ISSUE NO.

R3

PACKAGE CODE: A03 PHASE II

TCE CONSULTING ENGINEERS LIMITED

VOLUME IIB SECTION: D 1.3 SHEET 1 OF 3

DATA SHEET - A VERTICAL TURBINE PUMPS

LOCATION 1.0 1.1 DESIGN FEATURES Designation

GUARD POND

VERTICAL TURBINE (NEAR GUARD POND) Nos. cu.m/hr mwc 2 (1W+1S) 650 BY BIDDER

1.2 1.3 1.4

Quantity (working + standby) Rated capacity Total head (excluding column pipe and discharge elbow) Maximum speed LIQUID DATA Liquid handled Specific gravity Temperature Solids present Size of largest solid piece CONSTRUCTIONAL FEATURES Type of lubrication Liquid of lubrication Type of coupling Type of impeller Limitation of column pipe length MATERIALS OF CONSTRUCTION Base plate Pump Suction Bowl Column pipe discharge elbow PPD. BY CKD. BY DATE

1.5 2.0 2.1 2.2 2.3 2.4 2.5 3.0 3.1 3.2 3.3 3.4 3.5 4.0 4.1 4.2 4.3 REV. NO. DATE REV. BY

R.P.M.

BY BIDDER

WATER 1.02 C ppm mm 50 2000 Not available

Self Pumped liquid Flexible Semi-Open M BY BIDDER

MS to IS 2062 CI to IS 210 FG 260 Fabricated steel to IS 2062 with a minimum CLIENT NLC PROJECT 2250MW TCE FORM NO.330 R1

JOB NO.

File name : DA10502R3.DOC

ISSUE NO.R3

PACKAGE CODE: A03 PHASE II

TCE CONSULTING ENGINEERS LIMITED

VOLUME IIB SECTION: D 1.3 SHEET 2 OF 3

DATA SHEET - A VERTICAL TURBINE PUMPS

thickness of 16 mm and with epoxy painting 4.4 4.5 4.6 4.7 Impeller Shafts Shaft couplings Line bearings CA6 NM/ CF 8M SS 410 SS 410 Cutlass rubber in SS shell below water level. Thordon/ Finostos above water level. SS SS

4.8 4.9 5.0

Suction strainer Shaft sleeves ACCESSORIES AND SERVICES REQUIRED Companion flange with gasket, bolts, nuts, and washers. Suction strainer Pre lubricating tank & accessories Draw down level gauge SITE DATA Location Installation Bore well dia. Floor level Discharge head/elbow centreline elevation Design water level Minimum water level Maximum water level Design frequency PPD. BY CKD. BY DATE mm M M M M M Hz JOB NO.

5.1

Yes

5.2 5.3 5.4 6.0 6.1 6.2 6.3 6.4 6.5 6.6 6.7 6.8 6.9 REV. NO. DATE REV. BY

Yes Yes Yes

Outdoor Open well Not applicable REFER PUMP HOUSE DRAWING REFER PUMP HOUSE DRAWING REFER PUMP HOUSE DRAWING REFER PUMP HOUSE DRAWING REFER PUMP HOUSE DRAWING 50 CLIENT NLC PROJECT 2250MW TCE FORM NO.330 R1

File name : DA10502R3.DOC

ISSUE NO.R3

PACKAGE CODE: A03 PHASE II

TCE CONSULTING ENGINEERS LIMITED

VOLUME IIB SECTION: D 1.3 SHEET 3 OF 3

DATA SHEET - A VERTICAL TURBINE PUMPS

6.10 7.0

Variation in frequency TESTING/INSPECTION Shop inspection requirements shall be as per

Hz

+/- 5 %

Volume IIA

8.0 8.1 8.2 8.3 8.4

DRIVE DATA Prime Mover by Type of drive Drive as per Starter by BIDDER Motor Vol- IIIA of the specification BIDDER

REV. NO. DATE REV. BY File name : DA10502R3.DOC

PPD. BY CKD. BY DATE

JOB NO.

CLIENT NLC PROJECT 2250MW TCE FORM NO.330 R1