Professional Documents
Culture Documents
Facilities management has had the opportunity to work on several major projects
at the Martin Luther King Jr. Memorial Library and the branches during the above
listed months. Following is a list of projects:
• Completed major repairs on sewer ejector pit #2, checked price for
possible replacement
• Water Treatment contractor repaired and replaced needed element of the
cooling system
• Completed repairs on cooling unit 32 for Computer Room on A level
• Completed renovation in Room A-11 and relocated AV unit to the space
• Completed major re-facing project on mechanical level, entire area
cleaned, painted and safety striped
• Cable contractor and staff carpenter completed installation of seven
viewing stations throughout the 4th floor
• Completed renovation of IT staff working area on A level
• Completed elevator card reader system on all elevators, security is
working with contractor on programming of system
• Completed A/C preventive maintenance and change over from heating to
air conditioning was completed on April 19, 2008.
• Started repairs to drinking water chiller and have contracted to repair the
drinking fountains in the entire building.
• Contractor working to re-connect cooling coils for southeast portion of the
4th floor
• Completed several different paint projects for the 4th floor
• Installed new locks for 4th floor restrooms
• Purchased and installed new handicapped toilet seats for public restrooms
on the 2nd and 3rd floors.
• MLKML receives steam to heat our building from the General Services
Administration, this year we stopped our supply of steam on April 9, and
this will show an energy saving as well as fund saving for DCPL.
Document #8C.1
Board of Library Trustees Meeting
May 28, 2008
Branches
Miscellaneous Projects
Document #8C.1
Board of Library Trustees Meeting
May 28, 2008