SBU - ERT PRINCIPES : VERROUILLAGES Guide dApplication - Conception

1 Gnralits : Les verrouillages sont un lment essentiel pour l'exploitation. Ils permettent d'assurer la scurit :

AREVA TD
PRINCIPLES : INTERLOCKINGS Design Application Guide
1 General : The interlocking are essential for the operating They perform conditions to operate in full safety for : operator (operations according to required conditions; prevention of unexpected operation, restricted or forbidden access to dangerous areas ). apparatuses (disconnectors / circuit breaker).

des personnes (manuvres suivant conditions requises ; interdiction manuvres intempestives ; interdiction d'accs certaines zones dangereuses). des matriels (appareillage : sectionneurs / disjoncteurs etc.).

2 Types de verrouillage Verrouillages de scurit (trave & intertraves). Essentiellement bass sur la condition de manuvre hors charge des sectionneurs. Interdiction de manuvrer un sectionneur si le disjoncteur associ n'est pas ouvert. Interdiction de fermer un sectionneur de malt si les sectionneurs ou si le disjoncteur associs ne sont pas ouverts. Interdiction de fermer un sectionneur si le sectionneur de malt associ n'est pas ouvert Interdiction de fermer le disjoncteur si les sectionneurs associs sont en cours de manuvre ou si celle-ci a t interrompue.

2 Interlocking types Safety Interlocking (inside bay & between the bays). They prevent operation of an isolator under load conditions. Not possible to control the disconnectors if the associated circuit breaker is not in open position. Not possible to control the earthing switch if the associated disconnectors or the circuit breaker are not in fully open position. Not possible to close a disconnector if the associated earthing switch is not fully open. Not possible to close the circuit-breaker if the operation of the disconnector is in progress or if the operation is stopped in a intermediate position

Verrouillages d'exploitation incluent Operating Interlocking : Changements de configurations : transferts / changement jdB avec continuit de service Change the configuration of substation : transfer / change busbar without interruption of service Slection des lieux ou niveaux de commande (local / remote / supervisory). Selection of control levels and location of the control (local / remote / supervisory). Critres de disponibilit de l'appareillage (dj etc.) Criteria of available for the apparatuses (CB ) La constitution des verrouillages dpend essentiellement de la configuration du poste et des The interlocking circuits depend of on the circuit options retenues (redondance chanes de configuration of the substation and selected options verrouillages en soft et / ou en logique cble) (redundant functions : interlocking into the soft (DCS) and hardwired circuits) 3 Modes de verrouillages 3 Interlocking Modes Electriques en mode cbl : contacts auxiliaires (directs) ou issus de relais auxiliaires insrs Electric: hardwired circuits from auxiliary contact dans les chanes de commande des appareils. (direct) or issued from repeater relay into control Gnralement on ne prvoit pas de circuits of the apparatuses. verrouillages entre extrmits de ligne Generally no interlocking are provided between (consignes d'exploitation). the two end of the line (operating instructions). Soft : Verrouillages sont raliss dans le system DCS par dclaration quations.

Soft : are performed into DCS system by means of equations.


interlocking.doc REV A page 1 / 4

19/10/2005 16:17

DESIGN DATAS : INTERLOCKING

SBU - ERT PRINCIPES : VERROUILLAGES Guide dApplication - Conception

AREVA TD
PRINCIPLES : INTERLOCKINGS Design Application Guide

Mcaniques : directement par construction (systmes de tringlerie) ou par serrures et cls. L'utilisation de cls est habituelle sur les cellules MT. Ce systme est aussi utilis en HT. pour les appareils commande manuelle et sur des sectionneurs de malt (existence de serrures contact et de boites cls). Certains clients exigent un double systme de verrouillages (lectriques + cls) / scurit du personnel d'exploitation.

Mechanical devices : directly between disconnector & grounding blade (on the mechanism) or by means of the locks and keys. Using of keys is current on the MV cells. This practise is used on HV equipment for apparatuses with manual control and for the earthing switches (locks with contact and key boxes). Some Customers clients require two systems for the interlocking (electric + keys) / safety for the operator.

