SECTION 02735 SEWAGE TREATMENT PLANT

00000000PART 1 GENERAL 1.1. SECTION INCLUDES A. Design, supply, installation, testing and commissioning sewage treatment plant as shown on drawings and specified herein, complete with tanks, equipment, pipework, controls, instrumentation, wiring and other related civil, mechanical and electrical works.

1.2.

SCOPE OF WORK A. Sewage treatment plant shall be supplied and installed by a specialized Contractor approved by the Engineer. The plant components can be all above ground or underground. Incase of underground plant selected, submersible aerators shall be used. Sewage treatment plant Contractor shall be fully responsible for design, supply, installation, and testing and commissioning of complete sewage treatment works from sewage lift station to treated effluent tanks (irrigation) and irrigation pumps (both inclusive), and the equipment shelter as required. The Contractor shall be responsible for civil, mechanical and electrical (power, lighting, panel boards and controls) works for the proposed sewage treatment facility. Contractor's design for all sewage treatment works including equipment, lift station, tanks and equipment shelter shall be subject to approval of the Engineer. Contractor shall follow the recommendations of Soil Investigation Report (available with the Owner) for the design of foundations for tanks, lift station and pump house or equipment shelter. Capacity of sewage treatment plant shall be as shown on drawings. Sizing of the plant as shown on drawings is for guidance only and for bidding purposes. Sewage treatment plant Contractor shall coordinate closely with other Contractors for works and requirements affecting sewage treatment system.

B.

C. 1.3.

0REFERENCES A. SASO Saudi Arabian Standards Organization SASO 1011 SASO 1395 SASO 1396 SASO 1397 SASO 1398 Black and hot-dipped galvanized steel pipes suitable for screwing. Unplasticized polyvinyl chloride (uPVC) pipes for buried/drains and sewers. Methods of testing unplasticized polyvinyl chloride (u PVC) pipes for buried/drains and sewers. Unplasticized polyvinyl chloride (u PVC) pipe fittings for buried/drains and sewers. Methods of test for unplasticized polyvinyl chloride (u PVC) pipe fittings for buried/drains and sewers.

ITCC in Riyadh Residential Complex J10-13300

02735-1

Sewage Treatment Plant

SASO 412 SASO 413 B.

Method of Testing for Cast Iron Manhole Covers Cast Iron Manhole Covers.

ASTM - American Society for Testing and Materials ASTM A 105/A ASTM A 106 ASTM A 193/A ASTM A 194/A ASTM A 570 ASTM D 1785 ASTM D 2564 Forgings, Carbon Steel, for Piping Components Seamless Carbon Steel Pipe for High-Temperature Service Alloy-Steel and stainless Steel Bolting Materials for HighTemperature Service Carbon and Alloy-Steel Nuts for Bolts for High-pressure and High- Temperature Service Steel Sheet and Strip, Carbon, Hot-Rolled, Structural Quality Specifications for Poly(Vinyl Chloride) (PVC) Plastic Pipe, Schedules 40, 80, and 120 Specifications for Solvents Cements for Poly(Vinyl Chloride) (PVC) Plastic Pipe and Fittings

C.

ANSI - American National Standard Institute ANSI B16.5 Steel Pipe Flanges and Flanged Fittings

1.4.

DESIGN RESPONSIBILITY A. Provision of sewage treatment plant shall include design, construction, testing, commissioning, training of personnel by Contractor for all works as mentioned in scope of work within the area, including the necessary interface of services required for proper operation of the sewage treatment plant. Calculations and drawings for the proposed plant and associated construction work shall be submitted to the Engineer for review and approval. Manufacturing shall not start until the design has been approved by the Engineer and proposed alterations have been agreed. Design of sewage treatment plant shall be in accordance with the following: 1. 2. 3. Water Pollution Control Federation Manual of Practice No. 8 ASCE Manual of Engineering Practice No.36 Or equivalent Codes and Standard approved by the Engineer.

B.

C.

4.

0Contractor shall make allowance for climatic and environmental conditions of location with regard to treatment plant performance and impact on surrounding areas.

1.5.

WARRANTY
02735-2 Sewage Treatment Plant

ITCC in Riyadh Residential Complex J10-13300

A.

Sewage treatment plant and the related equipment specified herein shall be guaranteed against defects for one year starting from the date of substantial hand over.

PART 2 - PRODUCTS 2.1. 0SEWAGE TREATMENT PLANT A. General: 1. Contractor shall design, supply, install, test and commission sewage treatment plant as shown on drawings and as specified herein complete with the interconnecting piping and electrical wiring, panel boards, control panels and instrumentation. Sewage treatment plant shall comply with the requirements specified herein as well as the relevant Sections of the Specifications. All the pumps, except for chlorine dosing pumps, shall be from single manufacturer.

2. 3. B.

