BUMI ARMADA ENGINEERING SDN BHD


LIQUID PIPE SIZING CALCULATION
DESCRIPTION
Project
Project number
Client
File name
Line number
Line destination

OYO FIELD DEVELOPMENT


BAB 002 1004
ENI
\\vboxsrv\conversion_tmp\scratch_2\[208857486.xls.ms_office.xls]new

01-210-0-CO-010-8"-BC210-E38
Crude Oil Outlet of 1st Stage Separator

SIZE CASE

PIPE DATA
Nom.size (inches)
PIPE RATING
#
PIPE SCH NO.
PIPE INTERNAL DIA
in
ABSOLUTE ROUGHNESS
in

4
300
40
4.026
0.00192

6
300
40
6.066
0.00192

8
300
40
7.982
0.00192

10
10
300
40
10.022
0.00192

12
12
300
40
11.94
0.00192

8.50
123.25
60.0
140.00
600.00
264.971
40000.00
5.580
833.00
51.98

8.50
123.25
60.0
140.00
600.00
264.971
40000.00
5.580
833.00
51.98

8.50
123.25
60.00
140.00
600.00
264.971
40000.00
5.580
833.00
51.98

8.50
123.25
60.00
140.00
600.00
264.971
40000.00
5.580
833.00
51.98

8.50
123.25
60.00
140.00
600.00
264.971
40000.00
5.580
833.00
51.98

137716.05
4.76900E-04
7.88E+20
9.2535E-10
0.01955

91402.04
3.17E-04
6.95E+20
6.5277E-07
0.01986

69461.89
2.41E-04
5.53E+20
5.2737E-05
0.02044

55322.77
1.92E-04
4.26E+20
2.0118E-03
0.02111

46435.91
1.61E-04
3.36E+20
3.3143E-02
0.02175

9.032
29.614
28.33
640.999

3.979
13.045
3.71
83.856

2.298
7.534
0.97
21.874

1.458
4.779
0.32
7.242

1.027
3.367
1.37E-01
3.108

PROCESS DATA
PRESSURE
TEMPERATURE

LIQUID FLOWRATE
LIQUID VISCOCITY
LIQUID DENSITY

bara
psia
deg C
deg F
deg R
m3/hr
bpd
cP
kg/m3
lb/ft3

CALCULATION
NRe (Reynold Number)
Relative Roughness
A (Fric. Factor Constant)
B (Fric. Factor Constant)
Moody Friction Factor
RESULT
LIQUID VELOCITY

SELECTION CRITERIA
Liquid velocity
Pressure drop

m/s
ft/s
psi/100ft
kPa/100m

ft/s
m/s
psi/100ft
kpa/100m

3 - 15

3 - 15

3 - 15

3 - 15

AJ
Chkd

HH
App

SELECTION CRITERION

NOTE
1
Flowrate based on design capacity of oil production (40000blpd).

ISSUED AS FINAL
Description

EXCO-00
Rev

29/10/2008
Date

FO
Prep

3 - 15

Calculation number

BUMI ARMADA ENGINEERING SDN BHD


LIQUID PIPE SIZING CALCULATION
DESCRIPTION
Project
Project number
Client
File name
Line number
Line destination

OYO FIELD DEVELOPMENT


BAB 002 1002
ENI
\\vboxsrv\conversion_tmp\scratch_2\[208857486.xls.ms_office.xls]new

01-210-0-CO-012-12"-AC210-E38
Crude Oil to Booster Pump

SIZE CASE

10

12

PIPE DATA
Nom.size (inches)
PIPE RATING
#
PIPE SCH NO.
PIPE INTERNAL DIA
in
ABSOLUTE ROUGHNESS
in

6
150
40
6.066
0.00192

8
150
40
7.982
0.00192

10
150
40
10.022
0.00192

12
150
40
11.940
0.00192

1.21
17.55
65.00
149.00
609.00
322.100
48624.22
4.434
821.79
51.28

1.21
17.55
65.00
149.00
609.00
322.100
48624.22
4.434
821.79
51.28

1.21
17.55
65.00
149.00
609.00
322.100
48624.22
4.434
821.79
51.28

1.21
17.55
65.00
149.00
609.00
322.100
48624.22
4.434
821.79
51.28

137944.53
3.16518E-04
1.11E+21
9.0113E-10
0.01873

104832.31
2.41E-04
9.60E+20
7.2801E-08
0.01907

83493.46
1.92E-04
7.84E+20
2.7773E-06
0.01956

70081.37
1.61E-04
6.44E+20
4.5753E-05
0.02005

4.836
15.857
5.09
115.274

2.793
9.158
1.32
29.761

1.772
5.809
0.43
9.782

1.248
4.093
0.18
4.177

PROCESS DATA
PRESSURE
TEMPERATURE

LIQUID FLOWRATE
LIQUID VISCOCITY
LIQUID DENSITY

bara
psia
deg C
deg F
deg R
m3/hr
bpd
cP
kg/m3
lb/ft3

CALCULATION
NRe (Reynold Number)
Relative Roughness
A (Fric. Factor Constant)
B (Fric. Factor Constant)
Moody Friction Factor
RESULT
LIQUID VELOCITY

SELECTION CRITERIA
Liquid velocity
Pressure drop

m/s
ft/s
psi/100ft
kPa/100m

ft/s
m/s
psi/100ft
kpa/100m

3 - 15

3 - 15

3 - 15

3 - 15

AJ
Chkd

HH
App

SELECTION CRITERION

NOTE
Flowrate based on crude booster pump's capacity of 322.10m 3/hr.
1

ISSUED AS FINAL
Description

EXCO-00
Rev

29/10/2008
Date

FO
Prep

Calculation number

BUMI ARMADA ENGINEERING SDN BHD


LIQUID PIPE SIZING CALCULATION
DESCRIPTION
Project
Project number
Client
File name
Line number
Line destination

OYO FIELD DEVELOPMENT


BAB 002 1004
ENI
\\vboxsrv\conversion_tmp\scratch_2\[208857486.xls.ms_office.xls]new

01-210-0-CO-014-8"-AC210-E38
Crude Oil to Electrostatic Coalescer

SIZE CASE

PIPE DATA
Nom.size (inches)
PIPE RATING
#
PIPE SCH NO.
PIPE INTERNAL DIA
in
ABSOLUTE ROUGHNESS
in

4
150
40
4.026
0.00192

5
150
40
5.047
0.00192

6
150
40
6.066
0.00192

8
150
40
7.982
0.00192

4.50
65.25
65.00
149.00
609.00
322.100
48624.22
4.434
822.16
51.30

4.50
65.25
65.00
149.00
609.00
322.100
48624.22
4.434
822.16
51.30

4.50
65.25
65.00
149.00
609.00
322.100
48624.22
4.434
822.16
51.30

4.50
65.25
65.00
149.00
609.00
322.100
48624.22
4.434
822.16
51.30

207935.73
4.76900E-04
1.10E+21
1.2682E-12
0.01875

165870.67
3.80E-04
1.15E+21
4.7178E-11
0.01865

138006.80
3.17E-04
1.11E+21
8.9464E-10
0.01872

104879.64
2.41E-04
9.61E+20
7.2277E-08
0.01907

10.980
35.999
39.63
896.641

6.987
22.907
12.73
288.129

4.836
15.857
5.10
115.320

2.793
9.158
1.32
29.773

PROCESS DATA
PRESSURE
TEMPERATURE

LIQUID FLOWRATE
LIQUID VISCOCITY
LIQUID DENSITY

bara
psia
deg C
deg F
deg R
m3/hr
bpd
cP
kg/m3
lb/ft3

CALCULATION
NRe (Reynold Number)
Relative Roughness
A (Fric. Factor Constant)
B (Fric. Factor Constant)
Moody Friction Factor
RESULT
LIQUID VELOCITY

SELECTION CRITERIA
Liquid velocity
Pressure drop

m/s
ft/s
psi/100ft
kPa/100m

ft/s
m/s
psi/100ft
kpa/100m

3 - 15

3 - 15

3 - 15

3 - 15

AJ
Chkd

HH
App

SELECTION CRITERION

NOTE
1

Flowrate based on crude booster pump's capacity of 322.10m 3/hr.

