Aide Memoire

As on Date: 07-Dec-13 Subject: DEL EGC Project, Qatar 1. Project 2. Client 3. Feed 4. Project Scope 5. Zero Date : : : : : Export Gas Compression Facilities Upgrade Project, Ras Laffan Dolphin Energy Limited JGC Corporation Upgrading Export Gas Facilities from current 2.2 BSCFD to 3.2 BSCFD 05 September 2012 07 January 2015 (RFSU) 15 Months and 2 days 13 Months (Ready for Start-up) L&T Chiyoda Mumbai

6. Contractual Completion Date : 7. Time Elapsed 8. Balance Duration: 9. Detailed Engineering : : :

Aide Memoire
a) Executive Summary 1) 2) Cumulative Safe Man-hours : Equipment Status : Compressors and Turbines All 3 compressors and Turbines skids and accessories received at site. Alignment of Compressors and Turbines is in progress Module assembly of Roof Module, Filter Module and Structure Modules for Train 7 is in progress HRSG Train 7 Modules received at site, Erected, welding is in progress Train 8 and 9 Modules received at site on 07.12.13 Air Fin Coolers Air Fin cooler received at site on 04.12.13 Inventory taking is in progress Assembly on ground for Train 7 will start on 12.12.13 3) Planned Quantity v/s Actuals
DESCRIPTION UOM Cumulative Qty. Planned Actual

1.37 Million Man Hours without LTI till 06.12.13

Civil Foundation Building Pre-casting of Members at Vendor Shop Installation of Pre casting Members Cast in situ of Column and Beams Piping AG Piping Fabrication ID 14719 8584 CUM CUM Nos. Nos. CUM 3102 752 496 414 415 3025 1276 509 152 39

4)

Construction Progress Summary (As on 05 December 2013) SL. NO. 1 2 3 3.1 a) b) c) d) e) f) g) h) i) DESCRIPTION HSE & S Survey, Mobilisation and Temporary Facilities Construction Civil Excavation Backfilling Foundation Building Pre casting of Column and Beams Installation of Pre casting Cast in situ for wet joints Paving Road Work WTD. VALUE 1.0% 25.0% 74.0% 27.00% 0.04% 0.24% 5.28% 11.41% 3.06% 4.00% 1.15% 0.72% 0.49% CUMMULATIVE SCH
0.51% 19.55% 2.00% 14.040% 0.034% 0.029% 3.916% 4.815% 2.179% 2.375% 0.449% 0.000% 0.000%

ACT.
0.48% 24.76% 16.30%

13.789%
0.031% 0.016% 3.819% 8.170% 2.237% 0.873% 0.000% 0.000% 0.000%

Aide Memoire
SL. NO. j) 3.2 a) b) c) 3.3 a) b) c) d) e) f) 3.4 3.5 3.6 3.7 DESCRIPTION Other Civil Structure Structure Fabrication Structure Erection Grating Installation Piping AG Piping Fabrication AG Piping Erection (IM) AG Piping Erection (ID) Mechanical Completion Hydro Testing UG Piping Fabrication and Laying Mechanical Electrical Instrumentation Painting and Insulation Total WTD. VALUE 0.60% 3.75% 1.32% 2.01% 0.41% 23.25% 4.64% 8.78% 3.62% 1.17% 2.93% 2.11% 12.75% 3.00% 3.25% 1.00% 100.00% CUMMULATIVE SCH
0.243% 1.355% 0.565% 0.790% 0.000% 2.625% 1.16% 0.15% 0.00%

ACT.
0.000%

0.000%
0.000% 0.000% 0.000%

0.45%
0.68% 0.00% 0.00% 0.00% 0.00%

1.31% 3.278% 0.01% 0.02% 0.01

0.00%

2.10% 0.00% 0.00% 0.01%


3.278%

46.38%

5)

Construction S Curve

Progress as on 21-November-13 Schedule: 44.81 % Actual: 41.55 % Progress as on 05-December-13 (2 Week of Dec. 13) Schedule: 51.64 % Actual: 43.19 %
nd

