Landscaping work Rev-BOQ for Purva Grandbay, Kochi Firstfloor only

1 a Podium Driveway & Car Parking Plain Cement Concrete: Supply, placing and leveling of plain cement concrete 1:2:4 mix 100mm thk with trowel as base , cost including all materials at site, all labor charges ,Transportation ,loading , unloading charges and other necessary charges to complete the work as per drawing specification and as instructed by PIC SUB TOTAL Basket Ball Court Steps Connecting to Basket ball court Crusher run: Supply, placing, leveling and compaction with mechanical rammer for base to 100mm thick cost including all materials at site, all labor charges and other necessary charges to complete Plain Cement Concrete: Supply, placing and leveling of plain cement concrete 1:2:4 mix 50mm thk, cost including all materials at site, all labor c charges and other necessary charges to complete Reinforced Cement Concrete : Supply, placing and leveling of pre-mix cement concrete of grade M20, cost including materials conveyance to site, machine mixing, vibratory, centering, curing & formwork, all labor charges and necessary charges to complete. * For Steps Reinforcement: Supply and tying Structural Engr's design cost of steel all 0.92 Cum 188.24 Cum

2 A a

0.47 Sqm

0.11 Cum

0.05 Tons

reinforcement including cutting and bending as per including materials at site, necessary machineries, all labor 3 a charges and other necessary charges to complete Basket Ball Court Plain Cement Concrete: Supply, placing and leveling of plain cement concrete 1:2:4 mix 60mm thk, with trowel as base , cost including all materials at site, all labor charges,Transportation ,loading , unloading charges and other necessary charges to complete the work as per drawing specification and as instructed by PIC Reinforced Cement Concrete : Supply, placing and leveling of pre-mix cement concrete of grade M20, cost including materials conveyance to site, machine mixing, vibratory, centering, curing & formwork, all labor charges and necessary charges ,Transportation ,loading , unloading charges to complete. * For retaining wall for pedestal as per drawing specification and as instructed by PIC Reinforcement: Supply and tying of steel reinforcement including cutting and bending as per Structural Engr's design cost including all materials at site, necessary machineries, all labor charges and other necessary charges ,Transportation ,loading , unloading charges to complete as per drawing specification and as instructed by PIC Vacuum dewatered Flooring : Providing and laying 50mm thick Vacuum dewatered flooring using 40mm thk. (1:2:4) concrete mix to proper levels & slopes and finishing top with 10mm thk cement mortar 1:3mix, cost including all materials at site, all labor charges and other necessary charges ,Transportation ,loading , unloading charges to complete as per drawing (LSCD 11.1 R2) specification and as instructed by PIC Light wieght filling (cynder filling) : supply, placing, RO leveling and compaction with mechanical rammer for base including cost of all materials at site all lbourcharges,transporation,loading,unloading charges and other necessary charges to complete the work as per drawing, specification and as instructed by PIC Kid's Play Area Kid's Play Area

