MAINTENANCE
II. MAINTENANCE:
CONTENTS:
1) MAINTENANCE LEVELS 2) INFORMATION ON MAINTENANCE 3 ) MAINTENANCE PLANNING 4) DESCRIPTION OF SHEET BANNERS 5) CONTACT 6) MAINTENANCE SHEETS SHEETS
MAINTENANCE
The maintenance operations are classified in five groups. This classification was developed on the basis of the level of complexity of the operations to be carried out, required skills and the associated logistics environment (technical document, training, special tools, etc.).
MAINTENANCE LEVELS
PERSONS CONCERNED OPERATER TECHNICAL CONDUCTOR MAINTENANCE TECHNICIAN FEGE TECHNICIAN OR CLIENT (having received appropriate specific training and documentary support ) FEGE TECHNICIAN
1 2 3 4 5
FEGE
MAINTENANCE
2) INFORMATION ON MAINTENANCE:
a. GENERAL REQUIREMENTS FOR INTERVENTION: Before any maintenance work, the safety instructions must be taken into account by those doing the work. The frequencies of work are given as an example and defined according to an estimation corresponding with: 1 week = 125 hours machine opration; 2 weeks = 250 hours machine opration; 1 month = 500 hours machine opration; 3 months = 1500 hours machine opration; 6 months = 3000 hours machine opration; 1 year = 6000 hours machine operation;
For any work not defined in the general maintenance plan, you should contact FEGE. Compliance with safety instructions, procedures, frequencies of intervention and recommended industrial products necessary for the operation of different mechanical systems (grease, oil, tools, etc.) ensures optimal operation of the machine. Failure to follow these recommendations may cause deterioration to the equipment and injury to those working on the machine. The maintenance sheet are information documents. They are ranked in increasing order. b. DESCRIPTION OF THE VARIOUS TYPES OF MAINTENANCE:
PREVENTIVE MAINTENANCE:
It helps avoid downtime through proactive planning of maintenance operations.
CURATIVE MAINTENANCE:
It is maintenance of the moment. It is generally ad hoc and allows technical components to be replaced quickly without any production stoppages.
MAINTENANCE MAINTENANCE
FEGE
MAINTENANCE MAINTENANCE
1500 hours
COMPONENTS Safety component test General maintenance and cleaning Checking of terminal boards Compressed air treatment device assembly Linear ball bearing Reduction gear assembly Filters and grids for ventilation on electrical cabinets Ball joint ends
SHEET no.
125 hours
250 hours
500 hours
1 2 3 4 7 8 9 10
1 1 2 1-2 3 2-3 2 2
FEGE
COMPONENTS
Ball bearings
Mechanics 125 hours 250 hours 500 hours 1500 hours 14 12 SHEET no. 2-3 4-5
MAINTENANCE MAINTENANCE
MAINTENANCE MAINTENANCE
LEVEL:
..
../..
Intervention level
SAFETY SHEET
CLEANING SHEET
ADJUSTING SHEET
FEGE 5) CONTACT :
FEGE SARL Ple d'activit d'Argonne Rue Albert Caquot 08400 VOUZIERS (France) Spare Parts Manager: M. SEJOURNET Sbastien Phone number Fax number E-mail Electrical & Mechanical Design Office Manager M. BRICHET Guy Phone number Fax number E-mail
MAINTENANCE MAINTENANCE
00 33 3 24 71 65 50 00 33 3 24 71 63 18 s.sejournet@fege.fr
00 33 3 24 71 65 50 00 33 3 24 71 63 18 g.brichet@fege.fr
6) MAINTENANCE SHEETS: