176.62
176.62
176.62
176.62

2.00
4.00
1.00
1.00
1.00
1.00
1.00
2.00

175.44
174.33
171.53
171.53
171.53
171.53
171.00
171.15

2.00
3.00

175.29
174.18
173.07
171.96
171.00
171.21
171.29
171.38
171.46
171.00

1.54
2.52
2.52
2.52
2.52
1.00
1.00
1.00
1.66
4.81

0.91
1.41
1.41
1.41
1.41
0.30
0.30
0.30
0.30
1.38

1.33
2.44
3.55
4.66
5.62
5.41
5.33
5.24
5.16
5.62

175.29
174.18
171.21
171.29
171.38
171.46
170.37
171.00

1.54
2.52
1.00
1.00
1.00
1.66
0.23
4.81

0.91
1.41
0.30
0.30
0.30
0.30
0.30
1.38

0.15
0.15
0.32
0.24
0.15
0.07
0.63
0.15

176.62

175.44

1.39

0.51

1.18

174.33
174.33
171.15
175.44
171.53
171.53

2.22

0.76

2.01

2.00
1.00
1.00
1.00

176.62
176.06
173.12
175.67
175.97
172.32

6.88
1.50
13.01
0.30

1.18
1.20
0.30
0.62

1.97
0.23
0.23

2.00
1.00

171.61
171.72

171.21
171.29

-0.35
-0.60

0.29
0.15

0.40
0.43

1.00

171.53

171.38

15.97

0.30

0.15

Hard Soil
Soft Rock
Hard Rock
2.00 Earth Filling
3.00 CC-M15 in Foundation
U/s Wing and Return (sec1-1) Base
Body Wall Sec (2-2), sec(3-3)
At Cistern

2.00

D/s Cut off wall


D/s Wing MinSection (sec 4-4)
4.00 CC- M15 Super Structure
U/s Wing and Return (sec1-1) Trapezoidal
Body Wall (sec2-2, sec3-3)
D/s Wing and Return (sec1-1) Trapezoidal
Apron at crest
apron at chute portion
apron at end sill triangular portion
Deduction
Chute Block
Basin Block

5.00 CC -M 20
Wearing Coat

2.00

1.00
1.00

Indira Sagar Project Canal-Phase III

UWA BRACH CANAL


L AT KM0.735 KM ON SM-3-M-3-D-1
DETAILED MEASUREMENTS
Quantity

Remarks

in Cum

3.71
17.30
25.19
33.08
39.90
1.62
1.60
1.57
2.57
74.54
201.09
20.11 cum
40.22 cum
140.76 cum
140.76 cum

0.42
4.26
0.09
0.07
0.04
0.03
0.04
1.99
6.96 cum
1.65
20.19
31.91
0.41
0.88
0.19
-0.08
-0.04
55.09 cum

0.72 cum

Name of the Project : Indira Sagar Project Canal-Phase III


KUWA BRACH CANAL
3.50 M CHUTE FALL AT KM 0.893 KM ON SM-3-M-3-D-1

DETAILED MEASUREMEN
S. NO

DESCRIPTION

Unit

No
Top

LEVEL
Bottom

in mts

in mts

Length

Width

Depth /
Height

in mts

in mts

in mts

1.00 Earth work in Excavation


A

Excavation
U/S wing returns
Body wall (2 - 2) to (3 - 3)

At Cistern

D/S wing returns

2.00
2.00
2.00
2.00
2.00
1.00
1.00
1.00
1.00
2.00

170.80
170.80
170.80
170.80
170.80
170.80
170.80
170.80
170.80
170.80

2.00
4.00
1.00
1.00
1.00
1.00
1.00
2.00

169.62
168.51
165.90
165.90
165.90
165.90
165.18
165.33

2.00
3.00

169.47
168.36
167.25
166.14
165.18
165.59
165.67
165.76
165.84
165.18

1.54
2.52
2.52
2.52
2.52
1.00
1.00
1.00
1.66
4.81

0.91
1.41
1.41
1.41
1.41
0.30
0.30
0.30
0.30
1.38

1.33
2.44
3.55
4.66
5.62
5.21
5.13
5.04
4.96
5.62

169.47
168.36
165.59
165.67
165.76
165.84
164.55
165.18

1.54
2.52
1.00
1.00
1.00
1.66
0.23
4.81

0.91
1.41
0.30
0.30
0.30
0.30
0.30
1.38

0.15
0.15
0.32
0.24
0.15
0.07
0.63
0.15

170.80

169.62

1.39

0.51

1.18

168.51
168.51
165.33
169.62
165.90
165.90

2.22

0.76

2.01

2.00
1.00
1.00
1.00

170.80
170.24
167.30
169.85
170.15
166.50

6.88
1.50
13.31
0.30

1.18
1.20
0.30
0.36

1.97
0.23
0.23

2.00
1.00

165.79
165.90

165.59
165.67

-0.35
-0.60

0.29
0.15

0.20
0.24

1.00

165.90

165.75

15.84

0.30

0.15

Hard Soil
Soft Rock
Hard Rock
2.00 Earth Filling
3.00 CC-M15 in Foundation
U/s Wing and Return (sec1-1) Base
Body Wall Sec (2-2), sec(3-3)
At Cistern

