Site Code: Site Type: Lat:: Site Address: Date: Activity Type: Long:
NAME
COMPANY/TITLE
Acceptance Status*
V01
MA-FO-30701Page
M: Minor
Checked Item No Snag Do not Comply Failure Comments / Qualifying Information
Comply
M Cabinet Grounding should be tight and proper. J Optical Fiber, power & grounding cables routing should be proper (Optical Fiber cable shouldnt route with other cables from out of eNodeB).
eNodeB Modules & Internal Cables Installation (For New BTS3900 & APM30H installation scenarios)
M All Modules including PMU module, Battery Modules, FAN Modules & RFU subrack installation should be proper (all screws present and tightened). J Internal Cabling including CPRI, Alarm Signal Cables, BBU power cables and connectors should install properly & tied. M Necessary Labelling of cables & modules should exist (Ext Alarm cables, Sensors, ect..).
RRU Installation
J J J J The RRU is securely installed. None of power cables and GND cables cant be short-circuited or reversely connected. In addition, these cables are not damaged or broken. Power cables and GND cables should separately bound from other cables.
Grounding of the RRUs should connect to common grounding bus bar on tower top which is connected with tower grounding strip. M The connectors of each signal cable should intact and securely linked, and these cables should not damaged or broken.
TI Acceptance Check List 30601 V01 -2MA-FO-
No Snag
Comply
Do not Comply
Labels are correct, legible and complete at both ends of each cable terminations. (RRU & Antenna port) M All outdoor labelling should be installed with steel labels.
eNodeB Commissioning
J J J J J J J J J J J All eNode B commissioning data and results entered into site folder. Software loaded and version verified correct. Site configuration files (XML) is downloaded and running properly. eNodeB License installed and verification by using Local Login. Time synchronization & clock synchronization should verify. BTS type configured should match with hardware BTS type. Installed card should comply with configured hardware types. Certificate installation status should verify. Addition of standby power protection UPEUc. Replacement of existing BBU FAN with FANc. For newly installed cabinets only: eNodeB Reset by Power OFF & Power ON and check the stability of eNodeB after reset.
eNodeB Intgration
J J J J J J J J Test calls in all sectors performed. No alarm in Alarm browser. eNodeB Alarms reporting to OMC. Radio Network parameters & Transmission data consistent with site folder data? Management connection to the site is verified from OMC/NOC. eNodeB data consistency by STR CFGCHK from M2000. Binary alarms are connected & verified by testing (outdoor Macro) Continues ping test for five minutes to next hop performed & packet loss is less than 0.1% Note: Transmission link quality issues Should follow up with ND & MS teams)
No Snag
Comply
Do not Comply
M J M M M M M J
Indoor Optical Fiber patch cble Installation and Routing to RTN port
J
No Snag
Comply
Do not Comply
General
J M J Other unused material brought back. Site is clean and tidy? Cable ties trimmed. No property damage visible.
OIL List Item no Outstanding Items/Snags detected Clearance Date Witnessed by (Sign)
V01 -5-
MA-FO-
Nominal ID:
__________________
Candidate ID:
_________________
Date of completion:
_____/______/_______
Huawei
Sub con
Du ND
Du NO
Signature: