CORPORATE OFFICE :: VISAKHAPATNAM Memo.No.CGM/Projects/GM.P/DE.P2/ADE.P4/AE.P4/F.Cost DataD/D.No.876 /11Dt.30 -04-11 Sub:-EPDCL Revised Cost Data of materials, equipment, H.T & L.T Line, Services and 33 KV Substation to be adopted for the year 2010-11 Reg. Ref:- Memo.No.CGM/Projects/GM.P/DE.P2/ADE.P4/AE.P4/F.Cost DataD/D.No.699/11 Dt.06-04-11 *** The Cost Data 2010-11 has come in to force with effect from 08.04.2011 vide
1.
reference cited above. 2. Certain modifications for rates of poles, conductor, Power transformers, 11KV
and 33 KV XLPE cables and Labour and transport rates for service line estimates for the Cost Data 2010-11 have taken place and the revised Cost Data 2010-11 is herewith communicated. 3. Further, the field officers are requested to strictly adhere to the following
instructions while sanctioning the estimates. a) In case where the estimates are pending to be sanctioned on or after 08.04.2011, the same should be revised with latest cost data 2010-11. b) In case, where the applicants paid the necessary charges for the estimates on or before 08.04.2011 the estimates need not be revised. c) In case where the applicants come forward after 08.04.2011, and willing to pay the necessary charges for the estimates sanctioned prior to 08.04.2011 within the stipulated time as mentioned in the intimation letter from the concerned authority, the estimates need not be revised upto stipulated time period as communicated in the estimates. d) In case where the applicants come forward after 08.04.2011, and willing to pay the necessary charges for the estimates sanctioned prior to 08.04.2011, after lapse of the stipulated time as mentioned in the intimation letter from the concerned authority the estimates should be revised with latest cost data 2010-11.
C:\Documents and Settings\ambu\My Documents\Downloads\Cost data cov letter 10-11 modified.doc
4.
For service connection estimates in non REC scheme areas and execution of 33
KV Substations with other than REC funds, extra amounts should be added are 11% Establishment and General charges on Labour and Transport and 3% S& H charges on materials also. 5. 1% Cess is to be adopted on total cost of the construction as per the rules laid
down in the Building and other construction workers welfare Cess Act 1996.
B.SESHU KUMAR Chief General Manager/Projects APEPDCL::VISAKHAPATNAM To All Superintending Engineers All Divisional Engineers/ADEs/AEs Copy submitted to all The Directors/APEPDCL/Visakhapatnam Copy to: The Chief General Managers The Chief Project Manager/REC Ltd., Hyderabad The Managing Director/RECSO/Anakapalli & Chepurupalli The Chief Engineer/O & RE/ V.S/Hyderabad The Dy. General Manger /IT/APEPDCL/Visakhapatnam for uploading the Revised Cost data 2010-11 in EPIMRS The Dy. General Manager/CC with a request to upload the Cost Data 2010-11 in EPDCL website immediately.
INDEX
Sl. Description No. A ABSTRACT of rates of 33 KV / 11 KV / LT Lines B Rates for CENTRALIZED MATERIALS C 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 Cost Data for Hilly and Tribal areas as adopted by Irrigation Department in the State 33 KV Line over 9.1 Mts. PSCC Poles at 105 Mts.Span WL 280 Kgs 33 KV Line over 9.1 Mts. PSCC Poles at 80 Mts.Span WL 280 Kgs 11 KV Line over 8 Mts. PSCC Poles at 60 Mts.Span WL 140 Kgs 11 KV Line over 8 Mts. PSCC Poles at 65 Mts.Span WL 200 Kgs 11 KV Line over 8 Mts. PSCC Poles at 60 Mts.Span WL 140 Kgs 11 KV Line over 8 Mts. PSCC Poles at 65 Mts.Span WL 200 Kgs 6.3 KV Line over 8 Mts. PSCC Poles at 90 Mts.Span WL 140 Kgs 6.3 KV Line over 8 Mts. PSCC Poles at 90 Mts.Span WL 200 Kgs
LT 3 Ph.5 Wire line (Horizontal) over 8 Mts. PSCC Poles at 65 Mts.Span WL 140 Kgs LT 3 Ph.5 Wire line (Horizontal) over 8 Mts. PSCC Poles at 60 Mts.Span WL 200 Kgs LT 3 Ph.5 Wire line (Horizontal) over 8 Mts. PSCC Poles at 65 Mts.Span WL 140 Kgs LT 3 Ph.5 Wire line (Horizontal) over 8 Mts. PSCC Poles at 60 Mts.Span WL 200 Kgs LT 3 Ph.4 Wire line (Horizontal) over 8 Mts. PSCC Poles at 65 Mts.Span WL 140 Kgs LT 3 Ph.4 Wire line (Horizontal) over 8 Mts. PSCC Poles at 60 Mts.Span WL 200 Kgs LT 3 Ph.4 Wire line (Horizontal) over 8 Mts. PSCC Poles at 65 Mts.Span WL 140 Kgs LT 3 Ph.4 Wire line (Horizontal) over 8 Mts. PSCC Poles at 60 Mts.Span WL 200 Kgs LT 1 Ph. 3 Wire line (Horizontal) over 8 Mts. PSCC Poles at 65 Mts.Span WL 140 Kgs LT 1 Ph. 2 Wire line (Horizontal) over 8 Mts. PSCC Poles at 65 Mts.Span WL 140 Kgs L.T.AB Cable (3x16+25 Sqmm) over 8 Mts. PSCC Poles at 65 Mts.Span WL 140 Kgs L.T.AB Cable (2x16+25 Sqmm) over 8 Mts. PSCC Poles at 65 Mts.Span WL 140 Kgs L.T.AB Cable (1x16+25 Sqmm) over 8 Mts. PSCC Poles at 65 Mts.Span WL 140 Kgs L.T.AB Cable (3x16+25 Sqmm) over 8 Mts. PSCC Poles at 65 Mts.Span WL 200 Kgs L.T.AB Cable (2x16+25 Sqmm) over 8 Mts. PSCC Poles at 65 Mts.Span WL 200 Kgs L.T.AB Cable (1x16+25 Sqmm) over 8 Mts. PSCC Poles at 65 Mts.Span WL 200 Kgs Erection of 100 KVA 11/433 KV Conventional Distribution Transformer Erection of 16 KVA 11/433 KV Conventional Distribution Transformer on single pole structure Erection of 63 KVA 11/433 KV Conventional Distribution Transformer Erection of 25 KVA 11/433 KV Conventional Distribution Transformer on single pole structure Erection of 40 KVA 11/433 KV Conventional Distribution Transformer on single pole structure Erection of 15 KVA 6.3/0-240V CSP Transformer(Oil immersed) on 9.1Mtr PSCC Pole Erection of 15 KVA 6.3/0-240V CSP Transformer(Oil immersed) on 8 Mts PSCC Pole Erection of 15 KVA 6.3/0-240V Amorphous metal core Transformer(Oil immersed) on 8 Mts PSCC Pole Release of single phase Agl. Service erected on support Release of poly phase Agl. Service erected on support Release of 1 ph ( high quality). Domestic & non-domestic service Release of 1 ph (electronic). Domestic & non-domestic service Release of 1 ph Domestic & non-domestic service Release of 3 ph. ( electronic meter) Domestic & non-domestic service Release of 3 ph. (electronic meter) Domestic & non-domestic service Release of poly phase ( high quality) Indl.service upto 15 HP Release of Industrial service with poly phase CT operated meter upto 15 HP Release of Industrial service with poly phase CT operated meter above 15 HP Release of Street light service (1 -ph electonic meter) Erection of 33/11 KV Sub-station with1 No.Power Transformer & 3 Nos. 11 KV feeders ( with 11 KV 2 MVAR Capacitor Bank)
Page No. 3 4 - 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60
DATA FOR R.E. SCHEMES Abstract of schedule of rates for 2010-11 with modified rates : Cost Data per Km of 33/11 KV/LT Lines No. of Span Wind.pr. W.Load Type of pole poles/ in in kg/m2 in kg. being used KM Mtrs. Total Cost in Rs.
Sl. No.
