You are on page 1of 117

2012

[FEASABILITYSTUDY]
PROJECTNAME:ConstructionanddevelopmentofawindfarminthecommuneofDolhestiand
thecityofLiteni,Suceavacounty
September20,2012 [FEASABILITYSTUDY]

I. General Information:
1. ProjectName:ConstructionanddevelopmentofawindfarminthecommuneofDolhesti
andthecityofLiteni,Suceavacounty;
2. Location:communeDolhestiandLitenicity,Suceavacounty;
3. Beneficiary:S.CULLIROWINDS.R.L;
4. Generalengineeringcompany:S.CVectorConsultA.S.D.S.R.L
5. Financingsources:Ownfunds,cooptedfunds;
6. ProjectNo.:85/10.2012
7. PlanningCertificateNo.:27/05.12.2011;30/29.12.2011issuedbyDolhesticommune;
8. PlanningCertificateNo.:42/18.05.2011;7/27.01.2012issuedbyLitenicity;

II. Investment Description:


1. Currentstatus
Thebeneficiaryofthepresentinvestment,namely,S.CULLIROWINDS.R.L,afteracomplete
surveyoverthegreenenergymarketinRomaniaandafterseveralwindstudiesandmeasurements
doneintheproposedlocationthatisstudiedinthecurrentdocumentation,hasdecidedtostartthe
developmentoftheinvestmentforawindfarmintheLiteniDolhestiregion.
Accordingtothesolutionstudymadebythebeneficiary,forthisemplacementarequestfor30
MWallocationwasmadeintheNationalEnergeticSystem(SEN),withthepossibilitytoupgrade
untilatotalcapacityof80MW.
Theoptionstudiedinthepresentfeasibilitystudy,isthatofa30MWwindfarmlocatedinthe
peripheryofDolhesticommuneandintheperipheryofLitenicity.

Framingplanofthetwosites(com.Dolhesti;Litenicity)
September20,2012 [FEASABILITYSTUDY]

2. Proposedsituation
Theareaselectedforthedevelopmentofthewindfarm,itislocatedintheperipheryofDolhesti
commune(approx.atadistanceof1,4kmfromthebuildingfundoftheDolhestiiMarivillage)andin
theperipheryofLitenicity(approx.atadistanceof0,9kmfromthebuildingfundoftheCornivillage
andapprox.at0,7kmfromthebuildingfundoftheRotundavillage).
Theareaproposedforthewindfarmislocatedonthepeakoftwohills(HillPlesuluiandHill
Rotunda),benefitingfromagoodwindareaandfreeofobstacles.Forabetteremplacementofthe
turbinesandtoproperlymountthemitwasdecidedtosplitupthewindfarmintwomodules:
Module1:emplacedontheLitenicityland,itwillbecomprisedof6windturbineswitha3
MWcapacity(surfacestudiedinthePUZ65ha);
Module2:emplacedontheDolhesticommune,itwillbecomprisedof4windturbineswitha
3MWcapacity(surfacestudiedinthePUZ45ha);
ThezonesthatarestudiedinthetwoZonalUrbanPlanscouldallowadditionalturbinestobe
emplaced(namely7more),inthecasethatthebeneficiarywillconsidersuchacase.
Theareaselectedfortheemplacementofthiswindfarmpresentsseveraladvantages,relatedto
thehighvoltagetransportlines,namely:
LEA20kV(totheSouthofthestudiedarea,ontheDolhesticommune,butalsototheNorth
intheLitenicity);
LEA110kV(totheWestofthestudiedarea,ontheterritoryofPreutesticommune);
LEA220kV(totheNorthandNorthEastofthestudiedarea,ontheterritoryoftheLiteni
city);
Alsointheclosevicinityoftheproposedwindfarm,aEONsubstationislocatedintheDolhasca
city(approx.14km).Thisclosevicinitytothehighvoltagegridlinesandthesubstationwillfacilitate
thegridconnectionoftheproposedwindfarm,reducingthecostsgeneratedbythis.
3. TechnicalInformationabouttheinvestment
3.1 Areaandlocation
Module1peripheryLitenicity
Thetopographicconfigurationofthelandfromthestudiedzoneiscvasiplan,withheight
differencesbetween+384mand+428m.
GEOGRAFICALLY,theareainwhichtheinvestmentwillbelocated,ispartofthemorpho
structuralunitofPodisulMoldovei,subunitofthePodisulSucevei,characterizedbylandscape
characterizedbylowhillsandmostlycoveredbywoods,inwhichthecurrentgeomorphology
reflectsthecompositionandgeologicalstructure,includingtheroleplayedbythehydrographic
networkformedbytheSiretriveranditstributaries.
Theformoftheparcelsinthefieldisanirregularone.
AccordingtothenormP.100/12006,theareasurroundingtheLitenicityischaracterizedby
thefallowingvalues:
groundacceleration.............................................................ag=0,16;
September20,2012 [FEASABILITYSTUDY]

cornerperiod....................................................................Tc=0,7sec;
theregionfallsintherate6seismicregionafterMskscale.
Thestudiedzonepresentsseverallandslides,locatedontheEastandSouthEastoftheRotunda
Hill.
Alsothelandpresentsseveralcharacteristicsimproperforfoundations,thiscreatingtheneedfor
additionalworkstostabilizetheland.Thecurrentareaisusedatthemomentforcrops.Becauseof
thisfactor,duringconstructionphase(fortheturbineemplacements,forthetechnicalspacesandfor
theaccessroads)itwillbenecessarytoremovethegreencover,andreplaceitwithaproper
mechanicallystabilizedlayer.
Module2peripheryDolhesticommune
Thetopographicconfigurationofthelandfromthestudiedzoneiscvasiplan,withheight
differencesbetween+459mand+496m.
GEOGRAFICALLY,theareainwhichtheinvestmentwillbelocated,ispartofthemorpho
structuralunitofPodisulMoldovei,subunitofthePodisulSucevei,characterizedbylandscape
characterizedbylowhillsandmostlycoveredbywoods;TheregionisseveredbytheSomuzulMare
valley(generallyorientedfromWesttoEast).
Theformoftheparcelsinthefieldisanirregularone.
AccordingtothenormP.100/12006,theareasurroundingtheLitenicityischaracterizedby
thefallowingvalues:
groundacceleration.............................................................ag=0,16;
cornerperiod....................................................................Tc=0,7sec;
theregionfallsintherate6seismicregionafterMskscale.
Thelandstudieddoesnothaveanyparticulargeophysicalcharacteristics,becauseofthisthereis
noneedforspecialworksregardinglandimprovement.Atthemomentthestudiedzoneisusedas
grazingland
3.2 Thelegalstatusoftheland
Module1peripheryofLitenicity
ThestudiedlandispartofthepublicdomainofthecityofLiteniandsomeofthelandsare
ownedbyprivateowners:
4oftheturbineswillbeplacedonlandownedbythecityofLiteni(4X500sqmpermanently
occupied;4X2500sqmoccupiedonlyduringconstructionphase);
2oftheturbineswillbeplacedonprivateownedland(2X500sqmpermanentlyoccupied;
2X2500sqmoccupiedonlyduringconstructionphase);
ThetechnicalspacewillbeplacedonlandownedbythecityofLiteni(1X3000sqm);
September20,2012 [FEASABILITYSTUDY]

Theaccessroadtothewindfarmwillbemadebyrehabilitationandmodernizationofthe
currentcommunalroadDC6,foralengthof1180,87m,andawidthofthecarriagewayof5
mwith2X0,75shoulders;
InternalroadsofthewindfarmwillbemadeonthelandownedbythecityofLiteniona
surfaceof16589sqm;
Modul2extravilancomunaDolhesti
ThestudiedlandispartofthepublicdomainoftheDolhesticommune:
4oftheturbineswillbeplacedonlandownedbytheDolhesticommune(4X500sqm
permanentlyoccupied;4X2500sqmoccupiedonlyduringconstructionphase);
ThetechnicalspacewillbeplacedonlandownedbytheDolhesticommune(2X5000sqm);
Theaccessroadtothewindfarmwillbemadebyrehabilitationandmodernizationofthe
currentcommunalroadDC6,foralengthof2801,87m,andawidthofthecarriagewayof5
mwith2X0,75shouldersandalsobyrehabilitationandmodernizationoftheserviceroad
DE6A,foralengthof2231,64m,andawidthofthecarriagewayof5mwith2X0,75
shoulders;
InternalroadsofthewindfarmwillbemadeonthelandownedbytheDolhesticommuneon
asurfaceof7414sqm;

3.3 Fieldstudies
Thebeneficiaryprovidedtothegeneralengineeringcompanythefallowingstudies,regardingthe
proposedemplacementofthewindfarm:
- Topographicalsurvey;
- Geotechnicalstudygeneralstudy;
- Technicalexpertisefortheaccessroad;
- Verificationreportofthegeotechnicalstudy;
- SolutionstudyforSENinsertion

3.4 Maincharacteristicsoftheconstructions
TheinvestmentfordevelopingawindfarmintheDolhestiLiteniregionitsacomplexproject,
whichwillrequiretheclosecooperationfromseveralspecialties.Theconstructionworksneededfor
thedevelopmentofthecurrentinvestmentaremainlydividedupasitfallows:
Accessroads
Theaccesstothelocationwillbemadeusingthenationalandcountyroadsthatleadtowardsthe
communeofDolhesti.
Specificallytheaccesstothelocationofthewindfarm(comprisedofthetwomodules)willbemade
throughtheintersectionbetweenthecountyroadDJ209andthecommunalroadDC6situatedin
Dolhesticommune.
September20,2012 [FEASABILITYSTUDY]

ThisintersectionbetweenthecountyroadDJ208andthecommunalroadDC6willneedtobe
redesignedinordertoaccommodatetheoversizedtransportvehicles.
Theaccessroadwillneedtoundergothefallowinginterventionsinordertofacilitatetheaccessof
theoversizedtransportloads:
- WideningofthecommunalroadDC6fromtheintersectionwiththecountyroadDJ
208foralengthof134m;
- Reshaping,widening,ballastingandroadpavingwithasphaltofthecommunalroadDC
6foralengthof2533,15m;
- Reshaping,widening,ballastingofthecommunalroadDC6foralengthof134,72m;
- Reshaping,widening,ballastingandroadpavingwithasphaltofthecommunalroadDC
6foralengthof1180,87m;
- Constructionofstabilizingwallsforalengthof2X195m;
- Constructionofstabilizingwallsforalengthof1140m;
- WorksforstabilizationoftheRotundaHillforalengthof1140m;
- Reshaping,widening,ballastingoftheserviceroadDE6Aforalengthof2231,64m;
- Replacementofoldculvertsandmountingnewoneswhereisthecase(10pcs.);
- Arrangementofgroovesandshouldersoftheaccessroadsfortheirentirelength;
Theconstructionoftheaccessroadwillbemadeinordertohavethefallowingroadstructure:
- Baselayerofcrushedstoneof30cmthickness;
- Alayerofmixedballastof25cmthickness;
- Carriagewaysurfaceof5m;
- Shouldersof2X0,75m;
- Pearstrenches2X0,5m;
- LayerofAsphaltconcrete(rough)BAR16of5cmthickness(intheplaceswherethe
technicalsolutionimposesit);
Alsoontheareathroughwhichtheaccessroadleadstothemodule1ofthewindfarm,additional
stabilizationworkswillbedoneforalengthof1180,7m(thisworkswillbecomprisedofplanting
shrubsthatwillhelpstabilizetheRotundaHill).
Internalroadsforthetwomodelsthatmakethecurrentwindfarm
Theaccessinthetwomodulesofthewindfarmisprovidedasfallows:
- Internalroadsformodule1Liteni:totalsurface16589sqm;
- Internalroadsformodule2Dolhesti:totalsurface7414sqm;
Theconstructionoftheaccessroadwillbemadeinordertohavethefallowingroadstructure:
- Baselayerofcrushedstoneof30cmthickness;
- Alayerofmixedballastof25cmthickness;
- Carriagewaysurfaceof5m;
- Shouldersof2X0,75m;
- Pearstrenches2X0,5m;
September20,2012 [FEASABILITYSTUDY]

Theroadslayoutwillalsobeusedtolaydowntheinterconnectioninfrastructureforthetwo
modules(highvoltagecables,datacables,etc.).
WorksforstabilizingtheRotundaHill
TakinginconsiderationtheunstablecharacteroftheEastandSouthEastpartoftheRotundaHill,
severalworksforhillstabilizationwillhavetobedone,specificallyintheareainwhichtwoofthesix
turbinesthatmakeupthemodule1Liteniwillbeinstalled.
Workstoarrangesiteorganization
Iordertoproperlyarrangethesiteorganizationandinordertohaveaproperstorageareaforthe
equipmentthatmakesaturbine(thetower,nacelle,rotor,blades,etc.),atechnicalspacewas
considered.ThistechnicalspaceislocatedonDolhesticommuneland,hasasurfaceof22ha,itis
locatedontherouteoftheaccessroadanditisroughlyinthemiddleofthetwomodulesthat
comprisethewindfarm(approx.1kmfromModule1Liteniand2kmfromModule2Dolhesti).
Constructionworksneededforemplacingandmountingofthewindturbines
Forthetwomodulesofthewindfarm,thebeneficiarytookinconsiderationthesametypeof
turbines,namelywindturbinesof3MW(withapowerfactorbetween0,9and0,95imposedby
thesolutionstudythatwasapprovedintheEONMOLDOVACTE).
Thespecificcharacteristicsoftheseturbineswillbedetailedinthespecializedtechnical
memorandum(thatisannexedtothepresentstudy).
Inconclusion,inthefield,foreachturbine,afoundationwithadiameterof22mwillbemade
(permanentsurfaceoccupiedbythisis380sqm.).Alsoduringtheconstructionphaseforthe
foundations,thenecessarycablingworks(highvoltageanddatatransmission)willbeexecutedin
ordertofacilitateaproperworkflowfortheinterconnectionofthewindturbines.Theeffective
surfaceallocatedtoeachturbine(specifiedinthetabulationpapers)willbeof500sqm.Duringthe
constructionphasealargerareawillbeavailableforthesiteorganizationforeachturbine(thisis
specifiedinthepublicprivatepartnershipsdonewiththecommuneofDolhestiandLitenicityand
alsointhecontractsmadewithprivateowners)toallowproperconditionsforthemountingofthe
turbine(3000sqm.foreachturbine).
Thelayoutoftheelectriccableswillfallowtherouteoftheroadsinordertoavoidadditional
contractsforlandpermits.
AlsotheinterconnectioncablebetweenModule1LiteniandModule2Dolhestiwillfallowthe
routeofthecommunalroadDC6andserviceroadDE6A.
ForMTtransformerunitsthereweretakeninconsiderationtwotechnicalspacesinbothmodules
thatwillallowsuchapermanentconstruction(3000sqminModule1Liteniand2X5000sqmin
Module2Dolhesti).
WorksneededforinsertionintheNationalEnergySystem(SEN)

September20,2012 [FEASABILITYSTUDY]

