DOC NO.

: D-2-01-03-01-03

PRE-COMMISSIONING FORMATS FOR SURGE ARRESTOR


I. GENERAL DETAILS
DETAILS Region: Feeder name 425 LA Make:CG Sr. No.: R :-84997 Y:-84991 B:-84998 Rating:400KV Year of Manufacture: R :-2010 Y:- 2010 B:- 2010 Date of Erection: R :Y:B:Sub-Station: LOA No. : Type:ZLAX25C Voltage rating 400KV Feeder name: Date of Receipt at site: R :Y:B:Date of energisation

II.
SL.N O

PRE-COMMISSIONING CHECKS:
DESCRIPTION STATUS YES NO YES YES YES YES YES YES YES YES YES YES YES YES YES REMARK RECORD DEFICIENCIES, IF ANY

1 2 3 4 5 6 7 8 9 10 11 12

13 14 15 16 17

Equipment is free from dirt / dust foreign materials etc. Equipment is free from all visible defects on physical inspection Support structures have been provided with double earth All nuts and bolts are tightened correctly as per specified torque Equipment erection is complete in all respect (attach remaining activities, if any) Permanent la leveling and identification is done Leveling and alignment of structure and base frame is checked All insulators & surge counter are free from any physical defects Tightness of nuts bolts of terminal connectors are checked Erection completion certificate along with list of outstanding activities reviewed Check one end of surge counter is connected to the bottom of la stack and one end of surge counter has been earthed The direction of the exhaust vent ports away from the protected equipment and other arrester poles Clearance from the arrester to earthed objects and from the arrester pole to another arrester pole maintained as per outline drawing and all erection has been done as per drawing issued by engg. Dept. Operation of la counter checked by applying appropriate voltage Check the serial no. And sequence of la parts for erection in multi stack la Check the alignment of corona ring Check on charging, the surge counter pointer is in green zone

YES YES YES YES

Format No.: CF/SA/08/ R-3 DATED 01/04/2011 Page 1 of 3

SURGE ARRESTOR

DOC NO.: D-2-01-03-01-03

III.
SL. NO

INSULATION RESISTANCE MEASUREMENT : ( USING 5KV MEGGER)


PHASE BETWEEN UNIT R Y B

1 2 3

1st stack & earth 2nd stack & earth 3rd stack & earth

G G G

725 700 690

745 750 720

695 680 650

MIN VALUE > 1000 M OHMS

IV.
SL.NO

SURGE COUNTER READING


READING R Y B

1 2 3

Counter sr. No. Counter make Counter reading

GE2010957 2 CG 13

GE20100264 CG 12

GE20100245 CG 14

V. R ph

CAPACITANCE & TAN DELTA MEASUREMENT

STACK

CAPACITANCE(pF)

TAN DELTA

REMARKS

Top Middle 1 Middle 2 Bottom

36.54 26.59 30.32 9.368

0.03356 0.0526 0.0855 0.0455

Y ph
STACK CAPACITANCE(pF) TAN DELTA REMARKS

Top Middle 1 Middle 2 Bottom

37.75 30.57 29.39 7.18

0.0258 0.0891 0.1005 0.03830

B ph
STACK CAPACITANCE(pF) TAN DELTA REMARKS

Top Middle 1 Middle 2 Bottom

36.09 26.69 28.74 6.733

0.03096 0.0401 0.0855 0.0455

Permissible Limits Tan 0.007 (max.) and Rate of rise in Tan Delta 0.001 per year (max) Deviation of Capacitance value from factory value should be within 5% of the rated value 1-Since temperature correction factor for Tan-Delta depends on make, type and also aging conditions, the correction factors for different types / makes are different. Hence, no standard temperature correction factors can be applied. 2- In case of violation of Tan-Delta the test results with temperature are to be referred to CC/OS

Format No.: CF/SA/08/ R-3 DATED 01/04/2011 Page 2 of 3

SURGE ARRESTOR

DOC NO.: D-2-01-03-01-03

VI.

CHECKING OF HEALTHINESS OF SURGE MONITOR


Yes
YES

No

Refer manufacturers catalogue for detail checking of surge monitor I. FINAL DOCUMENTATION REVIEW i. Final documents of Pre- Commissioning checks reviewed and approved

Yes
YES

No

ii.

Document regarding spares equipment, O&M manuals etc available at sit

Yes
YES

No

for O&M purpose iii. After modification, if any, As built Drawings are available at site
Yes
YES

No

Signature: Name: Designation: Organization: (Supplier Representative) (Wherever Applicable)

Signature: Name: Designation: (Erection Agency)

Signature: Name: Designation: (POWERGRID Site I/C)

Signature: Name: Designation: (POWERGRID Commissioning Team) Members: 1. 2. 3. 4.

Format No.: CF/SA/08/ R-3 DATED 01/04/2011 Page 3 of 3

SURGE ARRESTOR