You are on page 1of 62

EASTERN POWER DISTRIBUTION COMPANY OF A.P.

LIMITED
CORPORATE OFFICE :: VISAKHAPATNAM Memo.No.CGM/Projects/GM.P/DE.P2/ADE.P4/AE.P4/F.Cost DataD/D.No.876 /11Dt.30 -04-11 Sub:-EPDCL Revised Cost Data of materials, equipment, H.T & L.T Line, Services and 33 KV Substation to be adopted for the year 2010-11 Reg. Ref:- Memo.No.CGM/Projects/GM.P/DE.P2/ADE.P4/AE.P4/F.Cost DataD/D.No.699/11 Dt.06-04-11 *** The Cost Data 2010-11 has come in to force with effect from 08.04.2011 vide

1.

reference cited above. 2. Certain modifications for rates of poles, conductor, Power transformers, 11KV

and 33 KV XLPE cables and Labour and transport rates for service line estimates for the Cost Data 2010-11 have taken place and the revised Cost Data 2010-11 is herewith communicated. 3. Further, the field officers are requested to strictly adhere to the following

instructions while sanctioning the estimates. a) In case where the estimates are pending to be sanctioned on or after 08.04.2011, the same should be revised with latest cost data 2010-11. b) In case, where the applicants paid the necessary charges for the estimates on or before 08.04.2011 the estimates need not be revised. c) In case where the applicants come forward after 08.04.2011, and willing to pay the necessary charges for the estimates sanctioned prior to 08.04.2011 within the stipulated time as mentioned in the intimation letter from the concerned authority, the estimates need not be revised upto stipulated time period as communicated in the estimates. d) In case where the applicants come forward after 08.04.2011, and willing to pay the necessary charges for the estimates sanctioned prior to 08.04.2011, after lapse of the stipulated time as mentioned in the intimation letter from the concerned authority the estimates should be revised with latest cost data 2010-11.
C:\Documents and Settings\ambu\My Documents\Downloads\Cost data cov letter 10-11 modified.doc

4.

For service connection estimates in non REC scheme areas and execution of 33

KV Substations with other than REC funds, extra amounts should be added are 11% Establishment and General charges on Labour and Transport and 3% S& H charges on materials also. 5. 1% Cess is to be adopted on total cost of the construction as per the rules laid

down in the Building and other construction workers welfare Cess Act 1996.

B.SESHU KUMAR Chief General Manager/Projects APEPDCL::VISAKHAPATNAM To All Superintending Engineers All Divisional Engineers/ADEs/AEs Copy submitted to all The Directors/APEPDCL/Visakhapatnam Copy to: The Chief General Managers The Chief Project Manager/REC Ltd., Hyderabad The Managing Director/RECSO/Anakapalli & Chepurupalli The Chief Engineer/O & RE/ V.S/Hyderabad The Dy. General Manger /IT/APEPDCL/Visakhapatnam for uploading the Revised Cost data 2010-11 in EPIMRS The Dy. General Manager/CC with a request to upload the Cost Data 2010-11 in EPDCL website immediately.

C:\Documents and Settings\ambu\My Documents\Downloads\Cost data cov letter 10-11 modified.doc

EASTERN POWER DISTRIBUTION COMPANY OF A.P. LIMITED CORPORATE OFFICE : VISAKHAPATNAM

REVISED COST DATA 2010-11

INDEX
Sl. Description No. A ABSTRACT of rates of 33 KV / 11 KV / LT Lines B Rates for CENTRALIZED MATERIALS C 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 Cost Data for Hilly and Tribal areas as adopted by Irrigation Department in the State 33 KV Line over 9.1 Mts. PSCC Poles at 105 Mts.Span WL 280 Kgs 33 KV Line over 9.1 Mts. PSCC Poles at 80 Mts.Span WL 280 Kgs 11 KV Line over 8 Mts. PSCC Poles at 60 Mts.Span WL 140 Kgs 11 KV Line over 8 Mts. PSCC Poles at 65 Mts.Span WL 200 Kgs 11 KV Line over 8 Mts. PSCC Poles at 60 Mts.Span WL 140 Kgs 11 KV Line over 8 Mts. PSCC Poles at 65 Mts.Span WL 200 Kgs 6.3 KV Line over 8 Mts. PSCC Poles at 90 Mts.Span WL 140 Kgs 6.3 KV Line over 8 Mts. PSCC Poles at 90 Mts.Span WL 200 Kgs
LT 3 Ph.5 Wire line (Horizontal) over 8 Mts. PSCC Poles at 65 Mts.Span WL 140 Kgs LT 3 Ph.5 Wire line (Horizontal) over 8 Mts. PSCC Poles at 60 Mts.Span WL 200 Kgs LT 3 Ph.5 Wire line (Horizontal) over 8 Mts. PSCC Poles at 65 Mts.Span WL 140 Kgs LT 3 Ph.5 Wire line (Horizontal) over 8 Mts. PSCC Poles at 60 Mts.Span WL 200 Kgs LT 3 Ph.4 Wire line (Horizontal) over 8 Mts. PSCC Poles at 65 Mts.Span WL 140 Kgs LT 3 Ph.4 Wire line (Horizontal) over 8 Mts. PSCC Poles at 60 Mts.Span WL 200 Kgs LT 3 Ph.4 Wire line (Horizontal) over 8 Mts. PSCC Poles at 65 Mts.Span WL 140 Kgs LT 3 Ph.4 Wire line (Horizontal) over 8 Mts. PSCC Poles at 60 Mts.Span WL 200 Kgs LT 1 Ph. 3 Wire line (Horizontal) over 8 Mts. PSCC Poles at 65 Mts.Span WL 140 Kgs LT 1 Ph. 2 Wire line (Horizontal) over 8 Mts. PSCC Poles at 65 Mts.Span WL 140 Kgs L.T.AB Cable (3x16+25 Sqmm) over 8 Mts. PSCC Poles at 65 Mts.Span WL 140 Kgs L.T.AB Cable (2x16+25 Sqmm) over 8 Mts. PSCC Poles at 65 Mts.Span WL 140 Kgs L.T.AB Cable (1x16+25 Sqmm) over 8 Mts. PSCC Poles at 65 Mts.Span WL 140 Kgs L.T.AB Cable (3x16+25 Sqmm) over 8 Mts. PSCC Poles at 65 Mts.Span WL 200 Kgs L.T.AB Cable (2x16+25 Sqmm) over 8 Mts. PSCC Poles at 65 Mts.Span WL 200 Kgs L.T.AB Cable (1x16+25 Sqmm) over 8 Mts. PSCC Poles at 65 Mts.Span WL 200 Kgs Erection of 100 KVA 11/433 KV Conventional Distribution Transformer Erection of 16 KVA 11/433 KV Conventional Distribution Transformer on single pole structure Erection of 63 KVA 11/433 KV Conventional Distribution Transformer Erection of 25 KVA 11/433 KV Conventional Distribution Transformer on single pole structure Erection of 40 KVA 11/433 KV Conventional Distribution Transformer on single pole structure Erection of 15 KVA 6.3/0-240V CSP Transformer(Oil immersed) on 9.1Mtr PSCC Pole Erection of 15 KVA 6.3/0-240V CSP Transformer(Oil immersed) on 8 Mts PSCC Pole Erection of 15 KVA 6.3/0-240V Amorphous metal core Transformer(Oil immersed) on 8 Mts PSCC Pole Release of single phase Agl. Service erected on support Release of poly phase Agl. Service erected on support Release of 1 ph ( high quality). Domestic & non-domestic service Release of 1 ph (electronic). Domestic & non-domestic service Release of 1 ph Domestic & non-domestic service Release of 3 ph. ( electronic meter) Domestic & non-domestic service Release of 3 ph. (electronic meter) Domestic & non-domestic service Release of poly phase ( high quality) Indl.service upto 15 HP Release of Industrial service with poly phase CT operated meter upto 15 HP Release of Industrial service with poly phase CT operated meter above 15 HP Release of Street light service (1 -ph electonic meter) Erection of 33/11 KV Sub-station with1 No.Power Transformer & 3 Nos. 11 KV feeders ( with 11 KV 2 MVAR Capacitor Bank)

Page No. 3 4 - 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60

DATA FOR R.E. SCHEMES Abstract of schedule of rates for 2010-11 with modified rates : Cost Data per Km of 33/11 KV/LT Lines No. of Span Wind.pr. W.Load Type of pole poles/ in in kg/m2 in kg. being used KM Mtrs. Total Cost in Rs.

Sl. No.

Particulars of items

Size of Conductor

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44

33 KV Line 33 KV Line 11 KV Line 11 KV Line 11 KV Line 11 KV Line 6.3 KV Line 6.3 KV Line L.T. 3Ph 5 Wire Line(Horizontal) L.T. 3Ph 5 Wire Line(Horizontal) L.T. 3Ph 5 Wire Line(Horizontal) L.T. 3Ph 5 Wire Line(Horizontal) L.T. 3Ph 4 Wire Line(Horizontal) L.T. 3Ph 4 Wire Line(Horizontal) L.T. 3Ph 4 Wire Line(Horizontal) L.T. 3Ph 4 Wire Line(Horizontal) L.T. 1Ph 3 Wire Line(Horizontal) L.T. 1Ph 2 Wire Line(Horizontal) L.T. AB Cable L.T. AB Cable L.T. AB Cable L.T. AB Cable L.T. AB Cable L.T. AB Cable

75 100 75 100 75 100 75 100 75 100 75 100 75 100 75 100 75 75 75 75 75 100 100 100

280 280 140 200 140 200 140 200 140 200 140 200 140 200 140 200 140 140 140 140 140 200 200 200

9.1 Mtr. PSCC 9.1 Mtr. PSCC 8 Mtr PSCC 8 Mtr PSCC 8 Mtr PSCC 8 Mtr PSCC 8 Mtr PSCC 8 Mtr PSCC 8 Mtr PSCC 8 Mtr PSCC 8 Mtr PSCC 8 Mtr PSCC 8 Mtr PSCC 8 Mtr PSCC 8 Mtr PSCC 8 Mtr PSCC 8 Mtr PSCC 8 Mtr PSCC 8 Mtr PSCC 8 Mtr PSCC 8 Mtr PSCC 8 Mtr PSCC 8 Mtr PSCC 8 Mtr PSCC

12 14 18 17 18 17 13 13 16 18 16 18 16 15 16 15 16 16 16 16 16 16 16 16

105 100 Sqmm AAAC 80 60 65 60 65 90 90 65 60 65 60 65 60 65 60 65 65 65 65 65 65 65 65 100 Sqmm AAA 55 Sqmm AAAC 55 Sqmm AAA 34 Sqmm AAA 34 Sqmm AAA 34 Sqmm AAAC 34 Sqmm AAA 3x55+2x34 Sqmm AAA 3x55+2x34 Sqmm AAA 5x34 Sqmm AAAC 5x34 Sqmm AAAC 3x55+1x34 Sqmm AAA 3x55+1x34 Sqmm AAA 4x34 Sqmm AAA 4x34 Sqmm AAA 34 Sqmm AAA 2x34 Sqmm AAA 3x16+25 Sqmm 2x16+25 Sqmm 1x16+25 Sqmm 3x16+25 Sqmm 2x16+25 Sqmm 1x16+25 Sqmm

312380 325160 204030 203610 165830 165410 110340 112520 226400 235210 188200 197010 201480 201260 163280 163100 136600 113210 128280 106960 100990 130960 109640 103680 214300 184,470 98430 121640 149930 33070 44870 42940 3030 6710 3110 2550 2850 8080 7960 10440 20990 14450 3120 9222000

Erection of 100KVA Conventional Distribution transformer Erection of 63 KVA Conventional Distribution transformer Erection of 3-Ph 16KVA Conventional Distribution transformer Erection of 3-Ph 25KVA Conventional Distribution transformer Erection of 3-Ph 40KVA Conventional Distribution transformer Erection of 15 KVA Single Phase 6.3 KV/0-240V CSP OIL IMMERSED transformer Erection of 15 KVA Single Phase 6.3 KV/0-240V Amorphous metal core transformer Erection of S-Ph 15 KVA CSP transformer on 9.1M PSCC pole Release of Single phase Agl. Service erected on support Release of poly phase Agl. Service erected on support Release of single phase domestic and non domestic service with High Quality meter Release of single phase domestic and non domestic service with High Quality meter Release of single phase domestic and non domestic service with High Quality meter Release of single phase domestic and non domestic service with 3 Phase Energy meter Release of single phase domestic and non domestic service with Electronic meter Release of poly phase Indl.service upto 15 H.P with Energy meter Release of pol phase industrial service (upto 15 HP) with CT meter Release of poly phase Industrial service upto 15 H.P with C.T. operated meter Release of Single Phase Street light service with Electronic Meter Erection of 33/11 K.V. Substation with 1x5MVA power transformer & 3 Nos. 11KV feeders

3
Re2k5/Revised Cost data 10-11.xls

COST DATA OF CENTRALISED MATERIALS FOR R.E. AND DISTRIBUTION WORKS 2010-11

Sl. No.