6)

NDT status
Period 05.12.13 Welded 738 RT to be Taken 661 RT Completed 601 Rejection % 0.17

Aide Memoire

7)

Construction work volume: S. No 1 2 3 4 5 6 7 Discipline Civil Foundation Civil Building Work Civil Column and Beams Paving Piping Fabrication Piping Erection (Field Welding) Piping Erection Milestone Status Sr No Construction Mile Stones Baseline Date Zero Date 1 2 3 4 5 6 7 8 9 10 11 12 13 MS-4 Subcontract Award for Temporary Facilities (D+ 2 M) MS-5 Construction of Temporary Facilities Start (D + 4 M) MS-8 Construction Subcontract Award (D + 6 M) MS-12 Construction Start (D + 7 M) MS-19 Foundation Work Start (D + 11 M) MS-22 Civil Pipe rack Installation Start (D + 14 M) MS-25 A/G Piping Pre-fabrication Start (D + 17 M) MS-23 Start U/G Piping Installation (D + 14 M) MS-26 Piping Installation on Pipe Rack Start ( D + 19 M) MS-28 EGC Erection Complete (D + 21 M) MS-27 HRSG Erection Complete - All 3 Units (D + 22 M) MS-30 Air Fin Cooler Erection Complete (D + 21 M) MS-29 SS32/ITR Building Civil Works Complete (D + 21 M) 05-Sep-13 07-Nov-13 23-Nov-13 19-Feb-13 05-Apr-13 05-Apr-13 27-Jun-13 27-Aug-13 04-Oct-13 11-Nov-13 21-May-14 17-May-14 17-Jun-14 13-May-14 06-Nov-13 Actual Date 05-Sep-13 07 Nov-13 23-Nov-13 07-Jan-13 09-Mar-13 20-Mar-13 28-Sept-13 26-Aug-13 UOM CUM CUM Nos. Sq. m ID ID IM Original Scope (Proposal) 5352 1516 885 1317 61300 40860 231000 Revised Scope 4179 1782 697 1317 61300 40860 231000 % Variation -21.92% +17.55% -21.24% 0% 0% 0% 0%

8)

Aide Memoire
9) Welder Status Total Welders Available Total Qualified Under Mechanical Testing Under Training 10) Critical Issues: General a) Availability of Visas for mobilization of work force. b) HMDI staff deputation for various disciplines as listed below: Execution Coordinator for Rotary Equipment. Material Controller E&I Coordinator c) Piping GAD for erection d) Balance Pipe support Materials e) Prefabricated structure supply at site Mobilization of staff from HCPI: a) b) c) d) e) f) g) 11) Construction Manager (Piping). Time- office staff. Resource Staff to mobilize the resources. Quantity Surveyor (Civil). Costing Engineer. Mobilization of balance equipment as per S3 i.e. 160 MT (1no) , 50MT (2 nos.) crane. Scaffold Materials, Scaffolding Incharge and Inspector : : : : 37 nos 37 Nos 00 Nos 00 Nos

Critical Drawings required from HMD Electrical Electrical Electrical Electrical Electrical Electrical Electrical SS ITR Building SS ITR Building SS ITR Building SS ITR Building SS ITR Building SS ITR Building SS ITR Building SS-32 Equipment Layout Cable Tray/Trench layout for SS-32 Power Layout for SS-32 Earthing & Lightning protection Layout for SS-32 & ITR-32 Power Layout for Unit -200 Earthing & Lightning protection Layout for Unit-200 Lighting Layout/ Street Lighting Layout for Unit-200 SS32/ITR32 Substation Ground Floor Plan SS32/ITR32 Substation First Floor Plan SS32/ITR32 Substation Roof Plan SS32-ITR Substation Elevations SS32/ITR32 Substation Section Details (1/2) SS32/ITR32 Substation Miscellaneous Details (2/3) SS32/ITR32 Substation Transformer Foundation