Thebeneficiary,S.CULLIROWINDS.R.L,hasasolutionstudythatanalyzesthepossibilitytoconnecta
windfarmwithacapacityof30MWintheregionofLiteniDolhestiintotheNationalEnergySystem
(SEN);
Theanalysisdonebythespecialtyengineers,proposeasasolutionforinsertionintotheSEN
networktheconstructionofa110/MTsubstationinthelocationofthewindfarm,andan
interconnectioncablebetweenthissubstationandEON110kVsubstationinDolhasca(highvoltage
line,cablesection185mm,lengthofapprox.14km).
Ifthebeneficiaryshouldchoosetoextendtheproductioncapacityofthecurrentwindfarm,hecan
doso,havingathisdisposalanadditionalsolutionstudythatallowsatotalcapacityof80MWinthe
DolhestiLiteniregion,withinsertionsolutionintoSENatsame110kVEONsubstationinDolhasca.
Allcategoriesofworksdescribedabove,willbedetailedintheTechnicalspecialtiesmemorandums
thatareannexedtothepresentstudy.
3.5 Thecurrentsituationofutilitiesintheregion
Intheareaswherethetwomodulesofthewindfarmwillbeemplaced,nonetworksforsewers,
watersupplyorgasarepresent.
Thehighvoltagenetworks(20kV,110kVand220kVlines)aresituatedatasafedistancefrom
thewindfarm(frombothmodules)andwillnotinterferewiththeconstructionproceduresofthe
windfarm.
Theinterconnectioncable,thelowvoltagelinesandonetelecommunicationlinewillhavetobe
takeninconsiderationduringtheengineeringphase.
3.6 Environmentalimpactassessmentconclusions
Bymakingthisparkthebeneficiarywilltakeintoaccountallthefactorsofpollutionwhichcould
haveanegativeimpactonthetwocommunities.
ProtectionareasforthesetypesofsystemshavebeenstudiedinPUZdocumentationsperformed
forthetwomodulesDolhestiandLiteni.
InbothPUZwecanobservethelocationofthetwomodulesofthewindfarmhastakeninto
accountthedevelopmentprioritiesofthetwocommunities(communeofDolhestiandLitenicity)
andthereisnonegativeimpactonthebuiltareasofthetwocommunities.
Waterqualityprotection.
ensuregroundwaterdrainageditchesneartheroadwithbaregroundorprotectedbypitching
cementconcreteslabs(wherethetechnicalprojectwillimposeit);
toprovidemeansforretainingthetechnologicalwastewaterandsewagespillsinsite
organization,sothattheyfallundertheNTPA001/2002approvedbyGovernmentHGno.188/2002;
Anydischargeofsewage,waste,wasteofanykind,onthegroundandbasementare
prohibited.
September20,2012 [FEASABILITYSTUDY]

Airprotection
technologicalequipmentusedduringconstructionandoperationwillcomplywithHG.743/2002
layingdowntheproceduresfortypeapprovalofinternalcombustionengines,fornonroadmobile
machineryandestablishmeasurestolimittheemissionofgaseousandparticulatepollutantsfrom
these.
Protectionofsoilandsubsoil:
Temporarystoragelandswillbedistinct,dependingontheirnatureandfunctionyouneedtohead;
Safestorageofconstructionmaterials(nottobedrivenbywindandrain)andremovalofthewaste
land;
Ensureretentionofwasteinsecurestoragespaces,fillingthemwithinertmaterials.
III. Economic evaluation;.
Toachievetheeconomicmodelofthisinvestmenthasbeentakenintoaccounttheseeconomic
data:
Description Value Source
Capital cost 1800000euro/MWinstalled Thispriceisevaluated
accordingtotheEuropean
marketgreenenergy.Thisprice
includesthevalueof
infrastructureworks,
installationsandequipment.
Operation and maintenance
costs
9euro/MWh Europeanspecializedindustry
average
Green Certificates
( trading operator OPCOM)
2pcs/MWhX50euro/pcs
100euro/MWh
Greencertificatesaregranted
bytheRomanianstate
subsidiesforgreenenergy
production.
Selling energy to EON
Furnizare
45euro/MWh Theaveragevalueobtained
whenconcludingaPPA(this
valueisanaverageofthe
currentmarket,itissubjective,
asanagreementconcludedas
PPAfeaturessome
particularitiesthatcanincrease
thevalueofthepriceper
installedMW)
Indexing of Costs 5% Thisvalueisamaximumvalue
toensureinvestmentinthe
faceofinflationrateof2.4%
(calculatedforendof2012)

Totalinvestmentstructuredonthegeneralestimate.
September20,2012 [FEASABILITYSTUDY]

VAT
0 2 3 4 5 6
Chapter 1. Costs for obtaining and improving the land
1.1
Obtaining the land
31,050 6,872 7,452 38,502 8,521
1.2 7.590,000 1.679,761 1.821,600 9.411,600 2.082,904
1.3
Design for environment protection and bringing to its original state
464,440 102,786 111,466 575,906 127,455
8.085,490 1.789,419 1.940,518 10.026,008 2.218,880
2.1 2.110,500 467,080 506,520 2.617,020 579,179
2.110,500 467,080 506,520 2.617,020 579,179
CHAPTER 3. Expenses for design and technical assistance
135,000 29,877 32,400 167,400 37,048
3.2 82,210 18,194 0,000 5,850 1,295
3.3 1.661,161 367,635 398,679 2.059,839 455,868
3.4 9,000 1,992 2,160 11,160 2,470
3.5 126,000 27,885 30,240 156,240 34,578
3,6 237,309 52,519 56,954 294,263 65,124
3,7 593,272 131,298 142,385 735,657 162,810
2.843,951 629,402 662,818 418,482 92,615
CHAPTER 4. Basic investment expenditures
4.1.1 roads rehabilitation and upgrading works 7.209,543 1.595,561 1.730,290 8.939,833 1.978,496
4.1.2 foundations and earth moving works 11.232,000 2.485,781 2.695,680 13.927,680 3.082,368
4.1.3 retaining wall, soil stabilization 1.067,120 236,167 256,109 1.323,229 292,847
4.1.4 electrical installations 37.800,000 8.365,608 9.072,000 46.872,000 10.373,354
4.1.5 0,000 0,000 0,000 0,000 0,000
4.1.6 0,000 0,000 0,000 0,000 0,000
4.1.7 0,000 0,000 0,000 0,000 0,000
4.1.8 0,000 0,000 0,000 0,000 0,000
4.1.9 0,000 0,000 0,000 0,000 0,000
57.308,663 12.683,117 13.754,079 71.062,742 15.727,065
0,000 0,000 0,000 0,000 0,000
0,000 0,000 0,000 0,000 0,000
180.000,000 39.836,229 43.200,000 223.200,000 49.396,924
180.000,000 39.836,229 43.200,000 223.200,000 49.396,924
0,000 0,000 0,000 0,000 0,000
0,000 0,000 0,000 0,000 0,000
4.5.a Features 0,000 0,000 0,000 0,000 0,000
4.5.b Other features 0,000 0,000 0,000 0,000 0,000
0,000 0,000 0,000 0,000 0,000
4.6 0,000 0,000 0,000 0,000 0,000
0,000 0,000 0,000 0,000 0,000
237.308,663 52.519,346 56.954,079 294.262,742 65.123,989
CHAPTER 5. Other expenses
1.012,104 223,991 242,905 1.255,009 277,749
5.1.1 Construction (1.0%) 674,736 149,327 161,937 836,673 185,166
5.1.2 Associated costs of organizing the site (0.5%) 337,368 74,664 80,968 418,336 92,583
877,157 194,126 0,000 43,684 9,668
Fee I.S.C. (0.8%) 539,789 119,462 0,000 26,882 5,949
* According to Law 10/95 (0.7%) 472,315 104,529 0,000 23,522 5,206
* According to Law 453/01 (0.1%) 67,474 14,933 0,000 3,360 0,744
5.2.2 Social House Builders (0.5%) 337,368 74,664 0,000 16,802 3,718
5.2.3 Building permit 674,736 149,327 0,000 674,736 149,327
5.2.4 Architect stamp tax (0.05%) 0,000 0,000 0,000 0,000 0,000
5.3 10.012,702 2.215,935 2.403,049 12.415,751 2.747,759
5.4 0,000 0,000 0,000 0,000 0,000
12.576,699 2.783,379 1.812,481 14.389,180 3.184,504
6.1 0,000 0,000 0,000 0,000 0,000
6.2 0,000 0,000 0,000 0,000 0,000
0,000 0,000 0,000 0,000 0,000
262.925,303 58.188,625 61.876,415 324.801,718 71.882,642
68.148,339 15.082,071 16.355,601 84.503,940 18.701,768
Improving the land
CHAPTER 2. Expenses for providing utilities needed for the objective
Expenses for providing utilities necessary objective (ATR-SEN)
Design and engineering
Fees for obtaining permits, agreements and authorizations
Total chapter 2
4.3
Technological equipment with mounting included
Technological equipment mounting
Technical assistance from the designer
4.1
4.3.1 - Technological equipment with mounting included ( 3 MW turbines)
nr.
crt.
Name of chapters and subchapters of expenses
value ( included VAT ) value ( without VAT )
thousands euro thousands RON thousands euro thousands RON thousands RON
3.1
total chapter 4.2
Field studies
Organization of procurement procedures
4.2
total chapter 4.1
4.2.1 - Technological equipment mounting
Project supervisor
5.1
5.2
4.4
Total chapter 4
4.5
4.4.1
total chapter 4.6
total chapter 4.5
5.2.1
Fees, rates, taxes
total chapter 4.4
Site organization
Machinery and transport equipment without installation
Intangible assets
1
Consulting
Total chapter 1
Features
Total chapter 3
Buildings and facilities
Total chapter 5
Technological tests
Total chapter 6
From which C+M ( Construction and installation)
GRAND TOTAL
Operating personnel training
Diverse and unexpected expenses (4%)
total chapter 4.3
CHAPTER 6: Expenses for technological tests and customer tests and teaching
September20,2012 [FEASABILITYSTUDY]

10

Estimatesandbillofquantitieswillbemadeafteracompletetechnicalprojectregardingall
specialtiesinvolved.
SummaryofenergyefficiencyofthewindfarmLiteniDolhesti

Turbinetype WinWinDWWD3
Numberofinstalledturbines 10
Maximumhight 120m
Grosspowercut(MWh/year) 109008
Netpowercut(MWh/year) 92856,8

Redacted Date
PetrareanuC.

September20,2012 [FEASABILITYSTUDY]

11

ANEXES:
Writtenanddrawnparts

TechnicaldocumentationTurbinespecificationsWinWindWWD3
Technicalreportgeneralconsiderations
Technicalreportaccessroads
Technicalreportelectrical


1(27)
Document WWD-1003

Prep. by EKU
Checked by GB
Ver 1.5 WWD-3 DETAILED TECHNICAL SPECIFICATION
Appr. by


Detailed Technical-specification WWD-3 ver 1.5.doc









WWD-3
3 MW wind turbine
Detailed technical specification


2(27)
Document WWD-1003

Prep. by EKU
Checked by GB
Ver 1.5 WWD-3 DETAILED TECHNICAL SPECIFICATION
Appr. by


Detailed Technical-specification WWD-3 ver 1.5.doc




Technical specification
Contents

1. General information.....................................................................................................................................4
2. General information of turbine electric systems..................................................................................6
3. Power curve ...................................................................................................................................................7
4. Annual production of WWD-3/100............................................................................................................8
5. Noise level (IEC 61400-11)..........................................................................................................................8
6. Detailed technical specification................................................................................................................9
6.1. Tower ...............................................................................................................................................................9
6.2. Rotor ................................................................................................................................................................9
6.3. Main bearing, planetary gear and generator. ........................................................................................9
6.4. Brake system...............................................................................................................................................10
6.5. Glassfiber cover..........................................................................................................................................10
6.6. Yaw system..................................................................................................................................................10
6.7. Foundation ...................................................................................................................................................11
6.8. Grid connection ..........................................................................................................................................11
6.8.1. Transformer technical specification......................................................................................................11
6.8.2. Switchgear, Electrical Characteristics..................................................................................................13
6.8.3 Frequency converter....................................................................................................................................15
6.8.4 Reactive power control ...............................................................................................................................15
6.9. Turbine control, remote monitoring and reporting............................................................................17
6.10. Presenting the production data on the Internet..................................................................................18
6.11. Alarms ...........................................................................................................................................................18
6.12. Self-diagnosis of the wind turbine.........................................................................................................19
6.13. Condition monitoring.................................................................................................................................19
6.14. Lightning protection ..................................................................................................................................19
7. Earthing system..........................................................................................................................................20
8. Options..........................................................................................................................................................20
8.1. Anti-icing of blades....................................................................................................................................20
8.2. Aviation lights..............................................................................................................................................20
8.3. Service Lift inside the Tower ...................................................................................................................20
8.4. High voltage switchgear ...........................................................................................................................21
9. Type Approvals...........................................................................................................................................21
10. Transportation dimensions......................................................................................................................24
11. Access roads and platforms....................................................................................................................24
12. General Reservations, Notes and Disclaimers ...................................................................................24
13. General drawings........................................................................................................................................25

Due to continuous development and product upgrade, WinWinD reserves the right to change or alter
these specifications at any time without notice. WinWinD

is a registered trademark of Winwind Oy.


This document contains general information about WWD-3 wind turbines. The exact scope of delivery
shall be defined in the contract.

3(27)
Document WWD-1003

Prep. by EKU
Checked by GB
Ver 1.5 WWD-3 DETAILED TECHNICAL SPECIFICATION
Appr. by


Detailed Technical-specification WWD-3 ver 1.5.doc

Date Revision Author Remark
April 2004 1/2004 Eku Document created
Sep 2004 4/2004 EKu An update
Apr 2005 1/2005 EKu An update
May 2005 2/2005 EKu Annual production added
Oct 2005 3/2005 EKu An update
Oct 2005 4/2005 EKu An update
30.11.2005 5/2005 Iri Electrics update
23.12.2005 1.0 GB General corrections/additions
6.1.2006 1.1. EKu Power production corrected
1.2.2006 1.2. EKu Power curve update
20.3.2006 1.3 EKu 90 m power curve added
30.8.2006 1.5 EKu General corrections/additions

4(27)
Document WWD-1003

Prep. by EKU
Checked by GB
Ver 1.5 WWD-3 DETAILED TECHNICAL SPECIFICATION
Appr. by


Detailed Technical-specification WWD-3 ver 1.5.doc

1. General information

WinWinD has developed an innovative wind turbine for the market with its
WWD concept. WinWinDs basic values include customer satisfaction and
the operational reliability of the products, as well as the win-win cooperation
achieved between the clients and WinWinD.

On the basis of thorough technical and economic research work the WWD
concept, which allows electricity to be produced with a new innovative inte-
grated power unit, was created. The basis for design was efficiency, reliabil-
ity and ease of maintenance which allows the WWD concept to offer the
most cost-effective production throughout its total life, combined with the
lowest operating costs.

WWD-3 is pitch regulated upwind wind turbine with active yaw and three-
blade rotor. The turbine consist of three main parts

Rotor
3 blades and hub, electrical pitch control

Integrated power unit
roller bearing, planetary gear and variable speed
generator with permanent magnets

Nacelle
frequency converter, transformer and accessories

The rotor hub is connected to the gearbox casing using a play-free double-
row tapered roller bearing. The bearing transfers the rotor loads directly to
the main casing, keeping the drive train free from deformation and rotor
loads. The planetary gear increases the rotating speed modestly and trans-
fers the torque to the low speed permanent magnet generator. All connec-
tion flanges are round and concentric, resulting in clearly defined borders.
This "black-box" design philosophy eases assembly and results in a well-
defined load distribution. The frequency converter transfers the full genera-
tor power. As a result the machine can use also low wind speeds with opti-
mum low rotational speed, and there is no need for slip rings as with a dou-
ble-fed generator solution.

5(27)
Document WWD-1003

Prep. by EKU
Checked by GB
Ver 1.5 WWD-3 DETAILED TECHNICAL SPECIFICATION
Appr. by


Detailed Technical-specification WWD-3 ver 1.5.doc



General
Type 3 blades, up-wind
Power control Pitch, variable speed
Rated power 3000 kW (grid side)
Rotor diameter 90 and 100 m
Cut-in wind speed 4 m/s
Rated wind speed 12,5 m/s (100 m)
13 m/s (90 m)
Cut-out wind speed 20 m/s (100 m)
25 m/s (90 m)
Design maximum 59,5 m/s (hub height)
Rotor speed 5-16 rpm
Frequency converter Located in nacelle
Transformer Transformer located in nacelle
Hub heights 80 -100 m


6(27)
Document WWD-1003

Prep. by EKU
Checked by GB
Ver 1.5 WWD-3 DETAILED TECHNICAL SPECIFICATION
Appr. by


Detailed Technical-specification WWD-3 ver 1.5.doc

2. General information of turbine electric systems

The WWD3-90m turbine has a water cooled permanent magnet synchro-
nous generator.

The frequency converter is also water cooled and installed in the nacelle.
The frequency converter consists of two separate converter units. One con-
verter unit is designed for 1,5MW and has 1500A IGBT-inverter units on
grid and generator side. This 2x1,5MW converter system is redundant, it is
possible to run only one 1,5MW converter if another converter is out of or-
der. On the grid side there is an LC-filter for reducing harmonic currents.

The main transformer is also installed in the nacelle. It is an oil-cooled fully
encapsuled version, reinforced internally to withstand vibration. Additionally
it stands on vibration dampers. Consequently all the cable connections are
made flexible. Cooling is by natural convection plus a thermostat-controlled
additional fan. The main transformer has five voltage tap settings (2x2,5%)
to make a fine adjustment according to the local grid.


Generator Synchronous machine
Cooling Water jacket cooling around stator,
Air cooling with air/water heat exchanger
Rated gen. voltage 660 V

Rated gen. frequency 49,2 Hz
Frequency converter IGBT -Bridges on both generator and grid
side
Filter generator side dU/dt-Filter and common-mode filter
Filter grid side LC-Filter
Transformer Oil-cooled, in nacelle



7(27)
Document WWD-1003

Prep. by EKU
Checked by GB
Ver 1.5 WWD-3 DETAILED TECHNICAL SPECIFICATION
Appr. by


Detailed Technical-specification WWD-3 ver 1.5.doc
3. Power curve

The guaranteed power curve with rotor diameter of 90 and 100 m.
Air density 1.225 kg/m3. Transformer losses are not deducted.

On the right side the thrust-coefficient (for wake calculations)


v WWD-3/90
WWD-3/100
m/s kW kW
3 0 0
4 80 79
5 220 254
6 389 458
7 627 740
8 944 1117
9 1351 1595
10 1858 2103
11 2410 2505
12 2873 2870
13 3032 3032
14 3032 3032
15 3030 3030
16 3030 3030
17 3030 3030
18 3030 3030
19 3030 3030
20 3030 3030
21 3030
22 3030
23 3030
24 3030
25 3030








8(27)
Document WWD-1003

Prep. by EKU
Checked by GB
Ver 1.5 WWD-3 DETAILED TECHNICAL SPECIFICATION
Appr. by


Detailed Technical-specification WWD-3 ver 1.5.doc
4. Annual production of WWD-3/100

The calculated power production with rotor diameter 100 m.
Air density 1.225 kg/m3, Weibull-C-factor = 2.
Gross production (i.e. park losses, transformer losses, etc are not de-
ducted).

m/s MWh/a
6,0 6360
6,5 7562
7,0 8732
7,5 9841


5. Noise level (IEC 61400-11)



The noise level values shall be guaranteed according the sales agreement.
The noise guarantee will be regarded as fulfilled, if a measured sound
power level is lower or equal than the guaranteed value (the inaccuracy of
the measurement result has been noticed in the process).

WWD-3 Technical specification 9 (27)
Detailed Technical-specification WWD-3 ver 1.5.doc

6. Detailed technical specification

6.1. Tower

Two different basic tower solutions are available. Steel tower and
concrete/steel hybrid tower.

Hub height 88 m 90 m 100 m
Number of sections 4 1 + 2 1 + 2
Colour of steel part RAL 7035 RAL 7035 RAL 7035
Steel part height 84,5 m 49,5 m 49,5 m
Concrete part height 36,5 m 46,5 m


6.2. Rotor
The rotor consists of three blades, hub and three electrical pitch
drives. The blades are made of epoxy resin reinforced glassfibre.
The blades also act as aerodynamic brakes. Normally the blades
are synchronised but in case of an emergency, each blade can be
controlled individually. The pitch system is electric and equipped
with a back-up battery or capacitor. The blades are equipped with
lightning conductors.

6.3. Main bearing, planetary gear and generator.
The rotor hub is connected to the gearbox casing using a play-free double-
row tapered roller bearing. The bearing transfers the rotor through a part of
the gear casing to the mainframe. The planetary gear increases the rotating
speed modestly and transfers the torque to the low speed permanent mag-
net generator. All connection flanges are round and concentric, resulting in
clearly defined borders. This "black-box" design philosophy eases assem-
bly and results in a well-defined load distribution. All possible deformations
due to rotor loads have been taken into consideration when designing the
gears.

The bearing has, integrated with the gearbox, forced oil lubrication. A dou-
ble radial shaft seal arrangement with grease filling in between seals to-
wards the ambient air. The manufacturer is FAG or equivalent.

The manufacturer of the gear is MOVENTAS (former METSO-DRIVES).
The low speed generator with permanent magnets is manufactured by
ABB.

WWD-3 Technical specification 10 (27)
Detailed Technical-specification WWD-3 ver 1.5.doc
6.4. Brake system

During emergency shutdown each rotor blade acts independently as an
aerodynamic brake. The computer controls the system with the help of
anemometers, wind vane and other sensors.

The stop procedures are:

The normal stop: the blades synchronously driven into storm
proofing position with a pitch speed of 4 degrees/s without us-
ing the mechanical brakes.

The emergency stop (low-level): the blades are driven with 4
deg/s to the end position and the mechanical disk brake is acti-
vated at the same time. In case of grid failure the pitch power
comes automatically from the buffer battery

The emergency stop (high-level): the blades are driven with
a certain pitch speed program. The mechanical brakes are
used at the same time. In case of grid failure the pitch power
comes automatically from the buffer battery.

Each blade is equipped with a back-up battery. If one of the blade pitches
fails, the synchronisation is turned off and each blade is driven separately
to the storm position. In case of grid failure using the battery power shall be
used.

The system meets the standards of Germanischer Lloyd.


6.5. Glassfiber cover

Nacelle and hub cover are made of glassfiber sandwich. The colour is RAL
7035 grey.

6.6. Yaw system

The wind vane on the roof of the drive train continuously monitors the direc-
tion of the wind. The wind vane is equipped with an anti-icing system. When
the direction of the wind changes, six geared yaw motors on top of the
tower (at the yaw bearing level) turn the nacelle. The hydraulic brakes are
loosened automatically to a reduced pressure for the time of yawing.

WWD-3 Technical specification 11 (27)
Detailed Technical-specification WWD-3 ver 1.5.doc
6.7. Foundation

The foundation is a gravity-based or pile foundation depending on the local
ground conditions.

The tower is connected to the foundation by a cylindrical bolted flange.


6.8. Grid connection

The main transformer in the nacelle is manufactured to meet the nominal
voltage of the interconnection grid. The transformer has adjustable winding
taps 2x2,5% and the voltage of the high voltage grid must be within 5%
of nominal voltage. Frequency variations within 3 Hz (50 Hz) can be han-
dled. Intermittent or rapid grid frequency fluctuations may cause damage to
the turbine. For the fatigue loads, 400 grid failures within the turbines life-
time have been assumed.


6.8.1. Transformer technical specification

Note
Rated power of wind
turbine
3000 kW on medium voltage side
Voltage 1033 2x2,5% /
0,690 kV

Primary / secondary
Phases 3
Connection Dyn11 Delta/star
z
k
6 %
Frequency 50 Hz
Power factor 0,951,00 Transformer HV-side
Transformer type Silicon oil-transformer
for converter supply

Power losses Po 3 kW
Pk 25 kW
full load, 75C reference
Static shield Yes Between primary and secondary

Ambient -30 +40C
5 95 %
Temperature
Humidity
Protections and
measurements in-
cluded to the trans-
former delivery
Oil overpressure
Oil temperature
Oil level


Type of frequency
converter
Active IGBT input
bridge,


WWD-3 Technical specification 12 (27)
Detailed Technical-specification WWD-3 ver 1.5.doc
active IGBT output
bridge,
Voltage = 690V
f
sw
= 3,6 kHz
LC-filter between con-
verter and transformer






Total Harmonic Dis-
tortion
THD = 5 % (voltage)
THD = 5 % (current)
Between LC-filter and trans-
former

Vibration The transformer will be
installed to the nacelle
and good mechanical
design against vibration
is required.

Cooling of transformer KNAN




WWD-3 Technical specification 13 (27)
Detailed Technical-specification WWD-3 ver 1.5.doc
6.8.2. Switchgear, Electrical Characteristics

The medium voltage switchgear of the grid connection is located in the
tower base. The SF
6
insulated switchgear consists of switch-disconnector(s)
and a transformer feeder circuit breaker. The switch-disconnector has 3 sta-
ble positions: closed, open and earthed. The switchgear is designed so that
the simultaneous closing of the switch or circuit breaker and the earthing
switch is impossible. The specification of the turbine switchgear is shown in
the table below.

As an option are the following devices for the switchgear available: voltage
indicator lamps, fast earthing switch (arc killer), manometer and raising
plinth.

Rated voltage (kV) 12 24 36
Network switch disconnec-
tor

Rated current (A) 630 630 630
Breaking capacity (A no load
cable)
30 30 25
Making capacity (kApeak) 52,5 40 50
Short-time withstand current
(kArms 1 s)
21 16 20
Insulation level (50Hz 1 min
kVrms)
28 50 70
Impulse voltage (kVpeak
1,2/50 s)
75 125 170
Cable connection bushing type C 630A,
disconnectable
M16

type C 630A,
disconnectable
M16
please consult
Winwind
Transformer feeder circuit
breaker

Rated current (A) 200 200 630
Breaking capacity (kApeak) 21 16 20
Making capacity (kApeak) 52,5 40 50
Insulation level (50Hz 1 min
kVrms)
28 50 70
Impulse voltage (kVpeak
1,2/50 s)
75 125 170
Cable connection bushing type C 630A,
disconnectable
M16
type C 630A,
disconnectable
M16
Please consult
Winwind
WWD-3 Technical specification 14 (27)
Detailed Technical-specification WWD-3 ver 1.5.doc

Current, voltage and energy measurement unit can be located in tower
base if needed. The measurement unit specification is shown in table X.

Table X. Measurement unit specification.

Rated voltage (kV) 12 24 36
Insulation air air SF
6
Current transformers
(A)
200-100/5/5
class 0,2s
200-100/5/5
class 0,2s
50-100/5/5
class 0,5
Voltage transformers
(kV)
10:3/0,1:3/0,1:3
class 0,2
20:3/0,1:3/0,1:3
class 0,2
30:3/0,1:3/0,1:3
class 0,5

Typical grid connection of WWD-3 wind turbine is shown in figure X. The
number of the switch-disconnectors depends on the supply grid type and
the number of the turbines in wind farm.


Typical grid connection of WWD-3 wind turbine.





WWD-3 Technical specification 15 (27)
Detailed Technical-specification WWD-3 ver 1.5.doc
6.8.3 Frequency converter

A liquid cooled IGBT frequency converter is used for connecting the vari-
able speed generator to the grid. The frequency converter consists of two
parallel connected converters (2x1,5MW) in separate cabinets resulting a
robust and redundant system. The voltage level of converter grid side is
690V and the grid synchronization is automatic. The power factor of gen-
erator and grid side converters is adjustable. The communication between
operation control computer and the converter is made by CANopen field-
bus. Due the effective grid side filters, the total harmonic distorsion of the
grid side current is low (THD < 4%).

6.8.4 Reactive power control

The reactive power of WWD-3 turbine can be adjusted by the frequency
converter. It is possible to control the grid side reactive power by following
ways
Power factor = 1,0 (default)
Power factor < 1,0 according to max reactive power diagram. (Note that the
diagram shows the maximum value and lower reactive power production
can be agreed).

The turbine is able to operate with a power factor of cos=0,95 (ind) to
cos=0,95 (cap) with the nominal power. With partial loads the maximum
reactive power diagram is shown in figure X. Note that if a power factor <
1,0 is used, then the power curve and energy yield is lower as specified.

WWD-3 Technical specification 16 (27)
Detailed Technical-specification WWD-3 ver 1.5.doc
WWD-3 Max reactive power
-2500
-2000
-1500
-1000
-500
0
500
1000
1500
2000
2500
0 500 1000 1500 2000 2500 3000 3500
P (kW)
Q

(
k
V
a
r
)


Maximum reactive power of WWD-3 turbine on grid side at the network
connection point.



WWD-3 Technical specification 17 (27)
Detailed Technical-specification WWD-3 ver 1.5.doc


6.9. Turbine control, remote monitoring and reporting

Each turbine has its own PLC, all the PLCs of the same park are con-
nected into network. See picture below.

VPN
VPN VPN
Production data
-actual data
-cumulative data
WinWinD Web-server
Customers has an access to
information of WinWinD web-
server thorugh internet
Production data Alarms and turbine control
Remote access for WinWinD
personnel to control the turbine
TCP/IP Industrial bus
Fiberoptic cables
Turbine
PLC
Turbine
PLC
Turbine
PLC
Turbine
PLC
VPN
VPN VPN
Production data
-actual data
-cumulative data
WinWinD Web-server
Customers has an access to
information of WinWinD web-
server thorugh internet
Production data Alarms and turbine control
Remote access for WinWinD
personnel to control the turbine
TCP/IP Industrial bus
Fiberoptic cables
Turbine
PLC
Turbine
PLC
Turbine
PLC
Turbine
PLC
Turbine
PLC
Turbine
PLC
Turbine
PLC
Turbine
PLC


WWD-3 Technical specification 18 (27)
Detailed Technical-specification WWD-3 ver 1.5.doc
Data connection to the park can be made using broadband access, an
ISDN connection, an analogue telephone line or a GSM connection. The
most recommended method is broadband.

The production data is automatically retrieved from the wind turbine PLC to
the WinWinD Web-server. From the Web-server data can be made avail-
able to customers.

The turbine control software contains several state-of-art features, which al-
lows optimisation of the production based on needs of the customer, for ex-
ample production optimised or noise optimised power curves, etc.

Wind turbines can be fully remote controlled, i.e. all the main functions can
be executed remotely.

6.10. Presenting the production data on the Internet

The system enables presenting the production data of the wind turbines on
the Internet. Access to the data can be free or a username with password
can be used. Thus the production data can be viewed regardless of the
place or time; the Internet-connection, however, is a necessity.





6.11. Alarms

In case of a malfunction the system alarms and informs to the WinCare
personnel of the reason for failure. Wincare personnel takes remote control
to turbine and start find solution in order to restart the turbine.

WWD-3 Technical specification 19 (27)
Detailed Technical-specification WWD-3 ver 1.5.doc
6.12. Self-diagnosis of the wind turbine

The wind turbine is equipped with an automatic monitoring system, which
continuously protects and controls the generator and the grid and adjusts
the settings according to the wind and weather conditions. This way the
power production can be optimised. During the cold season the sensors
measure the need for heating of the power unit and lubrication oil and en-
sure a safe start.

For case of a grid drop the wind turbine has an uninterruptible power sys-
tem (UPS), which ensures the control for 60 minutes.

The anemometer and wind vane of the wind turbine monitor the changes in
the wind and the technique starts and stops the plant according to the set-
tings.

6.13. Condition monitoring

The mechanical reliability of the wind turbine is ensured with a condition
monitoring system. E.g. vibration and temperature is measured by using
sensors. Condition monitoring system analyses the data received from the
sensors and gives a warning to the turbine controller if alarm limits are ex-
ceeded. Condition monitoring system provides trends, frequency spec-
trums, time domain signals as well as technical details of the wind turbine to
enable accurate analysis of possible faults.

6.14. Lightning protection

The most advanced lightning protection technology in the field is used. The
following principles are applied
Lightning conductor in each blade
Optional registration cards
Varistors and fuses in the terminal box of the generator
Varistors and fuses on the connectors of the inverter
Shielded sensor cables
Overvoltage protection on the high voltage side of the transformer
(option)
Earthing of the tower according to the VDE 0185 standard
The function of the varistors and their fuses is supervised by the con-
trol computer



WWD-3 Technical specification 20 (27)
Detailed Technical-specification WWD-3 ver 1.5.doc
7. Earthing system

The earthing system of WWD-3 turbine consists of a ring type earthing
electrode around the foundation in the soil and connection wires from the
ring to the flange of the tubular tower. The main earthing bus-bar is also
connected to the flange of the tower and the earth termination shall have a
resistance 10 . The 50mm2 copper electrode is used as a electrode wire
and the electrode joints in the soil shall be weld joined to get permanent
and low-resistance connections. The earthing system must be designed for
local soil conditions and if the resistance of 10 cant be met with ring type
electrode, then ground rods must be added to the earthing system.
The star point of the main transformer is earthed, which means that the tur-
bine main circuit is a TN-system.



8. Options

8.1. Anti-icing of blades

Ice sensors or an anti-icing equipment of the blades is available as an op-
tion.

8.2. Aviation lights


The following aviation light options are available:

1. Low intensity. Red 10-200 cd.
2. Medium intensity. Red/white/dual 200-2000 cd.
3. Medium intensity. Red/white/dual 2000-20000 cd.

The options are designed according to the ICAO and the FAA codes.

When installed in a wind farm, the obstruction light flashes can be synchro-
nised throughout the whole wind farm.

8.3. Service Lift inside the Tower

The turbine can be delivered with a man-carrying service lift inside the
tower.

WWD-3 Technical specification 21 (27)
Detailed Technical-specification WWD-3 ver 1.5.doc
8.4. High voltage switchgear

The high voltage switchgear can be delivered as well.



9. Type Approvals

The Design Assessment is the equivalent to the German Typenprfung. It
is a certification of the basic documents of the machine, stating that the
safety philosophy is correct, all safety devices and machine components
are correctly dimensioned and the machine has the calculated lifetime of 20
years.

The WWD3 is being assessed by Germanischer Lloyd (GL). The design
assessment is valid for the machine head (Rotor and Nacelle).

The tower will be certified separately, because it is often designed site-
specific. Winwind performs the tower certifications through TV Tech-
nischer berwachungs Verein.

CE Certificate of Conformity

98/37/EC Machinery
73/23/EEC Low voltage
89/336/EC Electromagnetic compatibility
SFS-EN ISO 12100-1:2003 Safety of Machinery. Part 1: Basic
concepts, general principles for design. Basic terminology and
methodology
WWD-3 Technical specification 22 (27)
Detailed Technical-specification WWD-3 ver 1.5.doc

WWD-3 Technical specification 23 (27)
Detailed Technical-specification WWD-3 ver 1.5.doc
WWD-3 Technical specification 24 (27)
Detailed Technical-specification WWD-3 ver 1.5.doc


10. Transportation dimensions

Please refer document WWD-3 transportation dimensions, access roads
and platforms

11. Access roads and platforms

Please refer document WWD-3 transportation dimensions, access roads
and platforms

12. General Reservations, Notes and Disclaimers

All data are valid at sea level (1,225 kg/m
3
).
Periodic operational disturbances and generator power de-rating
may be caused by a combination of high winds, low voltage or high
temperature.
WinWinD recommends that the electrical grid is as close to nominal
as possible with little variation in frequency.
A certain time allowance for turbine warm-up must be expected fol-
lowing a grid dropout and/or periods of very low ambient tempera-
ture.
All listed start/stop parameters (e. g. wind speeds and temperatures)
are equipped with hysteresis control. This can, in certain borderline
situations, result in turbine stops even though the ambient conditions
are within the listed operation parameters.


WWD-3 Technical specification 25 (27)
Detailed Technical-specification WWD-3 ver 1.5.doc
13. General drawings
N.B,
Site drawings are always site specific
WWD-3 Technical specification 26 (27)
Detailed Technical-specification WWD-3 ver 1.5.doc



N.B, Site drawings are always site spesific
WWD-3 Technical specification 27 (27)
Detailed Technical-specification WWD-3 ver 1.5.doc


Electrical drawings are always site specific
September20,2012 [FEASABILITYSTUDY]

12

General technical report

1. GeneralConsiderations
Thebeneficiary,SCUlliROWINDSRL,togetherwiththegeneraldesignersetthelocationofa
totalof10windturbines,eachwithacapacityof3MW,inthelocalitiesLiteniandDolhesti.
FollowingwindmeasurementsmadetodeterminetheoptimallocationthehillsRotundaand
Plesuluiwerechosen.
Afterstudyingwaysofaccess,ownershippapersidentifiedinthefieldaconclusionhasbeen
reachedtoestablishtwowindfarmmodulesthatwillformLiteniDolhestiinvestment,asfollows:
Module1Liteni,willcontainatotalof6windturbineswithaninstalledcapacityof
3MW/turbine(PUZstudiedarea65ha);
Module2Dolhesti,willcontainatotalof4windturbineswithacapacityof3MW/turbine
(PUZstudiedarea45ha);
Corroboratingwiththesituationinthefieldwiththeoneinthesolutionstudy,thedataprovided
bythemanufacturerofturbineshasledtothefollowingschemeselectionarea:
Module1peripheryLitenicity
ThelandstudiedisinthepublicdomainoftheLitenicitybutalsosomeemplacementsbelongto
privateowners:
4ofthewindturbineswillbelocatedonlandownedbytheLitenicity(4X500m
permanentlyoccupied,4X2500moccupiedduringconstructionphase);
2ofwindturbineswillbelocatedonprivatelandowners(2X500mpermanentlyoccupied,
2X2500moccupiedduringconstructionphase);
TechnicalspacewillbelocatedonlandownedbythecityofLiteni(1x3000m);
Thewindfarmaccessroad(tobeachievedbyupgradingandrehabilitationofcommunal
roadDC6overalengthof1180.87mandawidthof5mcarriagewayandshouldersof2X
0.75m);
InternalroadsofthewindfarmwillbemadeonlandbelongingtothecityofLitenionan
areaof16,589squaremeters.
Module2peripheryDolhesticommune
ThestudiedlandispublicdomainoftheDolhesticommune:
4ofthewindturbineswillbelocatedonlandownedbytheDolhesticommune(4X500m
permanentlyoccupied,4X2500moccupiedduringconstructionphase);
TechnicalspacewillbelocatedonlandownedbythecommuneofDolhesti(2x5000m);
Thewindfarmaccessroad(tobeachievedbyupgradingandrehabilitationofcommunal
roadDC6overalengthof2801.87meters,witharoadwaywidthof5mandshouldersof2x
September20,2012 [FEASABILITYSTUDY]

13

0.75m,andtherehabilitation6Aserviceroadoveralengthof2231.64meters,witha
roadwaywidthof5mandshouldersof2X0.75m);
InternalroadsofthewindfarmwillbemadeonlandbelongingtothecommuneofDolhesti
onanareaof7414squaremeters.

2. TechnicalConsiderations
GiventhefactthattheinvestmentBuildingwindfarmsinLiteniDolhestiregiontakes
placewithintheterritoryoftwoadministrativeunits,technicaldocumentationwilltreateach
UATseparately,namelyModule1toUATLItenicityandModule2onUATDolhesticommune.
Toensureinvestmentintheareawillbemadethefallowingmandatorycadastralworks:
Verificationofthetabulation/Propertiespapersavailable;
Itwillbringuptodatealllanddocumentsinaccordancewiththelawsinforce;
Itwillgetexcerptslandforeachparcelwillbesubjecttoinvestment;
Itwillperfecttheactsofsaleorlease,consideringallrelevantlegalprovisions(privateor
publicprocurement);
Alsocheckdocumentscertifyingtherightofaccesstothesiteswhichformthewindfarm;
Itwillobtain,whereappropriate,writtenagreementoftheownersforaccessroadstothe
area,ortolaydownpowercables;
Itwillfollowtheissuanceofcertificatesofplanningfortheproposedinvestment;
Itwillpreparezoningplansfordefininglocalurbanmarker;
Itwillpreparetechnicaldocumentationneededtoobtainthebuildingpermit,aswellas
technicalandprojectexecutiondetailsrequiredintheconstructionphase.
CoordinatesofsitesinSTEREO1970forthewindturbinesexpectedtobeinstalledcanbefound
inthetablebelow:
Module1Liteni
Nr.Crt X Y Z
1. 665116,988 615105,574 392,81
2. 665399,724 615511,446 420,42
3. 664997,732 615497,941 419,01
4. 664725,226 615790,089 423,36
5. 664510,188 616156,066 429,22
6. 664097,092 616339,479 416,24

September20,2012 [FEASABILITYSTUDY]

14

Module2Dolhesti
Nr.Crt X Y Z
1. 665562,024 611567,758 462,63
2. 665501,155 611960,160 488,57
3. 665248,035 612290,535 490,95
4. 665000,431 612595,413 471,23

Windturbineswillbeplacedobservingpositiontoeachotheranddistancesofprotection
fromtheelementsconstructedorprotectedbylawinthearea,publicroads,electricitytransmission
networks,irrigationchannelsandantennas(asdefinedinRegulationTechniqueconcerningthe
delimitationofprotectionandsafetyforenergycapacitiespublishedintheOfficialGazette,partI,
no.865/18.12.2007).
Title objective neighboring wind plant Protection Area
-m-
Safety Area
-m-
How the safe distance is
measured
Public roads of national interest or
communal interest county public roads,
public roads pavements, roads private utility
1) 1) H2) + 3m3) 5) 6) 4) 4)
Railways, LEA, wind plants 8) Tc Airlines 1) 1) 1) 1) H2) + 3m7) H2) + 3m
9) H2 + 3m
4) 4) 4) 4)
Aboveground piping for flammable fluids
historical sites and buildings
1) 1) H10) + 3m 11) 1) 4) 4)
Installations of oil and gas extraction, oil
pumping stations, control, gas measurement
1) H10) + 3m 11) 4)
Bridges 1) H3) + 3m 12) 4)
Dams, dikes buildings inhabited buildings
with flammable, potentially explosive or fire
Airports Air emission Tc reception areas
protected flora or fauna Sports grounds
approved
1) 1) 1) 1) 1) 1) 1) H2) + 3m H13) H2) +
3m 14) 14) 14) H2) +
3m
4) 4) 4) 4) 4) 4) 4)
Car parking outdoor platforms 1) H2) + 3m 4)

NOTES:
1)2)3)4) ContourfoundationpillarsPillarheightplus0.2mroundplusbladelengthDistance
toroadaxisshallnotbelessthan50mmeasuredfromtheedgeofthebuildingaboveground:fora
facilitywithmoreaggregate(firm)isconsideredremotetheaggregatenearestneighboringtarget
5)Equaltothelengthoftheblade,turbinelessthan30m
6)Distancefromthewindfarm'sownprivateutilitypathisnotstandardized
7)Distancetorailwayaxisshallnotbelessthan100m
8)Winddesigncomprisingoneormoreunits(farm)belongingtoanothereconomicoperator
September20,2012 [FEASABILITYSTUDY]

15

9)Thedistancebetweentheunitwhosesafetyzoneandaggregatestabilitynearestotherwindfarms
willbeownedequallyby7xrotordiameterofthelargestaggregatewhentheyareplacedonwind
directionpredominantlyturbinerotor4xdiameterofthelargestaggregatewhentheyarearranged
perpendiculartotheprevailingwinddirection
10)Pillarheightx1.5plusbladelength
11)iftheobjectiveisfenced,safedistanceismeasuredtothefencing
12)Whereappropriate,establishdistanceH+3m,ifthebridgegoesanationalroad,acountyroad
orarailway,takingintoaccountthenotes3)and7),turbineadistanceequaltolengthofablade,
darnulessthan30m,ifthebridgeoverlookingaroad,aroadoraroadvicinalpublicutility
13)pillarheightx3,thisdistancemaybereducedtotheresidentialarea,withthelocalcommunity,
toaminimumvalueequaltotheheightofthetowerplusthebladelength+3m,remotewind
turbinestomeettheownuseofanareashallbeatleastequaltotheheightofthetowerplusthe
bladelength+3m,remoteownahomewindturbineisnotstandardized
14)Bedeterminedbythecompetentauthoritytowhichthecertificateofurbanism.
OnthestudiedsitewerenotidentifiedurbantextureelementsfallingunderOrder49/2007ofANRE.
Havestudiedthesiteidentifiedthefollowingareasforprotectionrestriction:
1)Workingareaoftherotoracirclewitharadiusofturbinebladelength+3mlaccordingtoANRE
representinglandareaaffectedbytherotationofthepropellerturbinehorizontally.
Turbineplacementismadeinaccordancewithtownplanningcertificatesothatitislocatedon
privatepropertyorlandactsthatlandownersbeaffectedbythisareatoagreethattheturbineblade
affecttheirland.
Thisareahasthecharacterof"protectionzone"inthisareaispermittedexceptagriculturalactivities.
2)Constructionexclusionzoneacirclewitharadiusof3turbineheightsandisdetermined
accordingtoANREordertoprovideminimumsafetydistancesfrombuildings.
Thisallowedtheconstructionandinstallationlocation,underthelaw,unlesstheydonotrequire
humanpresenceanddoesnotaffectinanywaytheoperationoftheturbine.
Also,thisareamaybereducedtoaradiusof3turbineheightsuptoaradiusof1H+1P3ml(1tall
turbinebladeheight+1+3metri)isminimalandisrestrictedareaAreecanbeaffectedbythe
collapseofthesystem.
3)WindprotectionareaTheentireperimeterledthestudyareacandevelopmode"wind
protectionarea",implyingweturbinelocationotherthanfollowingastudytorevealnotaffectedin
anyexistingproductionunits.
ThusaccordingtoANREOrderfutureinstallationswillcomplywithminimumsafetydistancesand
protectionofexistingunitsdeterminedasfollows:
7rotordiametersofthedominantwinddirection
September20,2012 [FEASABILITYSTUDY]

16

4rotordiametersinotherdirectionsandrefersonlytonewwindturbinestobelocatedinthis
area.
Alsotheseforestedareaswillnotandwillnotestablishgrovesoftreeswithheightgreaterthan8ml.
4)InternalnetworkprotectionareaoftheparkEachwindturbineisconnectedtoacablecentral
park1.5mlburieddeep.Inthisareaestablishestheregimeoftheelectricalnetworkprotection
consistingof:
ensureaccesstoappropriateintervention
affectinginanyundergroundelectricalsystem
Areaofinterventionincaseofdamagetoburiedcableis1.5mlleftrightfromitsaxisandisthe
requiredminimumthatcouldbeeffectedwithouttheinterventionofdemandcompensationifthe
cable
Futurebuildingsorfacilitiesshallcomplywiththeminimumdistancesprotectionandsafety
accordingtoANREiftheirlocationintheimmediatevicinity.

3. Drawings
FramingplanModule1Litenisc.1/25000............................................................................................A1
FramingplanModule2Dolhestisc.1/25000.......................................................................................A2
FramingplanModule1Litenisc.1/5000..............................................................................................A3
FramingplanModule2Dolhestisc.1/5000.........................................................................................A4
SituationcadastralplanModule1Litenisc.1/5000.............................................................................A5
SituationcadastralplanModule2Dolhestisc.1/5000........................................................................A6

S.C. VECTOR CONSULT A.S.D.


S.R.L SUCEAVA
elaboratori
sef proiect
proiectat
REFERAT/EXPERTIZA NR./DATA
Data
10/2012
semnatura
cerinta semnatura

Plansa
A.1
nume si prenume
ing. Petrareanu C.
ing. Ursachi I.
nume si prenume
verificator/
expert
ing. arh. Adomnitei B.
desenat
S.C. VECTOR CONSULT A.S.D.
S.R.L SUCEAVA
elaboratori
sef proiect
proiectat
REFERAT/EXPERTIZA NR./DATA
Data
10/2012
semnatura
cerinta semnatura

Plansa
A.2
nume si prenume
ing. Petrareanu C.
ing. Ursachi I.
nume si prenume
verificator/
expert
ing. arh. Adomnitei B.
desenat
LEGENDA:
Zone functionale:
- Zona aferenta turbinelor eoliene si a instalatiilor
conexe, propusa pentru introducerea in
intravilanul com. Dolhesti
- Zona destinata fazei de constructie a turbinelor
eoliene, ce va fi ocupata provizoriu doar in faza de
constructie
Zone de siguranta - protectie:
- Zona de lucru a rotorului
- Zona de interdictie de construire
- Zona de protectie eoliana
- Zona de protectie a retelei interioare a parcului
Retele / Cai de comunicatie
- Drumintern de serviciu al parcului eolian ( l=5m)
- Retea electrica interna a parcului eolian
Limite
- Limita intravilan existent al orasului Liteni
- Limita UAT com. Liteni
- Limita Parc eolian Liteni
S.C. VECTOR CONSULT A.S.D.
S.R.L SUCEAVA
elaboratori
sef proiect
proiectat
REFERAT/EXPERTIZA NR./DATA
Data
10/2012
semnatura
cerinta semnatura

Plansa
A.3
nume si prenume
ing. Petrareanu C.
ing. Petrareanu C.
nume si prenume
verificator/
expert
ing. arh. Adomnitei B.
desenat
S.C. VECTOR CONSULT A.S.D.
S.R.L SUCEAVA
elaboratori
sef proiect
proiectat
REFERAT/EXPERTIZA NR./DATA
Data
10/2012
semnatura
cerinta semnatura

Plansa
A.4
nume si prenume
ing. Petrareanu C.
ing. Petrareanu C.
nume si prenume
verificator/
expert
ing.arh. Adomnitei B.
desenat
LEGENDA:
Zone functionale:
- Zona aferenta turbinelor eoliene si a instalatiilor
conexe, propusa pentru introducerea in
intravilanul com. Dolhesti
- Zona destinata fazei de constructie a turbinelor
eoliene, ce va fi ocupata provizoriu doar in faza de
constructie
- Pasune
Zone de siguranta - protectie:
- Zona de lucru a rotorului
- Zona de interdictie de construire
- Zona de protectie eoliana
- Zona de protectie a retelei interioare a parcului
Retele / Cai de comunicatie
- Drumintern de serviciu al parcului eolian ( l=5m)
- Retea electrica interna a parcului eolian
Limite
- Limita intravilan existent al com. Dolhesti
- Limita UAT com. Dolhesti
S.C. VECTOR CONSULT A.S.D.
S.R.L SUCEAVA
elaboratori
sef proiect
proiectat
REFERAT/EXPERTIZA NR./DATA
Data
10/2012
semnatura
cerinta semnatura

Plansa
A.5
nume si prenume
ing. Petrareanu C.
ing. Petrareanu C.
nume si prenume
verificator/
expert
ing.arh. Adomnitei B.
desenat
S.C. VECTOR CONSULT A.S.D.
S.R.L SUCEAVA
elaboratori
sef proiect
proiectat
REFERAT/EXPERTIZA NR./DATA
Data
10/2012
semnatura
cerinta semnatura

Plansa
A.6
nume si prenume
ing. Petrareanu C.
ing. Petrareanu C.
nume si prenume
verificator/
expert
ing.arh. Adomnitei B.
desenat
September20,2012 [FEASABILITYSTUDY]

17

Access road report



1. GeneralConsiderations
Aswithallthepartsfromthecurrentinvestment,namelyConstructionofawindfarminthe
DolhestiLiteniregion,alsotheaccessroadhastobedividedupandtreatedinto2separates
documentations,basedonthefactthatthetwomodulesofthewindfarmarelocatedontwo
separateadministrativeentities:LitenicityandDolhesticommune.
2. Descriptionoftheinvestment
ThemainaccessroadtothewindfarmwillbeconstitutedbythecommunalroadDC6.Thisroad
itconnectstothecountyroadDJ208,thatwillserveasmainroadforaccessingtheregionLiteni
Dolhesti.
Inordertoaccommodatetheoverloadtransportcapacity(causedbythesupplytransportwith
turbineequipment),theintersectionbetweenDC6andDJ208needstoberedone,bywideningthe
intersectioninordertomeettheminimumcurverequirementfortheoversizedtransport.
Module1Liteni:
TheaccessroadtotheLitenimoduleismadeupbythecommunalroadDC6.
Module2Dolhesti:
TheaccessroadtotheDolhestimoduleitscomprisedfromtworoads:
CommunalroadDC6;
ServiceroadDE6A;

3. TechnicalData
Module1Liteni
ToachieveaccesstothewindfarmmoduleintheLitenicity,SuceavaCounty,thefollowing
interventionsarerequired:
Reshaping,widening,ballasting,pavingthewaywithasphaltofthecommunalroadDC6overa
lengthof1180.87m;
ThelandonwhichtheproposedworkissituatedisownedbyLitenicity.
Existingsituation:
Intermsoftechnicalcondition,communalroadunderstudyisasfollows:
Doesnothaveadequatebearingcapacityfortakingatrafficneededconstructionandoperationof
windfarms;
September20,2012 [FEASABILITYSTUDY]

18

Theroadisnotpavedandspecificroadshowsandstrainsdegradationofland,weakgraveland
unmaintained;
Ontheroadplatformexistenceofsettlementswasshowed,formingpotholesandruts;
Noroadsystemclearlyrevealed,previouslyperformedballastingworksbeingmadeespeciallyin
criticalplacesrouteswithplasticroadbedduetowaterstagnation,butnotsolvedtheproblemof
waterleakagefromtheroadcontinuesPlatformdegradation;
Existingditchesforstormwaterdischargesaredownandnolongitudinalslopeandstagnantwater
inclosedbasins,wheretheslopeisgreaterlaterallongitudinalgrooves,afterrainfallsfallen,
accumulatewaterflowathighspeedproducesdegradationoftheroadplatform,thesesectionsmust
beperformedpearsconcreteditches;
Existingculvertsaredamaged(brokenorcompletelytubesareclogged);
Existingculvertsareappropriatesectiontubetodrainexistinggulliesorwaterflowinditches;
Nodifferentfromthecarriagewayverges,nocrossslopetodrains,stagnantwaterinponds
platformacceleratesthedegradationprocess;
Theroadisnotstabilized;thelandonwhichislaidouthasaseriouslandslideproblem,becauseof
thisasupportingwallisneeded;
Geometryofthecrossandlongitudinalslopescannotensurecorrectoperationofculverts;
Missingworkfortrafficsafety;
Indicatorsforkilometersandindicatorsforhectometeraremissing;notrafficindicatorsthathave
fluencytrafficontheseroads,connectingthecountyroadDJ208andthecommunalroadDC6are
notarrangedthere.Dangerofaccidentsintheseintersectionsareabeingmade.
Keyfeaturesoftheproposedconstructions
Totallengthofroads:1180.87mofwhich:
Communalroads:1180.87m;
Carriagewayarea:5904.35sqmofwhich:
Communalroads:5904.35sqm
Vergesarea:1771.31sqm
Culverts:
6002pcs;
Pearstrenches:1181m;
Wallsupport:1151m;
September20,2012 [FEASABILITYSTUDY]

19

Typeoftraffic:low,oversized;
Occupationofland:100%;
Objectivecharacteristicshavebeendeterminedinaccordancewiththetechnicalno.45/1998onthe
design,constructionandupgradingofroadsandTechnicalNormsno.46/1998ontheestablishment
oftechnicalgradepublicroads.
Designspeed:25km/h,accordingtotheTechnicalRegulations46/1998layingdowntechnicalclass
roadsTable2.
Categoryofroad:technicalclassV.
Besidesallthis,thedesignandplanningofroadswereconsideredandminimumrequirementsfor
suchequipmentgaugecarrierexceeded(equipmentthatwillservethewindfarm).
PlatformasTechnicalStandardsno.45ofdesigning,buildingandupgradingroads:
Nr. Crt Road Length ( m) Proposed cross section
1 DC 6 1180,87 Km 2+801-3+982: Pc=5m +Ac=2*0,75

Theconstructionoftheaccessroadwillbemadeinordertohavethefallowingroadstructure:
Profile1:DC6Km2+8012+831
- Baselayerofcrushedstoneof30cmthickness;
- Alayerofmixedballastof25cmthickness;
- Carriagewaysurfaceof5m;
- Shouldersof2X0,75m;
- Pearstrenches1X0,5m;
Profile2:DC6Km2+8313+982
- Baselayerofcrushedstoneof30cmthickness;
- Alayerofmixedballastof25cmthickness;
- Carriagewaysurfaceof5m;
- Shouldersof2X0,75m;
- Pearstrenches2X0,5m;
- Wallsupport1X2m;
- LayerofAsphaltconcrete(rough)BAR16of5cmthickness(intheplaceswherethe
technicalsolutionimposesit);
InternalroadsfortheLitenimodulewillbemadeonatotalsurfaceof16589sqm(madeonthe
currentlayoutofserviceroads).
Theconstructionoftheaccessroadwillbemadeinordertohavethefallowingroadstructure:
- Baselayerofcrushedstoneof30cmthickness;
- Alayerofmixedballastof25cmthickness;
September20,2012 [FEASABILITYSTUDY]

20

- Carriagewaysurfaceof5m;
- Shouldersof2X0,75m;
- Pearstrenches2X0,5m;
Module2Dolhesti
ToachieveaccesstothewindfarmmoduleintheDolhesticommune,SuceavaCounty,thefollowing
interventionsarerequired:
wideningoftheintersectionbetweenthecommunalroadDc6andthecountyroadDJ208;
wideningofthecommunalroadDC6fromtheintersectionwithDJ208foralengthof134m;
Reshaping,widening,ballasting,pavingthewaywithasphaltofthecommunalroadDC6overa
lengthof2533.15m;
Reshaping,widening,ballastingofthecommunalroadDC6overalengthof134,72m;
Reshaping,widening,ballastingoftheserviceroadDE6Aoveralengthof2231.64m;
ThelandonwhichtheproposedworkissituatedisownedbyDolhesticommune.
Existingsituation:
Intermsoftechnicalcondition,communalroadunderstudyisasfollows:
Doesnothaveadequatebearingcapacityfortakingatrafficneededconstructionandoperationof
windfarms;
Theroadisnotpavedandspecificroadshowsandstrainsdegradationofland,weakgraveland
unmaintained;
Ontheroadplatformexistenceofsettlementswasshowed,formingpotholesandruts;
Noroadsystemclearlyrevealed,previouslyperformedballastingworksbeingmadeespeciallyin
criticalplacesrouteswithplasticroadbedduetowaterstagnation,butnotsolvedtheproblemof
waterleakagefromtheroadcontinuesPlatformdegradation;
Existingditchesforstormwaterdischargesaredownandnolongitudinalslopeandstagnantwater
inclosedbasins,wheretheslopeisgreaterlaterallongitudinalgrooves,afterrainfallsfallen,
accumulatewaterflowathighspeedproducesdegradationoftheroadplatform,thesesectionsmust
beperformedpearsconcreteditches;
Existingculvertsaredamaged(brokenorcompletelytubesareclogged);
Existingculvertsareappropriatesectiontubetodrainexistinggulliesorwaterflowinditches;
Nodifferentfromthecarriagewayverges,nocrossslopetodrains,stagnantwaterinponds
platformacceleratesthedegradationprocess;
Geometryofthecrossandlongitudinalslopescannotensurecorrectoperationofculverts;
September20,2012 [FEASABILITYSTUDY]

21

Missingworkfortrafficsafety;
Indicatorsforkilometersandindicatorsforhectometeraremissing;notrafficindicatorsthathave
fluencytrafficontheseroads,connectingthecountyroadDJ208andthecommunalroadDC6are
notarrangedthere.Dangerofaccidentsintheseintersectionsareabeingmade.
Keyfeaturesoftheproposedconstructions
Totallengthofaccessroads:5033.51mofwhich:
Communalroads:2801.87m;
Serviceroads:2231.64m;
Carriagewayarea:25167.55sqmofwhich:
Communalroads:14009.35sqm;
Serviceroads:11158.2sqm
Vergesarea:9321.57sqm
Culverts:
8001pc;
6008pieces;
Pearstrenches:6500m;
Supportingwall:2X195m;
Typeoftraffic:low;
Occupationofland:100%;
Objectivecharacteristicshavebeendeterminedinaccordancewiththetechnicalno.45/1998onthe
design,constructionandupgradingofroadsandTechnicalNormsno.46/1998ontheestablishment
oftechnicalgradepublicroads.
Designspeed:25km/h,accordingtotheTechnicalRegulations46/1998layingdowntechnicalclass
roadsTable2.
Categoryofroad:technicalclassV.
Besidesallthis,thedesignandplanningofroadswereconsideredandminimumrequirementsfor
suchequipmentgaugecarrierexceeded(equipmentthatwillservethewindfarm).
PlatformasTechnicalStandardsno.45ofdesigning,buildingandupgradingroads:

September20,2012 [FEASABILITYSTUDY]

22

Nr. Crt Road Length ( m) Proposed cross section


1 DC 6 134 Km 0+000-0+134: Pc=6m +Ac=2*0,75
2 DC 6 2533,15 Km 0+134-2+533: Pc=5m +Ac=2*0,75
3 DE 6 A 2231,64 Km 0+000-2+231: Pc=5m +Ac=2*0,75
4 DC 6 134,72 Km 2+533-2+667: Pc=5m +Ac=2*0,75

Theconstructionoftheaccessroadwillbemadeinordertohavethefallowingroadstructure:
Profile1:DC6Km0+0000+134
- Baselayerofcrushedstoneof30cmthickness;
- Alayerofmixedballastof30cmthickness;
- Carriagewaysurfaceof5,5m;
- Shouldersof2X0,75m;
- Pearstrenches1X0,5m;
- LayerofAsphaltconcrete(rough)BAR16of5cmthickness(intheplaceswherethe
technicalsolutionimposesit);
Profile2:DC6Km0+1340+274;DC6Km0+4692+533;
- Baselayerofcrushedstoneof30cmthickness;
- Alayerofmixedballastof25cmthickness;
- Carriagewaysurfaceof5m;
- Shouldersof2X0,75m;
- Pearstrenches1X0,5m;
- LayerofAsphaltconcrete(rough)BAR16of5cmthickness(intheplaceswherethe
technicalsolutionimposesit);
Profile3:DC6Km2+5332+667;DE6Akm0+0002+231
- Baselayerofcrushedstoneof30cmthickness;
- Alayerofmixedballastof25cmthickness;
- Carriagewaysurfaceof5m;
- Shouldersof2X0,75m;
- Pearstrenches1X0,5m;
Profile4:DC6Km0+2740+469;
- Baselayerofcrushedstoneof30cmthickness;
- Alayerofmixedballastof25cmthickness;
- Carriagewaysurfaceof5m;
- Shouldersof2X0,75m;
- Pearstrenches2X0,5m;
- Supportwall2X195m;

September20,2012 [FEASABILITYSTUDY]

23

InternalroadsfortheDolhestimodulewillbemadeonatotalsurfaceof7414sqm(madeonthe
currentlayoutofserviceroads).
Theconstructionoftheaccessroadwillbemadeinordertohavethefallowingroadstructure:
- Baselayerofcrushedstoneof30cmthickness;
- Alayerofmixedballastof25cmthickness;
- Carriagewaysurfaceof5m;
- Shouldersof2X0,75m;
- Pearstrenches2X0,5m;

4. Drawings
LiteniModule
FramingplanModule1Litenisc.1/25000............................................................................................A1
SituationexistingplanModule1Litenisc.1/500...........................................................................A2A5
ProposedplanModule1Litenisc.1/500........................................................................................B1B4
CrosssectionprofileModule1Litenisc.1/50...................................................................................C1
Crosssectionprofile(internalroad)Module1Litenisc.1/50.........................................................C2
DolhestiModule
FramingplanModule2Dolhestisc.1/25000.......................................................................................A1
SituationexistingplanModule2Dolhestisc.1/500....................................................................A2A19
ProposedplanModule2Dolhestisc.1/500..................................................................................B1B18
CrosssectionprofileModule2Dolhestisc.1/50.........................................................................C1C3
Crosssectionprofile(internalroad)Module2Dolhestisc.1/50.....................................................C4

S.C. VECTOR CONSULT A.S.D.


S.R.L SUCEAVA
elaboratori
sef proiect
proiectat
REFERAT/EXPERTIZA NR./DATA
Data
02/2012
semnatura
cerinta semnatura

Plansa
A.1
nume si prenume
ing. Petrareanu C.
ing. Petrareanu C.
nume si prenume
verificator/
expert
ing. Ursachi I.
desenat
S.C. VECTOR CONSULT A.S.D.
S.R.L SUCEAVA
elaboratori
sef proiect
proiectat
REFERAT/EXPERTIZA NR./DATA
Data
02/2012
semnatura
cerinta semnatura

Plansa
A.2
nume si prenume
ing. Petrareanu C.
ing. Petrareanu C.
nume si prenume
verificator/
expert
ing. Adomnitei C.
desenat
GRAFIC DE RACORDARE A PLANSELOR
A2
A3
A4 A5
S.C. VECTOR CONSULT A.S.D.
S.R.L SUCEAVA
elaboratori
sef proiect
proiectat
REFERAT/EXPERTIZA NR./DATA
Data
02/2012
semnatura
cerinta semnatura

Plansa
A.3
nume si prenume
ing. Petrareanu C.
ing. Petrareanu C.
nume si prenume
verificator/
expert
ing. Adomnitei C.
desenat
GRAFIC DE RACORDARE A PLANSELOR
A2
A3
A4 A5
S.C. VECTOR CONSULT A.S.D.
S.R.L SUCEAVA
elaboratori
sef proiect
proiectat
REFERAT/EXPERTIZA NR./DATA
Data
02/2012
semnatura
cerinta semnatura

Plansa
A.4
nume si prenume
ing. Petrareanu C.
ing. Petrareanu C.
nume si prenume
verificator/
expert
ing. Adomnitei C.
desenat
GRAFIC DE RACORDARE A PLANSELOR
A2
A3
A4 A5
S.C. VECTOR CONSULT A.S.D.
S.R.L SUCEAVA
elaboratori
sef proiect
proiectat
REFERAT/EXPERTIZA NR./DATA
Data
02/2012
semnatura
cerinta semnatura

Plansa
A.5
nume si prenume
ing. Petrareanu C.
ing. Petrareanu C.
nume si prenume
verificator/
expert
ing. Adomnitei C.
desenat
GRAFIC DE RACORDARE A PLANSELOR
A2
A3
A4 A5
S.C. VECTOR CONSULT A.S.D.
S.R.L SUCEAVA
elaboratori
sef proiect
proiectat
REFERAT/EXPERTIZA NR./DATA
Data
02/2012
semnatura
cerinta semnatura

Plansa
B.1
nume si prenume
ing. Petrareanu C.
ing. Petrareanu C.
nume si prenume
verificator/
expert
ing. Ursachi I.
desenat
GRAFIC DE RACORDARE A PLANSELOR
B1
B2
B3 B4
GRAFIC DE RACORDARE A PLANSELOR
B1
B2
B3 B4
S.C. VECTOR CONSULT A.S.D.
S.R.L SUCEAVA
elaboratori
sef proiect
proiectat
REFERAT/EXPERTIZA NR./DATA
Data
02/2012
semnatura
cerinta semnatura

Plansa
B.2
nume si prenume
ing. Petrareanu C.
ing. Petrareanu C.
nume si prenume
verificator/
expert
ing. Ursachi I.
desenat
GRAFIC DE RACORDARE A PLANSELOR
B1
B2
B3 B4
S.C. VECTOR CONSULT A.S.D.
S.R.L SUCEAVA
elaboratori
sef proiect
proiectat
REFERAT/EXPERTIZA NR./DATA
Data
02/2012
semnatura
cerinta semnatura

Plansa
B.3
nume si prenume
ing. Petrareanu C.
ing. Petrareanu C.
nume si prenume
verificator/
expert
ing. Ursachi I.
desenat
GRAFIC DE RACORDARE A PLANSELOR
B1
B2
B3 B4
S.C. VECTOR CONSULT A.S.D.
S.R.L SUCEAVA
elaboratori
sef proiect
proiectat
REFERAT/EXPERTIZA NR./DATA
Data
02/2012
semnatura
cerinta semnatura

Plansa
B.4
nume si prenume
ing. Petrareanu C.
ing. Petrareanu C.
nume si prenume
verificator/
expert
ing. Ursachi I.
desenat
S.C. VECTOR CONSULT A.S.D.
S.R.L SUCEAVA
elaboratori
sef proiect
proiectat
REFERAT/EXPERTIZA NR./DATA
Data
02/2012
semnatura
cerinta semnatura

Plansa
C.1
nume si prenume
ing. Petrareanu C.
ing. Petrareanu C.
nume si prenume
verificator/
expert
ing. Adomnitei C.
desenat
- piatra sparta 30cm
- balast de 25 cm grosime ;
PROFIL TRANSVERSAL TIP
DC 6 intre Km 2+801 - 2+831
C1215 (Bc15)
C810(Bc10)
Armatura rost elevatie fundatie
OB 37, L =1.20m
Cap dren - argila
Geotextil cu rol de filtru invers
Dren din bolovani
Hidroizolatie - piatra sparta 30cm grosime;
- balast de 25cm grosime ;
- B.A.R 16 5cm grosime;
PROFIL TRANSVERSAL TIP
DC 6 intre Km 2+831 - 3+982
Pereu din bolovani de riu 15 cm
Pat beton C8/10 de 10 cm
25
1.50
25
2-4 % 2 -4%
25
C8/10
25
D
D
C=7.50
VEDERE IN PLAN
B-B
L
C8/10 C8/10
C=7.50
SECTIUNE LONGITUDINALA A-A
C
C8/10
50
F
F
35
50
50
15
50
1.05
2.70
60 1.05
10
25

SECTIUNE TRANSVERSALA F -F
2530 3025
50
SECTIUNE D - D
C8/10
SECTIUNE C - C
PROFIL TRANSVERSAL TIP
PODET TIP PREMO 600
- piatra sparta 30cm
- balast de 25 cm grosime ;
PROFIL TRANSVERSAL TIP
Drum de exploatare in interiorul
parcului Eolian Liteni
tubulatura cabluri electrice
S.C. VECTOR CONSULT A.S.D.
S.R.L SUCEAVA
elaboratori
sef proiect
proiectat
REFERAT/EXPERTIZA NR./DATA
Data
03/2012
semnatura
cerinta semnatura

Plansa
C.4
nume si prenume
ing. Petrareanu C.
ing. Petrareanu C.
nume si prenume
verificator/
expert
ing. arh. Adomnitei B.
desenat
S.C. VECTOR CONSULT A.S.D.
S.R.L SUCEAVA
elaboratori
sef proiect
proiectat
REFERAT/EXPERTIZA NR./DATA
Data
02/2012
semnatura
cerinta semnatura

Plansa
A.1
nume si prenume
ing. Petrareanu C.
ing. Petrareanu C.
nume si prenume
verificator/
expert
ing. Ursachi I.
desenat
S.C. VECTOR CONSULT A.S.D.
S.R.L SUCEAVA
elaboratori
sef proiect
proiectat
REFERAT/EXPERTIZA NR./DATA
Data
02/2012
semnatura
cerinta semnatura

Plansa
A.2
nume si prenume
ing. Petrareanu C.
ing. Petrareanu C.
nume si prenume
verificator/
expert
ing. Adomnitei C.
desenat
A2
A3
A4
A5
A6
A7
A8
A9
A10
A11
A12
A13 A14
A15
A16
A17
A18
A19
GRAFIC DE RACORDARE A PLANSELOR
S.C. VECTOR CONSULT A.S.D.
S.R.L SUCEAVA
elaboratori
sef proiect
proiectat
REFERAT/EXPERTIZA NR./DATA
Data
02/2012
semnatura
cerinta semnatura

Plansa
A.3
nume si prenume
ing. Petrareanu C.
ing. Petrareanu C.
nume si prenume
verificator/
expert
ing. Adomnitei C.
desenat
A2
A3
A4
A5
A6
A7
A8
A9
A10
A11
A12
A13 A14
A15
A16
A17
A18
A19
GRAFIC DE RACORDARE A PLANSELOR
S.C. VECTOR CONSULT A.S.D.
S.R.L SUCEAVA
elaboratori
sef proiect
proiectat
REFERAT/EXPERTIZA NR./DATA
Data
02/2012
semnatura
cerinta semnatura

Plansa
A.4
nume si prenume
ing. Petrareanu C.
ing. Petrareanu C.
nume si prenume
verificator/
expert
ing. Adomnitei C.
desenat
A2
A3
A4
A5
A6
A7
A8
A9
A10
A11
A12
A13 A14
A15
A16
A17
A18
A19
GRAFIC DE RACORDARE A PLANSELOR
S.C. VECTOR CONSULT A.S.D.
S.R.L SUCEAVA
elaboratori
sef proiect
proiectat
REFERAT/EXPERTIZA NR./DATA
Data
02/2012
semnatura
cerinta semnatura

Plansa
A.5
nume si prenume
ing. Petrareanu C.
ing. Petrareanu C.
nume si prenume
verificator/
expert
ing. Adomnitei C.
desenat
A2
A3
A4
A5
A6
A7
A8
A9
A10
A11
A12
A13 A14
A15
A16
A17
A18
A19
GRAFIC DE RACORDARE A PLANSELOR
S.C. VECTOR CONSULT A.S.D.
S.R.L SUCEAVA
elaboratori
sef proiect
proiectat
REFERAT/EXPERTIZA NR./DATA
Data
02/2012
semnatura
cerinta semnatura

Plansa
A.6
nume si prenume
ing. Petrareanu C.
ing. Petrareanu C.
nume si prenume
verificator/
expert
ing. Adomnitei C.
desenat
A2
A3
A4
A5
A6
A7
A8
A9
A10
A11
A12
A13 A14
A15
A16
A17
A18
A19
GRAFIC DE RACORDARE A PLANSELOR
S.C. VECTOR CONSULT A.S.D.
S.R.L SUCEAVA
elaboratori
sef proiect
proiectat
REFERAT/EXPERTIZA NR./DATA
Data
02/2012
semnatura
cerinta semnatura

Plansa
A.7
nume si prenume
ing. Petrareanu C.
ing. Petrareanu C.
nume si prenume
verificator/
expert
ing. Adomnitei C.
desenat
A2
A3
A4
A5
A6
A7
A8
A9
A10
A11
A12
A13 A14
A15
A16
A17
A18
A19
GRAFIC DE RACORDARE A PLANSELOR
S.C. VECTOR CONSULT A.S.D.
S.R.L SUCEAVA
elaboratori
sef proiect
proiectat
REFERAT/EXPERTIZA NR./DATA
Data
02/2012
semnatura
cerinta semnatura

Plansa
A.8
nume si prenume
ing. Petrareanu C.
ing. Petrareanu C.
nume si prenume
verificator/
expert
ing. Adomnitei C.
desenat
A2
A3
A4
A5
A6
A7
A8
A9
A10
A11
A12
A13 A14
A15
A16
A17
A18
A19
GRAFIC DE RACORDARE A PLANSELOR
S.C. VECTOR CONSULT A.S.D.
S.R.L SUCEAVA
elaboratori
sef proiect
proiectat
REFERAT/EXPERTIZA NR./DATA
Data
02/2012
semnatura
cerinta semnatura

Plansa
A.9
nume si prenume
ing. Petrareanu C.
ing. Petrareanu C.
nume si prenume
verificator/
expert
ing. Adomnitei C.
desenat
A2
A3
A4
A5
A6
A7
A8
A9
A10
A11
A12
A13 A14
A15
A16
A17
A18
A19
GRAFIC DE RACORDARE A PLANSELOR
S.C. VECTOR CONSULT A.S.D.
S.R.L SUCEAVA
elaboratori
sef proiect
proiectat
REFERAT/EXPERTIZA NR./DATA
Data
02/2012
semnatura
cerinta semnatura

