You are on page 1of 76

ANALISA HARGA SATUAN PEKERJAAN MEDAN

Kota

: Medan

No.

URAIAN

PEKERJAAN PERSIAPAN
1 M PAGAR SENG GELOMBANG TINGGI : 2 M
a Tiang kayu borneo 4/6
b Semen PC (abu-abu)
c Seng gelombang
d Pasir beton
e Split (batu pecah)
f Balok kayu borneo 4/6
g Paku 5 - 10 cm
h Meni Besi
i Tukang kayu
j Pembantu tukang

KOEFISIEN SAT HARGA SATUAN

0.05
0.05
1.20
0.01
0.01
0.05
0.06
0.45
0.20
0.10

m3
sak
sak
m3
m3
m3
kg
kg
org
org

5,400,000.00
54,000.00
57,500.00
92,000.00
270,000.00
5,400,000.00
17,500.00
22,000.00
87,500.00
50,000.00

270,000.00
2,700.00
69,000.00
460.00
2,430.00
270,000.00
1,050.00
9,900.00
17,500.00
5,000.00
648,040.00
648,040.00

5,400,000.00
54,000.00
155,000.00
92,000.00
270,000.00
17,500.00
87,500.00
50,000.00

270,000.00
2,160.00
387,500.00
460.00
2,430.00
1,050.00
17,500.00
15,000.00

Jumlah
Dibulatkan
2

1 M PAGAR KAWAT BERDURI TINGGI : 1,8 M


a Tiang kayu borneo 4/6
b Semen PC (abu-abu)
c Kawat Duri
d Pasir beton
e Split (batu pecah)
f Paku 5 - 10 cm
g Tukang kayu
h Pembantu tukang

0.05
0.04
2.50
0.01
0.01
0.06
0.20
0.30

m3
sak
kg
m3
m3
kg
org
org

JUMLAH (RP)

Jumlah
Dibulatkan
1 M1 PENGUKURAN & PEMASANGAN BOWPLANK
a Kayu kaso 5/7 borneo
b Paku 5 - 10 cm
c Papan papan kayu terentang 2/20
d Tukang kayu
e Pembantu tukang
Jumlah
Dibulatkan
1 M2 PEMBUATAN KANTOR DIREKSI
a Kayu kaso 5/7 borneo
b Papan kayu terentang
c Paku semua ukuran
d Besi strip
e Semen PC (abu-abu)
f Pasir pasang
g Pasir beton
h Split (batu pecah)
i Bata merah
j Seng gelombang 180 x 90 x 0,05 cm
k Seng Plat BJLS 32
l Kawat harmonika
m Kaca polos 3 mm
n Kunci tanam standart
o Triplek 120 x 240 x 0,4 cm
p Tukang kayu
q Tukang batu
r Pembantu tukang
Jumlah

696,100.00
696,100.00
0.02
0.02
0.00
0.10
0.10

m3
kg
m3
org
org

5,400,000.00
17,500.00
1,448,200.00
87,500.00
50,000.00

108,000.00
350.00
5,792.80
8,750.00
5,000.00
127,892.80
127,890.00

0.02
0.18
0.85
1.10
35.00
0.15
0.10
0.15
30.00
1.20
1.00
2.00
0.08
0.15
0.06
2.00
1.00
2.00

m3
m3
kg
kg
kg
m3
m3
m3
bh
lbr
m2
m2
m2
bh
lbr
org
org
org

5,400,000.00
1,448,200.00
17,500.00
14,100.00
54,000.00
84,000.00
92,000.00
270,000.00
650.00
61,750.00
33,300.00
24,500.00
90,000.00
55,000.00
53,750.00
87,500.00
87,500.00
50,000.00

108,000.00
260,676.00
14,875.00
15,510.00
1,890,000.00
12,600.00
9,200.00
40,500.00
19,500.00
74,100.00
33,300.00
49,000.00
7,200.00
8,250.00
3,225.00
175,000.00
87,500.00
100,000.00
2,908,436.00

Dibulatkan
1 M2 PEMBUATAN GUDANG PROYEK
a Kayu kaso 5/7 borneo
b Papan kayu terentang
c Paku
d Semen PC (abu-abu)
e Pasir beton
f Split (batu pecah)
g Seng gelombang 180 x 90 x 0,05 cm
h Tukang kayu
i Pembantu tukang
Jumlah
Dibulatkan
1 M2 MEMBERSIHKAN LOKASI ROYEK
a Pembantu tukang
Jumlah
Dibulatkan
1 M2 MEMBERSIHKAN PUING-PUING
a Pembantu tukang
Jumlah
Dibulatkan
1 BH MEMBERSIHKAN TUNGGUL TANAMAN
a Pembantu tukang
Jumlah
Dibulatkan
1M2 PEMBUATAN JALAN MASUK PROYEK
a Batu belah 15/20
b Koral 5/7 ( sirtu )
c Pasir urug
d Pembantu tukang

2,908,430.00
0.02
0.10
0.30
0.21
0.03
0.05
1.20
1.00
1.00

m3
m3
kg
sak
m3
m3
lbr
org
org

5,400,000.00
1,448,200.00
17,500.00
54,000.00
92,000.00
270,000.00
61,750.00
87,500.00
50,000.00

108,000.00
144,820.00
5,250.00
11,340.00
2,760.00
13,500.00
74,100.00
87,500.00
50,000.00
497,270.00
497,270.00

0.10

org

50,000.00

5,000.00
5,000.00
5,000.00

0.20

org

50,000.00

10,000.00
10,000.00
10,000.00

2.00

org

50,000.00

100,000.00
100,000.00
100,000.00

0.10
0.05
0.01
1.00

m3
m3
m3
org

128,200.00
82,000.00
67,000.00
50,000.00

12,820.00
4,100.00
670.00
50,000.00

10

11

12

II
1

Jumlah
Dibulatkan
1 M3 PEMBONGKARAN BETON
a Pembantu tukang
Jumlah
Dibulatkan
1 M3 PEMBONGKARAN DINDING BATA
a Pembantu tukang
Jumlah
Dibulatkan
1 M2 PEKERJAAN PAGAR PAPAN RANGKA BALOK
a Papan kayu borneo
b Balok kayu borneo 5/7
c Pasir beton
d Split (batu pecah)
e Semen abu - abu
f Tukang kayu
g Pembantu tukang
Jumlah
Dibulatkan

PEKERJAAN TANAH
1 M3 GALIAN TANAH SEDALAM 1 M
a Pembantu tukang
b Tukang gali
Jumlah
Dibulatkan
1 M3 GALIAN TANAH SEDALAM 2 M

67,590.00
67,500.00
6.20

org

50,000.00

310,000.00
310,000.00
310,000.00

4.60

org

50,000.00

230,000.00
230,000.00
230,000.00

0.02
0.02
0.08
0.15
0.50
0.13
0.38

m3
m3
m3
m3
sak
org
org

5,660,000.00
5,400,000.00
92,000.00
270,000.00
54,000.00
87,500.00
50,000.00

113,200.00
108,000.00
7,360.00
40,500.00
27,000.00
11,375.00
19,000.00
326,435.00
326,400.00

0.40
0.02

org
org

50,000.00
75,000.00

20,000.00
1,500.00
21,500.00
21,500.00

a Pembantu tukang
0.53
b Tukang gali
0.02
Jumlah
Dibulatkan
1 M3 GALIAN TANAH SEDALAM 3 M
a Pembantu tukang
0.74
b Tukang gali
0.02
Jumlah
Dibulatkan
1 M3 GALIAN TANAH KERAS SEDALAM 1 M
a Pembantu tukang
0.45
b Tukang gali
0.02
Jumlah
Dibulatkan
1 M2 PEKERJAAN PENGUPASAN TANAH SETEBAL 10 CM
a Pembantu tukang
0.05
b Tukang gali
0.02
Jumlah
Dibulatkan
1 M3 PEMBUANGAN TANAH SEJAUH 150 M
a Pembantu tukang
0.42
b Tukang gali
0.02
Jumlah
Dibulatkan
1 M3 URUGAN TANAH KEMBALI
a Pembantu tukang
0.19
b Tukang gali
0.02
Jumlah
Dibulatkan
1 M3 PEMADATAN TANAH

org
org

50,000.00
75,000.00

26,500.00
1,500.00
28,000.00
28,000.00

org
org

50,000.00
75,000.00

37,000.00
1,500.00
38,500.00
38,500.00

org
org

50,000.00
75,000.00

22,500.00
1,500.00
24,000.00
24,000.00

org
org

50,000.00
75,000.00

1,250.00
1,125.00
2,375.00
2,370.00

org
org

50,000.00
75,000.00

21,000.00
1,500.00
22,500.00
22,500.00

org
org

50,000.00
75,000.00

9,500.00
1,500.00
11,000.00
11,000.00

10

11

III
1

a Pembantu tukang
b Tukang gali
Jumlah
Dibulatkan
1 M3 URUGAN PASIR
a Pasir urug
b Pembantu tukang
c Tukang gali
Jumlah
Dibulatkan
1 M3 URUGAN TANAH
a Tanah urug
b Pembantu tukang
c Tukang gali
Jumlah
Dibulatkan
1 M3 URUGAN SIRTU
a Sirtu ( koral )
b Pembantu tukang
c Tukang gali
Jumlah
Dibulatkan

PEKERJAAN PONDASI
1 M3 PASANG PONDASI BT KALI , 1 Pc : 3 Ps
a Batu belah
b Semen PC (abu-abu)
c Pasir pasang

0.50
0.02

org
org

50,000.00
75,000.00

25,000.00
1,500.00
26,500.00
26,500.00

1.20
0.30
0.02

m3
org
org

67,000.00
50,000.00
75,000.00

80,400.00
15,000.00
1,500.00
96,900.00
96,900.00

1.20
0.30
0.02

m3
org
org

78,000.00
50,000.00
75,000.00

93,600.00
15,000.00
1,500.00
110,100.00
110,100.00

1.20
0.25
0.02

m3
org
org

82,000.00
50,000.00
75,000.00

98,400.00
12,500.00
1,500.00
112,400.00
112,400.00

1.10
4.04
0.49

m3
sak
m3

128,200.00
54,000.00
84,000.00

141,020.00
218,160.00
40,740.00

d Pembantu tukang
1.50 org
e Tukang batu
0.60 org
Jumlah
Dibulatkan
1 M3 PASANG PONDASI BT KALI , 1 Pc : 4 Ps
a Batu belah
1.10 m3
b Semen PC (abu-abu)
3.26 sak
c Pasir pasang
0.52 m3
d Pembantu tukang
1.50 org
e Tukang batu
0.60 org
Jumlah
Dibulatkan
1 M3 PASANG PONDASI BT KALI , 1 Pc : 5 Ps
a Batu belah
1.10 m3
b Semen PC (abu-abu)
2.72 sak
c Pasir pasang
0.54 m3
d Pembantu tukang
1.50 org
e Tukang batu
0.60 org
Jumlah
Dibulatkan
1 M3 PASANG PONDASI BATU KOSONG ( AANSTAMPING )
a Batu belah
1.20 m3
b Pasir urug
0.30 m3
c Pembantu tukang
0.78 org
d Tukang batu
0.39 org
Jumlah
Dibulatkan
1 M3 MEMBUAT BETON BERTULANG UNTUK PONDASI 1 Pc : 2 Ps : 3 Kr
a Semen PC (abu-abu)
6.72 sak
b Pasir beton
0.54 m3

50,000.00
87,500.00

75,000.00
52,500.00
527,420.00
527,420.00

128,200.00
54,000.00
84,000.00
50,000.00
87,500.00

141,020.00
176,040.00
43,680.00
75,000.00
52,500.00
488,240.00
488,240.00

128,200.00
54,000.00
84,000.00
50,000.00
87,500.00

141,020.00
146,880.00
45,696.00
75,000.00
52,500.00
461,096.00
461,090.00

128,200.00
67,000.00
50,000.00
87,500.00

153,840.00
20,100.00
39,000.00
34,125.00
247,065.00
247,000.00

54,000.00
92,000.00

362,880.00
49,680.00

c Split (batu pecah)


0.81 m3
d Pembantu tukang
2.00 org
e Tukang batu
0.35 org
Jumlah
Dibulatkan
1 Kg PENULANGAN BETON PONDASI
a Besi beton polos
1.05 kg
b Kawat beton
0.02 kg
c Pembantu tukang
0.01 org
d Tukang besi
0.01 org
Jumlah
Dibulatkan
1 M2 PEKERJAAN BEKISTING UNTUK PONDASI
a Papan kayu terentang
0.04 m3
b Paku 5 - 12 cm
0.30 kg
c Pelumas begisting (oli/minyak)
0.10 Ltr
d Pembantu tukang
0.30 org
e Tukang kayu
0.26 org
Jumlah
Dibulatkan
1 M3 PASANG PONDASI CYCLOOP (60 %BETON : 40% BATU KALI)
a Besi beton polos
50.00 kg
b Semen PC (abu-abu)
4.04 sak
c Pasir beton
0.32 m3
d Split (batu pecah)
0.49 m3
e Kawat beton
0.80 kg
f Batu belah
0.40 m3
g Pembantu tukang
2.00 org
h Tukang batu
0.85 org
Jumlah

270,000.00
50,000.00
87,500.00

218,700.00
100,000.00
30,625.00
761,885.00
761,800.00

13,950.00
13,400.00
50,000.00
87,500.00

14,647.50
201.00
350.00
612.50
15,811.00
15,800.00

1,448,200.00
1,900.00
12,500.00
50,000.00
87,500.00

57,928.00
570.00
1,250.00
15,000.00
22,750.00
97,498.00
97,400.00

13,950.00
54,000.00
92,000.00
270,000.00
13,400.00
128,200.00
50,000.00
87,500.00

697,500.00
218,160.00
29,440.00
132,300.00
10,720.00
51,280.00
100,000.00
74,375.00
1,313,775.00

10

11

Dibulatkan
1 M3 PASANG PONDASI SUMURAN DIAMETER 100 cm
a Batu belah
0.45 m3
128,200.00
b Semen PC (abu-abu)
5.60 sak
54,000.00
c Pasir beton
0.45 m3
92,000.00
3
d Split (batu pecah)
0.67 m
270,000.00
e Pembantu tukang
2.38 org
50,000.00
f Tukang batu
0.30 org
87,500.00
Jumlah
Dibulatkan
1 M PEMBUATAN PONDASI TIANG BETON BERTULANG UKURAN 40 X 40 Cm
a Pasir beton
0.10 m3
92,000.00
b Split (batu pecah)
0.15 m3
270,000.00
c Semen PC (abu-abu)
1.21 sak
54,000.00
d Besi beton polos
45.00 kg
13,950.00
e Kawat beton
0.90 kg
13,400.00
f Balok kayu borneo super 5/7
0.03 m3
5,400,000.00
g Papan kayu terentang
0.01 m3
5,660,000.00
h Paku 5 - 12 cm
0.12 kg
17,500.00
i Pelumas begisting (oli/minyak)
0.09 Ltr
12,500.00
j Plamir tembok
0.24 kg
25,000.00
k Pembantu tukang
1.00 org
50,000.00
l Tukang batu
0.67 org
87,500.00
Jumlah
Dibulatkan
1 M PEMBUATAN PONDASI TIANG BETON BERTULANG UKURAN 35 X 35 CM
a Pasir beton
0.08 m3
92,000.00
3
b Split (batu pecah)
0.13 m
270,000.00
c Semen PC (abu-abu)
0.98 sak
54,000.00
d Besi beton polos
34.50 kg
13,950.00

1,313,700.00
57,690.00
302,400.00
41,400.00
180,900.00
119,000.00
26,250.00
727,640.00
727,600.00
9,200.00
40,500.00
65,340.00
627,750.00
12,060.00
172,800.00
56,600.00
2,100.00
1,125.00
6,000.00
50,000.00
58,625.00
1,102,100.00
1,102,100.00
7,360.00
35,100.00
52,920.00
481,275.00

12

13

e Kawat beton
0.70 kg
13,400.00
3
f Balok kayu borneo super 5/7
0.03 m
5,400,000.00
3
g Papan kayu terentang
0.01 m
5,660,000.00
h Paku 5 - 12 cm
0.12 kg
17,500.00
i Pelumas begisting (oli/minyak)
0.09 Ltr
12,500.00
j Plamir tembok
0.20 kg
25,000.00
k Pembantu tukang
0.80 org
50,000.00
l Tukang batu
0.50 org
87,500.00
Jumlah
Dibulatkan
1 M3 MEMBUAT PONDASI TIANG PANCANG UKURAN 25 X 25
a Pasir beton
0.06 m3
92,000.00
b Split (batu pecah)
0.11 m3
270,000.00
c Semen PC (abu-abu)
0.82 sak
54,000.00
d Besi beton polos
34.50 kg
13,950.00
e Kawat beton
0.60 kg
13,400.00
f Balok kayu borneo super 5/7
0.03 m3
5,400,000.00
g Papan kayu terentang
0.01 m3
5,660,000.00
h Paku 5 - 12 cm
0.11 kg
17,500.00
i Pelumas begisting (oli/minyak)
0.08 Ltr
12,500.00
j Plamir tembok
0.20 kg
25,000.00
k Pembantu tukang
0.80 org
50,000.00
l Tukang batu
0.50 org
87,500.00
Jumlah
Dibulatkan
1 M3 MEMBUAT PONDASI PLAT BETON (PENULANGAN 125 kg + BEKISTING )
a Papan kayu terentang
0.20 m3
1,448,200.00
b Paku 5 - 12 cm
1.50 kg
17,500.00
c Pelumas begisting (oli/minyak)
0.40 Ltr
12,500.00
d Besi beton polos
125.00 kg
13,950.00

