w4 Number
To
C/SEFIW/LTOAlJCC Date: 17.01.2012
As per list Enclosed
Sub: - Report of the 3'd Co-ordination Committee Meeting of IPPs
granted/applied Connectivityl LTAILTOA in WR
Dear Sir,
We write with reference to the 3'd Joint Co-ordination Committee meeting held at
POWERGRID GUiJlaon office, on 06.01.2012. In this regard please find attached
report on the 3' Co-ordination Committee Meeting of IPPs granted/applied
Connectivity/ LTAILTOA in WR indicating the progress of generation projects and
associated transmission systems.
Yours faithfully,

(Pankaj Kumar)
Executive Director (SEF, CE, IT & ERP)
Copy to:
1. Shri Ravinder
Member (PS)
Central Electricity Authority
Sewa Shawan, R.K.Puram
New Delhi-110 066
2. ED (Commercial)/ED (WR-I&II)/GM (CMG)/GM (Proj-I)-WRTS-I/GM (Proj)-
WRTS-II
'!jQ'I mr<I. --& 26560121 $m: 01126560039 <IR
Registered ,Office: e.g, Qutab Institutional Area, Katwaria sarai, New Oelhi-110016 Tel. : 26560121 Fax: 011-26560039 Gram: 'NATGRIO'

Save Energy for Benefit of Self and Nation
!"-
, Sil. H.M Jain
------
....--.. ... .. ..
'""----i
1 ':2 i Sr,. Asnok Jain Chadha
VP (Power) Director
Coal &Power ltd. Jain Energy (Chhattisgarh) Pvt. ltd.
7' Floor, Corporate tower, 5'h Floor, Permlata, 39
Ambience Mall, NH-8, Shakespeare Sarani,
Gurgaon -122001 Kolkata-70017
--_.- .._--
3 Sil. A.K Dubey 4 Sil. RP. Vishwakarma
Chief Administrator (CEO) GM(E&I)
Sona Power Lyd. Godawari Energy Ltd.
37/75 , Punjabai Colony, First Floor, Hira Arcade,
Nr. SBI Zonal Office, Near New bus stand,
Katora Talab, Raipur (C.G) Pandri, Raipur.
..
5 Sil. Neeraj Agarwal 6 Ms. Radila M.S
VP-Thermal CEO (Power Business)
Welspun Energy Annupur Pvt. Ltd. Additional V.P.
3'd Floor, The Press Trust of Chitrangi Power Private Limited
India Building 1
5
' Floor, I Block, Dhirubhai Ambani
4, Parliament Street Knowledge City, Thane - Belapur
New Delhi 110001 Road, KoparKhairane,
Navi Mumbai -400710
7 Sil. Raja Vaisyanatilan 8 Sil. Suresh Medikonda
Director Vice President
Mis SJK Powergen limited Banas Thermal Power Private Limited.
IBC Knowledge Park, Plot No. 270, Phase-III, Udyog Vihar,
Phase 2, "D"Block, Gurgaon-122016 Haryana, India
9'h floor, 4/1, Bannerghatta Road,
Bangalore-560029
9 Sh. T. P. Vijayasarathy 10 Sh. R K. Madan
Executive Director (Corporate) CEO
Torrent Energy Ltd.(DGEN) Adani Power (DAHEJ) Ltd.
Torrent House, Off Ashram Road, Adani House, Plot No-83
Ahmedabad - 380009 Sector-32, Gurgaon-122001
Navi Mumbai -400710
11 Sh, Pramod Gupta 12 Sh. R K. Oke
Sr. Vice President Chief Engineer (Transmission)
Bharuch Power Limited Nuclear Power Corp. of India Ltd.
Dhirubhai Ambani Knowledge City V.S. Bhavan, Anushaktinagar,
I-Block, 2nd Floor, North wing, Mumbai 400094
Thane Belapur Road, Koparkhairane,
Navi Mumbai(Maharashtra)-400710
, 13
- - , _ . ~ - - - - - - ~ ~ - _ .
~ ~ - - .. ~ . ~ . ... - ~ - - - ' - ' - - ' " ~ ~ - - - - ' " - - ' - ' - - ' - " ~ - ' - " I
Sil. Bilupesh Juneja
114 Sh. Manven Dubey .
Vice President (Projects) Sintex Power Ltd.
Gujarat Fluorochemicals Ltd. Vice President (Projects)
INOX Towers, Plot 17, Abhijit -I, 704, 7'h Floor
Sector 16-A, Noida Mithakhali Six Roads,
Ellisbridge, Ahmedabad,
Gujarat 380006
15 Sh. D. P. Bhasin 16 Sh. Satish Shrikhande
Sr. General Manger General Manager
Pipavav Energy Ltd. Regal Energy Ltd.
12
th
Floor, Videocon Towers 6th Floor, Land Mark Building,
Jhandewalan Extn. Ramdaspeth,Wardha Road,
New delhi-11 0055 Nagpur-440010
._._.._..
17 Sh. K. K. Agarwal 18 Sh. R. Mani Mathavan
CEO Vice President
Jinbhiuvish Power Genrations Pvt. Ltd. Astarc Power Pvt Ltd.
155, A-Wing,Mittal Tower, Astarc house, 76/79, Makwana Lane,
Opp to Vidhan Bhavan, Takpada. Off. Andheri Kurla Road,
Nariman Point, Marol, Andheri (East), Mumbai-400059
Mumbai 400021,
Bangalore - 560001
19 Sh. A. B. Bajpai 20 Sh. S. K. Sharma
Chief General Manager (Comml) AGM, NTPC Ltd.
M.P. Tradeco. (Kawas-II, Gandhar-II, Lara Projects)
Block No.2, Shakti Bhavan,
NTPC Bhavan, Core-7,
Vidyut Nagar, Rampur, Jabalpur,
Scope Complex,
Madhya Pradesh, 482008
7, Institutional Area,
Lodi Road, New Delhi
21 Sh. A. K. Garg 22 Sh. Manven Dubey
Chief Engineer Sintex Power Ltd.
Chhattisgarh State Power Trading Ltd. Vice President (Projects)
2
nd
Floor, Vidyut Sewa Bhawan Abhijit -I, 704, 7
th
Floor
Dangania, Mithakhali Six Roads,
Raipur -492013 Ellisbridge, Ahmedabad,
Gujarat 380006
23 Sh. R. K. Agarwal
Executive Director
Sarda Energy & Minerals Ltd.
1st Floor, Vaujiya Bhawan,
Jail Road, Devendra Nagar Square,
Raipur-492001
Report on the 3"d Joint Co-ordination Meeting ofIPPs granted LTOA in WR
Report of the 3rd Co-ordination Committee Meeting of IPPs
Granted LTOA in WR held on 6.01.2012
1. The meeting of the 3
rd
Co-ordination Committee of IPPs in WR was held in
POWERGRID office, Gurgaon on 5
th
January, 2012. The meeting was attended by
CEA and the representatives of IPPs who have applied for! granted connectivity!
LTOA in WR. The list of participants of the meeting is enclosed at Annexure-t.
2. POWERGRID welcomed the participants and informed that after obtaining regulatory
approval of High Capacity Transmission Corridors, POWERGRID has started phase-
wise implementation of these corridors, considering progress of generation projects in
various complexes. POWERGRID made a presentation about the status of
implementation of transmission system including establishment of pooling stations in
Chhattisgarh, M.P and Gujarat. It was emphasized by POWERGRID that all the
generation developers need to ensure that the corresponding dedicated transmission
system and/or interim arrangement, being implemented by IPPs, is in place as per
their generation commissioning schedule. Before starting implementation of the
transmission system, they have to fulfill statutory requirements like obtaining approval
under Section-58 and Section-154 of EA 2003 from Ministry of Power. Some of the
developers informed that they have already obtained/applied for these approvals,
however, balance IPPs need to apply to MoP in this regard immediately.
3. POWERGRID informed that some of the developers have submitted the details as per
"Format-Con-4" of "Detailed Procedure of CTU on grant of Connectivity, Long Term
Access & Medium Term Open Access" for signing of connection agreement with
POWERGRID to facilitate interconnection with the ISTS grid substation. However,
gthersl1eed tosubmit the details immediately so that connection agreement may be
prepared.
4. CEA informed that the Wide Area Measurement System (WAMS) is being deployed as
a part of the Smart Grid implementation, nationwide by installing PMUs (Phasor
Measurement Unit) at all the important substations and power plants to provide
advance technology to RLDCs & NLDC. The WAMS shall improve the grid
management sUbstantially. It will also improve the capability of operators in managing
the grid, during the extreme hours of demand & supply of power. Better grid
management shall be helpful to all the generators in optimizing the resourses. On a
query by IPPs about the suitability of PLCC for the same, POWERGRID informed that
the installation of PMUs shall require higher bandwidth for flow of data at high speed
which shall not be possible with the conventional analog PLCC. To meet the higher
bandwidth requirement, POWERGRID is installing OPGW Cable to connect all the
important substations of Central Sector with Fibre Optic. Accordingly, installation of
OPGW cable is also required in the transmission lines emanating from IPPs
Generation switchyard and being constructed by IPPs. It was also mentioned that the
incremental cost due to OPGW is very small. Some of the IPPs informed that
construction of line is in advance stage and at this stage installation of OPGW may not
be possible. CEA informed that it is responsibility of the IPPs to provide the required
communication up to CTU wide band and requested to examine the possibility of
OPGW installation and inform CTU accordingly.
Page 1 of 11
Report on Joint Meeting ofIPPs granted LTOA in WR
5. POWERGRID informed that as per Central Electricity Regulatory Commission
(Sharing of Inter State Transmission Charges and Losses) Regulations, 2010, it is
mandatory for the Designated ISTS Customers and the CTU to enter into new
transmission services agreement or modify the existing Bulk Power Transmission
Agreements to incorporate the new tariff and related conditions. Such agreement shall
govern the provision of transmission services and charging for the same and shall be
called the Transmission Service Agreement (TSA) and shall provide for, detailed
commercial and administrative provisions relating to sharing of ISTS charges and
losses based on principles derived from these regulations. Accordingly, a model TSA,
as approved by CERC, has been uploaded on POWERGRID site which every DIC is
required to sign.
POWERGRID requested all the eligible developers to sign the said Agreement within
Jan'12.
6. Following IPPs in WR had applied for LTOA in Chhattisgarh complex under CERC
RegUlations, 2004. However, due to inadequate progress of the projects, LTOA was
to them. The progress of these IPPs was reviewed by CEA and
POWERGRID. The details are given in following paragraphs:
(i) Godawari Energy Ltd. (1320 MW)
Representative of MIs Godawari Energy submitted status report as under.
- Land: Total land acqUired is 860 acres, out of which 672 acres is acquired and
140.56 is under possession.
- Fuel linkage: Coal linkage is awaited.
-'EnvirOhmentalclearance: public hearing held, final EIA slibmittedto MoEF,
awaiting for the EC. Water linkage has been obtained. No forest is involved.
- EPC award for BTG package and BoP is yet to be finalized.
- Civil activities not yet started at site.
- Financial closure to be achieved.
- Mis Godawari Energy also informed that they have signed PPA for with CSPTL
for 458 MW and signed MOA with PTC for sale of 708 MW of power.
-Commissioning schedule is U#1 -Jul'15, U#2-Jul'16.
(ii) Sona Power Pvt. Ltd. (2x 660 MW)
Representative of Mis Sona Power submitted status report as under:
- Land: 100% land (509 acre) under possession.
- Fuel linkage: Coal linkage awaited.
Page 2 of 11
Report on the 3"d Joint Co-ordination Meeting ofIPPs granted LTOA in WR
- Environmental clearance: TOR for 660 MW received. No forest is involved.
Water linkage is obtained for 1x660 MW, application submitted to SIPB for
additional 16MCM water for enhanced capacity to 2x660 MW.
- EPC contract to be initiated.
- Financial closure under process.
- Sona Power informed that they have signed PPA with CSPTradeco/CSEB for
35% power.
- Commissioning schedule was indicated as U#1 - Mar'15 &U#2- Aug'15.
(iii) Sarda Energy and Minerals Ltd. (1350 MW)
Representative of M/s Sarda Energy and Minerals stated that they are yet to
receive coal linkage for their project.
POWERGRID stated that in view of inadequate progress of Godawari Energy Ltd.,
Sona Power Ltd. and Sarda Energy and Minerals Ltd., they can not be granted LTOA
at this stage. CEA stated that their progress may be monitored for some more time,
and in case no further progress is there, the LTOA applications may be closed.
7. Following IPPs in WR were granted connectivity in meeting of WR constituents to
discuss Connectivity/ Open Access. The progress of various IPPs in WR was
reviewed by CEA & POWERGRID. The details are given in following paragraphs:
(i) SJK Powergen Limited (1320 MW)
Representative of M/s SJK Powergen did not attend the meeting but submitted
status report as under:
- Land: 100% land acquired (588 acres).
- Fuel linkage: Coal linkage is awaited.
- Environmental clearance: Final EIA report submitted to MoEF, and is to be
granted by MoEF after the coal linkage is obtained. Water linkage obtained.
- Forest clearance: Deposit towards NPV and aforestation charges already made
along with other formalities. Formalities for stage -II clearance are completed
and awaiting for the same.
- EPC award: LOI placed for BTG. LOA is under process. Award for BoP under
process.
- Financial closure: After the coal linkage.
Page 3 of 11
to be slgnBd after the coal linkage.
- Commissioning schedule indicated by the developer is U#1-Dec'14, U#2-
Jun'15.
(ii) Chitrangi Power Pvt. ltd.(5940MWl
Representative of Mis Chitrangi power didn't attend the meeting. They have
submitted a letter stating that they are yet to receive forest clearance for one of
the coal blocks which may impact their overall implementation schedule.
(iii)Gujrat Fluorochemicals Ltd.
Representative of Mis Gujrat Fluorochemicals submitted status report as under:
- Land: Total land required is 601 acres, out of which 324 acre is acquired and
277 acres is under possession.
- Fuel linkage: Not required as it is a wind project.
- Environmental clearance: Not required. Water linkage not required. No Forest
involved.
- EPC award: Under process.
- Commissioning schedule indicated by the developer is U#1-Mar'13, U#2-
Sep'13, U#3: Mar'14.
- Regarding dedicated transmission system, Mis GUjrat Flourochemicals
informed that engineering work is in progress.
(iv)M.BPower (Chhattisgarhl Ltd. (1320 MWl
Representative of Mis M.B Power submitted status report as under:
- Land: Total land required is 925.132 acres, out of which 881.862 acres is
acquired.
- Fuel linkage: Application for coal linkage filed by the company with MoC.
- Environmental clearance: public hearing held. Water linkage has been
obtained. No forest is involved. Consent to establish will be obtained after
receiving Environmental Clearnance.
- EPC award for BTG package and BoP is yet to be finalized.
- Financial closure to be achieved.
- Mis M.B Power also informed that they have signed PPA with CSP Tradeco for
sale of 35% of power.
- Commissioning schedule is U#1 - Ap;'15. U#2-Aug'15.
Page 4 of 11
Report on the 3"d Joint Co-ordination Meeting ofIPPs granted LTOA in WR
(v) NTPC ltd. ( GlIndhar-1ll ( 1300 MWl
Mis NTPC Ltd. didn't attend the meeting. Status regarding their generation
project was also not submitted.
(vi)NTPC ltd. (Kawas -Ill ( 1300 MW)
Mis NTPC Ltd. didn't attend the meeting. Status regarding their generation
project was also not submitted.
In view of commissioning schedule of these projects, these IPPs were asked to apply
for LTA so that the transmission system for power transfer for these projects may be
evolved.
8. Following IPPs in WR were granted LTA in meeting of WR constituents to discuss
Connectivityl Open Access. The progress of various IPPs in WR was reviewed by
CEA & POWERGRID. The details are given in following paragraphs:
(i) Spectrum Coal And Power Ltd. (2x50 MW)
Representative of Mis Spectrum Coal and Power submitted status report as
under:
- Land: 100% land (197.25 acres) in possession.
- Fuel linkage: Long term Coal linkage has been granted by MoC.
~ Environmental clearance: EC is obtained and consent to establish received.
Water linkage has been obtained. No forest land is involved.
- EPC award for BTG package is placed to Qingdao Jieneng Power Station
(QJPS), China and award for BoP package is under process.
- Construction activities in full progress. Boiler light up in Jan'12.
- Financial closure is achieved and loan of Rs. 174.07 Cr. has been disbursed.
- Spectrum Coal and Power also informed that they have signed PPA for 5% +
30 % with Chhattisgarh and 15 MW with Reliance Energy trading Ltd.
- Commissioning schedule is as U#1 - Mar'12. For U#2 schedule is not
indicated.
- Regarding dedicated transmission line. Mis Spectrum Coal and Power informed
that 132 kV Ole dedicated transmission line from their switchyard to 400/132 kV
Substation of ACBIL Chakabura has been erected.
Page 5 of 11
Report on the Joint Meeting 0'IPPs granted LTOA in WR..
(ii) Pipavav Energy Ltd.
Mis Pipavav Energy didn't attend the meeting. Status regarding their generation
project was also not submitted.
(iii)Torrent Enegry Ltd. (1200 MWI
Representative of Mis Torrent Energy submitted status as under;
-Land: 100% land (1107157.94 Sq Mtr land) is in possession.
- Fuel linkage: Ministry of power has recommended Gas allocation.
- Environmental clearance obtained. No forest involvement. Water linkage
obtained.
- EPC award placed for BTG and BoP package to Siemens AG.
- PPA with distribution utility of Ahmedabad under consideration of GERC. Also
they are licensee for distribution in Dahej SEZ, where power generated by
DGEN project would be sold at regulated rates.
- Financial closure achieved. Loan of Rs. 649.79 Cr. Disbursed.
- Civil activities started at site. Boundary work completed, drum lifting is to be
done, foundation of chimney is completed, hydraulic test of HRSG is to be
dene,GWpipingandwater-treatmentplantinstaliationinprogress,TG building
construction in progress.
-Commissioning schedule is indicated as U#1: Jan'13, U#2: Mar'13, U#3:
May'13.
(iv)Nuclear Power Corporation of India (Kakraparl (1400 MWl
Mis Nuclear Power Corporation of India Limited didn't attend the meeting. Status
regarding their generation project was also not submitted.
9. Following IPPs in WR were granted in-principle connectivity in meeting of WR
constituents to discuss Connectivityl Open Access. The progress of various IPPs in
WR was reviewed by CEA & POWERGRID. The details are given in following
paragraphs:
(i) Jain Energy (Chhattisgarhl Pvt. Ltd. (2x660 MWl
Representative of Mis Jain Energy submitted status report as under:
Page 6 of 11
Report on the 3"d Joint Co-ordination Meeting ofIFFs granted LTOA in WR
-- Land: 210 acre land already possessed against requirement of 950.7 acre.
- Fuel linkage: Application submitted. Coal linkage awaited.
- Environmental clearance: Draft EIA report has been submitted and public
hearing completed. No forest land is involved. Water linkage is obtained for 32
MCM and application for enhancement to 36 MCM submitted.
- EPC award yet to be placed.
- Civil work is yet to be started.
- Financial closure under process.
- Jain Energy also informed that they have obtained letter of comfort from
CSPTCL for sale of 35% of power.
- Commissioning schedule as informed by Mis Jain energy is U#1 - Mar'14, U#2-
Jun'14.
- Considering status of project, the commissioning schedule as indicated by IPP
is considered unrealistic and the generation developer was asked to submit a
realistic schedule.
(ii) Welspun Energy (Katnil Pvt. Ltd. (1980 MW)
Representative of Mis Welspun Energy submitted status report as under:
- Land: 1200 acres of total land acquired. Out of which Govt. land is 264 acres
and Pvt. Land acquired is 936 acres.
- Fuel linkage: Coal linkage applied. As a backup imported coal tie up has been
done with Oorja Resources India Pvt. Ltd. for 6 MTPA and with P.T Batubara
Energy -Indonesia for 2 MTPA.
- Environmental clearance: Final EC letter to be received shortly. No forest
involvement. Water linkage obtained. No forest land involved.
- EPC contract: Under evaluation.
- Financial closure: under process.
- PPA for 5 % energy signed with GoMP/MP Tradeco.
- The erection activity has not initiated at site.
- Commissioning schedule is U#1-Nov'15, U#2- Jan'16 and U#3- Mar'16.
Page 70f11
Report on the_3
nd
Joint Co-ordination Meeting ofIPPs granted LTOA in WR
Mis Nuclear Power Corporation of India Limited didn't attend the meeting. Status
regarding their generation project was also not submitted.
(iv)Regal Energy Ltd. ( 1980 MW)
Mis Regal Energy didn't attend the meeting but submitted status report as under:
- Land: Land yet to be acquired against the total requirement of 1000 acres.
- Fuel linkage: Coal linkage awaited.
- Environmental clearance: Not yet obtained. Got in-principle approval for water
allocation. No forest land is involved.
- EPC award: Yet to be placed.
- Financial closure: not obtained.
- Commissioning schedule indicated by the developer is U#1-Nov'14, U#2-
Jan'15, U#3- Apr'15, U#4-Jun'15.
(v) Jinbhuvish Power Generations Pvt. Ltd. (2x300 MW)
Representative of Mis Jinbhuvish Power submitted status report as under:
- Land: 100% land of 500 acres is under possession.
- Fuel linkage: WCL issued Coal linkage for 18,51,000 MT of coal/annum.
- Environmental clearance: Final EIA report submitted to MoEF. Water linkage is
obtained. No forest land is involved.
- EPC award for BTG package placed to China Western Power Corporation and
BoP package is yet to be placed.
- Financial closure: achieved.
- Jinbuhvish Power also informed that they are expecting to sign MOA for sale of
75 % power with PTC India for long term tie up. For the balance 25% of power
discussions with NWN are being done for tie up of sale of merchant power.
- Commissioning schedule indicated by the developer is U#1-Aug'14, U#2-
Nov'14.
- Regarding dedicated transmission system, Mis Jinbhuvish Power informed that
line survey is to be awarded shortly.
Page 8 ofll
Report on the 3"d Joint Co-ordination Meeting ofIFFs granted LTOA in WR
(vi)Sintex Power Ltd. ,1708 r"iiiV,
Representative of Mis Sintex Power submitted status report as under:
- Land: Total land required is 748 acres, out of which 485 acres is acquired and
358 acres is under possession.
- Fuel linkage: MoU signed with Indonesian coal supplier for imported coal. For
Indian coal and for gas allocation applied, to CEA.
- Environmental clearance: TOR is approved, EIA study is completed and report
is awaited. Water allocation is under process. No forest land is involved.
- EPC award: Yet to be placed.
- Financial closure: to be initiated.
- Commissioning schedule indicated by the developer is U#1-Aug'15, U#2-
Oct'15, U#3- Dec'13, U#4- Sep'14.
Since, the progress of the project is not adequate to grant connectivity, POWERGRID
asked the applicant to inform POWERGRID when milestones are achieved, so that
final connectivity may be granted to them. Some of the IPPs stated that they have not
received connectivity intimations. POWERGRID informed them that connectivity
intimations shall be issued after grant of 'Final' connectivity.
10. Following IPPs had applied for connectivitylLTA in WR and their applications were
discussed in meeting of WR constituents to discuss Connectivity! Open Access. The
progress of various IPPs in WR was reviewed by CEA & POWERGRID. However, in
view of unsatisfactory progress of the project, connectivity!LTA was not given. The
details are given in following paragraphs:
(i) Welspun Energy Annupur Pvt. Ltd. (1)(600 MW)
Representative of Mis Welspun Energy submitted status report as under:
- Land: 927 acres of total land acquired. Out of which Govt. land acquired is 158
acres and Pvt. Land acquired is 768 acres.
- Fuel linkage: Coal linkage is awaited. As a back up coal tie up with P.T
Batubara Energy - Indonesia has been done.
- Environmental clearance: Public hearing held. Water linkage available. No
forest is involved.
- EPC award yet to be placed.
- Financial closure is under process.
Page 9 ofll
3
JJd
Joint Meeting oflPPs granted LTOA in WR
- The erection activity has not initiated at site.
- Commissioning schedule is U#1 - Nov'15 and U#2-Jan'16.
(ii) Banas Thermal Power Pvt. Ltd. (1320 MWl
- Representative of MIs Banas Thermal Power informed that total land required is
550 acres and process of land acquisition has been initiated and is in advance
stage.
- Fuel linkage: Coal linkage application has been submitted to MoC.
- Environment clearance: TOR has been approved by MoEF, REIA study in
progress. Water linkage has been obtained. No forest land is involved.
- EPC award placed for BTG to MIs Harbin, China. Award for BoP also placed.
- Financial closure: To be obtained.
- MIs Banas Thermal Power also informed that 40% of power to be supplied to
GoMP as per the MoU signed. PPA to be executed.
- Commissioning schedule as informed by MIs Banas Thermal for U#1 is Mar'14,
U#2: JUly'14.
.(IiI)AdaniPower(OAHEJl Ltd.
Representative of MIs Adani Power submitted status report as under:
- Land: Total land required is 337 acres, out of which 235.12 acres is under
possession.
- Fuel linkage: Submitted application to MoC.
- Environmental clearance: Obtained. Water linkage available. No forest is
involved.
- EPe award yet to be placed, selection of bidders (Suppliers) under process.
- Boundary wall construction is in progress and is under final stage of
completion.
- Commissioning schedule is indicated as U#1 - Mar'15 and U#2-Jun'15, U#3-
Sep'15, U#4- Dec'15.
Page 10 ofll
Report on the 3"d Joint Co-ordination Meeting o.rIPPs granted LTOA in WR
MIs Baruch power didn't attend the meeting. Status regarding their generation
project was also not submitted.
(v) Astarc Power Pvt. ltd. (1320 MW)
Representative of MIs Astarc Power submitted status report as under:
- Land: 254.2 acres of land is in possession against total requirement of 832
acres of land.
- Fuel linkage: Application for long term coal linkage submitted of MoC.
- Environmental clearance: Draft REIAIEMP/DMP report to be submitted to
MoEF. Application to MPCB to be filed for consent to establish. Obtained In-
principle grant for water linkage. No forest land is involved.
- EPC award for BTG package and BoP package yet to be placed.
- Financial closure: Yet to be achieved.
- Commissioning schedule indicated by the developer is U#1-Jun'15, U#2-
Dec'15.
The progress of these IPPs was not found to be adequate for grant of
connectivity/LTA. Above IPPs were asked by POWERGRID to submit their status
on achieving some milestones, so that applications for connectivitylLTA may be
considered.
------xxx------
Page 11 of 11
Report on the 3"d Joint Co-ordination Meeting ofIPPs granted LTOA in WR
3rd Joint Coordination Committee Meeting of Western Region IPPs
Date: 06.01.2012, Venue: C o r ~ o r a t e Centre, Guraaon
SL. NAME DESIGNATION ORGANIZATION rJl0BILE NO. E-MAIL
NO PHONE
1 Ravinder M(PS)
CEA
2 Pankaj Kumar ED(CE, ERP,IT POWERGRID
9873549049 pankaj@powergridindia.com
&SEF)
3 N.S Sodha ED( LD&C) POWERGRID
9717890988 sodhataJnoweroridindia.com
4 Mahender SinQh ED(Commercial) POWERGRID 9910379477 MahendersinahtaJDoweraridindia.com
5 Prashant Sharma GM( POWERGRID 9910378002 prashant@powergridindia.com
Commercial)
6 N. K. Jain GM POWERGRID 9910378087 neekeejain@powergridindia.com
(Commercial)
7 P.V. Nath GM(WR-II) POWERGRID 9429899474 vallishnathtaJomail.com
8 Avinash M. PavQi AGM POWERGRID 9910378086 aDavaaitaJDoweraridindia.com
9 Maniu Guota DGM POWERGRID 9910378111 maniutaJnoweroridinida.com
10 Aniali SanQa Chief ManaQer POWERGRID
9910378015 anialitaJDoweraridindia.com
11 Kanchan Kumar Chief Manager POWERGRID 9560690612 kanchan@powergridindia.com
ChaudharY
12 Prashant Pnadev EnQineer POWERGRID
9560050236 Drashant.DandevtaJDoweraridindia.com
13 Shaskar L Waah Enaineer POWERGRID 9560890352 bhaskarwaahtaJnoweroridindia.com
14 Col AKDubey CEO Sona Power Pvt. 9752011165 sonaoower@gmail ..com
Ltd.
15 V.K. Shrivastva DGM(CA) Godawri energy 9810442576 vkshrivastva@gelpower.in
Ltd.
16 Awical Dubey GM(ECA) Godawri energy 9893900554 anical.dubey@ggodindia.com
Ltd.
17 K.K. Shah V.P Torrent Energy 9824027015 kkshah@torrentpower.com
Ltd.
18 P.K Dosi V.P Torrent Energy 9227410115 pkdosi@torrentpower.com
Ltd.
19 Siren Shah Sr. ManaQer Sintex Dower
8347400023 nower.birentaJsintex.co.in
20 VK Prasher Advisor Adani Power Ltd.
9811511470 kk.orasher@adani.com
21 Rahul sharma ManaQer Adani Power Ltd.
9654364016 rahul.sharmataJadani.com
23 Sunil Choudhary Sr. Executive Sanas Thermal 9971222315 skchoudhary1985@gmail.com
Power
24 Deepesh Gupta Manager Welspun Energy 8826099003 deepesh gupta@welspun.com
limited
25 D.K Saxena V.P Welspun Energy 9560999271 deepak saxena@welspun.com
Limited
26 S.S.Rajnekar AVP Jinbhuvish Power 9903964973 rajssr@jinbhuvish.com
Generation Pv!.
Ltd.
27 Ashwin Gharote Asst!. Mgr(Elect) Jinbhuvish power
9561308500 ashwingharote@jinbhuvish.com
cen. Pv!. Ltd.
28 R.Manimathavan V.P Power Droi Astarc Power
9987941743 mani.mathavan((;)astarc.com
29 Prateek Rana Dv. G.M (Proil GFL
9810399513 DranataJafl.co.in
30 Manoi Dixit Mar. Proiects GFL
9811361125 manoidixit((;)ofl.co.in
31 G.M Consultant Jain Energy 9827269100 pecpltd@gmail.com
Tekchandani PECPL
32 P.S Dutta GUDta VP SEML
9752090024 nduttaounta((;)seml.co.in
33 A.S Sajpai CGM M.P Power Trading 9425805859 Cecomml mpseb@yahoo.co.in
(Commercial) Corporation
34 V.K Chadha GM(Power) Spectrum Coal 9868392859 acbpower@gmail.com
And Power Ltd.