Particulars of items
Size of Conductor
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44
33 KV Line 33 KV Line 11 KV Line 11 KV Line 11 KV Line 11 KV Line 6.3 KV Line 6.3 KV Line L.T. 3Ph 5 Wire Line(Horizontal) L.T. 3Ph 5 Wire Line(Horizontal) L.T. 3Ph 5 Wire Line(Horizontal) L.T. 3Ph 5 Wire Line(Horizontal) L.T. 3Ph 4 Wire Line(Horizontal) L.T. 3Ph 4 Wire Line(Horizontal) L.T. 3Ph 4 Wire Line(Horizontal) L.T. 3Ph 4 Wire Line(Horizontal) L.T. 1Ph 3 Wire Line(Horizontal) L.T. 1Ph 2 Wire Line(Horizontal) L.T. AB Cable L.T. AB Cable L.T. AB Cable L.T. AB Cable L.T. AB Cable L.T. AB Cable
75 100 75 100 75 100 75 100 75 100 75 100 75 100 75 100 75 75 75 75 75 100 100 100
280 280 140 200 140 200 140 200 140 200 140 200 140 200 140 200 140 140 140 140 140 200 200 200
9.1 Mtr. PSCC 9.1 Mtr. PSCC 8 Mtr PSCC 8 Mtr PSCC 8 Mtr PSCC 8 Mtr PSCC 8 Mtr PSCC 8 Mtr PSCC 8 Mtr PSCC 8 Mtr PSCC 8 Mtr PSCC 8 Mtr PSCC 8 Mtr PSCC 8 Mtr PSCC 8 Mtr PSCC 8 Mtr PSCC 8 Mtr PSCC 8 Mtr PSCC 8 Mtr PSCC 8 Mtr PSCC 8 Mtr PSCC 8 Mtr PSCC 8 Mtr PSCC 8 Mtr PSCC
12 14 18 17 18 17 13 13 16 18 16 18 16 15 16 15 16 16 16 16 16 16 16 16
105 100 Sqmm AAAC 80 60 65 60 65 90 90 65 60 65 60 65 60 65 60 65 65 65 65 65 65 65 65 100 Sqmm AAA 55 Sqmm AAAC 55 Sqmm AAA 34 Sqmm AAA 34 Sqmm AAA 34 Sqmm AAAC 34 Sqmm AAA 3x55+2x34 Sqmm AAA 3x55+2x34 Sqmm AAA 5x34 Sqmm AAAC 5x34 Sqmm AAAC 3x55+1x34 Sqmm AAA 3x55+1x34 Sqmm AAA 4x34 Sqmm AAA 4x34 Sqmm AAA 34 Sqmm AAA 2x34 Sqmm AAA 3x16+25 Sqmm 2x16+25 Sqmm 1x16+25 Sqmm 3x16+25 Sqmm 2x16+25 Sqmm 1x16+25 Sqmm
312380 325160 204030 203610 165830 165410 110340 112520 226400 235210 188200 197010 201480 201260 163280 163100 136600 113210 128280 106960 100990 130960 109640 103680 214300 184,470 98430 121640 149930 33070 44870 42940 3030 6710 3110 2550 2850 8080 7960 10440 20990 14450 3120 9222000
Erection of 100KVA Conventional Distribution transformer Erection of 63 KVA Conventional Distribution transformer Erection of 3-Ph 16KVA Conventional Distribution transformer Erection of 3-Ph 25KVA Conventional Distribution transformer Erection of 3-Ph 40KVA Conventional Distribution transformer Erection of 15 KVA Single Phase 6.3 KV/0-240V CSP OIL IMMERSED transformer Erection of 15 KVA Single Phase 6.3 KV/0-240V Amorphous metal core transformer Erection of S-Ph 15 KVA CSP transformer on 9.1M PSCC pole Release of Single phase Agl. Service erected on support Release of poly phase Agl. Service erected on support Release of single phase domestic and non domestic service with High Quality meter Release of single phase domestic and non domestic service with High Quality meter Release of single phase domestic and non domestic service with High Quality meter Release of single phase domestic and non domestic service with 3 Phase Energy meter Release of single phase domestic and non domestic service with Electronic meter Release of poly phase Indl.service upto 15 H.P with Energy meter Release of pol phase industrial service (upto 15 HP) with CT meter Release of poly phase Industrial service upto 15 H.P with C.T. operated meter Release of Single Phase Street light service with Electronic Meter Erection of 33/11 K.V. Substation with 1x5MVA power transformer & 3 Nos. 11KV feeders
3
Re2k5/Revised Cost data 10-11.xls
COST DATA OF CENTRALISED MATERIALS FOR R.E. AND DISTRIBUTION WORKS 2010-11
Sl. No.
Unit
Rupees
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
RS Joists 150 x 150mm(11 mtrs. Length) RS Joists 175 x 85mm (9 to 11 Mtrs) RS Joists 150 x 75mm (9 to 11 Mtrs) B F Beams 150X150 MM (9 to 10 Mtrs) B F Beams 150X150 MM (11 to 12 Mtrs) 11 mts. PSCC poles 365 Kgs 9.1 mts. PSCC poles 280 Kgs. 8 mts. PSCC poles 140 Kgs. 8 mts. PSCC poles 200 Kgs. 8 mts. PSCC poles 300 Kgs. 11 mts. Spun Poles 12.5 mts. Spun Poles Rail poles upto 7 Mtrs 52 Kg (105 lb) Rails (up to 13 mtrs. length) MS Channel 100 x 50MM MS Channel 75 x 40MM MS Angle 65 x 65 x 6mm MS Angle 50 x 50 x 6mm MS Flat 50 x 6/75 x 8mm MS Rod 20mm MS Rod 16mm Cement HT Steel wire-4mm GI Stay wire 7/3.15 mm GI Stay wire 7/2.5 mm GI Wire 4 mm GI Bolts and Nuts with Washers full thread(5/8"X6', 7', 9') GI Bolts and Nuts with Washers full thread(5/8" X 2 1/2 ', 3', 4') C R Sheet 1.6mm
33793 34419 36414 36400 36400 5287 2310 1323 1436 1592 8398 8781 64020 35527 39884 34300 39520 40040 31756 46280 34528 4800 50619 48796 49640 43402 49704
28
MT
47047
29
MT
35000
30
M S Plate 12mm/6mm
MT
30500
31
Torsteel 10mm/12mm
MT
28500
4
Re2k5/Revised Cost data 10-11.xls
Sl. No .
Unit
Rupees
2 33 KV GI Pin
- do -
Each
88
- do -
Each
900
- do -
Each
170
6 11 KV Pin Insulator 7 11 KV GI Pin 8 11 KV Post Insulator 9 11 KV String Insulator (B&S) 10 11 KV String Insulator (C&T)
11 11 KV String Insulator Fittings (C&T) 12 11 KV Polymer string insulator (C&T) 13 LT Pin Insulator 14 LT GI Pin
3/1991 (R-1993)
Each Each
67 147 8 38
Each Each
15 LT Shackle Insulator
- do -
Each
Sl. No .
Unit
Rupees
16 LT Shackle Hardware
- do -
Each
24
17 HT Guy Insulator
21/1981
Each
23
18 LT Guy Insulator
- do -
Each
- do -
Each
1010
- do -
Each
156
21
Each
89
Each
950
23 1.07 Mts Channel Cross arms without clamp 24 Top clamp with cleat (for 33 KV) 25 Top clamp with cleat (for 11 KV) 26 Top clamp for LT
Each
897
28 Stay set with clamp (for 11 KV) 29 Stay set with clamp (for 6.3 KV)
Each Each
328 298
Each
328
31 LT 3-Ph Cross arm (for 5 Wire line) 32 LT 3-Ph Cross arm (for 4 Wire line) 33 LT S-Ph Cross arm (for 3 Wire line) 34 LT S-Ph Cross arm (for 2 Wire line) 35 Back Clamp for 9.1 Mts PSCC pole 36 Back Clamp for 8 Mts PSCC pole
Sl. No .
Unit
Rupees
37 D Clamp for 8.0 M poles 38 Bracing set with double X arms with 9.1 Mts PSCC poles Bracing set with double X arms with 8 Mts PSCC poles
Each set
100 3150
39
set
2700
Kgs
172
41 DPC aluminium Winding Wire 1.6 mm SUBHEAD - III : CONDUCTORS 1 ACSR Zebra Conductor 2 200 Sq.mm Panther Conductor 37/3.0 Sq.mm ACSR 3 100 Sq.mm AAA Conductor or 7/4.26 AAAC 4 55 Sq.mm AAA Conductor or 7/3.15 AAAC/RABBIT 5 34 Sq.mm AAA Conductor or 7/2.50 AAAC/Weasel SUBHEAD-IV : CABLES SUBHEAD-IV : (A) LT XLPE SINGLE CORE CABLES 1 2.50 Sq.mm 2 4.00 Sq.mm 3 6.00 Sq.mm 4 10.00 Sq.mm 5 25.00 Sq.mm 6 50.00 Sq.mm 7 70.00 Sq.mm 8 95.00 Sq.mm 9 120.00 Sq.mm 10 150.00 Sq.mm 11 185.00 Sq.mm 26/1993(R-1987) - do - do - do - do - do - do - do - do - do - do - do - do 1/1971 (R-1993) 33/1984 (R-1993)
Kgs
167
KM KM
235223 127384
KM
42465
KM
22871
KM
14453
KM - do - do - do - do - do - do - do - do - do - do -
2550 4050 5100 8100 15000 32180 43400 60830 71500 89850 112340
Sl. No .
Unit
Rupees
SUBHEAD-IV : (B) LT PVC SINGLE CORE CABLES 1 25.00 Sq.mm 2 50.00 Sq.mm 3 70.00 Sq.mm 4 120.00 Sq.mm SUBHEAD-IV : (C) LT CONTROL CABLES 1 2 X 2.5 Sq.mm (Cu) 2 4 X 2.5 Sq.mm (Cu) 3 10 x 2.5 Sq.mm (Cu) KM KM KM 32300 50134 115077 KM KM KM KM 21460 39300 51300 84400
4 4 x 4.0 Sq.mm (AL) SUBHEAD-IV : (D) ) LT XLPE CABLES 1 3 1/2 X 300 sqmm LT XLPE cable 2 3 1/2 X 185 sqmm LT XLPE cable 3 3 1/2 X 150 sqmm LT XLPE cable 4 3 1/2 X 120 sqmm LT XLPE cable 5 3 1/2 X 95 sqmm LT XLPE cable
KM
22000
KM KM KM KM KM
KM
178272
KM
139607
KM
85187
SUBHEAD -IV: (E) LT AERIAL BUNCHED CABLES 1 1 x 16+25 Sq.mm 2 2 x 16+25 Sq.mm 3 3 x 16+25 Sq.mm 4 3 x 70 + 1x16 +1x50 Sqmm XLPE AB, Cable 32/1984 32/1984 32/1984 KM KM KM KM 20436 24456 38834 123000
Sl. No .
Unit
Rupees
SUBHEAD -IV: (F) LT AERIAL BUNCHED CABLE FITTINGS 1 Suspension Clamp with eye hook 32/1984 Each 88
- do -
Each
80
3 Dead-end Clamp with eye hooks SUBHEAD -IV: (G) 11 KV XLPE POWER CABLES 1 3 x 35 Sq.mm 2 3 x 95 Sq.mm 3 3 x 120 Sq.mm 4 3 x 185 Sq.mm
- do -
Each
88
63/1993 63/1993
KM KM KM
63/1993
KM
5 3 x 300 Sq.mm 11 KV , 3 X 35 Sq mm XLPE Indoor type Raychem make 11 KV , 3 X 35 Sq mm XLPE Outdoor type Raychem make
63/1993
KM
1116910
Each
551
Each
643
8 3X185 Sq mm End termination kit (Indoor) 11KV out door jointing kit for 3x185Sqmm XLPE Cable 3 x 300 Sq.mm Raychem Termination Joints kit
Each
1800
Each
1260
10
Each
4924
SUBHEAD - IV (H)11 KV AB Cable (Aluminum) 1 3x35+35 Sqmm. 2 3x70+70 Sqmm. 3 3x120+70 Sqmm. 4 3x185+70 Sqmm. SUBHEAD -IV: (I) 33 KV XLPE POWER CABLES 1 3 x 400 Sq.mm 63/1993
KM KM KM KM
KM
1768379
KM
1017161
Each 9
5416
Sl. No .