Manivelle de secours : Insertion de la manivelle coupe toutes les commandes lectriques

Crank : insertion of the crank switch-off all electrical control Other devices : Some disconnectors with manual control are equipped with magnetic bolts to perform electrical interlocking

Autres dispositifs : Certains appareils commande manuelle sont dots de dispositifs de dverrouillage lectromagntique.(fonctionnement mission).

4 Utilisation de relais rptiteurs : Le nombre de contacts auxiliaires sur les appareils HT. est limit technologiquement (voir possibilit maximum avec le fabricant). Dans les AIS ces relais permettent d'conomiser du cblage. Lorsque des relais rptiteurs sont utiliss pour la fonction de verrouillage il convient de prvoir la surveillance de ceux-ci (complmentarit). En cas de dfaillance ("dfaut rptiteur / trave") toute manuvre d'appareil est alors interdite Pour pallier l'indisponibilit il peut tre prvu un commutateur de dverrouillage. L'utilisation de relais rptiteurs doit tre clarifie le plus tt possible avec le client : la remise en cause de cette solution a des consquences dsastreuses en terme de reprise d'tude. 5 Dcompte des contacts : L'attribution et le dcompte des contacts doivent tre fige le plus tt possible avec nos partenaires.

4 Repeat relays : Quantity of the auxiliary contacts is limited (see maximum quantity allowed by the Manufacturer Into AIS substation these relays permit to reduce the cabling. When repeat relays are used for interlocking function it is required to supervise them. In case of failure (repeater relay faulty / bay) the control of the apparatuses is not possible. To keep possibility to control the apparatuses a bypass switch can be provided. The using of repeat relay should be validated as soon as possible by the Customer to avoid some very strong reworks.

5 Quantity for the contacts : The allocation of the contacts and the required quantity should be specified as soon as possible to the Manufacturer.

19/10/2005 16:17

DESIGN DATAS : INTERLOCKING

interlocking.doc REV A page 2 / 4

SBU - ERT PRINCIPES : VERROUILLAGES Guide dApplication - Conception

AREVA TD
PRINCIPLES : INTERLOCKINGS Design Application Guide

DIAGRAM OF CONTACTS
OFF OPENED ON CLOSED MAIN CONTACTS

AUXILIARY CONTACTS TYPE : ac A 1

bo

ao

bc

TABLE FOR QUANTITY OF CONTACTS (EXAMPLE) BUSBAR ISOLATOR Q21 or Q22 ac bo ao bc Interlocking opposite busbar isolator 1 busbar transfert autorisation (alt x) 1 busbar transfert autorisation(alt y) 1 CB (isolators : intermediate position) 1 1 CB :closing in test position 1 Breaker earthing switch 1 CB : transformer maintenance 1 busbar earhing switch 1 Synchronization (repeaters) Other functions (Control) Control discrepancy indication or semaphores (control board) Repeaters (RTU)
Bus bars Protection(High imp) currents Bus bars Protection(High imp) trip circuit

1 1 1 1

1 1 1 3 3 ? ?

Spares for client Manufacturer scheme (BHT) TOTAL

1 ? ?

1 ? ?

? ?

19/10/2005 16:17

DESIGN DATAS : INTERLOCKING

interlocking.doc REV A page 3 / 4

SBU - ERT PRINCIPES : VERROUILLAGES Guide dApplication - Conception

AREVA TD
PRINCIPLES : INTERLOCKINGS Design Application Guide

6 Technique dite de la "double coupure" : Elle consiste pour les sectionneurs insrer les contacts de verrouillage sur la polarit ngative. Cette prcaution permet en prsence d'un double dfaut d'isolement d'viter la manuvre en charge du sectionneur. Certains clients exigent la vritable double coupure qui consiste prvoir les ordres de cde sur les 2 polarits 7 Serrures : L'approvisionnement des serrures sur l'appareillage devrait assur par le Manufacturer Pour les autres serrures, boites cls externes la fourniture est dans le scope Contractor (ERT). 8 Cadenas : Ce sont des organes de consignation permettant la condamnation des appareils. Si exig contractuellement la fourniture est dans le scope Contractor (ERT). 9 Divers : Ne pas oublier de traiter : le verrouillage entre cellule MT et traverses embrochables des transformateurs auxiliaires. les verrouillages BT : arrives / permutation de sources et lments dbrochables.

