Date : Sheet # 1 of 9
Sl.No. A. B. 1. 2. C. D. E. F.
Test Description MECHANICAL CHECK & VISUAL INSPECTION ELECTRICAL TESTS OPERATION OF MCBs INSULATION RESISTANCE TEST VOLTAGE AND PHASE COINCIDENCE CHECK AUTO BUS TRANSFER SCHEME CHECK UNDER VOLTAGE SENSITIVITY CHECK TESTING OF METERS
NCC
WITNESSED BY NAME : :
SEC-EOA
DEPT.:
SIGNATURE
NATIONAL CONTRACTING CO. LTD., T&D CENTER, P.O. BOX 90, AL-KHOBAR-31952, KSA
Date : Sheet # 2 of 9
MECHANICAL CHECK & VISUAL INSPECTION : TEST INSTRUMENT Torque Wrench Make Sl.No. Calibration Certificate Sl.No.
1. 2. 3. 4.
: : : Test Procedure
Physical damage / defects Tightness of Bolted connection with torque wrench. Proper Grounding connections Check the size & quantity of incoming & outgoing feeders as per approved drawing. Check that the appropriate cable is connected as per cable schedule. Check for proper mounting of Auto Transfer Switch Verify all front panel mounted devices are installed as per approved drawing. Check for permanent identification Panel and Breaker identification. ( Feeder identification ) of
Criteria
No defects Tightness As per approved drawing To comply with
Result
5. 6. 7. 8.
To comply with As per approved drawing To comply with As per approved drawing
NCC
WITNESSED BY NAME : :
SEC-EOA
DEPT.:
SIGNATURE
NATIONAL CONTRACTING CO. LTD., T&D CENTER, P.O. BOX 90, AL-KHOBAR-31952, KSA
Date : Sheet # 3 of 9
ELECTRICAL TESTS : Sl.No. 1. Test Procedure Peform ON / OFF Operation of all MCB's and check the circuit continuity. Insulation reistance of wiring ( 500V DC ) A - Phase to Earth B - Phase to Earth C - Phase to Earth A - Phase to A Phase B - Phase to C Phase C - Phase to A Phase buses and > 1 M Ohms > 1 M Ohms > 1 M Ohms > 1 M Ohms > 1 M Ohms > 1 M Ohms Criteria Proper Operation Result
2.
NCC
WITNESSED BY NAME : :
SEC-EOA
DEPT.:
SIGNATURE
NATIONAL CONTRACTING CO. LTD., T&D CENTER, P.O. BOX 90, AL-KHOBAR-31952, KSA
Date : Sheet # 4 of 9
C. VOLTAGE AND PHASE COINCIDENCE CHECK : Procedure 1. Apply 380 V, 3 Phase to the 34.5kV side of Station Transformers 1 & 2 from a common source as in test connection. 2. Measure the voltage across the phases in the Bus tie as given in table. 3. Both the Transformer shall be kept at Normal Tap Measured at Auto Transfer Switch Terminal Measured Between Criteria Volts Measured Volts Remarks
A Phase of Incomer # 1 & A Phase of Incomer # 2 B Phase of Incomer # 1 & B Phase of Incomer # 2
NCC
WITNESSED BY NAME : :
SEC-EOA
DEPT.:
SIGNATURE
NATIONAL CONTRACTING CO. LTD., T&D CENTER, P.O. BOX 90, AL-KHOBAR-31952, KSA
Date : Sheet # 5 of 9
AUTO TRANSFER SCHEME CHECK : Functional Check : Procedure 1) 2) Sl. No. 1. 2. Energise the sources of both Main supplies, Main I & II keeping the Main Incomer 1 & 2 and ATS switch in OFF position. The magnitude of both the voltages shall be 380 V, 3 phase. Test Switch Position OFF MANUAL Both the closed. Criteria Main ACB's shall not be Result
Closing Interlock for Incomer A. Incomer ACB shall be closed when i) The other Incomer & Bus tie are in OPEN position. ii) The other Incomer in closed & Bus tie in OPEN position. iii) O/C & E/F relay not operated. B. Incomer ACB shall not be closed when i) The other Incomer & Bus tie ACB's are in closed position.