Unit
Rupees
Each
2691402
7/1974 (R-1993)
Each
3074752
Each
3976280
Each
5474490
5 Transformer Oil SUBHEAD -VI: DISTRIBUTION TRANSFORMERS (CRGO) 1 S-Ph 5 KVA DTR 6.3 KV/0-240 V 1-Phase 10kVA 11kV/250V (CSP) (Aluminium)
KL
61045
Each
20693
Each
18600
Each
22566
Each
22969
Each
38457
3-Ph 16 KVA Amorphous/CRGO core 6 conventional type copper wound DTR with BEE 5 star rating Conventional DTR (Cu) 3-Ph 25 KVA Amorphous/CRGO core 7 conventional type copper wound DTR with BEE 5 star ratingConventional DTR (Cu) 3-Ph 40 KVA Amorphous/CRGO core 8 conventional type copper wound DTR with BEE 5 star rating Conventional DTR (Cu) 3-Ph 63 KVA Amorphous/CRGO core 9 conventional type copper wound DTR with BEE 5 star ratingConventional DTR (Cu)
Each
52168
Each
66000
Each
86285
Each
96541
10
Sl. No .
Unit
Rupees
3-Ph 100 KVA Amorphous/CRGO core 10 conventional type copper wound DTR with BEE 5 star rating Conventional DTR (Cu) 3-Ph 160 KVA Amorphous/CRGO core 11 conventional type copper wound DTR with BEE 5 star rating Conventional DTR (Cu) 12 250 KVA CSP DTR (Cu)
Each
118403
Each
186576
Each
297500
13 315 KVA CSP DTR (Cu) Conventional 14 500 KVA Conventional (Al) 15 Single Phase 15 KVA Transformer (Amorphous) SUBHEAD -VII: SWITCH CONTROL AND PROTECTIVE GEAR 1 2 33 KV VCB with CRPs & CTs ratio (400-200100/1-1-1A) 11 KV VCB with CTs & Panels ( Feeder Control) 11 KV VCB with CTs & Panels ( LV Control ) without differential protection 12/1979 (R-1993) 22/1983
Each Each
361232 182526
Each
187731
4 5
11 KV VCB with CTs & Panels ( LV Control ) with differential protection 33 KV CTs 400-200-100/1-1A ratio 0.2 class accuracy 33 KV CTs 400-200-100/1-1A ratio 0.5 class accuracy
Each Each
227355 24573
Each
16803
Each
18780
Each
20029
9 11 KV CTs (50-25/1-1A)
59/1993
Each
14640
Each Each
14463 13564
12 11 KV CTs 200-100/1-1A
Each
13125
13 11 KV CTs (600-300/1-1-.577A) 11
Each
14640
Sl. No .
Unit
Rupees
14 33 KV PT (Single Phase) class 0.5 15 33 KV PT (Single Phase) class 0.2 16 33 KV PT (Three Phase) of 0.5 class accuracy 60/1993
17 11 KV PT (3 Phase) 33 KV 800 Amps AB Switch Double break with solid core insulator
18
--
Each
27071
43/1987
Each
14976
Each
9100
- do -
Each
11500
--
Each
4770
Each
5300
24
16/1981 (R-55/1987)
Each
3254
Each
2369
- do -
Each
1753
55/1987
Each
336
28 33 KV HG Fuse set
Set
9450
29 11 KV HG Fuse Set
Set
1195
Set
415
Set
959
32
Each
13996
12
Sl. No .
Unit
Rupees
33
Each
5425
Each
2290
35 12 V, 80 AH SMF Batteries cells 220 V, 80 AH SMF Batteries and Chargers & DCDB
Each
5290
36
Each
210000
Each
115000
38 LT Switched capacitors 1*9 KVAR 1x10 KVAR 11 KV 2 MVAR Capacitor banks with associated equipment a Type A b Type B with 40 Mtrs HT UG cable c Type C (Indoor Type with HT UG cable Each Each 2548 2614
39
40 Sectionalizers
Each
588444
41 Auto - Reclosures
Each
925206
Each
366000
Each
735000
Each
125584
Each
376368
Each
274818
Each
210677
Each
100000
13
Sl. No .
Unit
Rupees
Each
200000
Each
1020110
Each
1445325
Each
27569
Each
300000
SUBHEAD -VIII: ENERGY METERS AND METERING EQUIPMENT a) LT Single Phase High quality Meter Class 1 accuracy ( 5-20A) b) LT Single Phase Electronic Energy Meter 2.5A - 10A c) LT Single Phase Class 1 accuracy (push fit type box Non push fit type TC) 5-30A
Each
710
Each
447
Each
936
a) Three Phase Electronic Meter 10A - 40A with P P Box b) Three Phase High Quality Meter 10A - 40A (Counter type display without Box)
Each
1835
Each
900
a) LT 3-Ph Class-1 Accuracy CT Operated Electronic TVR Meter 200/5A b) LT 3-Ph Class-0.5 Accuracy CT Operated Electronic TVR Meter 125/5A
Each
6920
Each
7950
a) HT Trivector Meter 0.5 class accuracy(10/5A) b) HT Trivector Meter 0.5 class accuracy (200/1,100/1A)
Each
4435
Each
4435
14
Sl. No .
Unit
Rupees
11 KV Metering cubicles a) 10/5A class 0.5 accuracy b) 20/5 A c) 30/5A d) 40/5A e) 75/5 A f) 60/5 A, 0.5
Each
250
Each
387
Each
1647
9 HT Meter Box 10 A Type Distribution type BOX 11 B Type Distribution type BOX 12 SMC Meter Box with fixing clamps (3 phase meters) SMC Meter Box with fixing clamps (S- phase meters) SUBHEAD -IX: EARTHING MATERIALS 1 GI Earth pipe 40 mm , (1.8 mts. Length) 2 GI Earth pipe 40 mm (2.5 mts. Length) 3 CI Earth pipe 80mm dia, (2.5 mts. Length) SUBHEAD -X: OTHER MATERIALS 1 Hand Held Computers with Printer 2 CMRI 3 HT Meter Box
13
Each
408
15
COST DATA FOR HILLY AND TRIBAL AREAS AS ADOPTED BY IRRIGATION DEPARTMENT IN THE STATE
For hilly and tribal areas, the following EXTRA RATES are allowed over and above approved cost data of labour. a.25% extra is allowed for the works located within the interior Agency / Tribal limits. (i.e.) for the works located within and upto 16 Kilometers from any all weather route inside Agency/Tribal. a.40% extra is allowed for the works located within the interior Agency / Tribal Area i.e., for the works located beyond 16 Kilometers from any all weather route inside Agency/Tribal. Note : 1 No extra percentage is permissible in respect of Forest produce such as Bamboo, Rellu grass and all materials obtained from outside the Agency/Tribal. The extra percentage under Agency/Tribal areas allowance may be allowed on the labour component and on the labour charges in the rates for conveyance of materials. The extra percentage on cost of materials in Agency/Tribal areas can be allowed on the labour component only, if they are manufactured in the Agency/Tribal areas itself except Forest produce.
