You are on page 1of 12

Analytical Studies in Research & Technology

Ansart sdn bhd

CONTENTS

A. PROFILE
1.0 INTRODUCTION 2.0 SERVICES OFFERED 3.0 SOFTWARE AND TOOLS 4.0 PEOPLE 5.0 JOB HISTORY 6.0 CONTACTS

Analytical Studies in Research & Technology team

1.0 INTRODUCTION
Initially Ansart was very much influenced by TMSU (Traffic Modelling Simulation Unit), his strategic partner from Universiti Sains Malaysia. Ansart was earlier known as Analytical Studies and Research in Transport and Traffic Team since its involvement . then was majored in traffic and transport consultation.
Ansart was established in 1992 by the name of Menara Segar Sdn Bhd (MSSB). MSSB at the time was a project development consultant which involved in development planning, construction, technology, IT and traffic consulting. MSSB was among the first agent to Autocad Asia through his partner of Highway and Transport Group from the Universiti Kebangsaan Malaysia. Earlier in 2008 Ansart introduce VISSIM and VISUM into Malaysia as a solution tool in Traffic Simulation. The aim was as a tool for an imaginary real situation to analyze the order in proposing several options for traffic solutions, dispersal and to accelerate the movement of vehicles for a specific case. With TMSU, Ansart was then set up with the purpose of providing clients with transport and traffic related services in particular study to the issues using computer modeling and simulation.

Besides developing and designing the system for Transport Planning, Traffic Management and Traffic Operations, Ansart is also now focusing on its major future tool for technology innovations. As an inventor group, Ansart is very much appreciate and welcome any investor or counterpart with the same vision to share our mission towards making an easier and sustainable life for the people.

Besides the professionals in ANSART, members in the team also comprise of post-graduate students and research assistants who are engaged either in the pursuit of post-graduate studies or are being employed to conduct research support in USM. 1. The modelling and simulation approach in transport planning and traffic management is an essential tool for many agencies and developers who are interested to understand present and future issues that they are or will be facing with respect to their development proposals. Modelling and simulation provides a fast and inexpensive method for evaluating issues and problems relating to traffic and transport. 2. The Project Management is part of Ansart specialties. Being in construction since the 90-s had made Ansart to make a major come back by integrating findings of new technology, suitable system and effective planning before taking off into the total construction management control. For the case Ansart will closely collaborate with his strategic alliance of construction consultant team. 3. Innovations and new technology provider is part of Ansart interest towards future expansions. At the moment Ansart is looking into a) educating future generations into creative tech innovation set of mind by using Resberry Pi as a platform and b) to better systemized the transport operational control by using his own RFID tools and features.

2.0 TRAFFIC & TRANSPORT SERVICES OFFERED


The services offered by ANSART/TMSU can be divided into 3 main sections i.e. i) Transport Planning ii) Traffic Management iii) Traffic Operations Each of these sections are then further classified by the following list of studies Transport Planning a. Transport master-plan of town and cities b. Travel demand forecasting c. Modal split studies (public transport to private vehicle utilization) d. Road network analysis e. Traffic Impact Assessment (TIA) Traffic Management a. b. c. d. Junction studies Highway capacity studies Traffic flow control and management Pedestrian studies

Traffic Operations a. b. c. d. Public transport operations Bus operation studies Accessibility studies Mobility studies

3.0 SOFTWARE AND TOOLS


TMSU uses several well-known up dated software and tools to support its studies and findings. Besides the common method of data collection and analysis, TMSU is unique as a solution provider in the country by offering clients high-end up-market capability at very competitive cost. Similar work by foreign consultants will be very demanding on the clients budget. Among the favorite software utilized by TMSU are: i) ii) iii) iv) v) vi) vii) VISSIM state of the art multi mode traffic simulation VISUM transport planning incorporating public transport systems SIMIO general simulation tool OMNITRANS land use transport interaction model TRIPS traffic flow analysis aSidra junction analysis EMME3 transport planning of road networks

TMSU also links with international agencies supporting some of its more elaborate studies where required. Data collection is primarily conducted by local partners placed throughout Malaysia.

4.0 PEOPLE
ANSART is a dedicated team of people focused on providing the best service, consultation, solution, project management to clients. Those people are: Ahmad Fahizal Abdul Wahab Managing Director Dr Ahmad Hilmy Abdul Hamid Head of Transport Modelling Simulation Unit Advisor & Co-Consultant Mohd Shafis Abdul Hamid Director Mohammad Husni Jamil Director / Operations _________________________________________________________ Ahmad Fahizal Abdul Wahab Social / Economics / Project Management Mohammad Husni Jamil Traffic Engineering / Construction / Project Management Nor Diana Salihi Public Transport / Transport Planning Kam Khen Jhun Transport Management / Quality Analysis Mohd Zulkifli Ahmad Transport Planning / Risk Analysis and Management Nur Amirah Transport Management / Optimisation

5.0 JOB HISTORY


The list below provides the accumulated history of consultancy work completed by ANSART staff members from 1995 through 2011. The total aggregated experience defines the support strength that clients can expect from ANSART services. INTERNATIONAL STUDIES 1. The Zayed Sports City, Traffic Impact Studies, Abu Dhabi Responsible for coordinating and producing a Traffic Impact Studies report to obtain approval from the Abu Dhabi Municipality for the development area.