9,380.00
162,000.00
56,600.00
2,100.00
1,125.00
5,000.00
40,000.00
43,750.00
896,610.00
896,600.00
5,520.00
29,700.00
44,280.00
481,275.00
8,040.00
162,000.00
56,600.00
1,925.00
1,000.00
5,000.00
40,000.00
43,750.00
879,090.00
879,000.00
289,640.00
26,250.00
5,000.00
1,743,750.00

14

15

e Kawat beton
2.25 kg
13,400.00
f Semen PC (abu-abu)
6.46 sak
54,000.00
3
g Pasir beton
0.52 m
92,000.00
3
h Split (batu pecah)
0.78 m
270,000.00
i Pembantu tukang
3.90 org
50,000.00
j Tukang batu
0.35 org
87,500.00
k Tukang kayu
1.04 org
87,500.00
l Tukang besi
1.05 org
87,500.00
Jumlah
Dibulatkan
1 M3 MEMBUAT PONDASI PLAT BETON (PENULANGAN 150 kg + BEKISTING )
a Papan kayu terentang
0.20 m3
1,448,200.00
b Paku 5 - 12 cm
1.50 kg
17,500.00
c Pelumas begisting (oli/minyak)
0.40 ltr
12,500.00
d Besi beton polos Polos
150.00 kg
13,950.00
e Kawat beton
2.25 kg
13,400.00
f Semen PC (abu-abu)
6.46 sak
54,000.00
3
g Pasir beton
0.52 m
92,000.00
3
h Split (batu pecah)
0.78 m
270,000.00
i Pembantu tukang
4.00 org
50,000.00
j Tukang batu
0.40 org
87,500.00
k Tukang kayu
1.00 org
87,500.00
l Tukang besi
1.00 org
87,500.00
Jumlah
Dibulatkan
1 M3 MEMBUAT PONDASI BETON BOREPILE (PENULANGAN 125 kg + BEKISTING )
a Papan kayu terentang
0.20 m3
1,448,200.00
b Paku 5 - 12 cm
1.50 kg
17,500.00
c Pelumas begisting (oli/minyak)
0.40 ltr
12,500.00
d Besi beton polos Polos
125.00 kg
13,950.00

30,150.00
348,840.00
47,840.00
210,600.00
195,000.00
30,625.00
91,000.00
91,875.00
3,110,570.00
3,110,500.00
289,640.00
26,250.00
5,000.00
2,092,500.00
30,150.00
348,840.00
47,840.00
210,600.00
200,000.00
35,000.00
87,500.00
87,500.00
3,460,820.00
3,460,800.00
289,640.00
26,250.00
5,000.00
1,743,750.00

16

IV

e Kawat beton
2.10 kg
13,400.00
f Semen PC (abu-abu)
6.46 sak
54,000.00
3
g Pasir beton
0.52 m
92,000.00
3
h Split (batu pecah)
0.78 m
270,000.00
i Pembantu tukang
3.90 org
50,000.00
j Tukang batu
0.40 org
87,500.00
k Tukang kayu
1.00 org
87,500.00
l Tukang besi
1.00 org
87,500.00
Jumlah
Dibulatkan
1 M3 MEMBUAT PONDASI BETON BOREPILE (PENULANGAN 150 kg + BEKISTING )
a Papan kayu terentang
0.20 m3
1,448,200.00
b Paku 5 - 12 cm
1.50 kg
17,500.00
c Pelumas begisting (oli/minyak)
0.40 ltr
12,500.00
d Besi beton polos
150.00 kg
13,950.00
e Kawat beton
2.25 kg
13,400.00
f Semen PC (abu-abu)
6.46 sak
54,000.00
3
g Pasir beton
0.52 m
92,000.00
3
h Split (batu pecah)
0.78 m
270,000.00
i Pembantu tukang
4.00 org
50,000.00
j Tukang batu
0.40 org
87,500.00
k Tukang kayu
1.00 org
87,500.00
l Tukang besi
1.00 org
87,500.00
Jumlah
Dibulatkan

PEKERJAAN BETON NON STRUKTUR DAN BETON


STRUKTUR

28,140.00
348,840.00
47,840.00
210,600.00
195,000.00
35,000.00
87,500.00
87,500.00
3,105,060.00
3,105,000.00
289,640.00
26,250.00
5,000.00
2,092,500.00
30,150.00
348,840.00
47,840.00
210,600.00
200,000.00
35,000.00
87,500.00
87,500.00
3,460,820.00
3,460,800.00

A
1

PEKERJAAN BETON
1 M3 MEMBUAT BETON NON STRUKTUR, 1 Pc : 3 Ps : 5 Splt
a Semen PC (abu-abu)
4.36 sak
b Pasir beton
0.52 m3
c Split (batu pecah)
0.87 m3
d Pembantu tukang
2.00 org
e Tukang batu
0.35 org
Jumlah
Dibulatkan
1 M3 MEMBUAT BETON STRUKTUR 1 Pc : 2 Ps : 4 Splt
a Semen PC (abu-abu)
4.64 sak
b Pasir beton
0.52 m3
c Split (batu pecah)
0.78 m3
d Pembantu tukang
2.00 org
e Tukang batu
0.35 org
Jumlah
Dibulatkan
1 M3 MEMBUAT BETON STRUKTUR 1 Pc : 2 Ps : 3 Splt
a Semen PC (abu-abu)
6.72 sak
b Pasir beton
0.54 m3
c Split (batu pecah)
0.81 m3
d Pembantu tukang
2.00 org
e Tukang batu
0.35 org
Jumlah
Dibulatkan
1 M3 MEMBUAT BETON STRUKTUR DENGAN MUTU K 225
a Semen PC (abu-abu)
7.76 sak
b Pasir beton
0.65 m3
c Split (batu pecah)
0.65 m3
d Pembantu tukang
2.00 org

54,000.00
92,000.00
270,000.00
50,000.00
87,500.00

235,440.00
47,840.00
234,900.00
100,000.00
30,625.00
648,805.00
648,800.00

54,000.00
92,000.00
270,000.00
50,000.00
87,500.00

250,560.00
47,840.00
210,600.00
100,000.00
30,625.00
639,625.00
639,600.00

54,000.00
92,000.00
270,000.00
50,000.00
87,500.00

362,880.00
49,680.00
218,700.00
100,000.00
30,625.00
761,885.00
761,800.00

54,000.00
92,000.00
270,000.00
50,000.00

419,040.00
59,800.00
175,500.00
100,000.00

B
1

C
1

e Tukang batu
0.35 org
Jumlah
Dibulatkan
1 M3 MEMBUAT BETON STRUKTUR DENGAN MUTU K 275
a Semen PC (abu-abu)
8.00 sak
b Pasir beton
0.55 m3
c Split (batu pecah)
0.70 m3
d Pembantu tukang
2.02 org
e Tukang batu
0.40 org
Jumlah
Dibulatkan
PEKERJAAN PEMBESIAN
1 KG PENULANGAN BETON/BESI BETON POLOS
a Besi beton polos
1.05 kg
b Kawat beton
0.02 kg
c Pembantu tukang
0.01 org
d Tukang besi
0.01 org
Jumlah
Dibulatkan
1 KG PENULANGAN BETON/BESI BETON ULIR
a Besi Beton Ulir
1.10 kg
b Kawat beton
0.02 kg
c Pembantu tukang
0.01 org
d Tukang besi
0.02 org
Jumlah
Dibulatkan
PEKERJAAN BEGISTING
1 M2 PASANG BEKISTING UNTUK SLOOF
a Papan kayu terentang
0.05 m3
b Paku 5 - 12 cm
0.30 kg

87,500.00

30,625.00
784,965.00
784,900.00

54,000.00
92,000.00
270,000.00
50,000.00
87,500.00

432,000.00
50,600.00
189,000.00
101,000.00
35,000.00
807,600.00
807,600.00

13,950.00
13,400.00
50,000.00
87,500.00

14,647.50
268.00
500.00
875.00
16,290.50
16,200.00

15,100.00
13,400.00
50,000.00
87,500.00

16,610.00
201.00
500.00
1,750.00
19,061.00
19,000.00

1,448,200.00
17,500.00

65,169.00
5,250.00

c Pelumas begisting (oli/minyak)


d Pembantu tukang
e Tukang kayu
Jumlah
Dibulatkan
1 M2 PASANG BEKISTING UNTUK KOLOM
a Papan kayu terentang
b Paku 5 - 12 cm
c Pelumas begisting (oli/minyak)
d Balok Kayu Borneo
e Multiplex 120 x 240 x 9 mm
f Pembantu tukang
g Tukang kayu
Jumlah
Dibulatkan
1M2 PASANG BEKISTING UNTUK BALOK
a Papan kayu terentang
b Paku 5 - 12 cm
c Pelumas begisting (oli/minyak)
d Balok Kayu Borneo
e Multiplex 120 x 240 x 9 mm
f Pembantu tukang
g Tukang kayu
Jumlah
Dibulatkan
1 M2 PASANG BEKISTING UNTUK PLAT LANTAI
a Papan kayu terentang
b Paku 5 - 12 cm
c Pelumas begisting (oli/minyak)
d Balok Kayu Borneo

0.10
0.30
0.26

Ltr
org
org

12,500.00
50,000.00
87,500.00

1,250.00
15,000.00
22,750.00
109,419.00
109,400.00

0.04
0.40
0.20
0.04
0.35
0.30
0.33

m3
kg
Ltr
m3
lbr
org
org

1,448,200.00
17,500.00
12,500.00
5,400,000.00
120,950.00
50,000.00
87,500.00

57,928.00
7,000.00
2,500.00
216,000.00
42,332.50
15,000.00
28,875.00
369,635.50
369,600.00

0.04
0.40
0.20
0.04
0.35
0.32
0.33

m3
kg
Ltr
m3
lbr
org
org

1,448,200.00
17,500.00
12,500.00
5,400,000.00
120,950.00
50,000.00
87,500.00

57,928.00
7,000.00
2,500.00
216,000.00
42,332.50
16,000.00
28,875.00
370,635.50
370,600.00

0.04
0.40
0.20
0.04

m3
kg
Ltr
m3

1,448,200.00
17,500.00
12,500.00
5,400,000.00

57,928.00
7,000.00
2,500.00
216,000.00

D
1

e Multiplex 120 x 240 x 9 mm


0.35 lbr
120,950.00
f Pembantu tukang
0.32 org
50,000.00
g Tukang kayu
0.33 org
87,500.00
Jumlah
Dibulatkan
1 M2 PASANG BEKISTING UNTUK TANGGA
a Papan kayu terentang
0.03 m3
1,448,200.00
b Paku 5 - 12 cm
0.40 kg
17,500.00
c Pelumas begisting (oli/minyak)
0.15 Ltr
12,500.00
3
d Balok kayu borneo
0.02 m
5,400,000.00
e Multiplex 120 x 240 x 9 mm
0.35 lbr
120,950.00
f Pembantu tukang
0.32 org
50,000.00
g Tukang kayu
0.33 org
87,500.00
Jumlah
Dibulatkan
PEKERJAAN BETON BERTULANG
1 M3 MEMBUAT SLOOF BETON BERTULANG ( 200 kg BESI + BEKISTING ) K225
a Papan kayu terentang
0.27 m3
1,448,200.00
b Paku 5 - 12 cm
2.00 kg
17,500.00
c Pelumas begisting (oli/minyak)
0.60 Ltr
12,500.00
d Besi beton polos
200.00 kg
13,950.00
e Kawat beton
3.00 kg
13,400.00
f Semen PC (abu-abu)
8.00 sak
54,000.00
3
g Pasir beton
0.52 m
92,000.00
h Split (batu pecah)
0.78 m3
270,000.00
i Pembantu tukang
4.50 org
50,000.00
j Tukang batu
0.35 org
87,500.00
k Tukang kayu
1.56 org
87,500.00
l Tukang besi
1.40 org
87,500.00
Jumlah

42,332.50
16,000.00
28,875.00
370,635.50
370,600.00
43,446.00
7,000.00
1,875.00
108,000.00
42,332.50
16,000.00
28,875.00
247,528.50
247,500.00

391,014.00
35,000.00
7,500.00
2,790,000.00
40,200.00
432,000.00
47,840.00
210,600.00
225,000.00
30,625.00
136,500.00
122,500.00
4,468,779.00

Dibulatkan
1 M3 MEMBUAT KOLOM BETON BERTULANG ( 125 kg BESI + BEKISTING )
a Papan kayu terentang
0.40 m3
b Paku 5 - 12 cm
4.00 kg
c Pelumas begisting (oli/minyak)
2.00 Ltr
d Besi beton polos
125.00 kg
e Kawat beton
4.50 kg
f Semen PC (abu-abu)
6.45 sak
g Pasir beton
0.52 m3
h Split (batu pecah)
0.78 m3
i Balok kayu Borneo Super
0.30 m3
j Multiplex 120 x 240 x 9 mm
3.50 lbr
k Pembantu tukang
7.30 org
l Tukang batu
0.35 org
m Tukang kayu
3.30 org
n Tukang besi
2.10 org
Jumlah
Dibulatkan
1 M3 MEMBUAT KOLOM BETON BERTULANG (150 kg BESI + BEKISTING)
a Papan kayu terentang
0.40 m3
b Paku 5 - 12 cm
4.00 kg
c Pelumas begisting (oli/minyak)
2.00 Ltr
d Besi beton polos
150.00 kg
e Kawat beton
4.50 kg
f Semen PC (abu-abu)
6.45 sak
g Pasir beton
0.52 m3
h Split (batu pecah)
0.78 m3
i Balok kayu Borneo Super
0.30 m3
j Multiplex 120 x 240 x 9 mm
3.50 lbr
k Pembantu tukang
7.30 org

4,468,700.00
1,448,200.00
17,500.00
12,500.00
13,950.00
13,400.00
54,000.00
92,000.00
270,000.00
5,400,000.00
120,950.00
50,000.00
87,500.00
87,500.00
87,500.00

579,280.00
70,000.00
25,000.00
1,743,750.00
60,300.00
348,300.00
47,840.00
210,600.00
1,620,000.00
423,325.00
365,000.00
30,625.00
288,750.00
183,750.00
5,996,520.00
5,996,500.00

1,448,200.00
17,500.00
12,500.00
13,950.00
13,400.00
54,000.00
92,000.00
270,000.00
5,400,000.00
120,950.00
50,000.00

579,280.00
70,000.00
25,000.00
2,092,500.00
60,300.00
348,300.00
47,840.00
210,600.00
1,620,000.00
423,325.00
365,000.00

l Tukang batu
0.35 org
m Tukang kayu
3.30 org
n Tukang besi
2.10 org
Jumlah
Dibulatkan
1 M3 MEMBUAT KOLOM BETON BERTULANG ( 160 kg BESI + BEKISTING )
a Papan kayu terentang
0.40 m3
b Paku 5 - 12 cm
4.00 kg
c Pelumas begisting (oli/minyak)
2.00 Ltr
d Besi beton polos
160.00 kg
e Kawat beton
4.50 kg
f Semen PC (abu-abu)
6.45 sak
g Pasir beton
0.52 m3
h Split (batu pecah)
0.78 m3
i Balok kayu Borneo Super
0.30 m3
j Multiplex 120 x 240 x 9 mm
3.50 lbr
k Pembantu tukang
7.30 org
l Tukang batu
0.35 org
m Tukang kayu
3.30 org
n Tukang besi
2.10 org
Jumlah
Dibulatkan
1 M3 MEMBUAT KOLOM BETON BERTULANG ( 175 kg BESI + BEKISTING )
a Papan kayu terentang
0.40 m3
b Paku 5 - 12 cm
4.00 kg
c Pelumas begisting (oli/minyak)
2.00 Ltr
d Besi beton polos
175.00 kg
e Kawat beton
4.50 kg
f Semen PC (abu-abu)
6.45 sak
g Pasir beton
0.52 m3

87,500.00
87,500.00
87,500.00

30,625.00
288,750.00
183,750.00
6,345,270.00
6,345,200.00

1,448,200.00
17,500.00
12,500.00
13,950.00
13,400.00
54,000.00
92,000.00
270,000.00
5,400,000.00
120,950.00
50,000.00
87,500.00
87,500.00
87,500.00

579,280.00
70,000.00
25,000.00
2,232,000.00
60,300.00
348,300.00
47,840.00
210,600.00
1,620,000.00
423,325.00
365,000.00
30,625.00
288,750.00
183,750.00
6,484,770.00
6,484,700.00

1,448,200.00
17,500.00
12,500.00
13,950.00
13,400.00
54,000.00
92,000.00

579,280.00
70,000.00
25,000.00
2,441,250.00
60,300.00
348,300.00
47,840.00

h Split (batu pecah)


0.78 m3
i Balok kayu Borneo Super
0.30 m3
j Multiplex 120 x 240 x 9 mm
3.50 lbr
k Pembantu tukang
7.30 org
l Tukang batu
0.35 org
m Tukang kayu
3.30 org
n Tukang besi
2.10 org
Jumlah
Dibulatkan
1 M3 MEMBUAT KOLOM BETON BERTULANG ( 200 kg BESI + BEKISTING )
a Papan kayu terentang
0.40 m3
b Paku 5 - 12 cm
4.00 kg
c Pelumas begisting (oli/minyak)
2.00 Ltr
d Besi beton polos
200.00 kg
e Kawat beton
4.50 kg
f Semen PC (abu-abu)
6.45 sak
g Pasir beton
0.52 m3
h Split (batu pecah)
0.78 m3
i Balok kayu Borneo Super
0.30 m3
j Multiplex 120 x 240 x 9 mm
3.50 lbr
k Pembantu tukang
7.30 org
l Tukang batu
0.35 org
m Tukang kayu
3.30 org
n Tukang besi
2.10 org
Jumlah
Dibulatkan
1 M3 MEMBUAT KOLOM BETON BERTULANG ( 250 kg BESI + BEKISTING )
a Papan kayu terentang
0.40 m3
b Paku 5 - 12 cm
4.00 kg
c Pelumas begisting (oli/minyak)
2.00 Ltr

