FRUGAL INNOVATION
IN INDUSTRY
process of reducing the complexity and cost of a good and its production. Frugal innovation responds to limitations in resources, whether financial, material or institutional, and turns these constraints into an advantage through minimizing the use of resources in development, production and delivery. Frugal innovation results in dramatically lowercost products Dr. and R. A.services Mashelkar & a better way of doing a job. Successful frugal innovations are not only lower in cost, but outperform the alternative, and can be made available at large scale.
Frugal Innovation =
Value for
Money
Value for
Many
Dr. R. A. Mashelkar, President of Global Research Alliance, (former Director General of the Council of Scientific & Industrial Research (CSIR))
Important?
Improve people welfare
Drive the economic growth of nations Sustain Organizations
that roughly translates as an innovative fix; an improvised solution born from ingenuity and cleverness. Jugaad Innovation is about: Less, but better it concentrates on the essential aspects and not burdened with non-essentials back to purity, back to simplicity. Jugaad applications include finding new uses for everyday objects Indian kitchens are replete with empty bottles reused as ad-hoc containers for dried legumes or condimentsor inventing new utilitarian tools using everyday objects, like a makeshift truck cobbled together with a diesel engine slapped onto a cart (makeshift vehicles).
MittiCool Fridge
Believe it or NOT Indian Jugaad is MOST HAPPENING Thing for the world
European economies expanded, Western corporations began to institutionalize their innovation capabilities, creating dedicated R&D departments and standardizing the business processes needed to take their ideas to market. They focused on managing innovation, just as they managed any other business activity. This industrialization of the creative process led to a structured approach to innovation with the following key characteristics: big budgets, standardized business processes, and controlled access to knowledge. But this structured innovation approach, which helped Western firms become highly successful in the second half of the twentieth century, has three clear limitations in the fast pace and volatility of the twenty-first century:
1. 2. 3.
The structured approach is too expensive and resource consuming The structured approach lacks flexibility The structured approach is elitist and
Diversity
--------------------------------------------
Biological
Interconnectivity
Cloud Computing Mobile Social Media
Velocity
--------------------------------------------
Globalization
--------------------------------------------
Emerging Markets
More Consumers Greater Strain on Existing Resources Frugal Innovation
IFFCO Aonla
Producing 1.21 lacs Bags having 50 kg Urea. Plant is continuously running & DOWNTIME is not desirable. 1 day DOWNTIME cost = Production Loss of Rs.6 crore + Shutdown & Startup Energy Loss of Rs.2 crore. Shutdown Planning is a mega activity in the continuous running plants so that all activities can be completed within a specified span of time.
Certified for following Management System ISO-9001 Quality ISO-14001 Environment OHSAS-18001 Helath & Safety ISO-16001 Energy ISO-26001 CSR
and creative thinking on the part of employees. "IFFCO Employees Suggestion Scheme" is yet another step towards utilizing employees creativity and potential for improved organizational performance. The Scheme is aimed towards an objective of providing a wellstructured and formal platform for nurturing, supporting and rewarding creative ideas of employees.
Computerization
1133 969 924 802 Number of Employees Number of Suggestions Received No. of Suggestions Impleented 156 28 157
50
897
2010-2011
2011-2012
2012-2013
FRUGAL INNOVATION-1
Reduction in inspection time of Ammonia Converter (S-200 ) by providing prefabricated multi-storied inspection cage.
THE JOB: Inspection of inside wall of Ammonia Convertor which involved
NDT (DP/UT/Hardness/etc) of 6 nos. of C-Seam weld joints and 5 nos. of L-Seam joints.
scaffoldings
dia.
It involves 150M3 of scaffolding which takes 02 days to erect and 01 days to dismantle. Additionally 01 day required for Inspection .
FRUGAL INNOVATION-1
Conventional Scaffolding
FRUGAL INNOVATION-1
inspection activity
innovative idea
FRUGAL INNOVATION-1
This will allow inspection of all Cseam joints of all 6-levels at a time i.e. Inspection time is reduced.
More safe Installation and removal is
one
FRUGAL INNOVATION-1
This scaffolding structure was actually erected into vessel in 1 hour instead of
2days.
Inspection was carried out through out the vessel in a time in 12 Hrs instead 24hrs due to easy access.
FRUGAL INNOVATION-1
The scaffolding was de erected from the vessel in 1 hour instead of 1 day
FRUGAL INNOVATION-1
Other Benfits :
The fabricated structure can be utilised for such applications with slight modification
The used material can be reclaimed and re-utilised.
FRUGAL INNOVATION-2
REDUCTION IN REPAIR TIME OF Syn-loop boiler (E-1501) Ammonia-1
IMPORTANCE:
Use waste heat of syn gas coming from
OBSERVATION:
Tube leakage.
EFFECT:
Boiler steam conductivity running higher
FRUGAL INNOVATION-2
repaired.
Tubes were plugged with Inconel plugs and welding was done with TIG process using Er Ni Cr3 filler wire of 1.6 &2.4 mm size. Tube to
FRUGAL INNOVATION-2
and dry surface. This condition was not achieved in presence of water, which results difficulty in welding.
Note : Through this procedure more time required and also difficulty in welding.
FRUGAL INNOVATION-2
REPAIR
FRUGAL INNOVATION-2
To Bimetallic Stripper
AMMONIA PLANT
COMP
UREA PLANT
FRUGAL INNOVATION-2
was done with TIG process using Er Ni Cr3 filler wire of 1.6 &2.4 mm
size. Tube to tube sheet leakage was also repaired by welding overlaying process.
During last S/D -2012, 04 nos. leaky plugs were removed by grinding
and new plugs provided and welded. Tubes to tube sheet weld joint were repaired by welding.
FRUGAL INNOVATION-2
BENEFITS 1.Time saving 2. Defect free welding The above suggestion has given a Tangible Benefit of 3,00,00,000/- (one time) and other benefit like reduction in overall plant shut down period.
CD Cell AB Cell
View
FRUGAL INNOVATION - 3
Use of Special Jig for handling more than one catalyst Tube
FRUGAL INNOVATION-3
Earlier approach
Single catalyst Tube removal
would be required by conventional method.Catalyst Tube removal & insertion was done on single tube basis (conventional method).
Total time taken for tube
FRUGAL INNOVATION-3
Optimum capacity.
utilization
of
Crane
New Fixture for three tubes Removal/insertion
FRUGAL INNOVATION-3
IMPLEMENTED APPROACH
The Suggestion was
implemented by fabricating new Jigs & Fixtures in house using the scrap structural & piping material.
Sr no
Activity
% Reduction
60%
=288x30min =6 days
Safety
Groove for Two part Stopper cleats for two More safe ring But no Bolting part ring and fixtures were Bolted Note: *Extra time for single crane operation with new fixtures was due to Bolting & dismantling of clamps, difficulties in alignment & removal of old catalyst tubes.