ISSUED AS FINAL
Description

EXCO-00
Rev

29/10/2008
Date

FO
Prep

Calculation number

BUMI ARMADA ENGINEERING SDN BHD


LIQUID PIPE SIZING CALCULATION
DESCRIPTION
Project
Project number
Client
File name
Line number
Line destination

OYO FIELD DEVELOPMENT


BAB 002 1004
ENI
\\vboxsrv\conversion_tmp\scratch_2\[208857486.xls.ms_office.xls]new

01-210-0-CO-017-8"-AC210-E38
Oil to Coolers

SIZE CASE

PIPE DATA
Nom.size (inches)
PIPE RATING
#
PIPE SCH NO.
PIPE INTERNAL DIA
in
ABSOLUTE ROUGHNESS
in

4
150
40
4.026
0.00192

5
150
40
5.047
0.00192

6
150
40
6.066
0.00192

8
150
40
7.982
0.00192

4.51
65.40
64.28
147.70
607.70
264.971
40000.00
3.744
814.49
50.82

4.51
65.40
64.28
147.70
607.70
100.000
40000.00
3.744
814.49
50.82

4.51
65.40
64.28
147.70
607.70
100.000
40000.00
3.744
814.49
50.82

4.51
65.40
64.28
147.70
607.70
100.000
40000.00
3.744
814.49
50.82

200689.04
4.76900E-04
1.07E+21
2.2371E-12
0.01881

160089.97
3.80E-04
1.11E+21
8.3221E-11
0.01873

133197.18
3.17E-04
1.07E+21
1.5781E-09
0.01881

101224.52
2.41E-04
9.18E+20
1.2749E-07
0.01918

9.032
29.614
26.65
603.071

5.747
18.844
8.57
193.948

3.979
13.045
3.43
77.676

2.298
7.534
0.89
20.072

PROCESS DATA
PRESSURE
TEMPERATURE

LIQUID FLOWRATE
LIQUID VISCOCITY
LIQUID DENSITY

bara
psia
deg C
deg F
deg R
m3/hr
bpd
cP
kg/m3
lb/ft3

CALCULATION
NRe (Reynold Number)
Relative Roughness
A (Fric. Factor Constant)
B (Fric. Factor Constant)
Moody Friction Factor
RESULT
LIQUID VELOCITY

SELECTION CRITERIA
Liquid velocity
Pressure drop

m/s
ft/s
psi/100ft
kPa/100m

ft/s
m/s
psi/100ft
kpa/100m

3 - 15

3 - 15

3 - 15

3 - 15

AJ
Chkd

HH
App

SELECTION CRITERION

NOTE
1
Flowrate based on design capacity of oil production (40000blpd).

ISSUED AS FINAL
Description

EXCO-00
Rev

29/10/2008
Date

FO
Prep

Calculation number

BUMI ARMADA ENGINEERING SDN BHD


LIQUID PIPE SIZING CALCULATION
DESCRIPTION
Project
Project number
Client
File name
Line number
Line destination

OYO FIELD DEVELOPMENT


BAB 002 1004
ENI
\\vboxsrv\conversion_tmp\scratch_2\[208857486.xls.ms_office.xls]new

01-210-0-CO-029-8"-AC210-E38
Oil to Storage

SIZE CASE

PIPE DATA
Nom.size (inches)
PIPE RATING
#
PIPE SCH NO.
PIPE INTERNAL DIA
in
ABSOLUTE ROUGHNESS
in

4
150
40
4.026
0.00192

5
150
40
5.047
0.00192

6
150
40
6.066
0.00192

8
150
40
7.982
0.00192

2.00
29.00
45.00
113.00
573.00
264.971
40000.00
5.427
828.53
51.70

2.00
29.00
45.00
113.00
573.00
155.698
40000.00
5.427
828.53
51.70

2.00
29.00
45.00
113.00
573.00
155.698
40000.00
5.427
828.53
51.70

2.00
29.00
45.00
113.00
573.00
155.698
40000.00
5.427
828.53
51.70

140837.90
4.76900E-04
8.04E+20
6.4646E-10
0.01950

112346.62
3.80E-04
7.80E+20
2.4049E-08
0.01957

93474.02
3.17E-04
7.14E+20
4.5604E-07
0.01979

71036.50
2.41E-04
5.71E+20
3.6843E-05
0.02035

9.032
29.614
28.11
635.959

5.747
18.844
9.11
206.199

3.979
13.045
3.67
83.120

2.298
7.534
0.96
21.670

PROCESS DATA
PRESSURE
TEMPERATURE

LIQUID FLOWRATE
LIQUID VISCOCITY
LIQUID DENSITY

bara
psia
deg C
deg F
deg R
m3/hr
bpd
cP
kg/m3
lb/ft3

CALCULATION
NRe (Reynold Number)
Relative Roughness
A (Fric. Factor Constant)
B (Fric. Factor Constant)
Moody Friction Factor
RESULT
LIQUID VELOCITY

SELECTION CRITERIA
Liquid velocity
Pressure drop

m/s
ft/s
psi/100ft
kPa/100m

ft/s
m/s
psi/100ft
kpa/100m

3 - 15

3 - 15

3 - 15

3 - 15

AJ
Chkd

HH
App

SELECTION CRITERION

NOTE
1
Flowrate based on design capacity of oil production (40000blpd).

ISSUED AS FINAL
Description

EXCO-00
Rev

29/10/2008
Date

FO
Prep

Calculation number

BUMI ARMADA ENGINEERING SDN BHD


LIQUID PIPE SIZING CALCULATION
DESCRIPTION
Project
Project number
Client
File name
Line number
Line destination

OYO FIELD DEVELOPMENT


BAB 002 1004
ENI
\\vboxsrv\conversion_tmp\scratch_2\[208857486.xls.ms_office.xls]new

01-555-0-PW-021-4"-AC210-V
Produced Water Outlet from Flotation Cell

SIZE CASE

10

PIPE DATA
Nom.size (inches)
PIPE RATING
#
PIPE SCH NO.
PIPE INTERNAL DIA
in
ABSOLUTE ROUGHNESS
in

3
150
40
3.068
0.00192

4
150
40
4.026
0.00192

5
150
40
5.046
0.00192

6
150
40
6.066
0.00192

8
150
40
7.982
0.00192

10
150
40
10.022
0.00192

3.00
43.50
65.0
149.00
609.00
59.618
9000.00
0.440
978.30
61.05

3.00
43.50
65.0
149.00
609.00
59.618
9000.00
0.440
978.30
61.05

3.00
43.50
65.00
149.00
609.00
59.618
9000.00
0.440
978.30
61.05

3.00
43.50
65.00
149.00
609.00
59.618
9000.00
0.440
978.30
61.05

3.00
43.50
65.00
149.00
609.00
59.618
9000.00
0.440
978.30
61.05

3.00
43.50
65.00
149.00
609.00
59.618
9000.00
0.440
978.30
61.05

605611.41
6.25815E-04
1.29E+21
4.7310E-20
0.01838

461504.18
4.77E-04
1.74E+21
3.6580E-18
0.01771

368215.58
3.80E-04
2.07E+21
1.3565E-16
0.01733

306300.00
3.17E-04
2.25E+21
2.5805E-15
0.01715

232775.72
2.41E-04
2.30E+21
2.0848E-13
0.01710

185393.72
1.92E-04
2.14E+21
7.9531E-12
0.01726

3.500
11.474
6.16
139.421

2.032
6.663
1.53
34.520

1.294
4.242
0.48
10.923

0.895
2.935
0.19
4.306

0.517
1.695
4.81E-02
1.088

0.328
1.075
1.56E-02
0.352

PROCESS DATA
PRESSURE
TEMPERATURE

LIQUID FLOWRATE
LIQUID VISCOCITY
LIQUID DENSITY

bara
psia
deg C
deg F
deg R
m3/hr
bpd
cP
kg/m3
lb/ft3

CALCULATION
NRe (Reynold Number)
Relative Roughness
A (Fric. Factor Constant)
B (Fric. Factor Constant)
Moody Friction Factor
RESULT
LIQUID VELOCITY

SELECTION CRITERIA
Liquid velocity
Pressure drop

m/s
ft/s
psi/100ft
kPa/100m

ft/s
m/s
psi/100ft
kpa/100m

3 - 15

3 - 15

3 - 15

3 - 15

3 - 15

4 - 15

SELECTION CRITERION
Fraude Number

4.003

2.029

1.154

0.728

NOTE
1
Flowrate based on design flowrate of produced water which is 9000blpd.

ISSUED AS FINAL
Description

EXCO-00
Rev

29/10/2008
Date

FO
Prep

AJ
Chkd

HH
App

0.367

0.208

Calculation number

BUMI ARMADA ENGINEERING SDN BHD


LIQUID PIPE SIZING CALCULATION
DESCRIPTION
Project
Project number
Client
File name
Line number
Line destination

OYO FIELD DEVELOPMENT


BAB 002 1004
ENI
\\vboxsrv\conversion_tmp\scratch_2\[208857486.xls.ms_office.xls]new

01-590-0-CW-003-8"-AN140-N
Cooling Water Discharge from Crude Coolers

SIZE CASE

10

12

14

16

18

PIPE DATA
Nom.size (inches)
PIPE RATING
#
PIPE SCH NO.
PIPE INTERNAL DIA
in
ABSOLUTE ROUGHNESS
in

8
300
40
7.982
0.00192

10
300
40
10.022
0.00192

12
300
40
11.940
0.00192

14
300
40
13.124
0.00192

16
300
40
15.2496
0.00192

18
300
40
16.8687
0.00192

4.70
68.15
45.0
113.00
573.00
262.200
39581.71
1.000
1030.00
64.27

4.70
68.15
45.0
113.00
573.00
262.200
39581.71
1.000
1030.00
64.27

4.70
68.15
45.00
113.00
573.00
262.200
39581.71
1.000
1030.00
64.27

4.70
68.15
45.00
113.00
573.00
262.200
39581.71
1.000
1030.00
64.27

4.70
68.15
45.00
113.00
573.00
262.200
39581.71
1.000
1030.00
64.27

4.70
14.69
45.00
113.00
573.00
262.200
39581.71
1.000
1030.00
64.27

474256.22
2.40544E-04
4.02E+21
2.3651E-18
0.01595

377715.60
1.92E-04
4.22E+21
9.0244E-17
0.01585

317038.03
1.61E-04
4.14E+21
1.4869E-15
0.01589

288447.21
1.46E-04
4.02E+21
6.7452E-15
0.01595

248233.77
1.26E-04
3.74E+21
7.4522E-14
0.01609

224407.67
1.14E-04
3.50E+21
3.7450E-13
0.01623

2.274
7.455
0.91
20.671

1.442
4.729
0.29
6.584

1.016
3.332
0.12
2.749

0.841
2.758
0.08
1.720

0.623
2.042
3.62E-02
0.819

0.509
1.669
2.20E-02
0.499

PROCESS DATA
PRESSURE
TEMPERATURE

LIQUID FLOWRATE
LIQUID VISCOCITY
LIQUID DENSITY

bara
psia
deg C
deg F
deg R
m3/hr
bpd
cP
kg/m3
lb/ft3

CALCULATION
NRe (Reynold Number)
Relative Roughness
A (Fric. Factor Constant)
B (Fric. Factor Constant)
Moody Friction Factor
RESULT
LIQUID VELOCITY

SELECTION CRITERIA
Liquid velocity
Pressure drop

m/s
ft/s
psi/100ft
kPa/100m

ft/s
m/s
psi/100ft
kpa/100m

3 - 15

3 - 15

3 - 15

3 - 15

3 - 15

3 - 15

SELECTION CRITERION
Fraude Number

1.612

0.913

0.589

0.465

NOTE
1
Flowrate based on design flowrate of produced water which is 9000blpd.

ISSUED AS FINAL
Description

EXCO-00
Rev

29/10/2008
Date

FO
Prep

AJ
Chkd

HH
App

0.320

0.248

Calculation number

BUMI ARMADA ENGINEERING SDN BHD


LIQUID PIPE SIZING CALCULATION
DESCRIPTION
Project
Project number
Client
File name
Line number
Line destination

OYO FIELD DEVELOPMENT


BAB 002 1004
ENI
\\vboxsrv\conversion_tmp\scratch_2\[208857486.xls.ms_office.xls]new

01-130-0-TW-046-6"-FC200-V
Water Injection Line From Water Injection Pump Discharge

SIZE CASE

10

12

14

16

PIPE DATA
Nom.size (inches)
PIPE RATING
#
PIPE SCH NO.
PIPE INTERNAL DIA
in
ABSOLUTE ROUGHNESS
in

6
2500
40
6.066
0.00192

8
2500
40
7.982
0.00192

10
2500
40
10.022
0.00192

12
2500
40
11.940
0.00192

14
2500
40
13.124
0.00192

16
2500
40
15.2496
0.00192

210.00
3045.00
30.0
86.00
546.00
99.364
15000.00
1.000
1030.00
64.27

210.00
3045.00
30.0
86.00
546.00
99.364
15000.00
1.000
1030.00
64.27

210.00
3045.00
30.00
86.00
546.00
99.364
15000.00
1.000
1030.00
64.27

210.00
3045.00
30.00
86.00
546.00
99.364
15000.00
1.000
1030.00
64.27

210.00
3045.00
30.00
86.00
546.00
99.364
15000.00
1.000
1030.00
64.27

210.00
14.69
30.00
86.00
546.00
99.364
15000.00
1.000
1030.00
64.27

236490.45
3.16518E-04
1.84E+21
1.6182E-13
0.01758

179723.26
2.41E-04
1.78E+21
1.3073E-11
0.01765

143140.20
1.92E-04
1.59E+21
4.9874E-10
0.01791

120146.65
1.61E-04
1.38E+21
8.2162E-09
0.01823

109307.46
1.46E-04
1.26E+21
3.7296E-08
0.01844

94071.39
1.26E-04
1.07E+21
4.1185E-07
0.01882

1.492
4.892
0.57
12.909

0.862
2.825
0.15
3.286

0.547
1.792
0.05
1.068

0.385
1.263
0.02
0.453

0.319
1.045
1.26E-02
0.286

0.236
0.774
6.08E-03
0.138

PROCESS DATA
PRESSURE
TEMPERATURE

LIQUID FLOWRATE
LIQUID VISCOCITY
LIQUID DENSITY

bara
psia
deg C
deg F
deg R
m3/hr
bpd
cP
kg/m3
lb/ft3

CALCULATION
NRe (Reynold Number)
Relative Roughness
A (Fric. Factor Constant)
B (Fric. Factor Constant)
Moody Friction Factor
RESULT
LIQUID VELOCITY

SELECTION CRITERIA
Liquid velocity
Pressure drop

m/s
ft/s
psi/100ft
kPa/100m

ft/s
m/s
psi/100ft
kpa/100m

3 - 15

3 - 15

3 - 15

3 - 15

3 - 15

3 - 15

SELECTION CRITERION
Fraude Number

1.214

0.611

0.346

0.223

NOTE
1
Flowrate based on design flowrate of water injection system.

ISSUED AS FINAL
Description

EXCO-00
Rev

29/10/2008
Date

FO
Prep

AJ
Chkd

HH
App

0.176

0.121

Calculation number

BUMI ARMADA ENGINEERING SDN BHD


LIQUID PIPE SIZING CALCULATION
DESCRIPTION
Project
Project number
Client
File name
Line number
Line destination

OYO FIELD DEVELOPMENT


BAB 002 1004
ENI
\\vboxsrv\conversion_tmp\scratch_2\[208857486.xls.ms_office.xls]new

01-210-0-CO-026-6"-BC210-V
Oil from Test Separator

SIZE CASE

PIPE DATA
Nom.size (inches)
PIPE RATING
#
PIPE SCH NO.
PIPE INTERNAL DIA
in
ABSOLUTE ROUGHNESS
in

3
300
40
3.068
0.00192

4
300
40
4.026
0.00192

5
300
40
5.047
0.00192

6
300
40
6.066
0.00192

8
300
40
7.982
0.00192

8.50
123.25
60.0
140.00
600.00
99.364
15000.00
5.580
833.00
51.98

8.50
123.25
60.0
140.00
600.00
99.364
15000.00
5.580
833.00
51.98

8.50
123.25
60.00
140.00
600.00
99.364
15000.00
5.580
833.00
51.98

8.50
123.25
60.00
140.00
600.00
99.364
15000.00
5.580
833.00
51.98

8.50
123.25
60.00
140.00
600.00
99.364
15000.00
5.580
833.00
51.98

67769.49
6.25815E-04
3.03E+20
7.8255E-05
0.02203

51643.52
4.77E-04
2.62E+20
6.0507E-03
0.02244

41196.12
3.80E-04
2.12E+20
2.2509E-01
0.02303

34275.77
3.17E-04
1.70E+20
4.2684E+00
0.02368

26048.21
2.41E-04
1.14E+20
3.4483E+02
0.02488

5.833
19.123
17.47
395.223

3.387
11.105
4.57
103.451

2.155
7.067
1.52
34.304

1.492
4.892
0.62
14.060

0.862
2.825
1.66E-01
3.745

PROCESS DATA
PRESSURE
TEMPERATURE

LIQUID FLOWRATE
LIQUID VISCOCITY
LIQUID DENSITY

bara
psia
deg C
deg F
deg R
m3/hr
bpd
cP
kg/m3
lb/ft3

CALCULATION
NRe (Reynold Number)
Relative Roughness
A (Fric. Factor Constant)
B (Fric. Factor Constant)
Moody Friction Factor
RESULT
LIQUID VELOCITY

SELECTION CRITERIA
Liquid velocity
Pressure drop

m/s
ft/s
psi/100ft
kPa/100m

ft/s
m/s
psi/100ft
kpa/100m

3 - 15

3 - 15

3 - 15

3 - 15

FO
Prep

AJ
Chkd

HH
App

SELECTION CRITERION

NOTE
1
Flowrate based on oil flowrate of 15000blpd.

ISSUED AS FINAL
Description

EXCO-00
Rev

29/10/2008
Date

3 - 15

Calculation number

BUMI ARMADA ENGINEERING SDN BHD


LIQUID PIPE SIZING CALCULATION
DESCRIPTION
Project
Project number
Client
File name
Line number
Line destination

OYO FIELD DEVELOPMENT


BAB 002 1004
ENI
\\vboxsrv\conversion_tmp\scratch_2\[208857486.xls.ms_office.xls]new

01-210-0-CO-035-4"-AC210-E25
Condensate return line from HP and LP Flare System

SIZE CASE

PIPE DATA
Nom.size (inches)
PIPE RATING
#
PIPE SCH NO.
PIPE INTERNAL DIA
in
ABSOLUTE ROUGHNESS
in

3
150
40
3.068
0.00192

4
150
40
4.026
0.00192

5
150
40
5.047
0.00192

6
150
40
6.066
0.00192

8
150
40
7.982
0.00192

1.50
21.75
45.0
113.00
573.00
40.000
6038.40
4.581
823.27
51.37

1.50
21.75
45.0
113.00
573.00
40.000
6038.40
4.581
823.27
51.37

1.50
21.75
45.00
113.00
573.00
40.000
6038.40
4.581
823.27
51.37

1.50
21.75
45.00
113.00
573.00
40.000
6038.40
4.581
823.27
51.37

1.50
21.75
45.00
113.00
573.00
40.000
6038.40
4.581
823.27
51.37

32842.33
6.25815E-04
1.19E+20
8.4550E+00
0.02477

25027.39
4.77E-04
8.77E+19
6.5375E+02
0.02572

19964.39
3.80E-04
6.36E+19
2.4320E+04
0.02677

16610.66
3.17E-04
4.72E+19
4.6118E+05
0.02780

12623.44
2.41E-04
2.87E+19
3.7258E+07
0.02958

2.348
7.698
3.15
71.182

1.364
4.470
0.84
18.995

0.868
2.845
0.28
6.387

0.601
1.969
0.12
2.644

0.347
1.137
3.15E-02
0.713

PROCESS DATA
PRESSURE
TEMPERATURE

LIQUID FLOWRATE (Note 1)


LIQUID VISCOCITY
LIQUID DENSITY

bara
psia
deg C
deg F
deg R
m3/hr
bpd
cP
kg/m3
lb/ft3

CALCULATION
NRe (Reynold Number)
Relative Roughness
A (Fric. Factor Constant)
B (Fric. Factor Constant)
Moody Friction Factor
RESULT
LIQUID VELOCITY

SELECTION CRITERIA
Liquid velocity
Pressure drop

m/s
ft/s
psi/100ft
kPa/100m

ft/s
m/s
psi/100ft
kpa/100m

3 - 15

3 - 15

3 - 15

3 - 15

SELECTION CRITERION

NOTE
1
Flowrate is based on comingled flow from both HP and LP Condensate Return Pump.

ISSUED AS FINAL
Description

EXCO-00
Rev

29/10/2008
Date

FO
Prep

AJ
Chkd

HH
App

3 - 15

Calculation number

BUMI ARMADA ENGINEERING SDN BHD


LIQUID PIPE SIZING CALCULATION
DESCRIPTION
Project
Project number
Client
File name
Line number
Line destination

OYO FIELD DEVELOPMENT


BAB 002 1004
ENI
\\vboxsrv\conversion_tmp\scratch_2\[208857486.xls.ms_office.xls]new
01-500-0-SW -202-2"-AN140-N
Seawater to Electrochlorinator

SIZE CASE

PIPE DATA
Nom.size (inches)
PIPE RATING
#
PIPE SCH NO.
PIPE INTERNAL DIA
in
ABSOLUTE ROUGHNESS
in

2
150
40
2.066
0.00192

3
150
40
3.068
0.00192

4
150
40
4.026
0.00192

6
150
40
6.066
0.00192

0
300
40
5.047
0.00192

5.80
84.10
35.0
95.00
555.00
11.400
1720.94
1.000
1030.00
64.27

5.80
84.10
35.0
95.00
555.00
11.400
1720.94
1.000
1030.00
64.27

5.80
84.10
35.00
95.00
555.00
11.400
1720.94
1.000
1030.00
64.27

5.80
84.10
35.00
95.00
555.00
11.400
1720.94
1.000
1030.00
64.27

5.80
84.10
35.00
95.00
555.00
11.400
1720.94
1.000
1030.00
64.27

79663.83
9.29332E-04
2.44E+20
5.8868E-06
0.02263

53645.85
6.26E-04
2.30E+20
3.2921E-03
0.02280

40880.64
4.77E-04
1.89E+20
2.5455E-01
0.02337

27132.45
3.17E-04
1.15E+20
1.7957E+02
0.02487

32610.55
3.80E-04
1.47E+20
9.4695E+00
0.02411

1.476
4.838
2.11
47.725

0.669
2.194
0.29
6.658

0.389
1.274
0.08
1.754

0.171
0.561
0.01
0.240

0.247
0.811
2.58E-02
0.584

PROCESS DATA
PRESSURE
TEMPERATURE

LIQUID FLOWRATE (Note 1)


LIQUID VISCOCITY
LIQUID DENSITY

bara
psia
deg C
deg F
deg R
m3/hr
bpd
cP
kg/m3
lb/ft3

CALCULATION
NRe (Reynold Number)
Relative Roughness
A (Fric. Factor Constant)
B (Fric. Factor Constant)
Moody Friction Factor
RESULT
LIQUID VELOCITY

m/s
ft/s
psi/100ft
kPa/100m

SELECTION CRITERIA
Liquid velocity
Pressure drop

ft/s
m/s
psi/100ft
kpa/100m

3 - 15

3 - 15

3 - 15

3 - 15

SELECTION CRITERION

NOTE

ISSUED AS FINAL

EXCO-00

29/10/2008

FO

AJ

HH

Description

Rev

Date

Prep

Chkd

App

3 - 15

Calculation number

BUMI ARMADA ENGINEERING SDN BHD


LIQUID PIPE SIZING CALCULATION
DESCRIPTION
Project
Project number
Client
File name
Line number
Line destination