270,000.00
5,400,000.00
120,950.00
50,000.00
87,500.00
87,500.00
87,500.00

210,600.00
1,620,000.00
423,325.00
365,000.00
30,625.00
288,750.00
183,750.00
6,694,020.00
6,694,000.00

1,448,200.00
17,500.00
12,500.00
13,950.00
13,400.00
54,000.00
92,000.00
270,000.00
5,400,000.00
120,950.00
50,000.00
87,500.00
87,500.00
87,500.00

579,280.00
70,000.00
25,000.00
2,790,000.00
60,300.00
348,300.00
47,840.00
210,600.00
1,620,000.00
423,325.00
365,000.00
30,625.00
288,750.00
183,750.00
7,042,770.00
7,042,700.00

1,448,200.00
17,500.00
12,500.00

579,280.00
70,000.00
25,000.00

d Besi beton polos


250.00 kg
e Kawat beton
4.50 kg
f Semen PC (abu-abu)
6.45 sak
g Pasir beton
0.52 m3
h Split (batu pecah)
0.78 m3
i Balok kayu Borneo Super
0.30 m3
j Multiplex 120 x 240 x 9 mm
3.50 lbr
k Pembantu tukang
7.30 org
l Tukang batu
0.35 org
m Tukang kayu
3.30 org
n Tukang besi
2.10 org
Jumlah
Dibulatkan
1 M3 MEMBUAT KOLOM BETON BERTULANG ( 300 kg BESI + BEKISTING )
a Papan kayu terentang
0.40 m3
b Paku 5 - 12 cm
4.00 kg
c Pelumas begisting (oli/minyak)
2.00 Ltr
d Besi beton polos
300.00 kg
e Kawat beton
4.50 kg
f Semen PC (abu-abu)
6.45 sak
g Pasir beton
0.52 m3
h Split (batu pecah)
0.78 m3
i Balok kayu Borneo Super
0.30 m3
j Multiplex 120 x 240 x 9 mm
3.50 lbr
k Pembantu tukang
7.30 org
l Tukang batu
0.35 org
m Tukang kayu
3.30 org
n Tukang besi
2.10 org
Jumlah
Dibulatkan

13,950.00
13,400.00
54,000.00
92,000.00
270,000.00
5,400,000.00
120,950.00
50,000.00
87,500.00
87,500.00
87,500.00

3,487,500.00
60,300.00
348,300.00
47,840.00
210,600.00
1,620,000.00
423,325.00
365,000.00
30,625.00
288,750.00
183,750.00
7,740,270.00
7,740,200.00

1,448,200.00
17,500.00
12,500.00
13,950.00
13,400.00
54,000.00
92,000.00
270,000.00
5,400,000.00
120,950.00
50,000.00
87,500.00
87,500.00
87,500.00

579,280.00
70,000.00
25,000.00
4,185,000.00
60,300.00
348,300.00
47,840.00
210,600.00
1,620,000.00
423,325.00
365,000.00
30,625.00
288,750.00
183,750.00
8,437,770.00
8,437,700.00

10

1 M3 MEMBUAT BALOK BETON BERTULANG ( 125 kg BESI + BEKISTING )


a Papan kayu terentang
0.32 m3
b Paku 5 - 12 cm
3.20 kg
c Pelumas begisting (oli/minyak)
1.60 Ltr
d Besi beton polos
125.00 kg
e Kawat beton
2.25 kg
f Semen PC (abu-abu)
6.45 sak
g Pasir beton
0.52 m3
h Split (batu pecah)
0.78 m3
i Balok kayu Borneo Super
0.12 m3
j Multiplex 120 x 240 x 9 mm
2.80 lbr
k Dolken -8 Cm atau kayu 4 x 6 cm / 4m
32.00 btg
l Pembantu tukang
5.80 org
m Tukang batu
0.35 org
n Tukang kayu
2.80 org
o Tukang besi
1.05 org
Jumlah
Dibulatkan
1 M3 MEMBUAT BALOK BETON BERTULANG ( 150 kg BESI + BEKISTING )
a Papan kayu terentang
0.32 m3
b Paku 5 - 12 cm
3.20 kg
c Pelumas begisting (oli/minyak)
1.60 Ltr
d Besi beton polos
150.00 kg
e Kawat beton
2.25 kg
f Semen PC (abu-abu)
6.45 sak
g Pasir beton
0.52 m3
h Split (batu pecah)
0.78 m3
i Balok kayu Borneo Super
0.12 m3
j Multiplex 120 x 240 x 9 mm
2.80 lbr
k Dolken -8 Cm atau kayu 4 x 6 cm / 4m
32.00 btg

1,448,200.00
17,500.00
12,500.00
13,950.00
13,400.00
54,000.00
92,000.00
270,000.00
5,400,000.00
120,950.00
8,000.00
50,000.00
87,500.00
87,500.00
87,500.00

463,424.00
56,000.00
20,000.00
1,743,750.00
30,150.00
348,300.00
47,840.00
210,600.00
648,000.00
338,660.00
256,000.00
290,000.00
30,625.00
245,000.00
91,875.00
4,820,224.00
4,820,200.00

1,448,200.00
17,500.00
12,500.00
13,950.00
10,000.00
54,000.00
92,000.00
10,000.00
5,400,000.00
120,950.00
8,000.00

463,424.00
56,000.00
20,000.00
2,092,500.00
22,500.00
348,300.00
47,840.00
7,800.00
648,000.00
338,660.00
256,000.00

11

12

l Pembantu tukang
5.80 org
m Tukang batu
0.35 org
n Tukang kayu
2.80 org
o Tukang besi
1.05 org
Jumlah
Dibulatkan
1 M3 MEMBUAT BALOK BETON BERTULANG ( 200 kg BESI + BEKISTING )
a Papan kayu terentang
0.32 m3
b Paku 5 - 12 cm
3.20 kg
c Pelumas begisting (oli/minyak)
1.60 Ltr
d Besi beton polos
200.00 kg
e Kawat beton
3.00 kg
f Semen PC (abu-abu)
6.45 sak
g Pasir beton
0.52 m3
h Split (batu pecah)
0.78 m3
i Balok kayu Borneo Super
0.14 m3
j Multiplex 120 x 240 x 9 mm
2.80 lbr
k Dolken -8 Cm atau kayu 4 x 6 cm / 4m
16.00 btg
l Pembantu tukang
5.96 org
m Tukang batu
0.35 org
n Tukang kayu
2.80 org
o Tukang besi
1.40 org
Jumlah
Dibulatkan
1 M3 MEMBUAT BALOK BETON BERTULANG (200 kg BESI + BEKISTING)
a Papan kayu terentang
0.32 m3
b Paku 5 - 12 cm
3.20 kg
c Pelumas begisting (oli/minyak)
1.60 Ltr
d Besi beton polos
225.00 kg
e Kawat beton
4.00 kg

50,000.00
87,500.00
87,500.00
87,500.00

290,000.00
30,625.00
245,000.00
91,875.00
4,958,524.00
4,958,500.00

1,448,200.00
17,500.00
12,500.00
13,950.00
13,400.00
54,000.00
92,000.00
140,000.00
4,000,000.00
105,000.00
18,000.00
27,500.00
42,000.00
42,000.00
42,000.00

463,424.00
56,000.00
20,000.00
2,790,000.00
40,200.00
348,300.00
47,840.00
109200
560,000.00
294,000.00
288,000.00
163,900.00
14,700.00
117,600.00
58,800.00
5,371,964.00
5,371,900.00

1,750,000.00
17,500.00
10,000.00
8,750.00
15,000.00

560,000.00
56,000.00
16,000.00
1,968,750.00
60,000.00

13

f Semen PC (abu-abu)
6.45 sak
g Pasir beton
0.52 m3
h Split (batu pecah)
0.78 m3
i Balok kayu Borneo Super
0.14 m3
j Multiplex 120 x 240 x 9 mm
2.80 lbr
k Dolken -8 Cm atau kayu 4 x 6 cm / 4m
16.00 btg
l Pembantu tukang
5.96 org
m Tukang batu
0.35 org
n Tukang kayu
2.80 org
o Tukang besi
1.40 org
Jumlah
Dibulatkan
1 M3 MEMBUAT BALOK BETON BERTULANG ( 250 kg BESI + BEKISTING )
a Papan kayu terentang
0.32 m3
b Paku 5 - 12 cm
3.20 kg
c Pelumas begisting (oli/minyak)
1.60 Ltr
d Besi beton polos
250.00 kg
e Kawat beton
6.00 kg
f Semen PC (abu-abu)
6.45 sak
g Pasir beton
0.52 m3
h Split (batu pecah)
0.78 m3
i Balok kayu Borneo Super
0.14 m3
j Multiplex 120 x 240 x 9 mm
2.80 lbr
k Dolken -8 Cm atau kayu 4 x 6 cm / 4m
16.00 btg
l Pembantu tukang
5.96 org
m Tukang batu
0.35 org
n Tukang kayu
2.80 org
o Tukang besi
1.40 org
Jumlah
Dibulatkan

49,500.00
140,000.00
140,000.00
4,000,000.00
120,950.00
8,000.00
50,000.00
87,500.00
87,500.00
87,500.00

319,275.00
72,800.00
109,200.00
560,000.00
338,660.00
128,000.00
298,000.00
30,625.00
245,000.00
122,500.00
4,884,810.00
4,884,800.00

1,448,200.00
17,500.00
12,500.00
13,950.00
13,400.00
54,000.00
92,000.00
270,000.00
5,400,000.00
120,950.00
8,000.00
50,000.00
87,500.00
87,500.00
87,500.00

463,424.00
56,000.00
20,000.00
3,487,500.00
80,400.00
348,300.00
47,840.00
210,600.00
756,000.00
338,660.00
128,000.00
298,000.00
30,625.00
245,000.00
122,500.00
6,632,849.00
6,632,800.00

14

15

16

17

1 M3 MEMBUAT TANGGA BETON BERTULANG ( 200 kg BESI + BEKISTING )


a Papan kayu terentang
0.25 m3
1,448,200.00
b Paku 5 - 12 cm
3.00 kg
17,500.00
c Pelumas begisting (oli/minyak)
1.20 Ltr
12,500.00
d Besi beton polos
200.00 kg
13,950.00
e Kawat beton
3.00 kg
13,400.00
f Semen PC (abu-abu)
6.45 sak
54,000.00
3
g Pasir beton
0.52 m
92,000.00
h Split (batu pecah)
0.78 m3
270,000.00
i Balok kayu Borneo Super
0.30 m3
5,400,000.00
j Multiplex 120 x 240 x 9 mm
2.50 lbr
120,950.00
k Pembantu tukang
5.60 org
50,000.00
l Tukang batu
0.35 org
87,500.00
m Tukang kayu
2.30 org
87,500.00
n Tukang besi
1.40 org
87,500.00
Jumlah
Dibulatkan
1 M3 MEMBUAT PLAT LANTAI Tb. 10 Cm BETON BERTULANG ( 100 kg BESI + BEKISTING )
a Beton bertulang camp. 1Pc : 2 Ps : 3 Kr
1.00 m3
761,800.00
2
b Pasang Bekisting untuk lantai
10.00 m
370,600.00
c Besi Beton rakit
100.00 kg
13,950.00
Jumlah
Dibulatkan
1 M3 MEMBUAT PLAT LANTAI Tb. 12 Cm BETON BERTULANG ( 115 kg BESI + BEKISTING )
a Beton bertulang camp. 1Pc : 2 Ps : 3 Kr
1.00 m3
761,800.00
2
b Pasang Bekisting untuk lantai
8.33 m
370,600.00
c Besi Beton rakit
115.00 kg
16,200.00
Jumlah
Dibulatkan
1 M3 MEMBUAT PLAT LANTAI Tb. 12 Cm BETON BERTULANG ( 125 kg BESI + BEKISTING )

362,050.00
52,500.00
15,000.00
2,790,000.00
40,200.00
348,300.00
47,840.00
210,600.00
1,620,000.00
302,375.00
280,000.00
30,625.00
201,250.00
122,500.00
6,423,240.00
6,423,200.00
761,800.00
3,706,000.00
1,395,000.00
5,862,800.00
5,862,800.00
761,800.00
3,087,098.00
1,863,000.00
5,711,898.00
5,711,800.00

18

19

20

a Beton bertulang camp. 1Pc : 2 Ps : 3 Kr


1.00 m3
761,800.00
2
b Pasang Bekisting untuk lantai
8.33 m
370,600.00
c Besi Beton rakit
125.00 kg
16,200.00
Jumlah
Dibulatkan
1 M3 MEMBUAT PLAT LANTAI Tb. 15 Cm BETON BERTULANG ( 100 kg BESI + BEKISTING )
a Beton bertulang camp. 1Pc : 2 Ps : 3 Kr
1.00 m3
761,800.00
b Pasang Bekisting untuk lantai
6.67 m2
370,600.00
c Besi Beton rakit
100.00 kg
16,200.00
Jumlah
Dibulatkan
1 M3 MEMBUAT PLAT LANTAI Tb. 20 Cm BETON BERTULANG ( 115 kg BESI + BEKISTING )
a Beton bertulang camp. 1Pc : 2 Ps : 3 Kr
1.00 m3
761,800.00
2
b Pasang Bekisting untuk lantai
7.50 m
370,600.00
c Besi Beton rakit
115.00 kg
16,200.00
Jumlah
Dibulatkan
1M3 MEMBUAT RING BALK BETON BERTULANG ( 175 kg BESI + BEKISTING ) K225
a Papan kayu terentang
0.27 m3
1,448,200.00
b Paku 5 - 12 cm
2.00 kg
17,500.00
c Pelumas begisting (oli/minyak)
0.60 Ltr
12,500.00
d Besi beton polos
175.00 kg
13,950.00
e Kawat beton
3.00 kg
13,400.00
f Semen PC (abu-abu)
8.00 sak
54,000.00
g Pasir beton
0.52 m3
92,000.00
3
h Split (batu pecah)
0.78 m
270,000.00
i Pembantu tukang
4.85 org
50,000.00
j Tukang batu
0.40 org
87,500.00
k Tukang kayu
1.75 org
87,500.00
l Tukang besi
1.45 org
87,500.00

761,800.00
3,087,098.00
2,025,000.00
5,873,898.00
5,873,800.00
761,800.00
2,471,902.00
1,620,000.00
4,853,702.00
4,853,700.00
761,800.00
2,779,500.00
1,863,000.00
5,404,300.00
5,404,300.00
391,014.00
35,000.00
7,500.00
2,441,250.00
40,200.00
432,000.00
47,840.00
210,600.00
242,500.00
35,000.00
153,125.00
126,875.00

Jumlah
Dibulatkan

V
1

PEKERJAAN DINDING
1 M2 PASANGAN Bata merah TEBAL 1 BATA, CAMPURAN 1 Pc : 3 Ps
a Bata merah
140.00 bh
b Semen PC (abu-abu)
0.65 sak
c Pasir pasang
0.09 m3
d Pembantu tukang
0.65 org
e Tukang batu
0.20 org
Jumlah
Dibulatkan
1 M2 PASANGAN Bata merah TEBAL 1 BATA, CAMPURAN 1 Pc : 4 Ps
a Bata merah
140.00 bh
b Semen PC (abu-abu)
0.55 sak
c Pasir pasang
0.09 m3
d Pembantu tukang
0.65 org
e Tukang batu
0.20 org
Jumlah
Dibulatkan
1 M2 PASANGAN BATA MERAH TEBAL 1 BATA, CAMPURAN 1 Pc : 5 Ps
a Bata merah
140.00 bh
b Semen PC (abu-abu)
0.45 sak
c Pasir pasang
0.10 m3
d Pembantu tukang
0.65 org
e Tukang batu
0.20 org
Jumlah
Dibulatkan
1 M2 PASANGAN BATA MERAH TEBAL BATA, CAMPURAN 1 Pc : 3 Ps

4,162,904.00
4,162,900.00

650.00
54,000.00
84,000.00
50,000.00
87,500.00

91,000.00
35,100.00
7,560.00
32,500.00
17,500.00
183,660.00
183,600.00

650.00
54,000.00
84,000.00
50,000.00
87,500.00

91,000.00
29,700.00
7,560.00
32,500.00
17,500.00
178,260.00
178,200.00

650.00
54,000.00
84,000.00
50,000.00
87,500.00

91,000.00
24,300.00
8,400.00
32,500.00
17,500.00
173,700.00
173,700.00

a Bata merah
70.00 bh
b Semen PC (abu-abu)
0.29 sak
c Pasir pasang
0.04 m3
d Pembantu tukang
0.32 org
e Tukang batu
0.10 org
Jumlah
Dibulatkan
1 M2 PASANGAN BATA MERAH TEBAL BATA, CAMPURAN 1 Pc : 4 Ps
a Bata merah
70.00 bh
b Semen PC (abu-abu)
0.25 sak
c Pasir pasang
0.05 m3
d Pembantu tukang
0.32 org
e Tukang batu
0.10 org
Jumlah
Dibulatkan
1 M2 PASANGAN BATA MERAH TEBAL BATA, CAMPURAN 1 Pc : 5 Ps
a Bata merah
70.00 bh
b Semen PC (abu-abu)
0.22 sak
c Pasir pasang
0.05 m3
d Pembantu tukang
0.32 org
e Tukang batu
0.10 org
Jumlah
Dibulatkan
1 M2 PASANG DINDING BATA ROOSTER / BATA TERAWANG
a Rooster / Terawang ukuran 12 x 11 x 24
37.00 bh
b Semen PC (abu-abu)
0.27 sak
c Pasir pasang
0.04 m3
d Pembantu tukang
0.30 org
e Tukang batu
0.10 org
Jumlah

