Application for the Post of Electrical Engineer (Power Plant)

Sunil Kumar Thakur


E-mail: sunilthakur5055@Gmail.com Cell No. :09584522123 Contact no:09329295051

Personal Memorandum:Date of Birth : 10.07.1979 Fathers name : Mr.Kriparam Thakur Marital status : Married Religion : Hindu Nationality : Indian Languages known: Hindi, English Hobbies : Net surfing, Playing Chess, Traveling, Watching TV

Contact Address:S/O:- Mr.Kriparam Thakur Sunil Kumar Thakur Village & Post:-Chikhlakasha Police Station:-Dallirajhara Block:-Dondi, Dist:-Durg Chhattishgarh,491228

Job Profile:1. Working as an site engineer in Pre-commissioning work of 25 MW project work in Prakash Ind. Ltd an ISO 9001 & 14001 2. Working in Prakash Industries ltd. As an Engineer. since last 4 years in Electrical Depts. In power generation unit.3x25MW+1x10MW+2x15MW=115MW,with Boiler 3x50TPH WHRB+1x65TPH FBB +2x 110TPH FBB. All direction of work in maintenances and operation field perfectly situated at Janjgir-Champa,Chhattishgarh. Since 14/July/2006. & continuing. 3. I have also worked in LDC in Prakash Industries ltd.

Career Objective:To pursue a long term carrier in an organization where my qualification, skill and experience would take an asset and where I can learn and add value to both my technical and managerial skill to attain the greatest possible height. While contributing my best towards the growth of the organization with my never give up attitude & positive thinking.

Professional Qualification:Qualification Board Or University Rajiv Gandhi Prodyogiki ViswaVidyalya, Bhopal(M.P.) H.S.C

Institute Govt. Polytechnic, Betul (M.P.) Govt. Higher Secondary School, Camp-1, Bhilai

Year

Diploma
th

2002

10

1996

Computer Literacy:Operating Systems Languages Software : DOS, WINDOWS-9x & Server XP, 2000, ME : C, Assembly language : MS-Office, Photoshop, Tally, Known about Hard Were & Soft Were Installation.

Vocational Training:1. I had undergone 15days observational summer training in 4th semester at Thermal Power Plant Sarni.(M.P.), The training field was on Power Plant. The training was about networking inside the project area.

Summary Of Skills & Experience:Look out for both Operation & Maintenances.
In Operation: Responsible to maintain Active & Reactive Power, Power Factor, voltage, for the Generator of rating 25MVA,1640Amps,11KV,2 Pole,50HZ. Involved in Synchronizing procedure of Generator with Grid of 11/33KV line. Involved in maintaining TG when they are separate from Grid by putting KW & Frequency command on the respective TG by the Governor, Also maintaining increased or decreased load on Governor. Having a bit knowledge of Cold & Hot startup of TG. Involved in operation like Increasing & decreasing Load, starting up CEP,AOP,EOP, Maintaining HotWell Label, and some more normal operation for both the Turbine and Generator which will be held on DCS system. Some executive decision to be made under some emergency condition like Load Shedding, Maintain load at low pressure & High export conditions, Maintain furnace at High import condition from Grid.& many more like that. Special Responsibility : Taking on Dead-Bus & Synchronizing of TG. Transfer of Plant Auxiliary Power when needed. Watch out for starting & stopping a UNIT during Shut-Down. Watch out TG at Plant DARK-OUT & get quickly out of it.

In Maintenance: Maintenance of all the Generators & D.G. sets. Watch out for maintenance of all types H.T. & L.T. Motors. Watch out for maintenance of both Indoor & Outdoor Circuit Breakers. Look out for routine maintenance of Battery & Charger of respective TG Look out for routine maintenance of MCC,PCC & Control Room Panels Feeders, SFU,Contactors,Relays etc. Involved in maintenance of VFD-Room & Drives. Watch out for the maintenance of all 30/35 MVA Transformer,& all Auxiliary Transformer bellow 6 MVA with all Lighting Transformers. Also watch for 11/33 KV Switch yard and 11 KV Bus Bar Chamber with LA,CT,PT,SC. Of respective area during shut down. Special Responsibility : Bearing change in all types of H.T. & L.T. Motors. Maintenance of all Ear thing & Ear thing-Pit. Job planning during Shut Down period & responsibility to complete all of them. Maintaining 5S system for Plant. Involved a little bit of Mechanical job.

In LDC: In LDC I maintain the load for all direction of Furnace like IT,MT,ET & SAF with total capacity of 199tons. I maintain it by giving load which we generate from our different power station by DCS system. Maintain Export & Import Power from Grid as directed during Shut Down period. As An DET: In this training period I attained several classes on Boiler, Turbine, & on Electrical parts. Learned what to do in faulty condition, What to do in emergency period. How to work safe. Learned also managerial skill at it best. Maintain both the levels also. At last in over view I learned to how to work in professional line.

Project Supervisor: In this role I inspect the project site. Maintain the file works. The equipment indent in proper time and what more to indent. The rating of item indented was proper or not. Where to store them & where to install them, by taking proper care of them. Observe the Tested equipments. Involved in Panel shifting, Cable laying, LCS checking, Motor shifting & Feeder checking. Watching Testing & installation of Transformer. Watching overall Project. At last we make our Power Plant Environment Safe and Clean.

Slr.No
1. 2. 3. 4.

Organization
Prakash Industries Ltd. Prakash Industries Ltd Prakash Industries Ltd. Prakash Industries Ltd.

Period
Continue From April-2009 From April-2008 Mar-2009 From Aug-2007 To March-2008 From July-2006 To July-2007

Designation
Engineer A.E. J.E. D.E.T.

Experience
Continuing 1.8 Years 1 Years 1 Year

Total Period of Experience: Total 4.6 years of experience since I m started my job from 1/July/06 as a D.E.T. DECLARATION: I hereby declare that the above-mentioned details in this resume are true, complete and correct to the best of my knowledge and belief in accordance with my working performance.