11
Re2k5/Revised Cost data 10-11.xls
1. R.E.C. - Construction Standard No. M11/1979 (R-1989) Costdata per Km of 33 KV Line with 100 Sq.mm AAA Conductor over 9.1 Mts. PSCC Poles at 105 Mts. Span, 75 Kg/Sq.Mt wind pressure, working load 280 Kgs. Sl. No. 1 2 3 4 5 6 7 8 9 9.1 M PSCC Pole 1.53M Cross Arm (Channel) without clamps Top Clamp with cleat Back Clamp Stay sets with clamps Bracing Set with double cross arm 100 Sq.mm AAA Conductor 33 KV Pin - Insulator with Pin Strain Insulator set with metal parts( 3x 11 KV B&S Insulator with 33 KV Hard ware fitting) Concreting of Pole, Stay sets & Base concreting Misc. Items like coil earthing, pipe earthing, danger-boards, bolts & nuts, etc. Total Cost of Material 3% storage & handling charges on items (1) to (9) 3% Contingencies on Materials Labour Transport 1% Cess on Material, Labour & Transport 11% Estt. & Genl. Charges On Materials Particulars Qty. 12 10 10 10 6 1 3.06 33 6 Rate in Rs. 2310 950 214 130 897 3150 42465 235 653 Per Unit Each Each Each Each Each Set K.M. Each Set Amount in Rs. 27720 9500 2140 1300 5382 3150 129943 7755 3918
10 11
LS LS
LS LS
LS LS
16940 3300 211048 5724 6331 52762 10552 2744 23215 312376 312,380
190808
Total or say
2. R.E.C. - Construction Standard No. M11/1979 (R-1989) Costdata per Km of 33 KV Line with 100 Sq.mm AAA Conductor over 9.1 Mts. PSCC Poles at 80 Mts. Span, 100 Kg/Sq.Mt wind pressure, working load 280 Kgs. Sl. No. Particulars Qty. Rate in Rs. 2310 950 214 130 897 3150 42465 235 653 LS LS Per Unit Each Each Each Each Each Set K.M. Each Set LS LS Amount in Rs. 32340 11400 2568 1560 5382 3150 129943 9165 3918 16940 3300
1 2 3 4 5 6 7 8 9 10 11
9.1 M PSCC Pole 1.53M Cross Arm (Channel) without clamps Top Clamp with cleat Back Clamp Stay sets with clamps Bracing Set with double cross arm 100 Sq.mm AAA Conductor 33 KV Pin - Insulator with Pin Strain Insulator set with metal parts Concreting of Pole, Stay sets & Base concreting Misc. Items like coil earthing, pipe earthing, danger-boards, bolts & nuts, etc. Total Cost of Material 3% storage & handling charges on items (1) to (9) 3% Contingencies on Materials Labour Transport 1% Cess on Material, Labour & Transport 11% Estt. & Genl. Charges On Materials
14 12 12 12 6 1 3.06 39 6 LS LS
199426
Total or say
3. R.E.C. - Construction Standard No. A-5/1972 Costdata per Km of 11 KV Line with 55 Sq.mm AAA Conductor over 8 Mts. PSCC Poles at 60 Mts. Span, 75 Kg/Sq.Mt wind pressure, working load 140 Kgs. Sl. No. Particulars Qty. Rate in Rs. 1323 418 167 93 328 2700 22871 67 229 LS LS Per Unit Each Each Each Each Each Set K.M. Each Set LS LS Amount in Rs. 23814 6688 2672 1488 1968 2700 69985 3417 1374 19556 4400
1 2 3 4 5 6 7 8 9 10 11
8.0 M PSCC Pole 1.07M Cross Arm (Channel) without clamps Top Clamp with cleat Back Clamp Stay sets with clamps Bracing Set with double cross arm 55 Sq.mm AAA Conductor 11 KV Pin - Insulator with Pin Strain Insulator set with metal parts Concreting of Pole, Stay sets & Base concreting Misc. Items like coil earthing, pipe earthing, danger-boards, bolts & nuts, etc. Total Cost of Material 3% storage & handling charges on items (1) to (9) 3% Contingencies on Materials Labour Transport 1% Cess on Material, Labour & Transport 11% Estt. & Genl. Charges On Materials
18 16 16 16 6 1 3.06 51 6 LS LS
114106
Total or say
4. R.E.C. - Construction Standard No. A-5/1972 Costdata per Km of 11 KV Line with 55 Sq.mm AAA Conductor over 8 Mts. PSCC Poles at 65 Mts. Span, 100 Kg/Sq.Mt wind pressure, working load 200 Kgs. Sl. No. Particulars Qty. Rate in Rs. 1436 418 167 93 328 2700 22871 67 229 LS LS Per Unit Each Each Each Each Each Set K.M. Each Set LS LS Amount in Rs. 24412 6270 2505 1395 1968 2700 69985 3216 1374 19556 4400
1 2 3 4 5 6 7 8 9 10 11
8.0 M PSCC Pole 1.07M Cross Arm (Channel) without clamps Top Clamp with cleat Back Clamp Stay sets with clamps Bracing Set with double cross arm 55 Sq.mm AAA Conductor 11 KV Pin - Insulator with Pin Strain Insulator set with metal parts Concreting of Pole, Stay sets & Base concreting Misc. Items like coil earthing, pipe earthing, danger-boards, bolts & nuts, etc. Total Cost of Material 3% storage & handling charges on items (1) to (9) 3% Contingencies on Materials Labour Transport 1% Cess on Material, Labour & Transport 11% Estt. & Genl. Charges On Materials
17 15 15 15 6 1 3.06 48 6 LS LS
113825
137781 3415 4133 34445 6889 1791 15156 Total or say 203610 203,610
5. R.E.C. - Construction Standard No. A-5/1972 Costdata per Km of 11 KV Line with 34 Sq.mm AAA Conductor over 8 Mts. PSCC Poles at 60 Mts. Span, 75 Kg/Sq.Mt wind pressure, working load 140 Kgs. Sl. No. 1 2 3 4 5 6 7 8 9 10 11 8 M PSCC Pole 1.07M Cross Arm (Channel) without clamps Top Clamp with cleat Back Clamp Stay sets with clamps Bracing Set with double cross arm 34 Sq.mm AAA Conductor 11 KV Pin - Insulator with Pin Strain Insulator set with metal parts Concreting of Pole, Stay sets & Base concreting Misc. Items like coil earthing, pipe earthing, danger-boards, bolts & nuts, etc. Total Cost of Material 3% storage & handling charges on items (1) to (9) 3% Contingencies on Materials Labour Transport 1% Cess on Material, Labour & Transport 11% Estt. & Genl. Charges On Materials Particulars Qty. 18 16 16 16 6 1 3.06 51 6 LS LS Rate in Rs. 1323 418 167 93 328 2700 14453 67 229 LS LS Per Unit Each Each Each Each Each Set K.M. Each Set LS LS Amount in Rs. 23814 6688 2672 1488 1968 2700 44226 3417 1374 19556 4400
88347
Total or say
6. R.E.C. - Construction Standard No. A-5/1972 Costdata per Km of 11 KV Line with 34 Sq.mm AAA Conductor over 8 Mts. PSCC Poles at 65 Mts. Span, 100 Kg/Sq.Mt wind pressure, working load 200 Kgs. Sl. No. Particulars Qty. Rate in Rs. 1436 418 167 93 328 2700 14453 67 229 LS LS Per Unit Each Each Each Each Each Set K.M. Each Set LS LS Amount in Rs. 24412 6270 2505 1395 1968 2700 44226 3216 1374 19556 4400
1 2 3 4 5 6 7 8 9 10 11
8 PSCC Pole 1.53M Cross Arm (Channel) without clamps Top Clamp with cleat Back Clamp Stay sets with clamps Bracing Set with double cross arm 34 Sq.mm AAA Conductor 11 KV Pin - Insulator with Pin Strain Insulator set with metal parts Concreting of Pole, Stay sets & Base concreting Misc. Items like coil earthing, pipe earthing, danger-boards, bolts & nuts, etc. Total Cost of Material 3% storage & handling charges on items (1) to (9) 3% Contingencies on Materials Labour Transport 1% Cess on Material, Labour & Transport 11% Estt. & Genl. Charges On Materials
17 15 15 15 6 1 3.06 48 6 LS LS
88066
112022 2642 3361 28005 5601 1456 12322 Total or say 165410 165,410
7. R.E.C. - Construction Standard No. A-17/1972 Costdata per Km of 6.3 KV S-ph Line with 34 Sq.mm AAA Conductor over 8 Mts. PSCC Poles at 90 Mts. Span, 75 Kg/Sq.Mt wind pressure, working load 140 Kgs. Sl. No. Particulars Qty. Rate in Rs. 1323 167 100 298 14453 67 229 Per Unit Each Each Each Each K.M. Each Set L.S. L.S. 2500 Amount in Rs. 17199 1670 1000 1788 29484 737 916 19556
1 2 3 4 5 6 7 8 9
8 M PSCC Pole Top Clamp with cleat D clamp MS Stay sets 34 Sq.mm AAA Conductor 11 K.V.Pin-Insulator with Pin Strain Insulator set Concreting of Pole,Stay sets & Base concreting Misc. Items like coil earthing, pipe earthings, danger-boards, bolts & nuts, etc. Total Cost of Material 3% storage & handling charges on items (1) to (10) 3% Contingencies on Materials Labour Transport 1% Cess on Material, Labour & Transport 11% Estt. & Genl. Charges On Materials
13 10 10 6 2.04 11 4
52794
74850 1584 2245 18712 3742 973 8233 Total or say 110341 110,340
8. R.E.C. - Construction Standard No. A-17/1972 Costdata per Km of 6.3 KV S-ph Line with 34 Sq.mm AAA Conductor over 8 Mts. PSCC Poles at 90 Mts. Span, 100 Kg/Sq.Mt wind pressure, working load 200 Kgs. Sl. No. Particulars Qty. Rate in Rs. 1436 167 100 298 14453 67 229 Per Unit Each Each Each Set K.M. Each Set Amount in Rs. 18668 1670 1000 1788 29484 737 916
1 2 3 4 5 6 7 8 9
8 M PSCC Pole Top Clamp with cleat D clamp MS Stay sets 34 Sq.mm AAA Conductor 11 K.V.Pin-Insulator with Pin Strain Insulator set Concreting of Pole,Stay sets & Base concreting Misc. Items like coil earthing, pipe earthings, danger-boards, bolts & nuts, etc. Total Cost of Material 3% storage & handling charges on items (1) to (10) 3% Contingencies on Materials Labour Transport 1% Cess on Material, Labour & Transport 11% Estt. & Genl. Charges On Materials
13 10 10 6 2.04 11 4
L.S. L.S.
19556 2500
54263
76319 1628 2290 19080 3816 992 8395 Total or say 112519 112,520
9. R.E.C. - Construction Standard No. B-5/1972 Costdata per Km of LT 3-Ph 5 Wire Line(Horizontal formation ) with 3 x 55 Sq.mm + 2 x 34 Sq.mm AAAC over 8 Mts. PSCC Poles at 65 Mts. Span, 75 Kg/Sq.Mt wind pressure, working load 140 Kgs. Sl. No. Particulars Qty. Rate in Rs. 1323 343 93 328 22871 14453 32 46 12 Per Unit Each Each Each Each K.M. K.M. Set Set Each Amount in Rs. 21168 6174 1674 1312 69985 29484 1344 2208 192
1 2 3 4 5 6 7 8 9 10 11
8 M PSCC Pole L.T. 3 Phase cross arms Back Clamp Stay sets 55 Sq.mm AAA Conductor 34 Sq.mm AAA Conductor Shakle Insulator set L.T.pin insulator with pin C.I. Knob Concreting of Pole,Stay sets & Base concreting Misc. Items like coil earthing, pipe earthings, danger-boards, bolts & nuts, etc. Total Cost of Material 3% storage & handling charges on items (1) to (9) 3% Contingencies on Materials Labour Transport 1% Cess on Material, Labour & Transport 11% Estt. & Genl. Charges On Materials
16 18 18 4 3.06 2.04 42 48 16
L.S. L.S.
