You are on page 1of 15

FABRICATION BILL

AGENCY: OME ENGINEERING


BILL No:RA 02
Project:Crusher & House Erection
S.No.

1
2
3
4
5

DESCRIPTION

Erection Crusher with Alignment


Erection of coal Crusher Building
Erection of Rail Fixing
Erection of Bag Filter
Fabrication & Erection Work
Total

Material Wt in Tonnes
As per Drg As per Bill

41.184
25.552
37.6
6.654
12.248
123.238

13.68
18.641
2.729
2.028
3.64
3.235
25.552
5.827
2.71
0.982

Diffrence Wt in
Tonnes

Remarks

FABRICATION & ERECTION BILL


AGENCY:Om Engineering
BILL No:06
S.No
.

Work Completed

DESCRIPTION

L S Crusher House Fabrication work

L S Crusher House Erection work

Billed
Payable
Excess
Excess Wt Rate per
Value in
Value
Value in
As per As per Drg
in MT
MT
Rs/in Rs/Rs/Bill
in in MT
MT
26.000
23.826
2.174
5500 143000.00 131043.00 11957.00
26.000

23.826

2.174

5500 143000.00 131043.00 11957.00

Erection of Bag Filter Work

2.700

2.700

0.000

6000 16200.00

L S Crusher Alignment work

28.168

26.697

1.471

8500 239428.00 226924.50 12503.50

Bag filter duct Erection (BF1)

11.890

11.890

0.000

5000 59450.00

59450.00

0.00

Bag Filter Stack Erection

11.800

11.800

0.000

5500 64900.00

64900.00

0.00

106.558

100.739

5.819

16200.00

0.00

36000 665978.00 629560.50 36417.50

Amount Payable is Rs/- 629560.00

10/8/2011

Remarks
No Supporting Details
No Supporting Details
No Supporting Details

FABRICATION & ERECTION BILL


10/9/2011

AGENCY:Om Engineering
BILL No:07
Work Completed

DESCRIPTION

S.No.

As per As per Drg


Bill
in MT
in MT

Excess
Wt in
MT

Rate per
MT

Billed
Value in
Rs/-

Payable
Value
in Rs/-

Excess
Value in
Rs/-

L S Crusher House Fabrication work

9.573

9.573

0.000

5500

52651.50

52651.50

0.00

L S Crusher House Erection work

9.573

9.573

0.000

5500

52651.50

52651.50

0.00

Fabrication of Chequred Plate work

4.329

4.329

0.000

5500

23809.50

23809.50

0.00

Erection of Chequred Plate work

4.329

4.329

0.000

5500

23809.50

23809.50

0.00

Erection of Bag Filter Work *

9.887

9.887

0.000

6000

59322.00

59322.00

0.00

9.930

9.930

0.000

8500

84405.00

84405.00

0.00

10.200

10.200

0.000

8500

86700.00

86700.00

0.00

Remarks

L S Crusher Alignment works


6

Omni Screen *

Impactor *

Wobbler Feeder with Drive Box *

2.887

2.887

0.000

8500

24539.50

24539.50

0.00

Wobler Feeder Chute

4.095

4.095

0.000

8500

34807.50

34807.50

0.00

10

Erection of Discharge Chute for BC7


Drg.No.C.S.1.1-06249

1.441

1.441

0.000

8500

12248.50

12248.50

0.00

66.244

66.244

0.000

454944.50 454944.50

0.00

As per Mech.Depot.Recommended Bill Amount in Rs/- 454944.50


As per Trusst Engineers Recommended Amount Rs/- 454944.50

21/11/2011

The above Tonnage put on hold as per work order, due to pending no load & load trials of L/S
Crusher,Omni Screen,Wobbler Feeder and Bag Filter.

Trusst Engineers

FABRICATION & ERECTION BILL


AGENCY:Om Engineering
BILL No:08
Work Completed

S.No.

DESCRIPTION

L S Crusher Alignment works


Erection of EOT Crane work (Structural
erection only)
Erection of Bag Filter Work
Erection of Coal Crusher Work
Fabrication of Structural Work
Erection of Structural Work
Erection of Bag filter Cages
Dismaentling Work

2
3
4
5
6
7
8

Excess Wt Rate per Billed Value


As per As per Drg
in MT
MT
in Rs/Bill
in MT
61.369
64.690
3.321
8500
549865.00

Payable
Value
in Rs/521638.20

Excess
Value in
Rs/28226.80

13.715

13.715

0.000

5500

75432.00

75432.00

0.00

2.914
19.435
63.979
75.269
812.000
2.662

2.914
19.435
63.979
75.269
812.000
2.662
1051.343

0.000
0.000
0.000
0.000
0.000
0.000
3.321

6000
8500
5500
5500
110
2750

17484.00
165197.00
351884.00
413979.00
89320.00
7320.00
1670481.00

17484.00
165197.00
351884.00
413979.00
89320.00
7320.00
1642254.20

0.00
0.00
0.00
0.00
0.00
0.00
28226.80

As per Mech.Depot.Recommended Bill Amount in Rs/- 1670481.00


As per Trusst Engineers Recommended Amount Rs/- 1642254.20
10% hold of total Bill of Rs 1670481/- is Rs 167048/-

