Provisional Acceptance Testing Telecom Works Acceptance Checklist-LTE Project

Site Code: Site Type: Lat:: Site Address: Date: Activity Type: Long:

Attendees (Complete as Appropriate)

Team Huawei Sub-Con du ND du NO

NAME

COMPANY/TITLE

Acceptance Status*

* 1) Fully accepted 2) Partially accepted 3) Rejected

*Snag List should be attached

TI Acceptance Check List 1 of 6

V01

MA-FO-30701Page

Provisional Acceptance Testing


Telecom Works Checklist-LTE Project
Severity Levels were classified as: J: Major
Severity Level

M: Minor
Checked Item No Snag Do not Comply Failure Comments / Qualifying Information

Work Item / Check

Comply

eNodeB Installation (For New BTS3900 & APM30H installation scenarios)


J Stability of Cabinet should proper. M (Outdoor Node B only) Cabinet should correctly mount with specified size bolts. (Galvanized or stainless steel only) M Is the Locking mechanism & door fitted and functioning correctly? J Cabinet positioning in shelter should be as per design.

M Cabinet Grounding should be tight and proper. J Optical Fiber, power & grounding cables routing should be proper (Optical Fiber cable shouldnt route with other cables from out of eNodeB).

eNodeB Modules & Internal Cables Installation (For New BTS3900 & APM30H installation scenarios)
M All Modules including PMU module, Battery Modules, FAN Modules & RFU subrack installation should be proper (all screws present and tightened). J Internal Cabling including CPRI, Alarm Signal Cables, BBU power cables and connectors should install properly & tied. M Necessary Labelling of cables & modules should exist (Ext Alarm cables, Sensors, ect..).

BBU cards/DCDU Installation


J The installation position of the BBU/DCDU strictly complies with the engineering design. J The installed breakers in Rectifier module should meet the needs of eNodeB power consumption which is larger than 50A. M Required boards are installed on existing BBU in correct positions as per design. M All the bolts should tight. Both the spring washer and the flat washer are installed in the correct sequence. J All cards should be neat and clean. J All labels, tags and name plates are correct, legible and complete.

RRU Installation
J J J J The RRU is securely installed. None of power cables and GND cables cant be short-circuited or reversely connected. In addition, these cables are not damaged or broken. Power cables and GND cables should separately bound from other cables.

Grounding of the RRUs should connect to common grounding bus bar on tower top which is connected with tower grounding strip. M The connectors of each signal cable should intact and securely linked, and these cables should not damaged or broken.
TI Acceptance Check List 30601 V01 -2MA-FO-

Provisional Acceptance Testing


Telecom Works Checklist-LTE Project
Checked Item Severity Level Failure Comments / Qualifying Information

Work Item / Check

No Snag

Comply

Do not Comply

Labels are correct, legible and complete at both ends of each cable terminations. (RRU & Antenna port) M All outdoor labelling should be installed with steel labels.

eNodeB Commissioning
J J J J J J J J J J J All eNode B commissioning data and results entered into site folder. Software loaded and version verified correct. Site configuration files (XML) is downloaded and running properly. eNodeB License installed and verification by using Local Login. Time synchronization & clock synchronization should verify. BTS type configured should match with hardware BTS type. Installed card should comply with configured hardware types. Certificate installation status should verify. Addition of standby power protection UPEUc. Replacement of existing BBU FAN with FANc. For newly installed cabinets only: eNodeB Reset by Power OFF & Power ON and check the stability of eNodeB after reset.

eNodeB Intgration
J J J J J J J J Test calls in all sectors performed. No alarm in Alarm browser. eNodeB Alarms reporting to OMC. Radio Network parameters & Transmission data consistent with site folder data? Management connection to the site is verified from OMC/NOC. eNodeB data consistency by STR CFGCHK from M2000. Binary alarms are connected & verified by testing (outdoor Macro) Continues ping test for five minutes to next hop performed & packet loss is less than 0.1% Note: Transmission link quality issues Should follow up with ND & MS teams)

Outdoor/Indoor Power, Optical Fiber & RF Jumper cable Installation


J Internal Jumper Installation & routing should proper.
V01 -3MA-FO-

TI Acceptance Check List 30601

Provisional Acceptance Testing


Telecom Works Checklist-LTE Project
Checked Item Severity Level Failure Comments / Qualifying Information

Work Item / Check


All connectors should tighten to specified torque setting. External jumper installation & routing should proper. Internal and External connectors installation and waterproofing should proper. Labelling of RF jumpers at antenna & eNodeB end shouls available. ( Outdoor Labelling with Steel lables) Outdoor Optical cable installation should proper. Outdoor DC power cable installation should proper. Cable laying in cable tray should without overlapping each other. All DC power cable terminations should with proper rating of lugs & boot lugs. Correct antenna types (Dual Band-1800/2100Mhz) on each sector according to design. LTE & 3G antenna ports should labelled. Tilting kits installation should proper. SASU unit installation should proper with labelling & grounding cable. All Node-B antenna/RF system installation data has been entered into site folder. Printed measurement results properly filled signed and inserted in the Site Specific Folder. VSWR done and Values are within range? (<1.5). Note: VSWR of Jumper cable between RRU & antenna can be measured by equipment command. VSWR of feeders scenarios need to be measured by SiteMaster (IBS & Shared Sites). VSWR of 2G DCS antenna path should measure & verified until triplexer in feeder sharing with 2G scenarios. (<1.5) Note: Ericsson MS team will verify 2G DCS ports VSWR. Optical fiber cable routing through cable tray to RTN optical ports should proper & safe. Cable should be standard shielded optical fiber cable.

No Snag

Comply

Do not Comply

M J M M M M M J

eNodeB Antenna & SASU Installation


J M M M J

eNodeB Antenna System Commissioning


J

Indoor Optical Fiber patch cble Installation and Routing to RTN port
J

SLO Check Items :


J j j eNodeB access through Web LMT by M2000 & LAN eNodeB access rights for Local users in correct user categories RTWP of 3G cells effected after LTE cell unblocked?
V01 -4MA-FO-

TI Acceptance Check List 30601

Provisional Acceptance Testing


Telecom Works Checklist-LTE Project
Checked Item Severity Level Failure Comments / Qualifying Information

Work Item / Check

No Snag

Comply

Do not Comply

General
J M J Other unused material brought back. Site is clean and tidy? Cable ties trimmed. No property damage visible.

OIL List Item no Outstanding Items/Snags detected Clearance Date Witnessed by (Sign)

TI Acceptance Check List 30601

V01 -5-

MA-FO-

Provisional Acceptance Testing


Telecom Works Checklist-LTE Project

Nominal ID:

__________________

Candidate ID:

_________________

Date of completion:

_____/______/_______

Inspection completed by: Name:

Huawei

Sub con

Du ND

Du NO

Signature: