StructuralSurveyandFloorFlatness
Agenda
Project j Introduction LifeCycleFlowofInformation ChangeManagement TrimbleProjectControl StructuralSurvey FloorFlatness FieldVerifications S Summary /Q&A
CONTROL&LAYOUT
CHANGEMANAGEMENT
SCHEDULEINTEGRATION
MODELREPOSITORY (2D,3D,4D,5D,6D)
FABRICATION FIELDVERIFICATIONS
VIRTUALDESIGNMODEL
CONTROL&LAYOUT
CHANGEMANAGEMENT
SCHEDULEINTEGRATION
MODELREPOSITORY (2D,3D,4D,5D,6D)
FABRICATION FIELDVERIFICATIONS
VIRTUALDESIGNMODEL
ChangeManagement
ModelingtheIdealProcesstoensure ti i dwork kfl llparties ti optimized flowf forall
Providesuniversalconfidenceincurrentstate
ChangeManagement
Hospitalsarecontinuallychanging Essentialtoplanforchanges Ownerexpectationsofincorporatingchanges
Minimizeimpactstoscheduleandcosts
ProcessFlowofChanges
Realigned expectations across project participants Better informed and timely decisions Prioritization of changes/scope Smoother production cycle work flow Incorporation of changes as they happen Balance limited resources, production and field installation
IdentificationofChanges
Original
Changes Ch
Current
Ch Changes
TeklaConstructionManagementModule
ApproachtoUseofTrimble
Aligninteresttoonecommonoutcome Providestandardizedtrainingforall, addressedrisksandconcerns MBCparticipationandsupport,skininthe game,garnered dtrust t twith ithsubs b Clearpathoftransition
Control&Layout
AbsoluteonSite,RelativeonFloor
TrimbleRoboticTotalStation
Pointsfromthesightplansand buildingmodelsaregeneratedin Tekla
Standardizedprogram,GCleadandperformed
TrimbleRoboticTotalStation
Standardizedprogram,GCleadandperformed
LeverageSuccess
Internalcrewsforperformingenhancedsurveycontrol Providementoring,training,support Subtrades deckinsertsof8 8,000 0009,000 9 000perfloorinthetime, time betteraccuracy Backcheck subtrades layout,avoidconflict FieldverificationsandAsBuilts Expandoncapabilities
FloorMonitoringProgram
StructureSurvey
PrePour,PostPour,and PostShoringRemoval Monitorsdisplacement,not originalrequirement
FloorProfileTesting g
ASTM1155M FloorFlatness FloorLevelness
ProjectConstraints
Schedule
Constructionwellunderway,andcouldnotdelayprogress
Costs
Additionalsurveyingnotoriginallybudgeted,exceeded contractedscope
Qualityofsurvey
Hadtobeequalorgreaterthantraditionalmethods
Experiencelimitedtotraditionalmethods
LaserScanofAsBuiltSteel
TrimbleRealworks todevelopsteelmeasurements
PrePourandPostPourSurvey
Accuracyisachievedbyintegrationoftechnologywithprocess
Accuracyisachievedbyintegrationoftechnologywithprocess
BeamDeflectionAnalysis
Beamcamber,preandpostplacementofconcrete
BeamDeflectionAnalysis
FloorFlatnessConsiderations
ProjectRequirements
ProjectminimumFFof28,ASTM1155M
Design/Construction g / Considerations
Slabthickness,overloadingduringpour Grind/FillConsiderations,flooringsubtrade Framinganddoorheaderplacement,fixtureplacement
Qualityoffinalconditions OwnerSatisfaction
TraditionalFloorFlatnessTest
LocationofTestRuns
ReportResults
Exceededprojectrequirements,great!Right?
TopographicPlans
Createtopo plansofconcrete,exporttoCAD
AnIntegratedPerspective
Topo WithArchitecturalOverlay
WhatYouAreNotSeeing
Interiorbuildoutimpacts
ProvenResults
Qualityofsurveyvalidated Schedule S h d l 70%reduction d ti overt traditional diti l
Traditional3xmoreforPrePour,1.5xPostPour
Field Verifications
A3ofFieldConflictandResolution
BuildingtotheModel
3DLaserScanAsBuilts
ASBUILTSURVEYING
3DLaserScanAsBuilts
Capturein wallconditions forfollowon facilitiesuse, i e backing i.e. location
Summary
Change Management Optimized management of changes Control and Layout Control of schedule and accuracy Floor Monitoring Program Enhanced QC program, higher satisfaction Field Verifications Building to model plan, build, verify
Q&A