Trusst Engineers

Trusst Engineers

5-Dec-11
1
Remarks
Apron Feeder Wt Excess wt

1
2
3
4

0.9
1.42
6
9.122

1.42
6
9.122

14.644

9.427
4.66
1.3762
5.588

15

4.66
1.3762
5.588
2.014
2.6
7.4
3.2
3.5472
2.4
17.035

16
17
18
19
20
21
21
22
23
24
25
26
27

2.13
1.584
12.898
2.998
1.554
11.117
2.692
1.833
2.579
1.556
8.51
2.69

5
6
7
8
9
10
11
12
13
14

Trusst Engineers

0.9

2.014

3.2
2.78
2.4
17.035
2.13
1.584
2.998

2.13
1.584
12.898
2.998

1.833
2.579
1.556
8.51
2.69

1.833
2.579
1.556
8.51
2.69

28
29
30a
30b
31
32
33
34
35
36
37
38
39

Trusst Engineers

0.252
1.405
2.66
4.8
13.716
1.77
7.495
2.842
3.679
6.066
21.544
2.5

0.252
1.405

0.252
1.405

7.495
2.842
3.679
6.066
21.514

7.495
2.842
3.679
6.066
21.514

67.132

80.030

2.66
4.8
13.716
1.77

6.066

2.5
61.369

13.716

2.914

19.435

2.223

Trusst Engineers

0.000

Trusst Engineers

Equipment
Impactor
Impactor Discharge chute
Erection of Loose Items for Crusher
Erection of Loose Items for Crusher
Wobbler Feeder
Wobbler Discharge chute
Apron Feeder
211 BF1
211 BF2
211 FN1
211 FN2
Bag House Stack
Screen House-A1-08148-21SH-1-04
Screen House Platform -A1-08148-21-1-04
Omni Screen
LS Crusher House
Bag Filter Erection CS11.06813
Screen House-A1-08148-21SH-1-05
Impactor Drive Base
Coal Crusher

Total Wt

RA01

RA02 RA03

102.000 61.200
9.000
7.256
23.301
28.872
8.088
55.889
28.000
9.000
4.369
18.712
7.748
11.117
19.860
10.697
10.074
3.317
15.000
12.000

RA04

RA05

RA06
RA07
Percentage Passed

RA08 RA09

10.200
3.600
5.805

1.451
18.641

4.660

28.872
3.235
33.533
13.800

16.767
5.600
5.400
0.000
1.748
13.098
6.198

2.700

0.900

3.742
0.115

8.894
9.930
2.139
8.059
3.317
9.000
2.400

6.000

RA10

RA11

Total
71.400
3.600
7.256
23.301
28.872
3.235
50.300
19.400
9.000
0.000
1.748
16.841
6.314
8.894
9.930
2.139
8.059
3.317
15.000
2.400
0.000
0.000
0.000
0.000
0.000
291.006

Balance

1.4343
9.93

FABRICATION & ERECTION BILL


AGENCY:Om Engineering
BILL No:09
Work Completed
S.No.

DESCRIPTION

Fabrication of Structural work

Re fab.of Drg.No.A1-08148-21SH-1-04

b
c
d

Cola Crusher De Dusting Pipe Support


Fabrication Support
C.S.1.1 06673
EOT Crane for LS Crusher

Excess
As per Bill As per Drg Wt in
MT
in MT
in MT

Rate per Billed Value


MT
in Rs/-

Payable
Value
in Rs/-

Excess
Value in
Rs/-

5.550

3.875

1.675 5500.00

30525.00

21312.50

9212.50

3.294

3.294

0.000 5500.00

18117.00

18117.00

0.00

4.782
61.321

4.782
60.624

0.000 5500.00
0.697 5500.00

26301.00
337265.50

26301.00
333432.00

0.00
3833.50

3.294

3.294

0.000 5500.00

18117.00

18117.00

0.00

4.782

4.782

0.000 5500.00

26301.00

26301.00

0.00

Erection of Structural Work

Cola Crusher De Dusting Pipe Support


Fabrication Support
C.S.1.1 06673

Erection of equipment Work

Coal Cruser with Drive Base

1.600

1.600

0.000 8500.00

13600.00

13600.00

0.00

Coal Crusher Vibro Feeder

2.280

1.824

0.456 8500.00

19369.72

15504.00

3865.72

Screen for Coal Crusher

4.000

4.000

0.000 8500.00

34000.00

34000.00

0.00

Erection of Belt Conveyor work

211BC-A Conveyor for LS Crusher

12.000

12.000

0.000 6500.00

78000.00

78000.00

0.00

L11 BC-3 Conveyor for Coal Crusher

10.956

9.726

1.230 6500.00

71203.04

63216.92

7986.12

Erection EOT Crane work

C.S.1.1.06520

22.204

22.204

0.000 6500.00

Erection of Dedusting Pipe Line work


Total

144326.00
2229.00

144326.00
0.00

0.00
2229.00

819354.26 792227.42 27126.84

As per Mech.Depot.Recommended Bill Amount in Rs/- 819354.26


As per Trusst Engineers Recommended Amount Rs/- 792227.42
TRUSST ENGINEERS

11-Jan-12
Remarks

Excess wt

Calculation mistake

20% hold due to wt is not


conformed so far
50% hold of 8MT due to wt is not
conformed so far
50% hold of 24MT due to wt is not
conformed so far
50% hold of drg No.46016254 due
to wt is not conformed so far.

Hold as per no work order details

TRUSST ENGINEERS

You might also like