6 Solution named "double break" : The interlocking contacts must be installed on the negative polarity (C-). In case of double fault on the insulation : this solution avoids the untimely operation of the disconnector under load condition. Some Customers require the full double break with the control order on the two polarities (C+ ; C-)

7 Locks : The Manufacturer should perform the supply of the locks on the apparatuses. For the other locks, key boxes the supply should be performed by the Contractor (ERT). 8 Safety Padlocks : These protective devices are used during maintenance operations ; for isolation of the circuits and locking out-off the apparatuses. If contractual required, the supply is into Contractor scope (ERT). 9 Miscellaneous : Don't forget : the interlocking between MV cell and drawout terminal on the auxiliary transformer. LV interlocking: incomings / drawout equipment.

Further information

19/10/2005 16:17

DESIGN DATAS : INTERLOCKING

interlocking.doc REV A page 4 / 4

SBU - ERT PRINCIPES : POLARITES Guide dApplication - Conception

AREVA TD
PRINCIPLES : DC & AC SUPPLIES Design Application Guide

1 Gnralits :
Les postes lectriques sont subdiviss en tranches HT ou systmes lmentaires dnomms traves. Les diverses configurations HT sont prvues afin dassurer au maximum la continuit de service (limiter les interruptions de service aux seuls circuits considrs).

1 General :
HV substations are subdivided into different sections or an elementary systems named bays. The HV configurations are foreseen to provide the best availability, reliability, maintainability. (interruption of the service is limited at the equipment in failure)

A limage des tranches HT. les polarits sont Same as HV sections, DC supplies are organised & organises et distribues dans chaque tranche BT distributed inside HV bays to allow reliability and avec lobjectif de satisfaire aux exigences de fiabilit availability. et de disponibilit. 2 Dfinition des Polarits : Circuits tablis dans chaque tranche pour constituer lalimentation fonctionnelle en courant CC ou CA des diffrents circuits de controle-cde et de supervision : Polarits de tranche / trave Polarits communes / tranche gnrale 2 Dfinition of DC & AC supplies : These efficient circuits supply the different functions of control, supervision, signalling. DC supply for each bay Common DC supplies / General Section

3 Formation des Polarits


Les alimentations sont issues des diffrentes sources CC & CA et sont distribues depuis les tableaux de Services Auxiliaires. Les polarits CC sont formes avec des MCB installs dans chaque tranche (trave / diamtre / coupure) Le rgle de base pour la conception est dorganiser la formation de toutes les polarits et la distribution des barres gnrales en un seul point : Tableau de Commande ou de Relayage. Ce point unique permet la consignation de toute la tranche BT et les oprations de maintenance peuvent tre ralises en toute scurit La sous-distribution toutes les armoires de la tranche est assure depuis ce point en vitant dinstaller tout organe de protection ou de coupure en aval (exception armoire locale GIS avec cration de polarits contrles)

3 Formation des Polarits


The DC supplies are issued from the supplies and distributed from DA & AC Distribution Boards DC supplies are performed with some MCB's installed into each bay (bays, diameters, cut-off)

The basic rule for the design is to organise the distribution of the DC supplies and the common buswires from only one location : Control board or Relay Cubicle. This intentional point permits the complete isolation of the LV section and the maintenance operations can be carried out safely The distribution to all cubicles of the bay is performed from this point. No protection or break devices are foreseen at the downstream (except GIS Local Control Cubicle where the supplies are supervised)

Further information

Ce document est usage du bureau d'tudes (A Adapter avant transmission au Client) This document is only for use by the design office (modify before Client transmission) Adapter pour transmisssion au Client / Modify before transmisssion to the Client Le terme POLARITY n'a pas le mme sens qu'en Franais : utiliser DC SUPPLY