650.00
54,000.00
84,000.00
50,000.00
87,500.00

45,500.00
15,660.00
3,360.00
16,000.00
8,750.00
89,270.00
89,200.00

650.00
54,000.00
84,000.00
50,000.00
87,500.00

45,500.00
13,500.00
4,200.00
16,000.00
8,750.00
87,950.00
87,900.00

650.00
54,000.00
84,000.00
50,000.00
87,500.00

45,500.00
11,880.00
4,200.00
16,000.00
8,750.00
86,330.00
86,300.00

4,200.00
54,000.00
84,000.00
50,000.00
87,500.00

155,400.00
14,580.00
3,360.00
15,000.00
8,750.00
197,090.00

10

11

Dibulatkan
1 M2 PASANG DINDING GLASSBLOCK
a Glassblock ukuran 18 x 18 cm
30.00 bh
b Semen putih
0.27 sak
c Pembantu tukang
0.30 org
d Tukang batu
0.10 org
Jumlah
Dibulatkan
1 M2 PASANGAN BATACO PUTIH, CAMPURAN 1 Pc : 5 Ps
a Bataco putih
15.00 bh
b Semen PC (abu-abu)
0.25 sak
c Pasir pasang
0.03 m3
d Pembantu tukang
0.30 org
e Tukang batu
0.15 org
Jumlah
Dibulatkan
1 M2 PASANGAN BATACO PRES SEMEN, CAMPURAN 1 Pc : 5 Ps
a Bataco press semen
15.00 bh
b Semen PC (abu-abu)
0.20 sak
c Pasir pasang
0.02 m3
d Pembantu tukang
0.30 org
e Tukang batu
0.15 org
Jumlah
Dibulatkan
1 M2 PASANGAN BATA RINGAN ( HEBEL/CELCON ).
a Bata Ringan ( hebel/celcon )
8.00 bh
b Semen Instan
11.45 kg
c Pembantu tukang
0.30 org
d Tukang batu
0.20 org
Jumlah

197,000.00
21,500.00
12,700.00
50,000.00
87,500.00

645,000.00
3,429.00
15,000.00
8,750.00
672,179.00
672,100.00

4,000.00
54,000.00
84,000.00
50,000.00
87,500.00

60,000.00
13,500.00
2,520.00
15,000.00
13,125.00
104,145.00
104,100.00

4,200.00
54,000.00
84,000.00
50,000.00
87,500.00

63,000.00
10,800.00
1,680.00
15,000.00
13,125.00
103,605.00
103,600.00

3,500.00
2,450.00
50,000.00
87,500.00

28,000.00
28,052.50
15,000.00
17,500.00
88,552.50

Dibulatkan

VI
1

PEKERJAAN PLESTERAN/ACCI
1 M2 PLESTERAN CAMPURAN 1 Pc : 2 Ps TEBAL 1,5 cm
a Semen PC (abu-abu)
0.14
b Pasir pasang
0.02
c Pembantu tukang
0.20
d Tukang batu
0.15
Jumlah
Dibulatkan
1 M2 PLESTERAN CAMPURAN 1 Pc : 3 Ps TEBAL 1,5 cm
a Semen PC (abu-abu)
0.13
b Pasir pasang
0.02
c Pembantu tukang
0.20
d Tukang batu
0.15
Jumlah
Dibulatkan
1 M2 PLESTERAN CAMPURAN 1 Pc : 4 Ps TEBAL 1,5 cm
a Semen PC (abu-abu)
0.10
b Pasir pasang
0.02
c Pembantu tukang
0.20
d Tukang batu
0.15
Jumlah
Dibulatkan
1 M2 PLESTERAN CAMPURAN 1 Pc : 5 Ps TEBAL 1,5 cm
a Semen PC (abu-abu)
0.09
b Pasir pasang
0.02
c Pembantu tukang
0.20
d Tukang batu
0.15

88,500.00

sak
m3
org
org

54,000.00
84,000.00
50,000.00
87,500.00

7,560.00
1,680.00
10,000.00
13,125.00
32,365.00
32,300.00

sak
m3
org
org

54,000.00
84,000.00
50,000.00
87,500.00

7,020.00
1,680.00
10,000.00
13,125.00
31,825.00
31,800.00

sak
m3
org
org

54,000.00
84,000.00
50,000.00
87,500.00

5,400.00
1,680.00
10,000.00
13,125.00
30,205.00
30,200.00

sak
m3
org
org

54,000.00
84,000.00
50,000.00
87,500.00

4,860.00
1,680.00
10,000.00
13,125.00

Jumlah
Dibulatkan
1 M2 PLESTERAN CAMPURAN 1 Pc : 4 Ps TEBAL 2,0 cm
a Semen PC (abu-abu)
0.17 sak
b Pasir pasang
0.03 m3
c Pembantu tukang
0.22 org
d Tukang batu
0.16 org
Jumlah
Dibulatkan
1 M2 PLESTERAN CAMPURAN 1 Pc : 5 Ps TEBAL 2,0 cm
a Semen PC (abu-abu)
0.15 sak
b Pasir pasang
0.03 m3
c Pembantu tukang
0.25 org
d Tukang batu
0.20 org
Jumlah
Dibulatkan
1 M2 BERAPEN CAMPURAN 1 Pc : 5 Ps TEBAL 1,5 cm
a Semen PC (abu-abu)
0.11 sak
b Pasir pasang
0.03 m3
c Pembantu tukang
0.15 org
d Tukang batu
0.07 org
Jumlah
Dibulatkan
1 M2 PLESTERAN BETON CAMPURAN 1 Pc : 2 Ps TEBAL 1,5 cm
a Semen PC (abu-abu)
0.19 sak
b Pasir pasang
0.02 m3
c Pembantu tukang
0.26 org
d Tukang batu
0.20 org
Jumlah
Dibulatkan

29,665.00
29,600.00
54,000.00
84,000.00
50,000.00
87,500.00

9,180.00
2,520.00
11,000.00
14,000.00
36,700.00
36,700.00

54,000.00
84,000.00
50,000.00
87,500.00

8,100.00
2,520.00
12,500.00
17,500.00
40,620.00
40,600.00

54,000.00
84,000.00
50,000.00
87,500.00

5,940.00
2,100.00
7,500.00
6,125.00
21,665.00
21,600.00

54,000.00
84,000.00
50,000.00
87,500.00

10,260.00
1,680.00
13,000.00
17,500.00
42,440.00
42,400.00

10

11

12

VII

1 M2 PLESTERAN BETON CAMPURAN 1 Pc : 3 Ps TEBAL 1,5 cm


a Semen PC (abu-abu)
0.15 sak
b Pasir pasang
0.02 m3
c Pembantu tukang
0.26 org
d Tukang batu
0.20 org
Jumlah
Dibulatkan
1 M2 PLESTERAN SKONENG CAMPURAN 1 Pc : 2 Ps
a Semen PC (abu-abu)
0.01 sak
b Pasir pasang
0.01 m3
c Pembantu tukang
0.06 org
d Tukang batu
0.04 org
Jumlah
Dibulatkan
1 M2 ACCIAN PLESTERAN
a Semen PC (abu-abu)
0.08 sak
b Pembantu tukang
0.14 org
c Tukang batu
0.11 org
Jumlah
Dibulatkan
1 M2 PLESTERAN SIAR CAMPURAN 1 Pc : 2 Ps
a Semen PC (abu-abu)
0.09 sak
b Pasir pasang
0.02 m3
c Pembantu tukang
0.15 org
d Tukang batu
0.07 org
Jumlah
Dibulatkan

PEKERJAAN PELAPIS LANTAI

54,000.00
84,000.00
50,000.00
87,500.00

8,100.00
1,680.00
13,000.00
17,500.00
40,280.00
40,200.00

54,000.00
84,000.00
50,000.00
87,500.00

540.00
840.00
3,000.00
3,500.00
7,880.00
7,800.00

54,000.00
50,000.00
87,500.00

4,320.00
7,000.00
9,625.00
20,945.00
20,900.00

54,000.00
84,000.00
50,000.00
87,500.00

4,860.00
1,680.00
7,500.00
6,125.00
20,165.00
20,100.00

1 M2 PASANG LANTAI KERAMIK UKURAN


a Keramik ukuran 40 x 40 cm
b Semen PC (abu-abu)
c Pasir pasang
d Semen warna
e Pembantu tukang
f Tukang batu
Jumlah
Dibulatkan
1 M2 PASANG LANTAI KERAMIK UKURAN
a Keramik ukuran 40 x 40 cm
b Semen PC (abu-abu)
c Pasir pasang
d Semen warna
e Pembantu tukang
f Tukang batu
Jumlah
Dibulatkan
1 M2 PASANG LANTAI KERAMIK UKURAN
a Keramik ukuran 60 x 60 cm
b Semen PC (abu-abu)
c Pasir pasang
d Semen warna
e Pembantu tukang
f Tukang batu
Jumlah
Dibulatkan
1 M2 PASANG LANTAI KERAMIK UKURAN
a Keramik ukuran 60 x 90 cm
b Semen PC (abu-abu)

40 x 40 cm POLISHED
1.00 m2
0.16 sak
0.02 m3
0.02 kg
0.25 org
0.12 org

225,000.00
54,000.00
84,000.00
12,700.00
50,000.00
87,500.00

225,000.00
8,640.00
1,806.00
254.00
12,500.00
10,500.00
258,700.00
258,700.00

40 x 40 cm UNPOLISH
1.00 m2
0.16 sak
0.02 m3
0.02 kg
0.26 org
0.13 org

202,000.00
54,000.00
84,000.00
12,700.00
50,000.00
87,500.00

202,000.00
8,640.00
1,680.00
254.00
13,000.00
10,937.50
236,511.50
236,510.00

60 x 60 cm
1.00
0.18
0.02
0.01
0.25
0.12

m2
sak
m3
kg
org
org

298,000.00
54,000.00
84,000.00
12,700.00
50,000.00
87,500.00

298,000.00
9,720.00
1,806.00
165.10
12,500.00
10,500.00
332,691.10
332,690.00

60 x 90 cm
1.00
0.17

m2
sak

340,000.00
54,000.00

340,000.00
9,180.00

c Pasir pasang
d Semen warna
e Pembantu tukang
f Tukang batu
Jumlah
Dibulatkan
1 M2 PASANG LANTAI KERAMIK 10 x 20 cm
a Keramik lantai 10 x 20 cm
b Semen PC ( abu-abu )
c Pasir pasang
d Semen warna
e Pembantu tukang
f Tukang batu
Jumlah
Dibulatkan
1 M2 PASANG LANTAI KERAMIK POLOS 20 x 20 cm
a Keramik polos 20 x 20 cm
b Semen PC (abu-abu)
c Pasir pasang
d Semen warna
e Pembantu tukang
f Tukang batu
Jumlah
Dibulatkan
1 M2 PASANG LANTAI KERAMIK MOTIF 20 x 20 cm
a Keramik motif 20 x 20 cm
b Semen PC (abu-abu)
c Pasir pasang
d Semen warna
e Pembantu tukang

0.02
0.02
0.26
0.14

m3
kg
org
org

84,000.00
12,700.00
50,000.00
87,500.00

1,806.00
254.00
13,000.00
12,250.00
376,490.00
376,490.00

1.00
0.18
0.02
0.02
0.22
0.40

m2
sak
m3
kg
org
org

34,000.00
54,000.00
84,000.00
12,700.00
50,000.00
87,500.00

34,000.00
9,720.00
1,680.00
254.00
11,000.00
35,000.00
91,654.00
91,650.00

1.00
0.17
0.02
0.02
0.30
0.15

m2
sak
m3
kg
org
org

37,000.00
54,000.00
84,000.00
12,700.00
50,000.00
87,500.00

37,000.00
9,180.00
1,806.00
254.00
15,000.00
13,125.00
76,365.00
76,360.00

1.00
0.17
0.02
0.02
0.30

m2
sak
m3
kg
org

39,000.00
54,000.00
84,000.00
12,700.00
50,000.00

39,000.00
9,180.00
1,806.00
254.00
15,000.00

10

f Tukang batu
Jumlah
Dibulatkan
1 M2 PASANG LANTAI KERAMIK POLOS 30 x 30 cm
a Keramik polos 30 x 30 cm
b Semen PC (abu-abu)
c Pasir pasang
d Semen warna
e Pembantu tukang
f Tukang batu
Jumlah
Dibulatkan
1 M2 PASANG LANTAI KERAMIK MOTIF 30 x 30 cm
a Keramik motif 30 x 30 cm
b Semen PC (abu-abu)
c Pasir pasang
d Semen warna
e Pembantu tukang
f Tukang batu
Jumlah
Dibulatkan
1 M2 PASANG LANTAI MARMER
a marmer standar
b Semen PC (abu-abu)
c Pasir pasang
d Semen warna
e Pembantu tukang
f Tukang batu
Jumlah
Dibulatkan

0.15

org

87,500.00

13,125.00
78,365.00
78,360.00

1.00
0.16
0.02
0.02
0.25
0.12

m2
sak
m3
kg
org
org

39,000.00
54,000.00
84,000.00
12,700.00
50,000.00
87,500.00

39,000.00
8,640.00
1,680.00
254.00
12,500.00
10,500.00
72,574.00
72,570.00

1.00
0.16
0.02
0.02
0.25
0.12

m2
sak
m3
kg
org
org

43,000.00
54,000.00
84,000.00
12,700.00
50,000.00
87,500.00

43,000.00
8,640.00
1,680.00
254.00
12,500.00
10,500.00
76,574.00
76,570.00

1.00
0.48
0.10
0.20
0.62
0.35

m2
sak
m3
sak
org
org

212,000.00
54,000.00
84,000.00
12,700.00
50,000.00
87,500.00

212,000.00
25,920.00
8,400.00
2,540.00
31,000.00
30,625.00
310,485.00
310,480.00

11

12

VIII
1

1 M2 PASANG LANTAI PARQUET JATI


a Parquet jati
b Lem vinyl
c Pembantu tukang
d Tukang
Jumlah
Dibulatkan
1 M2 PASANG LANTAI GRANIT
a Granit standar
b Semen PC (abu-abu)
c Pasir pasang
d Semen warna
e Pembantu tukang
f Tukang batu
Jumlah
Dibulatkan

PEKERJAAN PELAPIS DINDING


1 M2 PASANG DINDING KERAMIK MOTIF 10 x 20 cm
a Keramik motif 10 x 20 cm
b Semen PC ( abu-abu )
c Pasir pasang
d Semen warna
e Pembantu tukang
f Tukang batu
Jumlah
Dibulatkan
1 M2 PASANG DINDING KERAMIK POLOS 10 x 20 cm

1.05
0.60
0.65
0.35

m2
kg
org
org

276,000.00
32,000.00
50,000.00
87,500.00

289,800.00
19,200.00
32,500.00
30,625.00
372,125.00
372,120.00

1.00
0.48
0.08
0.10
0.60
0.48

m2
sak
m3
sak
org
org

750,000.00
54,000.00
84,000.00
12,700.00
50,000.00
87,500.00

750,000.00
25,920.00
6,720.00
1,270.00
30,000.00
42,000.00
855,910.00
855,910.00

1.00
0.18
0.02
0.02
0.22
0.40

m2
sak
m3
kg
org
org

38,000.00
54,000.00
84,000.00
12,700.00
50,000.00
87,500.00

38,000.00
9,720.00
1,680.00
254.00
11,000.00
35,000.00
95,654.00
95,650.00

a Keramik polos 10 x 20 cm
b Semen PC ( abu-abu )
c Pasir pasang
d Semen warna
e Pembantu tukang
f Tukang batu
Jumlah
Dibulatkan
1 M2 PASANG DINDING KERAMIK MOTIF 20 x 20 cm
a Keramik motif 20 x 20 cm
b Semen PC ( abu-abu )
c Pasir pasang
d Semen warna
e Pembantu tukang
f Tukang batu
Jumlah
Dibulatkan
1 M2 PASANG DINDING KERAMIK POLOS 20 x 20 cm
a Keramik polos 20 x 20 cm
b Semen PC ( abu-abu )
c Pasir pasang
d Semen warna
e Pembantu tukang
f Tukang batu
Jumlah
Dibulatkan
1 M2 PASANG DINDING KERAMIK POLOS 20 x 25 cm
a Keramik polos 20 x 25 cm
b Semen PC ( abu-abu )
c Pasir pasang

1.00
0.18
0.02
0.02
0.22
0.40

m2
sak
m3
kg
org
org

36,000.00
54,000.00
84,000.00
12,700.00
50,000.00
87,500.00

36,000.00
9,720.00
1,680.00
254.00
11,000.00
35,000.00
93,654.00
93,650.00

1.00
0.17
0.02
0.02
0.20
0.39

m2
sak
m3
kg
org
org

39,000.00
54,000.00
84,000.00
12,700.00
50,000.00
87,500.00

39,000.00
9,180.00
1,680.00
254.00
10,000.00
34,125.00
94,239.00
94,230.00

1.00
0.17
0.02
0.02
0.20
0.39

m2
sak
m3
kg
org
org

37,000.00
54,000.00
84,000.00
12,700.00
50,000.00
87,500.00

37,000.00
9,180.00
1,680.00
254.00
10,000.00
34,125.00
92,239.00
92,230.00

1.00
0.16
0.02

m2
sak
m3

38,000.00
54,000.00
84,000.00

38,000.00
8,640.00
1,512.00

d Semen warna
e Pembantu tukang
f Tukang batu
Jumlah
Dibulatkan
1 M2 PASANG DINDING KERAMIK MOTIF 20 x 25 cm
a Keramik motif 20 x 25 cm
b Semen PC ( abu-abu )
c Pasir pasang
d Semen warna
e Pembantu tukang
f Tukang batu
Jumlah
Dibulatkan
1 M2 PASANG DINDING MARMER
a Marmer standar
b Paku sekrup
c Semen PC ( abu-abu )
d Pasir pasang
e Semen warna
f Kawat ikat
g Paku
h Pembantu tukang
i Tukang batu
Jumlah
Dibulatkan
1 M2 PASANG DINDING GRANIT
a Granit standar
b Paku sekrup
c Semen PC ( abu-abu )

