Piping Design Engg.course MITSDE tech courses for engineers & diploma holders. Join now www.mitsde.com Ejectors/Diaphragm Valve Mfr:Ejectors & Diaphragm Valve Pressure Vessels & Tank 09930058904 www.BestPPC.in/... ASME Code Pipe Supports Pipe Support and Restraint Devices Made Per ASME Codes and Standards www.pipingt...
Non-Destructive Testing Eddy Current, Ultrasonic, & Flux Leakage Inspection Systems www.mac-ndt.com Piping Engineering Piping Design Training and Consultancy by experts www.Charismacareer.com Pressure Vessel Heat exchanger , column , reactor , cylindirical and spherical tank www.tekfenim.com
Search
In this section you will learn the more advanced options for creating centerline routing and branch creations. The majority of these functions are options that may be chosen from the Sketch Piping form. Topics Distance and Direction moves the active place point a specified or calculated distance in a specified direction or along a defined angle. Select the Sketch option from the Placement palette activated by the Piping pull-down menu. Extend/Shorten Pipe Run lengthens or shortens the next segment of pipe run by a specified distance predefined. Select the Sketch option from the Placement palette
tweet
retweet
Subscribe
http://www.pipingguide.net/2009/07/advanced-sketching.html
6/1/2011
Page 2 of 19
Translate
Select Language
Gadgets powered by Google
activated by the Piping pull-down menu. Create Bypass creates a bypass at the active segment point or at an existing segment end point. Select the Sketch option from the Placement palette activated by the Piping pull-down menu. Intersect to Branch extends the active segment to its intersection with a specified segment pipe run. Select the Sketch option from the Placement palette activated by the Piping pull-down menu. Intersect Sloped Pipe Run intersects the piping segment being created or extended with an arbitrarily skewed pipe run of an existing piping segment that is sloped in the vertical plane. Select the Sketch option from the Placement palette activated by the Piping pull-down menu. Intersect by Angles intersects two existing segment pipe runs at a specified angle. Select the Sketch option from the Placement palette activated by the Piping pull-down menu. Intersect Plane sketches a segment pipe run to the point of intersection between the piping segment and a planar element in the design or reference file. Select the Sketch option from the Placement palette activated by the Piping pull-down menu. Skewed Intersect connects the end points of two different piping segments. Select the Sketch option from the Placement palette activated by the Piping pull-down menu. Branch on Pipe Run creates a branch along a segment pipe run (not at a vertex or end point). Select the Sketch option from the Placement palette activated by the Piping pull-down menu. Create Branch using the Sketch command shows you how to create a branch at an end point or at an embedded vertex on a piping segment. Select Placement from the Piping pull-down menu. Lab Exercises.
http://www.pipingguide.net/2009/07/advanced-sketching.html
6/1/2011
Page 3 of 19
Note: Refer to Distance and Direction for reference information on this command. Complete the following three exercises on the Distance and Direction option.
Exercise 1
The existing piping segment A-B-C is to be extended to a new configuration A-B-C-D-E-F and you are attached to vertex C.
1. Select the Distance and Direction option from the Sketch Piping Segment form. The Distance and Direction form displays. 2. Select the Horizontal Angle option and key in 300. 3. Select the Vertical Angle option and key in 0. 4. Select the Move North/South option and key in 2'0" (610 mm). The system calculates the distance. 5. Accept the form with Confirm. The system updates the database and the graphics. 6. Now continue sketching to finish the piping segment D-E-F.
Exercise 2
The existing piping segment A-B-C-D-E is to be modified to a new configuration of A-B-C-D-E-E' and you are attached to vertex E.
http://www.pipingguide.net/2009/07/advanced-sketching.html
6/1/2011
Page 4 of 19
1. Select the Distance and Direction option. 2. Select the Active Direction option. 3. Select the Move Up option and key in 3'0" (914 mm)
4. Accept the form with Confirm. The system updates the database and the graphics. 5. Continue in sketch to finish the piping segment E' and beyond.
http://www.pipingguide.net/2009/07/advanced-sketching.html
6/1/2011
Page 5 of 19
Exercise 3
The existing piping segment A-B-C is to be extended to a new configuration of A-B-C-D-E-F and you are attached to vertex C.