Name of the Material


SUBHEAD-I : SUPPORTS AND FIXTURES, IRON, STEEL AND CEMENT

Unit

Rupees

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27

RS Joists 150 x 150mm(11 mtrs. Length) RS Joists 175 x 85mm (9 to 11 Mtrs) RS Joists 150 x 75mm (9 to 11 Mtrs) B F Beams 150X150 MM (9 to 10 Mtrs) B F Beams 150X150 MM (11 to 12 Mtrs) 11 mts. PSCC poles 365 Kgs 9.1 mts. PSCC poles 280 Kgs. 8 mts. PSCC poles 140 Kgs. 8 mts. PSCC poles 200 Kgs. 8 mts. PSCC poles 300 Kgs. 11 mts. Spun Poles 12.5 mts. Spun Poles Rail poles upto 7 Mtrs 52 Kg (105 lb) Rails (up to 13 mtrs. length) MS Channel 100 x 50MM MS Channel 75 x 40MM MS Angle 65 x 65 x 6mm MS Angle 50 x 50 x 6mm MS Flat 50 x 6/75 x 8mm MS Rod 20mm MS Rod 16mm Cement HT Steel wire-4mm GI Stay wire 7/3.15 mm GI Stay wire 7/2.5 mm GI Wire 4 mm GI Bolts and Nuts with Washers full thread(5/8"X6', 7', 9') GI Bolts and Nuts with Washers full thread(5/8" X 2 1/2 ', 3', 4') C R Sheet 1.6mm

MT MT MT MT MT Each Each Each Each Each Each Each MT MT MT MT MT MT MT MT MT MT MT MT MT MT MT

33793 34419 36414 36400 36400 5287 2310 1323 1436 1592 8398 8781 64020 35527 39884 34300 39520 40040 31756 46280 34528 4800 50619 48796 49640 43402 49704

28

MT

47047

29

MT

35000

30

M S Plate 12mm/6mm

MT

30500

31

Torsteel 10mm/12mm

MT

28500

4
Re2k5/Revised Cost data 10-11.xls

Sl. No .

Name of the Material

REC Specification No.

Unit

Rupees

SUBHEAD-II : INSULATORS AND HARDWARE 1 33 KV Pin Insulator 13/1979 Each 147

2 33 KV GI Pin

- do -

Each

88

3 33 KV Post Insulator Stack

- do -

Each

900

4 33 KV String Insulator Fittings (B&S) 33 KV polymer disc insulator/string insulator (B&S)

- do -

Each

170

Each 3/1971 (R-1993) - do - do - do - do Each Each Each Each Each

641 27 40 181 161 162

6 11 KV Pin Insulator 7 11 KV GI Pin 8 11 KV Post Insulator 9 11 KV String Insulator (B&S) 10 11 KV String Insulator (C&T)

11 11 KV String Insulator Fittings (C&T) 12 11 KV Polymer string insulator (C&T) 13 LT Pin Insulator 14 LT GI Pin

3/1991 (R-1993)

Each Each

67 147 8 38

4/1972 D-1 (R-1979) - do -

Each Each

15 LT Shackle Insulator

- do -

Each

Sl. No .

Name of the Material

REC Specification No.

Unit

Rupees

16 LT Shackle Hardware

- do -

Each

24

17 HT Guy Insulator

21/1981

Each

23

18 LT Guy Insulator

- do -

Each

19 33 KV Solid Core Insulators

- do -

Each

1010

20 11 KV Solid Core Insulators for AB Switches

- do -

Each

156

21

11 KV Solid Core Insulators for 11 KV HG Fuse sets

Each

89

22 1.53 Mts Channel Cross arms without clamp

Each

950

23 1.07 Mts Channel Cross arms without clamp 24 Top clamp with cleat (for 33 KV) 25 Top clamp with cleat (for 11 KV) 26 Top clamp for LT

Each Each Each Each

418 214 167 173

27 Stay set with clamp (for 33 KV)

Each

897

28 Stay set with clamp (for 11 KV) 29 Stay set with clamp (for 6.3 KV)

Each Each

328 298

30 Stay set with clamp (for LT)

Each

328

31 LT 3-Ph Cross arm (for 5 Wire line) 32 LT 3-Ph Cross arm (for 4 Wire line) 33 LT S-Ph Cross arm (for 3 Wire line) 34 LT S-Ph Cross arm (for 2 Wire line) 35 Back Clamp for 9.1 Mts PSCC pole 36 Back Clamp for 8 Mts PSCC pole

Each Each Each Each Each Each

343 277 145 136 130 93

Sl. No .

Name of the Material

REC Specification No.

Unit

Rupees

37 D Clamp for 8.0 M poles 38 Bracing set with double X arms with 9.1 Mts PSCC poles Bracing set with double X arms with 8 Mts PSCC poles

Each set

100 3150

39

set

2700

40 DPC aluminium Winding Wire 1.25 mm

Kgs

172

41 DPC aluminium Winding Wire 1.6 mm SUBHEAD - III : CONDUCTORS 1 ACSR Zebra Conductor 2 200 Sq.mm Panther Conductor 37/3.0 Sq.mm ACSR 3 100 Sq.mm AAA Conductor or 7/4.26 AAAC 4 55 Sq.mm AAA Conductor or 7/3.15 AAAC/RABBIT 5 34 Sq.mm AAA Conductor or 7/2.50 AAAC/Weasel SUBHEAD-IV : CABLES SUBHEAD-IV : (A) LT XLPE SINGLE CORE CABLES 1 2.50 Sq.mm 2 4.00 Sq.mm 3 6.00 Sq.mm 4 10.00 Sq.mm 5 25.00 Sq.mm 6 50.00 Sq.mm 7 70.00 Sq.mm 8 95.00 Sq.mm 9 120.00 Sq.mm 10 150.00 Sq.mm 11 185.00 Sq.mm 26/1993(R-1987) - do - do - do - do - do - do - do - do - do - do - do - do 1/1971 (R-1993) 33/1984 (R-1993)

Kgs

167

KM KM

235223 127384

KM

42465

KM

22871

KM

14453

KM - do - do - do - do - do - do - do - do - do - do -

2550 4050 5100 8100 15000 32180 43400 60830 71500 89850 112340

Sl. No .

Name of the Material

REC Specification No.

Unit

Rupees

SUBHEAD-IV : (B) LT PVC SINGLE CORE CABLES 1 25.00 Sq.mm 2 50.00 Sq.mm 3 70.00 Sq.mm 4 120.00 Sq.mm SUBHEAD-IV : (C) LT CONTROL CABLES 1 2 X 2.5 Sq.mm (Cu) 2 4 X 2.5 Sq.mm (Cu) 3 10 x 2.5 Sq.mm (Cu) KM KM KM 32300 50134 115077 KM KM KM KM 21460 39300 51300 84400

4 4 x 4.0 Sq.mm (AL) SUBHEAD-IV : (D) ) LT XLPE CABLES 1 3 1/2 X 300 sqmm LT XLPE cable 2 3 1/2 X 185 sqmm LT XLPE cable 3 3 1/2 X 150 sqmm LT XLPE cable 4 3 1/2 X 120 sqmm LT XLPE cable 5 3 1/2 X 95 sqmm LT XLPE cable

KM

22000

KM KM KM KM KM

640401 304890 347992 289956 202895

6 3 1/2 X 70 sqmm LT XLPE cable

KM

178272

7 3 1/2 X 50 sqmm LT XLPE cable

KM

139607

8 3 1/2 X 25 sqmm LT XLPE cable

KM

85187

SUBHEAD -IV: (E) LT AERIAL BUNCHED CABLES 1 1 x 16+25 Sq.mm 2 2 x 16+25 Sq.mm 3 3 x 16+25 Sq.mm 4 3 x 70 + 1x16 +1x50 Sqmm XLPE AB, Cable 32/1984 32/1984 32/1984 KM KM KM KM 20436 24456 38834 123000

Sl. No .

Name of the Material

REC Specification No.

Unit

Rupees

SUBHEAD -IV: (F) LT AERIAL BUNCHED CABLE FITTINGS 1 Suspension Clamp with eye hook 32/1984 Each 88

2 LT Connector with Insulator Cover

- do -

Each

80

3 Dead-end Clamp with eye hooks SUBHEAD -IV: (G) 11 KV XLPE POWER CABLES 1 3 x 35 Sq.mm 2 3 x 95 Sq.mm 3 3 x 120 Sq.mm 4 3 x 185 Sq.mm

- do -

Each

88

63/1993 63/1993

KM KM KM

293164 558600 514277 893413

63/1993

KM

5 3 x 300 Sq.mm 11 KV , 3 X 35 Sq mm XLPE Indoor type Raychem make 11 KV , 3 X 35 Sq mm XLPE Outdoor type Raychem make

63/1993

KM

1116910

Each

551

Each

643

8 3X185 Sq mm End termination kit (Indoor) 11KV out door jointing kit for 3x185Sqmm XLPE Cable 3 x 300 Sq.mm Raychem Termination Joints kit

Each

1800

Each

1260

10

Each

4924

SUBHEAD - IV (H)11 KV AB Cable (Aluminum) 1 3x35+35 Sqmm. 2 3x70+70 Sqmm. 3 3x120+70 Sqmm. 4 3x185+70 Sqmm. SUBHEAD -IV: (I) 33 KV XLPE POWER CABLES 1 3 x 400 Sq.mm 63/1993

KM KM KM KM

219898 318653 476000 429020

KM

1768379

2 3 x 185 Sq.mm 3 x 400 Sq.mm Raychem End Termination Joints Kit

KM

1017161

Each 9

5416

Sl. No .

Name of the Material

REC Specification No.

Unit

Rupees

SUBHEAD -V: POWER TRANSFORMERS, CAPACITORS AND TRASFORMER OIL

1 33/11 KV 3.15 MVA Power Transformer

Each

2691402

2 33/11 KV 5 MVA Power Transformer

7/1974 (R-1993)

Each

3074752

3 33/11 KV 8 MVA Power Transformer

Each

3976280

4 33/11 KV 12.5 MVA Power Transformer

Each

5474490

5 Transformer Oil SUBHEAD -VI: DISTRIBUTION TRANSFORMERS (CRGO) 1 S-Ph 5 KVA DTR 6.3 KV/0-240 V 1-Phase 10kVA 11kV/250V (CSP) (Aluminium)

KL

61045

Each

20693

Each

18600

3 S-Ph 15 KVA CSP DTR 6.3 KV/0-240V (Al)

Each

22566

S-Ph 15 KVA CSP DTR 6.3 KV/230-0-230V (Al)

Each

22969

5 1-Phase 25 KVA (CSP) (Copper)

Each

38457

3-Ph 16 KVA Amorphous/CRGO core 6 conventional type copper wound DTR with BEE 5 star rating Conventional DTR (Cu) 3-Ph 25 KVA Amorphous/CRGO core 7 conventional type copper wound DTR with BEE 5 star ratingConventional DTR (Cu) 3-Ph 40 KVA Amorphous/CRGO core 8 conventional type copper wound DTR with BEE 5 star rating Conventional DTR (Cu) 3-Ph 63 KVA Amorphous/CRGO core 9 conventional type copper wound DTR with BEE 5 star ratingConventional DTR (Cu)

Each

52168

Each

66000

Each

86285

Each

96541

10

Sl. No .

Name of the Material

REC Specification No.

Unit

Rupees

3-Ph 100 KVA Amorphous/CRGO core 10 conventional type copper wound DTR with BEE 5 star rating Conventional DTR (Cu) 3-Ph 160 KVA Amorphous/CRGO core 11 conventional type copper wound DTR with BEE 5 star rating Conventional DTR (Cu) 12 250 KVA CSP DTR (Cu)

Each

118403

Each

186576

Each

297500

13 315 KVA CSP DTR (Cu) Conventional 14 500 KVA Conventional (Al) 15 Single Phase 15 KVA Transformer (Amorphous) SUBHEAD -VII: SWITCH CONTROL AND PROTECTIVE GEAR 1 2 33 KV VCB with CRPs & CTs ratio (400-200100/1-1-1A) 11 KV VCB with CTs & Panels ( Feeder Control) 11 KV VCB with CTs & Panels ( LV Control ) without differential protection 12/1979 (R-1993) 22/1983

Each Each Each

420152 531833 33061

Each Each

361232 182526

Each

187731

4 5

11 KV VCB with CTs & Panels ( LV Control ) with differential protection 33 KV CTs 400-200-100/1-1A ratio 0.2 class accuracy 33 KV CTs 400-200-100/1-1A ratio 0.5 class accuracy

Each Each

227355 24573

Each

16803

7 33 KV CTs (200-100/1-1A) 0.2 class accuracy

Each

18780

8 33 KV CTs (100-50/1-1A) 0.2 class accuracy

Each

20029

9 11 KV CTs (50-25/1-1A)

59/1993

Each

14640

10 11 KV CTs 200-100/5-5A 11 11 KV CTs 400-200/1-1A

Each Each

14463 13564

12 11 KV CTs 200-100/1-1A

Each

13125

13 11 KV CTs (600-300/1-1-.577A) 11

Each

14640

Sl. No .

Name of the Material

REC Specification No.

Unit

Rupees

14 33 KV PT (Single Phase) class 0.5 15 33 KV PT (Single Phase) class 0.2 16 33 KV PT (Three Phase) of 0.5 class accuracy 60/1993

Each Each Each Each

16448 18113 44263 11882

17 11 KV PT (3 Phase) 33 KV 800 Amps AB Switch Double break with solid core insulator

18

--

Each

27071

19 11 KV 800 Amps AB Switch

43/1987

Each

14976

20 11 KV 400 Amps AB Switch Double break

Each

9100

21 11 KV 400 Amps AB Switch with insulators

- do -

Each

11500

22 11 KV 200 Amps AB Switch (Tilting)

--

Each

4770

23 11 KV 200 Amps AB Switch (Horizontal)

Each

5300

24

30 KV 10 KA Metal Oxide Lighting Arrester (station type)

16/1981 (R-55/1987)

Each

3254

25 33 KV Line type Lighting Arrester

Each

2369

26 9 KV 10 KA Metal Oxide Lighting Arrester

- do -

Each

1753

27 9 KV 5 KA Metal Oxide Lighting Arrester

55/1987

Each

336

28 33 KV HG Fuse set

Set

9450

29 11 KV HG Fuse Set

Set

1195

30 6.3 KV HG Fuse Set

Set

415

31 LT HG Fuse Set 24 Volts 40 AH Battery set including Battery charger

Set

959

32

Each

13996

12

Sl. No .

Name of the Material

REC Specification No.

Unit

Rupees

33

24 Volts 40 AH Battery set without Battery charger

Each

5425

34 12 V, 40 AH SMF Batteries cells

Each

2290

35 12 V, 80 AH SMF Batteries cells 220 V, 80 AH SMF Batteries and Chargers & DCDB

Each

5290

36

Each

210000

37 220 V, 80 AH SMF Batteries

Each

115000

38 LT Switched capacitors 1*9 KVAR 1x10 KVAR 11 KV 2 MVAR Capacitor banks with associated equipment a Type A b Type B with 40 Mtrs HT UG cable c Type C (Indoor Type with HT UG cable Each Each 2548 2614

39

Each Each Each

768176 895869 969867

40 Sectionalizers

Each

588444

41 Auto - Reclosures

Each

925206

42 11 KV 3 Way RMU (SF6)

Each

366000

43 11 KV SF6 5 Way RMU

Each

735000

44 33 KV Indoor twin feeder control panel

Each

125584

45 Indoor type VCB with control panel (LV)

Each

376368

46 Indoor type VCB with control panel (feeder)

Each

274818

47 11 VCB for bus coupler

Each

210677

48 11KV switch Fuse unit (SFU)

Each

100000

13

Sl. No .

Name of the Material

REC Specification No.

Unit

Rupees

49 33KV switch Fuse unit (SFU)

Each

200000

49 33KV 3-way RMU without VCB

Each

1020110

50 33KV 3-way RMU with VCB

Each

1445325

50 11KV metering panel with CTS& PTS (Indoor)

Each

27569

51 33KV metering panel with CTS&PTS (Indoor)

Each

300000

SUBHEAD -VIII: ENERGY METERS AND METERING EQUIPMENT a) LT Single Phase High quality Meter Class 1 accuracy ( 5-20A) b) LT Single Phase Electronic Energy Meter 2.5A - 10A c) LT Single Phase Class 1 accuracy (push fit type box Non push fit type TC) 5-30A

Each

710

Each

447

Each

936

a) Three Phase Electronic Meter 10A - 40A with P P Box b) Three Phase High Quality Meter 10A - 40A (Counter type display without Box)

Each

1835

Each

900

a) LT 3-Ph Class-1 Accuracy CT Operated Electronic TVR Meter 200/5A b) LT 3-Ph Class-0.5 Accuracy CT Operated Electronic TVR Meter 125/5A

Each

6920

Each

7950

a) HT Trivector Meter 0.5 class accuracy(10/5A) b) HT Trivector Meter 0.5 class accuracy (200/1,100/1A)

Each

4435

Each

4435

14

Sl. No .

Name of the Material

REC Specification No.

Unit

Rupees

11 KV Metering cubicles a) 10/5A class 0.5 accuracy b) 20/5 A c) 30/5A d) 40/5A e) 75/5 A f) 60/5 A, 0.5

Each Each Each Each Each Each

26602 23600 22977 26602 22977 31961

6 Moulded Box for Single Phase service

Each

250

7 Moulded Box for 3 Phase service

Each

387

8 Moulded box for CT Meter(Poly phase)

Each

1647

9 HT Meter Box 10 A Type Distribution type BOX 11 B Type Distribution type BOX 12 SMC Meter Box with fixing clamps (3 phase meters) SMC Meter Box with fixing clamps (S- phase meters) SUBHEAD -IX: EARTHING MATERIALS 1 GI Earth pipe 40 mm , (1.8 mts. Length) 2 GI Earth pipe 40 mm (2.5 mts. Length) 3 CI Earth pipe 80mm dia, (2.5 mts. Length) SUBHEAD -X: OTHER MATERIALS 1 Hand Held Computers with Printer 2 CMRI 3 HT Meter Box

Each Each Each Each

3587 4836 1199 6750

13

Each

408

Each Each Each

380 496 1934

Each Each Each

14913 29148 3587

15

COST DATA FOR HILLY AND TRIBAL AREAS AS ADOPTED BY IRRIGATION DEPARTMENT IN THE STATE

For hilly and tribal areas, the following EXTRA RATES are allowed over and above approved cost data of labour. a.25% extra is allowed for the works located within the interior Agency / Tribal limits. (i.e.) for the works located within and upto 16 Kilometers from any all weather route inside Agency/Tribal. a.40% extra is allowed for the works located within the interior Agency / Tribal Area i.e., for the works located beyond 16 Kilometers from any all weather route inside Agency/Tribal. Note : 1 No extra percentage is permissible in respect of Forest produce such as Bamboo, Rellu grass and all materials obtained from outside the Agency/Tribal. The extra percentage under Agency/Tribal areas allowance may be allowed on the labour component and on the labour charges in the rates for conveyance of materials. The extra percentage on cost of materials in Agency/Tribal areas can be allowed on the labour component only, if they are manufactured in the Agency/Tribal areas itself except Forest produce.

11
Re2k5/Revised Cost data 10-11.xls

1. R.E.C. - Construction Standard No. M11/1979 (R-1989) Costdata per Km of 33 KV Line with 100 Sq.mm AAA Conductor over 9.1 Mts. PSCC Poles at 105 Mts. Span, 75 Kg/Sq.Mt wind pressure, working load 280 Kgs. Sl. No. 1 2 3 4 5 6 7 8 9 9.1 M PSCC Pole 1.53M Cross Arm (Channel) without clamps Top Clamp with cleat Back Clamp Stay sets with clamps Bracing Set with double cross arm 100 Sq.mm AAA Conductor 33 KV Pin - Insulator with Pin Strain Insulator set with metal parts( 3x 11 KV B&S Insulator with 33 KV Hard ware fitting) Concreting of Pole, Stay sets & Base concreting Misc. Items like coil earthing, pipe earthing, danger-boards, bolts & nuts, etc. Total Cost of Material 3% storage & handling charges on items (1) to (9) 3% Contingencies on Materials Labour Transport 1% Cess on Material, Labour & Transport 11% Estt. & Genl. Charges On Materials Particulars Qty. 12 10 10 10 6 1 3.06 33 6 Rate in Rs. 2310 950 214 130 897 3150 42465 235 653 Per Unit Each Each Each Each Each Set K.M. Each Set Amount in Rs. 27720 9500 2140 1300 5382 3150 129943 7755 3918

10 11

LS LS

LS LS

LS LS

16940 3300 211048 5724 6331 52762 10552 2744 23215 312376 312,380

190808

Total or say

Re2k5/Revised Cost data 10-11.xls

2. R.E.C. - Construction Standard No. M11/1979 (R-1989) Costdata per Km of 33 KV Line with 100 Sq.mm AAA Conductor over 9.1 Mts. PSCC Poles at 80 Mts. Span, 100 Kg/Sq.Mt wind pressure, working load 280 Kgs. Sl. No. Particulars Qty. Rate in Rs. 2310 950 214 130 897 3150 42465 235 653 LS LS Per Unit Each Each Each Each Each Set K.M. Each Set LS LS Amount in Rs. 32340 11400 2568 1560 5382 3150 129943 9165 3918 16940 3300