16016 3500
133541
153057 4006 4592 38264 7653 1990 16836 Total or say 226398 226,400
10. R.E.C. - Construction Standard No. B-5/1972 Costdata per Km of LT 3-Ph 5 Wire Line(Horizontal formation ) with 3 x 55 Sq.mm + 2 x 34 Sq.mm AAAC over 8 Mts. PSCC Poles at 60 Mts. Span, 100 Kg/Sq.Mt wind pressure, working load 200 Kgs. Sl. No. Particulars Qty. Rate in Rs. 1436 343 93 328 22871 14453 32 46 12 Per Unit Each Each Each Each K.M. K.M. Set Set Each L.S. Amount in Rs. 25848 6860 1860 1312 69985 29484 1344 2576 216 16016
1 2 3 4 5 6 7 8 9 10 11
8 M PSCC Pole L.T. 3 Phase cross arms Back Clamp LT Stay sets 55 Sq.mm AAA Conductor 34 Sq.mm AAA Conductor Shakle Insulator set L.T.pin insulator with pin C.I. Knob Concreting of Pole,Stay sets & Base concreting Misc. Items like coil earthing, pipe earthings, danger-boards, bolts & nuts, etc. Total Cost of Material 3% storage & handling charges on items (1) to (9) 3% Contingencies on Materials Labour Transport 1% Cess on Material, Labour & Transport 11% Estt. & Genl. Charges On Materials
18 20 20 4 3.06 2.04 42 56 18
L.S.
3500
139485
Total or say
11. R.E.C. - Construction Standard No. B-5/1972 Costdata per Km of LT 3-Ph 5 Wire Line(Horizontal formation ) with 5 x 34 Sq.mm AAAC over 8 Mts. PSCC Poles at 65 Mts. Span, 75 Kg/Sq.Mt wind pressure, working load 140 Kgs. Sl. No. Particulars Qty. Rate in Rs. 1323 343 93 328 14453 32 46 12 Per Unit Each Each Each Each K.M. Set Set Each L.S. L.S. Amount in Rs. 21168 6174 1674 1312 73710 1344 2208 192
1 2 3 4 5 6 7 8 9 10
8 M PSCC Pole L.T. 3 Phase cross arms Back Clamp LT Stay sets 34 Sq.mm AAA Conductor Shakle Insulator set L.T.pin insulator with pin C.I. Knob Concreting of Pole,Stay sets & Base concreting Misc. Items like coil earthing, pipe earthings, danger-boards, bolts & nuts, etc. Total Cost of Material 3% storage & handling charges on items (1) to (8) 3% Contingencies on Materials Labour Transport 1% Cess on Material, Labour & Transport 11% Estt. & Genl. Charges On Materials
16 18 18 4 5.10 42 48 16
16016 3500
107782
127298 3233 3819 31825 6365 1655 14003 Total or say 188197 188,200
12. R.E.C. - Construction Standard No. B-5/1972 Costdata per Km of LT 3-Ph 5 Wire Line(Horizontal formation ) with 5 x 34 Sq.mm AAAC over 8 Mts. PSCC Poles at 60 Mts. Span, 100 Kg/Sq.Mt wind pressure, working load 200 Kgs. Sl. No. Particulars Qty. Rate in Rs. 1436 343 93 328 14453 32 46 12 Per Unit Each Each Each Each K.M. Set Set Each L.S. L.S. Amount in Rs. 25848 6860 1860 1312 73710 1344 2576 216
1 2 3 4 5 6 7 8 9 10
8 M PSCC Pole L.T. 3 Phase cross arms Back Clamp LT Stay sets 34 Sq.mm AAA Conductor Shakle Insulator set L.T.pin insulator with pin C.I. Knob Concreting of Pole,Stay sets & Base concreting Misc. Items like coil earthing, pipe earthings, danger-boards, bolts & nuts, etc. Total Cost of Material 3% storage & handling charges on items (1) to (8) 3% Contingencies on Materials Labour Transport 1% Cess on Material, Labour & Transport 11% Estt. & Genl. Charges On Materials
18 20 20 4 5.10 42 56 18
16016 3500
113726
Total or say
197012 197,010
13. R.E.C. - Construction Standard No. B-12/1981 Costdata per Km of LT 3-Ph 4 Wire Line(Horizontal formation ) with 3 x 55 Sq.mm + 1 x 34 Sqmm AAAC over 8 Mts. PSCC Poles at 65 Mts. Span, 75 Kg/Sq.Mt wind pressure, working load 140 Kgs. Sl. No. Particulars Qty. Rate in Rs. 1323 277 93 328 22871 14453 32 46 12 Per Unit Each Each Each Each K.M. K.M. Set Set Each L.S. L.S. Amount in Rs. 21168 4986 1674 1312 69985 14742 1024 1656 192
1 2 3 4 5 6 7 8 9 10 11
8 M PSCC Pole L.T. 3 Phase cross arms Back Clamp LT Stay sets 55 Sqmm AAA Conductor 34 Sq.mm AAA Conductor Shakle Insulator set L.T.pin insulator with pin C.I. Knob Concreting of Pole,Stay sets & Base concreting Misc. Items like coil earthing, pipe earthings, danger-boards, bolts & nuts, etc. Total Cost of Material 3% storage & handling charges on items (1) to (9) 3% Contingencies on Materials Labour Transport 1% Cess on Material, Labour & Transport 11% Estt. & Genl. Charges On Materials
16 18 18 4 3.06 1.02 32 36 16
16016 3500
116739
Total or say
14. R.E.C. - Construction Standard No. B-12/1981 Costdata per Km of LT 3 Ph 4 Wire Line(Horizontal formation ) with 3 x 55 Sq.mm + 1 x 34 Sqmm AAAC over 8 Mts. PSCC Poles at 60 Mts. Span, 100 Kg/Sq.Mt wind pressure, working load 200 Kgs. Sl. No. Particulars Qty. Rate in Rs. 1436 277 93 328 22871 14453 32 46 12 Per Unit Each Each Each Each K.M. K.M. Set Set Each L.S. L.S. Amount in Rs. 21540 4709 1581 1312 69985 14742 1024 1518 180
1 2 3 4 5 6 7 8 9 10 11
8 M PSCC Pole L.T. 3 Phase cross arms Back Clamp LT Stay sets 55 Sqmm AAA Conductor 34 Sq.mm AAA Conductor Shakle Insulator set L.T.pin insulator with pin C.I. Knob Concreting of Pole,Stay sets & Base concreting Misc. Items like coil earthing, pipe earthings, danger-boards, bolts & nuts, etc. Total Cost of Material 3% storage & handling charges on items (1) to (9) 3% Contingencies on Materials Labour Transport 1% Cess on Material, Labour & Transport 11% Estt. & Genl. Charges On Materials
15 17 17 4 3.06 1.02 32 33 15
16016 3500
116591
Total or say
15. R.E.C. - Construction Standard No. B-12/1981 Costdata per Km of LT 3-Ph 4 Wire Line(Horizontal formation ) with 4 x 34 Sqmm AAAC over 8 Mts. PSCC Poles at 65 Mts. Span, 75 Kg/Sq.Mt wind pressure, working load 140 Kgs. Sl. No. Particulars Qty. Rate in Rs. 1323 277 93 328 14453 32 46 12 Per Unit Each Each Each Each K.M. Set Set Each L.S. L.S. Amount in Rs. 21168 4986 1674 1312 58968 1024 1656 192
1 2 3 4 5 6 7 8 9 10
8 M PSCC Pole L.T. 3 Phase cross arms Back Clamp LT Stay sets 34 Sq.mm AAA Conductor Shakle Insulator set L.T.pin insulator with pin C.I. Knob Concreting of Pole,Stay sets & Base concreting Misc. Items like coil earthing, pipe earthings, danger-boards, bolts & nuts, etc. Total Cost of Material 3% storage & handling charges on items (1) to (8) 3% Contingencies on Materials Labour Transport 1% Cess on Material, Labour & Transport 11% Estt. & Genl. Charges On Materials
16 18 18 4 4.08 32 36 16
16016 3500
90980
Total or say
16. R.E.C. - Construction Standard No. B-12/1981 Costdata per Km of LT 3-Ph 4 Wire Line(Horizontal formation ) with 4 x 34 Sqmm AAAC over 8 Mts. PSCC Poles at 60 Mts. Span, 100 Kg/Sq.Mt wind pressure, working load 200 Kgs. Sl. No. Particulars Qty. Rate in Rs. 1436 277 93 328 14453 32 46 12 Per Unit Each 4709 2 3 4 5 6 7 8 9 L.T. 3 Phase cross arms Back Clamp LT Stay sets 34 Sq.mm AAA Conductor Shakle Insulator set L.T.pin insulator with pin C.I. Knob Concreting of Pole,Stay sets & Base concreting Misc. Items like coil earthing, pipe earthings, danger-boards, bolts & nuts, etc. Total Cost of Material 3% storage & handling charges on items (1) to (8) 3% Contingencies on Materials Labour Transport 1% Cess on Material, Labour & Transport 11% Estt. & Genl. Charges On Materials 17 17 4 4.08 32 33 17 Each 1581 Each 1312 Each 58968 K.M. 1024 Set 1518 Set 204 Each Amount in Rs. 21540 1 8 M PSCC Pole 15
L.S.
16016
10
L.S.
3500
90856
110372 2726 3311 27593 5519 1435 12141 Total or say 163096 163,100
17. R.E.C. - Construction Standard No. B-14/1981 Costdata per Km of LT S-Ph 3 Wire Line(Horizontal formation ) with 34 Sqmm AAAC over 8 Mts. PSCC Poles at 65 Mts. Span, 75 Kg/Sq.Mt wind pressure, working load 140 Kgs. Sl. No. Particulars Qty. Rate in Rs. 1323 145 93 328 14453 32 46 12 Per Unit Each Each Each Each K.M. Set Set Each L.S. L.S. Amount in Rs. 21168 2610 1674 1312 44226 704 1104 192
1 2 3 4 5 6 7 8 9 10
8 M PSCC Pole L.T. 1 Phase cross arms Back Clamp LT Stay sets 34 Sq.mm AAA Conductor Shakle Insulator set L.T.pin insulator with pin C.I. Knob Concreting of Pole,Stay sets & Base concreting Misc. Items like coil earthing, pipe earthings, danger-boards, bolts & nuts, etc. Total Cost of Material 3% storage & handling charges on items (1) to (8) 3% Contingencies on Materials Labour Transport 1% Cess on Material, Labour & Transport 11% Estt. & Genl. Charges On Materials
16 18 18 4 3.06 22 24 16
16016 3500
72990
92506 2190 2775 23127 4625 1203 10176 Total or say 136601 136,600
Note : Substitute the cost of 8 mts PSCC pole in above data for wind pressure of 100 kgs/Sqmts, and working load of 200 Kgs.