0.01
0.19
0.38

kg
org
org

12,700.00
50,000.00
87,500.00

165.10
9,375.00
32,812.50
90,504.60
90,500.00

1.00
0.16
0.02
0.01
0.19
0.38

m2
sak
m3
kg
org
org

39,000.00
54,000.00
84,000.00
12,700.00
50,000.00
87,500.00

39,000.00
8,640.00
1,512.00
165.10
9,375.00
32,812.50
91,504.60
91,500.00

1.00
4.00
0.25
0.03
1.50
0.03
0.03
0.72
0.65

m2
bh
sak
m3
kg
kg
kg
org
org

212,000.00
600.00
54,000.00
84,000.00
12,700.00
13,400.00
17,500.00
50,000.00
87,500.00

212,000.00
2,400.00
13,500.00
2,100.00
19,050.00
335.00
437.50
36,000.00
56,875.00
342,697.50
342,690.00

1.00
2.00
0.25

m2
bh
sak

750,000.00
600.00
54,000.00

750,000.00
1,200.00
13,500.00

10

11

d Pasir pasang
e Semen warna
f Kawat ikat
g Paku
h Pembantu tukang
i Tukang batu
Jumlah
Dibulatkan
1 M2 PASANG DINDING BATU TEMPEL HITAM
a Batu tempel hitam
b Semen PC ( abu-abu )
c Pasir pasang
d Pembantu tukang
e Tukang batu
Jumlah
Dibulatkan
1 M2 PASANG DINDING BATU ALAM
a Batu alam
b Semen PC ( abu-abu )
c Pasir pasang
d Pembantu tukang
e Tukang batu
Jumlah
Dibulatkan
1 M PASANG PLINT KERAMIK UKURAN 10 x 40 cm
a Plint Keramik ukuran 10 x 40 cm
b Semen PC (abu-abu)
c Pasir pasang
d Semen warna
e Pembantu tukang

0.03
1.50
0.03
0.03
0.72
0.65

m3
kg
kg
kg
org
org

84,000.00
12,700.00
13,400.00
17,500.00
50,000.00
87,500.00

2,100.00
19,050.00
335.00
437.50
36,000.00
56,875.00
879,497.50
879,490.00

1.00
0.24
0.04
0.32
0.25

m2
sak
m3
org
org

108,200.00
54,000.00
84,000.00
50,000.00
87,500.00

108,200.00
12,960.00
2,940.00
16,000.00
21,875.00
161,975.00
161,970.00

1.00
0.25
0.04
0.32
0.25

m2
sak
m3
org
org

157,900.00
54,000.00
84,000.00
50,000.00
87,500.00

157,900.00
13,500.00
2,940.00
16,000.00
21,875.00
212,215.00
212,210.00

2.65
0.02
0.01
0.10
0.06

bh
sak
m3
kg
org

10,000.00
54,000.00
84,000.00
12,700.00
50,000.00

26,500.00
1,080.00
840.00
1,270.00
3,000.00

12

IX
1

f Tukang batu
Jumlah
Dibulatkan
1 m PASANG PLINT KERAMIK UKURAN 10 x 30 cm
a Plint Keramik ukuran 10 x 30 cm
b Semen PC (abu-abu)
c Pasir pasang
d Semen warna
e Pembantu tukang
f Tukang batu
Jumlah
Dibulatkan

0.03

org

87,500.00

2,625.00
35,315.00
35,310.00

3.30
0.02
0.01
0.12
0.06
0.03

bh
sak
m3
kg
org
org

8,000.00
54,000.00
84,000.00
12,700.00
50,000.00
87,500.00

26,400.00
1,080.00
840.00
1,524.00
3,000.00
2,625.00
35,469.00
35,460.00

PEKERJAAN KUSEN, PINTU, JENDELA, PARTISI


1 M3 PASANG KUSEN PINTU & JENDELA KAYU KAMPER SAMARINDA
a Balok kayu kamper samarinda
1.20 m3
9,670,000.00
b Pembantu tukang
6.00 org
50,000.00
c Tukang kayu
15.00 org
87,500.00
Jumlah
Dibulatkan
1 M3 PASANG KUSEN PINTU & JENDELA KAYU KAMPER MEDAN / KRUING
a Balok kayu kamper medan
1.20 m3
6,550,000.00
b Pembantu tukang
6.00 org
50,000.00
c Tukang kayu
15.00 org
87,500.00
Jumlah
Dibulatkan
1 M3 PASANG KUSEN PINTU & JENDELA KAYU BORNEO SUPER
a Kayu balok borneo super
1.20 m3
5,400,000.00

11,604,000.00
300,000.00
1,312,500.00
13,216,500.00
13,216,500.00
7,860,000.00
300,000.00
1,312,500.00
9,472,500.00
9,472,500.00
6,480,000.00

b Pembantu tukang
6.00 org
c Tukang kayu
15.00 org
Jumlah
Dibulatkan
1 M2 PASANG PINTU PANEL KAYU KAMPER SAMARINDA
a Papan kayu kamper samarinda
0.04 m3
b Pembantu tukang
1.00 org
c Tukang kayu
2.50 org
Jumlah
Dibulatkan
1 M2 PASANG PINTU PANEL KAYU KAMPER MEDAN / KRUING
a Papan kayu kamper medan
0.04 m3
b Pembantu tukang
1.00 org
c Tukang kayu
2.50 org
Jumlah
Dibulatkan
1 M2 PASANG PINTU DAN JENDELA KACA KAYU KAMPER MEDAN
a Papan kayu kamper medan
0.04 m3
b Pembantu tukang
0.80 org
c Tukang kayu
2.00 org
Jumlah
Dibulatkan
1 M2 PASANG PINTU DAN JENDELA KACA KAYU BORNEO
a Papan kayu borneo super
0.04 m3
b Pembantu tukang
0.80 org
c Tukang kayu
2.00 org
Jumlah
Dibulatkan
1 M2 PASANG PINTU DAN JENDELA JALUSI KAYU KAMPER MEDAN
a Papan kayu Kamper Medan
0.06 m3

50,000.00
87,500.00

300,000.00
1,312,500.00
8,092,500.00
8,092,500.00

9,980,000.00
50,000.00
87,500.00

399,200.00
50,000.00
218,750.00
667,950.00
667,950.00

6,750,000.00
50,000.00
87,500.00

270,000.00
50,000.00
218,750.00
538,750.00
538,750.00

6,750,000.00
50,000.00
87,500.00

245,000.00
91,875.00
245,000.00
581,875.00
581,800.00

5,660,000.00
50,000.00
87,500.00

56,000.00
20,000.00
175,000.00
251,000.00
251,000.00

6,750,000.00

432,000.00

10

11

12

b Pembantu tukang
1.00 org
50,000.00
c Tukang kayu
3.00 org
87,500.00
Jumlah
Dibulatkan
1 M2 PASANG PINTU TRIPLEK RANGKAP , RANGKA KAYU KAMPER MEDAN
a Papan kayu kamper medan
0.02 m3
6,750,000.00
b Paku 1 s/d 5 cm
0.03 kg
17,500.00
c Lem Kayu
0.30 Ltr
27,000.00
d Triplek 0,4 cm ukuran pintu
1.00 lbr
42,000.00
e Pembantu tukang
0.60 org
50,000.00
f Tukang kayu
2.00 org
87,500.00
Jumlah
Dibulatkan
1 M2 PASANG JALUSI MATI KUSEN KAYU KAMPER MEDAN
a Papan kayu kamper medan
0.06 m3
6,750,000.00
b Paku 1 s/d 5 cm
0.15 kg
17,500.00
c Pembantu tukang
0.50 org
50,000.00
d Tukang kayu
2.00 org
87,500.00
Jumlah
Dibulatkan
1 M2 PASANG PINTU TRIPLEK RANGKAP , RANGKA KAYU BORNEO SUPER
a Papan kayu borneo super
0.02 m3
5,660,000.00
b Paku 1 s/d 5 cm
0.03 kg
17,500.00
c Lem kayu
0.30 Ltr
27,000.00
d Triplek 0,4 cm ukuran pintu
1.00 lbr
42,000.00
e Pembantu tukang
0.60 org
50,000.00
f Tukang kayu
2.00 org
87,500.00
Jumlah
Dibulatkan
1 M2 PASANG PINTU TEAKWOOD RANGKAP , RANGKA KAYU KAMPER MEDAN

50,000.00
262,500.00
744,500.00
744,500.00
132,300.00
525.00
8,100.00
42,000.00
30,000.00
175,000.00
387,925.00
387,900.00
405,000.00
2,625.00
25,000.00
175,000.00
607,625.00
607,600.00
110,936.00
525.00
8,100.00
42,000.00
30,000.00
175,000.00
366,561.00
366,500.00

13

14

15

a Papan kayu Kamper Medan


0.02 m3
6,750,000.00
b Paku 1 s/d 5 cm
0.30 kg
17,500.00
c Lem Kayu
0.30 Ltr
27,000.00
d Teakwood 120 x 240 x 0,4 cm
1.00 lbr
82,000.00
e Pembantu tukang
0.60 org
50,000.00
f Tukang kayu
2.00 org
87,500.00
Jumlah
Dibulatkan
1 M2 PASANG PINTU TRIPLEK & FORMIKA RANGKA KAYU KAMPER MEDAN
a Papan kayu kamper medan
0.02 m3
6,750,000.00
b Paku 1 s/d 5 cm
0.30 kg
17,500.00
c Lem kayu
0.80 Ltr
27,000.00
d Triplek 0,4 cm ukuran pintu
1.00 lbr
42,000.00
e Formica 3" x 6"
0.50 lbr
166,700.00
f Pembantu tukang
0.80 org
50,000.00
g Tukang kayu
2.50 org
87,500.00
Jumlah
Dibulatkan
1 M2 PASANG PINTU TEAKWOOD & FORMIKA RANGKA KAYU KAMPER MEDAN
a Papan kayu kamper medan
0.02 m3
6,750,000.00
b Paku 1 s/d 5 cm
0.30 kg
17,500.00
c Lem Kayu
0.80 Ltr
27,000.00
d Teakwood 120 x 240 x 0,4 cm
0.50 lbr
82,000.00
e Vernis
0.50 Ltr
50,000.00
a Formica 4" x 8"
0.50 lbr
166,700.00
b Pembantu tukang
0.80 org
50,000.00
c Tukang kayu
2.50 org
87,500.00
Jumlah
Dibulatkan
1 M2 PASANG DINDING PEMISAH DOUBLE TEAKWOOD, RANGKA KAYU KAMPER MEDAN

132,300.00
5,250.00
8,100.00
82,000.00
30,000.00
175,000.00
432,650.00
432,600.00
132,300.00
5,250.00
21,600.00
42,000.00
83,350.00
40,000.00
218,750.00
543,250.00
543,200.00
132,300.00
5,250.00
21,600.00
41,000.00
25,000.00
83,350.00
40,000.00
218,750.00
567,250.00
567,200.00

16

17

18

a Balok kayu Kamper Medan


0.02 m3
6,550,000.00
3
b Papan kayu Kamper Medan
0.01 m
6,750,000.00
c Paku 5 - 12 cm
0.10 kg
17,500.00
d Lem Kayu
0.56 Ltr
27,000.00
e Teakwood 120 x 240 x 0,4 cm
1.00 lbr
82,000.00
f Pembantu tukang
0.15 org
50,000.00
g Tukang kayu
0.45 org
87,500.00
Jumlah
Dibulatkan
1 M2 PASANG DINDING PEMISAH DOUBLE GRC, RANGKA KAYU KAMPER MEDAN
a Balok kayu Kamper Medan
0.02 m3
6,550,000.00
3
b Papan kayu Kamper Medan
0.01 m
6,750,000.00
c Paku 5 - 12 cm
0.10 kg
17,500.00
d Lem Kayu
0.56 Ltr
27,000.00
e Triplek 0,4 cm ukuran pintu
1.00 lbr
42,000.00
f Pembantu tukang
0.20 org
50,000.00
g Tukang kayu
0.60 org
87,500.00
Jumlah
Dibulatkan
1 BH PASANG PINTU ALUMINIUM / PINTU PVC
a Pintu Aluminium / Pintu PVC
1.00 bh
400,000.00
b Alat bantu 10 % harga material
1.00 ls
40,000.00
c Tukang kayu
0.02 org
87,500.00
Jumlah
Dibulatkan
1 M2 PASANG KUSEN PARTISI DOUBLE TRIPLEK
a Balok kayu borneo super
0.11 m3
5,400,000.00
b Triplek 0,4 cm ukuran pintu
5.00 lbr
42,000.00
c Paku 1 s/d 3 cm
2.00 kg
17,500.00
d Ampelas
2.00 lbr
2,500.00

127,725.00
47,250.00
1,750.00
15,120.00
82,000.00
7,500.00
39,375.00
320,720.00
320,700.00
127,725.00
47,250.00
1,750.00
15,120.00
42,000.00
10,000.00
52,500.00
296,345.00
296,300.00
400,000.00
40,000.00
1,837.50
441,837.50
441,800.00
567,000.00
210,000.00
35,000.00
5,000.00

19

20

e Engsel
4.00 bh
25,000.00
f Grendel / slot
4.00 bh
33,000.00
g Pembantu tukang
0.30 org
50,000.00
h Tukang kayu terampil
1.30 org
87,500.00
Jumlah
Dibulatkan
1 M2 PASANG KUSEN PARTISI DOUBLE GYPSUM + RANGKA KAYU
a Balok kayu borneo super
0.11 m3
5,400,000.00
b Gypsum board ( 120 x 240 x 9 ) mm
0.72 lbr
86,000.00
c Paku 1 s/d 3 cm
2.00 kg
17,500.00
d Ampelas
2.00 lbr
2,500.00
e Engsel
4.00 bh
25,000.00
f Grendel / Slot
4.00 bh
33,000.00
g Pembantu tukang
0.30 org
50,000.00
h Tukang kayu
1.30 org
87,500.00
Jumlah
Dibulatkan
1 M2 PASANG DINDING PARTISI GYPSUM BOARD + RANGKA BESI HOLLOW
a Hollow 4/4 Zincromate
0.42 btg
48,000.00
b Hollow 2/4 Zincromate
0.15 btg
35,000.00
c Gypsum board ( 120 x 240 x 9 ) mm
0.72 lbr
86,000.00
d Paku sekrup
25.00 bh
600.00
e Ramset / dina bolt
4.00 bh
2,800.00
f Cotton plaster
0.10 bh
55,500.00
g Compoun
0.13 kg
30,000.00
h Pembantu tukang
0.10 org
50,000.00
i Tukang kayu
0.05 org
87,500.00
Jumlah
Dibulatkan

100,000.00
132,000.00
15,000.00
113,750.00
1,177,750.00
129,530.00
567,000.00
61,920.00
35,000.00
5,000.00
100,000.00
132,000.00
15,000.00
113,750.00
1,029,670.00
129,530.00
20,160.00
5,250.00
61,920.00
15,000.00
11,200.00
5,550.00
3,900.00
5,000.00
4,375.00
132,355.00
132,350.00

X
A
1

PEKERJAAN RANGKA ATAP DAN PENUTUP ATAP


PEKERJAAN RANGKA ATAP
1 M3 PEKERJAAN KONSTRUKSI KUDA - KUDA KAYU KAMPER MEDAN
a Balok kayu kamper medan
1.10 m3
b Besi strip
15.00 kg
c Paku ukuran besar
0.80 kg
d Meni kayu
0.40 kg
e Pembantu tukang
4.00 org
f Tukang kayu
12.00 org
Jumlah
Dibulatkan
1 M3 PEKERJAAN KONSTRUKSI KUDA - KUDA KAYU BORNEO SUPER
a Balok kayu borneo super
1.10 m3
b Besi strip
15.00 kg
c Paku ukuran besar
0.80 kg
d Meni kayu
0.40 kg
e Pembantu tukang
4.00 org
f Tukang kayu
12.00 org
Jumlah
Dibulatkan
1 M2 PASANG KASO + RENG GENTENG PLENTONG KAYU BORNEO SUPER
a Balok kayu borneo super
0.01 m3
b Paku 7 - 10 cm
0.15 kg
c Pembantu tukang
0.10 org
d Tukang kayu
0.10 org
Jumlah
Dibulatkan

6,550,000.00
14,100.00
17,500.00
17,000.00
50,000.00
87,500.00

7,205,000.00
211,500.00
14,000.00
6,800.00
200,000.00
1,050,000.00
8,687,300.00
8,687,300.00

5,400,000.00
14,100.00
17,500.00
17,000.00
50,000.00
87,500.00

5,940,000.00
211,500.00
14,000.00
6,800.00
200,000.00
1,050,000.00
7,422,300.00
7,422,300.00

5,400,000.00
17,500.00
50,000.00
87,500.00

64,800.00
2,625.00
5,000.00
8,750.00
81,175.00
81,100.00

B
1

1 M2 PASANG KASO + RENG GENTENG BETON KAYU BORNEO SUPER


a Balok kayu borneo super
0.01 m3
b Paku 7 - 10 cm
0.15 kg
c Pembantu tukang
0.10 org
d Tukang kayu
0.10 org
Jumlah
Dibulatkan
1 M1 PASANG LISPLANG KAYU KAMPER MEDAN UKURAN 3 X 20 cm
a Papan kayu kamper medan
0.01 m3
b Paku 7 - 10 cm
0.05 kg
c Pembantu tukang
0.10 org
d Tukang kayu
0.20 org
Jumlah
Dibulatkan
1 M2 PASANG LISPLANG KAYU KAMPER MEDAN UKURAN 3 X 30 cm
a Papan kayu kamper medan
0.01 m3
b Paku 7 - 10 cm
0.05 kg
c Pembantu tukang
0.11 org
d Tukang kayu
0.22 org
Jumlah
Dibulatkan
1 M3 PEKERJAAN NOK/GORDING/JURAY KAYU BORNEO SUPER
a Balok kayu borneo super
1.05 m3
b Paku 10 - 15 cm
0.20 kg
c Pembantu tukang
2.00 org
d Tukang kayu
2.00 org
Jumlah
Dibulatkan
PEKERJAAN PENUTUP ATAP
1 M2 PASANG ATAP GENTENG PLENTONG