0General Requirements: 1. The sewage treatment plant shall be designed for average daily flow as required and as indicated on drawings. The treatment plant will be designed for domestic sewage purification and utilize the extended aeration process. The following is a list of the treatment units to be incorporated: a b c d Odor control Electromagnetic flow meter Comminutor and bar screen Aeration tank, settlement tank and sludge holding tank with air diffusers, air heater, sludge scrapper drive, scum box, baffle plates, effluent weirs, trough, sludge return line, bridge walkway with handrail and ladders. Air blowers Chlorination injection system Feed and backwash pumps Sand filter Carbon filter Irrigation tanks Irrigation pumps Control panel

2.

e f g h i j k l

3.

Performance: The system will be designed to treat the domestic sewage wastewater. The influent waste water shall flow by gravity into the main lift station. The raw sewage from the main lift station shall be pumped to the treatment plant. The treated wastewater shall be of quality suitable for irrigation of landscaped areas.

ITCC in Riyadh Residential Complex J10-13300

02735-3

Sewage Treatment Plant

4.

Scope of Work: a b c d e All associated civil works Any item not specifically described herein and required for complete operation of the plant. Consumables such as spare parts (for two years of operation) Contractor shall provide water, power, chemicals, lubricants and fuel during construction, commissioning and guarantee period. The contractor shall be responsible for design, supply, delivery to site, installation, testing supervision and commissioning of the sewage treatment plant

C.

Process Description 1. The raw sewage flow shall be discharged freely into the lift station. The lift station will also act as a break tank (i.e. it will store any excess sewage during periods when the flow from the sewer exceeds the maximum design flow to the sewage treatment plant). Submersible grinding sewage pumps in the lift station shall be actuated by level switches and deliver the sewage to the extended aeration plant, which is located above ground. The pumped flow of raw sewage arrives at the extended aeration plant via the comminutor/bar screen arrangement, which shreds and holds debris that otherwise may cause blockages. The bar screen is housed in the bar screen box. The screened sewage discharges into the aeration chamber where it is mixed with recycled activated sludge (a mixture of natural aerobic microorganisms). For purification to proceed the mixture must be agitated to prevent settlement and aerated to supply oxygen for the respiration of the micro-organisms. Both agitation and oxygen are provided by the aeration system comprising air blowers delivering via an air manifold to diffusers, which release the air near the floor of the aeration chamber. The micro-organisms remove the organic materials from the sewage and multiply to greater numbers. This increase in number of micro-organisms results in excess activated sludge which requires occasional disposal. When biological reaction is complete the mixed liquor flows to the settlement chamber where the velocity is reduced by baffles and the activated sludge separated from the secondary effluent during a period of quiescent settlement. The secondary effluent discharges from the plant via an over flow weir, and part of the settled sludge is pumped back to the aeration chamber to treat more sewage where the balance is wasted. The overflow of secondary effluent from the extended aeration plant discharges into the chlorine contact / break tank where it meets a controlled dose of sodium hypochlorite solution. The sodium hypochlorite solution is drawn from the hypochlorite storage tank by hypochlorite
02735-4 Sewage Treatment Plant

2.

3.

4.

5.

6.

7.

ITCC in Riyadh Residential Complex J10-13300

dosing pump of adjustable delivery rate. 8. Level switches in the chlorine contact / break tank actuate filter feed pumps which deliver the disinfected secondary effluent to the tertiary filters through graded sand media. The tertiary effluent from the filters passes on to the treated effluent irrigation tank. As solids accumulate in the sand bed the pressure loss through the media rises and periodically reaches a value above which the plant will not function as designed. At this time the filter requires to be washed clear of accumulated solids. The filter begins with a short period of air scour when the air is delivered by the same blowers that supply the extended aeration plant. During air scour the accumulated solids are shaken free of the sand media by high turbulence. The media is then backwashed by a controlled flow of tertiary effluent delivered from the tertiary treated effluent storage tank by the filter feed pumps. The backwash water passes up through the sand media, flushing out the accumulated solids and the resulting spent backwash water is returned to the lift station. Backwashing is manually controlled. The wasted sludge from the settlement tank will be collected in a sludge holding tank in which further digestion of the sludge takes place by means of air supplied by the same air blowers used for aeration and air scouring tank. The digested sludge shall be hold by trucks (by others).

9.

10.

2.2.

MISCELLANEOUS MATERIALS A. Piping: 1. Above Ground: Carbon steel pipes and pipe fittings in accordance with the following requirements: a. b. Pipes: Carbon steel pipes conforming to ASTM A 106, Grade B, Schedule 40. Fittings: Provide Manufacturer's standard flanged type fittings for 75 mm and above pipes conforming to ASTM A 105. Provide malleable-iron threaded fittings for pipes below 75 mm. Jointing System: Flanged-type joints, with flanges and gaskets rated class 150 in accordance with ANSI B16.5. Bolting: Alloy stud bolts in conformance with ASTM A 193/A, Grade B7 with semi-finished heavy pattern hex nuts in conformance with ASTM A 194, Grade 2H. Malleable-Iron Threaded Fittings: ANSI B16.3, Class 150, standard pattern, for threaded joints. Treads shall confirm to ANSI B1.20.1.

c.