NCC
WITNESSED BY NAME : :
SEC-EOA
DEPT.:
SIGNATURE
NATIONAL CONTRACTING CO. LTD., T&D CENTER, P.O. BOX 90, AL-KHOBAR-31952, KSA
Date : Sheet # 6 of 9
Criteria Closing Interlock for Incomer A. Incomer ACB shall be closed when i) No under voltage respective Incomer. in the
Result
ii) O/C & E/F Relays not operated. iii) Either or both the Bus tie & the other Incomer in Open position. iii) Incomer will close after the set time delay. Tripping Interlock for Incomer 3. A. B. 4. MANUAL A) Bus tie Breaker shall be closed when i) O/C & E/F relays not operated. ii) Either Open. one of the Incomer is not be Under voltage in Incoming source. the respective
shall
NCC
WITNESSED BY NAME : :
SEC-EOA
DEPT.:
SIGNATURE
NATIONAL CONTRACTING CO. LTD., T&D CENTER, P.O. BOX 90, AL-KHOBAR-31952, KSA
Date : Sheet # 7 of 9
Result
AUTO
i) Under voltage in any one of the Incomer source ii) O/C & E/F relay not operated iii) Incomer of under voltage source is Open.
5.
TRIPPING INTERLOCK
i) O/C & E/F relay operated. ii) Resumption of supply voltage for the Incomer source.
6.
AUTO TRANSFER
A.
De-energise Incomer # 1 source & check for i) Tripping of Incomer # 1 through under voltage relay after set time delay ii) Bus tie breaker close after Incomer # 1 has tripped
B.
Energise Incomer # 1 source & check for i) Bus tie breaker instantaneously trips
NCC
WITNESSED BY NAME : :
SEC-EOA
DEPT.:
SIGNATURE
NATIONAL CONTRACTING CO. LTD., T&D CENTER, P.O. BOX 90, AL-KHOBAR-31952, KSA
Date : Sheet # 8 of 9
Sl. No.
Criteria C. De-energise Incomer # 2 source & check for i) Tripping of Incomer # 2 through under voltage relay after the set time delay ii) Bus tie Breaker closing after the set time delay. D) Energise check for Incomer # 2 source & breaker trips
Result
ii) Closing of Incomer # 2 after the set time delay. 7. Check all other functional checks as per approved drawing.
NCC
WITNESSED BY NAME : :
SEC-EOA
DEPT.:
SIGNATURE
NATIONAL CONTRACTING CO. LTD., T&D CENTER, P.O. BOX 90, AL-KHOBAR-31952, KSA
Date : Sheet # 9 of 9
NCC
WITNESSED BY NAME : :
SEC-EOA
DEPT.:
SIGNATURE
NATIONAL CONTRACTING CO. LTD., T&D CENTER, P.O. BOX 90, AL-KHOBAR-31952, KSA
Date : Sheet # 10 of 9
UNDER VOLTAGE SENSIVITY CHECK : Test Instrument 1) Single phase Variac : Make Sl. No. Type : : :
2) Multimeter ( Voltmeter range ) Make Sl.No. Type Sl. No. 1. : : : Description 75% Under Voltage Pick-up Volts Incomer # 1 80% 85% 95% 75% Incomer # 2 80% 85% 95%
2.
NCC
WITNESSED BY NAME : :
SEC-EOA
DEPT.:
SIGNATURE
NATIONAL CONTRACTING CO. LTD., T&D CENTER, P.O. BOX 90, AL-KHOBAR-31952, KSA
Date : Sheet # 11 of 9
TESTING OF METERS : Sl.No. 1. 2. 3. Test Instruments Current & Voltage Injection Test Kit Voltmeter Ammeter INCOMER # 1 Class of Accuracy Injected Current / Voltage Meter reading Result Serial Number
Voltmeter INCOMER # 2 Meter Ammeter Range Class of Accuracy Injected Current / Voltage Meter reading Result
Voltmeter
NCC
WITNESSED BY NAME : :
SEC-EOA
DEPT.:
SIGNATURE