1. Select the Distance and Direction option. 2. Select the S/E option. 3. Select the Distance option and key in 4'6" (1372 mm). 4. Accept the form with Confirm. The system updates the database and the graphics. 5. Continue with sketch to finish the rest of the piping segment.
http://www.pipingguide.net/2009/07/advanced-sketching.html
6/1/2011
Page 6 of 19
1. Select the Extend or Shorten Pipe Run option. 2. Toggle Shorten to Extend 3. Select the Lengthen Next Run by: field and key in 3" (914 mm) for the shoe height. 4. Select the 1/2 Piping Outside Diameter option. 5. Identify a component or pipe or Confirm the active data. 6. Select the Insulation Thickness option. 7. Confirm the active data. 8. Confirm to confirm all the active data. 9. Select the Move to Point option. 10. Deactivate the Northing and Easting options. 11. Identify the top of steel at the correct elevation. 12. Accept the form with Confirm. The system updates the database and the graphics. 13. Continue sketching to finish the piping segment to vertex E.
http://www.pipingguide.net/2009/07/advanced-sketching.html
6/1/2011
Page 7 of 19
necessary to define the centerline of the bypass. Note: See Create Bypass for reference information on this option. The existing piping segment A-B-C is to be extended to the new configuration A-B-C-D-E-F and you are attached to vertex C.
1. Select the Create Bypass option. 2. Select Move East and key in 3'6" (1067 mm). 3. Move South and key in 1'3" (381 mm). 4. Select the Nominal Piping Diameter field and key in 4 (100). 5. Accept the form with Confirm. The system updates the database and the graphics. 6. Continue sketching from vertex D to finish the piping segment.
http://www.pipingguide.net/2009/07/advanced-sketching.html
6/1/2011
Page 8 of 19
1. Select the Intersect to Branch option. 2. Identify pipe run D-E. 3. The system computes alternative 1. Accept with <D> to accept, Reject to select another. 4. The system computes alternative 2. Accept with <D> to accept, Reject to select another. 5. The system computes alternative 3. Accept with <D> to accept, Reject to select another. The system continues to cycle through until you accept one of the alternatives. 6. Once you accept an alternative, the system automatically extends the segment and places a branch point at point X.
Exercise 1
Join together piping segments A-B-C and D-E at point X or Y. You are currently attached to vertex C. Note:
http://www.pipingguide.net/2009/07/advanced-sketching.html
6/1/2011
Page 9 of 19
1. Select the Intersect Sloped Pipe Run option. 2. Identify pipe run D-E. 3. Key in 40. 4. The system computes alternative 1. Accept with <D> to accept, Reject to select another. 5. The system computes alternative 2. Accept with <D> to accept, Reject to select another. 6. The system continues to cycle through until you accept one of the alternatives. 7. Once you accept an alternative, the system automatically extends the segment and places a branch point at point X or Y.
Exercise 2
Join piping segments A-B-C and D-E at point X. You are attached to vertex C.
http://www.pipingguide.net/2009/07/advanced-sketching.html
6/1/2011
Page 10 of 19
2. Identify pipe run D-E. 3. Key in 30 for the angle. The system automatically extends the needed segments to point X and connects them.
1. Select the Intersect by Angles option. 2. Identify pipe run F-G on the G half of the pipe run. 3. Key in 35 for the angle. The system automatically shortens/extends segment F-G to point X and connects them.
http://www.pipingguide.net/2009/07/advanced-sketching.html
6/1/2011
Page 11 of 19
http://www.pipingguide.net/2009/07/advanced-sketching.html
6/1/2011
Page 12 of 19
1. Select the Skewed Intersection option. 2. Identify second end point, vertex X. 3. The system computes alternative 1. Accept with <D> to accept or Reject to select another. 4. The system computes alternative 2. Accept with <D> to accept or Reject to select another. 5. The system computes alternative 3. Accept with <D> to accept or Reject to select another. 6. The system computes alternative 4. Accept with <D> to accept or Reject to select another. 7. The system computes alternative 5. Accept with <D> to accept or Reject to select another. 8. The system computes alternative 6. Accept with <D> to accept or Reject to select another. 9. The system computes alternative 7. Accept with <D> to accept or Reject to select another. 10. The system continues to cycle through until you accept one of the alternatives.
http://www.pipingguide.net/2009/07/advanced-sketching.html
6/1/2011
Page 13 of 19
11. Once you accept an alternative, the system automatically extends the segments and connects them.
Exercise 1
Place a 4 (100 mm) NPD branch at the midpoint of pipe run B-C on existing piping segment A-B-C-D-E.
1. Select the Branch on Pipe Run option. 2. Identify pipe run B-C. The system highlights the segment pipe run. 3. Accept the form with Confirm. The system automatically places a branch point at point F. 4. Select the Active Segment Data area. 5. Select the Nominal Piping Diameter field and key in 4 (100). 6. Accept the form with Confirm. The system updates the database. 7. Continue using sketch to finish the piping segment F-G.
http://www.pipingguide.net/2009/07/advanced-sketching.html
6/1/2011
Page 14 of 19
Exercise 2
Place a branch point on pipe run B-C of existing piping segment A-B-C-D-E.
1. Select the Branch on Pipe Run option. 2. Identify pipe run B-C on the B half of the segment. The system highlights the segment. 3. Key in 3'0" (914 mm) to specify the distance from the endpoint. The system automatically places a branch point at point F. 4. Continue sketching to finish segment F-G.
Exercise 1
Place a branch point at embedded vertex B on piping segment A-B-C.
http://www.pipingguide.net/2009/07/advanced-sketching.html
6/1/2011
Page 15 of 19
1. Identify vertex B. The system automatically creates a branch point at vertex B. 2. Continue sketching to finish piping segment B-D.
Exercise 2
Place a branch point at end point C on piping segment A-B-C.
1. Identify vertex C. 2. Toggle Extend Piping Segment to Create Piping Segment. 3. Continue sketching to finish piping segment C-D. 4. Accept the form with Confirm. The system updates the database and the graphics. 5. Identify vertex C. The system knows that there is a branch point at point C.
http://www.pipingguide.net/2009/07/advanced-sketching.html
6/1/2011
Page 16 of 19
6. Continue sketching to finish piping segment C-E. 7. Accept the form with Confirm. The system updates the database and the graphics.
Exercise 3
Place a branch point at end point C on piping segment A-B-C. You are attached to point C.
1. Select the Place and Start New Segment option. 2. Now continue sketching to finish piping segment C-E. 3. Accept the form with Confirm. The system updates the database and the graphics. 4. Identify vertex C. The system automatically creates a branch point at vertex C. 5. Continue sketching to finish piping segment C-D.
Labs
Complete all three labs using the commands you learned in this section.
Lab 1
Sketch pipeline DOW0102-XIN-2C0032-N from equipment/nozzle 38E-103/N3 & N4 to equipment nozzle 38TW-102/N14 using the command learned in this and previous sections. Use Auto Placement to place pipe and components. Refer to figure below for detailed information.
http://www.pipingguide.net/2009/07/advanced-sketching.html
6/1/2011
Page 17 of 19
Lab 2
Sketch pipeline DOW0101-XIN-2C0032-N from equipment/nozzle 38E-105/N1 & N2 to equipment nozzle 38E-102/T1 using the command learned in this and previous sections. Use Auto Placement to place pipe and components. Refer to figure below for detailed information.
http://www.pipingguide.net/2009/07/advanced-sketching.html
6/1/2011
Page 18 of 19
Lab 3
Sketch pipeline DOW0103-XIN-2C0032-N from equipment/nozzle 38E-104/N1 & N2 to equipment nozzle 38E-101A/N4 using the command learned in this and previous sections. Use Auto Placement to place pipe and components. Refer to the figure below for detailed information.
http://www.pipingguide.net/2009/07/advanced-sketching.html
6/1/2011
Page 19 of 19
Email this Email the author Technorati Links Subscribe to this feed Sphere: Related Content Posted by Author at 2:23 PM
0 comments:
Post a Comment
Home
Older Post
http://www.pipingguide.net/2009/07/advanced-sketching.html
6/1/2011