2.
ITCC in Riyadh Residential Complex J10-13300

00Below Ground: Unplasticized polyvinyl chloride (uPVC) pipes and pipe fittings in accordance with the following requirements:
02735-5 Sewage Treatment Plant

a.

Pipes: Unplasticized polyvinyl chloride (uPVC), Schedule 40 for gravity piping and Schedule 80 pressure piping, all conforming to ASTM D 1785. Pipe Fittings: Unplasticized polyvinyl chloride (uPVC), Schedule 40 for gravity piping and Schedule 80 pressure piping, all conforming to ASTM D 1785, socket-type. Jointing System: Welded joints for joining pipes and pipe fittings using solvent cement conforming to ASTM D 2564. 00Painting for Above Ground Piping: All above ground piping shall have enamel paint finish.

b.

c. d. 2.3.

00ABOVE GROUND TANKS A. Above ground aeration tank, settling tank and chlorine contact tank shall be bolted type glass coated steel tanks. The inert glass shall be chemically bonded to the steel sheet by spraying the grit blasted with specially prepared slip and then drying it prior to firing it in a furnace at a temperature of up to 90 degree C. The molten glass fuses with the surface of the steel giving permanent high bond strength. Rubber gaskets shall be used at bolted connections. Material, design, fabrication, and erection of bolted steel tanks shall conform to AWWA D103 or equivalent Standards. Steel sheets shall conform to ASTM A 570, Grade 33. Galvanized steel bolts shall conform to ASTM A 307. All coatings shall be factory applied. Field coating, except for touch-up will not be acceptable. Size and shape of tanks shall be as shown on drawings. Tanks shall be with reinforced concrete foundation designed by the Contractor and approved by the Engineer. Reinforced concrete shall comply with the requirements of Division 3 - CONCRETE. Concrete shall be of minimum 30 MPa compressive strength at 28 days. Waterproofing concrete foundation shall comply with the requirements of Division 7 - THERMAL AND MOISTURE PROTECTION. Concrete tanks are acceptable in lieu of glass lined tanks, provided that the contractor will convince the consultant engineer that the concrete will be treated against all sewage gases.

2.5.

00CHLORINE DOSING SYSTEM A. Chlorine dosing system tank shall be of polyethylene construction, size and shape as shown on drawings, and shall be provided with complete chlorine dosing system including chlorine dosing pumps manufactured by REPUTABLE manufacturer; type and capacity as shown on drawings. Pumps shall be with control panel provided in weatherproof enclosure.

2.6.

PLANT CONTROL PANEL A. Shall be manufacturer's standard suitable for the sewage treatment plant operation. Control panel shall be installed in weatherproof polyester enclosure with IP 55 protection.

PART 3 EXECUTION 3.1. INSTALLATION


02735-6 Sewage Treatment Plant

ITCC in Riyadh Residential Complex J10-13300

A.

Install materials and equipment in strict accordance with the requirements of this Section and the written recommendations of the manufacturer as well as the applicable Sections of the USA Hydraulic Institute Standards. Installation shall be performed by workmen skilled in this type of work. Provide electrical motor-driven equipment specified herein complete with motors, motor starters, and controls. Provide motor starters with properly sized thermal overload protection and other appurtenances necessary for the motor control specified.

B. C.

3.2.

0TESTING AND COMMISSIONING A. B. C. General: Provide clean water, appliances, consumable stores and sewage necessary for the complete testing of the sewage treatment plant and pumps. Sewage treatment plant shall be tested and commissioned to the complete satisfaction of the Engineer. Following completion of erection and cleaning of tanks, tanks shall be tested for liquid-tightness by filling the tank to its overflow elevation. Any leaks discovered by this test shall be corrected by the Contractor in accordance tank manufacturer's written recommendation. Prior to backfilling of any excavation, perform the hydraulic test for the piping below. Sewage treatment plant shall be filled with water and kept filled for 2 days during which time it will be regularly inspected for loss of water and for signs of leakage externally. Test will be deemed to be passed if the Engineer is satisfied that there has been no perceptible loss of water through leakage during this period.

D.

E. 3.3.

0LABORATORY EQUIPMENT A. General: Contractor shall supply standard laboratory equipment necessary for dayto-day operation of the plant including chemicals for laboratory analysis good for 3 months. Laboratory equipment include the following as a minimum: 1. 2. Portable Dissolved Oxygen Meter with automatic temperature compensation. Portable sewerage treatment plant laboratory equipment for carrying out the following tests: Dissolved Oxygen Sludge Settlement Chlorine pH Temperature

B.

3.4.

0MONITOR AND CONTROL A. The plant shall be controlled by SCADA system. The contractor shall hire
02735-7 Sewage Treatment Plant

ITCC in Riyadh Residential Complex J10-13300

specialist company to submit their proposal to Consultant engineer review and approval END OF SECTION

ITCC in Riyadh Residential Complex J10-13300

02735-8