You are on page 1of 2

A.

YITE GROUP
GE921DifferentialPressureSwitch

INTRODUCTION:
SeriesofGE921AirDifferentialPressureSwitchcanbeusedtosense(differential)pressureandflow ofairinductsandpipes.

Typicalapplicationsinclude:
Filterobstructivealarm. Maximum air flow controller for variable air volume systems. Airprovinginventilationducts. Burneraircontrol OverheatingprotectionforElectricHeaterwithblower

TechnicalSpecification:
Type GE921A GE921B GE921C GE921D GE921E GE921F GE921G AdjustRange 20200Pa 40100Pa 40200Pa 50500Pa 200~1000Pa 5002500Pa 100054000Pa ReturnDifference 10Pa 20Pa 20Pa 20Pa 100Pa 150Pa 200Pa Deviation 10% 10% 10% 10% 10% 10% 10%

Max.differentialpressure:5000Pa ProtectionClass:IP54 Output:1.0A(0.4A)/250VAC Workingtemperature:20~85CDegree Storagetemperature:40~85CDegree Min.Actuatingpressure: Standard:20Pa; min.startinginterval:10Pa range:20~30Pa Installation direction: vertical (standard installation style) Hoseconnection:pipeP6.2mm

Web: http://www.ayite.net

Email: sales@ayite.net

A.YITE GROUP
INSTALLATION
Location: select a location where vibrations are minimal. Ambient temperature should be within the rangeof15/+60.TheproductioncalibrationoftheGE921ismadeatroomtemperature; Mounting locations close to room temperatures are preferred. In systems with high humidity where condensationispossible,thustheentranceshouldpointdownwards. PressureconnectionsaremarkedwithP1&P2,incorrectconnectionsareforbidden.Pipesizeis6.0mm. *P1connectwithHighPressureterminal(Markedwith+) *P2connectwithLowPressureterminal(Markedwith)

MOUNTING INSTRUCTION:
The switch is preferably mounted with the diaphragm in a vertical plane, unless the device is set or calibrated for horizontal mounting as on special customer models. On these models the mounting position is indicated on the side of the control. It may be fastened directly to the duct, heater or panel as long as the mounting surface has minimal or no vibration. Pressure connections are marked +(high pressure ) and (low or static pressure). For more information, please read the diagramonthesideofthecontrol. NoteTo drill a hole through the plastic tube or pipe before installation, and also mount part of Zbracketonthespot(Standardsetting).

SystermCheck
After proper installation and adjustment of the control, the system should be checked by running at leastonefull cycle of the equipment. If anything appears to operate incorrectly; the wiring and components should berechecked.

REPAIRANDREPLACEMENT:
Repair is not possible. In case of a defective orimproperly functioning control; please check with yournearestsupplier.Whencontactingthesupplierforareplacement,youshouldstatethetype /model number of the control. This number can be found on the side of the control. After screwing off the loose screws and removing the superstructure can be set the pressure(Setting redarrowatthelocation).

Web: http://www.ayite.net

Email: sales@ayite.net

You might also like