Site Gen-Sets Inatalllation Check-list


Project Address Date NO. 1 2 3 4 5 6 Description The position of generators, fuel tank and ATS, ACDB,etc. are conformed with design drawings The power cable are armoured and the size of power cable is conformed with specification Check the generator's control panel and ensure that all electrical components are ready in good condition. Ensure that all auxiliary devices such as the fuel tank, ATS, and ACDB are in good condition. DC 12V battery are installed and are functional properly Site Name and Site ID SBC Site Supervisor Inspector Level minor major major minor major
Y

Pass

Result Fail N/A

Photo Required

Ensure that the diesel generator is firmly fixed to the foundation minor and is reliably grounded. Ensure that the fuel pipes (oil water separator, valves, and pipes) are installed according to the design requirements and all valves and joints are free of oil leakage. Ensure that the water level in the cooling water tank is acceptable and all water pipes are not leaking. Ensure that the oil level in the oil pan is within the allowed range (between ADD and FULL). Fuel Piping is properly secured above the ground level,has no leakage Ensure that all fastening screws and nuts are screwed tightly. minor

8 9 10 11 12 13 14 15 16 17 18 19 20 21 Conclusion &Comment

major minor major minor


Y

Ensure that the surface of the diesel generator set is clean minor without any filth. Ensure that the power cables are laid separately from the control signal cables in different tubes. No crossing of cable is minor allowed. Ensure that all cables are connected according to the electrical specifications and all cables are affixed with labels and minor protected with heat-shrink tubes. Genaretors operational:no alarm condition indicated major
Y

Geneerator installation/commissioning test report and minor manufacturer's certificate is available for inspection ATS panel is properly mounted,commisioned and functioning minor properly Ensure that all lugs are connected firmly to the busbars and the minor busbars are connected firmly to each other. Alarm cable installed between generators,ATS,fuel tank and DDF for common generator alarm fuel tank is filled with 1500L diesel major major

Ensure that the site is clean without any useless materials and all excessive installation materials are arranged neatly.General minor workmanship is good.

Site supervisor of subcontractor (signature and date) Signatures

Site engineer of Huawei(signature and date)

12/20/2013

140

196954608.xls.ms_office

Project Address Date NO. 1 1.1 1.2

1.3

1.4 1.5

12/20/2013

240

196954608.xls.ms_office

1.6

2 2.1 2.2 2.3 2.4 3 3.1 3.2 3.3

12/20/2013

340

196954608.xls.ms_office

3.4 3.5 3.6 3.7

3.8

3.9 3.10 3.11 Conclusion&Co mment Signatures

12/20/2013

440

196954608.xls.ms_office

Site Hybrid In

Description Hardware installation The positioning and orientation of power cabinets are None of the components of power cabinet is loose or damaged.

All cabling apertures on the cabinets are sealed.

The coating of the cabinets is intact, the surface of the The coating of diesel generator is intact, the surface of

12/20/2013

540

196954608.xls.ms_office

The batteries in battery cabinet are installed as per specificatipon

Grounding The rectifier cabinet has been grounded as per specification. The components in rectifier cabinet have connected with grounding bar of cabinet as per specification The battery cabinet has been grounded as per specification The terminals of grounding calbe have been put lugs and lugs have been crimped by crimping tools Power cable connection AC power cable from generator to IATS is connected correctly and firmly. AC power cables from Mains to IATS is connected correctly and firmly. AC power cables from IATS to rectifier is connected correctly and firmly.

12/20/2013

640

196954608.xls.ms_office

DC power cables from rectifier to battery are connected correctly and firmly. DC power cables from rectifier to load (BTS, Tx, and etc.) are connected correctly and firmly. DC power cables from rectifier to inverter are connected correctly and firmly. DC power cables of the heat exchanger for rectifier cabinet are connected correctly and firmly. DC power cables of the DC conditioner for battery cabinet are connected correctly and firmly. AC power cables from inverter to load (security light, aviation light and etc.) are connected correctly and firmly. The type and size of power calbes are correct All cables are labeled accordingly.

Site supervisor of subcontractor (signature and date)

12/20/2013

740

196954608.xls.ms_office

Site Hybrid Installation Check-list Site Name and Site ID SBC Site Supervisor Inspector Result Level Pass Fail minor minor
AN0445 REM-BAM EMMANUEL

N/A

minor

minor minor

12/20/2013

840

196954608.xls.ms_office

minor

major major major major

major major major

12/20/2013

940

196954608.xls.ms_office

major major major major

major

major major minor

ate)

Site engineer of Huawei(signature and date)

12/20/2013

1040

196954608.xls.ms_office

Photo Required

12/20/2013

1140

196954608.xls.ms_office

12/20/2013

1240

196954608.xls.ms_office

signature and date)

12/20/2013

1340

196954608.xls.ms_office

12/20/2013

1440

196954608.xls.ms_office

12/20/2013

1540

196954608.xls.ms_office

12/20/2013

1640

196954608.xls.ms_office

12/20/2013

1740

196954608.xls.ms_office

12/20/2013

1840

196954608.xls.ms_office

Site Hybrid Installation Che Project Address Date NO. 4 4.1 4.2 4.3 4.4 4.5 4.6 4.7 4.9 5 5.1 5.2 5.3 5.4 5.5

12/20/2013

1940

196954608.xls.ms_office

5.6 5.7 5.8 5.9 5.10 5.11 5.12 5.13 5.14 6 6.1 6.2 6.3 6.4 6.5 6.6 6.7 Conclusion &Comment Signatures

12/20/2013

2040

196954608.xls.ms_office

Site Hybrid Installation Check-list

Description Signal cables connection Mains input and IATS output cables are connected correctly and cables firmly with SAU. The signal from the generator to IATS are connected correctly firmly. The signal cables and for start/stop the generator are connected and the firmly. The signalcorrectly cables for battery current sensor from battery cabinet to SAU aresampling connected correctly The 48V battery voltage cables are and connected correctly and firmly to the SAU. The signal cables for the battery temperature sensor are All alarm cables are connected correctly and firmly to BTS. (see alarm section for details) All cables are run in cable PVC pipe or cable trunk, tightened to the equipments with cable ties to avoid Power On Test All devices power-on and work normally. The diesel generator in automatic control mode can be Whether rectifier system switch power supply normally when the D.G. startup and stop. are set accord with the The SAU battery parameters battery. The rectifier battery parameters are set accord with the battery.
12/20/2013 , 2140

196954608.xls.ms_office

Whether the SPD breakers of all devices are ON. Measure the AC voltage of each AC connection point, check whether the voltage value is normal. Includes the generator output, ATS output, rectifier and Measure and check whether the output input voltage ofinverter rectifier is normal.and check wether the voltage of each storage Measure battery is the normal. Measure current of battery, check that whether the SAU battery is inverter accurate., check whether Measure the current output sampling voltage of the outputall ACpower voltage sampling is accurate. Whether supply parameters is display right accord with actually. Whether the indicator LEDs of ATS indicate the status of power supply accurately; Whether the SPD MCB of ATS is switched on. System Alarm Simulation Test Generator Alarm (IATS--RBS) Battery Alarm (Rectifier--RBS) Rectifier Alarm (Rectifier--RBS) Systems Alarm (SAU--RBS) High Temperature (Rectifier--RBS) Hybrid in Operation (SAU--RBS) Emergency Fan (Rectifier--RBS)

Site supervisor of subcontractor (signature and date) date)

Site e

12/20/2013

2240

196954608.xls.ms_office

Check-list Site Name and Site AN0445 ID SBC Site REM-BAM Supervisor EMMANUEL Inspector Result Lev el Pass Fail N/A min or min or min or min or min or min min or min or maj or maj maj or maj or maj or
12/20/2013 , 2340

Photo Required

196954608.xls.ms_office

min or maj or maj or maj or maj or maj or maj or maj or maj or maj maj maj maj or maj or maj or maj maj or Site engineer of Huawei(signature and

12/20/2013

2440

196954608.xls.ms_office

Site MW Installation Check-list Project Address Date NO. Description INDOOR UINT EQUIPMENT MOUNTED ACCORDING TO VENDOR INSTALLATION SPECIFICATION Level MTN FYK 13 Site Name and Site ID and ID SBC Site Supervisor Inspector Result Pass Fail

minor

RADIO CHASSIS HAS FAN UNITS INSTALLED AND WORKING FOR ALL RADIO TYPES EXCLUDING TRUNKING RADIOS

minor

BACK-PLANE MAPPING IS IMPLEMENTED FOR THE minor NEW SITESS MICROWAVE LINK (LOG INTO HUB-SITE-

TRANSMISSION CABINET GROUNDED

major

INDOOR UNIT GROUNDED AS PER VENDOR

major

INDOOR UNIT LABELLED WITH LOCAL AND REMOTE SITE NAMES AND FREQUENCIES

minor

7 9 10

POWER FEED CONNECTED TO HIGH PRIORITY SITE CONFIRMED VISIBLE ON NMS - IP &OSPF ADRESSES ARE INPUTTED AND INTEGRATED FOR IDLE E1 INTERFACES ALARMS DE-ACTIVATED (TO AVERT NMS SERVER PROCESSORS OVERLOAD BY

