17 – 19 APRIL 2006

SHERATON HOTEL, LABUAN

JABATAN PEMBANGUNAN BANDAR, PERBADANAN PUTRAJAYA


1
By

Ir. Razali bin Jarmin


B.Sc. (Hons), M.Sc. (Geotechnical),P.Eng.
Timbalan Pengarah
Bahagian Kawalan Infrastruktur & Penyelenggaraan
Jabatan Pembangunan Bandar
Perbadanan Putrajaya

JABATAN PEMBANGUNAN BANDAR, PERBADANAN PUTRAJAYA


2
Area : 4,932 hectares

Population : 330,000

Residential Units : 67,000 units

Land Use :-

Government Offices 5.3 %


Commercial 2.9 %
Residential 25.8 %
Civic & Cultural 0.2 %
Public Amenities 10.1 %
Infrastructure & 18.2 %
Utilities
Open Space 37.5 %

JABATAN PEMBANGUNAN BANDAR, PERBADANAN PUTRAJAYA


3
GOALS OF PUTRAJAYA DRAINAGE MASTER PLAN

a To preserve the environmental values of the lake system.

b. To mitigate increased runoff and pollutant exports to external


catchments. (provision of detention ponds)

c. To provide for public convenience and safety from flooding

d. To provide a cost effective maintainable drainage system

JABATAN PEMBANGUNAN BANDAR, PERBADANAN PUTRAJAYA


4
DRAINAGE PATHS AND THE OPEN SPACE
NETWORK
The drainage infrastructure proposed for Putrajaya to achieve the goals
comprises of the following system :-
a Stormwater pipes (conduits) – closed systems

b. Open channels

c. Culverts

d. Detention basins (dry and wet type)

e. Gross Pollutant Traps (GPTs)

f Water Pollution Control Ponds / Wetlands

JABATAN PEMBANGUNAN BANDAR, PERBADANAN PUTRAJAYA


5
DETENTION PONDS (TO BE CONSTRUCTED)

Detention Detention
Pond Pond

Detention
Pond Detention
Pond

Detention
Pond

JABATAN PEMBANGUNAN BANDAR, PERBADANAN PUTRAJAYA


6
PLOT AREA

JABATAN PEMBANGUNAN BANDAR, PERBADANAN PUTRAJAYA


7
JABATAN PEMBANGUNAN BANDAR, PERBADANAN PUTRAJAYA
8
JABATAN PEMBANGUNAN BANDAR, PERBADANAN PUTRAJAYA
9
TO ACHIEVE THIS, WE NEED CONTROLS IN DEVELOPMENT

JABATAN PEMBANGUNAN BANDAR, PERBADANAN PUTRAJAYA


10
LEGISLATION

TOWN AND COUNTRY PLANNING ACT 1976 (ACT 172)

STREET, DRAINAGE AND BUILDING ACT 1974 (ACT 133)

EARTHWORKS (PERBADANAN PUTRAJAYA) BY-LAWS 1996

ENVIRONMENTAL QUALITY ACT 1974 (ACT 127)

ENVIRONMENTAL QUALITY (DELEGATION OF POWERS)


(PERBADANAN PUTRAJAYA) ORDER 2002

JABATAN PEMBANGUNAN BANDAR, PERBADANAN PUTRAJAYA


11
ENVIRONMENTAL PLANNING STAGE EARTHWORKS REPORT
MANAGEMENT REPORT
(EMR)
ENVIRONMENTAL BEFORE DETAIL INSPECTION OF
MANAGEMENT CONSTRUCTION EARTHWORKS PLAN AND
COMPLIANCE PLAN SPECIFICATIONS
(EMCP) BEFORE APPROVAL

ENVIRONMENTAL DURING SITE INSPECTION AND


MANAGEMENT AUDIT CONSTRUCTION MONITORING
REPORT (EMAR) STAGE

PROJECT CLOSURE PROJECT RECOMMENDATION FOR


PLAN (PCP) COMPLETION INFRA WORKS FOR CF
APPLICATION

JABATAN PEMBANGUNAN BANDAR, PERBADANAN PUTRAJAYA


12
1.0 PLANNING STAGE
1.1 TOWN AND COUNTRY PLANNING ACT 1976

SECTION 19(1)

No person other than local authority shall carry out any development
unless planning permission has been granted.

SECTION 27(6)

On conviction can be fine not exceeding RM 50,000.00 and to a further


fine which may extend to RM 1,000.00 for each day during which the
development is carried out after the first conviction for the offence.

JABATAN PEMBANGUNAN BANDAR, PERBADANAN PUTRAJAYA


13
1.2 PLANNING STAGE CONTROL

SECTION 21A(1) – DEVELOPMENT PROPOSAL REPORT

For erosion and sediment control , the report should contained


the following :-

Measures for the preservation of its natural topography


The proposed earthworks and a
A description on how the earthworks to be carried out.
Environmental Control Plan

JABATAN PEMBANGUNAN BANDAR, PERBADANAN PUTRAJAYA


14
2.0 EARTHWORKS APPROVAL STAGE
2.1 STREET, DRAINAGE AND BUILDING ACT 1974

SECTION 70A (1)

No person shall commence or carry out or permit to be commenced or


Carried out any earthworks without having first submitted to the
local authority plans and specifications in respect of the earthworks and
obtained the approval of the local authority thereto.

SECTION 70A (9) - PENALTY

Upon conviction, liable to an imprisonment for a term not exceeding


5 years or fine not exceeding RM 50,000.00 or both

JABATAN PEMBANGUNAN BANDAR, PERBADANAN PUTRAJAYA


15
2.2 STREET,DRAINAGE AND BUILDING
(COMPOUNDING OF OFFENCES)
(FEDERAL TERRITORY OF PUTRAJAYA) BY-LAWS 2003

Can be Compounded – not exceeding 50% of the maximum amount


of fine (i.e. RM 25,000.00 )

2.3 EARTHWORKS (PERBADANAN PUTRAJAYA)


BY-LAWS 1996

Upon conviction shall be liable to a fine not exceeding RM 2,000.00


And shall also be liable to a further fine not exceeding RM 100.00 for
Every day during which the offence is continued after the conviction.

JABATAN PEMBANGUNAN BANDAR, PERBADANAN PUTRAJAYA


16
2.0 SUBMISSION OF PLANS

PLANS FOR EARTHWORKS APPROVAL SHALL BE SUBMITTED


BY A REGISTERED PROFESSIONAL CIVIL ENGINEER AS
REQUIRED BY THE LAW

Plans submitted by the Consultant should indicate the following :-

1. Cut / Fill Area


2. Location of Silt Traps and Wash Trough
3. Location of Temporary Drainage System etc.
4. And any other measures to control erosion during construction and
5. Permanent protection upon completion of the earthworks.

** (Participant can refer to the Earthworks By-Laws for further details)

JABATAN PEMBANGUNAN BANDAR, PERBADANAN PUTRAJAYA


17
EXAMPLE : EROSION CONTROL PLAN SUBMISSION

JABATAN PEMBANGUNAN BANDAR, PERBADANAN PUTRAJAYA


18
EXAMPLE : TYPICAL DETAILS OF SILT TRAP

JABATAN PEMBANGUNAN BANDAR, PERBADANAN PUTRAJAYA


19
EARTHWORKS CONTROL
SILT TRAP

Function :-
To control the flow of sediment and polluted
water from entering the main water system
eg. river, streams, main drains
Spillway
Design of Silt Traps :-
As per MASMA Guidelines
Filter Material
Monitoring :-
Ensure that the Developer/Contractor desilt
the silt trap as and when required to ensure
its efficiency.