18. R.E.C. - Construction Standard No. B-14/1981 Costdata per Km of LT S-Ph 2 Wire Line(Horizontal formation ) with 2 x 34 Sqmm AAAC over 8 Mts. PSCC Poles at 65 Mts. Span, 75 Kg/Sq.Mt wind pressure, working load 140 Kgs. Sl. No. Particulars Qty. Rate in Rs. 1323 136 93 328 14453 32 46 12 Per Unit Each Each Each Each K.M. Set Set Each L.S. L.S. Amount in Rs. 21168 2448 1674 1312 29484 384 552 192
1 2 3 4 5 6 7 8 9 10
8 M PSCC Pole L.T. 1 Phase cross arms Back Clamp LT Stay sets 34 Sq.mm AAA Conductor Shakle Insulator set L.T.pin insulator with pin C.I. Knob Concreting of Pole,Stay sets & Base concreting Misc. Items like coil earthing, pipe earthings, danger-boards, bolts & nuts, etc. Total Cost of Material 3% storage & handling charges on items (1) to (8) 3% Contingencies on Materials Labour Transport 1% Cess on Material, Labour & Transport 11% Estt. & Genl. Charges On Materials
16 18 18 4 2.04 12 12 16
16016 3500
57214
76730 1716 2302 19183 3837 997 8440 Total or say 113205 113,210
19. R.E.C. - Construction Standard No. B-32/1984 Costdata per Km of LT line with 3 x 16 + 25 Sqmm AB Cable over 8 Mts. PSCC Poles at 65 Mts. Span, 75 Kg/Sq.Mt wind pressure, working load 140 Kgs. Sl. No. Particulars Qty. Rate in Rs. Per Unit Amount in Rs. 21168 1 2 3 4 5 6 7 8 M PSCC Pole Suspension clamp assembly with eye hook Dead end clamp assembly with eye hook LT Stay sets L.T. A.B. Cable 3 x 16 x 25 Sqmm Insulated connectors with covers Concreting of Pole,Stay concreting & Base concreting 16 12 6 4 1 56 1323 88 88 328 38834 80 Each 1056 Each 528 Each 1312 Set 38834 K.M. 4480 Each
L.S.
16016
L.S.
3500
Total Cost of Material 3% storage & handling charges on items (1) to (6) 3% Contingencies on Materials Labour Transport 1% Cess on Material, Labour & Transport 11% Estt. & Genl. Charges On Materials 67378
86894 2021 2607 21724 4345 1130 9558 Total or say 128278 128,280
20. R.E.C. - Construction Standard No. B-32/1984 Costdata per Km of LT line with 2 x 16 + 25 Sqmm AB Cable over 8 Mts. PSCC Poles at 65 Mts. Span, 75 Kg/Sq.Mt wind pressure, working load 140 Kgs. Sl. No. Particulars Qty. Rate in Rs. 1323 88 88 328 24456 80 Per Unit Each 1056 2 3 4 5 6 7 Suspension clamp assembly with eye hook Dead end clamp assembly with eye hook LT Stay sets L.T. A.B. Cable 2 x 16 x 25 Sqmm Insulated connectors with covers Concreting of Pole,Stay concreting & Base concreting Misc. Items like coil earthing, bolts & nuts, etc. 12 6 4 1 56 Each 528 Each 1312 Set 24456 K.M. 4480 Each Amount in Rs. 21168 1 8 M PSCC Pole 16
L.S.
16016
L.S.
3500
Total Cost of Material 3% storage & handling charges on items (1) to (6) 3% Contingencies on Materials Labour Transport 1% Cess on Material, Labour & Transport 11% Estt. & Genl. Charges On Materials 53000
72516 1590 2175 18129 3626 943 7977 Total or say 106956 106,960
21. R.E.C. - Construction Standard No. B-32/1984 Costdata per Km of LT line with 1 x 16 + 25 Sqmm AB Cable over 8 Mts. PSCC Poles at 65 Mts. Span, 75 Kg/Sq.Mt wind pressure, working load 140 Kgs. Sl. No. Particulars Qty. Rate in Rs. 1323 88 88 328 20436 80 Per Unit Each Each Each Set K.M. Each L.S. Amount in Rs. 21168 1056 528 1312 20436 4480 16016
1 2 3 4 5 6 7
8 M PSCC Pole Suspension clamp assembly with eye hook Dead end clamp assembly with eye hook LT Stay sets L.T. A.B. Cable 1 x 16 + 25 Sqmm Insulated connectors with covers Concreting of Pole,Stay concreting & Base concreting Misc. Items like coil earthing, bolts & nuts, etc.
16 12 6 4 1 56
L.S.
3500
Total Cost of Material 3% storage & handling charges on items (1) to (6) 3% Contingencies on Materials Labour Transport 1% Cess on Material, Labour & Transport 11% Estt. & Genl. Charges On Materials
48980
Total or say
22. R.E.C. - Construction Standard No. B-32/1984 Costdata per Km of LT line with 3 x 16 + 25 Sqmm AB Cable over 8 Mts. PSCC Poles at 65 Mts. Span, 100 Kg/Sq.Mt wind pressure, working load 200 Kgs. Sl. No. Particulars Qty. Rate in Rs. 1436 88 88 328 38834 80 Per Unit Each Each Each Set K.M. Each L.S. Amount in Rs. 22976 1056 528 1312 38834 4480 16016
1 2 3 4 5 6 7
8 M PSCC Pole Suspension clamp assembly with eye hook Dead end clamp assembly with eye hook LT Stay sets L.T. A.B. Cable 3 x 16 + 25 Sqmm Insulated connectors with covers Concreting of Pole,Stay concreting & Base concreting Misc. Items like coil earthing, bolts & nuts, etc. Total Cost of Material 3% storage & handling charges on items (1) to (6) 3% Contingencies on Materials Labour Transport 1% Cess on Material, Labour & Transport 11% Estt. & Genl. Charges On Materials
16 12 6 4 1 56
L.S.
3500 88702 2076 2661 22176 4435 1153 9757 130960 130,960
69186
Total or say
23. R.E.C. - Construction Standard No. B-32/1984 Costdata per Km of LT line with 2 x 16 + 25 Sqmm AB Cable over 8 Mts. PSCC Poles at 65 Mts. Span, 100 Kg/Sq.Mt wind pressure, working load 200 Kgs. Sl. No. Particulars Qty. Rate in Rs. 1436 88 88 328 24456 80 Per Unit Each Each Each Set K.M. Each Amount in Rs. 22976 1056 528 1312 24456 4480
1 2 3 4 5 6 7
8 M PSCC Pole Suspension clamp assembly with eye hook Dead end clamp assembly with eye hook LT Stay sets L.T. A.B. Cable 2 x 16 + 25 Sqmm Insulated connectors with covers Concreting of Pole,Stay concreting & Base concreting Misc. Items like coil earthing, bolts & nuts, etc.
16 12 6 4 1 56
L.S.
16016
L.S.
3500
Total Cost of Material 3% storage & handling charges on items (1) to (6) 3% Contingencies on Materials Labour Transport 1% Cess on Material, Labour & Transport 11% Estt. & Genl. Charges On Materials
54808
Total or say
24. R.E.C. - Construction Standard No. B-32/1984 Costdata per Km of LT line with 1 x 16 + 25 Sqmm AB Cable over 8 Mts. PSCC Poles at 65 Mts. Span, 100 Kg/Sq.Mt wind pressure, working load 200 Kgs. Sl. No. Particulars Qty. Rate in Rs. 1436 88 88 328 20436 80 Per Unit Each Each Each Set K.M. Each Amount in Rs. 22976 1056 528 1312 20436 4480
1 2 3 4 5 6 7
8 M PSCC Pole Suspension clamp assembly with eye hook Dead end clamp assembly with eye hook LT Stay sets L.T. A.B. Cable 1 x 16 + 25 Sqmm Insulated connectors with covers Concreting of Pole,Stay concreting & Base concreting Misc. Items like coil earthing, bolts & nuts, etc.
16 12 6 4 1 56
L.S.
16016
L.S.
3500
Total Cost of Material 3% storage & handling charges on items (1) to (6) 3% Contingencies on Materials Labour Transport 1% Cess on Material, Labour & Transport 11% Estt. & Genl. Charges On Materials
50788
Total or say
25. R.E.C. - CONSTRUCTION STANDARD SPECIFICATION NO. F3&F4/1981 COST DATA FOR ERRECTION OF 100KVA-11KV/433V CONVENTIONAL TRANSFORMER
Sl. No.
Particulars
1 2 3 4 5
11 KV/433V 100KVA Conventional Transformer Erection of 11 KV AB Switch (200A) D.P.Structure (Including all Earthing) Erection of 11 KV H.G. Fuse set Installation of L.T.H.G. Fuse sets (2 Nos.) including connections LT Metering arrangements with CTs including cable connections and cleat arrangement Installation of A type distribuion box Installation of HT Lightening Arrestors Misc. Items Total Cost of Material 3% storage & handling charges on items (1) to (8) 3% Contingencies on Materials Labour & Transport 1% Cess on Material, Labour & Transport 11% Estt. & Genl. Charges on Materials Total Cost in Rs. or say :
8368
940
7 8 9
4836 5259 500 167,380 5006 5021 16,645 1840 18412 214,304 214,300
162 605
16,645
26.