19/10/2005 16:08

DESIGN DATAS : DC & AC Supplies

dc_ac_supplies.doc REV A page 1 / 4

SBU - ERT PRINCIPES : : POLARITES Guide dApplication - Conception

AREVA TD
PRINCIPLES : DC & AC SUPPLIES Design Application Guide

Certains clients (EDF ; SCECO .) exigent que les polarits soient formes dans les tableaux de distribution SA. Cette configuration induit un surcot important : quantit disjoncteurs x 2 (pour 2 sources CC) fourniture de disjoncteurs botier moul (dans SA) au lieu de MCB La pratique Anglo-Saxonne consiste installer des fusibles ou MCB pour former les polarits leur point d'utilisation. 4 Consignation- Scurit : La localisation en seul point de la formation des polarits et de la distribution des barres gnrales a pour objectif de faciliter la consignation de la tranche (isolation et sparation des circuits) Le personnel d'intervention habilit pour l'entretien et la maintenance peut intervenir en toute scurit. L'implantation judicieuse des MCB et des bornes interruptibles associes aux barres gnrales (sur le mme profil) constitue un dispositif de consignation de tranche (analogue ICT & ICS d'EDF). Il convient d'identifier clairement les barres gnrales qui ne doivent pas tre coupes (ncessaires pour la continuit de service des autres tranches. L'attention du personnel d'exploitation et de maintenance doit tre attire par des tiquettes. Exemple : verrouillages inter-traves etc. 5 Contrle des Polarits Les polarits sont gnralement contrles leur point de formation. Il est parfois exig que le contrle soit effectu le plus en aval possible afin de contrler la filerie. Cette disposition prsente un intrt limit ; surtout en cas de sous-distribution radiale. Exception faite des relais manque tension, il est peut tre utile de rappeler que la supervision d'une polarit est effectuer partir d'une autre polarit (au mme titre qu'une source est contrle depuis une autre source : croisement entre systmes batteries 1 & 2).

Some Clients (EDF ; SCECO) require that DC supplies are performed into the auxiliary distribution board This configuration induces an important extra cost quantity of CB x 2 (for the 2 DC systems) supply of some moulded circuit breaker (into Distribution Board) instead MCB's Some practises require the installation of fuses or MCB's to perform the DC supplies near the consumers. 4 Electrical Isolation Safety : The location at only one point of the DC supplies and the common buswires makes easy the electrical isolation and the separation of the circuits. The authorised operating and maintenance personnel can work safely.

The installation of the MCB's and the disconnect terminal blocks on the same rail makes an isolating device (analogue to ICT & ICS switches - EDF practise). It is necessary to identify the common buswires should be not broken to perform the service continuity on the other bays. Some labels shall be provided to inform the operating and maintenance Example : Interlocking between bays etc. 5 Supervision of DC supplies The DC supplies are generally supervised at their origin (downstream of the MCB's). Sometimes the supervision is required at the end of the circuits (for wiring supervision) This solution is not interesting because it is incompatible possible with a radial distribution. Except for no relays with lack of voltage, reminder that the supervision shall be performed by an other DC supply (in the same spirit the system 1 is supervised by the system 2 and vice et versa)

Further information

19/10/2005 16:08

DESIGN DATAS : DC & AC Supplies

dc_ac_supplies.doc REV A page 2 / 4

SBU - ERT PRINCIPES : : POLARITES Guide dApplication - Conception

AREVA TD
PRINCIPLES : DC & AC SUPPLIES Design Application Guide

5-1 Spcificits Polarits CC : La disponibilit des polarits CC est indispensable pour assurer la conduite de la tranche : Il est recommand d'assurer la surveillance de chaque polarit par un relais auxiliaire tout ou rien. Cette supervision n'est pas ncessaire si le contrle est dj ralis dans le systme de protection ou DCS. L'utilisation de relais temporis ou de mesure n'est pas indispensable puisqu'il n'y a pas de microcoupure ou creux de tension en CC, de plus la tension chargeur / batterie fait l'objet d'une surveillance spcifique. La surveillance par contact de dfaut ou de position du MCB n'est pas conomiquement intressante puisque l'on est oblig de relayer pour dcoupler l'information. Ne pas prvoir de contact sur MCB (conomie substantielle : 50% cot MCB) 5-1 Spcificits Polarits CA En opposition avec les circuits CC la surveillance peut tre assure par un contact de dfaut du MCB (ouverture non volontaire) associ un relais de dcouplage. Pour les circuits triphass la dtection par 2 relais TOR n'est pas fiable (absence tension sur la phase constitue qui un point milieu : les relais ne retombent pas). 6 Principales polarits : Polarits de commande Polarits de dclenchement & alimentation des systmes de protection 1 & 2 Polarits de signalisations et d'alarmes Polarits gnrales de verrouillage Polarits pour protection dfaillance disjoncteur Polarits pour surveillance pression SF6 7 Cas Special : Postes avec 2 voies de dclenchement sur disjoncteurs alimentes par 2 systmes CC diffrents et un seul systme de protection : L'alimentation auxiliaires des protections est prvoir par l'ensemble des 2 polarits en secours l'une de l'autre (voir diagram).