5,400,000.00
17,500.00
50,000.00
87,500.00

75,600.00
2,625.00
5,000.00
8,750.00
91,975.00
91,900.00

6,750,000.00
17,500.00
50,000.00
87,500.00

48,600.00
875.00
5,000.00
17,500.00
71,975.00
71,900.00

6,750,000.00
17,500.00
50,000.00
87,500.00

74,250.00
875.00
5,500.00
19,250.00
99,875.00
99,800.00

5,400,000.00
17,500.00
50,000.00
87,500.00

5,670,000.00
3,500.00
100,000.00
175,000.00
5,948,500.00
5,948,500.00

a Genteng palentong
25.00 bh
b Pembantu tukang
0.15 org
c Tukang kayu
0.08 org
Jumlah
Dibulatkan
1 M2 PASANG NOK/BUBUNGAN GENTENG KERAMIK GLAZUR
a Genteng nok/bubungan plentong
5.00 bh
b Semen PC (abu-abu)
0.16 sak
c Pasir pasang
0.03 m3
d Pembantu tukang
0.30 org
e Tukang kayu
0.20 org
Jumlah
Dibulatkan
1 M2 PASANG ATAP FIBREGLASS UKURAN 180 X 90 cm
a Atap fibreglass
0.60 lbr
b Paku 2 - 5 cm
0.05 kg
c Pembantu tukang
0.14 org
d Tukang kayu
0.07 org
Jumlah
Dibulatkan
1 M2 PASANG ATAP ASBES GELOMBANG UKURAN 2,70 x 1,05 m TEBAL 4 mm
a Asbes gelombang
0.35 lbr
b Paku payung
0.12 kg
c Pembantu tukang
0.14 org
d Tukang kayu
0.07 org
Jumlah
Dibulatkan
1 M2 PASANG ATAP ASBES GELOMBANG UKURAN 2,40 x 1,05 m TEBAL 4 mm
a Asbes gelombang
0.42 lbr
b Paku payung
0.12 kg

800.00
50,000.00
87,500.00

20,000.00
7,500.00
6,562.50
34,062.50
34,060.00

24,000.00
54,000.00
84,000.00
50,000.00
87,500.00

120,000.00
8,640.00
2,688.00
15,000.00
17,500.00
163,828.00
163,820.00

72,500.00
17,500.00
50,000.00
87,500.00

43,500.00
875.00
7,000.00
5,862.50
57,237.50
57,230.00

70,000.00
17,500.00
50,000.00
87,500.00

24,500.00
2,100.00
7,000.00
6,125.00
39,725.00
39,720.00

62,000.00
17,500.00

26,040.00
2,100.00

c Pembantu tukang
0.14 org
d Tukang kayu
0.07 org
Jumlah
Dibulatkan
1 M2 PASANG ATAP ASBES GELOMBANG UKURAN 2,70 x 1,02 m TEBAL 5 mm
a Asbes gelombang
0.44 lbr
b Paku payung
0.12 kg
c Pembantu tukang
0.14 org
d Tukang kayu
0.07 org
Jumlah
Dibulatkan
1 M2 PASANG ATAP ASBES GELOMBANG UKURAN 2,40 x 1,02 m TEBAL 5 mm
a Asbes gelombang
0.51 lbr
b Paku payung
0.12 kg
c Pembantu tukang
0.14 org
d Tukang kayu
0.07 org
Jumlah
Dibulatkan
1 M2 PASANG ATAP ASBES GELOMBANG ( 1,50 x 1,02 m ) x 5 mm
a Asbes gelombang
0.80 lbr
b Paku payung
0.12 kg
c Pembantu tukang
0.14 org
d Tukang kayu
0.07 org
Jumlah
Dibulatkan
1 M PASANG ATAP SIRAP
a Genteng sirap
80.00 bh
b Paku
0.20 kg
c Pembantu tukang
0.10 org
d Tukang kayu
0.20 org

50,000.00
87,500.00

7,000.00
6,125.00
41,265.00
41,260.00

92,000.00
17,500.00
50,000.00
87,500.00

40,480.00
2,100.00
7,000.00
5,862.50
55,442.50
55,440.00

84,000.00
17,500.00
50,000.00
87,500.00

42,840.00
2,100.00
7,000.00
5,862.50
57,802.50
57,800.00

48,000.00
17,500.00
50,000.00
87,500.00

38,400.00
2,100.00
7,000.00
6,125.00
53,625.00
53,620.00

1,100.00
17,500.00
50,000.00
87,500.00

88,000.00
3,500.00
5,000.00
17,500.00

10

11

12

13

Jumlah
Dibulatkan
1 M2 PASANG ATAP GENTENG BETON
a Genteng beton
b Paku 5 - 12 cm
c Pembantu tukang
d Tukang kayu
Jumlah
Dibulatkan
1 M2 PASANG ATAP GENTENG METAL + C301
a Genteng metal
b Paku 5 - 12 cm
c Pembantu tukang
d Tukang kayu
Jumlah
Dibulatkan
1 M PASANG NOK GENTENG BETON
a Nok genteng beton
b Paku 5 - 12 cm
c Semen PC (abu-abu)
d Pasir pasang
e Semen warna
f Pembantu tukang
g Tukang kayu
Jumlah
Dibulatkan
1 M PASANG NOK GENTENG METAL
a Nok genteng metal
b Paku payung
c Pembantu tukang

114,000.00
114,000.00
1.10
0.03
0.20
0.10

bh
kg
org
org

70,000.00
17,500.00
50,000.00
87,500.00

77,000.00
525.00
10,000.00
8,750.00
96,275.00
96,270.00

1.02
0.20
0.20
0.10

lbr
kg
org
org

134,000.00
17,500.00
50,000.00
87,500.00

136,680.00
3,500.00
10,000.00
8,750.00
158,930.00
158,930.00

3.50
0.05
0.22
0.03
1.00
0.40
0.20

bh
kg
sak
m3
kg
org
org

15,000.00
17,500.00
54,000.00
84,000.00
12,700.00
50,000.00
87,500.00

52,500.00
875.00
11,664.00
2,688.00
12,700.00
20,000.00
17,500.00
117,927.00
117,920.00

1.10
0.05
0.25

bh
kg
org

60,000.00
17,500.00
50,000.00

66,000.00
875.00
12,500.00

14

15

16

17

d Tukang kayu
0.15 org
Jumlah
Dibulatkan
1 M2 PASANG ATAP SENG GELOMBANG
a Seng gelombang
0.70 lbr
b Paku payung
0.02 kg
c Pembantu tukang
0.12 org
d Tukang kayu
0.06 org
Jumlah
Dibulatkan
1 M2 PASANG NOK SENG UNTUK ATAP SENG GELOMBANG
a Seng plat BJLS
1.05 M1
b Paku payung
0.04 kg
c Pembantu tukang
0.15 org
d Tukang kayu
0.07 org
Jumlah
Dibulatkan
1 M2 PASANG ATAP POLYCARBONATE
a Polycarbonate
1.05 m2
b Besi Hollow
1.50 btg
c Alat bantu 20 % harga material
1.00 ls
d Pembantu tukang
0.15 org
e Tukang kayu
0.05 org
Jumlah
Dibulatkan
1 M2 PASANG ALUMINIUM FOIL
a Aluminium foil
1.05 m2
b Alat bantu 20 % harga material
1.00 ls
c Pembantu tukang
0.15 org
d Tukang kayu
0.05 org

87,500.00

13,125.00
92,500.00
92,500.00

57,500.00
17,500.00
50,000.00
87,500.00

40,250.00
350.00
6,000.00
5,250.00
51,850.00
51,850.00

33,300.00
17,500.00
50,000.00
87,500.00

34,965.00
700.00
7,500.00
6,125.00
49,290.00
49,290.00

215,000.00
48,000.00
45,150.00
50,000.00
87,500.00

225,750.00
72,000.00
45,150.00
7,500.00
4,375.00
354,775.00
354,770.00

5,500.00
1,155.00
50,000.00
87,500.00

5,775.00
1,155.00
7,500.00
4,375.00

Jumlah
Dibulatkan

XI
1

PEKERJAAN PENUTUP PLAFON


1 M2 PASANG RANGKA PLAFON ( UKRN 0,50 X 1,00 ) M, KAYU BORNEO SUPER
a Balok kayu borneo super 4 x 6 cm
0.01 m3
5,400,000.00
b Paku 5 - 12 cm
0.10 kg
17,500.00
c Pembantu tukang
0.15 org
50,000.00
d Tukang kayu
0.25 org
87,500.00
Jumlah
Dibulatkan
1 M2 PLAFON GRC ( 60 X 1,20 ) M, TEBAL 4 MM
a Pelat GRC tebal 4 mm
1.10 lbr
47,500.00
b Paku 1 cm
0.01 kg
17,500.00
c Pembantu tukang
0.03 org
50,000.00
d Tukang kayu
0.07 org
87,500.00
Jumlah
Dibulatkan
1 M2 PLAFON Asbes ( 1,00 x 1,00 ) m, tebal 5 mm
a Pelat asbes tebal 5 mm
1.10 lbr
13,500.00
b Paku 1 cm
0.01 kg
17,500.00
c Pembantu tukang
0.03 org
50,000.00
d Tukang kayu
0.07 org
87,500.00
Jumlah
Dibulatkan
1 M2 PLAFON Akustik ( 60 x 120 ) cm
a Akustik 600 x 1200 x 15 mm
1.50 lbr
70,000.00
b Paku 2 - 5 cm
0.05 kg
17,500.00

18,805.00
18,800.00

64,800.00
1,750.00
7,500.00
21,875.00
95,925.00
95,900.00
52,250.00
175.00
1,500.00
6,125.00
60,050.00
60,050.00
14,850.00
175.00
1,500.00
6,125.00
22,650.00
22,650.00
105,000.00
875.00

c Pembantu tukang
0.06 org
d Tukang kayu
0.10 org
Jumlah
Dibulatkan
1 M2 PLAFON AKUSTIK ( 60 X 120 ) CM + RANGKA ALLUMINIUM
a Profil Alluminium "T"
3.60 M
b Kawat seng polos
0.15 kg
c Ramset / dina bolt
1.00 bh
d Akustik 600 x 1200 x 15 mm
1.50 lbr
e Pembantu tukang
0.15 org
f Tukang kayu
0.20 org
Jumlah
Dibulatkan
1 M LIST PLAFON PROFIL KAYU
a Listp profil kayu
1.10 M
b Paku 2 cm
0.01 kg
c Pembantu tukang
0.05 org
d Tukang kayu
0.05 org
Jumlah
Dibulatkan
1 M LIST PLAFON KAYU 1/4
a List kayu 1/4
1.10 M
b Paku 2 cm
0.01 kg
c Pembantu tukang
0.05 org
d Tukang kayu
0.05 org
Jumlah
Dibulatkan
1 M2 PLAFON TRIPLEK 4 MM + RANGKA KAYU BORNEO SUPER
a Balok kayu borneo super
0.02 m3
b Paku 1- 12 cm
0.06 kg

50,000.00
87,500.00

3,000.00
8,750.00
117,625.00
117,620.00

32,000.00
13,400.00
2,800.00
70,000.00
50,000.00
87,500.00

115,200.00
2,010.00
2,800.00
105,000.00
7,500.00
17,500.00
250,010.00
250,010.00

6,800.00
17,500.00
50,000.00
87,500.00

7,480.00
175.00
2,500.00
4,375.00
14,530.00
14,530.00

1,900.00
17,500.00
50,000.00
87,500.00

2,090.00
175.00
2,500.00
4,375.00
9,140.00
9,140.00

5,400,000.00
17,500.00

124,200.00
1,050.00

10

11

c Triplek 120 cm x 240 cm x 0,4 cm


0.39 lbr
d Pembantu tukang
0.27 org
e Tukang kayu
0.40 org
Jumlah
Dibulatkan
1 M2 PLAFON TEAKWOOD 4 MM + RANGKA KAYU BORNEO SUPER
a Balok kayu borneo super
0.02 m3
b Paku 1 - 12 cm
0.06 kg
c Teakwood 120 cm x 240 cm x 0,4 cm
0.39 lbr
d Pembantu tukang
0.27 org
e Tukang kayu
0.40 org
Jumlah
Dibulatkan
1 M2 Plafon PAPAN 10 CM, TEBAL 1 CM + RANGKA KAYU BORNEO SUPER
a Balok kayu borneo super
0.02 m3
b Paku 2 - 12 cm
0.20 kg
c Papan kayu kamper
0.02 m3
d Pembantu tukang
0.35 org
e Tukang kayu
0.50 org
Jumlah
Dibulatkan
1 M2 Plafon GYPSUM BOARD, TEBAL 9 MM + RANGKA BESI HOLLOW
a Hollow 4/4 Zincromate
0.42 btg
b Hollow 2/4 Zincromate
0.15 btg
c Gypsum board ( 120 x 240 x 9 ) mm
0.36 lbr
d Paku sekrup
25.00 bh
e Ramset / dina bolt
4.00 bh
f Cotton plaster
0.07 bh
g Compoun
0.13 kg
h Pembantu tukang
0.10 org

42,000.00
50,000.00
87,500.00

16,380.00
13,500.00
35,000.00
190,130.00
190,130.00

5,400,000.00
17,500.00
82,000.00
50,000.00
87,500.00

124,200.00
1,050.00
31,980.00
13,500.00
35,000.00
205,730.00
205,730.00

5,400,000.00
17,500.00
9,980,000.00
50,000.00
87,500.00

124,200.00
3,500.00
199,600.00
17,500.00
43,750.00
388,550.00
388,550.00

48,000.00
35,000.00
86,000.00
600.00
2,800.00
55,500.00
30,000.00
50,000.00

19,920.00
5,250.00
31,304.00
15,000.00
11,200.00
3,996.00
3,750.00
5,000.00

i Tukang kayu
Jumlah
Dibulatkan
XII
1

0.05

PEKERJAAN SANITAIR
MEMASANG 1 BUAH KLOSET DUDUK / MONOBLOK
a Kloset duduk / monoblok
1.00
b Perlengkapan ( 10% hrg kloset )
c Pembantu tukang
3.30
d Tukang batu
1.10
Jumlah
Dibulatkan
MEMASANG 1 BUAH KLOSET JONGKOK PORSELEN
a Kloset jongkok porselen
1.00
b Semen PC (abu-abu)
0.12
c Pasir pasang
0.01
d Pembantu tukang
1.00
e Tukang batu
1.50
Jumlah
Dibulatkan
MEMASANG 1 BUAH URINOIR
a Urinoir
1.00
b Perlengkapan ( 30% hrg urinoir )
c Semen PC (abu-abu)
0.12
d Pasir pasang
0.01
e Pembantu tukang
1.00
f Tukang batu
1.00
Jumlah
Dibulatkan
MEMASANG 1 BUAH WASTAFEL DINDING

org

87,500.00

4,375.00
99,795.00
99,790.00

org
org

2,300,000.00
230,000.00
50,000.00
87,500.00

2,300,000.00
230,000.00
165,000.00
96,250.00
2,791,250.00
2,791,250.00

bh
sak
m3
org
org

170,000.00
54,000.00
84,000.00
50,000.00
87,500.00

170,000.00
6,480.00
840.00
50,000.00
131,250.00
358,570.00
358,570.00

bh

380,000.00
114,000.00
54,000.00
84,000.00
50,000.00
87,500.00

380,000.00
114,000.00
6,480.00
840.00
50,000.00
87,500.00
638,820.00
638,820.00

bh

sak
m3
org
org

a Wastafel
1.00 bh
b Perlengkapan ( 12% hrg kloset )
c Semen PC ( abu-abu )
0.12 sak
d Pasir pasang
0.01 m3
e Pembantu tukang
1.20 org
f Tukang batu
1.45 org
Jumlah
Dibulatkan
MEMASANG 1 BUAH WASTAFEL KAKI
a Wastafel
1.00 bh
b Perlengkapan ( 12% hrg kloset )
c Semen PC ( abu-abu )
0.12 sak
d Pasir pasang
0.01 m3
e Pembantu tukang
1.20 org
f Tukang batu
1.45 org
Jumlah
Dibulatkan
MEMASANG 1 BH SHOWER DINDING
a Shower dinding
1.00 bh
b Pembantu tukang
0.01 org
c Tukang batu
0.10 org
Jumlah
Dibulatkan
MEMASANG BAK MANDI FIBERGLASS UKURAN SEDANG
a Bak fibreglass
1.00 bh
b Perlengkapan ( 20% hrg bak )
c Pembantu tukang
1.80 org
d Tukang batu
2.70 org
Jumlah
Dibulatkan