major minor minor

12/20/2013

2540

196954608.xls.ms_office

ERROR RATE THRESHOLD VALUE SET TO 10 (INSTEAD OF THE USUAL 10-3). THIS IS TO ACCOMMODATE DATA REQUIREMENTS FOR THE FOLLOWING TRANSMITION LINK KPIs: ES ERRORED SECONDS 11 SES - SERIOUSLY ERRORED SECONDS BB - BACK BLOCK BBE - BACK BLOCK ERRORS US - UN-AVAILABLE SECONDS 12 13 14 15 16 17 18 19 20 Conclusion&C omment Site supervisor of subcontractor (signature and date) AT - AVAILABLE TIME ALL CONNECTORS MADE OFF ACCORDING TO ALL CABLES LABELLED ALL FUSES AND BREAKERS LABELLED ALL CABLES NEAT AND TIDY SLOT/CARD PROPERLY ARRANGED AS PER WA MODULATION SCHEME AS PER WA TRANSMIT POWER AS PER WA FREQUENCY BAND AND CHANNEL AS PER WA RECEIVE SIGNAL LEVEL AS PER WA

-6

major major major major major major minor minor minor minor major major major major critical

Site engineer of Huawei(signature and date)

12/20/2013

2640

196954608.xls.ms_office

Installation Check-list
AN0445 REM-BAM EMMANUEL

Result N/A

Photo Required

12/20/2013

2740

196954608.xls.ms_office

Y Y Y Y Y

engineer of Huawei(signature and date)

12/20/2013

2840

196954608.xls.ms_office

Site MW Installation Check-list


Project Address Date NO. Outdoor Unit
1

FYK13 12/4/2013 Description

Site Name and Site AN0445 SBC Site Supervisor REM-BAM Inspector EMMANUEL Result Level Pass Fail N/A

OUTDOOR UNIT MOUNTED WITH EASY ACCESS ACCORDING TO VENDOR INSTALLATION SPECIFICATION ANTENNA ASSEMBLED CORRECTLY ACCORDING TO VENDOR INSTALLATION SPECIFICATION

minor major

ANTENNA MOUNTED TO THE CORRECT TOWER LEG TO ACCOMMODATE PANNING ARM SPECIFICATION LIMITS

minor

4 5 6

ANTENNA POLARIZATION AS PER WA ANTENNA HEIGHT AS PER WA ANTENNA SIZE AS PER W.A

major major major

RF RECEIVE LEVEL AS PER WA

major

8 9

ANTENNA BOLTS TORQUED AFTER ALIGNMENT AS major PER VENDOR SPECIFICATION FLEXIBLE WAVEGUIDE FITTED CORRECTLY BETWEEN ANTENNA AND OUTDOOR UNIT USING SUPPORT minor BRACKET OUTDOOR UNIT GROUNDED AS PER VENDOR SPECIFICATION

10

major

11

ALL EXTERNAL CO-AX CONNECTORS WATERPROOFED major AS PER VENDOR SPECIFICATION

12 13 14 15 16 17

EXTERNAL CO-AX CABLE OR WAVEGUIDE SECURED AT minor 1-METER INTERVALS, ADHERING TO BENDING RADII CO-AX CABLE OR WAVEGUIDE TO BE GROUNDED AS major PER INSTALLATION SPECIFICATION SITE FREE OF INSTALLATION DEBRIS DEHYDRATOR INSTALLED AS PER INSTALLATION SPECIFICATION STATIC DESICCATORS INSTALLED CORRECTLY ON FLEXIBLE WAVEGUIDE minor minor minor

12/20/2013

2940

196954608.xls.ms_office

Conclusion&C omment Site supervisor of subcontractor (signature and date) Signatures Site engineer of Huawei(signature and date)

12/20/2013

3040

196954608.xls.ms_office

heck-list

Photo Required

12/20/2013

3140

196954608.xls.ms_office

ignature and date)

12/20/2013

3240

196954608.xls.ms_office

Site BTS Installation Check-list


Project Address Date NO. MTNFYK13 Site Name and Site ID SBC Site Supervisor Inspector Level Pass
ALL MATERIALS AND EQUIPMENT AS PER SPECIFICATION major minor

