You are on page 1of 6

Plant/Unit

Tender No and Date

Bokaro Steel Plant

GTS

Bokaro Steel Plant

BSL/PUR-MODN/G012/13-14/12 dated 11.12.2013

Bokaro Steel Plant

BSL/PUR-MODN/G011/13-14/11 Dated : 11.12.2013

Bokaro Steel Plant

BSL/PUR-MODN/G010/13-14/10 DATED 11.12.2013

Rourkela Steel Plant

P/PROJ/Railway/Dumetra/R-1/96 dt 02.01.2014.

Centre for Engineering &


Technology (CET)

CET-17(7)/03/02/CONT/NIT/386 dated 27.12.2013

Alloy Steels Plant

ASP/PROJECT/13-14/12/1 dt 28/12/13

Durgapur Steel Plant

DSP/PROJ-PUR/AMR/COB4-01/330 Dated 14.12.2013

Bokaro Steel Plant

T&C(M)/B369/2/AKG/169R dated 26.11.2013

Rourkela Steel Plant

P/4/640/1390000001/R1/95 dated 23.12.2013

Bhilai Steel Plant

DGM/PCC/TK/5(499)R1/2013/5079, Dtd.16.12.2013

Rourkela Steel Plant

P/Proj/006/1390000086/93 dated 20.12.2013

Rourkela Steel Plant

042/677/1390000095/01/00/500001381 DATED:31.12.2013

Rourkela Steel Plant

P/Proj/354/99004/ R2/91 dtd 21.12.2013

Durgapur Steel Plant

DSP/PROJ-PUR/EXPN/RMHP-11RT/326 DATED 12.11.13

Rourkela Steel Plant

P/PROJ/697(002)R1/79004 /70 dt. 06.09.2013

Rourkela Steel Plant

042/664/1390000035/02/00/500001277 DATED:23.10.2013

IISCO Steel Plant

2013-14/Proj/149 dated 26.12.13

Bokaro Steel Plant

T&C(M)/A5950/AKG/258 Dated 26.09.2013

Salem Steel Plant

PU-C43-9019 dt 22.11.13

Durgapur Steel Plant

DSP/PROJ-PUR/ABB/CO&CC/EXHAUSTER/331 Dated 10.12.2013

Durgapur Steel Plant

DSP/PUR/PC/KKK/SMS/1704 dtd 6.12.13

IISCO Steel Plant

ISP/PROJ/2013-14/153

Rourkela Steel Plant

P/Proj/697/1390000092/82 dated 05.11.2013

Rourkela Steel Plant

P/PROJ/383/1393000011/84 dtd.12.11.2013

Durgapur Steel Plant

DSP/PROJ-PUR/ABB/CO&CC/PGC-1,5&6/329 Dated 10.12.2013

Bhilai Steel Plant

DGM/PCC/TK/5(666)/2013/4806, Dtd.30.11.2013

Bokaro Steel Plant

T&C(E)/A5932/SKK/221R Dated 14.11.2013

Research & Development


Centre for Iron & Steel
(RDCIS)

RD/MM-AGL(APP-01)/19020 Date 11/11/2013

IISCO Steel Plant

2013-14/PROJ/144 Dt.16.12.13

Rourkela Steel Plant

P/Proj/287/39001/660/86 Date 22.11.2013

Raw Materials Division (RMD)

RMD/K/PROJ/NIT/GOM/13-14/071/DATED/05/12/2013

Alloy Steels Plant

ASP/Project/13-14/12 , Dt 3/12/13

Tender Title

Tender Issue Date & Time

GENERAL TECHNICAL SPECIFICATION NO. MEC/S/E24F/11/ 38/0/00/ 00/F1874/R.0.

Dec 11 2013 10:57:53:000PM

Slab Caster with Associated facilities (Pkg. No. 05) for Modernization of SMS-I (Stage-1) of BSL, Bokaro Steel City

Dec 12 2013 7:13:03:000PM

Design, Engineering, Fabrication, Manufacturing, Testing, Inspection and Commissioning of all the equipment/ items for
INSTALLATION OF SUPPRESSED COMBUSTION SYSTEM ALONG WITH REPLACEMENT OF BOF CONVERTER (1 NO.)
WITH ALL ASSOCIATED FACILITIES (PACKAGE NO. 03) AT SMS I OF BOKARO STEEL PLANT within the battery limit on a
turnkey basis

Dec 12 2013 6:28:11:000PM

Ladle Furnace with all associated facilities (pkg-4) for Modernization of SMS-I (Stage-1) in proposed Slab Caster Shop at Bokaro
Steel Plant.

Dec 12 2013 6:48:57:000PM

Construction & Up gradation of Railway Track Works for Interconnection jobs at Dumetra Station (Inside Railway Yard)as detailed
in enclosed Technical Specification.

Jan 3 2014 10:45:00:000AM

REPLACEMENT OF EXISTING MONOBLOCK PUMPS WITH ASSOCIATED CONTROL & MOTORS (4 NOS.), ELECTRICAL
PANELS ALONG WITH ASSOCIATED JOBS WITH NEW EQUIPMENT OF CENTRALIZED AIR CONDITIONING SYSTEM AT
4TH FLOOR, CET, RANCHI.

Dec 27 2013 5:00:00:000PM

Power Distribution and Yar Illumination system expansion of SAIL Warehouse at Durgapur

Dec 30 2013 10:03:12:000AM

REBUILING OF COKE OVEN BATTERY NO. 4 : BATTERY PROPER PACKAGE

Dec 16 2013 2:30:34:000PM

DESIGN, ENGINEERING, FABRICATION, MANUFACTURING, SUPPLY, TRANSPORTATION, INSPECTION, TESTING,


PAINTING, MARKING, HANDLING AND STORAGE OF EQUIPMENT OF FACILITIES OF THE 450 TPD LIME SHAFT KILN OF
BOKARO STEEL PLANT (UNDER PKG. - 2) ON TURNKEY BASIS

Nov 27 2013 6:36:37:000PM

Design, Engineering ,Supply, Installation ,Commissioning of UHMW Polymer Liners with Air Blaster for 8 nos Coal Bunker in MT
side of Coal Handling Plant of Coke oven dept at Rourkela Steel Plant

Dec 24 2013 3:00:00:000PM

Design , engineering, manufacture, supply, storage, civil work, erection, testing, commissioning and demonstration of performance
guarantee tests for Gas Cleaning Plant Rectification consisting of Part-A Technological and Part-B Water System for SMS-II on
divisible turnkey basis as detailed in enclosed TS No. 11/40/9101/TS/ 038-03 , Rev.03 May, 2013 and GTS No.
MEC/S/1901/11/38/0/ 00/00/ F1889/ R2, July 07.

Dec 16 2013 5:00:00:000PM

Supply, Implementation & Commissioning of Hospital Management Information System in Ispat General Hospital of RSP .

Dec 20 2013 7:00:00:000PM

Strengthening of Water treatment system at Rolling Mill Pump House

Dec 31 2013 5:30:00:000PM

design, engineering, manufacture, painting, assembly, shop testing, packaging, transportation and supply of equipment, handling at
site, testing & commissioning and demonstration of Performance Guarantee parameters for Augmentation of existing cooling
facilities for Finishing Mill Motors of Hot Strip Mill. as per the Technical Specification. CET/05/RK/3409/TS/ME/01/R=1 on Divisible
Turnkey Contract basis.

Dec 27 2013 5:30:00:000PM

Nov 18 2013 9:00:00:000AM


Construction & Upgradation of Railway Track Works for RSP Yards & Inplant New Lines

Sep 6 2013 6:00:00:000PM

INSTALLATION OF DE-MINERALISATION UNIT IN DECARB ANNEALING LINE OF SILICON STEEL MILL AT RSP

Oct 24 2013 4:30:00:000PM

Construction of 96 Quarters at Burnpur Township-Phase-I.

Dec 26 2013 4:59:05:000PM

DESIGN, ENGINEERING, MANUFACTURING, SUPPLY, ERECTION, COMMISSIONING AND TESTING FOR THE WORK OF
REPLACEMENT OF WEIGHING SYSTEM OF TUNDISH CARS (TUNDISH CARS # 1 & 2 ) OF CASTER 1 IN CCS IN ALL
RESPECTS ON TURN-KEY BASIS

Sep 27 2013 6:14:53:000PM

CONSTRUCTION OF NEW SECURED LAND FILL

Nov 22 2013 4:59:20:000PM

Replacement of 1 No. Steam Exhauster by Electrical Exhauster

Dec 12 2013 11:08:27:000AM


Dec 14 2013 9:00:00:000AM

Conversion of 29 KV overhead double circuit transmission line of DPSCL between tower location 4 &5 to underground cable at
Damodar Rail yard.

Dec 31 2013 1:30:00:000PM

Provision of Alternate Power Supply for OHE works

Nov 5 2013 6:15:04:000PM

Installation of 1 MW Solar PV Power Plant in RSP complete in all respect on turnkey basis as detailed in enclosed Technical
Specification (TS) No. RSP/383/18109/12080420/TS/R-2 dated Oct- 2013.

Nov 13 2013 5:45:00:000PM

Replacement Primary Gas Coolers

Dec 12 2013 11:31:41:000AM

Manufacture / supply, erection, testing, calibration, successful commissioning, demonstration of working of macro etching and
sulphur printing facilities including mechanical and auxiliary equipment, electrical equipment, auxiliary systems as detailed in
Nov 30 2013 3:00:00:000PM
Technical Specification No. MEC/S/9101/11/18/10/122A, R3, July 2013 and GTS no. MEC/S/9101/11/38/0/00/00/F1889/R-2, July07
and other tender documents on divisible turnkey basis.

REPLACEMENT OF SIMADYND REGULATION WITH FIELD CONVERTER OF FINISHING MAIN DRIVES OF HOT STRIP MILL
Nov 15 2013 12:03:33:000PM
OF BOKARO STEEL PLANT ON TURN-KEY BASIS

Design, Engineering, Supply, erection, installation, commissioning, testing, Demonstration of PG parameters and training of hot air
circulation system at Sinter machine #3 at Bokaro Steel Plant, SAIL, Bokaro.

Nov 11 2013 4:00:00:000PM

Maintenance of 50 nos. High Mast illumination Towers, electrical installation of zone offices at ISP and commissioning of
Transformer, HT and LT Board

Dec 16 2013 3:45:30:000PM

New DM Water Plant for CPP-1 for Civil & Balance Work on Divisible Turnkey Contract basis

Nov 23 2013 7:30:00:000PM

Construction of a Bachelor & Married Hostel at Gua Ore Mines Township at Gua Ore Mines, Dist. Singhbhum, Jharkhand

Dec 6 2013 9:00:00:000AM

Civil and Electrical Work Expansion of SAIL Warehouse , Durgapur

Dec 3 2013 2:00:00:000PM

Bid Submission Closing Date &


Time

May 30 2014 11:30:01:000AM

Feb 11 2014 11:30:00:000AM

Feb 11 2014 11:30:00:000AM

Corrigendum

Feb 11 2014 11:30:00:000AM

Corrigendum

Jan 30 2014 2:30:00:000PM

Jan 28 2014 3:00:00:000PM

Jan 28 2014 2:30:00:000PM

Jan 28 2014 2:00:00:000PM

Jan 23 2014 11:30:00:000AM

Jan 22 2014 2:30:00:000PM

Jan 22 2014 11:00:00:000AM

Jan 21 2014 2:30:00:000PM

Corrigendum

Jan 21 2014 2:30:00:000PM

Jan 20 2014 2:30:00:000PM

Jan 20 2014 2:00:00:000PM

Corrigendum

Jan 17 2014 2:30:00:000PM

Corrigendum

Jan 17 2014 2:30:00:000PM

Corrigendum

Jan 16 2014 3:00:00:000PM

Corrigendum

Jan 15 2014 11:30:00:000AM

Corrigendum

Jan 13 2014 3:00:00:000PM

Corrigendum

Jan 13 2014 2:00:00:000PM

Jan 13 2014 1:00:00:000PM

Jan 10 2014 3:00:00:000PM

Corrigendum

Jan 10 2014 2:30:00:000PM

Corrigendum

Jan 10 2014 2:30:00:000PM

Corrigendum

Jan 10 2014 2:00:00:000PM

Corrigendum

Jan 10 2014 11:00:00:000AM

Corrigendum

Jan 9 2014 11:30:00:000AM

Jan 7 2014 12:30:00:000PM

Corrigendum

Jan 6 2014 3:00:00:000PM

Jan 6 2014 2:30:00:000PM

Corrigendum

Jan 3 2014 11:30:00:000AM

Jan 2 2014 2:30:00:000PM

You might also like