3.29 Cum

1.04 Cum

0.03 Tons

54.86 Sqm

cum

4 A

Rev-BOQ for Purva Grandbay, Kochi Site Concepts Pvt Ltd. 1/6

Landscaping work Rev-BOQ for Purva Grandbay, Kochi


a Water proofing: Supplying and applying of approved water proof membrane two coats as per manufacturers direction and one productive layer of cement sand screed 12mm thick cost including all materials at site, all labor charges,Transportation, loading , unloading and other necessary charges to complete the work as per the drawing,specification and as instructed by PIC Plain Cement Concrete: Supply, placing and leveling of plain cement concrete 1:2:4 mix 125mm thk with trowel as base , cost including all materials at site, all labor charges and other necessary charges ,Transportation ,loading , unloading charges to complete the work as per drawing specification and as instructed by PIC Light wieght filling (cynder filling) : supply, placing, RO leveling and compaction with mechanical rammer for base including cost of all materials at site all lbourcharges,transporation,loading,unloading charges and other necessary charges to complete the work as per drawing, specification and as instructed by PIC Veiwing deck Paving Crusher run: Supply, placing, leveling and compaction with mechanical rammer for base to 470mm thick cost including all materials at site, all labor charges and other necessary charges to complete Plain Cement Concrete: Supply, placing and leveling of plain cement concrete 1:2:4 mix 150mm thk, cost including all materials at site, all labor charges and other necessary charges to complete Reinforced Cement Concrete : Supply, placing and leveling of pre-mix cement concrete of grade M20, cost including materials conveyance to site, machine mixing, vibratory, centering, curing & formwork, all labor charges and necessary charges to complete. * For retaining wall Reinforcement: Supply and tying of Structural Engr's design cost steel all Sqm

21.53 Cum

cum

5 A a

2.41 Sqm

0.77 Cum

0.53 Cum

0.02 Tons

reinforcement including cutting and bending as per including materials at site, necessary machineries, all labor e charges and other necessary charges to complete Light wieght filling (cynder filling) : supply, placing, leveling and compaction with mechanical rammer for base including cost of all materials at site all lbourcharges,transporation,loading,unloading charges and other necessary charges to complete the work as per drawing, specification and as instructed by PIC (aprox high 500 mm ) 6 A a Water feature Water Feature Plain Cement Concrete: Supply, placing and leveling of plain cement concrete 1:2:4 mix 100mm thk, cost including all materials at site, all labor charges and other necessary charges to complete Reinforced Cement Concrete : Supply, placing and leveling of pre-mix cement concrete of grade M20, cost including materials conveyance to site, machine mixing, vibratory, centering, curing & formwork, all labor charges and necessary charges to complete. * For retaining wall Reinforcement: Supply and tying of Structural Engr's design cost steel all 0.57 Cum 3.50 cum

1.02 Cum

0.08 Tons

reinforcement including cutting and bending as per including materials at site, necessary machineries, all labor charges and other necessary charges to complete

Rev-BOQ for Purva Grandbay, Kochi Site Concepts Pvt Ltd. 2/6

Landscaping work Rev-BOQ for Purva Grandbay, Kochi


d Water proofing: Supplying and applying of approved water proof membrane two coats as per manufacturers direction and one productive layer of cement sand screed 12mm thick cost including all materials at site, all labor charges and other necessary charges to complete Planter Box (3 nos) Reinforced Cement Concrete : Supply, placing and leveling of pre-mix cement concrete of grade M20, cost including materials conveyance to site, machine mixing, vibratory, centering, curing & formwork, all labor charges and necessary charges to complete. * For Planter walls Reinforcement: Supply and tying of Structural Engr's design cost steel all 10.12 Sqm

7 a

1.34 Cum

0.04 Tons

reinforcement including cutting and bending as per including materials at site, necessary machineries, all labor c charges and other necessary charges to complete Water proofing: Supplying and applying of approved water proof membrane two coats as per manufacturers direction and one productive layer of cement sand screed 12mm thick cost including all materials at site, all labor charges and other necessary charges to complete Plastering: Plastering for side walls in cement mortar 1:6mix 12mm thick sponge finish for walls cost including all material to site, all labor charges 8 a and other necessary charges to complete Planter Boxes (2 nos) Reinforced Cement Concrete: Supply, placing and leveling of pre-mix cement concrete of grade M20, cost including materials conveyance to site, machine mixing, vibratory, centering, curing & formwork, all labor charges and necessary charges to complete. * For Planter walls Reinforcement: Supply and tying of Structural Engr's design cost steel all 7.43 Sqm

