1 x xx MW SOLAR PV POWER PLANT INDEX

S no
1.0 2.0
2.1 2.2 2.3

Description
PROJECT HIGHLIGHTS INTRODUCTION NEED FOR THE PROJECT
Power scenario Objectives of the Project Study Government Policy for Power Generation / Requirement of input/clearance

3.0
3.1 3.1.1

SELECTION OF SITE & LEAST COST OPTIONS


SITE SELECTION CRITERIA Techno - Economic

3.1.2 Infra Structure Logistics 3.1.3 Environmental Considerations


3.2 3.2.1 3.2.2 3.2.3 3.2.4 3.2.5 3.2.6 LOCATION AND SITE DETAILS Location of the site Availability of land Solar Insolation level Availability of Water Power Evacuation Environmental Considerations

4.0
4.1 4.2 4.3 4.3.1 4.3.2 4.3.3 4.3.4 4.3.5 4.3.6 4.4 4.5

SELECTION OF TECHNOLOGY & UNIT SIZE


Basics of Solar Power PV Technology Solar Thermal Power Generating Technology Parabolic Trough System Solar Tower with Central Receiver Parabolic Dish Systems Linear Fresnel Collectors Integration with Power Cycles Thermal Storage Selected Technology for this Project Selection of Unit Size

5.0

MAIN PLANT AND EQUIPMENT 5.1 SYSTEM DESCRIPTION

Page No 4 6 8 8 12 16 19 19 19 19 19 20 20 20 20 20 21 21 22 22 22 24 25 26 26 26 27 27 28 29 30 30

6.1

MECHNICAL SYSTEMS

31

6.1.1 6.1.2 6.1.3 6.1.4

Plant Water System Ventilation and Air conditioning System Fire Protection System General Stores

6.2
6.2.1 6.2.2 6.2.3 6.2.4 6.2.5 6.2.6 6.2.7 6.2.8 6.2.9 6.2.10 6.2.11 6.2.12

ELECTRICAL SYSTEM
Basic Design Concept Power Evacuation 132 KV Switchyard Bays Station Step-up Transformer Utility Transformer Switchgears Protection Control Room DC System Power and Control Cables Grounding & Lighting Protection Lighting

6.3 6.4 7.0


7.1 7.2

CONTROL AND MONITORING SYSTEM CIVIL & STRUCTURAL WORKS PLOT PLAN AND GENERAL ARRANGEMENT
Plot Plan General Arrangement ENVIRONMENTAL PROTECTION CONSIDERTATIONS ENVIRONMENTAL ASPECTS 8.2 8.2.1 8.2.2 CDM (Clean Development Mechanism) Assessment of CDM Eligibility CDM project cycle

8.0
8.1

9.0
9.1 9.2 9.3 9.4

EXECUTION AND MANAGEMENT


Construction Operation & Maintenance Training of O&M Staff Completion Schedule

10.0
10.1 10.2 10.3 10.4 10.5 10.6

COST ESTIMATES AND FINANCIAL ANALYSIS


Capital Cost Estimates Financing of Project Interest During Construction Working Capital Completion Schedule Cost of Generation

31 31 32 32 33 33 34 34 34 35 35 36 37 37 37 38 38 39 40 43 43 43 44 44 45 45 45 48 48 48 49 49 50 50 51 51 52 52 52

LIST OF ANNEXURES

3.1 3.2 6.1 7.1 10.1

District Map & Identified site for power Plant Maps Solar Irradiation Analysis Single Line Diagram GA of Solar PV Panel and Structural drawing Finance report

PROJECT HIGH LIGHTS


1. 2. 3. 4. Project Promoters Plant Capacity Location : : : : MW Solar PV Power Plant M/s Pvt. Ltd. MW

Nearest Town State High way Nearest railway Station Nearest Sea Port Nearest Air Port Longitude Latitude 5. Metrological Data :

: Km : KM : KM : KM : Km : E, :N

Ambient temperature (Annual Mean) a) b) c) d) Minimum Maximum :0C : 0C

Annual rain fall : mm Average relative: % Humidity :

6.

Land Availability

i) Main Plant and Equipment

7. 8. 9. 10. 11.

Energy Resource Power Evacuation Project Schedule Total Project Cost Levelised Tariff

: : : : :

Solar Light Energy State Grid System 12 Months wef Zero date* Crores Rs.

* Zero Date: The Date of Signing PPA with