5-1 DC supplies : Paticular The availability of DC supplies is indispensable for the operation of each bay. It is recommended to supervise with an instantaneous auxiliary relay. This supervision is not necessary when the function is performed into the protection system or into the DCS system Time delay relay are not indispensable to perform this supervision

The check by an auxiliary contact on the MCB's (position or fault) is not economical because a relay should be provided to distribute the information No provision of the auxiliary contact on the MCB (saving 50 % cost of MCB) 5-2 AC supplies : Paticular At the opposite of the DC circuits the supervision can be issued from an auxiliary contact on the MCB (tripping on fault). In this case On the three phase circuit the supervision by 2 all or nothing relays is not active (in case of lack voltage on the median phase : the relays do not release)

6 Main DC supplies : Control Tripping Circuits System 1 & 2 & Protection systems. Alarm processing & Signalling Circuits. General Interlocking Breaker Failure & Busbar Protection SF6 Supervision 7 Special Case: Substations with 2 tripping ways on the CB and 2 DC systems and only one protection system : The auxiliary supplies for the protections shall be issued from the 2 DC system (back-up system). (see diagram)

Further information

19/10/2005 16:08

DESIGN DATAS : DC & AC Supplies

dc_ac_supplies.doc REV A page 3 / 4

SBU - ERT PRINCIPES : : POLARITES Guide dApplication - Conception


Diagram
T1+ T2+ T1+ / - : Trip supply circuit 1 T2+ / - : Trip supply circuit 2

AREVA TD
PRINCIPLES : DC & AC SUPPLIES Design Application Guide

Protections Auxiliary Supplies

T2T1-

8 Barres gnrales Elles sont constitues pour : Assurer la sous-distribution de polarits Regrouper des informations qui ont un caractre commun Distribuer des ordres de commande dlivrs par le process gnral, ou des interdictions. Parmi les barres gnrales : les sous-polarits font l'objet de dispositifs de sectionnement pour assurer la consignation . Sur les autres barres, il n'est gnralement pas prvu de bornes sectionnables, ainsi que sur les polarits indispensables la conduite de l'ouvrage. Certaines barres sont cres directement pour l'exploitation. Exemple : mise en service ou hors service des signalisations et alarmes en local lorsque le poste est exploit depuis le dispatching. Aprs tout dispositif de sectionnement ou de coupure ; la polarit ou barre gnrale change de nom (incrmente d'un indice). 9 Conclusion : La conception des polarits a une incidence importante sur la fiabilit et la disponibilit du poste. La structure des polarits influe sur le relayage (dcouplage) et sur le cblage (sparation des circuits) ; donc sur les cots matriels. Il convient de trouver le compromis permettant d'assurer au mieux la continuit de service tout en vitant l'inflation sur le nombre de polarits.

8 Common Buswires Elles sont constitues to perform : The sub-distribution of DC supplies The grouping of the common informations The distribution of control orders given by the general process or the blocking order.

The DC supplies issued from common buswires are distributed through disconnecting terminal blocks to permit isolation & separation of the circuits The other buswires and the essential supplies are not sectionalised

Some buswires are directly used for the operation. Example: Signalling & Alarms switched off during operation from the dispatching. After the disconnecting device the name of the DC supplied is changed (ex : C+ becomes C1+)

9 Conclusion : The design for the DC supplies and the common buswires is very important for the availability and reliability. This structure has an influence over the schematic diagram and the cabling (separation of the circuits) and on the cost of the equipments. It is important to find the better solution for availability, reliability, maintainability, but it is necessary to avoid the increase of quantity of supplies

