Professional Documents
Culture Documents
S no
1.0 2.0
2.1 2.2 2.3
Description
PROJECT HIGHLIGHTS INTRODUCTION NEED FOR THE PROJECT
Power scenario Objectives of the Project Study Government Policy for Power Generation / Requirement of input/clearance
3.0
3.1 3.1.1
4.0
4.1 4.2 4.3 4.3.1 4.3.2 4.3.3 4.3.4 4.3.5 4.3.6 4.4 4.5
5.0
Page No 4 6 8 8 12 16 19 19 19 19 19 20 20 20 20 20 21 21 22 22 22 24 25 26 26 26 27 27 28 29 30 30
6.1
MECHNICAL SYSTEMS
31
Plant Water System Ventilation and Air conditioning System Fire Protection System General Stores
6.2
6.2.1 6.2.2 6.2.3 6.2.4 6.2.5 6.2.6 6.2.7 6.2.8 6.2.9 6.2.10 6.2.11 6.2.12
ELECTRICAL SYSTEM
Basic Design Concept Power Evacuation 132 KV Switchyard Bays Station Step-up Transformer Utility Transformer Switchgears Protection Control Room DC System Power and Control Cables Grounding & Lighting Protection Lighting
CONTROL AND MONITORING SYSTEM CIVIL & STRUCTURAL WORKS PLOT PLAN AND GENERAL ARRANGEMENT
Plot Plan General Arrangement ENVIRONMENTAL PROTECTION CONSIDERTATIONS ENVIRONMENTAL ASPECTS 8.2 8.2.1 8.2.2 CDM (Clean Development Mechanism) Assessment of CDM Eligibility CDM project cycle
8.0
8.1
9.0
9.1 9.2 9.3 9.4
10.0
10.1 10.2 10.3 10.4 10.5 10.6
31 31 32 32 33 33 34 34 34 35 35 36 37 37 37 38 38 39 40 43 43 43 44 44 45 45 45 48 48 48 49 49 50 50 51 51 52 52 52
LIST OF ANNEXURES
District Map & Identified site for power Plant Maps Solar Irradiation Analysis Single Line Diagram GA of Solar PV Panel and Structural drawing Finance report
Nearest Town State High way Nearest railway Station Nearest Sea Port Nearest Air Port Longitude Latitude 5. Metrological Data :
: Km : KM : KM : KM : Km : E, :N
6.
Land Availability
7. 8. 9. 10. 11.
Energy Resource Power Evacuation Project Schedule Total Project Cost Levelised Tariff
: : : : :
Solar Light Energy State Grid System 12 Months wef Zero date* Crores Rs.