TECHNICAL NOTE
PILOT TEST WORK On-line test work was conducted at plant site using 3 Deister column. The basic parameters generated during the test work and used in the model for scale-up are: Column carrying capacity Residence Time Superficial feed velocity.
The column operating parameters studied during the test work includes wash water, froth depth and air rate. COLUMN SCALE-UP AND DESIGN CALCULATIONS Data Reconciliation and Gross Error Estimation ( RAGE) software developed at EIL was used to filter the laboratory information and estimate the flowrates. RAGE uses the well accepted sum of weighted least square errors as objective function for minimization, subject to different combinations of mass and energy balance constraints. The reconciled information was then used for column scale-up using the software COLSIM.COLSIM is a column flotation simulator developed based on axial plug flow dispersion approach. For purposes of modelling, column is divided into two zones viz., the collection zone, where particle recovery occurs and the cleaning zone, where there is preferential froth drop back effect. The model equations used for simulating the collection zone are based on first principles of bubble particle hydrodynamics. Based on the acceptable values for basic parameters and simulation studies (Mittal et al ., 1995), it was decided to install two column in series of circular cross-section and of size 1.75m (Dia) X 12m (height) so as to replace three zinc cleaning banks of total nine cells. AIR SPARGER, WASH WATER AND FEED DISTRIBUTION Air Sparger Variable gap air spargers of Multotec, South Africa have been used for this installation. The spargers are in use since last one year and are giving quite satisfactory performance. Feed Distribution Feed distributor being an integral part of column has been specifically designed for this installation by EIL. No internal launders and baffles have been used. Wash Water Distribution The wash water distributor consists of horizontal tubular set with holes located in the lower part of the tube at specified angles in order to get a rain of sprinkled water, like a fountain. COLUMNS COMMISSIONING AND METALLURGICAL PERFORMANCE Integrated flowsheet of zinc circuit at RD Mine after column installation is shown in Figure-1. The plant was commissioned in May-June, 1998 and since then it is running with consistent and desired metallurgical
performance. Table-1 gives an idea of circuit metallurgical performance before and after columns installation.
TABLE 1 CIRCUIT PERFORMANCE BEFORE AND AFTER COLUMNS INSTALLATION Metallurgical Data % ZINC % ISM Pre-Revamp % 48-50 7-8 Design Data % +52 <5 CONCLUSIONS Indias first column flotation system in lead-zinc circuit of a base metal industry has been successfully installed at Rajpura Dariba Mine of Hindustan Zinc Limited. The plant is in operation since last one year and the results are quite satisfactory and are as per the design predictions. The installation has led to improvement in final zinc concentrate grade by a minimum of 4 % and at the same time reduced the ISM content by 4 %. ACKNOWLEDGEMENTS Financial support for this work was provided by Department of Science and Technology (Govt. of India), Ministry of Mines (Govt. of India) & Hindustan Zinc Ltd., and is gratefully acknowledged. The authors also wish to thank management of EIL & HZL for giving the permission to publish this work. REFERENCES 1. Mittal, N.K., Sen, P.K. and Chopra, S.J., An Approach to Flotation Circuit Simulation: Integration of Column Cells. In Proc. Conference on Mineral Processing Recent Advances and Future Trends, Eds. Mehrotra, S.P, et al., IIT, Kanpur, India, 1995, pp 743-748 2. Jakhu, M.R, and Sinha, B.K.P., Beneficiation plants of HZL-Technology Update. In Proc. Conference on International symposium on Beneficiation, Agglomeration and Environment, RRL, Bhubneswar,India, 1999. Post-Revamp % 52-55 2-4 1 Yr Average % 52-55 2-4
Lead tailing
Wash water
Rougher Conc.
Column-II
Air
Column-I
Thickener
Column Tailings