Further information

19/10/2005 16:08

DESIGN DATAS : DC & AC Supplies

dc_ac_supplies.doc REV A page 4 / 4

SBU - ERT PRINCIPES SYNCHRONISATION Conception : Guide dApplication

AREVA TD
SYNCHRONISATION Design Application Guide

1 Gnralits : Dans les postes d'interconnexion, par opposition aux postes de centrale, il n'est pas possible d'adresser des ordres de rgulation (+ / - vite pour la frquence ; + / - U sur l'excitation. Par synchronisation il faut comprendre contrle de synchronisme (cart tensions / frquences / dphasage). 2 Circuits de synchronisation se dcompose en 2 circuits :

1 General: In HV substations (except power substations) there is not possible to send some orders for regulation (+ / - speed for the frequency; + / - U on the excitation. In fact the synchronisation is only the checking of the synchronism (voltage / frequency / phasing angle). 2 Synchronising circuits 2 independent circuits are provided:

Circuit mesure : consiste aiguiller les circuits tensions Measuring circuits : voltage circuits issued from the issus des capteurs de mesure afin de comparer la VT's are switched according to substation configuration tension synchroniser avec la tension de rfrence. to compare incoming voltage to reference voltage. La pratique courante dans les postes d'interconnexion The current practise in HV substations is to perform the maills est d'effectuer des mesures en tension simple measure between phase & neutral (Ph to N). (phase / neutre) Certains Client (postes de centrale) exigent une Some customers (power substations) require the synchronisation entre phases qui permet de vrifier synchronisation between phases for checking the phase l'ordre de succession des phases. Cette pratique n'tant succession. This practise can be incompatible with the pas toujours compatible avec les systmes DCS, il DCS system ; the validation of the scheme shall be with convient de faire valider formellement la solution the Client retenue. La structure des circuits de synchronisation est Synchronising circuits is adapted to the configuration of adapter suivant la configuration du poste et the substation and the location of the VT's. (direct l'implantation des VT. (circuits directs ou fantmes) circuits or picture circuits) Circuit logique : dlivre les autorisations de fermeture au disjoncteur(s) en les asservissant aux conditions de non-dfaut (fusion fusible VT / dclenchement MCB). 3 Modes de synchronisation Mode manuel L'oprateur par aiguille avec un commutateur de synchro cl aiguille les tensions vers une colonne de synchro (voltmtre double, frquencemtre double, synchroscope avec lampes). Lorsque les appareils indiquent que les conditions sont satisfaisantes l'oprateur initie l'ordre de fermeture Le terme synchro manuelle est un peu abusif car la validation est souvent dlivre par un check synchro ddi cette fonction. Mode automatique : L'autorisation d'enclenchement est dlivre directement par le contrle de synchronisme intgr dans le systme DSC ou par un check synchro associ au disjoncteur commander. Le contrle de synchronisme est galement oprationnel lors des phases automatiques de renclenchement triphas lent. La fonction est ralise soit par le systme protection soit par un check synchro peut tre externe. Further information Logic circuits: give the closing authorisation to the CB This authorisation includes the checking of the VT's circuits (no MCB tripping or no fuse blowing). 3 Modes de synchronisation Manuel mode With the key synchro switch, the operator selects the voltage & switches on the synchronising column (double voltmeter, double frequency meter, synchroscope with lamps) When the instruments display satisfied conditions, the operator can give the closing order. Manual synchro is an excessive term because the authorisation is often given by a check synchro (dedicated to this function). Automatic mode: The closing authorisation is given by the check of the synchronisation inside the DCS system or by the check synchro provided for each circuit breaker.

The check of the synchronisation is operative during the autoreclosing cycles (3 phases ; low speed) The function is performed inside the protection relay or by an external check synchronising relay.

19/10/2005 15:38

DESIGN DATAS : SYNCHRONISATION

synchro.doc REV A page 1 / 3

SBU - ERT PRINCIPES SYNCHRONISATION Conception : Guide dApplication

AREVA TD
SYNCHRONISATION Design Application Guide

4 Lieux de commande / Synchronisation Gnralement le contrle de synchronisation est effectu Mode manuel : depuis la salle de commande (remote)

4 Location of Control / Synchronisation Generally the check of the synchronism is performed Manual mode : from the control room (remote)