OYO FIELD DEVELOPMENT


BAB 002 1004
ENI
\\vboxsrv\conversion_tmp\scratch_2\[208857486.xls.ms_office.xls]new

01-500-0-SW-508-14"-AN140-V
Seawater Header from Seawater Lift Pump Discharge

SIZE CASE

12

PIPE DATA
Nom.size (inches)
PIPE RATING
#
PIPE SCH NO.
PIPE INTERNAL DIA
in
ABSOLUTE ROUGHNESS in

14

10

12

12
150
40
12.350
0.00192

14
150
40
13.290
0.00192

8
300
40
7.982
0.00192

10
300
40
10.022
0.00192

12
300
40
11.94
0.00192

7.70
111.65
30.0
86.00
546.00
1600.000
241536.00
1.000
1030.00
64.27

7.70
111.65
30.0
86.00
546.00
1600.000
241536.00
1.000
1030.00
64.27

7.70
111.65
30.00
86.00
546.00
264.971
241536.00
1.000
1030.00
64.27

7.70
111.65
30.00
86.00
546.00
264.971
241536.00
1.000
1030.00
64.27

7.70
111.65
30.00
86.00
546.00
264.971
241536.00
1.000
1030.00
64.27

1870422.24
1.55466E-04
1.29E+22
6.9028E-28
0.01378

1738127.51
1.44E-04
1.38E+22
2.2323E-27
0.01367

2893975.78
2.41E-04
7.96E+21
6.3994E-31
0.01464

2304900.69
1.92E-04
1.05E+22
2.4413E-29
0.01415

1934649.47
1.61E-04
1.25E+22
4.0218E-28
0.01383

5.796
19.003
3.31
75.001

5.005
16.410
2.28
51.568

13.875
45.492
31.23
706.610

8.801
28.857
9.67
218.796

6.201
20.331
3.94E+00
89.137

PROCESS DATA
PRESSURE
TEMPERATURE

LIQUID FLOWRATE
LIQUID VISCOCITY
LIQUID DENSITY

bara
psia
deg C
deg F
deg R
m3/hr
bpd
cP
kg/m3
lb/ft3

CALCULATION
NRe (Reynold Number)
Relative Roughness
A (Fric. Factor Constant)
B (Fric. Factor Constant)
Moody Friction Factor
RESULT
LIQUID VELOCITY

SELECTION CRITERIA
Liquid velocity
Pressure drop

m/s
ft/s
psi/100ft
kPa/100m

ft/s
m/s
psi/100ft
kpa/100m

3 - 15

3 - 15

3 - 15

3 - 15

3 - 15

SELECTION CRITERION

NOTE
1
Flowrate based on operating flowrate from both seawater lift pumps running at the same time during changeover.

ISSUED AS FINAL
Description

EXCO-00
Rev

29/10/2008
Date

FO
Prep

AJ
Chkd

HH
App

Calculation number

BUMI ARMADA ENGINEERING SDN BHD


LIQUID PIPE SIZING CALCULATION
DESCRIPTION
Project
Project number
Client
File name
Line number
Line destination

OYO FIELD DEVELOPMENT


BAB 002 1004
ENI
\\vboxsrv\conversion_tmp\scratch_2\[208857486.xls.ms_office.xls]new

01-730-0-FW-529-16"-AG170-V and 01-730-0-FW-505-16"-AG170-V


Seawater Supply to Fire Water Ring Main

SIZE CASE

12

PIPE DATA
Nom.size (inches)
PIPE RATING
#
PIPE SCH NO.
PIPE INTERNAL DIA
in
ABSOLUTE ROUGHNESS in

14

16

10

12

12
150
40
12.350
0.00192

14
150
40
13.290
0.00192

16
150
40
15.000
0.00192

10
300
40
10.022
0.00192

12
300
40
11.94
0.00192

7.70
111.65
30.0
86.00
546.00
1600.000
241536.00
1.000
1030.00
64.27

7.70
111.65
30.0
86.00
546.00
1600.000
241536.00
1.000
1030.00
64.27

7.70
111.65
30.00
86.00
546.00
264.971
241536.00
1.000
1030.00
64.27

7.70
111.65
30.00
86.00
546.00
264.971
241536.00
1.000
1030.00
64.27

7.70
111.65
30.00
86.00
546.00
264.971
241536.00
1.000
1030.00
64.27

1870422.24
1.55466E-04
1.29E+22
6.9028E-28
0.01378

1738127.51
1.44E-04
1.38E+22
2.2323E-27
0.01367

1539980.98
1.28E-04
1.50E+22
1.5481E-26
0.01352

2304900.69
1.92E-04
1.05E+22
2.4413E-29
0.01415

1934649.47
1.61E-04
1.25E+22
4.0218E-28
0.01383

5.796
19.003
3.31
75.001

5.005
16.410
2.28
51.568

3.929
12.882
1.23
27.842

8.801
28.857
9.67
218.796

6.201
20.331
3.94E+00
89.137

PROCESS DATA
PRESSURE
TEMPERATURE

LIQUID FLOWRATE
LIQUID VISCOCITY
LIQUID DENSITY

bara
psia
deg C
deg F
deg R
m3/hr
bpd
cP
kg/m3
lb/ft3

CALCULATION
NRe (Reynold Number)
Relative Roughness
A (Fric. Factor Constant)
B (Fric. Factor Constant)
Moody Friction Factor
RESULT
LIQUID VELOCITY

SELECTION CRITERIA
Liquid velocity
Pressure drop

m/s
ft/s
psi/100ft
kPa/100m

ft/s
m/s
psi/100ft
kpa/100m

3 - 15

3 - 15

3 - 15

3 - 15

29/10/2008
Date

FO
Prep

AJ
Chkd

HH
App

SELECTION CRITERION

NOTE
1
Flowrate based on pump's capacity.

ISSUED AS FINAL
Description

EXCO-00
Rev

3 - 15

Calculation number

BUMI ARMADA ENGINEERING SDN BHD


LIQUID PIPE SIZING CALCULATION
DESCRIPTION
Project
Project number
Client
File name
Line number
Line destination

OYO FIELD DEVELOPMENT


BAB 002 1004
ENI
\\vboxsrv\conversion_tmp\scratch_2\[208857486.xls.ms_office.xls]new

01-210-0-CO-060-4"-AC210-V
Condensate return to 2nd Stage Separator (Header)

SIZE CASE

PIPE DATA
Nom.size (inches)
PIPE RATING
#
PIPE SCH NO.
PIPE INTERNAL DIA
in
ABSOLUTE ROUGHNESS
in

2
150
40
2.066
0.00192

3
150
40
3.068
0.00192

4
150
40
4.026
0.00192

6
300
40
6.066
0.00192

8
300
40
7.982
0.00192

8.30
120.35
44.8
112.66
572.66
1.600
241.54
0.596
837.80
52.28

8.30
120.35
44.8
112.66
572.66
1.600
241.54
0.596
837.80
52.28

8.30
120.35
44.81
112.66
572.66
1.600
241.54
0.596
837.80
52.28

8.30
120.35
44.81
112.66
572.66
0.500
241.54
0.596
837.80
52.28

8.30
120.35
44.81
112.66
572.66
0.500
241.54
0.596
837.80
52.28

15261.81
9.29332E-04
2.86E+19
1.7880E+06
0.02959

10277.35
6.26E-04
1.58E+19
9.9991E+08
0.03186

7831.82
4.77E-04
9.54E+18
7.7314E+10
0.03394

5197.97
3.17E-04
3.98E+18
5.4540E+13
0.03786

3950.25
2.41E-04
2.09E+18
4.4062E+15
0.04103

0.207
0.679
0.04
1.000

0.094
0.308
0.01
0.149

0.055
0.179
0.00
0.041

0.024
0.079
0.00
0.006

0.014
0.045
7.12E-05
0.002

PROCESS DATA
PRESSURE
TEMPERATURE

LIQUID FLOWRATE (Note 1)


LIQUID VISCOCITY
LIQUID DENSITY

bara
psia
deg C
deg F
deg R
m3/hr
bpd
cP
kg/m3
lb/ft3

CALCULATION
NRe (Reynold Number)
Relative Roughness
A (Fric. Factor Constant)
B (Fric. Factor Constant)
Moody Friction Factor
RESULT
LIQUID VELOCITY

SELECTION CRITERIA
Liquid velocity

Pressure drop

m/s
ft/s
psi/100ft
kPa/100m

ft/s
m/s
psi/100ft
kpa/100m

3 - 15

3 - 15

3 - 15

3 - 15

3 - 15

SELECTION CRITERION

NOTE
1
Flowrate is based on 'Line Sizing Calculation' document 08055E-801-FI-02 and Hysys simulation Design Case

ISSUED AS FINAL
Description

EXCO-00
Rev

29/10/2008
Date

FO
Prep

AJ
Chkd

HH
App

Calculation number BAE 00 C0701-EC-PR003

BUMI ARMADA ENGINEERING SDN BHD


LIQUID PIPE SIZING CALCULATION
DESCRIPTION
Project
Project number
Client
File name
Line number
Line destination

OYO FIELD DEVELOPMENT


BAB 002 1004
ENI
\\vboxsrv\conversion_tmp\scratch_2\[208857486.xls.ms_office.xls]new

01-210-0-CO-059-3"-BC210-V
Condensate return to 1st Stage Separator (Header)

SIZE CASE

PIPE DATA
Nom.size (inches)
PIPE RATING
#
PIPE SCH NO.
PIPE INTERNAL DIA
in
ABSOLUTE ROUGHNESS
in

2
300
40
2.066
0.00192

3
300
40
3.068
0.00192

4
300
40
4.026
0.00192

6
300
40
6.066
0.00192

8
300
40
7.982
0.00192

122.69
1779.01
49.8
121.64
581.64
5.600
845.38
6.324
421.60
26.31

122.69
1779.01
49.8
121.64
581.64
5.600
845.38
6.324
421.60
26.31

122.69
1779.01
49.80
121.64
581.64
5.600
845.38
6.324
421.60
26.31

122.69
1779.01
49.80
121.64
581.64
1.820
845.38
6.324
421.60
26.31

122.69
1779.01
49.80
121.64
581.64
1.820
845.38
6.324
421.60
26.31

2532.89
9.29332E-04
5.93E+17
5.3976E+18
0.03602

1705.65
6.26E-04
2.10E+17
3.0186E+21
0.03753

1299.79
4.77E-04
9.59E+16
2.3340E+23
0.04925

862.67
3.17E-04
2.66E+16
1.6465E+26
0.07420

655.59
2.41E-04
1.05E+16
1.3302E+28
0.09764

0.725
2.377
0.33
7.502

0.329
1.078
0.05
1.083

0.191
0.626
0.02
0.365

0.084
0.276
0.00
0.071

0.049
0.159
1.04E-03
0.024

PROCESS DATA
PRESSURE
TEMPERATURE

LIQUID FLOWRATE (Note 1)


LIQUID VISCOCITY
LIQUID DENSITY

bara
psia
deg C
deg F
deg R
m3/hr
bpd
cP
kg/m3
lb/ft3

CALCULATION
NRe (Reynold Number)
Relative Roughness
A (Fric. Factor Constant)
B (Fric. Factor Constant)
Moody Friction Factor
RESULT
LIQUID VELOCITY

SELECTION CRITERIA
Liquid velocity
Pressure drop

m/s
ft/s
psi/100ft
kPa/100m

ft/s
m/s
psi/100ft
kpa/100m

3 - 15

3 - 15

3 - 15

3 - 15

3 - 15

SELECTION CRITERION

NOTE
1
Flowrate is based on 'Line Sizing Calculation' document 08055E-801-FI-02 and Hysys simulation Design Case.

ISSUED AS FINAL
Description

EXCO-00
Rev

29/10/2008
Date

FO
Prep

AJ
Chkd

HH
App

Calculation number BAE 00 C0701-EC-PR003

BUMI ARMADA ENGINEERING SDN BHD


LIQUID PIPE SIZING CALCULATION
DESCRIPTION
Project
Project number
Client
File name
Line number
Line destination

OYO FIELD DEVELOPMENT


BAB 002 1004
ENI
\\vboxsrv\conversion_tmp\scratch_2\[208857486.xls.ms_office.xls]new

01-555-0-CO-101-2"-AC210-E25
Oil Return from Flotation Cell

SIZE CASE

PIPE DATA
Nom.size (inches)
PIPE RATING
#
PIPE SCH NO.
PIPE INTERNAL DIA
in
ABSOLUTE ROUGHNESS in

1
150
40
1.049
0.00192

2
150
40
2.066
0.00192

3
150
40
3.068
0.00192

4
150
40
4.026
0.00192

3.00
43.50
65.00
149.00
609.00
3.000
452.88
4.434
822.16
51.30

3.00
43.50
65.00
149.00
609.00
3.000
452.88
4.434
822.16
51.30

3.00
43.50
65.00
149.00
609.00
3.000
452.88
4.434
822.16
51.30

3.00
43.50
65.00
149.00
609.00
3.000
452.88
4.434
822.16
51.30

7432.89
1.83031E-03
5.52E+18
1.7846E+11
0.03635

3774.01
9.29E-04
1.61E+18
9.1455E+15
0.04237

2541.43
6.26E-04
6.28E+17
5.1146E+18
0.03620

1936.69
4.77E-04
3.06E+17
3.9546E+20
0.03307

1.506
4.939
5.55
125.564

0.388
1.273
0.22
4.939

0.176
0.577
0.03
0.584

0.102
0.335
0.01
0.137

PROCESS DATA
PRESSURE

bara
psia
TEMPERATURE
deg C
deg F
deg R
LIQUID FLOWRATE (Note 1) m3/hr
bpd
LIQUID VISCOCITY
cP
LIQUID DENSITY
kg/m3
lb/ft3
CALCULATION
NRe (Reynold Number)
Relative Roughness
A (Fric. Factor Constant)
B (Fric. Factor Constant)
Moody Friction Factor
RESULT
LIQUID VELOCITY

SELECTION CRITERIA
Liquid velocity
Pressure drop

m/s
ft/s
psi/100ft
kPa/100m

ft/s
m/s
psi/100ft
kpa/100m

3 - 15

3 - 15

3 - 15

3 - 15

SELECTION CRITERION

NOTE
Oil outlet from the flotation cell is based on 5% of total flowrate into the flotation cell which is at 60m3/hr.
1

Issued for design


Description

EXCO-00
Rev

29/10/2008
Date

FO
Prep

AJ
Chkd

HH
App

Calculation number BAE 00 C0701-EC-PR003

BUMI ARMADA ENGINEERING SDN BHD


LIQUID PIPE SIZING CALCULATION
DESCRIPTION
Project
Project number
Client
File name
Line number
Line destination

OYO FIELD DEVELOPMENT


BAB 002 1004
ENI
\\vboxsrv\conversion_tmp\scratch_2\[208857486.xls.ms_office.xls]new
Oil from Test Separator

SIZE CASE

PIPE DATA
Nom.size (inches)
PIPE RATING
#
PIPE SCH NO.
PIPE INTERNAL DIA
in
ABSOLUTE ROUGHNESS
in

8
300
40
7.982
0.00192

3
300
40
3.068
0.00192

6
300
40
6.066
0.00192

4
300
40
4.026
0.00192

5
300
40
5.047
0.00192

8.50
123.25
60.0
140.00
600.00
99.364
15000.00
4.581
823.27
51.37

8.50
123.25
60.0
140.00
600.00
53.000
15000.00
4.581
823.27
51.37

8.50
123.25
60.00
140.00
600.00
53.000
15000.00
4.581
823.27
51.37

8.50
123.25
60.00
140.00
600.00
53.000
15000.00
4.581
823.27
51.37

8.50
123.25
60.00
140.00
600.00
53.000
15000.00
4.581
823.27
51.37

31358.33
2.40545E-04
1.58E+20
1.7718E+01
0.02389

81583.68
6.26E-04
3.71E+20
4.0216E-06
0.02148

41261.60
3.17E-04
2.29E+20
2.1944E-01
0.02282

62170.82
4.77E-04
3.34E+20
3.1094E-04
0.02177

49593.57
3.80E-04
2.79E+20
1.1568E-02
0.02226

0.862
2.825
0.16
3.555

5.833
19.123
16.84
380.956

1.492
4.892
0.59
13.389

3.387
11.105
4.38
99.194

2.155
7.067
1.45E+00
32.764

PROCESS DATA
PRESSURE
TEMPERATURE

LIQUID FLOWRATE (Note 1)


LIQUID VISCOCITY
LIQUID DENSITY

bara
psia
deg C
deg F
deg R
m3/hr
bpd
cP
kg/m3
lb/ft3

CALCULATION
NRe (Reynold Number)
Relative Roughness
A (Fric. Factor Constant)
B (Fric. Factor Constant)
Moody Friction Factor
RESULT
LIQUID VELOCITY

m/s
ft/s
psi/100ft
kPa/100m

SELECTION CRITERIA
Liquid velocity
Pressure drop

ft/s
m/s
psi/100ft
kpa/100m

3 - 15

3 - 15

3 - 15

3 - 15

Date

Prep

Chkd

App

SELECTION CRITERION

NOTE

Description

Rev

3 - 15

Calculation number BAE 00 C0701-EC-PR003

BUMI ARMADA ENGINEERING SDN BHD


LIQUID PIPE SIZING CALCULATION
DESCRIPTION
Project
Project number
Client
File name
Line number
Line destination

OYO FIELD DEVELOPMENT


BAB 002 1004
ENI
\\vboxsrv\conversion_tmp\scratch_2\[208857486.xls.ms_office.xls]new

01-500-0-SW-508-14"-AN140-V
SW LIFT PUMP LINE

SIZE CASE

12

PIPE DATA
Nom.size (inches)
PIPE RATING
#
PIPE SCH NO.
PIPE INTERNAL DIA
in
ABSOLUTE ROUGHNESS in

14

10

12

12
300
40
12.350
0.00192

14
300
40
13.290
0.00192

8
300
40
7.982
0.00192

10
300
40
10.022
0.00192

12
300
40
11.94
0.00192

7.70
111.65
30.0
86.00
546.00
800.000
120768.00
1.000
1030.00
64.27

7.70
111.65
30.0
86.00
546.00
800.000
120768.00
1.000
1030.00
64.27

7.70
111.65
30.00
86.00
546.00
264.971
120768.00
1.000
1030.00
64.27

7.70
111.65
30.00
86.00
546.00
264.971
120768.00
1.000
1030.00
64.27

7.70
111.65
30.00
86.00
546.00
264.971
120768.00
1.000
1030.00
64.27

935211.12
1.55466E-04
9.50E+21
4.5238E-23
0.01432

869063.76
1.44E-04
9.82E+21
1.4630E-22
0.01426

1446987.89
2.41E-04
6.74E+21
4.1939E-26
0.01495

1152450.34
1.92E-04
8.30E+21
1.5999E-24
0.01456

967324.73
1.61E-04
9.33E+21
2.6357E-23
0.01435

2.898
9.502
0.86
19.486

2.503
8.205
0.59
13.447

6.938
22.746
7.97
180.367

4.401
14.429
2.49
56.311

3.100
10.165
1.02E+00
23.120

PROCESS DATA
PRESSURE
TEMPERATURE

LIQUID FLOWRATE
LIQUID VISCOCITY
LIQUID DENSITY

bara
psia
deg C
deg F
deg R
m3/hr
bpd
cP
kg/m3
lb/ft3

CALCULATION
NRe (Reynold Number)
Relative Roughness
A (Fric. Factor Constant)
B (Fric. Factor Constant)
Moody Friction Factor
RESULT
LIQUID VELOCITY

SELECTION CRITERIA
Liquid velocity
Pressure drop

m/s
ft/s
psi/100ft
kPa/100m

ft/s
m/s
psi/100ft
kpa/100m

3 - 15

3 - 15

3 - 15

3 - 15

AJ
Chkd

HH
App

SELECTION CRITERION

NOTE
1
Flowrate based on operating flowrate from the seawater lift pump.

Issued for design


Description

EXCO-00
Rev

29/10/2008
Date

FO
Prep

3 - 15

Calculation number BAE 00 C0701-EC-PR003

BUMI ARMADA ENGINEERING SDN BHD


LIQUID PIPE SIZING CALCULATION
DESCRIPTION
Project
Project number
Client
File name
Line number
Line destination

OYO FIELD DEVELOPMENT


BAB 002 1004
ENI
\\vboxsrv\conversion_tmp\scratch_2\[208857486.xls.ms_office.xls]new

Condensate return to 2nd Stage Separator from HP Compressor

SIZE CASE

PIPE DATA
Nom.size (inches)
PIPE RATING
#
PIPE SCH NO.
PIPE INTERNAL DIA
in
ABSOLUTE ROUGHNESS in

2
300
40
2.066
0.00192

3
300
40
3.068
0.00192

4
300
40
4.026
0.00192

6
300
40
6.066
0.00192

8
300
40
7.982
0.00192

8.30
120.35
44.8
112.66
572.66
0.500
75.48
0.596
837.80
52.28

8.30
120.35
44.8
112.66
572.66
0.500
75.48
0.596
837.80
52.28

8.30
120.35
44.81
112.66
572.66
0.500
75.48
0.596
837.80
52.28

8.30
120.35
44.81
112.66
572.66
0.500
75.48
0.596
837.80
52.28

8.30
120.35
44.81
112.66
572.66
0.500
75.48
0.596
837.80
52.28

4769.32
9.29332E-04
2.79E+18
2.1615E+14
0.03959

3211.67
6.26E-04
1.15E+18
1.2088E+17
0.04367

2447.44
4.77E-04
5.81E+17
9.3466E+18
0.03390

1624.37
3.17E-04
1.89E+17
6.5935E+21
0.03941

1234.45
2.41E-04
8.38E+16
5.3268E+23
0.05186

0.065
0.212
0.01
0.131

0.029
0.096
0.00
0.020

0.017
0.056
0.00
0.004

0.008
0.025
0.00
0.001

0.004
0.014
8.78E-06
0.000

PROCESS DATA
PRESSURE

bara
psia
TEMPERATURE
deg C
deg F
deg R
LIQUID FLOWRATE (Note 1) m3/hr
bpd
LIQUID VISCOCITY
cP
LIQUID DENSITY
kg/m3
lb/ft3
CALCULATION
NRe (Reynold Number)
Relative Roughness
A (Fric. Factor Constant)
B (Fric. Factor Constant)
Moody Friction Factor
RESULT
LIQUID VELOCITY

SELECTION CRITERIA
Liquid velocity
Pressure drop

m/s
ft/s
psi/100ft
kPa/100m

ft/s
m/s
psi/100ft
kpa/100m

3 - 15

3 - 15

3 - 15

3 - 15

AJ
Chkd

HH
App

SELECTION CRITERION

NOTE
1
Flowrate is based on 'Line Sizing Calculation' document 08055E-801-FI-02

Issued for design


Description

EXCO-00
Rev

29/10/2008
Date

FO
Prep

3 - 15

Calculation number BAE 00 C0701-EC-PR003

BUMI ARMADA ENGINEERING SDN BHD


LIQUID PIPE SIZING CALCULATION
DESCRIPTION
Project
Project number
Client
File name
Line number
Line destination

OYO FIELD DEVELOPMENT


BAB 002 1004
ENI
\\vboxsrv\conversion_tmp\scratch_2\[208857486.xls.ms_office.xls]new
01-210-0-CO-059-3"-BC210-V
Condensate return to 1st Stage Separator from HP Compressor

SIZE CASE

PIPE DATA
Nom.size (inches)
PIPE RATING
#
PIPE SCH NO.
PIPE INTERNAL DIA
in
ABSOLUTE ROUGHNESS
in