Plansa
A.10
nume si prenume
ing. Petrareanu C.
ing. Petrareanu C.
nume si prenume
verificator/
expert
ing. Adomnitei C.
desenat
A2
A3
A4
A5
A6
A7
A8
A9
A10
A11
A12
A13 A14
A15
A16
A17
A18
A19
GRAFIC DE RACORDARE A PLANSELOR
S.C. VECTOR CONSULT A.S.D.
S.R.L SUCEAVA
elaboratori
sef proiect
proiectat
REFERAT/EXPERTIZA NR./DATA
Data
02/2012
semnatura
cerinta semnatura

Plansa
A.11
nume si prenume
ing. Petrareanu C.
ing. Petrareanu C.
nume si prenume
verificator/
expert
ing. Adomnitei C.
desenat
A2
A3
A4
A5
A6
A7
A8
A9
A10
A11
A12
A13 A14
A15
A16
A17
A18
A19
GRAFIC DE RACORDARE A PLANSELOR
S.C. VECTOR CONSULT A.S.D.
S.R.L SUCEAVA
elaboratori
sef proiect
proiectat
REFERAT/EXPERTIZA NR./DATA
Data
02/2012
semnatura
cerinta semnatura

Plansa
A.12
nume si prenume
ing. Petrareanu C.
ing. Petrareanu C.
nume si prenume
verificator/
expert
ing. Adomnitei C.
desenat
A2
A3
A4
A5
A6
A7
A8
A9
A10
A11
A12
A13 A14
A15
A16
A17
A18
A19
GRAFIC DE RACORDARE A PLANSELOR
S.C. VECTOR CONSULT A.S.D.
S.R.L SUCEAVA
elaboratori
sef proiect
proiectat
REFERAT/EXPERTIZA NR./DATA
Data
02/2012
semnatura
cerinta semnatura

Plansa
A.13
nume si prenume
ing. Petrareanu C.
ing. Petrareanu C.
nume si prenume
verificator/
expert
ing. Adomnitei C.
desenat
A2
A3
A4
A5
A6
A7
A8
A9
A10
A11
A12
A13 A14
A15
A16
A17
A18
A19
GRAFIC DE RACORDARE A PLANSELOR
S.C. VECTOR CONSULT A.S.D.
S.R.L SUCEAVA
elaboratori
sef proiect
proiectat
REFERAT/EXPERTIZA NR./DATA
Data
02/2012
semnatura
cerinta semnatura

Plansa
A.14
nume si prenume
ing. Petrareanu C.
ing. Petrareanu C.
nume si prenume
verificator/
expert
ing. Adomnitei C.
desenat
A2
A3
A4
A5
A6
A7
A8
A9
A10
A11
A12
A13 A14
A15
A16
A17
A18
A19
GRAFIC DE RACORDARE A PLANSELOR
S.C. VECTOR CONSULT A.S.D.
S.R.L SUCEAVA
elaboratori
sef proiect
proiectat
REFERAT/EXPERTIZA NR./DATA
Data
02/2012
semnatura
cerinta semnatura

Plansa
A.15
nume si prenume
ing. Petrareanu C.
ing. Petrareanu C.
nume si prenume
verificator/
expert
ing. Adomnitei C.
desenat
A2
A3
A4
A5
A6
A7
A8
A9
A10
A11
A12
A13 A14
A15
A16
A17
A18
A19
GRAFIC DE RACORDARE A PLANSELOR
S.C. VECTOR CONSULT A.S.D.
S.R.L SUCEAVA
elaboratori
sef proiect
proiectat
REFERAT/EXPERTIZA NR./DATA
Data
02/2012
semnatura
cerinta semnatura

Plansa
A.16
nume si prenume
ing. Petrareanu C.
ing. Petrareanu C.
nume si prenume
verificator/
expert
ing. Adomnitei C.
desenat
A2
A3
A4
A5
A6
A7
A8
A9
A10
A11
A12
A13 A14
A15
A16
A17
A18
A19
GRAFIC DE RACORDARE A PLANSELOR
S.C. VECTOR CONSULT A.S.D.
S.R.L SUCEAVA
elaboratori
sef proiect
proiectat
REFERAT/EXPERTIZA NR./DATA
Data
02/2012
semnatura
cerinta semnatura

Plansa
A.17
nume si prenume
ing. Petrareanu C.
ing. Petrareanu C.
nume si prenume
verificator/
expert
ing. Adomnitei C.
desenat
A2
A3
A4
A5
A6
A7
A8
A9
A10
A11
A12
A13 A14
A15
A16
A17
A18
A19
GRAFIC DE RACORDARE A PLANSELOR
S.C. VECTOR CONSULT A.S.D.
S.R.L SUCEAVA
elaboratori
sef proiect
proiectat
REFERAT/EXPERTIZA NR./DATA
Data
02/2012
semnatura
cerinta semnatura

Plansa
A.18
nume si prenume
ing. Petrareanu C.
ing. Petrareanu C.
nume si prenume
verificator/
expert
ing. Adomnitei C.
desenat
A2
A3
A4
A5
A6
A7
A8
A9
A10
A11
A12
A13 A14
A15
A16
A17
A18
A19
GRAFIC DE RACORDARE A PLANSELOR
S.C. VECTOR CONSULT A.S.D.
S.R.L SUCEAVA
elaboratori
sef proiect
proiectat
REFERAT/EXPERTIZA NR./DATA
Data
02/2012
semnatura
cerinta semnatura

Plansa
A.19
nume si prenume
ing. Petrareanu C.
ing. Petrareanu C.
nume si prenume
verificator/
expert
ing. Adomnitei C.
desenat
A2
A3
A4
A5
A6
A7
A8
A9
A10
A11
A12
A13 A14
A15
A16
A17
A18
A19
GRAFIC DE RACORDARE A PLANSELOR
S.C. VECTOR CONSULT A.S.D.
S.R.L SUCEAVA
elaboratori
sef proiect
proiectat
REFERAT/EXPERTIZA NR./DATA
Data
02/2012
semnatura
cerinta semnatura

Plansa
B.1
nume si prenume
ing. Petrareanu C.
ing. Petrareanu C.
nume si prenume
verificator/
expert
ing. Adomnitei C.
desenat
B1
B2
B3
B4
B5
B6
B7
B8
B9
B10
B11
B12 B13
B14
B15
B16
B17
B18
GRAFIC DE RACORDARE A PLANSELOR
S.C. VECTOR CONSULT A.S.D.
S.R.L SUCEAVA
elaboratori
sef proiect
proiectat
REFERAT/EXPERTIZA NR./DATA
Data
02/2012
semnatura
cerinta semnatura

Plansa
B.2
nume si prenume
ing. Petrareanu C.
ing. Petrareanu C.
nume si prenume
verificator/
expert
ing. Adomnitei C.
desenat
B1
B2
B3
B4
B5
B6
B7
B8
B9
B10
B11
B12 B13
B14
B15
B16
B17
B18
GRAFIC DE RACORDARE A PLANSELOR
S.C. VECTOR CONSULT A.S.D.
S.R.L SUCEAVA
elaboratori
sef proiect
proiectat
REFERAT/EXPERTIZA NR./DATA
Data
02/2012
semnatura
cerinta semnatura

Plansa
B.3
nume si prenume
ing. Petrareanu C.
ing. Petrareanu C.
nume si prenume
verificator/
expert
ing. Adomnitei C.
desenat
B1
B2
B3
B4
B5
B6
B7
B8
B9
B10
B11
B12 B13
B14
B15
B16
B17
B18
GRAFIC DE RACORDARE A PLANSELOR
S.C. VECTOR CONSULT A.S.D.
S.R.L SUCEAVA
elaboratori
sef proiect
proiectat
REFERAT/EXPERTIZA NR./DATA
Data
02/2012
semnatura
cerinta semnatura

Plansa
B.4
nume si prenume
ing. Petrareanu C.
ing. Petrareanu C.
nume si prenume
verificator/
expert
ing. Adomnitei C.
desenat
B1
B2
B3
B4
B5
B6
B7
B8
B9
B10
B11
B12 B13
B14
B15
B16
B17
B18
GRAFIC DE RACORDARE A PLANSELOR
S.C. VECTOR CONSULT A.S.D.
S.R.L SUCEAVA
elaboratori
sef proiect
proiectat
REFERAT/EXPERTIZA NR./DATA
Data
02/2012
semnatura
cerinta semnatura

Plansa
B.5
nume si prenume
ing. Petrareanu C.
ing. Petrareanu C.
nume si prenume
verificator/
expert
ing. Adomnitei C.
desenat
B1
B2
B3
B4
B5
B6
B7
B8
B9
B10
B11
B12 B13
B14
B15
B16
B17
B18
GRAFIC DE RACORDARE A PLANSELOR
S.C. VECTOR CONSULT A.S.D.
S.R.L SUCEAVA
elaboratori
sef proiect
proiectat
REFERAT/EXPERTIZA NR./DATA
Data
02/2012
semnatura
cerinta semnatura

Plansa
B.6
nume si prenume
ing. Petrareanu C.
ing. Petrareanu C.
nume si prenume
verificator/
expert
ing. Adomnitei C.
desenat
B1
B2
B3
B4
B5
B6
B7
B8
B9
B10
B11
B12 B13
B14
B15
B16
B17
B18
GRAFIC DE RACORDARE A PLANSELOR
S.C. VECTOR CONSULT A.S.D.
S.R.L SUCEAVA
elaboratori
sef proiect
proiectat
REFERAT/EXPERTIZA NR./DATA
Data
02/2012
semnatura
cerinta semnatura

Plansa
B.7
nume si prenume
ing. Petrareanu C.
ing. Petrareanu C.
nume si prenume
verificator/
expert
ing. Adomnitei C.
desenat
B1
B2
B3
B4
B5
B6
B7
B8
B9
B10
B11
B12 B13
B14
B15
B16
B17
B18
GRAFIC DE RACORDARE A PLANSELOR
S.C. VECTOR CONSULT A.S.D.
S.R.L SUCEAVA
elaboratori
sef proiect
proiectat
REFERAT/EXPERTIZA NR./DATA
Data
02/2012
semnatura
cerinta semnatura

Plansa
B.8
nume si prenume
ing. Petrareanu C.
ing. Petrareanu C.
nume si prenume
verificator/
expert
ing. Adomnitei C.
desenat
B1
B2
B3
B4
B5
B6
B7
B8
B9
B10
B11
B12 B13
B14
B15
B16
B17
B18
GRAFIC DE RACORDARE A PLANSELOR
elaboratori
sef proiect
proiectat
verificator/
expert
desenat
S.C. VECTOR CONSULT A.S.D.
S.R.L SUCEAVA
elaboratori
sef proiect
proiectat
REFERAT/EXPERTIZA NR./DATA
Data
02/2012
semnatura
cerinta semnatura

Plansa
B.9
nume si prenume
ing. Petrareanu C.
ing. Petrareanu C.
nume si prenume
verificator/
expert
ing. Adomnitei C.
desenat
B1
B2
B3
B4
B5
B6
B7
B8
B9
B10
B11
B12 B13
B14
B15
B16
B17
B18
GRAFIC DE RACORDARE A PLANSELOR
S.C. VECTOR CONSULT A.S.D.
S.R.L SUCEAVA
elaboratori
sef proiect
proiectat
verificator/
expert
desenat
B1
B2
B3
B4
B5
B6
B7
B8
B9
B10
B11
B12 B13
B14
B15
B16
B17
B18
GRAFIC DE RACORDARE A PLANSELOR
S.C. VECTOR CONSULT A.S.D.
S.R.L SUCEAVA
elaboratori
sef proiect
proiectat
REFERAT/EXPERTIZA NR./DATA
Data
02/2012
semnatura
cerinta semnatura

Plansa
B.10
nume si prenume
ing. Petrareanu C.
ing. Petrareanu C.
nume si prenume
verificator/
expert
ing. Adomnitei C.
desenat
S.C. VECTOR CONSULT A.S.D.
S.R.L SUCEAVA
elaboratori
sef proiect
proiectat
REFERAT/EXPERTIZA NR./DATA
Data
02/2012
semnatura
cerinta semnatura

Plansa
B.11
nume si prenume
ing. Petrareanu C.
ing. Petrareanu C.
nume si prenume
verificator/
expert
ing. Adomnitei C.
desenat
B1
B2
B3
B4
B5
B6
B7
B8
B9
B10
B11
B12 B13
B14
B15
B16
B17
B18
GRAFIC DE RACORDARE A PLANSELOR
S.C. VECTOR CONSULT A.S.D.
S.R.L SUCEAVA
elaboratori
sef proiect
proiectat
REFERAT/EXPERTIZA NR./DATA
Data
02/2012
semnatura
cerinta semnatura

Plansa
B.12
nume si prenume
ing. Petrareanu C.
ing. Petrareanu C.
nume si prenume
verificator/
expert
ing. Adomnitei C.
desenat
B1
B2
B3
B4
B5
B6
B7
B8
B9
B10
B11
B12 B13
B14
B15
B16
B17
B18
GRAFIC DE RACORDARE A PLANSELOR
S.C. VECTOR CONSULT A.S.D.
S.R.L SUCEAVA
elaboratori
sef proiect
proiectat
REFERAT/EXPERTIZA NR./DATA
Data
02/2012
semnatura
cerinta semnatura

Plansa
B.13
nume si prenume
ing. Petrareanu C.
ing. Petrareanu C.
nume si prenume
verificator/
expert
ing. Adomnitei C.
desenat
B1
B2
B3
B4
B5
B6
B7
B8
B9
B10
B11
B12 B13
B14
B15
B16
B17
B18
GRAFIC DE RACORDARE A PLANSELOR
S.C. VECTOR CONSULT A.S.D.
S.R.L SUCEAVA
elaboratori
sef proiect
proiectat
REFERAT/EXPERTIZA NR./DATA
Data
02/2012
semnatura
cerinta semnatura

Plansa
B.14
nume si prenume
ing. Petrareanu C.
ing. Petrareanu C.
nume si prenume
verificator/
expert
ing. Adomnitei C.
desenat
B1
B2
B3
B4
B5
B6
B7
B8
B9
B10
B11
B12 B13
B14
B15
B16
B17
B18
GRAFIC DE RACORDARE A PLANSELOR
S.C. VECTOR CONSULT A.S.D.
S.R.L SUCEAVA
elaboratori
sef proiect
proiectat
REFERAT/EXPERTIZA NR./DATA
Data
02/2012
semnatura
cerinta semnatura

Plansa
B.15
nume si prenume
ing. Petrareanu C.
ing. Petrareanu C.
nume si prenume
verificator/
expert
ing. Adomnitei C.
desenat
B1
B2
B3
B4
B5
B6
B7
B8
B9
B10
B11
B12 B13
B14
B15
B16
B17
B18
GRAFIC DE RACORDARE A PLANSELOR
S.C. VECTOR CONSULT A.S.D.
S.R.L SUCEAVA
elaboratori
sef proiect
proiectat
REFERAT/EXPERTIZA NR./DATA
Data
02/2012
semnatura
cerinta semnatura