220,000.00
26,400.00
54,000.00
84,000.00
50,000.00
87,500.00

220,000.00
26,400.00
6,480.00
840.00
60,000.00
126,875.00
440,595.00
440,590.00

255,000.00
30,600.00
54,000.00
84,000.00
50,000.00
87,500.00

255,000.00
30,600.00
6,480.00
840.00
60,000.00
126,875.00
479,795.00
479,790.00

132,000.00
50,000.00
87,500.00

132,000.00
500.00
8,750.00
141,250.00
141,250.00

178,000.00
32,040.00
50,000.00
87,500.00

178,000.00
32,040.00
90,000.00
236,250.00
536,290.00
536,290.00

10

11

MEMASANG BAK KONTROL PASANGAN BATU BATA UKURAN 30 X 30 CM, TINGGI 35 CM


a Batu bata
0.15 m3
650.00
b Semen PC (abu-abu)
0.88 sak
54,000.00
3
c Pasir pasang
0.07 m
84,000.00
d Batu kerikil
0.07 m3
157,900.00
e Besi beton
1.60 kg
15,100.00
3
f Pasir beton
0.06 m
92,000.00
g Pembantu tukang
3.20 org
50,000.00
h Tukang batu
1.02 org
87,500.00
Jumlah
Dibulatkan
MEMASANG KICHEN ZINK/BAK CUCI PIRING STAINLESS STEEL
a Bak cuci stainless steel
1.00 bh
191,500.00
b Water Drain + Asesories
1.00 Set
88,000.00
c Pembantu tukang
0.03 org
50,000.00
d Tukang batu
0.30 org
87,500.00
Jumlah
Dibulatkan
MEMASANG 1 BH KRAN DIAMETER 3/4 " ATAU 1/2 "
a Kran air
1.00 bh
56,000.00
b Perlengkapan ( 2% hrg kran )
1.00 ls
1,120.00
c Pembantu tukang
0.01 org
50,000.00
d Tukang batu
0.10 org
87,500.00
Jumlah
Dibulatkan
MEMASANG 1 BH KRAN AIR ANGSA
a Kran air angsa
1.00 bh
157,500.00
b Perlengkapan ( 2% hrg kran )
1.00 ls
3,150.00
c Pembantu tukang
0.01 org
50,000.00
d Tukang batu
0.10 org
87,500.00

97.50
47,520.00
5,880.00
11,053.00
24,160.00
5,520.00
160,000.00
89,250.00
343,480.50
343,480.00
191,500.00
88,000.00
1,500.00
26,250.00
307,250.00
307,250.00
56,000.00
1,120.00
500.00
8,750.00
66,370.00
66,370.00
157,500.00
3,150.00
500.00
8,750.00

12

13

Jumlah
Dibulatkan
MEMASANG 1 BH FLOOR DRAIN
a Floor drain
b Pembantu tukang
c Tukang batu
Jumlah
Dibulatkan
MEMASANG 1 BH TEMPAT SABUN
a Tempat Sabun
b Pembantu tukang
c Tukang batu
Jumlah
Dibulatkan

XIII PEKERJAAN PERPIPAAN DAN POMPA


1
MEMASANG 1 M PIPA GALVANIS DIAMETER "
a Pipa galvanis dia 1/2"
b Perlengkapan ( 30% harga pipa )
c Pembantu tukang
d Tukang pipa
Jumlah
Dibulatkan
2
MEMASANG 1 M PIPA GALVANIS DIAMETER "
a Pipa galvanis
b Perlengkapan ( 30% harga pipa )
c Pembantu tukang
d Tukang pipa
Jumlah

169,900.00
169,900.00
1.00
0.01
0.10

bh
org
org

62,000.00
50,000.00
87,500.00

62,000.00
500.00
8,750.00
71,250.00
71,250.00

1.00
0.01
0.10

bh
org
org

32,000.00
50,000.00
87,500.00

32,000.00
500.00
8,750.00
41,250.00
41,250.00

1.10

0.05
0.09

org
org

15,300.00
4,590.00
50,000.00
87,500.00

16,830.00
4,590.00
2,700.00
7,875.00
31,995.00
31,990.00

1.10

0.05
0.09

org
org

20,850.00
6,255.00
50,000.00
87,500.00

22,935.00
6,255.00
2,700.00
7,875.00
39,765.00

Dibulatkan
MEMASANG 1 M PIPA GALVANIS DIAMETER 1"
a Pipa galvanis
b Perlengkapan ( 30% harga pipa )
c Pembantu tukang
d Tukang pipa
Jumlah
Dibulatkan
MEMASANG 1 M PIPA GALVANIS DIAMETER 1"
a Pipa galvanis
b Perlengkapan ( 30% harga pipa )
c Pembantu tukang
d Tukang pipa
Jumlah
Dibulatkan
MEMASANG 1 M PIPA PVC TYPE D DIAMETER 3"
a Pipa PVC type D
b Perlengkapan ( 30% harga pipa )
c Pembantu tukang
d Tukang pipa
Jumlah
Dibulatkan
MEMASANG 1 M PIPA PVC TYPE D DIAMETER 4"
a Pipa PVC type D
b Perlengkapan ( 30% harga pipa )
c Pembantu tukang
d Tukang pipa
Jumlah
Dibulatkan
MEMASANG 1 M PVC TIPE AW DIAMETER "

39,760.00
1.10

0.05
0.09

org
org

1.10

0.11
0.18

org
org

1.10

0.10
0.18

org
org

1.10

0.13
0.22

org
org

30,500.00
9,150.00
50,000.00
87,500.00

33,550.00
9,150.00
2,700.00
7,875.00
53,275.00
53,270.00

34,750.00
10,425.00
50,000.00
87,500.00

38,225.00
10,425.00
5,400.00
15,750.00
69,800.00
69,800.00

6,750.00
2,025.00
50,000.00
87,500.00

7,425.00
2,025.00
5,000.00
15,750.00
30,200.00
30,200.00

9,000.00
2,700.00
50,000.00
87,500.00

9,900.00
2,700.00
6,500.00
19,250.00
38,350.00
38,350.00

10

11

a Pipa PVC
b Perlengkapan ( 30% harga pipa )
c Pembantu tukang
d Tukang pipa
Jumlah
Dibulatkan
MEMASANG 1 M PVC TIPE AW DIAMETER "
a Pipa PVC
b Perlengkapan ( 30% harga pipa )
c Pembantu tukang
d Tukang pipa
Jumlah
Dibulatkan
MEMASANG 1 M PVC TIPE AW DIAMETER 1"
a Pipa PVC
b Perlengkapan ( 30% harga pipa )
c Pembantu tukang
d Tukang pipa
Jumlah
Dibulatkan
MEMASANG 1 M PVC TIPE AW DIAMETER 2"
a Pipa PVC
b Perlengkapan ( 30% harga pipa )
c Pembantu tukang
d Tukang pipa
Jumlah
Dibulatkan
MEMASANG 1 M PVC TIPE AW DIAMETER 4"
a Pipa PVC
b Perlengkapan ( 30% harga pipa )

1.10

0.04
0.06

org
org

1.10

0.03
0.06

org
org

1.10

0.04
0.06

org
org

1.10

0.05
0.09

org
org

1.10

5,750.00
1,725.00
50,000.00
87,500.00

6,325.00
1,725.00
1,800.00
5,250.00
15,100.00
15,100.00

7,700.00
2,310.00
50,000.00
87,500.00

8,470.00
2,310.00
1,500.00
5,250.00
17,530.00
17,530.00

14,000.00
4,200.00
50,000.00
87,500.00

15,400.00
4,200.00
1,800.00
5,250.00
26,650.00
26,650.00

24,000.00
7,200.00
50,000.00
87,500.00

26,400.00
7,200.00
2,700.00
7,875.00
44,175.00
44,170.00

51,700.00
15,510.00

56,870.00
15,510.00

12

13

c Pembantu tukang
0.08 org
d Tukang pipa
0.14 org
Jumlah
Dibulatkan
MEMBUAT 1 BH SEPTICTANK PASANGAN BATU BATA DAN REMBESAN
a Galian tanah Septictank & rembesan
7.5
m3
b Pasir urug
0.21
m3
c Lantai kerja
2.25 m3
d Pasang bata 1 Pc : 2 Psr
15.00 m2
e Pelat beton penutup dan balok
0.30 m3
f Pipa PVC 4 inci AW & perlengkapannya
5.40 M1
g Plesteran 1 Pc : 3 Psr
30.00 m2
h Pasangan ijuk
5.00 IKAT
i Urugan kerikil 3,5 cm
1.05 m3
j Pipa PVC 4 inci AW dilobang
9.00 M1
k Urugan kembali
1.13 m3
l Pembantu tukang
4.00 org
m Tukang batu
3.00 org
Jumlah
Dibulatkan
MEMASANG 1 BH POMPA AIR
a Pompa Air 100 Watt
1.00 bh
b Perlengkapan ( 25% harga pompa )
c Pembantu tukang
0.08 org
d Tukang Pipa
0.14 org
Jumlah
Dibulatkan

50,000.00
87,500.00

4,050.00
11,812.50
88,242.50
88,240.00

38,500.00
67,000.00
648,800.00
89,270.00
5,711,800.00
51,700.00
31,800.00
7,500.00
112,400.00
51,700.00
11,000.00
50,000.00
87,500.00

288,750.00
14,070.00
1,459,800.00
1,339,050.00
1,713,540.00
279,180.00
954,000.00
37,500.00
118,020.00
465,300.00
12,430.00
200,000.00
262,500.00
7,144,140.00
7,144,140.00

800,000.00
200,000.00
50,000.00
87,500.00

800,000.00
200,000.00
4,050.00
11,812.50
1,015,862.50
1,015,860.00

XIV
1

PEKERJAAN PENUTUP BESI DAN BAJA


1 KG PASANG RANGKA ATAP BAJA
a Besi profil WF
b Meni besi
c Peralatan las ( 5 % material )
d Elektroda
e Tukang besi
f Pembantu tukang
Jumlah
Dibulatkan
1 KG PASANG RANGKA ATAP BESI SIKU
a Besi Siku
b Meni besi
c Peralatan las ( 5 % material )
d Elektroda
e Baud
f Tukang besi
g Pembantu tukang
Jumlah
Dibulatkan
1 KG PASANG GORDING BESI C
a Besi C
b Meni besi
c Peralatan las ( 5 % material )
d Elektroda
e Baud
f Tukang besi
g Pembantu tukang
Jumlah
Dibulatkan

1.10
0.08
1.00
0.20
0.04
0.06

kg
kg
ls
ls
org
org

16,550.00
27,500.00
910.25
18,000.00
87,500.00
50,000.00

18,205.00
2,200.00
910.25
3,600.00
3,500.00
3,000.00
31,415.25
31,410.00

1.10
0.10
1.00
0.15
0.20
0.04
0.06

kg
kg
ls
ls
kg
org
org

16,550.00
27,500.00
910.25
18,000.00
15,100.00
87,500.00
50,000.00

18,205.00
2,750.00
910.25
2,700.00
3,020.00
3,500.00
3,000.00
34,085.25
34,080.00

1.10
0.10
1.00
0.15
0.20
0.04
0.06

kg
kg
ls
ls
kg
org
org

14,100.00
27,500.00
775.50
18,000.00
15,100.00
87,500.00
50,000.00

15,510.00
2,750.00
775.50
2,700.00
3,020.00
3,500.00
3,000.00
31,255.50
31,250.00

1 M2 PASANG PINTU ROLLING DOOR BESI


a Rolling door besi
b Tukang besi
c Pembantu tukang
Jumlah
Dibulatkan
1 BH PASANG PINTU BESI UKURAN 0,8 X 2 M
a Pintu besi jadi
b Tukang besi
c Pembantu tukang
Jumlah
Dibulatkan
1 M2 PASANG TERALIS BESI
a Besi strip 2 mm x 3 cm
b Tukang las
c Pembantu tukang
Jumlah
Dibulatkan
1 M2 PASANG KAWAT HARMONIKA
a Kawat harmonika
b Paku 2 - 5 cm
c Papan kayu kamper medan
d Pembantu tukang
e Tukang kayu
Jumlah
Dibulatkan
1 M1 PASANG TALANG DATAR, SENG PLAT BJLS
a Seng plat BJLS
b Paku 2 - 5 cm
c Papan kayu borneo super

1.00
1.50
1.05

m2
org
org

782,000.00
87,500.00
50,000.00

782,000.00
131,250.00
52,500.00
965,750.00
965,750.00

1.00
1.05
1.05

bh
org
org

400,000.00
87,500.00
50,000.00

400,000.00
91,875.00
52,500.00
544,375.00
544,370.00

11.50
1.20
1.20

M
org
org

14,100.00
75,000.00
50,000.00

162,150.00
90,000.00
60,000.00
312,150.00
312,150.00

1.10
0.02
0.00
0.10
0.10

m2
kg
m3
org
org

18,000.00
17,500.00
6,750,000.00
50,000.00
87,500.00

19,800.00
350.00
12,150.00
5,000.00
8,750.00
46,050.00
46,050.00

1.00
0.02
0.01

M1
kg
m3

33,300.00
17,500.00
5,660,000.00

33,300.00
262.50
54,336.00

XV
1

d Flincote / meni besi


e Pembantu tukang
f Tukang kayu
Jumlah
Dibulatkan
1 M1 PASANG TALANG MIRING, SENG PLAT BJLS
a Seng plat BJLS
b Paku 2 - 5 cm
c Papan kayu borneo super
d Flincote / meni besi
e Pembantu tukang
f Tukang kayu
Jumlah
Dibulatkan

PEKERJAAN ALUMINIUM
1 M2 PASANG PINTU ROLLING DOOR ALUMINIUM
a Rolling door aluminium
b Tukang besi konstruksi
c Pembantu tukang
Jumlah
Dibulatkan
1 M2 PASANG PINTU ALUMINIUM PABRIKAN
a Pintu alluminium
b Tukang batu
c Pembantu tukang
Jumlah
Dibulatkan

0.25
0.15
0.40

kg
org
org

22,000.00
50,000.00
87,500.00

5,500.00
7,500.00
35,000.00
135,898.50
135,890.00

0.50
0.02
0.02
0.30
0.04
0.40

M1
kg
m3
kg
org
org

33,300.00
17,500.00
5,660,000.00
22,000.00
50,000.00
87,500.00

16,650.00
262.50
107,540.00
6,600.00
2,000.00
35,000.00
168,052.50
168,050.00

1.00
1.50
1.05

m2
org
org

782,000.00
87,500.00
50,000.00

782,000.00
131,250.00
52,500.00
965,750.00
965,750.00

1.00
1.05
1.05

bh
org
org

400,000.00
75,671.00
50,000.00

400,000.00
79,454.55
52,500.00
531,954.55
531,950.00

1 UNIT KUSEN JENDELA ALUMINIUM 2 LUBANG DGN 2 DAUN JENDELA (UKURAN 1,6 X 1,5 M)
a Profil aluminium 4" natural (+ spare 20 %)
9.24 M1
78,000.00
720,720.00
b Profil daun jendela alm.( + spare 20%)
11.04 M1
75,600.00
834,624.00
2
c Kaca polos 3 mm
2.40 m
90,000.00
216,000.00
d Engsel jendela
4.00 ps
22,000.00
88,000.00
e Grendel jendela
2.00 bh
19,500.00
39,000.00
f Kait angin
2.00 bh
19,800.00
39,600.00
g Acesories ( 6 % harga bahan)
1.00 ls
106,280.64
106,280.64
h Upah pembuatan profil ( 20 % bahan )
1.00 ls
144,144.00
144,144.00
i Upah pembuatan daun jendela (20 % bahan)
1.00 ls
166,924.80
166,924.80
Jumlah
2,355,293.44
Dibulatkan
2,355,290.00
1 UNIT KUSEN JENDELA ALUMINIUM 3 LUBANG DGN 2 DAUN JENDELA DAN 1 KACA MATI (UKURAN 2 X
1,5 M)
a Profil aluminium 4" natural (+ spare 20 %)
12.00 M1
78,000.00
936,000.00
b Profil daun jendela alm.( + spare 20%)
11.04 M1
75,600.00
834,624.00
2
c Kaca polos 3 mm
3.00 m
90,000.00
270,000.00
d Engsel jendela
4.00 ps
22,000.00
88,000.00
e Grendel jendela
2.00 bh
19,500.00
39,000.00
f Kait angin
2.00 bh
19,800.00
39,600.00
g Acesories ( 6 % harga bahan )
1.00 ls
122,437.44
122,437.44
h Upah pembuatan profil ( 20 % bahan )
1.00 ls
187,200.00
187,200.00
i Upah pembuatan daun jendela (20 % bahan)
1.00 ls
166,924.80
166,924.80
Jumlah
2,329,661.44
Dibulatkan
2,329,660.00
1 UNIT KUSEN PINTU JENDELA GENDONG ALUMINIUM DGN 2 JNDL DAN 1 PNT TEAKWOOD (UKR 2,2 X
2,7 M)
a Profil aluminium 4" natural (+ spare 20 %)
17.04 M1
78,000.00
1,329,120.00
b Profil daun jendela alm.( + spare 20%)
14.88 M1
75,600.00
1,124,928.00
2
c Kaca polos 3 mm
3.96 m
90,000.00
356,400.00

d Daun pintu teakwood


1.80 m2
432,600.00
e Engsel jendela
4.00 ps
22,000.00
f Grendel jendela
2.00 bh
19,500.00
g Kait angin
4.00 bh
19,800.00
h Engsel pintu
3.00 ps
25,000.00
i Grendel pintu
1.00 bh
33,000.00
j Kunci tanam
1.00 bh
22,000.00
k Acesories ( 6 % harga bahan )
1.00 ls
140,522.40
l Upah pembuatan profil ( 20 % bahan )
1.00 ls
17,600.00
m Upah pembuatan daun jendela (20 % bahan)
1.00 ls
7,800.00
Jumlah
Dibulatkan
1 UNIT KUSEN PINTU ALUMINIUM UKR 0.9 X 2,7 M
a Profil aluminium 4" natural (+ spare 20 %)
7.56 M1
78,000.00
2
b Kaca polos 3 mm untuk bovenlight
0.45 m
90,000.00
2
c Daun pintu tekwood
1.68 m
432,600.00
d Engsel pintu
3.00 ps
25,000.00
e Grendel pintu
1.00 bh
33,000.00
f Kunci tanam
1.00 bh
22,000.00
g Acesories ( 6 % )
1.00 ls
37,810.80
h Upah pembuatan profil ( 20 % bahan )
1.00 ls
117,936.00
Jumlah
Dibulatkan
1 BH BOVENLIGHT ALMUNIUM DENGAN KISI-KISI ALMUNIUM PLAT (UKURAN 0,5 X 1 M)
a Profil Aluminium 4" natural + upah 20%
3.60 M1
90,000.00
b Plat Aluminium untuk Jalusi
5.00 M1
20,000.00
c Acesories ( 6 % )
1.00 ls
19,440.00
d Upah pembuatan profil ( 20 % bahan )
1.00 ls
23,587.20
Jumlah
Dibulatkan