Description

Result Fail

1
BTS AND ANCILLARY EQUIPMENT POSITION AS PER DRAWING

BTS ACCORDING TO SITE CONFIGURATION (WA)

major

4 5 6

PCM AND ALARM CABLING TO DDF WIRED AND LABELLED CORRECTLY DC AND GROUND CABLES FIXED TIGHTLY AND LAID NEATLY BLANKING PLATES (DUMMY) INSTALLED AT UNEQUIPPED POSITIONS CABINETS SECURELY INSTALLED

major minor minor minor

8 9 10 11 12 13 14 15 16 17 18

FANS OPERATIONAL NO UNACCOUNTED VISUAL ALARMS COMMISSIONING & INTEGRATION DOCUMENTATION AVAILABLE GENERAL WORKMANSHIP NO EXTERNAL ALARM IS MASKED ALL THE ALARMS ARE CONFIGURED AND LABELLED CORRECTLY ON DDF SMOKE DETECTOR FIXED SECURELY IN THE CORRECT PLACE AS PER THE SPECIFICATION THERMOSTAT AND THERMOSTAT SENSOR FIXED SECURELY

major major minor minor major major major major

minor SET THE TEMPERATURE ALARM SETTING TO 30C TEST THE TEMPERATURE ALARM BY TURNING DIAL CLOCKWISE minor GENERATING A CLICK EVERY TIME THE AMBIENT TEMPERATURE IS PASSED major TEST THE DOOR ALARM BY OPENING AND CLOSING THE DOOR

12/20/2013

3340

196954608.xls.ms_office
minor minor

19 20 21 22 Conclusion &Comment

ALARM MOUNTINGS ARE CORRECT AND NEAT ALARM DUCTING IS NEAT AND TO THE SPECIFICATION

CHECK THAT THE GENERATORS AND FUEL TANK ARE ALARMED major AND THAT THE ALARMS ARE FUNCTIONAL minor FIRE EXTINGUISHER MOUNTING BEING SECURE AND IN THE CORRECT PLACE IF REQUIRED

Site supervisor of subcontractor (signature and date) Signatures

Site engineer of Huawei(signature and date)

12/20/2013

3440

196954608.xls.ms_office

tallation Check-list
AN0445 REM-BAM EMMANUEL Result N/A Photo Required

12/20/2013

3540

196954608.xls.ms_office

gineer of Huawei(signature and date)

12/20/2013

3640

196954608.xls.ms_office

Site Antenna Installation Check-list


Project Address Date NO. 1 MTN FYK 13 Site Name and Site AN0445 SBC Site Supervisor REM-BAM Inspector EMMANUEL Level Pass
ANTENNA MAKE & TYPE IS AS PER WA ANTENNA AZIMUTH OR BOOM ORIENTATION IS AS PER WA major major

Description

Result Fail N/A

3 4 5 6

ANTENNA TILT IS WITHIN SPECIFICATIONS ANTENNAE CONFIGURATION IS AS PER WA HORIZONTAL AND VERTICAL SPACE DIVERSITY IS CORRECT

major major minor

PANEL ANTENNAE SUPPORTED WITH STAINLESS STEEL minor CABLES ANTENNAE BRACKETS FITTED WITH STAINLESS STEEL BOLTS major AND DOUBLE LOCKED NUTS

8 9 10 11

BOOMS ARE SECURE, STABILISED & LEVEL ANTENNA MOUNTING POLES ON ROOF TOPS ARE STAYED DRESSING AND BENDING RADIUS OF FEEDERS IS AS PER SPECS FEEDERS ARE CLAMPED AS PER SPECIFICATION WATERPROOFING KITS INSTALLATION DONE CORRECTLY

minor minor major minor major

12

FEEDERS EARTHED AS PER SPECIFICATION

major

13

14 15 16

TERMINATION AND LENGTH OF FEEDERS INSIDE CONTAINER AS PER SPECIFICATION SURGE PROTECTORS FITTED INSIDE EQUIPMENT ROOM ONTO FEEDER ENTRY PANEL CABLE TRAYS LEVEL

minor minor minor

12/20/2013

3740

196954608.xls.ms_office
CABLE TRAY SUPPORTS SECURELY FIXED minor

17

18

CABLE TRAY BONDING AND EARTHING DONE ON ROOFTOPS FEEDERS SECURED INSIDE CABLE TRAY

minor minor

19

21 22

GLANDS TIGHT AND SEALED WITH RUBBER BOOTS CABLE MARKERS MARKED TO SPECIFICATION JUMPER CABLES SECURED AND WATERPROOFED

minor minor major

23

24 25 26 Conclusion &Comment

HORIZONTAL AND VERTICAL SEPARATION OF ANTENNAS TO SPEC The VSWR VALUE OF FEEDERS IS LESS THAN 1.4 OUTDOOR JUMPER CABLES INSTALLED FOR OUTDOORS (NO INDOOR JUMPERS USED OUTDOOR)

minor critical minor

Site supervisor of subcontractor (signature and date) Signatures

Site engineer of Huawei(signature and date)

12/20/2013

3840

196954608.xls.ms_office

Antenna Installation Check-list

Photo Required

12/20/2013

3940

196954608.xls.ms_office

of Huawei(signature and date)

12/20/2013

4040