You are on page 1of 3

http://digilib.its.ac.

id

SUMMARY ANALISA DAMPAK LALU LINTAS AKIBAT PEMBANGUNAN SURABAYA HOSPITAL DI SURABAYA
THE ANALYSIS OF TRAFFIC IMPACT AS THE RESULT OF SURABAYA HOSPITAL IN SURABAYA Created by SUGIHARTO, DEDY Subject Subject Alt Keyword : : Kota Surabaya : Urban Traffic : tarikan; persimpangan; manajemen lalu lintas; Surabaya Hospital

Description :
Kota Surabaya adalah ibukota provinsi Jawa Timur yang merupakan kota terbesar kedua setelah Jakarta. Dengan jumlah penduduk yang hampir mencapai 3 juta jiwa menjadikan kota Surabaya sebagai pusat ekonomi, industri, perdagangan dan pendidikan di Jawa Timur. Oleh karena itu, perlu diimbangi dengan ketersediaan sarana dan prasarana yang memadai guna memenuhi kebutuhan warga kota. Dari semua sarana fasilitas umum yang ada, rumah sakit yang sebagai tempat rujukan untuk perihal medis atau kesehatan merupakan sesuatu hal yang tentunya sangat penting dan dibutuhkan keberadaannya. Keberadaan rumah sakit yang ada di Surabaya umumnya terletak di tengah kota. Dengan keadaan ini, maka banyak penduduk yang berasal dari pinggiran kota Surabaya melakukan pergerakan ke tengah kota guna memenuhi kebutuhan medis. Pergerakan kendaraan yang dilakukan penduduk di sekitar pinggiran kota Surabaya menuju ke tengah kota menimbulkan permasalahan lalu lintas yang merugikan para pengguna jalan. Pembangunan Surabaya Hospital yang berada pada kawasan Surabaya Barat berusaha mengurangi kepadatan arus lalu lintas di tengah kota. Pemilihan lokasi disesuaikan dengan rencana tata ruang kota yang tata guna lahannya diperuntukkan sebagai pemukiman, pendidikan, perdagangan dan jasa. Rencana pembangunan Surabaya Hospital di kawasan tersebut tentunya menimbulkan dampak positif dan negatif bagi lingkungan sekitar, ii apalagi mengingat letaknya di jalan arteri. Untuk mengantisipasi hal tersebut, dalam tugas akhir ini membahas tentang analisa dampak lalu lintas akibat pembangunan Surabaya Hospital tersebut. Metodologi yang akan digunakan adalah identifikasi masalah, survey, studi literatur, pengumpulan data-data sekunder, primer, analisa persimpangan dan ruas jalan perkotaan, manajemen lalu lintas. Hasil yang akan diperoleh dari tugas akhir ini adalah didapatkannya kinerja ruas jalan akibat pembangunan Surabaya Hospital pada masa datang, kinerja persimpangan akibat pembangunan Surabaya Hospital pada masa datang, dan manajemen lalu lintas berupa pelebaran jalan dan pengaturan ulang persinyalan di persimpangan.

Description Alt:
Surabaya is capital of East Java that is the second big city after Jakarta. With population density almost 3 millions being Surabaya as central of economy, industry, commerce, and education in East Java. So, it certainly must be balanced with available of facility and infrastructure to be equal to fulfill towny requirement. From all generall facilities, the hospital thas used as place to medical thing or health is something that very important and existence needed. The hospital existence in Surabaya usually in town center. So many action have been made by citizens to move away from suburban area to middle to fulfill medical requirement. Vehicles definitely are all means that people use so far causing traffic problem that injuring the peoples. Surabaya Hospital building in West Surabaya try to reduce flow traffic density in the middle of town. Location selection

Page 1

will be adapted with administration plan which its land courtesy just for settlement, education, commerce and service. The development of Surabaya Hospital will be constructed in that area has given bad impact to the nearest surrounding area, especially its location has just been in artery road. To anticipate that matter, in final assignment, we shall discuss on analysis of traffic impact as the result of the development of Surabaya Hospital. Certain methodology will be used like problem identification, survey, study of literature, group of data primer, iv and secunder, intersection analysis, urban road analysis and traffic management. The result gained from the final assignment is to obtain the urban road analysis impact of development Surabaya Hopital in the future, condition of intersection impact of development Surabaya Hospital in the future, and traffic management like road broadening and resystematization of signal in intersection.

Contributor Date Create Type Format Language Identifier Collection Call Number Source COverage Right

: Cahya Buana, ST.MT. : 27/01/2010 : Text : pdf : Indonesian : ITS-Undergraduate-3100010038597 : 3100010038597 : RSS 388.413 12 Sug a : Undergraduate thesis,Civil Engineering, RSS 388.413 12 Sug a, 2010 : ITS Community : Copyright @2010 by ITS Library. This publication is protected by copyright and per obtained from the ITS Library prior to any prohibited reproduction, storage in a re transmission in any form or by any means, electronic, mechanical, photocopying, reco For information regarding permission(s), write to ITS Library

Full file - Member Only


If You want to view FullText...Please Register as MEMBER

Contact Person :
Administrator (timit_perpus@its.ac.id) Taufik Rachmanu (taujack@its.ac.id) Dewi Eka Agustina (dee@its.ac.id) Ansi Aflacha Putri (ansi@its.ac.id) Tondo Indra Nyata (tondoindra@gmail.com) Aprillia Tri Wulansari (rezha_la2@ymail.com)

Thank You,

Page 2

Nur Hasan ( hassane@its.ac.id ) Supervisor

Page 3

You might also like