5.54 Sqm

1.05 Cum

0.03 Tons

reinforcement including cutting and bending as per including materials at site, necessary machineries, all labor c charges and other necessary charges to complete Water proofing: Supplying and applying of approved water proof membrane two coats as per manufacturers direction and one productive layer of cement sand screed 12mm thick cost including all materials at site, all labor charges and other necessary charges to complete Plastering: Plastering for wall surfaces in cement mortar 1:6mix 12mm thick; finish for wall cost including all material to site, all labor charges and 9 a other necessary charges to complete. Planter Boxes Reinforced Cement Concrete: Supply, placing and leveling of pre-mix cement concrete of grade M20, cost including materials conveyance to site, machine mixing, vibratory, centering, curing & formwork, all labor charges Transportation ,loading , unloading and necessary charges to complete. * For Planter walls as per drawing ,specification and instructed PICbut exculding cost of reinforcement steel Reinforcement: Supply and tying of steel reinforcement including cutting and bending as per Structural Engr's design cost including all materials at site, necessary machineries, all labor charges ,Transportation ,loading , unloading charges and other necessary charges to complete as per drawing specification and as instructed by PIC Water proofing: Supplying and applying of approved water proof membrane two coats as per manufacturers direction and one productive layer of cement sand screed 12mm thick cost including all materials at site, all labor charges,Transportation, loading , unloading and other necessary charges to complete as per the drawing,specification and as instructed by PIC 9.48 Sqm

14.04 Sqm

24.26 Cum

0.73 Tons

161.70 Sqm

Rev-BOQ for Purva Grandbay, Kochi Site Concepts Pvt Ltd. 3/6

Landscaping work Rev-BOQ for Purva Grandbay, Kochi


d Plastering: Plastering for wall surfaces in cement mortar 1:6mix 12mm thick; finish for wall cost including all material to site, all labor charges Transportation ,loading , unloading and other necessary charges to complete the work as per drawing,specification and as instruced by PIC SUB TOTAL TOTAL FIRST FLOOR 1 a GRANITE AND TILING WORK Feature Steps Granite work (Black Granite): Supply and fixing of Black Granite as per dig on cement mortar 1:3mix cost including all materials to site, all labor charges ,Transportation ,loading , unloading charges and other necessary charges to complete the work as per drawing (LSCD 3.1 R2 ) specification and as instructed by PIC i) Cut to size x 20mm thick antique finish with sandwich edge for step threads ii) Cut to size x 20mm thick antique finish for step landing Granite work (Black Granite): Supply and fixing of Black Granite as per dig on cement mortar 1:3mix cost including all materials to site, all labor charges ,Transportation ,loading , unloading charges and other necessary charges to complete the work as per drawing (LSCD 3.1 R2 ) specification and as instructed by PIC i) 150 x L x 20mm thick polished finish for step risers Basket Ball Court Steps Connecting to Basket ball court Granite work (Black granite): Supply and fixing of Black granite as per dig on cement mortar 1:3mix cost including all materials to site, all labor charges and other necessary charges to complete i) 300 x L x 20mm thk antique finish with sandwich edge for step tread Granite work (Grey granite): Supply and fixing of Grey granite as per dig on cement mortar 1:3mix cost including all materials to site, all labor charges and other necessary charges to complete i) 150x L x 20mm thk polished finish for step riser 3 a Kid's Play Area Granite work (Sadarahalli Grey granite): Supply and fixing of Sadarahalli grey granite as per drg on cement mortar 1:3mix and applying of impregnable clear colour sealer two coats one coat before installation and one coatafter installation with necessary pointing work, cost including all materials to site, all labor charges,Transportation ,loading , unloading and all other necessary charges to complete the work as per drawing,specification and as instruced by PIC i) 250 x L x 40mm thk flamed finish for banding Veiwing deck Granite work (Royal Brown granite): Supply and fixing of Royal Brown granite as per dig on cement mortar 1:3mix cost including all materials to site, all labor charges and other necessary charges to complete i) Cut to size x 20mm thk antique finish for paving ii) 100 x L x 20mm thk antique finish for external cladding 1.58 Sqm 3.15 Sqm 323.40 Sqm

49.12 Sqm 60.31 Sqm

42.36

21.18 Sqm

2 A a

3.11 Sqm

4 a

5.94 Sqm 0.58 Sqm

5 a

Water feature Granite work (Black Granite): Supply and fixing of Black Granite as per dig on cement mortar 1:3mix and applying of impregnable clear color sealer two coats one coat before installation and one coat after installation cost including all materials to site, all labor charges and other necessary charges to complete

Rev-BOQ for Purva Grandbay, Kochi Site Concepts Pvt Ltd. 4/6

Landscaping work Rev-BOQ for Purva Grandbay, Kochi


i) 200 x L x 40mm thk polished finish both edge chamfered for coping (without clear color sealer) ii) Cut to size x 20mm thk polished finish for internal cladding iii) Cut to size x 20mm thk polished finish for external cladding (without clear color sealer) 6 a Planter Boxes (3nos) Granite work (Black Granite): Supply and fixing of Black Granite as per dig on cement mortar 1:3mix, cost including all materials to site, all labor charges and other necessary charges to complete i) 200 x L x 20mm thk polished finish with sandwich & both edge for coping 7 a Stepping stones Stepping stone work (Grey granite): Supply and fixing of 50mm thk Grey granite stepping stone as per dig on 50mm sand bed cost including all materials to site, all labour charges and other necessary charges to complete i) 1200 x 450 x 50mm thk antique finish with grass joints for stepping stones 8 a Planter Boxes (2 nos) Granite work (Black granite): Supply and fixing of Black granite as per dig on cement mortar 1:3mix cost including all materials to site, all labor charges and other necessary charges to complete i) 200 x L x 40mm thk polished finish with sandwich & both edge chamfered for coping Planter Boxes Granite work (Black granite): Supply and fixing of Black granite as per dig on cement mortar 1:3mix and applying of impregnable clear colour sealer two coats one coat before installation and one coatafter installation with necessary pointing work cost including all materials to site, all labor charges Transportation ,loading , unloading and other necessary charges to complete the work as per drawing,specification and as instruced by PIC i) 200 x L x 20mm thk polished finish with sandwich edge for coping TOTAL 1ST FLOOR 53.90 Sqm 2.34 Sqm 4.86 Sqm 1.99 Sqm 2.60 Sqm

3.51 Sqm 1.83 Sqm

9 a

GRAND TOTAL (Total Civil and granite work)

Rev-BOQ for Purva Grandbay, Kochi Site Concepts Pvt Ltd. 5/6

Landscaping work Rev-BOQ for Purva Grandbay, Kochi


No. Description of work Unit Quantity First floor and fifth floor Rate Amount Remarks

1 Basket Ball Court Synthetic paint finish: Providing synthetic paint finish over basketball court area color: Blue, cost including all materials to site, necessary machineries, all labor charges and other a necessary charges ,Transportation ,loading , unloading charges to complete as per drawing (LSCD 11.1 R2) specification and as instructed by PIC i Ditto but red color 50 mm wide court white marker (dashed line as ii per drg no LSCD11.1 R2 2 Planter Box (3 nos) Painting: Painting for plastered surface in textured finish, color: match to building color, one a base coat and two finishing coats cost including all materials at site, all labor charges and other necessary charges to complete 3 Planter Boxes (2 nos) Painting: Painting for external plastered surface in textured paint finish, color: match to building a color, one base coat and one finishing coat cost including all materials at site, all labor charges and necessary 4 other Planter Boxes charges to complete. Painting: Painting for external plastered surface in textured paint finish, color: match to building color, one base coat and one finishing coat cost a including all materials at site, all labor charges Transportation ,loading , unloading and other necessary charges to complete the work as per drawing,specification and as instruced by PIC TOTAL

54.86

Sqm

Sqm Sqm

Sqm

7.02

Sqm

151.95

Sqm

Rev-BOQ for Purva Grandbay, Kochi Site Concepts Pvt Ltd. 1/6