2. Highland Resorts, Traffic Impact Studies, Abu Dhabi Responsible for coordinating and producing a Traffic Impact Studies report to obtain approval from the Abu Dhabi Municipality for the development area

3. Khalifa City A Concept Plan Study, Abu Dhabi Provided input and topical writing for Public Transportation facilities and requirements to the Concept Plan study report

4. Area between Maqta Bridge and Sas Al Nakhil Concept Plan Study, Abu Dhabi Provided input and topical writing for Public Transportation facilities and requirements to the Concept Plan study report

5. Highland Resorts, Traffic Impact Studies, Abu Dhabi Responsible for coordinating and producing a Traffic Impact Studies report to obtain approval from the Abu Dhabi Municipality for the development area

6. Abu Dhabi International Airport Landside study Simulation study of road network and parking facility operations

7. Abu Dhabi Green Line Parking Facility Study Simulation study of multi-storey parking facility operation and management

LOCAL STUDIES 8. SAINS@USM Complex, Bukit Jambul Main consultant Traffic Impact Assessment report for obtaining approval from Majlis Perbandaran Pulau Pinang

9. Taman Serai, Padang Serai, Sungai Petani Main consultant Traffic Impact Assessment report for obtaining approval from Majlis Perbandaran Sungai Petani Kedah

10. North Seberang Perai District, Local Plan Study, Malaysia Main consultant for Transportation and Traffic responsible for the production of Local Transport Plan for 2005-2020 for the district. Project was for the Department of Town and

Country Planning, Malaysia and the Seberang Perai Municipality, State of Penang

11. Kulim District, Local Plan Study, Malaysia. Main consultant for Transportation and Traffic responsible for the production of Local Transport Plan for 2004-2020 for the district. Project was for the Department of Town and Country Planning, Malaysia and the Kulim District and Municipality, State of Kedah

12. Padang Terap District, Local Plan Study, Malaysia. Main consultant for Transportation and Traffic responsible for the production of Local Transport Plan for 2001-2016 for the district. Project was for the Department of Town and Country Planning, Malaysia and the Padang Terap District, State of Kedah

13. Perda Agro Base Industry Area, Penang, Malaysia Project managed and responsible for the production of a Traffic Assessment Report for a 400 acres proposed new industrial area in Kepala Batas, Penang.

14. 4-Star Hotel Development, Kepala Batas, Penang, Malaysia . Project managed and responsible for the production of a Traffic Assessment Report for a 150 rooms hotel complex in Kepala Batas, Penang.

15. One-way Traffic System Study at Jalan Maju, Bukit Mertajam Main study consultant and responsible for a Traffic Impact Assessment Report for the Seberang Perai Municipality proposed new traffic management scheme.

16. Traffic Management Studies for Taiping Municipal Council for the preparation of Taiping Structural Plan. Team member responsible for traffic analysis and junction management. Contributed to the final report on Transport in the council structural plan.

17. Traffic Impact Assessment of the Bertam Estate Interchange for Messrs. Bertam Properties Sdn Bhd. Responsible for the production of a Traffic Assessment Report for approval from the Malaysian Highway authority and Ministry of Works Malaysia for the construction of the Bertam Interchange.

18. Traffic Impact Appraisal Study of Bandar Muadzam Shah, Sungai Petani for ERINCO Sdn. Bhd. Project managed and responsible for the production of Appraisal Study Report for Traffic for the proposed new township

19. Traffic Studies/Design for a new Complex at the Johore Causeway for the Economic Planning Unit, Prime Minister Department, Malaysia. Lead consultant for traffic and study team member for the proposed new Immigration and Customs complex at the Johore Causeway.

20. Traffic Accidents Statistics for the Royal Malaysian Police Department. Main consultant and responsible for collating, analysis and preparation of a report on Accident Statistics. 21. Viability Analysis of Puncak Alam KL Expressway (PAKLEX). Simulation of Traffic Absorption from Kuala Lumpur CBD and the Contribution from West Section of Greater KL to the Boundary of KL City (helmet). CONSTRUCTION 1. Immigration CIQ Complex, Pengkalan Hulu, Perak . Project Director responsible for planning, managing and construct. A design and build project.

You might also like