1 2 3 4 5 6 7 8 9 10 11

9.1 M PSCC Pole 1.53M Cross Arm (Channel) without clamps Top Clamp with cleat Back Clamp Stay sets with clamps Bracing Set with double cross arm 100 Sq.mm AAA Conductor 33 KV Pin - Insulator with Pin Strain Insulator set with metal parts Concreting of Pole, Stay sets & Base concreting Misc. Items like coil earthing, pipe earthing, danger-boards, bolts & nuts, etc. Total Cost of Material 3% storage & handling charges on items (1) to (9) 3% Contingencies on Materials Labour Transport 1% Cess on Material, Labour & Transport 11% Estt. & Genl. Charges On Materials

14 12 12 12 6 1 3.06 39 6 LS LS

199426

Total or say

219666 5983 6590 54917 10983 2856 24163 325158 325,160

Re2k5/Revised Cost data 10-11.xls

3. R.E.C. - Construction Standard No. A-5/1972 Costdata per Km of 11 KV Line with 55 Sq.mm AAA Conductor over 8 Mts. PSCC Poles at 60 Mts. Span, 75 Kg/Sq.Mt wind pressure, working load 140 Kgs. Sl. No. Particulars Qty. Rate in Rs. 1323 418 167 93 328 2700 22871 67 229 LS LS Per Unit Each Each Each Each Each Set K.M. Each Set LS LS Amount in Rs. 23814 6688 2672 1488 1968 2700 69985 3417 1374 19556 4400

1 2 3 4 5 6 7 8 9 10 11

8.0 M PSCC Pole 1.07M Cross Arm (Channel) without clamps Top Clamp with cleat Back Clamp Stay sets with clamps Bracing Set with double cross arm 55 Sq.mm AAA Conductor 11 KV Pin - Insulator with Pin Strain Insulator set with metal parts Concreting of Pole, Stay sets & Base concreting Misc. Items like coil earthing, pipe earthing, danger-boards, bolts & nuts, etc. Total Cost of Material 3% storage & handling charges on items (1) to (9) 3% Contingencies on Materials Labour Transport 1% Cess on Material, Labour & Transport 11% Estt. & Genl. Charges On Materials

18 16 16 16 6 1 3.06 51 6 LS LS

114106

Total or say

138062 3423 4142 34515 6903 1795 15187 204027 204,030

Re2k5/Revised Cost data 10-11.xls

4. R.E.C. - Construction Standard No. A-5/1972 Costdata per Km of 11 KV Line with 55 Sq.mm AAA Conductor over 8 Mts. PSCC Poles at 65 Mts. Span, 100 Kg/Sq.Mt wind pressure, working load 200 Kgs. Sl. No. Particulars Qty. Rate in Rs. 1436 418 167 93 328 2700 22871 67 229 LS LS Per Unit Each Each Each Each Each Set K.M. Each Set LS LS Amount in Rs. 24412 6270 2505 1395 1968 2700 69985 3216 1374 19556 4400

1 2 3 4 5 6 7 8 9 10 11

8.0 M PSCC Pole 1.07M Cross Arm (Channel) without clamps Top Clamp with cleat Back Clamp Stay sets with clamps Bracing Set with double cross arm 55 Sq.mm AAA Conductor 11 KV Pin - Insulator with Pin Strain Insulator set with metal parts Concreting of Pole, Stay sets & Base concreting Misc. Items like coil earthing, pipe earthing, danger-boards, bolts & nuts, etc. Total Cost of Material 3% storage & handling charges on items (1) to (9) 3% Contingencies on Materials Labour Transport 1% Cess on Material, Labour & Transport 11% Estt. & Genl. Charges On Materials

17 15 15 15 6 1 3.06 48 6 LS LS

113825

137781 3415 4133 34445 6889 1791 15156 Total or say 203610 203,610

Re2k5/Revised Cost data 10-11.xls

5. R.E.C. - Construction Standard No. A-5/1972 Costdata per Km of 11 KV Line with 34 Sq.mm AAA Conductor over 8 Mts. PSCC Poles at 60 Mts. Span, 75 Kg/Sq.Mt wind pressure, working load 140 Kgs. Sl. No. 1 2 3 4 5 6 7 8 9 10 11 8 M PSCC Pole 1.07M Cross Arm (Channel) without clamps Top Clamp with cleat Back Clamp Stay sets with clamps Bracing Set with double cross arm 34 Sq.mm AAA Conductor 11 KV Pin - Insulator with Pin Strain Insulator set with metal parts Concreting of Pole, Stay sets & Base concreting Misc. Items like coil earthing, pipe earthing, danger-boards, bolts & nuts, etc. Total Cost of Material 3% storage & handling charges on items (1) to (9) 3% Contingencies on Materials Labour Transport 1% Cess on Material, Labour & Transport 11% Estt. & Genl. Charges On Materials Particulars Qty. 18 16 16 16 6 1 3.06 51 6 LS LS Rate in Rs. 1323 418 167 93 328 2700 14453 67 229 LS LS Per Unit Each Each Each Each Each Set K.M. Each Set LS LS Amount in Rs. 23814 6688 2672 1488 1968 2700 44226 3417 1374 19556 4400

88347

Total or say

112303 2650 3369 28076 5615 1460 12353 165826 165,830

Re2k5/Revised Cost data 10-11.xls

6. R.E.C. - Construction Standard No. A-5/1972 Costdata per Km of 11 KV Line with 34 Sq.mm AAA Conductor over 8 Mts. PSCC Poles at 65 Mts. Span, 100 Kg/Sq.Mt wind pressure, working load 200 Kgs. Sl. No. Particulars Qty. Rate in Rs. 1436 418 167 93 328 2700 14453 67 229 LS LS Per Unit Each Each Each Each Each Set K.M. Each Set LS LS Amount in Rs. 24412 6270 2505 1395 1968 2700 44226 3216 1374 19556 4400

1 2 3 4 5 6 7 8 9 10 11

8 PSCC Pole 1.53M Cross Arm (Channel) without clamps Top Clamp with cleat Back Clamp Stay sets with clamps Bracing Set with double cross arm 34 Sq.mm AAA Conductor 11 KV Pin - Insulator with Pin Strain Insulator set with metal parts Concreting of Pole, Stay sets & Base concreting Misc. Items like coil earthing, pipe earthing, danger-boards, bolts & nuts, etc. Total Cost of Material 3% storage & handling charges on items (1) to (9) 3% Contingencies on Materials Labour Transport 1% Cess on Material, Labour & Transport 11% Estt. & Genl. Charges On Materials

17 15 15 15 6 1 3.06 48 6 LS LS

88066

112022 2642 3361 28005 5601 1456 12322 Total or say 165410 165,410

Re2k5/Revised Cost data 10-11.xls

7. R.E.C. - Construction Standard No. A-17/1972 Costdata per Km of 6.3 KV S-ph Line with 34 Sq.mm AAA Conductor over 8 Mts. PSCC Poles at 90 Mts. Span, 75 Kg/Sq.Mt wind pressure, working load 140 Kgs. Sl. No. Particulars Qty. Rate in Rs. 1323 167 100 298 14453 67 229 Per Unit Each Each Each Each K.M. Each Set L.S. L.S. 2500 Amount in Rs. 17199 1670 1000 1788 29484 737 916 19556

1 2 3 4 5 6 7 8 9

8 M PSCC Pole Top Clamp with cleat D clamp MS Stay sets 34 Sq.mm AAA Conductor 11 K.V.Pin-Insulator with Pin Strain Insulator set Concreting of Pole,Stay sets & Base concreting Misc. Items like coil earthing, pipe earthings, danger-boards, bolts & nuts, etc. Total Cost of Material 3% storage & handling charges on items (1) to (10) 3% Contingencies on Materials Labour Transport 1% Cess on Material, Labour & Transport 11% Estt. & Genl. Charges On Materials

13 10 10 6 2.04 11 4

52794

74850 1584 2245 18712 3742 973 8233 Total or say 110341 110,340

Re2k5/Revised Cost data 10-11.xls

8. R.E.C. - Construction Standard No. A-17/1972 Costdata per Km of 6.3 KV S-ph Line with 34 Sq.mm AAA Conductor over 8 Mts. PSCC Poles at 90 Mts. Span, 100 Kg/Sq.Mt wind pressure, working load 200 Kgs. Sl. No. Particulars Qty. Rate in Rs. 1436 167 100 298 14453 67 229 Per Unit Each Each Each Set K.M. Each Set Amount in Rs. 18668 1670 1000 1788 29484 737 916

1 2 3 4 5 6 7 8 9

8 M PSCC Pole Top Clamp with cleat D clamp MS Stay sets 34 Sq.mm AAA Conductor 11 K.V.Pin-Insulator with Pin Strain Insulator set Concreting of Pole,Stay sets & Base concreting Misc. Items like coil earthing, pipe earthings, danger-boards, bolts & nuts, etc. Total Cost of Material 3% storage & handling charges on items (1) to (10) 3% Contingencies on Materials Labour Transport 1% Cess on Material, Labour & Transport 11% Estt. & Genl. Charges On Materials

13 10 10 6 2.04 11 4

L.S. L.S.

19556 2500

54263

76319 1628 2290 19080 3816 992 8395 Total or say 112519 112,520

Re2k5/Revised Cost data 10-11.xls

9. R.E.C. - Construction Standard No. B-5/1972 Costdata per Km of LT 3-Ph 5 Wire Line(Horizontal formation ) with 3 x 55 Sq.mm + 2 x 34 Sq.mm AAAC over 8 Mts. PSCC Poles at 65 Mts. Span, 75 Kg/Sq.Mt wind pressure, working load 140 Kgs. Sl. No. Particulars Qty. Rate in Rs. 1323 343 93 328 22871 14453 32 46 12 Per Unit Each Each Each Each K.M. K.M. Set Set Each Amount in Rs. 21168 6174 1674 1312 69985 29484 1344 2208 192

1 2 3 4 5 6 7 8 9 10 11

8 M PSCC Pole L.T. 3 Phase cross arms Back Clamp Stay sets 55 Sq.mm AAA Conductor 34 Sq.mm AAA Conductor Shakle Insulator set L.T.pin insulator with pin C.I. Knob Concreting of Pole,Stay sets & Base concreting Misc. Items like coil earthing, pipe earthings, danger-boards, bolts & nuts, etc. Total Cost of Material 3% storage & handling charges on items (1) to (9) 3% Contingencies on Materials Labour Transport 1% Cess on Material, Labour & Transport 11% Estt. & Genl. Charges On Materials

16 18 18 4 3.06 2.04 42 48 16

L.S. L.S.

16016 3500

133541

153057 4006 4592 38264 7653 1990 16836 Total or say 226398 226,400

Re2k5/Revised Cost data 10-11.xls

10. R.E.C. - Construction Standard No. B-5/1972 Costdata per Km of LT 3-Ph 5 Wire Line(Horizontal formation ) with 3 x 55 Sq.mm + 2 x 34 Sq.mm AAAC over 8 Mts. PSCC Poles at 60 Mts. Span, 100 Kg/Sq.Mt wind pressure, working load 200 Kgs. Sl. No. Particulars Qty. Rate in Rs. 1436 343 93 328 22871 14453 32 46 12 Per Unit Each Each Each Each K.M. K.M. Set Set Each L.S. Amount in Rs. 25848 6860 1860 1312 69985 29484 1344 2576 216 16016

1 2 3 4 5 6 7 8 9 10 11

8 M PSCC Pole L.T. 3 Phase cross arms Back Clamp LT Stay sets 55 Sq.mm AAA Conductor 34 Sq.mm AAA Conductor Shakle Insulator set L.T.pin insulator with pin C.I. Knob Concreting of Pole,Stay sets & Base concreting Misc. Items like coil earthing, pipe earthings, danger-boards, bolts & nuts, etc. Total Cost of Material 3% storage & handling charges on items (1) to (9) 3% Contingencies on Materials Labour Transport 1% Cess on Material, Labour & Transport 11% Estt. & Genl. Charges On Materials

18 20 20 4 3.06 2.04 42 56 18

L.S.

3500

139485

Total or say

159001 4185 4770 39750 7950 2067 17490 235213 235,210

Re2k5/Revised Cost data 10-11.xls

11. R.E.C. - Construction Standard No. B-5/1972 Costdata per Km of LT 3-Ph 5 Wire Line(Horizontal formation ) with 5 x 34 Sq.mm AAAC over 8 Mts. PSCC Poles at 65 Mts. Span, 75 Kg/Sq.Mt wind pressure, working load 140 Kgs. Sl. No. Particulars Qty. Rate in Rs. 1323 343 93 328 14453 32 46 12 Per Unit Each Each Each Each K.M. Set Set Each L.S. L.S. Amount in Rs. 21168 6174 1674 1312 73710 1344 2208 192

1 2 3 4 5 6 7 8 9 10

8 M PSCC Pole L.T. 3 Phase cross arms Back Clamp LT Stay sets 34 Sq.mm AAA Conductor Shakle Insulator set L.T.pin insulator with pin C.I. Knob Concreting of Pole,Stay sets & Base concreting Misc. Items like coil earthing, pipe earthings, danger-boards, bolts & nuts, etc. Total Cost of Material 3% storage & handling charges on items (1) to (8) 3% Contingencies on Materials Labour Transport 1% Cess on Material, Labour & Transport 11% Estt. & Genl. Charges On Materials

16 18 18 4 5.10 42 48 16

16016 3500

107782

127298 3233 3819 31825 6365 1655 14003 Total or say 188197 188,200

Re2k5/Revised Cost data 10-11.xls

12. R.E.C. - Construction Standard No. B-5/1972 Costdata per Km of LT 3-Ph 5 Wire Line(Horizontal formation ) with 5 x 34 Sq.mm AAAC over 8 Mts. PSCC Poles at 60 Mts. Span, 100 Kg/Sq.Mt wind pressure, working load 200 Kgs. Sl. No. Particulars Qty. Rate in Rs. 1436 343 93 328 14453 32 46 12 Per Unit Each Each Each Each K.M. Set Set Each L.S. L.S. Amount in Rs. 25848 6860 1860 1312 73710 1344 2576 216

1 2 3 4 5 6 7 8 9 10

8 M PSCC Pole L.T. 3 Phase cross arms Back Clamp LT Stay sets 34 Sq.mm AAA Conductor Shakle Insulator set L.T.pin insulator with pin C.I. Knob Concreting of Pole,Stay sets & Base concreting Misc. Items like coil earthing, pipe earthings, danger-boards, bolts & nuts, etc. Total Cost of Material 3% storage & handling charges on items (1) to (8) 3% Contingencies on Materials Labour Transport 1% Cess on Material, Labour & Transport 11% Estt. & Genl. Charges On Materials

18 20 20 4 5.10 42 56 18

16016 3500

113726

133242 3412 3997 33311 6662 1732 14657

Total or say

197012 197,010

Re2k5/Revised Cost data 10-11.xls

13. R.E.C. - Construction Standard No. B-12/1981 Costdata per Km of LT 3-Ph 4 Wire Line(Horizontal formation ) with 3 x 55 Sq.mm + 1 x 34 Sqmm AAAC over 8 Mts. PSCC Poles at 65 Mts. Span, 75 Kg/Sq.Mt wind pressure, working load 140 Kgs. Sl. No. Particulars Qty. Rate in Rs. 1323 277 93 328 22871 14453 32 46 12 Per Unit Each Each Each Each K.M. K.M. Set Set Each L.S. L.S. Amount in Rs. 21168 4986 1674 1312 69985 14742 1024 1656 192

1 2 3 4 5 6 7 8 9 10 11

8 M PSCC Pole L.T. 3 Phase cross arms Back Clamp LT Stay sets 55 Sqmm AAA Conductor 34 Sq.mm AAA Conductor Shakle Insulator set L.T.pin insulator with pin C.I. Knob Concreting of Pole,Stay sets & Base concreting Misc. Items like coil earthing, pipe earthings, danger-boards, bolts & nuts, etc. Total Cost of Material 3% storage & handling charges on items (1) to (9) 3% Contingencies on Materials Labour Transport 1% Cess on Material, Labour & Transport 11% Estt. & Genl. Charges On Materials

16 18 18 4 3.06 1.02 32 36 16

16016 3500

116739

Total or say

136255 3502 4088 34064 6813 1771 14988 201481 201,480

Re2k5/Revised Cost data 10-11.xls

14. R.E.C. - Construction Standard No. B-12/1981 Costdata per Km of LT 3 Ph 4 Wire Line(Horizontal formation ) with 3 x 55 Sq.mm + 1 x 34 Sqmm AAAC over 8 Mts. PSCC Poles at 60 Mts. Span, 100 Kg/Sq.Mt wind pressure, working load 200 Kgs. Sl. No. Particulars Qty. Rate in Rs. 1436 277 93 328 22871 14453 32 46 12 Per Unit Each Each Each Each K.M. K.M. Set Set Each L.S. L.S. Amount in Rs. 21540 4709 1581 1312 69985 14742 1024 1518 180

1 2 3 4 5 6 7 8 9 10 11

8 M PSCC Pole L.T. 3 Phase cross arms Back Clamp LT Stay sets 55 Sqmm AAA Conductor 34 Sq.mm AAA Conductor Shakle Insulator set L.T.pin insulator with pin C.I. Knob Concreting of Pole,Stay sets & Base concreting Misc. Items like coil earthing, pipe earthings, danger-boards, bolts & nuts, etc. Total Cost of Material 3% storage & handling charges on items (1) to (9) 3% Contingencies on Materials Labour Transport 1% Cess on Material, Labour & Transport 11% Estt. & Genl. Charges On Materials

15 17 17 4 3.06 1.02 32 33 15

16016 3500

116591

Total or say

136107 3498 4083 34027 6805 1769 14972 201261 201,260

Re2k5/Revised Cost data 10-11.xls

15. R.E.C. - Construction Standard No. B-12/1981 Costdata per Km of LT 3-Ph 4 Wire Line(Horizontal formation ) with 4 x 34 Sqmm AAAC over 8 Mts. PSCC Poles at 65 Mts. Span, 75 Kg/Sq.Mt wind pressure, working load 140 Kgs. Sl. No. Particulars Qty. Rate in Rs. 1323 277 93 328 14453 32 46 12 Per Unit Each Each Each Each K.M. Set Set Each L.S. L.S. Amount in Rs. 21168 4986 1674 1312 58968 1024 1656 192

1 2 3 4 5 6 7 8 9 10

8 M PSCC Pole L.T. 3 Phase cross arms Back Clamp LT Stay sets 34 Sq.mm AAA Conductor Shakle Insulator set L.T.pin insulator with pin C.I. Knob Concreting of Pole,Stay sets & Base concreting Misc. Items like coil earthing, pipe earthings, danger-boards, bolts & nuts, etc. Total Cost of Material 3% storage & handling charges on items (1) to (8) 3% Contingencies on Materials Labour Transport 1% Cess on Material, Labour & Transport 11% Estt. & Genl. Charges On Materials

16 18 18 4 4.08 32 36 16

16016 3500

90980

Total or say

110496 2729 3315 27624 5525 1436 12155 163280 163,280

Re2k5/Revised Cost data 10-11.xls

16. R.E.C. - Construction Standard No. B-12/1981 Costdata per Km of LT 3-Ph 4 Wire Line(Horizontal formation ) with 4 x 34 Sqmm AAAC over 8 Mts. PSCC Poles at 60 Mts. Span, 100 Kg/Sq.Mt wind pressure, working load 200 Kgs. Sl. No. Particulars Qty. Rate in Rs. 1436 277 93 328 14453 32 46 12 Per Unit Each 4709 2 3 4 5 6 7 8 9 L.T. 3 Phase cross arms Back Clamp LT Stay sets 34 Sq.mm AAA Conductor Shakle Insulator set L.T.pin insulator with pin C.I. Knob Concreting of Pole,Stay sets & Base concreting Misc. Items like coil earthing, pipe earthings, danger-boards, bolts & nuts, etc. Total Cost of Material 3% storage & handling charges on items (1) to (8) 3% Contingencies on Materials Labour Transport 1% Cess on Material, Labour & Transport 11% Estt. & Genl. Charges On Materials 17 17 4 4.08 32 33 17 Each 1581 Each 1312 Each 58968 K.M. 1024 Set 1518 Set 204 Each Amount in Rs. 21540 1 8 M PSCC Pole 15

L.S.

16016

10

L.S.

3500

90856

110372 2726 3311 27593 5519 1435 12141 Total or say 163096 163,100

Re2k5/Revised Cost data 10-11.xls

17. R.E.C. - Construction Standard No. B-14/1981 Costdata per Km of LT S-Ph 3 Wire Line(Horizontal formation ) with 34 Sqmm AAAC over 8 Mts. PSCC Poles at 65 Mts. Span, 75 Kg/Sq.Mt wind pressure, working load 140 Kgs. Sl. No. Particulars Qty. Rate in Rs. 1323 145 93 328 14453 32 46 12 Per Unit Each Each Each Each K.M. Set Set Each L.S. L.S. Amount in Rs. 21168 2610 1674 1312 44226 704 1104 192

1 2 3 4 5 6 7 8 9 10

8 M PSCC Pole L.T. 1 Phase cross arms Back Clamp LT Stay sets 34 Sq.mm AAA Conductor Shakle Insulator set L.T.pin insulator with pin C.I. Knob Concreting of Pole,Stay sets & Base concreting Misc. Items like coil earthing, pipe earthings, danger-boards, bolts & nuts, etc. Total Cost of Material 3% storage & handling charges on items (1) to (8) 3% Contingencies on Materials Labour Transport 1% Cess on Material, Labour & Transport 11% Estt. & Genl. Charges On Materials

16 18 18 4 3.06 22 24 16

16016 3500

72990

92506 2190 2775 23127 4625 1203 10176 Total or say 136601 136,600

Note : Substitute the cost of 8 mts PSCC pole in above data for wind pressure of 100 kgs/Sqmts, and working load of 200 Kgs.

Re2k5/Revised Cost data 10-11.xls

18. R.E.C. - Construction Standard No. B-14/1981 Costdata per Km of LT S-Ph 2 Wire Line(Horizontal formation ) with 2 x 34 Sqmm AAAC over 8 Mts. PSCC Poles at 65 Mts. Span, 75 Kg/Sq.Mt wind pressure, working load 140 Kgs. Sl. No. Particulars Qty. Rate in Rs. 1323 136 93 328 14453 32 46 12 Per Unit Each Each Each Each K.M. Set Set Each L.S. L.S. Amount in Rs. 21168 2448 1674 1312 29484 384 552 192

1 2 3 4 5 6 7 8 9 10

8 M PSCC Pole L.T. 1 Phase cross arms Back Clamp LT Stay sets 34 Sq.mm AAA Conductor Shakle Insulator set L.T.pin insulator with pin C.I. Knob Concreting of Pole,Stay sets & Base concreting Misc. Items like coil earthing, pipe earthings, danger-boards, bolts & nuts, etc. Total Cost of Material 3% storage & handling charges on items (1) to (8) 3% Contingencies on Materials Labour Transport 1% Cess on Material, Labour & Transport 11% Estt. & Genl. Charges On Materials

16 18 18 4 2.04 12 12 16

16016 3500

57214

76730 1716 2302 19183 3837 997 8440 Total or say 113205 113,210

Re2k5/Revised Cost data 10-11.xls

19. R.E.C. - Construction Standard No. B-32/1984 Costdata per Km of LT line with 3 x 16 + 25 Sqmm AB Cable over 8 Mts. PSCC Poles at 65 Mts. Span, 75 Kg/Sq.Mt wind pressure, working load 140 Kgs. Sl. No. Particulars Qty. Rate in Rs. Per Unit Amount in Rs. 21168 1 2 3 4 5 6 7 8 M PSCC Pole Suspension clamp assembly with eye hook Dead end clamp assembly with eye hook LT Stay sets L.T. A.B. Cable 3 x 16 x 25 Sqmm Insulated connectors with covers Concreting of Pole,Stay concreting & Base concreting 16 12 6 4 1 56 1323 88 88 328 38834 80 Each 1056 Each 528 Each 1312 Set 38834 K.M. 4480 Each

L.S.

16016

Misc. Items like coil earthing, bolts & nuts, etc.

L.S.

3500

Total Cost of Material 3% storage & handling charges on items (1) to (6) 3% Contingencies on Materials Labour Transport 1% Cess on Material, Labour & Transport 11% Estt. & Genl. Charges On Materials 67378

86894 2021 2607 21724 4345 1130 9558 Total or say 128278 128,280

Re2k5/Revised Cost data 10-11.xls

20. R.E.C. - Construction Standard No. B-32/1984 Costdata per Km of LT line with 2 x 16 + 25 Sqmm AB Cable over 8 Mts. PSCC Poles at 65 Mts. Span, 75 Kg/Sq.Mt wind pressure, working load 140 Kgs. Sl. No. Particulars Qty. Rate in Rs. 1323 88 88 328 24456 80 Per Unit Each 1056 2 3 4 5 6 7 Suspension clamp assembly with eye hook Dead end clamp assembly with eye hook LT Stay sets L.T. A.B. Cable 2 x 16 x 25 Sqmm Insulated connectors with covers Concreting of Pole,Stay concreting & Base concreting Misc. Items like coil earthing, bolts & nuts, etc. 12 6 4 1 56 Each 528 Each 1312 Set 24456 K.M. 4480 Each Amount in Rs. 21168 1 8 M PSCC Pole 16

L.S.

16016

L.S.

3500

Total Cost of Material 3% storage & handling charges on items (1) to (6) 3% Contingencies on Materials Labour Transport 1% Cess on Material, Labour & Transport 11% Estt. & Genl. Charges On Materials 53000

72516 1590 2175 18129 3626 943 7977 Total or say 106956 106,960

Re2k5/Revised Cost data 10-11.xls

21. R.E.C. - Construction Standard No. B-32/1984 Costdata per Km of LT line with 1 x 16 + 25 Sqmm AB Cable over 8 Mts. PSCC Poles at 65 Mts. Span, 75 Kg/Sq.Mt wind pressure, working load 140 Kgs. Sl. No. Particulars Qty. Rate in Rs. 1323 88 88 328 20436 80 Per Unit Each Each Each Set K.M. Each L.S. Amount in Rs. 21168 1056 528 1312 20436 4480 16016

1 2 3 4 5 6 7

8 M PSCC Pole Suspension clamp assembly with eye hook Dead end clamp assembly with eye hook LT Stay sets L.T. A.B. Cable 1 x 16 + 25 Sqmm Insulated connectors with covers Concreting of Pole,Stay concreting & Base concreting Misc. Items like coil earthing, bolts & nuts, etc.

16 12 6 4 1 56

L.S.

3500

Total Cost of Material 3% storage & handling charges on items (1) to (6) 3% Contingencies on Materials Labour Transport 1% Cess on Material, Labour & Transport 11% Estt. & Genl. Charges On Materials

48980

Total or say

68496 1469 2055 17124 3425 890 7535 100994 100,990

Re2k5/Revised Cost data 10-11.xls

22. R.E.C. - Construction Standard No. B-32/1984 Costdata per Km of LT line with 3 x 16 + 25 Sqmm AB Cable over 8 Mts. PSCC Poles at 65 Mts. Span, 100 Kg/Sq.Mt wind pressure, working load 200 Kgs. Sl. No. Particulars Qty. Rate in Rs. 1436 88 88 328 38834 80 Per Unit Each Each Each Set K.M. Each L.S. Amount in Rs. 22976 1056 528 1312 38834 4480 16016

1 2 3 4 5 6 7

8 M PSCC Pole Suspension clamp assembly with eye hook Dead end clamp assembly with eye hook LT Stay sets L.T. A.B. Cable 3 x 16 + 25 Sqmm Insulated connectors with covers Concreting of Pole,Stay concreting & Base concreting Misc. Items like coil earthing, bolts & nuts, etc. Total Cost of Material 3% storage & handling charges on items (1) to (6) 3% Contingencies on Materials Labour Transport 1% Cess on Material, Labour & Transport 11% Estt. & Genl. Charges On Materials

16 12 6 4 1 56

L.S.

3500 88702 2076 2661 22176 4435 1153 9757 130960 130,960

69186

Total or say

Re2k5/Revised Cost data 10-11.xls

23. R.E.C. - Construction Standard No. B-32/1984 Costdata per Km of LT line with 2 x 16 + 25 Sqmm AB Cable over 8 Mts. PSCC Poles at 65 Mts. Span, 100 Kg/Sq.Mt wind pressure, working load 200 Kgs. Sl. No. Particulars Qty. Rate in Rs. 1436 88 88 328 24456 80 Per Unit Each Each Each Set K.M. Each Amount in Rs. 22976 1056 528 1312 24456 4480

1 2 3 4 5 6 7

8 M PSCC Pole Suspension clamp assembly with eye hook Dead end clamp assembly with eye hook LT Stay sets L.T. A.B. Cable 2 x 16 + 25 Sqmm Insulated connectors with covers Concreting of Pole,Stay concreting & Base concreting Misc. Items like coil earthing, bolts & nuts, etc.

16 12 6 4 1 56

L.S.

16016

L.S.

3500

Total Cost of Material 3% storage & handling charges on items (1) to (6) 3% Contingencies on Materials Labour Transport 1% Cess on Material, Labour & Transport 11% Estt. & Genl. Charges On Materials

54808

Total or say

74324 1644 2230 18581 3716 966 8176 109637 109,640

Re2k5/Revised Cost data 10-11.xls

24. R.E.C. - Construction Standard No. B-32/1984 Costdata per Km of LT line with 1 x 16 + 25 Sqmm AB Cable over 8 Mts. PSCC Poles at 65 Mts. Span, 100 Kg/Sq.Mt wind pressure, working load 200 Kgs. Sl. No. Particulars Qty. Rate in Rs. 1436 88 88 328 20436 80 Per Unit Each Each Each Set K.M. Each Amount in Rs. 22976 1056 528 1312 20436 4480

1 2 3 4 5 6 7

8 M PSCC Pole Suspension clamp assembly with eye hook Dead end clamp assembly with eye hook LT Stay sets L.T. A.B. Cable 1 x 16 + 25 Sqmm Insulated connectors with covers Concreting of Pole,Stay concreting & Base concreting Misc. Items like coil earthing, bolts & nuts, etc.

16 12 6 4 1 56

L.S.

16016

L.S.

3500

Total Cost of Material 3% storage & handling charges on items (1) to (6) 3% Contingencies on Materials Labour Transport 1% Cess on Material, Labour & Transport 11% Estt. & Genl. Charges On Materials

50788

Total or say

70304 1524 2109 17576 3515 914 7733 103675 103,680

Re2k5/Revised Cost data 10-11.xls

25. R.E.C. - CONSTRUCTION STANDARD SPECIFICATION NO. F3&F4/1981 COST DATA FOR ERRECTION OF 100KVA-11KV/433V CONVENTIONAL TRANSFORMER

Sl. No.

Particulars

Cost of Material (Rs.) 118403 5300 21600 1195 1918

Labour & Transport (Rs.) 3,213 909 9,702 388 726

1 2 3 4 5

11 KV/433V 100KVA Conventional Transformer Erection of 11 KV AB Switch (200A) D.P.Structure (Including all Earthing) Erection of 11 KV H.G. Fuse set Installation of L.T.H.G. Fuse sets (2 Nos.) including connections LT Metering arrangements with CTs including cable connections and cleat arrangement Installation of A type distribuion box Installation of HT Lightening Arrestors Misc. Items Total Cost of Material 3% storage & handling charges on items (1) to (8) 3% Contingencies on Materials Labour & Transport 1% Cess on Material, Labour & Transport 11% Estt. & Genl. Charges on Materials Total Cost in Rs. or say :

8368

940

7 8 9

4836 5259 500 167,380 5006 5021 16,645 1840 18412 214,304 214,300

162 605

16,645

Sub data for Sl.No.3 of Estimate Nos. 25 & 26

Re2k5/Revised Cost data 10-11.xls

26.

COST DATA FOR ERRECTION OF 63KVA-11KV/433V CONVENTIONAL TRANSFORMER

Sl. No.

Particulars 11 KV/433V 63KVA Conventional Distribution Transformer Erection of 11 KV AB Switch (200A) D.P.Structure (Including all Earthing) Erection of 11 KV H.G. Fuse set Installation of L.T.H.G. Fuse sets (2 Nos.) including connections LT Metering arrangements with CTs including cable connections and cleat arrangement Installation of A type distribuion box Installation of HT Lightening Arrestors with earth connection Misc. Items Total Cost of Material

Cost of Material (Rs.) 96541 5300 21600 1195 1918

Labour & Transport (Rs.) 3,213

1 2 3 4

909 9,702 388 726

6 7

8368 4836 1918 420 142,097

940

162 605

8 9

16,645

3% storage & handling charges on items 1 to 8 3% Contingencies on Materials Labour & Transport 1% Cess on Material, Labour & Transport 11% Estt. & Genl. Charges on Materials

4,250 4,263 16,645 1587 15,631

Total Cost in Rs. or say :

184,473 184,470

Re2k5/Revised Cost data 10-11.xls

27. Cost Data For Erection of 3 Phase 16 KVA-11KV/433V Conventional Distribution Transformer On Single Pole Structure

Sl. No. 1

Particulars 11 KV/433V 16KVA Conventional Distribution Transformer Erection of 11 KV AB Switch (200A) Single Pole.Structure with 9.1Mtr PSCC Pole (Including Earthing) Erection of 11 KV H.G. Fuse set CT Distribution box including CT wiring with 1x25 sqmm XLPE cable and cleat wiring Misc. Items(Danger boards,Bolts &Nuts,Concreting etc.) Total Cost of Material

Cost of Material (Rs.) 52168

Labour & Transport (Rs.) 613

5300 9877

909 3,448

3 4

1195 8279

388 253

5 6

1650

214

78469

5825

2,305 3% storage & handling charges on items (1) to (5) 3% Contingencies on Materials Labour & Transport 1% Cess on Material, Labour & Transport 11% Estt. & Genl. Charges on Materials 2,354 5,825 843 8,632

Total Cost in Rs. or say :

98,427 98,430

Sub data for Sl.No.3 of Estimate Nos. 27, 28 & 29 Sl. No. 1 2 3 4 5 6 7 8 9 10 Desctiption 9.1M/280 Kg WL PSCC Pole 100 X 50 mm MS Channel 65X65X6 mm MS Angle 50X6 mm MS Flat G.I.Earth Pipe 40 mm dia., 1.8M long 4 mm G.I.Wire LT Side arm with strut Cross arms, back clamps for cleat wiring C.I.Earth Pipe 75 mm dia., 2.5M long Bentonite compuond Sub Total for materials Unit Nos. Kg Kg Kg Nos. Kg Nos. Set Nos. LS Qty. 1 40 20 22 2 15 1 4 1 1

Re2k5/Revised Cost data 10-11.xls

28. Cost Data For Erection of 3 Phase 25 KVA-11KV/433V Conventional Distribution Transformer On Single Pole Structure

Sl. No. 1

Particulars 11 KV/433V 25KVA Conventional Distribution Transformer Erection of 11 KV AB Switch (200A) Single Pole.Structure with 9.1Mtr PSCC Pole (Including Earthing) Erection of 11 KV H.G. Fuse set CT Distribution box including CT wiring with 1x50 sqmm XLPE cable and cleat wiring Misc. Items(Danger boards,Bolts &Nuts,Concreting etc.) Total Cost of Material

Cost of Material (Rs.) 66000

Labour & Transport (Rs.) 673

5300 9877

909 3,448

3 4

1195 14228

388 252

5 6

1500

196

98,100

5,866

2,898 3% storage & handling charges on items (1) to (5) 3% Contingencies on Materials Labour & Transport 1% Cess on Material, Labour & Transport 11% Estt. & Genl. Charges on Materials 2,943 5,866 1040 10,791

Total Cost in Rs. or say :

121,638 121,640

Re2k5/Revised Cost data 10-11.xls

29. Cost Data For Erection of 3 Phase 40 KVA-11KV/433V Conventional Distribution Transformer On Single Pole Structure

Sl. No. 1

Particulars 11 KV/433V 40KVA Conventional Distribution Transformer Erection of 11 KV AB Switch (200A) Single Pole.Structure with 9.1Mtr PSCC Pole (Including Earthing) Erection of 11 KV H.G. Fuse set CT Distribution box including CT wiring with 1x70 sqmm XLPE cable and cleat wiring Misc. Items(Danger boards,Bolts &Nuts,Concreting etc.) Total Cost of Material

Cost of Material (Rs.) 86285

Labour & Transport (Rs.) 542

5300 9877

909 3,448

3 4

1195 18043

388 238

5 6

1500

196

122,200

5,721

3,621 3% storage & handling charges on items (1) to (5) 3% Contingencies on Materials Labour & Transport 1% Cess on Material, Labour & Transport 11% Estt. & Genl. Charges on Materials 3,666 5,721 1279 13,442

Total Cost in Rs. or say :

149,929 149,930

Re2k5/Revised Cost data 10-11.xls

30. Cost Data For Erection of Single Phase 15 KVA-6.3KV/0-240V CSP Transformer(Oil immersed) On 9.1Mtr PSCC Pole Support

Sl. No. 1 2 9.1 Mtr PSCC Pole

Particulars

Cost of Material (Rs.) 2310 22566

Labour & Transport (Rs.) 994 285

15KVA Single Phase CSP Distribution Transformer 3 Mounting arrangements for transformer Earthing with 1No 2.5 Mts Long 75 mm CI earth pipe Distribution box with 1 No 100A Fuse unit and cleat wiring with 50 sqmm XPLE cable & LT side arm with strut 1996 1912 618 431

4378

303

Misc. Items(Danger boards,Bolts &Nuts,Concreting etc.) Total Cost of Material

1000

34,163

2,631

995 3% storage & handling charges on items (1) to (5) 3% Contingencies on Materials Labour & Transport 1% Cess on Material, Labour & Transport 11% Estt. & Genl. Charges on Materials 1,025 2,631 368 3,758

Total Cost in Rs. or say :

42,940 42,940

Re2k5/Revised Cost data 10-11.xls

31.

R.E.C. - CONSTRUCTION STANDARD SPECIFICATION NO. F3&F4/1981 COST DATA FOR ERECTION OF 15KVA SINGLE PHASE 6.3KV/0-240V C.S.P TRANSFORMER (OIL IMMERSED) ON EXISTING 8M PSCC SUPPORT Particulars Qty. 1 No. 1 Set 1 No. L.S. Rate in Rs. 22,566 1,996 753 L.S. Per Unit Each Each Each L.S. Amount in Rs. 22,566 1,996 753 500

Sl.No. 1 2 3 4

15KVA Single Phase CSP Distribution Transformer Mounting arrangements for Transformer Pipe earthing Misc. Items

Total Cost of Material

25,816

3% storage & handling charges on items (1) to (3) 3% Contingencies on Materials Labour & Transport 1% Cess on Material, Labour & Transport 11% Estt. & Genl. Charges On Materials Total Cost in Rs. Or say :

759 774 2,592 284 2,840 33,065 33,070

Re2k5/Revised Cost data 10-11.xls

32.

R.E.C. - CONSTRUCTION STANDARD SPECIFICATION NO. F3&F4/1981 COST DATA FOR ERECTION OF 15KVA SINGLE PHASE 6.3KV/0-240V AMORPHOUS METAL CORE C.S.P TRANSFORMER (OIL IMMERSED) ON EXISTING 8M PSCC SUPPORT Particulars Qty. 1 No. Rate in Rs. 33,061 Per Unit Each Amount in Rs. 33,061

Sl.No. 1

15 KVA Oil Immersed Single Phase 6.3KV/0-240V Amorphous Metal Core Transformer Mounting arrangements for Transformer Pipe earthing Misc. Items

2 3 4

1 Set 1 No. L.S.

1,996 753 L.S.

Each Each L.S.

1,996 753 500

Total Cost of Material

36,311

3% storage & handling charges on items (1) to (3) 3% Contingencies on Materials Labour & Transport 1% Cess on Material, Labour & Transport 11% Estt. & Genl. Charges On Materials Total Cost in Rs. Or say :

1,074 1,089 2,403 387 3,994 44,872 44,870

Re2k5/Revised Cost data 10-11.xls

33.

R.E.C. - CONSTRUCTION STANDARD SPECIFICATION NO. H1&H3/1981

COST DATA FOR SINGLE PHASE AGRICULTURE SERVICE ERECTED ON SUPPORT Sl.No. 1 2 3 4 5 6 Particulars 1 Phase (5A-20A) Energy meter 1 Phase 15A M.C.B./Fuse Unit P.V.C. Cable 6 Sq.mm Single Core Moulded Distribution Box P.V.C. Bends 38mm Bolts, Nuts etc. Qty. 1 1 20 1 1 L.S. Rate in Rs. 710 115 26 250 12 L.S. Per Unit Each Each Each Each Each L.S. Amount in Rs. 710 115 520 250 12 80

Total Cost of Material

1,687

3% Contingencies Labour & Transport 1% Cess on Material, Labour & Transport 11% Estt. & Genl. Charges Total Cost in Rs. Or say :

51 1,076 28 186 3,027 3,030

Re2k5/Revised Cost data 10-11.xls

34. R.E.C. - CONSTRUCTION STANDARD SPECIFICATION NO. H6&H8/1981 COST DATA FOR RELEASE OF POLY PHASE AGRICULTURE SERVICE ERECTED ON SUPPORT Sl.No. 1 2 3 4 5 6 Particulars 3 Phase (10A-40A ) Energy meter 3 Phase 40A M.C.B./Fuse Unit (3 Nos.) P.V.C. Cable 6 Sq.mm Single Core Moulded Distribution Box Installation of 2KVAR Capacitor Misc. items such as Bolts, Nuts & Board etc. Qty. 1 1 30 1 1 L.S. Rate in Rs. 1,835 729 26 387 500 L.S. Per Unit Each Each Each Each 1 L.S. Amount in Rs. 1,835 729 780 387 500 80

Total Cost of Material

4,311

3% Contingencies Labour & Transport 1% Cess on Material, Labour & Transport 11% Estt. & Genl. Charges Total Cost in Rs. Or say :

129 1,739 61 474 6,714 6,710

Re2k5/Revised Cost data 10-11.xls

35. R.E.C.-CONSTRUCTION STANDARD SPECIFICATION NO.H1 TO H3/1981 COST DATA FOR DOMESTIC AND NON-DOMESTIC SERVICE CONNECTION (SINGLE PHASE) WITH QUALITY METER

Sl. No. 1

Particulars Single Phase electronic Energy Meter 5-30A 15A M.C.B./Fuse Unit P.V.C. Cable single core 2.5 Sq.mm Moulded Distribution Box G.I. Wire No.8 P.V.C. Pipe 20mm P.V.C. Bends 20mm Misc.

Rate 936

Chargable to Qty . Amount 1 936

Chargable to Qty. Amount

Amount in Rs. 936

2 3 4 5 6 7 8

115/E 11.5/M 250/E 48/Kg 11/M 2.5/E L.S

115 60 1 250 1 Kg. 2M 2 Nos. 48 22 5 85 690

115 690 250 48 22 5 85

Total

1301

850

2151

3% Contingencies on Materials Labour & Transport 1% Cess on Material, Labour & Transport 11% Estt. & Genl. Charges

39 202 15 143

26 430 13 94

65 633 28 237

Total Cost in Rs. Or say : Note : Item Nos. 4 to 7 are to be borne & arranged by the Consumer.

1701

1412

3,112 3,110

Re2k5/Revised Cost data 10-11.xls

36. R.E.C.-CONSTRUCTION STANDARD SPECIFICATION NO.H1 TO H3/1981 COST DATA FOR DOMESTIC AND NON-DOMESTIC SERVICE CONNECTION (SINGLE PHASE) WITH ELECTRONIC METER

Sl. No. 1

Particulars

Rate

Chargable to DISCOM Qty . Amount 1 447

Chargable to Consumer Qty. Amount

Amount in Rs. 447

Single Phase electronic Energy Meter 2.5A-10A 15A M.C.B./Fuse Unit P.V.C. Cable single core 2.5 Sq.mm Moulded Distribution Box G.I. Wire No.8 P.V.C. Pipe 20mm P.V.C. Bends 20mm Misc.

447

2 3 4 5 6 7 8

115/E 11.5/M 250/E 48/Kg 11/M 2.5/E L.S

115 60 1 250 1 Kg. 2M 2 Nos. 48 22 5 85 690

115 690 250 48 22 5 85

Total

812

850

1662

3% Contingencies on Materials Labour & Transport 1% Cess on Material, Labour & Transport 11% Estt. & Genl. Charges

24 202 10 89

26 430 13 94

50 633 23 183

Total Cost in Rs. Or say : Note : Item Nos. 4 to 7 are to be borne & arranged by the Consumer.

1138

1412

2,550 2,550

Re2k5/Revised Cost data 10-11.xls

37. R.E.C.-CONSTRUCTION STANDARD SPECIFICATION NO.H1 TO H3/1981 COST DATA FOR DOMESTIC AND NON-DOMESTIC SERVICE CONNECTION (SINGLE PHASE) WITH QUALITY METER

Sl. No. 1

Particulars

Rate

Chargable to DISCOM Qty . Amount 1 710

Chargable to Consumer Qty. Amount

Amount in Rs. 710

Single Phase Quality Energy Meter 5A-20A 15A M.C.B./Fuse Unit P.V.C. Cable single core 2.5 Sq.mm Moulded Distribution Box G.I. Wire No.8 P.V.C. Pipe 20mm P.V.C. Bends 20mm Misc.