Sl. No.
Particulars 11 KV/433V 63KVA Conventional Distribution Transformer Erection of 11 KV AB Switch (200A) D.P.Structure (Including all Earthing) Erection of 11 KV H.G. Fuse set Installation of L.T.H.G. Fuse sets (2 Nos.) including connections LT Metering arrangements with CTs including cable connections and cleat arrangement Installation of A type distribuion box Installation of HT Lightening Arrestors with earth connection Misc. Items Total Cost of Material
1 2 3 4
6 7
940
162 605
8 9
16,645
3% storage & handling charges on items 1 to 8 3% Contingencies on Materials Labour & Transport 1% Cess on Material, Labour & Transport 11% Estt. & Genl. Charges on Materials
184,473 184,470
27. Cost Data For Erection of 3 Phase 16 KVA-11KV/433V Conventional Distribution Transformer On Single Pole Structure
Sl. No. 1
Particulars 11 KV/433V 16KVA Conventional Distribution Transformer Erection of 11 KV AB Switch (200A) Single Pole.Structure with 9.1Mtr PSCC Pole (Including Earthing) Erection of 11 KV H.G. Fuse set CT Distribution box including CT wiring with 1x25 sqmm XLPE cable and cleat wiring Misc. Items(Danger boards,Bolts &Nuts,Concreting etc.) Total Cost of Material
5300 9877
909 3,448
3 4
1195 8279
388 253
5 6
1650
214
78469
5825
2,305 3% storage & handling charges on items (1) to (5) 3% Contingencies on Materials Labour & Transport 1% Cess on Material, Labour & Transport 11% Estt. & Genl. Charges on Materials 2,354 5,825 843 8,632
98,427 98,430
Sub data for Sl.No.3 of Estimate Nos. 27, 28 & 29 Sl. No. 1 2 3 4 5 6 7 8 9 10 Desctiption 9.1M/280 Kg WL PSCC Pole 100 X 50 mm MS Channel 65X65X6 mm MS Angle 50X6 mm MS Flat G.I.Earth Pipe 40 mm dia., 1.8M long 4 mm G.I.Wire LT Side arm with strut Cross arms, back clamps for cleat wiring C.I.Earth Pipe 75 mm dia., 2.5M long Bentonite compuond Sub Total for materials Unit Nos. Kg Kg Kg Nos. Kg Nos. Set Nos. LS Qty. 1 40 20 22 2 15 1 4 1 1
28. Cost Data For Erection of 3 Phase 25 KVA-11KV/433V Conventional Distribution Transformer On Single Pole Structure
Sl. No. 1
Particulars 11 KV/433V 25KVA Conventional Distribution Transformer Erection of 11 KV AB Switch (200A) Single Pole.Structure with 9.1Mtr PSCC Pole (Including Earthing) Erection of 11 KV H.G. Fuse set CT Distribution box including CT wiring with 1x50 sqmm XLPE cable and cleat wiring Misc. Items(Danger boards,Bolts &Nuts,Concreting etc.) Total Cost of Material
5300 9877
909 3,448
3 4
1195 14228
388 252
5 6
1500
196
98,100
5,866
2,898 3% storage & handling charges on items (1) to (5) 3% Contingencies on Materials Labour & Transport 1% Cess on Material, Labour & Transport 11% Estt. & Genl. Charges on Materials 2,943 5,866 1040 10,791
121,638 121,640
29. Cost Data For Erection of 3 Phase 40 KVA-11KV/433V Conventional Distribution Transformer On Single Pole Structure
Sl. No. 1
Particulars 11 KV/433V 40KVA Conventional Distribution Transformer Erection of 11 KV AB Switch (200A) Single Pole.Structure with 9.1Mtr PSCC Pole (Including Earthing) Erection of 11 KV H.G. Fuse set CT Distribution box including CT wiring with 1x70 sqmm XLPE cable and cleat wiring Misc. Items(Danger boards,Bolts &Nuts,Concreting etc.) Total Cost of Material
5300 9877
909 3,448
3 4
1195 18043
388 238
5 6
1500
196
122,200
5,721
3,621 3% storage & handling charges on items (1) to (5) 3% Contingencies on Materials Labour & Transport 1% Cess on Material, Labour & Transport 11% Estt. & Genl. Charges on Materials 3,666 5,721 1279 13,442
149,929 149,930
30. Cost Data For Erection of Single Phase 15 KVA-6.3KV/0-240V CSP Transformer(Oil immersed) On 9.1Mtr PSCC Pole Support
Particulars
15KVA Single Phase CSP Distribution Transformer 3 Mounting arrangements for transformer Earthing with 1No 2.5 Mts Long 75 mm CI earth pipe Distribution box with 1 No 100A Fuse unit and cleat wiring with 50 sqmm XPLE cable & LT side arm with strut 1996 1912 618 431
4378
303
1000
34,163
2,631
995 3% storage & handling charges on items (1) to (5) 3% Contingencies on Materials Labour & Transport 1% Cess on Material, Labour & Transport 11% Estt. & Genl. Charges on Materials 1,025 2,631 368 3,758
42,940 42,940
31.
R.E.C. - CONSTRUCTION STANDARD SPECIFICATION NO. F3&F4/1981 COST DATA FOR ERECTION OF 15KVA SINGLE PHASE 6.3KV/0-240V C.S.P TRANSFORMER (OIL IMMERSED) ON EXISTING 8M PSCC SUPPORT Particulars Qty. 1 No. 1 Set 1 No. L.S. Rate in Rs. 22,566 1,996 753 L.S. Per Unit Each Each Each L.S. Amount in Rs. 22,566 1,996 753 500
Sl.No. 1 2 3 4
15KVA Single Phase CSP Distribution Transformer Mounting arrangements for Transformer Pipe earthing Misc. Items
25,816
3% storage & handling charges on items (1) to (3) 3% Contingencies on Materials Labour & Transport 1% Cess on Material, Labour & Transport 11% Estt. & Genl. Charges On Materials Total Cost in Rs. Or say :
32.
R.E.C. - CONSTRUCTION STANDARD SPECIFICATION NO. F3&F4/1981 COST DATA FOR ERECTION OF 15KVA SINGLE PHASE 6.3KV/0-240V AMORPHOUS METAL CORE C.S.P TRANSFORMER (OIL IMMERSED) ON EXISTING 8M PSCC SUPPORT Particulars Qty. 1 No. Rate in Rs. 33,061 Per Unit Each Amount in Rs. 33,061
Sl.No. 1
15 KVA Oil Immersed Single Phase 6.3KV/0-240V Amorphous Metal Core Transformer Mounting arrangements for Transformer Pipe earthing Misc. Items
2 3 4
36,311
3% storage & handling charges on items (1) to (3) 3% Contingencies on Materials Labour & Transport 1% Cess on Material, Labour & Transport 11% Estt. & Genl. Charges On Materials Total Cost in Rs. Or say :
33.
COST DATA FOR SINGLE PHASE AGRICULTURE SERVICE ERECTED ON SUPPORT Sl.No. 1 2 3 4 5 6 Particulars 1 Phase (5A-20A) Energy meter 1 Phase 15A M.C.B./Fuse Unit P.V.C. Cable 6 Sq.mm Single Core Moulded Distribution Box P.V.C. Bends 38mm Bolts, Nuts etc. Qty. 1 1 20 1 1 L.S. Rate in Rs. 710 115 26 250 12 L.S. Per Unit Each Each Each Each Each L.S. Amount in Rs. 710 115 520 250 12 80
1,687
3% Contingencies Labour & Transport 1% Cess on Material, Labour & Transport 11% Estt. & Genl. Charges Total Cost in Rs. Or say :
34. R.E.C. - CONSTRUCTION STANDARD SPECIFICATION NO. H6&H8/1981 COST DATA FOR RELEASE OF POLY PHASE AGRICULTURE SERVICE ERECTED ON SUPPORT Sl.No. 1 2 3 4 5 6 Particulars 3 Phase (10A-40A ) Energy meter 3 Phase 40A M.C.B./Fuse Unit (3 Nos.) P.V.C. Cable 6 Sq.mm Single Core Moulded Distribution Box Installation of 2KVAR Capacitor Misc. items such as Bolts, Nuts & Board etc. Qty. 1 1 30 1 1 L.S. Rate in Rs. 1,835 729 26 387 500 L.S. Per Unit Each Each Each Each 1 L.S. Amount in Rs. 1,835 729 780 387 500 80
4,311
3% Contingencies Labour & Transport 1% Cess on Material, Labour & Transport 11% Estt. & Genl. Charges Total Cost in Rs. Or say :
35. R.E.C.-CONSTRUCTION STANDARD SPECIFICATION NO.H1 TO H3/1981 COST DATA FOR DOMESTIC AND NON-DOMESTIC SERVICE CONNECTION (SINGLE PHASE) WITH QUALITY METER
Sl. No. 1
Particulars Single Phase electronic Energy Meter 5-30A 15A M.C.B./Fuse Unit P.V.C. Cable single core 2.5 Sq.mm Moulded Distribution Box G.I. Wire No.8 P.V.C. Pipe 20mm P.V.C. Bends 20mm Misc.
Rate 936
2 3 4 5 6 7 8
Total
1301
850
2151
3% Contingencies on Materials Labour & Transport 1% Cess on Material, Labour & Transport 11% Estt. & Genl. Charges
39 202 15 143
26 430 13 94
65 633 28 237
Total Cost in Rs. Or say : Note : Item Nos. 4 to 7 are to be borne & arranged by the Consumer.
1701
1412
3,112 3,110
36. R.E.C.-CONSTRUCTION STANDARD SPECIFICATION NO.H1 TO H3/1981 COST DATA FOR DOMESTIC AND NON-DOMESTIC SERVICE CONNECTION (SINGLE PHASE) WITH ELECTRONIC METER
Sl. No. 1
Particulars
Rate
Single Phase electronic Energy Meter 2.5A-10A 15A M.C.B./Fuse Unit P.V.C. Cable single core 2.5 Sq.mm Moulded Distribution Box G.I. Wire No.8 P.V.C. Pipe 20mm P.V.C. Bends 20mm Misc.