2
300
40
2.066
0.00192

4
300
40
4.026
0.00192

6
300
40
6.066
0.00192

6
300
40
6.066
0.00192

8
300
40
7.982
0.00192

122.69
1779.01
49.8
121.64
581.64
1.820
274.75
6.324
421.60
26.31

122.69
1779.01
49.8
121.64
581.64
1.820
274.75
6.324
421.60
26.31

122.69
1779.01
49.80
121.64
581.64
1.820
274.75
6.324
421.60
26.31

122.69
1779.01
49.80
121.64
581.64
1.820
274.75
6.324
421.60
26.31

122.69
1779.01
49.80
121.64
581.64
1.820
274.75
6.324
421.60
26.31

823.19
9.29332E-04
2.17E+16
3.4839E+26
0.07776

422.43
4.77E-04
2.04E+15
1.5065E+31
0.15153

280.37
3.17E-04
3.82E+14
1.0627E+34
0.22830

280.37
3.17E-04
3.82E+14
1.0627E+34
0.22830

213.07
2.41E-04
1.11E+14
8.5856E+35
0.30041

0.236
0.772
0.08
1.711

0.062
0.203
0.01
0.119

0.027
0.090
0.00
0.023

0.027
0.090
0.00
0.023

0.016
0.052
3.39E-04
0.008

PROCESS DATA
PRESSURE
TEMPERATURE

LIQUID FLOWRATE (Note 1)


LIQUID VISCOCITY
LIQUID DENSITY

bara
psia
deg C
deg F
deg R
m3/hr
bpd
cP
kg/m3
lb/ft3

CALCULATION
NRe (Reynold Number)
Relative Roughness
A (Fric. Factor Constant)
B (Fric. Factor Constant)
Moody Friction Factor
RESULT
LIQUID VELOCITY

m/s
ft/s
psi/100ft
kPa/100m

SELECTION CRITERIA
Liquid velocity

ft/s
m/s
psi/100ft
kpa/100m

Pressure drop

3 - 15

3 - 15

3 - 15

3 - 15

SELECTION CRITERION

NOTE
1

Flowrate is based on 'Line Sizing Calculation' document 08055E-801-FI-02

Issued for design

EXCO-00

29/10/2008

FO

AJ

HH

Description

Rev

Date

Prep

Chkd

App

3 - 15

Calculation number BAE 00 C0701-EC-PR003

BUMI ARMADA ENGINEERING SDN BHD


LIQUID PIPE SIZING CALCULATION
DESCRIPTION
Project
Project number
Client
File name
Line number
Line destination

OYO FIELD DEVELOPMENT


BAB 002 1004
ENI
\\vboxsrv\conversion_tmp\scratch_2\[208857486.xls.ms_office.xls]new

01-230-0-CO-062-2"-AC210-E25 and 01-230-0-CO-061-2"-AC210-E25


Recycle line from the condensate return pump back to LP Flare KOD.

SIZE CASE

PIPE DATA
Nom.size (inches)
PIPE RATING
#
PIPE SCH NO.
PIPE INTERNAL DIA
in
ABSOLUTE ROUGHNESS in

2
300
40
2.066
0.00192

3
300
40
3.068
0.00192

4
300
40
4.026
0.00192

5
300
40
5.046
0.00192

6
300
40
6.066
0.00192

4.00
58.00
45.0
113.00
573.00
20.000
3019.20
4.581
823.27
51.37

4.00
58.00
45.0
113.00
573.00
20.000
3019.20
4.581
823.27
51.37

4.00
58.00
45.00
113.00
573.00
20.000
3019.20
4.581
823.27
51.37

4.00
58.00
45.00
113.00
573.00
20.000
3019.20
4.581
823.27
51.37

4.00
58.00
45.00
113.00
573.00
20.000
3019.20
4.581
823.27
51.37

24385.35
9.29332E-04
6.04E+19
9.9082E+02
0.02695

16421.16
6.26E-04
3.84E+19
5.5411E+05
0.02852

12513.69
4.77E-04
2.50E+19
4.2844E+07
0.03010

9984.17
3.80E-04
1.66E+19
1.5888E+09
0.03168

8305.33
3.17E-04
1.15E+19
3.0224E+10
0.03316

2.589
8.488
6.18
139.810

1.174
3.849
0.91
20.493

0.682
2.235
0.25
5.556

0.434
1.423
0.08
1.891

0.300
0.985
3.48E-02
0.788

PROCESS DATA
PRESSURE
TEMPERATURE

LIQUID FLOWRATE
LIQUID VISCOCITY
LIQUID DENSITY

bara
psia
deg C
deg F
deg R
m3/hr
bpd
cP
kg/m3
lb/ft3

CALCULATION
NRe (Reynold Number)
Relative Roughness
A (Fric. Factor Constant)
B (Fric. Factor Constant)
Moody Friction Factor
RESULT
LIQUID VELOCITY

SELECTION CRITERIA
Liquid velocity
Pressure drop

m/s
ft/s
psi/100ft
kPa/100m

ft/s
m/s
psi/100ft
kpa/100m

3 - 15

3 - 15

3 - 15

3 - 15

FO
Prep

AJ
Chkd

HH
App

SELECTION CRITERION

NOTE
1
Flowrate based condensate return pump's capacity.

Issued for design


Description

EXCO-00
Rev

29/10/2008
Date

3 - 15

Calculation number

BUMI ARMADA ENGINEERING SDN BHD


LIQUID PIPE SIZING CALCULATION
DESCRIPTION
Project
Project number
Client
File name
Line number
Line destination

OYO FIELD DEVELOPMENT


BAB 002 1004
ENI
\\vboxsrv\conversion_tmp\scratch_2\[208857486.xls.ms_office.xls]new

SIZE CASE

0.5

PIPE DATA
Nom.size (inches)
PIPE RATING
#
PIPE SCH NO.
PIPE OUTSIDE DIA
mm
WALL THICKNESS
mm
PIPE INTERNAL DIA
in
ABSOLUTE ROUGHNESS
in
PIPE LENGTH
ft

0.5
150
40
21.3
2.770
0.620
0.00192
100

1
1
150
40
33.4
3.380
1.049
0.00192
100

1.5
1.5
150
40
48.3
3.680
1.612
0.00192
100

2
150
40
60.3
3.910
2.066
0.00192
100

3
300
40
88.9
5.49
3.068
0.00192
100

63.00
913.50
116.0
240.80
700.80
0.050
7.55
11.000
1078.00
67.27

63.00
913.50
116.0
240.80
700.80
0.050
7.55
11.000
1078.00
67.27

63.00
913.50
116.00
240.80
700.80
0.050
7.55
11.000
1078.00
67.27

63.00
913.50
116.00
240.80
700.80
0.050
7.55
11.000
1078.00
67.27

63.00
913.50
116.00
240.80
700.80
0.050
7.55
11.000
1078.00
67.27

110.69
3.09442E-03
3.49E+12
3.0484E+40
0.57823

65.49
1.83E-03
1.24E+11
1.3543E+44
0.97740

42.61
1.19E-03
4.13E+09
1.3108E+47
1.50202

62.91
9.29E-04
9.40E+10
2.5751E+44
1.01745

22.39
6.26E-04
3.62E+06
3.8865E+51
2.85869

0.071758
0.235272
5.8167
25.7063
581.5410

0.025114
0.082341
0.7125
3.1486
71.2294

0.010634
0.034865
0.1277
0.5645
12.7702

0.006471
0.021218
0.0250
0.1105
2.4992

0.002936
0.009625
0.0097
0.0430
0.9732

PROCESS DATA
PRESSURE
TEMPERATURE

LIQUID FLOWRATE (Note 1)


LIQUID VISCOCITY
LIQUID DENSITY

bara
psia
deg C
deg F
deg R
m3/hr
bpd
cP
kg/m3
lb/ft3

CALCULATION
NRe (Reynold Number)
Relative Roughness
A (Fric. Factor Constant)
B (Fric. Factor Constant)
Moody Friction Factor
RESULT
LIQUID VELOCITY
PRESSURE DROP

m/s
ft/s
bar/100m
psi/100ft
kPa/100m

SELECTION CRITERIA
Liquid velocity
Pressure drop

ft/s
m/s
psi/100ft
kpa/100m

3 - 15

3 - 15

3 - 15

3 - 15

SELECTION CRITERION

NOTE

ISSUED AS FINAL

EXCO-00

29/10/2008

FO

AJ

HH

Description

Rev

Date

Prep

Chkd

App

3 - 15