Ind-Barath 660MW Power Plant Project Schedule

(Design, Civil work, Supply, Installation & Commisioning)


Activity
Pubilic
System
Description

-1

10 11 12 13 14 15 16 17 18

Mont
Months
hs
20
1 21
2 22
3 23
4 24
5 25
6 26
7 27
8 28
9 10
29 11
30 12
31 32
13 33
14 34
15 35
16 36
17 37
18 38
19 39
20 21
40 22
41 23
42 24
43

--- limestone

#1

Validate contract
Preliminary design
Detailed investigation
Pile foundation construction
Main plant excavation
Pour the first side of concrete
The main plant on the basis of zero meter
Begin lifting main plant steel structure
Install dust removing system
Center control building preparation
Chimney top sealing
Install turbine pedestal
Chemical water workshop preparation
Main plant close
Air cooler island foundation preparation
Chemical qualified demineralized water
Boiler installation starts
Boiler drum lifting in position
ST bedplate in position
Auxiliary power receiving
Finish boiler water pressure test
Sheet 1 of 7

Ind-Barath 660MW Power Plant Project Schedule


(Design, Civil work, Supply, Installation & Commisioning)
Activity
Pubilic
System
Description

-1

10 11 12 13 14 15 16 17 18

Mont
Months
hs
20
1 21
2 22
3 23
4 24
5 25
6 26
7 27
8 28
9 10
29 11
30 12
31 32
13 33
14 34
15 35
16 36
17 37
18 38
19 39
20 21
40 22
41 23
42 24
43

--- limestone

Turbine covering
Boiler acid cleaning starts
Boiler ignition pipe blowing
Initial synchronization
Whole set test run end
PAC end

Design

--- progress

Preliminary detailed investigation


Preliminary design
Construction general drawing
Boiler drawing
Preliminary design review
Construction drawing of five open one flat
Construction drawing of plant underground equipment
Technology construction drawing
Electric heat control drawing
Drawing design of pile foundation project

Sheet 2 of 7

Ind-Barath 660MW Power Plant Project Schedule


(Design, Civil work, Supply, Installation & Commisioning)
Activity
Equipment
Purchasing
Description

-1

10 11 12 13 14 15 16 17 18

Mont
Months
hs
20
1 21
2 22
3 23
4 24
5 25
6 26
7 27
8 28
9 10
29 11
30 12
31 32
13 33
14 34
15 35
16 36
17 37
18 38
19 39
20 21
40 22
41 23
42 24
43

Main equipment bid inviting


Boiler equipment purchasing
STG equipment purchasing
The first batch purchasing
HP heater
LP heater
Deaerator
Fan
Electrical equipment
Cable bracket/cable
HP pipe & valves,pipe fittings
M/L P pipe & valves,pipe fittings
ESP
Condensate pump
Electrically driven feed pump
Other pressure vessels
Circulating water pump
Boiler elevator
Thermal control equipment
Chemical water equipment

Sheet 3 of 7

Ind-Barath 660MW Power Plant Project Schedule


(Design, Civil work, Supply, Installation & Commisioning)
Activity
Transportation
Description

-1

10 11 12 13 14 15 16 17 18

Mont
Months
hs
20
1 21
2 22
3 23
4 24
5 25
6 26
7 27
8 28
9 10
29 11
30 12
31 32
13 33
14 34
15 35
16 36
17 37
18 38
19 39
20 21
40 22
41 23
42 24
43

Boiler steel structure


Turbine foundation embedded part
Fan & pump
ESP
Deaerator & Coal Mills
Continuous Blowdown & Intermittent Blowdown System
AUX of Turbine
Turbine proper
Generator proper
Drum
Boiler proper
pipe & thermal control
Air cooler island equipment

Sheet 4 of 7

Ind-Barath 660MW Power Plant Project Schedule


(Design, Civil work, Supply, Installation & Commisioning)
Activity
Engineering
Progress Schedule
Description

-1

10 11 12 13 14 15 16 17 18

Mont
Months
hs
20
1 21
2 22
3 23
4 24
5 25
6 26
7 27
8 28
9 10
29 11
30 12
31 32
13 33
14 34
15 35
16 36
17 37
18 38
19 39
20 21
40 22
41 23
42 24
43

#1

--- progress
4-8

4-8

5-7

8-15

4-7

6-10

4-7

9-11

7-16

8-13

#2

8-14

8-11

7-10

11-15

6-11

15

15

11-19

8-14

Sheet 5 of 7

Ind-Barath 660MW Power Plant Project Schedule


(Design, Civil work, Supply, Installation & Commisioning)
Activity
Engineering
Progress Schedule
Descript on

-1

Mont
Months
hs
10 11 12 13 14 15 16 17 18 19
1 21
2 22
3 23
4 24
5 25
6 26
7 27
8 28
9 10
29 11
30 12
31 32
13 33
14 34
15 35
16 36
17 37
18 38
19 39
20 21
40 22
41 23
42 24
43
0 20

#1

6-11

14-20

14-22

10-18

15

15-20

15-21
15-20

16-20

17-22

15-21

#2

15-21

15-21
17-21

16

18-20

19-21

11-18

14-19

16-20
19-20

Sheet 6 of 7

Ind-Barath 660MW Power Plant Project Schedule


(Design, Civil work, Supply, Installation & Commisioning)

Engineering Progress Schedule


D

ip

-1

Mont
Months
hs
10 11 12 13 14 15 16 17 18 19
0 20
1 21
2 22
3 23
4 24
5 25
6 26
7 27
8 28
9 10
29 11
30 12
31 32
13 33
14 34
15 35
16 36
17 37
18 38
19 39
20 21
40 22
41 23
42 24
43

#1

20-22

20-22
20

20-22

21-22

21-22

21-22
22

21

21

22

#2

21

22

21

24

The first four months is equipment bid inviting and design stage
and the 22nd month is test run period.
In china, generating power within 24 months for this project is feasible.
But the foundation construction depends on the geological condition,
if you want to generate power within this period,
the erection works must keep up with the whole progress.

Sheet 7 of 7