710

2 3 4 5 6 7 8

115/E 11.5/M 250/E 48/Kg 11/M 2.5/E L.S

115 60 1 250 1 Kg. 2M 2 Nos. 48 22 5 85 690

115 690 250 48 22 5 85

Total

1075

850

1925

3% Contingencies on Materials Labour & Transport 1% Cess on Material, Labour & Transport 11% Estt. & Genl. Charges

32 202 13 118

26 430 13 94

58 633 26 212

Total Cost in Rs. Or say : Note : Item Nos. 4 to 7 are to be borne & arranged by the Consumer.

1441

1412

2,853 2,850

Re2k5/Revised Cost data 10-11.xls

38. R.E.C.-CONSTRUCTION STANDARD SPECIFICATION NO.H1 TO H3/1981 COST DATA FOR DOMESTIC AND NON-DOMESTIC SERVICE CONNECTION (THREE PHASE)

Sl. No. 1

Particulars

Rate

Chargable to DISCOM Qty . Amount 1 1835

Chargable to Consumer Qty. Amount

Amount in Rs. 1835

Three Phase electronic Energy Meter 1040A 3 Phase 60A M.C.B./Fuse Unit Moulded Distribution Box P.V.C. Cable single core 6 Sq.mm G.I. Wire No.8 P.V.C. Pipe 20mm P.V.C. Bends 20mm Misc.

1835

2 3 4 5 6 7 8

955/E 387/E 26/M 48/Kg 11/M 2.5/E L.S

1 1

955 387 120 1 Kg. 2M 2 Nos. 3120 48 22 5 95

955 387 3120 48 22 5 95

Total

3177

3290

6467

3% Contingencies on Materials Labour & Transport 1% Cess on Material, Labour & Transport 11% Estt. & Genl. Charges

95 202 34 349

99 430 37 362

194 633 71 711

Total Cost in Rs. Or say : Note : Item Nos. 4 to 7 are to be borne & arranged by the Consumer.

3858

4218

8,076 8,080

Re2k5/Revised Cost data 10-11.xls

39. R.E.C.-CONSTRUCTION STANDARD SPECIFICATION NO.H1 TO H3/1981 COST DATA FOR DOMESTIC AND NON-DOMESTIC SERVICE CONNECTION (THREE PHASE) WITH ELECTRONIC METER Sl. No. 1 Chargable to DISCOM Qty . Amount 1 1835 Chargable to Consumer Qty. Amount Amount in Rs. 1835

Particulars

Rate

3 Phase Electronic Energy Meter Housed in box 10-40A 3 phase 60A M.C.B./Fuse Unit P.V.C. Cable single core 6 Sq.mm G.I. Wire No.8 P.V.C. Pipe 20mm P.V.C. Bends 20mm Misc.

1835

2 3 4 5 6 7

955/E 26/M 48/Kg 11/M 2.5/E L.S

955 120 Mts. 1 Kg. 2M 2 Nos. 3120 48 22 5 95

955 3120 48 22 5 95

Total

2790

3290

6080

3% Contingencies on Materials Labour & Transport 1% Cess on Material, Labour & Transport 11% Estt. & Genl. Charges

84 405 32 307

99 557 38 362

182 961 70 669

Total Cost in Rs. Or say : Note : Item Nos. 4 to 7 are to be borne & arranged by the Consumer.

3617

4346

7,963 7,960

Re2k5/Revised Cost data 10-11.xls

40.

R.E.C.-CONSTRUCTION STANDARD SPECIFICATION NO.H-5/1981 POLY PHASE SERVICE CONNECTION CHARGES FOR ERECTION OF 1 NO. INDUSTRIAL SERVICE (UPTO 15 H.P.)

Sl. No. 1

Particulars

Rate

Chargable to DISCOM Qty . Amount 1 1835

Chargable to Consumer Qty. Amount

Amount in Rs. 1835

Poly Phase Energy Meter housed 10A 40A 3 phase 60A M.C.B./Fuse unit Moulded Box for CT Meter P.V.C. Cable single core 10 Sq.mm G.I. Wire No.8 P.V.C. Pipe 38mm P.V.C. Bends 38mm Misc. items viz. link clips, wooden box, Bolts & Nuts.

1835

2 3 4 5 6 7 8

955/E 1647/E 43/M 48/Kg 41.4/M 12/E L.S

955 1647 80 1 Kg. 2M 2 Nos. 75 3440 48 83 24 125

955 1647 3440 48 83 24 200

Total

4512

3719.8

8231.8

3% Contingencies Labour & Transport 1% Cess on Material, Labour & Transport 11% Estt. & Genl. Charges

135 405 49 496

112 557 43 409

247 961 92 905

Total Cost in Rs. Or say :

5598

4840

10,438 10,440

Re2k5/Revised Cost data 10-11.xls

41. R.E.C.-CONSTRUCTION STANDARD SPECIFICATION NO.H-5/1981 COST DATA FOR POLY PHASE SERVICE CONNECTION CHARGES FOR ERECTION OF 1 NO. INDUSTRIAL SERVICE (UPTO 15 H.P.) (C T METER)

Sl. No. 1

Particulars

Rate

Chargable to DISCOM Qty . Amount 1 7950

Chargable to Consumer Qty. Amount

Amount in Rs. 7950

3 Phase electronic energy meter 10-40 A

7950

2 3 4 5 6 7 8 9

3 phase 60A M.C.B./Fuse unit Moulded Box for C T Meter L T Current Transformers P.V.C. Cable single core 10 Sq.mm G.I. Wire No.8 P.V.C. Pipe 38mm P.V.C. Bends 38mm Misc. items viz. link clips, wooden box, Bolts & Nuts.

955/E 1647/E 447/E 43/M 48/Kg 41.4/M 12/E L.S

1 1 3

955 1647 1341 120 1 Kg. 2M 2 Nos. 75 5160 48 83 24 125

955 1647 1341 5160 48 83 24 200

Total

11968

5439.8

17407.8

3% Contingencies Labour & Transport 1% Cess on Material, Labour & Transport 11% Estt. & Genl. Charges

359 405 124 1316

163 557 60 598

522 961 184 1915

Total Cost in Rs. Or say :

14172

6818

20,990 20,990

Re2k5/Revised Cost data 10-11.xls

R.E.C.-CONSTRUCTION STANDARD SPECIFICATION NO.H-5/1981 COST DATA FOR POLY PHASE SERVICE CONNECTION FOR ERECTION OF 1 NO. INDUSTRIAL SERVICE (ABOVE 15 H.P.) (C.T. METER)

42.

Sl. No. 1

Particulars

Rate

Chargable to DISCOM Qty. Amount 1 7950

Chargable to Consumer Qty. Amount

Amount in Rs. 7950

L.T. 3-Phase class-0.5 Accuracy CT Operated Energy Meter Housed in a box P.V.C. Cable single core 10 Sq.mm G.I. Wire No.8 P.V.C. Pipe 38mm P.V.C. Bends 38mm Misc. items viz. link clips, wooden box, Bolts & Nuts.

7950

2 3 4 5 6

43/M 48/Kg 41.4/M 12/E L.S 75

80 1 Kg. 2M 2 Nos.

3440 48 83 24 100

3440 48 83 24 175

Total

8025

3694.8

11719.8

3% Contingencies Labour & Transport 1% Cess on Material, Labour & Transport 11% Estt. & Genl. Charges

241 405 84 883

111 557 43 406

352 961 127 1289

Total Cost in Rs. Or say :

9638

4811

14,449 14,450

Re2k5/Revised Cost data 10-11.xls

43. Sl. No.

COST DATA FOR STREET LIGHT SERVICE CONNECTION (SINGLE PHASE) Rate Amount Particulars Qty. Per Unit in Rs. in Rs.

LT 1 phase Electronic Meter 5A-30A

1 No.

936

Each

936

1 phase 15A M.C.B./Fuse Unit

1 No.

115

Each

115

Light sensitive switch

1 No.

400

Each

400

P.V.C. Cable 4 Sq.mm Single Core

15 M

17

255

P.V.C. Pipe 25mm

2 Mts

17.45

35

P.V.C. Bends 25mm

2 No.

3.5

Each

Moulded Distribution Box

1 No.

250

Each

250

Wooden, plugs, clamps, bolts, nuts link clips etc

L.S.

L.S.

L.S.

50

Total

2,048

3% Contingenics Labour & Transport 1% Cess on Material, Labour & Transport 11% Estt. & Genl. Charges Total Cost in Rs. Or say :

61 759 28 225 3,122 3,120

Re2k5/Revised Cost data 10-11.xls

44. DETAILED ESTIMATE FOR ERECTION OF 1No. 33/11 KV SUBSTATION WITH (NT) X 5 MVA POWER TRANSFORMERS AND NF = 3 NO. 11 KV FEEDERS

Sl. No 1 (a) Lands and Rights

Particulars

Qty. LS LS LS

Rate (Rs. in lakhs) As per local conditions

Unit

Amount (Rs. in lakhs) 0.000

(b) Plantation of Trees Control Room and Consumer service centre 2 (including furniture) 3 Station Auxillaries Peripheral, Security Fencing, Approach road, retaing wall around switchward with gravel a) filling, gate and bore well b) Yard lighting c) Fire fighting Equipment d) P&T Phone and wireless set 4 Foundations for structures, PTRs & breakers 5 Bus bars, Jumpers, Connectors claps etc. 6 Control Cables 7 Structural Steel 8 Transformers a) 33/11KV, 5 MVA Power Transformer b) 11KV/ 415V 16KVA Stn. Transformer 9 Circiut Breakres (including trivector meters) a) 20 KA 11 kv feeder VCB including Control panel and CTs (NF=3) b) 20 KA 11 kv LV VCB including Control panel and CTs 10 Control Circiut Panels a) AC Supply Panel b) DC Aunnciation Panel 11 Instrument Transformers a) 11kv P.T (3 Phase) 12 Lightning Arrestors a) 33KV 10KA b) 11KV Line Type (NFX3) c) 11KV Station Type 10 KA 13 Isolating Switches a) 33KV 800A double break centrally operated Horizantal AB Switch b) 11KV 800A double break centrally operated Horizantal AB Switch (NT X 1+1) c) 11KV 400A Horizantal AB Switch (NF X 2+2) d) 11KV 200A Horizantal AB Switch for station transformer e) 33KV Horn Gap Fuse Set (1XNT) 14 2MVAR 11KV Capacitor Bank along with Associated Equipment 15 24V, 40 AH Battery Set including Battery Charger 16 Earthing of PTR, VCBs, AB Swicthes, Strucutres with 75x8mm GI Flat

LS LS

0.061 3.630

LS LS LS LS LS LS 15 1 1 3 1 1 1 1 6 9 3 3 2 8 1 1 1 4

LS LS LS LS LS LS MT Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each LS

6.655 0.550 0.660 1.375 3.025 1.100 1.210 5.069 30.748 0.522 5.476 1.877 0.330 0.330 0.119 0.195 0.158 0.053 0.812 0.300 0.920 0.053 0.095 7.682 0.560 1.815 75.377

0.338 30.748 0.522 1.825 1.877 0.330 0.330 0.119 0.033 0.018 0.018 0.271 0.150 0.115 0.053 0.095 7.682 0.140

Sub Total
17 Erection and transport and commissioning charges on items 7 to 15 at 10% 18 Contingencies on items 7 to 15 at 3% 19 T&P Charges on items No. 7 to 15 at 1% 20 1% Cess on Material, Labour & Transport 21 Establishment and General Charges at 11%

5.530 1.659 0.553 0.809 8.291 Total Rs. in Lakhs


Or say (Rs. lakhs)

92.219 92.220

Note : NF = No. of 11 KV Feeders, The number of outgoing feeders at substation limited to the demand in MVA i.e. if substation demand is 5 MVA, the number of feeders should not exceed five.