Mode automatique : depuis la salle de commande Automatic mode : from the control room Human Human Machine Interface (HMI) avec la position remote Machine Interface (HMI) with the selector switch on slectionne ou depuis le dispatching avec la position remote position or from the dispatching with the selector "supervisory" slectionne. switch on supervisory position. Dans les postes AIS la fermeture du disjoncteur en local depuis l'armoire de commande du disjoncteur n'est gnralement pas associe un contrle de synchro. Cette commande est utilise pour la maintenance et les essais : Le disjoncteur est ferm vide avec les sectionneurs encadrant ouverts). Dans les postes GIS la fermeture du disjoncteur depuis l'armoire locale peut tre associe au contrle de synchro effectu dans le systme DCS. La commande de fermeture du disjoncteur vide (sectionneurs ouverts) est ncessaire pour la maintenance et les essais. Dans tous les cas le dclenchement est libre pour autant que le lieu de commande soit slectionn. 5 Conception des circuits tension In AIS substations the closing of the CB from the local control cubicle is seldom performed with a check of the synchronism This control is used for the maintenance operations & for the tests : the CB is closed at no load conditions with the disconnectors in open position. In GIS substations the closing of the CB from the local control cubicle can be performed with the check of synchronism present into the DCS system The closing of the CB at no load conditions (with the disconnectors in open position) is necessary for the maintenance operations & for the tests. The tripping of the CB is always possible. Requirement : This control level should be selected. 5 Design of the voltage circuits

Un soin tout particulier doit tre apport afin d'viter Particular caution shall be brought to avoid the absolument la mise en parallle de VT (erreurs / possibilit establishment of parallel circuits on the VT's (mistakes / de rinjection de HT par la BT). HV voltage supply from the LV circuits). Le dispositif de protection doit tre prvu le plus prs possible des VT. Certains clients exigent mme l'implantation des fusibles dans la boite bornes des VT. La tendance fournir des coffrets de regroupement des circuits tension implant sur le chssis support s'estompe au profit de l'installation de MCB dans l'armoire de trave. Il est impratif d'implanter cette armoire proximit des VT (rduire la longueur de cble non protge). Le dispositif de protection doit tre dimensionn pour une limination rapide du dfaut permettant d'assurer le verrouillage de la protection de distance lorsque le circuit tension est commun avec celui de la protection de distance (ex MCB courbe Z). 6 Critres rseau mort (dead line / dead busbars) : L'autorisation d'enclenchement est galement dlivre sur l'un de ces 2 critres pour permettre d'effectuer le renvoi de tension depuis le poste ou la ralimentation du poste. The protection of the VT's secondary circuits should be located near the VT's. Some Clients require the installation of the fuses into the LV terminal box. The installation of marshalling box on the support is not an economical solution. It is preferable to install some MCB into bay marshalling cubicle. The bay marshalling cubicle should be located near the VT's to reduce length of the cable without protection. MCB shall be designed to perform the speed elimination of the fault and the blocking of the distance protection when the voltage circuit is common. In this case use some one pole MCB's with Z curve.

6 Network criteria's (dead line / dead busbars) : The closing authorization should be given from the criteria "dead line" or from the criteria "dead busbars". These functions permit to perform the re-energization of the line or the of the substation

Further information

19/10/2005 15:38

DESIGN DATAS : SYNCHRONISATION

synchro.doc REV A page 2 / 3

SBU - ERT PRINCIPES SYNCHRONISATION Conception : Guide dApplication

AREVA TD
SYNCHRONISATION Design Application Guide

Le choix d'un de ces 2 critres permet de dfinir le cot prioritaire pour le renclenchement des lignes. Note : il est indispensable qu'au moins une des deux tensions soit prsente pour dlivrer l'autorisation d'enclenchement au disjoncteur. 7 Surveillance du dispositif de protection :

The choice of one of the two criteria's defines the priority side of the line for the autoreclosing. Note : The presence of one of the two voltages is required to give the closing authorisation to the circuit breaker.

7 Supervision of the protective device :

Le dclenchement des MCB au secondaire des VT (ou la The tripping of the MCB's on the VT's secondary circuits fusion fusible) ne doit pas tre interprt comme un critre (or fuses blowing) shall be not estimated as a dead voltage absence tension (rseau mort). criteria Afin de d'viter de dlivrer une autorisation intempestive d'enclenchement il y a lieu de prvoir un schma scurit positive (chane ouverture) bloquant toute autorisation d'enclenchement en prsence d'un dfaut au secondaire des VT. To avoid the wrong closing order, it is required to perform a scheme with positive safety. When a fault occurs on the secondary VT's circuits the closing authorisation is blocked.

