PROJEK MENYIAPKAN RANGKAIAN PAIP PEMBETUNGAN TERBENGKALAI DI KUALA SAWAH, NEGERI SEMBILAN Lampiran 1 Item No Description Unit Qty

Remarks *Date will be rescheduled base on site condition Flow test Proposed dated Flow Flow test Test result

1.0 1.1 a.

Sewer Repair Works by Open Cut Method Trench excavation for 225mm dia VCP sewer for 825mm wide bed Average depth to invert E2.0m but NE4.0m i. MH98-4-1 to 98-4 ii. SEN158 to MH 106-27-8 iii. SEN 047 to MH106-6-1 iv. MH106-27-8 to MH 106-27-7

m m m m

14 6 14 69

Camera submerged Adverse level shown in As Built Drawing CCTV camera submerged (relay due to adverse gradient shown in As built at SEN 158 to MH 106-27-8

/ / / /

19/3/2013 19/3/2013 20/3/2013 20/3/2013

b.

Average depth E4.0m but NE6.0m i. MH106-27-7 to MH106-27-4 m 63 (relay due to adverse gradient shown in As built at SEN 158 to MH 106-27-8 / 21/3/2013

1.2 a.

Trench excavation 300mm dia VCP sewer for 900mm wide bed Average depth E2.0m but NE4.0m i.SEN054 to MH113-6 m 10 Average depth E4.0m but NE6.0m i.MH126 to MH125

Water level 25% - 40%

21/3/2013

b.

57

Water level 50%.Fracture

22/3/2013

1.3

Trench excavation 450mm dia VCP sewer for 1050mm wide bed Average depth E2.0m but NE4.0m i.MH106-20-4 to MH106-20-3 m 53 ii.MH106-15-3A to MH106-15-3B m 82 Average depth E4.0m but NE6.0m i.MH106-15-4 to MH106-15-3

Adverse level shown in As Built Drawing Pipe drop.Camera submerged

/ /

22/3/2013 23/3/2013

54

Sagging.Pipe drop

23/3/2013

1.4

Trench excavation 600mm dia RCP sewer for 1500mm wide bed Average depth E2.0m but NE4.0m i.MH112 to MH 111 m 88 Average depth E4.0m but NE6.0m i.MH113 to MH112

Sagging. 50% water level

25/3/2013

67

Water level 35%. CCTV camere submerged

25/3/2013

1.5

Trench excavation 900mm dia RCP sewer for 1800mm wide bed Average depth E2.0m but NE4.0m i.MH106-10 to MH 106-9 m 56 ii.MH106-8 to MH106-7 m 100 Trench excavation 1200mm dia RCP sewer for 2100mm wide bed Average depth E4.0m but NE6.0m i.MH57 to MH58 m 144 Trench excavation 1200mm dia RCP sewer for 2100mm wide bed Average depth E2.0m but NE4.0m i.MH77 to MH76 m 53 ii.MH76 to MH75 m 104 iii.MH72 to MH71 m 18 iv.MH70 to MH 69 m 76 Average depth E4.0m but NE6.0m i.MH75 to MH74 ii.MH74 to MH73 iii.MH73 to MH72 iv.MH71 to MH70

Adverse level shown in As Built Drawing Water level 30% - 40%

/ /

7/3/2013 7/3/2013

Passed Passed

1.6

Water level 50%

14/3/2013

Passed

1.7

Adverse level shown in As Built Drawing

/ / / /

14/3/2013 14/3/2013 14/3/2013 14/3/2013

Passed Passed Passed Passed

m m m m

61 93 38 65

Adverse level shown in As Built Drawing

/ / / /

14/3/2013 14/3/2013 14/3/2013 14/3/2013

Passed Passed Passed Passed

2.0 2.1 (a)

Pipe Jacking 375mm dia RJCP Sewer Jacking of the following span,L NE85m i.MH113-4 to MH113-3 m E85 but NE 100m i.MH106-27-1 to MH 106-27

81.514

High water level

27/3/2013

(b)

89.22

High water level

28/3/2013

2.2

1200mm dia RJCP Sewer Jacking of the following span,L NE85m i.MH73 to MH70 m 450mm dia RJCP Sewer Jacking of the following span,L NE85m i.MH106-20-4-6 to MH106-20-4-4 m ii.MH106-20-4-4 to MH106-20-4-3 m

65

28/3/2013

2.3

33 47

Adverse level shown in As Built Drawing Adverse level shown in As Built Drawing

/ /