447
2 3 4 5 6 7 8
Total
812
850
1662
3% Contingencies on Materials Labour & Transport 1% Cess on Material, Labour & Transport 11% Estt. & Genl. Charges
24 202 10 89
26 430 13 94
50 633 23 183
Total Cost in Rs. Or say : Note : Item Nos. 4 to 7 are to be borne & arranged by the Consumer.
1138
1412
2,550 2,550
37. R.E.C.-CONSTRUCTION STANDARD SPECIFICATION NO.H1 TO H3/1981 COST DATA FOR DOMESTIC AND NON-DOMESTIC SERVICE CONNECTION (SINGLE PHASE) WITH QUALITY METER
Sl. No. 1
Particulars
Rate
Single Phase Quality Energy Meter 5A-20A 15A M.C.B./Fuse Unit P.V.C. Cable single core 2.5 Sq.mm Moulded Distribution Box G.I. Wire No.8 P.V.C. Pipe 20mm P.V.C. Bends 20mm Misc.
710
2 3 4 5 6 7 8
Total
1075
850
1925
3% Contingencies on Materials Labour & Transport 1% Cess on Material, Labour & Transport 11% Estt. & Genl. Charges
32 202 13 118
26 430 13 94
58 633 26 212
Total Cost in Rs. Or say : Note : Item Nos. 4 to 7 are to be borne & arranged by the Consumer.
1441
1412
2,853 2,850
38. R.E.C.-CONSTRUCTION STANDARD SPECIFICATION NO.H1 TO H3/1981 COST DATA FOR DOMESTIC AND NON-DOMESTIC SERVICE CONNECTION (THREE PHASE)
Sl. No. 1
Particulars
Rate
Three Phase electronic Energy Meter 1040A 3 Phase 60A M.C.B./Fuse Unit Moulded Distribution Box P.V.C. Cable single core 6 Sq.mm G.I. Wire No.8 P.V.C. Pipe 20mm P.V.C. Bends 20mm Misc.
1835
2 3 4 5 6 7 8
1 1
Total
3177
3290
6467
3% Contingencies on Materials Labour & Transport 1% Cess on Material, Labour & Transport 11% Estt. & Genl. Charges
95 202 34 349
99 430 37 362
Total Cost in Rs. Or say : Note : Item Nos. 4 to 7 are to be borne & arranged by the Consumer.
3858
4218
8,076 8,080
39. R.E.C.-CONSTRUCTION STANDARD SPECIFICATION NO.H1 TO H3/1981 COST DATA FOR DOMESTIC AND NON-DOMESTIC SERVICE CONNECTION (THREE PHASE) WITH ELECTRONIC METER Sl. No. 1 Chargable to DISCOM Qty . Amount 1 1835 Chargable to Consumer Qty. Amount Amount in Rs. 1835
Particulars
Rate
3 Phase Electronic Energy Meter Housed in box 10-40A 3 phase 60A M.C.B./Fuse Unit P.V.C. Cable single core 6 Sq.mm G.I. Wire No.8 P.V.C. Pipe 20mm P.V.C. Bends 20mm Misc.
1835
2 3 4 5 6 7
955 3120 48 22 5 95
Total
2790
3290
6080
3% Contingencies on Materials Labour & Transport 1% Cess on Material, Labour & Transport 11% Estt. & Genl. Charges
84 405 32 307
99 557 38 362
Total Cost in Rs. Or say : Note : Item Nos. 4 to 7 are to be borne & arranged by the Consumer.
3617
4346
7,963 7,960
40.
R.E.C.-CONSTRUCTION STANDARD SPECIFICATION NO.H-5/1981 POLY PHASE SERVICE CONNECTION CHARGES FOR ERECTION OF 1 NO. INDUSTRIAL SERVICE (UPTO 15 H.P.)
Sl. No. 1
Particulars
Rate
Poly Phase Energy Meter housed 10A 40A 3 phase 60A M.C.B./Fuse unit Moulded Box for CT Meter P.V.C. Cable single core 10 Sq.mm G.I. Wire No.8 P.V.C. Pipe 38mm P.V.C. Bends 38mm Misc. items viz. link clips, wooden box, Bolts & Nuts.
1835
2 3 4 5 6 7 8
Total
4512
3719.8
8231.8
3% Contingencies Labour & Transport 1% Cess on Material, Labour & Transport 11% Estt. & Genl. Charges
5598
4840
10,438 10,440
41. R.E.C.-CONSTRUCTION STANDARD SPECIFICATION NO.H-5/1981 COST DATA FOR POLY PHASE SERVICE CONNECTION CHARGES FOR ERECTION OF 1 NO. INDUSTRIAL SERVICE (UPTO 15 H.P.) (C T METER)
Sl. No. 1
Particulars
Rate
7950
2 3 4 5 6 7 8 9
3 phase 60A M.C.B./Fuse unit Moulded Box for C T Meter L T Current Transformers P.V.C. Cable single core 10 Sq.mm G.I. Wire No.8 P.V.C. Pipe 38mm P.V.C. Bends 38mm Misc. items viz. link clips, wooden box, Bolts & Nuts.
1 1 3
Total
11968
5439.8
17407.8
3% Contingencies Labour & Transport 1% Cess on Material, Labour & Transport 11% Estt. & Genl. Charges
14172
6818
20,990 20,990
R.E.C.-CONSTRUCTION STANDARD SPECIFICATION NO.H-5/1981 COST DATA FOR POLY PHASE SERVICE CONNECTION FOR ERECTION OF 1 NO. INDUSTRIAL SERVICE (ABOVE 15 H.P.) (C.T. METER)
42.
Sl. No. 1
Particulars
Rate
L.T. 3-Phase class-0.5 Accuracy CT Operated Energy Meter Housed in a box P.V.C. Cable single core 10 Sq.mm G.I. Wire No.8 P.V.C. Pipe 38mm P.V.C. Bends 38mm Misc. items viz. link clips, wooden box, Bolts & Nuts.
7950
2 3 4 5 6
80 1 Kg. 2M 2 Nos.
3440 48 83 24 100
3440 48 83 24 175
Total
8025
3694.8
11719.8
3% Contingencies Labour & Transport 1% Cess on Material, Labour & Transport 11% Estt. & Genl. Charges
9638
4811
14,449 14,450
COST DATA FOR STREET LIGHT SERVICE CONNECTION (SINGLE PHASE) Rate Amount Particulars Qty. Per Unit in Rs. in Rs.
1 No.
936
Each
936
1 No.
115
Each
115
1 No.
400
Each
400
15 M
17
255
2 Mts
17.45
35
2 No.
3.5
Each
1 No.
250
Each
250
L.S.
L.S.
L.S.
50
Total
2,048
3% Contingenics Labour & Transport 1% Cess on Material, Labour & Transport 11% Estt. & Genl. Charges Total Cost in Rs. Or say :
44. DETAILED ESTIMATE FOR ERECTION OF 1No. 33/11 KV SUBSTATION WITH (NT) X 5 MVA POWER TRANSFORMERS AND NF = 3 NO. 11 KV FEEDERS
Particulars
Qty. LS LS LS
Unit
(b) Plantation of Trees Control Room and Consumer service centre 2 (including furniture) 3 Station Auxillaries Peripheral, Security Fencing, Approach road, retaing wall around switchward with gravel a) filling, gate and bore well b) Yard lighting c) Fire fighting Equipment d) P&T Phone and wireless set 4 Foundations for structures, PTRs & breakers 5 Bus bars, Jumpers, Connectors claps etc. 6 Control Cables 7 Structural Steel 8 Transformers a) 33/11KV, 5 MVA Power Transformer b) 11KV/ 415V 16KVA Stn. Transformer 9 Circiut Breakres (including trivector meters) a) 20 KA 11 kv feeder VCB including Control panel and CTs (NF=3) b) 20 KA 11 kv LV VCB including Control panel and CTs 10 Control Circiut Panels a) AC Supply Panel b) DC Aunnciation Panel 11 Instrument Transformers a) 11kv P.T (3 Phase) 12 Lightning Arrestors a) 33KV 10KA b) 11KV Line Type (NFX3) c) 11KV Station Type 10 KA 13 Isolating Switches a) 33KV 800A double break centrally operated Horizantal AB Switch b) 11KV 800A double break centrally operated Horizantal AB Switch (NT X 1+1) c) 11KV 400A Horizantal AB Switch (NF X 2+2) d) 11KV 200A Horizantal AB Switch for station transformer e) 33KV Horn Gap Fuse Set (1XNT) 14 2MVAR 11KV Capacitor Bank along with Associated Equipment 15 24V, 40 AH Battery Set including Battery Charger 16 Earthing of PTR, VCBs, AB Swicthes, Strucutres with 75x8mm GI Flat
LS LS
0.061 3.630
LS LS LS LS LS LS 15 1 1 3 1 1 1 1 6 9 3 3 2 8 1 1 1 4
LS LS LS LS LS LS MT Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each LS
6.655 0.550 0.660 1.375 3.025 1.100 1.210 5.069 30.748 0.522 5.476 1.877 0.330 0.330 0.119 0.195 0.158 0.053 0.812 0.300 0.920 0.053 0.095 7.682 0.560 1.815 75.377
0.338 30.748 0.522 1.825 1.877 0.330 0.330 0.119 0.033 0.018 0.018 0.271 0.150 0.115 0.053 0.095 7.682 0.140
Sub Total
17 Erection and transport and commissioning charges on items 7 to 15 at 10% 18 Contingencies on items 7 to 15 at 3% 19 T&P Charges on items No. 7 to 15 at 1% 20 1% Cess on Material, Labour & Transport 21 Establishment and General Charges at 11%
92.219 92.220
Note : NF = No. of 11 KV Feeders, The number of outgoing feeders at substation limited to the demand in MVA i.e. if substation demand is 5 MVA, the number of feeders should not exceed five.