Further information

19/10/2005 15:38

DESIGN DATAS : SYNCHRONISATION

synchro.doc REV A page 3 / 3

SBU - ERT TRANSFORMATEURS DE COURANT ORIENTATION

AREVA TD

CURRENT TRANSFORMER ORIENTATION Guide dApplication - Conception Design Application Guide


1- REGLE DE BASE : La norme IEC (60044-1) prconise que la borne secondaire S1 soit du cot P1. 10-1-3 stipule que les bornes P1 et S1 doivent avoir tout instant la mme polarit. 2- IMPOSITIONS TECHNOLOGIQUES : Les TC type "inverss" installs dans les postes extrieurs sont munis d'crans mtalliques relis au P2 pour la rpartition du champ lectrique. Pour absorber les courants HF produits par la manuvre des appareils il est ncessaire que le P2 soit orient cot ligne. Cet impratif a introduit la rgle "Cogelex" prconisant l'installation du P1 cot disjoncteur. 3- DISPOSITIONS DANS POSTES GIS : Les TC sont souvent rpartis de chaque ct du disjoncteur. Sur les TC multi-ratios o la borne commune n'est pas le S1 mais le S3 (ou S4 ou le S5) ; la rgle P1 cot disjoncteur devient antagoniste avec la volont de fixer au potentiel de malt la borne secondaire commune ( et par ailleurs que cette malt soit situe cot zone protger). 4- NOUVELLE REGLE : Afin de concilier tous les impratifs et ne pas remettre en cause les standards de fabrication la formulation de la rgle devient P2 cot ligne ce qui se traduit : 4-1 POSTE 1 OU 2 JEUX DE BARRES : P1 cot jeu de barres quelque soit la position des TC. Dans le cas ou l'ensemble des TC est en aval du DJ : le P1 se retrouve cot DJ. Dans le cas ou les TC sont rpartis de chaque cot du DJ : le P1 se retrouve cot DJ pour les TC en aval mais pour les TC situs entre le JDB et le DJ c'est le P2 qui se retrouve cot DJ. 4-2 POSTE A 1,5 DISJONCTEUR : P1 cot disjoncteur. Chaque cut-off devant tre orient de telle sorte que le P2 soit ct drivation. 5- DOMAINE D'APPLICATION Ces rgles s'appliquent en l'absence d'exigences spcifiques. Pour les TC hors de notre scope rechercher quelle est borne commune. 1- BASIC RULE : Standard IEC (60044-1) requires that secondary terminal S1 should be located same side that P1 10-1-3 specifies that P1 and S1 shall have the same polarity at the same instant 2- TECHNICAL REQUIREMENTS CT's installed into the AIS substations have some metallic screen connected to the P2 for share the electric field. It is required that the primary terminal P2 shall be installed on the side of the line. This requirement had introduced the old rule : installation of the P1 on the side of circuit breaker. 3- CONFIGURATION GIS SUBSTATION : Sometimes the CT's are installed on each side of the Circuit breaker On the multi-ratios CT's, when the common terminal is not the S1, but S3 (or S3 or S5), The rule P1 on the side of the circuit breaker is incompatible with the necessity to ground the earth the common terminal

4- NEW RULE : The general rule becomes : terminal P2 installed on the side of the line with the further explanation :

4-1 ONE OR TWO BUSBAR CONFIGURATION P1 is always on the side busbars (whatever the CT's location) When the CT's are installed at the downstream of the CB : P1 is on the side of the CB When the CT's are installed on each side of the CB : : P1 is on the CB side for the CT's installed at the downstream of the CB but P2 is side CB for CT's located between the busbar and the CB. 4-2 1 & CB CONFIGURATION P1 is on the CB side. Each cut-off should be arranged to have P2 on the side of the derivation. 5- SCOPE When no specific requirement, these rules are applicable. For CT's not into the scope of the supply it is necessary to identify the common terminal

Further information

19/10/2005 15:56

DESIGN DATAS : CT's

cts_circuits.doc REV A page 1 / 1