Dry Type

JABATAN PEMBANGUNAN BANDAR, PERBADANAN PUTRAJAYA


20
Well maintained Silt Trap

Silt Trap not properly maintained

(Action can be taken by the Local Authority


by issuing Compliance Instructions or fine
the Developer / Contractor as stipulated in
the Act / By-Laws )

JABATAN PEMBANGUNAN BANDAR, PERBADANAN PUTRAJAYA


21
Silt trap – Wet Type

Spillway

JABATAN PEMBANGUNAN BANDAR, PERBADANAN PUTRAJAYA


22
EARTHWORKS CONTROL
TEMPORARY EARTH DRAINS

Function :-
To direct the flow of surface water to the silt
trap or sediment basin.

Overflow pipe Monitoring :-


Ensure that the Developer/Contractor
maintain the temporary drain regularly.
Filter Material

Temporary Earth drains

JABATAN PEMBANGUNAN BANDAR, PERBADANAN PUTRAJAYA


23
EARTHWORKS CONTROL
SILT FENCE

Function :-

To control the flow of sediments into


Overflow pipe temporary drains / waterways / lakes

Filter Material

JABATAN PEMBANGUNAN BANDAR, PERBADANAN PUTRAJAYA


24
EARTHWORKS CONTROL
SILT FENCE

Overflow pipe

Filter Material

JABATAN PEMBANGUNAN BANDAR, PERBADANAN PUTRAJAYA


25
JABATAN PEMBANGUNAN BANDAR, PERBADANAN PUTRAJAYA
26
JABATAN PEMBANGUNAN BANDAR, PERBADANAN PUTRAJAYA
27
EARTHWORKS CONTROL
WASH TROUGH

Function :-

To ensure that vehicles leaving the


Overflow pipe site is clean and does not dirty the
public road.
Filter Material

JABATAN PEMBANGUNAN BANDAR, PERBADANAN PUTRAJAYA


28
EARTHWORKS CONTROL
PROTECTION TO SLOPES

All exposed slopes to be


turfed
immediately (preferred
Overflow pipe method : Hydroseeding)
to control erosion.
Filter Material

JABATAN PEMBANGUNAN BANDAR, PERBADANAN PUTRAJAYA


29
JABATAN PEMBANGUNAN BANDAR, PERBADANAN PUTRAJAYA
30
3.0 ENFORCEMENT

REGULAR INSPECTIONS BY THE AUTHORITY TO THE CONSTRUCTION


SITE IS A MUST TO ENSURE THAT THE DEVELOPER / CONTRACTOR
FULFILL THE REQUIREMENTS AS PER APPROVED PLAN.

ACTION AS STATED IN THE ACT OR BY-LAWS SHALL BE ENFORCED


IMMEDIATELY TO ENSURE THAT THE DAMAGE DONE BY NOT
FULFILLING THE REQUIREMENTS IS MINIMAL.

JABATAN PEMBANGUNAN BANDAR, PERBADANAN PUTRAJAYA


31
DESILTING WORKS

JABATAN PEMBANGUNAN BANDAR, PERBADANAN PUTRAJAYA


32
DETENTION POND - DESILTING WORKS (POST CONSTRUCTION)

JABATAN PEMBANGUNAN BANDAR, PERBADANAN PUTRAJAYA


33
DETENTION POND – AFTER DESILTING WORKS

JABATAN PEMBANGUNAN BANDAR, PERBADANAN PUTRAJAYA


34
PERMANENT CONTROLS
GROSS POLLUTANT TRAP

Function :-
To control the flow of
sediment and rubbish
Spillway from entering the main water
system eg. river, streams,
Filter Material main drains, lakes

JABATAN PEMBANGUNAN BANDAR, PERBADANAN PUTRAJAYA


35
RUBBISH SCREEN/ SEDIMENT TRAP

PATENTED GROSS
POLLUTANT TRAP
(eg. ECOSOL, CDS, ROCLA)

JABATAN PEMBANGUNAN BANDAR, PERBADANAN PUTRAJAYA


36
FOR YOUR ATTENTION

JABATAN PEMBANGUNAN BANDAR, PERBADANAN PUTRAJAYA


37