Plansa
B.16
nume si prenume
ing. Petrareanu C.
ing. Petrareanu C.
nume si prenume
verificator/
expert
ing. Adomnitei C.
desenat
B1
B2
B3
B4
B5
B6
B7
B8
B9
B10
B11
B12 B13
B14
B15
B16
B17
B18
GRAFIC DE RACORDARE A PLANSELOR
S.C. VECTOR CONSULT A.S.D.
S.R.L SUCEAVA
elaboratori
sef proiect
proiectat
REFERAT/EXPERTIZA NR./DATA
Data
02/2012
semnatura
cerinta semnatura

Plansa
B.17
nume si prenume
ing. Petrareanu C.
ing. Petrareanu C.
nume si prenume
verificator/
expert
ing. Adomnitei C.
desenat
B1
B2
B3
B4
B5
B6
B7
B8
B9
B10
B11
B12 B13
B14
B15
B16
B17
B18
GRAFIC DE RACORDARE A PLANSELOR
S.C. VECTOR CONSULT A.S.D.
S.R.L SUCEAVA
elaboratori
sef proiect
proiectat
REFERAT/EXPERTIZA NR./DATA
Data
02/2012
semnatura
cerinta semnatura

Plansa
B.18
nume si prenume
ing. Petrareanu C.
ing. Petrareanu C.
nume si prenume
verificator/
expert
ing. Adomnitei C.
desenat
B1
B2
B3
B4
B5
B6
B7
B8
B9
B10
B11
B12 B13
B14
B15
B16
B17
B18
GRAFIC DE RACORDARE A PLANSELOR
- piatra sparta 30cm
- balast de 25 cm grosime ;
PROFIL TRANSVERSAL TIP
DE 6A intre Km 0+000 - 0+878
DC 6 intre Km 2+533 - 2+677
S.C. VECTOR CONSULT A.S.D.
S.R.L SUCEAVA
elaboratori
sef proiect
proiectat
REFERAT/EXPERTIZA NR./DATA
Data
02/2012
semnatura
cerinta semnatura

Plansa
C.1
nume si prenume
ing. Petrareanu C.
ing. Petrareanu C.
nume si prenume
verificator/
expert
ing. Adomnitei C.
desenat
- piatra sparta 30 cm
- balast de 25 cm grosime ;
PROFIL TRANSVERSAL TIP
DC 6 intre Km 0+274 - 0+469
(Bc250)
Barbacane din tub PVC 110mm
Cap dren - argila
Armatura rost elevatie fundatie
OB 37, L =1.50m
(Bc250)
Dren din bolovani
Geotextil cu rol de filtru invers
Hidroizolatie
2.0%
sant dalat 10cmgrosime
nisip pilonat 5cm
Barbacane din tub PVC 110mm
Cap dren - argila
Armatura rost elevatie fundatie
OB 37, L =1.50m
Dren din bolovani
Geotextil cu rol de filtru invers
Hidroizolatie
sant dalat 10cmgrosime
nisip pilonat 5cm
- piatra sparta 30cm
- balast de 25 cm grosime ;
PROFIL TRANSVERSAL TIP
DE 6A intre Km 0+878 -2+231
S.C. VECTOR CONSULT A.S.D.
S.R.L SUCEAVA
elaboratori
sef proiect
proiectat
REFERAT/EXPERTIZA NR./DATA
Data
02/2012
semnatura
cerinta semnatura

Plansa
C.2
nume si prenume
ing. Petrareanu C.
ing. Petrareanu C.
nume si prenume
verificator/
expert
ing. Adomnitei C.
desenat
Pereu din bolovani de riu 15 cm
Pat beton C8/10 de 10 cm
25
1.50
25
2-4 % 2 -4%
25
C8/10
25
D
D
C=7.50
VEDERE IN PLAN
B-B
L
C8/10 C8/10
C=7.50
SECTIUNE LONGITUDINALA A-A
C
C8/10
50
F
F
35
50
50
15
50
1.05
2.70
60 1.05
10
25

SECTIUNE TRANSVERSALA F -F
2530 3025
50
SECTIUNE D - D
C8/10
SECTIUNE C - C
PROFIL TRANSVERSAL TIP
PODET TIP PREMO 600
- piatra sparta 30cm grosime;
- balast de 25cm grosime ;
- B.A.R 16 5cm grosime;
PROFIL TRANSVERSAL TIP
DC 6 intre Km 0+134 - 0+274
DC 6 intre Km 0+469 - 2+533
S.C. VECTOR CONSULT A.S.D.
S.R.L SUCEAVA
elaboratori
sef proiect
proiectat
REFERAT/EXPERTIZA NR./DATA
Data
02/2012
semnatura
cerinta semnatura

Plansa
C.3
nume si prenume
ing. Petrareanu C.
ing. Petrareanu C.
nume si prenume
verificator/
expert
ing. Adomnitei C.
desenat
C=7.00
C
C8/10
C8/10 Pat beton C8/10 de 10 cm
Pereu din bolovani de riu 15 cm C8/10 C8/10
1.50
25
25
2-4 % 2 -4%
25
25
502.40
VEDERE IN PLAN
B-B
SECTIUNE C - C
C8/10
C8/10
SECTIUNE D - D
L
D
D
L
F
F
SECTIUNE TRANSVERSALA F -F
50
30
50
30 25
50
25
1.05
2.70
1.05 60
35
10
15
50
25
S=1.00 S=1.00
S=1.00
C=7.00
S=1.00
SECTIUNE LONGITUDINALA A-A
PROFIL TRANSVERSAL TIP
PODET TIP PREMO 00
PROFIL TRANSVERSAL TIP
DC 6 intre Km 0+000 - 0+134
- piatra sparta 30cm
- balast de 25 cm grosime ;
PROFIL TRANSVERSAL TIP
Drum de exploatare in interiorul
parcului Eolian Dolhesti
tubulatura cabluri electrice
S.C. VECTOR CONSULT A.S.D.
S.R.L SUCEAVA
elaboratori
sef proiect
proiectat
REFERAT/EXPERTIZA NR./DATA
Data
03/2012
semnatura
cerinta semnatura

Plansa
C.4
nume si prenume
ing. Petrareanu C.
ing. Petrareanu C.
nume si prenume
verificator/
expert
ing. arh. Adomnitei B.
desenat
September20,2012 [FEASABILITYSTUDY]

24

Electrical technical report


1. GeneralConsiderations
ThispaperisthestudyofthefinalsolutionforconnectingintheelectricitygridsintheEON
Moldovaawindpowerinstalledcapacityof30MW(10windpowerunitsof3MWeach)calledthe
CEELiteniDolhestilocatedintheLitenicityandDolhesticommune,Suceavacounty.
AnalyzedareainwichCEELiteniDolhestiislocatedbelongstoEONMoldova.
The110kVnetworkofEONMoldova,structuredaccordingtooldorganizationondistribution
subsidiaries,referredtoaszonesandgridconnectionswithneighboringbranchesareshownin
Figurebelow.

Theareaproposedforthewindfarmislocatedonthepeakoftwohills(HillPlesuluiandHill
Rotunda),benefitingfromagoodwindareaandfreeofobstacles.Forabetteremplacementofthe
turbinesandtoproperlymountthemitwasdecidedtosplitupthewindfarmintwomodules:
Module1:emplacedontheLitenicityland,itwillbecomprisedof6windturbineswitha3
MWcapacity(surfacestudiedinthePUZ65ha);
Module2:emplacedontheDolhesticommune,itwillbecomprisedof4windturbineswitha
3MWcapacity(surfacestudiedinthePUZ45ha);
Theanalysisdonebythespecialtyengineers,proposeasasolutionforinsertionintotheSEN
networktheconstructionofa110/MTsubstationinthelocationofthewindfarm,andan
interconnectioncablebetweenthissubstationandEON110kVsubstationinDolhasca(highvoltage
line,cablesection185mm,lengthofapprox.14km).
September20,2012 [FEASABILITYSTUDY]

25

Ifthebeneficiaryshouldchoosetoextendtheproductioncapacityofthecurrentwindfarm,he
candoso,havingathisdisposalanadditionalsolutionstudythatallowsatotalcapacityof80MWin
theDolhestiLiteniregion,withinsertionsolutionintoSENatsame110kVEONsubstationin
Dolhasca.
2. TechnicalConsiderations
Accordingtothesolutionstudytheconnectionmodewillbe:
Module 1 - Liteni
1 2 3 4 BC

5

6

Module 2 - Dolhesti
10 9 BC

8

7
Forthecaseanalyzedwereconsideredasfollows:
a)Thecablewillbeburiedintheground(inmin.70cm);
b)Soiltemperature(maximum)considered25C;
c)Specificthermalresistanceofsoilwasconsidered1.5Km/W;
d)threephasesystemisformedcablesposeinclubs;
e)Thedegreeofloadingofthecablelengthwasconsidered0.5(minimum)isaboutCEErated
operatingintermittentlyandproduceareducednumberofhoursinayear;
f)cablevoltage20kV;
Accordingtoinformationreceivedfromthebeneficiary,CEELiteniDolhestiwillbemadeof
10generatingunitsof3MWeachmanufacturedbyWinWind(WWD3)withaterminalpowerfactor
between0.9capacitiveto0.9inductive.Synchronousgeneratorisapermanentmagnetrotor,
debitedtopowerandisconnectedtothemains690Vdistributionsystemofpowertransformer0.65
/20kV3300kVA.
Technicalcharacteristicsofwindunitare:
Ratedactivepower:3000kW;
Allowablevoltagevariation:690V10%

Transformernetworkconnection:
Ratedpower:3300kVA;
Averagenominalvoltage:20kV;
September20,2012 [FEASABILITYSTUDY]

26

LowVoltagerated:690V;
Plots:2X2,5%;
Connection:Dyn11;
Shortcircuittension(relativetoratedpower):6%;
CharacteristicsofwindWinWindgroupsmustmeettherequirementscontainedinRuleSystem
OperatorTechniqueforconnectingwindfarmstothepublic.
TakinginconsiderationthelocationoftheCEELiteniDolhestitheoptionforinsertingthepower
inthenationalgridisthefollowing:
Constructionofa110/MTsubstationatthelocationoftheCEELiteniDolhestiand
connectingitwiththe110kVEONDolhascapowerstationthroughapowercablewiththe
crosssectionof185sqmmforalengthofapprox.14km(8kmminimum).

IntheregionofCEELiteniDolhestitherearethefallowing110kVareanetworks:

September20,2012 [FEASABILITYSTUDY]

27

ThereviewfoundthattoevacuatepowerintoSENthroughatransformerMT/110kV,40MVAwith
voltageshortof12%.
Todeterminetheactiveandreactivepowerbandgroupsensuredthatthebars20kVto110kVTR
110/MTtheconnectionoftheCEELiteniDolhesti(BC)tothesystemandthesystemstation(PCC)
whichwillconnecttheCEEwereperformedsteadyregimecalculations.
ThefigurebelowshowsthepowerproducedbyCEELiteniDolhestiintheCEE110kVstationresulting
fromthecalculationsofstationaryregimesconsideringgroupswithapowerfactorof0.9inductiveto
0.9capacitive.

ApparentpowerproducedbythenewCEE30MW,110kVsideof110kVstationinCEEis
[29.6+j(21.49)]MVA.
UnderArticle16,paragraph1oftheTechnicalStandard"Technicalrequirementsforconnectionto
thepublicelectricitynetworksforpower"atvoltagesintheconnectionpointlocatedintheallowable
voltagereactivepowergenerated/absorbedbyCEEdispatchedtoPCCcanbecontinuouslyadjusted
appropriatelylocatedpowerfactoratleastintherange0.950.95capacitiveandinductive.
Thus,consideringcompliancewiththiscondition,thereactivepowerissued/producedbynewCEE
atthepointofdemarcationinoperationattheratedCEEshouldbeintherange(9.6...9.6)MVAr.
NeedandopportunityforareactivepowercompensationequipmentinPCCforCEELiteniDolhesti
tocomplywiththenewrequirementforpowerfactorgeneratedpowervariationbetween0%
100%Powerinstalledwillbeanalyzedaftertherecipientwillknowtheelectricalcharacteristicsof
generatorscontractedMVcables,transformer110/20kVyouwillacquireandlineconnectionand
mayevenbenecessarytoinstallanadditionalreactivepowercompensation(SVC,STATCOM).
Powercompensationrequiredtobeinstalledinadditiontocompliancewiththisconditionwillbe
establishedwithOTSaftercompletionofinstallationparameters.
Accordingtothetechnicalstandard"Technicalrequirementsforconnectiontothepublicelectricity
networksforwindpower"approvedbyANREOrderNo.51/03.02.2009[1],windfarmswithan
installedcapacityofmorethan10MWwillconsiderCEEdispatchable.Forthisreason,theCEE
consideredinthisstudywillbeconsideredadispatchablepowersource.
September20,2012 [FEASABILITYSTUDY]

28

FortheGridconnectionsolutionsgenerator,itwillbetakingintoaccountoftheoperating
conditionsofwindgroupswillfindthattheentireinstalledcapacitywillevacuatetheentirenetwork
operationconditions(Nelementsinservice)andallowedlimiting/stoppingpoweroutletSENthe
lackofanetworkelement(ofareaorconnectionitself).
Ifthebeneficiarywillwantahigherdegreeofcontinuity,alllinkstoRET/REDofthewindparkwill
bedoubled.
Thetablebelowshowsthecalculationresultsofmaximumshortcircuit110kVCEEbarsrespectively
adjacentstations.
I
k3
(kA) S
k3
(MVA) I
k1
(kA)
Proposed Variant
CEE Liteni-Dolhesti 20kV 7,82 298 0
Aport CEE 1,41 54 0
Aport SEN 6,42 245 0
CEE Liteni-Dolhesti 110kV 4,6 964 4,88
Aport SEN 4,38 917 4,26
Aport CEE 0,22 46 0,63
Dolhasca 110kV 5,06 1060 5,32
Flticeni 110kV 8,35 1749 8,77
Hudum 110kV 6,84 1433 7,99
Suceava 110kV 20,08 4209 25,81
Stejaru 110kV 21,03 4408 22,46

Necessaryinvestmentsareestimatedconsideringthatthe110kVstationwillbeusingcompact
modules.Inthiscasetheinvestmentyouneedtomakebeneficialinclude:
Necessary works
Connection into the 110kV station EON Dolhasca
14 km LEA 110 kV connection power cable c. S 185 sqmm
One 110kV cell in the EON Dolhasca 110/20 kV station
a cell with breaker 110kV transformer 110/20kV connection to CEE Liteni-Dolhesti
One transformer unit 110/20kV 40MVA
20 kV cell for connecting with the 110/20kV transformer unit
Fiber optic cable for integration in SCADA on LEA 110kV CEE Dolhasca and for longitudinal differential
protection (14 km)

Considerationspointofdemarcationandmeasurementofwindfarmschemeleadstothefollowing
functionaldrawing:

September20,2012 [FEASABILITYSTUDY]

29

3. Drawings
FramingplanCEELiteniDolhestisc.1/25000.......................................................................................A1
ElectricalschemeofEONgridinDolhascapowerstationregion.........................................................A2

S.C. VECTOR CONSULT A.S.D.


S.R.L SUCEAVA
elaboratori
sef proiect
proiectat
REFERAT/EXPERTIZA NR./DATA
Data
10/2012
semnatura
cerinta semnatura

Plansa
A.1
nume si prenume
ing. Petrareanu C.
ing. Ursachi I.
nume si prenume
verificator/
expert
ing. arh. Adomnitei B.
desenat

You might also like