778,680.00
88,000.00
39,000.00
79,200.00
75,000.00
33,000.00
22,000.00
140,522.40
17,600.00
7,800.00
4,091,250.40
4,091,250.00
589,680.00
40,500.00
726,768.00
75,000.00
33,000.00
22,000.00
37,810.80
117,936.00
1,642,694.80
1,642,690.00
324,000.00
100,000.00
19,440.00
23,587.20
467,027.20
467,020.00

1 BH BOVENLIGHT ALMUNIUM UKURAN 0,5 X 1 M DENGAN BAGIAN DALAM KACA


a Profil Aluminium 4" natural + upah 20%
3.60 M1
78,000.00
2
b Kaca Polos 3 mm
0.50 m
90,000.00
c Acesories ( 6 % )
1.00 ls
16,848.00
d Upah pembuatan profil ( 20 % bahan )
1.00 ls
4,717.44
Jumlah
Dibulatkan

XVI PEKERJAAN KACA & PENGGANTUNG


1
1 BUAH PASANG KUNCI TANAM BESAR
a Kunci tanam besar
1.00
b Pembantu tukang
0.06
c Tukang kayu
0.60
Jumlah
Dibulatkan
2
1 BUAH PASANG KUNCI TANAM SEDANG
a Kunci tanam sedang
1.00
b Pembantu tukang
0.01
c Tukang kayu
0.50
Jumlah
Dibulatkan
3
1 BUAH PASANG KUNCI BULAT PUTAR KAMAR MANDI
a Kunci bulat putar kamar mandi
1.00
b Pembantu tukang
0.01
c Tukang kayu
0.50
Jumlah

280,800.00
45,000.00
16,848.00
4,717.44
347,365.44
347,360.00

bh
org
org

189,000.00
50,000.00
87,500.00

189,000.00
3,000.00
52,500.00
244,500.00
244,500.00

bh
org
org

55,000.00
50,000.00
87,500.00

55,000.00
500.00
43,750.00
99,250.00
99,250.00

bh
org
org

55,000.00
50,000.00
87,500.00

55,000.00
250.00
43,750.00
99,000.00

Dibulatkan
1 BUAH PASANG ENGSEL PINTU
a Engsel pintu
1.00
b Pembantu tukang
0.02
c Tukang kayu
0.15
Jumlah
Dibulatkan
1 BUAH PASANG ENGSEL JENDELA KUPU-KUPU
a Engsel jendela
1.00
b Pembantu tukang
0.01
c Tukang kayu
0.10
Jumlah
Dibulatkan
1 BUAH PASANG KAIT ANGIN
a Kait angin
1.00
b Pembantu tukang
0.02
c Tukang kayu
0.15
Jumlah
Dibulatkan
1 BUAH PASANG DOOR CLOSER
a Door closer
1.00
b Pembantu tukang
0.05
c Tukang kayu
0.50
Jumlah
Dibulatkan
1 BUAH PASANG PEGANGAN PINTU / DOOR HOLDER
a Door holder
1.00
b Pembantu tukang
0.05
c Tukang kayu
0.50
Jumlah

99,000.00
bh
org
org

25,000.00
50,000.00
87,500.00

25,000.00
750.00
13,125.00
38,875.00
38,870.00

bh
org
org

22,000.00
50,000.00
87,500.00

22,000.00
500.00
8,750.00
31,250.00
31,250.00

bh
org
org

19,800.00
50,000.00
87,500.00

19,800.00
750.00
13,125.00
33,675.00
33,670.00

bh
org
org

380,000.00
50,000.00
87,500.00

380,000.00
2,500.00
43,750.00
426,250.00
426,250.00

bh
org
org

50,000.00
50,000.00
87,500.00

50,000.00
2,500.00
43,750.00
96,250.00

10

11

12

13

Dibulatkan
1 BUAH PASANG PENAHAN PINTU / DOOR STOPER
a Door stoper
b Pembantu tukang
c Tukang kayu
Jumlah
Dibulatkan
1 BUAH PASANG GRENDEL / SLOOT PINTU
a Grendel / sloot pintu
b Pembantu tukang
c Tukang kayu
Jumlah
Dibulatkan
1 BUAH PASANG GRENDEL / SLOOT JENDELA
a Grendel / sloot jendela
b Pembantu tukang
c Tukang kayu
Jumlah
Dibulatkan
1 BUAH PASANG TARIKAN JENDELA
a Tarikan jendela
b Pembantu tukang
c Tukang kayu
Jumlah
Dibulatkan
1 M2 PASANG KACA POLOS, TEBAL 3 MM
a Kaca polos
b Pembantu tukang
c Tukang kayu
Jumlah

96,250.00
1.00
0.05
0.50

bh
org
org

66,000.00
50,000.00
87,500.00

66,000.00
2,500.00
43,750.00
112,250.00
112,250.00

1.00
0.05
0.50

bh
org
org

33,000.00
50,000.00
87,500.00

33,000.00
2,500.00
43,750.00
79,250.00
79,250.00

1.00
0.05
0.50

bh
org
org

19,500.00
50,000.00
87,500.00

19,500.00
2,500.00
43,750.00
65,750.00
65,750.00

1.00
0.05
0.50

bh
org
org

18,000.00
50,000.00
87,500.00

18,000.00
2,500.00
43,750.00
64,250.00
64,250.00

1.10
0.02
0.15

m2
org
org

90,000.00
50,000.00
87,500.00

99,000.00
750.00
13,125.00
112,875.00

14

15

Dibulatkan
1 M2 PASANG KACA POLOS, TEBAL 5 MM
a Kaca polos
b Pembantu tukang
c Tukang kayu
Jumlah
Dibulatkan
1 M2 PASANG KACA RAY BAND, TEBAL 5 MM
a Kaca
b Pembantu tukang
c Tukang kayu
Jumlah
Dibulatkan

112,870.00
1.10
0.02
0.15

m2
org
org

150,000.00
50,000.00
87,500.00

165,000.00
750.00
13,125.00
178,875.00
178,870.00

1.10
0.02
0.15

m2
org
org

199,000.00
50,000.00
87,500.00

218,900.00
750.00
13,125.00
232,775.00
232,770.00

XVII PEKERJAAN PENGECATAN


1
1 M2 MENGIKIS / MENGEROK / MENGELUPAS PERMUKAAN CAT TEMBOK LAMA
a Soda api
0.05 kg
44,000.00
b Pembantu tukang
0.05 org
50,000.00
c Tukang cat
0.02 org
87,500.00
Jumlah
Dibulatkan
2
1 M2 MENDEMPUL DAN MENGGOSOK KAYU
a Dempul jadi
0.10 kg
24,000.00
b Minyak cat
0.03 kg
19,300.00
c Ampelas kasar
0.30 lbr
2,500.00
d Pembantu tukang
0.04 org
50,000.00
e Tukang cat
0.05 org
87,500.00
Jumlah

2,200.00
2,500.00
1,750.00
6,450.00
6,450.00
2,400.00
579.00
750.00
2,000.00
4,375.00
10,104.00

Dibulatkan
1 M2 PENGECATAN KAYU LAMA
a Cat meni
b Plamir
c Ampelas
d Cat dasar
e Cat penutup kwalitas baik
f Pembantu tukang
g Tukang cat
Jumlah
Dibulatkan
1 M2 PENGECATAN KAYU BARU
a Cat meni
b Plamir
c Ampelas
d Cat dasar
e Cat penutup kwalitas baik
f Pembantu tukang
g Tukang cat
Jumlah
Dibulatkan
1 M2 PENGECATAN KAYU DENGAN POLITUR
a Politur
b Dempul jadi
c Ampelas
d Pembantu tukang
e Tukang cat
Jumlah
Dibulatkan
1 M2 PENGECATAN KAYU DENGAN MELAMIK

10,100.00
0.25
0.15
1.00
0.15
0.60
0.05
0.15

kg
kg
lbr
kg
kg
org
org

27,500.00
23,100.00
2,500.00
41,000.00
39,000.00
50,000.00
87,500.00

6,875.00
3,465.00
2,500.00
6,150.00
23,400.00
2,500.00
13,125.00
58,015.00
58,010.00

0.50
0.15
1.00
0.15
0.35
0.05
0.15

kg
kg
lbr
kg
kg
org
org

27,500.00
23,100.00
2,500.00
41,000.00
39,000.00
50,000.00
87,500.00

13,750.00
3,465.00
2,500.00
6,150.00
13,650.00
2,500.00
13,125.00
55,140.00
55,140.00

0.15
0.25
2.00
0.05
0.15

Ltr
kg
lbr
org
org

35,000.00
24,000.00
2,500.00
50,000.00
87,500.00

5,250.00
6,000.00
5,000.00
2,500.00
13,125.00
31,875.00
31,870.00

a Melamik
0.15 Ltr
b Dempul jadi
0.25 kg
c Ampelas
2.00 lbr
d Pembantu tukang
0.05 org
e Tukang cat
0.15 org
Jumlah
Dibulatkan
1 M2 PENGECATAN KAYU DENGAN CAT RESIDU/TER
a Residu atau ter
0.35 Ltr
b Pembantu tukang
0.15 org
c Tukang cat
0.02 org
Jumlah
Dibulatkan
1 M2 PENGECATAN TEMBOK/Plafon BARU KWALITAS SEDANG
a Plamir
0.10 kg
b Rol cat
0.01 bh
c Cat penutup kwalitas sedang
0.45 kg
d Steger ( perancah kerja )
0.01 Ls
e Ampelas
0.50 lbr
f Pembantu tukang
0.06 org
g Tukang cat
0.20 org
Jumlah
Dibulatkan
1 M2 PENGECATAN TEMBOK/Plafon BARU KWALITAS BAIK
a Plamir
0.10 kg
b Rol cat
0.01 bh
c Cat penutup kwalitas baik
0.50 kg
d Steger ( perancah kerja )
0.01 Ls
e Ampelas
0.50 lbr
f Pembantu tukang
0.06 org

32,000.00
24,000.00
2,500.00
50,000.00
87,500.00

4,800.00
6,000.00
5,000.00
2,500.00
13,125.00
31,425.00
31,420.00

6,800.00
50,000.00
87,500.00

2,380.00
7,500.00
1,750.00
11,630.00
11,630.00

25,000.00
27,000.00
15,000.00
75,000.00
2,500.00
50,000.00
87,500.00

2,500.00
270.00
6,750.00
750.00
1,250.00
3,000.00
17,500.00
32,020.00
32,020.00

25,000.00
27,000.00
44,000.00
75,000.00
2,500.00
50,000.00

2,500.00
270.00
22,000.00
750.00
1,250.00
3,000.00

10

11

12

13

g Tukang cat
0.20 org
Jumlah
Dibulatkan
1 M2 PENGECATAN TEMBOK LAMA
a Cat penutup kwalitas baik
0.40 kg
b Rol cat
0.01 bh
c Steger ( perancah kerja )
0.01 Ls
d Ampelas
0.50 lbr
e Pembantu tukang
0.06 org
f Tukang cat
0.20 org
Jumlah
Dibulatkan
1 M2 PENGECATAN EXTERIOR
a Cat tembok
0.36 kg
b Plamir tembok
0.16 kg
c Rol cat
0.01 bh
d Steger ( perancah kerja )
0.01 Ls
e Ampelas
0.50 lbr
f Pembantu tukang
0.20 org
g Tukang cat
0.30 org
Jumlah
Dibulatkan
1 M2 MEMASANG WALLPAPER
a Wallpaper
1.20 m2
b Lem Perekat
0.20 kg
c Pembantu tukang
0.02 org
d Tukang cat
0.15 org
Jumlah
Dibulatkan
1 M2 PENGECATAN PERMUKAAN BAJA DENGAN MENI BESI

87,500.00

17,500.00
47,270.00
47,270.00

28,000.00
27,000.00
75,000.00
2,500.00
50,000.00
87,500.00

11,200.00
270.00
750.00
1,250.00
3,000.00
17,500.00
33,970.00
33,970.00

75,000.00
25,000.00
27,000.00
75,000.00
2,500.00
50,000.00
87,500.00

27,000.00
4,000.00
270.00
750.00
1,250.00
10,000.00
26,250.00
69,520.00
69,520.00

23,400.00
32,000.00
50,000.00
87,500.00

28,080.00
6,400.00
1,000.00
13,125.00
48,605.00
48,600.00

14

XVIII
1

a Meni besi
0.10 kg
b Kuas
0.01 bh
c Pembantu tukang
0.02 org
d Tukang cat
0.20 org
Jumlah
Dibulatkan
1 M2 PENGECATAN PERMUKAAN BAJA DENGAN MENI BESI DAN CAT
a Meni besi
0.10 kg
b Cat besi
0.13 kg
c Kuas
0.01 bh
d Ampelas
0.50 lbr
e Perancah kayu
0.01 m3
f Pembantu tukang
0.20 org
g Tukang cat
0.20 org
Jumlah
Dibulatkan

PEKERJAAN LISTRIK
PASANG 1 TITIK STOP KONTAK
a Stop kontak
b Kabel listrik NYM 3 x 2,5 mm
c Aksesoris ( 20 % material )
d Pembantu tukang
e Tukang listrik
Jumlah
Dibulatkan
PASANG 1 TITIK LAMPU
a Saklar
b Kabel Listrik NYM 2 x 2,5 mm

27,500.00
14,000.00
50,000.00
87,500.00

2,750.00
140.00
1,000.00
17,500.00
21,390.00
21,390.00

27,500.00
38,500.00
14,000.00
2,500.00
75,000.00
50,000.00
87,500.00

2,750.00
5,005.00
140.00
1,250.00
750.00
10,000.00
17,500.00
37,395.00
37,390.00

1.00
0.25
1.00
0.20
0.60

bh
rol
ls
org
org

21,500.00
450,000.00
22,500.00
50,000.00
87,500.00

21,500.00
112,500.00
22,500.00
10,000.00
52,500.00
219,000.00
219,000.00

1.00
0.25

bh
rol

21,500.00
415,000.00

21,500.00
103,750.00

c Aksesoris ( 20 % material )
d Pembantu tukang
e Tukang listrik
Jumlah
Dibulatkan
PASANG 1 BUAH LAMPU SL
a Lampu SL
b Aksesoris ( 1 % alat )
c Tukang listrik
Jumlah
Dibulatkan
PASANG 1 BUAH LAMPU TL
a Lampu TL
b Aksesoris ( 1 % alat )
c Tukang listrik
Jumlah
Dibulatkan
PASANG 1 BUAH LAMPU BARET
a Lampu Baret
b Aksesoris ( 1 % alat )
c Tukang listrik
Jumlah
Dibulatkan
PASANG 1 BUAH LAMPU PIJAR
a Lampu Pijar
b Aksesoris ( 1 % alat )
c Tukang listrik
Jumlah
Dibulatkan
PASANG 1 BUAH LAMPU TAMAN

1.00
0.20
0.60

ls
org
org

20,750.00
50,000.00
87,500.00

20,750.00
10,000.00
52,500.00
208,500.00
208,500.00

1.00
1.00
0.10

bh
ls
org

55,500.00
555.00
87,500.00

55,500.00
555.00
8,750.00
64,805.00
64,800.00

1.00
1.00
0.12

bh
ls
org

55,500.00
555.00
87,500.00

55,500.00
555.00
10,500.00
66,555.00
66,550.00

1.00
1.00
0.15

bh
ls
org

92,000.00
920.00
87,500.00

92,000.00
920.00
13,125.00
106,045.00
106,040.00

1.00
1.00
0.10

bh
ls
org

6,000.00
60.00
87,500.00

6,000.00
60.00
8,750.00
14,810.00
14,810.00

a Lampu Taman
b Aksesoris ( 1 % alat )
c Tukang listrik
Jumlah
Dibulatkan
PASANG 1 BUAH PANEL
a Panel Listrik standart untuk Rumah
b Aksesoris ( 10 % alat )
c Tukang listrik
Jumlah
Dibulatkan

XIX PEKERJAAN WATERPROOFING


1
PASANG 1 M2 WATERPROOFING MEMBRAN
a Material Primer
b Waterproofing Membrane
c Pengetesan ( 10 % material )
d Pembantu tukang
e Tukang batu
Jumlah
Dibulatkan
2
PASANG 1 M2 WATERPROOFING COATING
a Pre treatment / Cleaning ( 10 % material )
b Bahan Waterproofing Coating
c Kuas 3 "
d Pembantu tukang
e Tukang batu
Jumlah
Dibulatkan
3
PASANG 1 M2 FLOOR HARDERNER

1.00
1.00
0.35

bh
ls
org

175,000.00
1,750.00
87,500.00

175,000.00
1,750.00
30,625.00
207,375.00
207,370.00

1.00
1.00
1.00

bh
ls
org

300,000.00
30,000.00
87,500.00

300,000.00
30,000.00
87,500.00
417,500.00
417,500.00

2.50
1.10
1.00
0.20
0.60

kg
m2
ls
org
org

2,450.00
75,000.00
8,250.00
50,000.00
87,500.00

6,125.00
82,500.00
8,250.00
10,000.00
52,500.00
159,375.00
159,370.00

1.00
1.00
0.25
0.20
0.60

m2
kg
bh
org
org

4,400.00
44,000.00
14,000.00
50,000.00
87,500.00

4,400.00
44,000.00
3,500.00
10,000.00
52,500.00
114,400.00
114,400.00

a Material Natural non Metalic


b Aksesoris ( 10 % alat )
c Pembantu tukang
d Tukang batu
Jumlah
Dibulatkan

1.10
1.00
0.20
0.60

kg
ls
org
org

44,000.00
484.00
50,000.00
87,500.00

48,400.00
484.00
10,000.00
52,500.00
111,384.00
111,380.00

You might also like