2.00

D/s Cut off wall


D/s Wing MinSection (sec 4-4)
4.00 CC- M15 Super Structure
U/s Wing and Return (sec1-1) Trapezoidal
Body Wall (sec2-2, sec3-3)
D/s Wing and Return (sec1-1) Trapezoidal
Apron at crest
apron at chute portion
apron at end sill triangular portion
Deduction
Chute Block
Basin Block

5.00 CC -M 20
Wearing Coat

2.00

1.00
1.00

Indira Sagar Project Canal-Phase III

UWA BRACH CANAL


L AT KM 0.893 KM ON SM-3-M-3-D-1
DETAILED MEASUREMENTS
Quantity

Remarks

in Cum

3.71
17.30
25.19
33.08
39.90
1.56
1.54
1.51
2.47
74.54
200.81
20.08 cum
40.16 cum
140.57 cum
140.57 cum

0.42
4.26
0.09
0.07
0.04
0.03
0.04
1.99
6.96 cum
1.65
20.19
31.91
0.41
0.90
0.11
-0.04
-0.02
55.09 cum

0.71 cum

Name of the Project : Indira Sagar Project Canal-Phase III


KUWA BRACH CANAL
3.00 M CHUTE FALL AT KM 0.450 KM ON M-7-D-1

DETAILED MEASUREMEN
S. NO

DESCRIPTION

Unit

No
Top

LEVEL
Bottom

in mts

in mts

Length

Width

Depth /
Height

in mts

in mts

in mts

1.00 Earth work in Excavation


A

Excavation
U/S wing returns
Body wall (2 - 2) to (3 - 3)

At Cistern

D/S wing returns

2.00
2.00
2.00
2.00
2.00
1.00
1.00
1.00
1.00
2.00

168.15
168.15
168.15
168.15
168.15
168.15
168.15
168.15
168.15
168.15

2.00
4.00
1.00
1.00
1.00
1.00
1.00
2.00

167.02
166.04
163.61
163.61
163.61
163.61
163.08
163.23

2.00
3.00

166.87
165.89
164.90
163.92
163.08
163.34
163.41
163.49
163.57
163.08

1.34
2.52
2.52
2.52
2.52
1.00
1.00
1.00
1.54
4.69

0.88
1.33
1.33
1.33
1.33
0.30
0.30
0.30
0.30
1.35

1.28
2.26
3.25
4.23
5.07
4.81
4.74
4.66
4.58
5.07

166.87
165.89
163.34
163.41
163.49
163.57
162.30
163.08

1.34
2.52
1.00
1.00
1.00
1.54
0.23
4.69

0.88
1.33
0.30
0.30
0.30
0.30
0.30
1.35

0.15
0.15
0.27
0.20
0.12
0.04
0.79
0.15

168.15

167.02

1.19

0.49

1.13

166.04
166.04
163.23
167.02
163.61
163.61

2.22

0.71

1.86

2.00
1.00
1.00
1.00

168.15
167.65
165.15
167.25
167.55
164.40

6.76
1.43
11.77
0.30

1.15
1.13
0.30
0.62

1.92
0.23
0.23

2.00
1.00

163.69
163.81

163.34
163.41

-0.35
-0.60

0.19
0.16

0.35
0.40

1.00

163.61

163.46

14.66

0.30

0.15

Hard Soil
Soft Rock
Hard Rock
2.00 Earth Filling
3.00 CC-M15 in Foundation
U/s Wing and Return (sec1-1) Base
Body Wall Sec (2-2), sec(3-3)
At Cistern

2.00

D/s Cut off wall


D/s Wing MinSection (sec 4-4)
4.00 CC- M15 Super Structure
U/s Wing and Return (sec1-1) Trapezoidal
Body Wall (sec2-2, sec3-3)
D/s Wing and Return (sec1-1) Trapezoidal
Apron at crest
apron at chute portion
apron at end sill triangular portion
Deduction
Chute Block
Basin Block

5.00 CC -M 20
Wearing Coat

2.00

1.00
1.00

Indira Sagar Project Canal-Phase III

UWA BRACH CANAL


ALL AT KM 0.450 KM ON M-7-D-1
DETAILED MEASUREMENTS
Quantity

Remarks

in Cum

3.01
15.09
21.67
28.25
33.82
1.44
1.42
1.40
2.11
64.14
172.36
17.24 cum
34.47 cum
120.65 cum
120.65 cum

0.35
4.01
0.08
0.06
0.03
0.02
0.05
1.90
6.50 cum
1.31
17.69
29.77
0.36
0.79
0.19
-0.05
-0.04
50.04 cum

0.66 cum

You might also like