You are on page 1of 4

ASHUTOSH DWIVEDI

Address E-mail Phone : 24/169,Dwarika Nagar, Rewa MP : ashutoshdwivedi_civil@in.com : +91 9907543998

Objective : Intend to build a career with leading corporate of hi-tech environment with committed & dedicated people, which will help me to explore myself fully and realize my potential. Willing to work as a key player in challenging & creative environment. Skills : Key Skill : OS: DOS/Windows Programming Languages: c/c++/java MS Office & internet AutoCAD

Computer Proficiency:

Educational Qualification : Degree College/School Govt. B.E. (Civil) Engg.College,Rewa (M.P.) H.S.S.C. S.S.C Experience :
EMPLOYMENT RECORD From April 2013 to till date. Position Employer Client Concessionaire PMC Contractor Cost of project : : : : : : :

University/Board

Marks 65.11% 52.22% 67.22%

R.G.P.V, Bhopal M.P. Board,Bhopal M.P. Board,Bhopal

Govt.Higher Secondary School No-2 Rewa Saraswati Shishu Mandir Rewa

Ass Bridge Engineer


Voyants Solutions India Limited. MORTH NavYuva Dhola Infra Pvt.Ltd. SN Bhobe Associates with Voyants Pvt.Ltd. NavYuva Pvt. Limited. 992.00 Crores

Job Title and project:

Assistant Bridge Engineer for Construction of 12.9m wide Bridge between Dhola & Sadia ghats along with 2 lane connecting roads from near about Dhola to Islampur Tinali in Assam at our Independent Engineering Assam Project Site under Transportation, Roads & Bridges Division, (TRB) Asia`s Second Largest bridge by Asia at Brahmputra River 12 km approx.
Duties

Position

From June. 2010 to March 2013. : : : : : : :

Ass Bridge Engineer


Supreme Infrastructure India Limited. National Highway Authority of India. Supreme Panvel Indapur Tollways Private Limited. Consulting Engineering Services (I) Pvt. Ltd. Supreme Infrastructure India Limited. 670.00 Crores

Employer Client Concessionaire PMC Contractor Cost of project

Job Title and project: Rehabilitation and Upgrading of NH-17 4-Lane in the state of Maharashtra under NHDP Phase 111 on a DBFOT 84.000. Duties As Bridge Engineer was responsible for studying & verifying the drawings issued by DPR Consultants and prepare good for construction drawings and as built drawings along with Design Engineers. Planning and programming of the project along with planning engineers and scheduling of all the items of the works. Preparing the methodologies of all the major activities. Preparation of traffic management plan, safety plan and environment management plan & implement.. Liason and co-ordinate with public and Govt. bodies to procure the material as per specifications. Setting out of all plants, monitoring day-to-day production of concrete batching plants, aggregate crusher plant etc. Instructing all the field staff regarding survey works, supervision, execution and organization of all site activities i.e. construction techniques, checking and taking measurements. Preparation of bills, calculation of quantities, quality assurance and quality control procedures and certifying sub contractor bills. Supervise all the site activities i.e. construction supervision of structures i.e.8 nos of major bridge,both well and pile foundation,psc girder launching with grantry girder, span length 28m,16 nos of minor bridges all open foundation and solid slab, 3 nos of , underpasses,11 nos of slab culverts,10 nos box culverts and2 nos of pipe culverts, service roads, median drains, kerb and longitudinal drains related to the project. Preparation of quality assurance manual and quality control procedures, and supervise all the activities are carrying out as per specifications stipulated in contract documents. MORT & H, IS codes and IRC standards. Conducting internal quality audits. Discuss with Sr. Quantity Surveyor or Contracts Manager regarding variation orders, Interim payment statements, and contractual matters and finalise. Site visits along with Consultants and client conducting internal meetings with staff members to discuss and sort out problems encounted if any while execution. Fixing of targets, monthly quantity wise, prepare physical progress and financial progress of the month. Liason and co-ordinate with client, and consultants regarding all the issues related to the project. Prepare Hindrance list, carryout hindrance survey Liason and Co-ordinate with public and relevant authorities to clearing all the obstructions and encumbrances subject to the project. Participating in progress review meetings along with client & consultants . basis from Km 0.00 to Km

Trainings : Organization: Mahan Canal Project (Water Resources Deptt.,Govt.of MP) Duration: 4 weeks. Field in which took the training: study of canal project Organization: Path Oriental Infrastructure Ltd. Duration: 4 weeks. Field in which took the training :study of road,highways and Bypass Construction. Projects Undertaken Major Project : Project Name : Soil Testing of Polytechnic Buiding Site at GEC Rewa Role Description Team Leader : Duration : Eighth Semester Minor Project : Innovative research of RCC using Bamboo instead of Steel.(Patent Pending.) Team Leader Sixth Semester

Project Name : Role Description : Duration : Co-curricular Activities:

Got first Prize in Quiz conducted by Gayatri Shakti Peeth at district level. Got first prize in quiz conducted by Int`l Youth Hostels ASS. Of India . I has been active member in all kinds of construction work, soil testing, surveying of sites in Rewa Engineering college .

PERSONAL Personal Information : Name: Fathers Name: Mothers Name: D.O.B: Nationality: Languages: Hobbies: Declaration :

Ashutosh Dwivedi Shri A.P. dwivedi Smt. Usha Dwivedi 03th Dec. 1989 Indian English, Hindi Computers,Listening Music & PC gaming

I hereby declare that information mentioned above is true to best of my knowledge. And the Reference could be furnished upon request. Date: / / Place: Rewa

ASHUTOSH DWIVEDI

You might also like