You are on page 1of 27

IBS

SCORE

Md Nasir Bin Md Safar JKA, POLITEKNIK SULTAN ABDUL HALIM MUADZAM SHAH.

DEFINITION
A

structured and systematically evaluation systems Used to measure the content usage of IBS components in a building

PRINCIPLE OF IBS SCORE

The use of prefabricated and precast concrete components


Off-site production of components The use of standardized components

Repeatability
Design using MC concept

HIGHER IBS SCORE REFLECT :


Total IBS Score (%) 100

70

Clean environment Quality

workers on site

50

Wastage

30

safe Faster completion

Site materials Total cost

IBS CONTENT SCORING SYSTEM (IBS SCORE)


PART 1 : STRUCTURAL SYSTEM
trusses Column Slab

PART 2 : WALL SYSTEM


Internal wall External wall
PART 3 : OTHER SIMPLIFIED CONSTRUCTION

Modular MS 1064

Repetitiveness

IBS CONTENT SCORING SYSTEM (IBS SCORE)


MAX IBS Score for a building is = 100 points The IBS Score is made up of the following components : Part 1: Structural System, Max= 50 points Part 2: Wall System, Max= 20 points Part 3: Other Simplified Construction Solutions, Max= 30 points
Part 1 Part 2 Part 3

IBS SKOR 2010

50p

20p

30p = 100p

Formula IBS Score


STRUCTURAL SYSTEM

WALL SYSTEM

OTHER SIMPLIFIED CONSTRUCTION SOLUTIONS

CALCULATION PRINSIP
1.

Structural system
Sub-structure works (elements) are not taken into account in the calculation e.g. Piling, ground beam, ground slab, underground car park etc)

Table 1: IBS Factor: Structural System

Table 1A: IBS Factor: Roof System

Roof

: Roof truss using prefab roof truss

Roof
Beam : precast beam Column : insitu column with reusable formwork No floor :

First floor

Beam : precast beam Column : insitu column with reusable formwork Slab :precast concrete half floor slab

Ground floor

STRUCTURAL SYSTEM :NOTES (TABLE 1)


1.Precast concrete slabs include half slab, hollow core slab and precast prestressed plank. 2. Reusable formworks include plastics, fiberglass, Steel, aluminium and other metal formworks that can be used not less than 20 cycles 3. Timber formwork (timber roof trusses) means the timber components are sized, cut and fabricated in-situ to form the formworks and the required temporary works.

STRUCTURAL SYSTEM :NOTES (TABLE 1)


5. The factor for tunnel formwork system is 0.6 6. Load-bearing blockwork include interlocking block, concrete mansory unit, hollow and lightweight block 7. This is structures without floor. 8. For other structural systems not mentioned in the table please refer to IBS Centre, CIDB for the factor.

EXERCISE 1
Question What is the IBS Factor for the following Structural components? (Refer Table 1 & 1A) 1. Ground Floor i) Precast Concrete beam ii) Column with timber formwork iii) All slab pre-stress plank except toilet area insitu

2. Roof i) Prefab roof truss.

EXERCISE 1
Question What is the IBS Factor for the following Structural components? (Refer Table 1 & 1A) 1. Ground Floor i) Precast Concrete beam ii) Column with timber formwork iii) All slab pre-stress plank except toilet area insitu

= 0.8

2. Roof i) Prefab roof truss = 1.0

2. Wall system
Points are awarded based on the wall system used Allocation based on the % of the length of the wall system used Point =

Qw Length of wall system is used Qst Total wall length of the building Fw from Table 2

Table 2: IBS Factor: Wall System

WALL SYSTEM: NOTES (TABLE 2)


1.

2.

Precast concrete panels include sandwich panel, solid panel, hollow core panel and bay-window. Wall cladding consists of panel actings as wall or facade and not as a skim to brickwall

3. For full height windows, use the IBS factor for panel glass. For wall with non-full height windows, take the highest or the widest materials. 4. Pre-assemble brickwall/blockwall means brick that being laid in form of a panel and transported to site. 5. Wall constructed using tunnel formworks, use Factor 0.6

3. Other Simplified Construction


Points are awarded based on the utilisation of construction methods or solutions that can contribute to the objectives of IBS. Use of standardised components; MS1064 (Beams, columns, walls, slab, windows, door) Repeating features Vertical repetitions, horizontal repetition

Point = 30%

TABLE 3 : IBS SCORE FOR OTHER SIMPLIFIED CONSTCRUTION SOLUTIONS

OTHER SIMPLIFIED CONSTRUCTION : NOTES (TABLE 3)


Refer to MS 1064: Pt 4: 2001 ( Coordinating sizes and Preferred sizes for doorsets. 2. Refer to MS 1064: Pt 5: 2001 (Coordinating sizes and Preferred sizes for window sets. 3. Refer to MS 1064:Pt 10: 2001 ( Coordinating sizes and Preferred sizes for reinforced concrete components. 4. For structure using load bearing wall system, 8 marks is given automatically 5. For non-concrete beams columns and slabs, 4 marks is given automatically for each component
1.

IBS Score Calculation &

EXAMPLE

Double Storey Terrace House

Say, from measurement taken from drawings: 1) Construction area i) Construction area ground floor ii) Construction area 1st floor iii) Construction roof area Total construction area 2)Structural Systems = = = = 117.0 m2 117.0 m2 117.0 m2 351.0 m2

i) Beams: ii) Columns : iii) Floor slab: iv) Roof truss:


3) Wall System i) Internal wall: ii) External wall:

Precast concrete beams In-situ concrete using steel formworks Precast half slabs floor Prefabricated timber roof truss.
Precast concrete panel Precast blockworks

Other simplified construction solutions


i) Beams: Columns: Walls and slabs: Doors : 60% complies to MS 1064 100% complies to MS 1064 Less than 50% complies to MS 1064 80% complies to MS 1064

Windows:

0% complies to MS 1064

ii) Horizontal repetition of structure = 100%

ELEMENTS Part 1: Structure Elements Precast beams + in-situ column with reusable formwork + precast concrete half slab floor. Ground floor area = 117.0m2

AREA (m2) or Length (m)

IBS FACTOR

COVERAGE

IBS SCORE

117.0 m2

0.9

(117 / 351) =0.33 (117 / 351) =0.33 (117/351) =0.33 1.00

0.33 x 0.9 x 50 =14.9 0.33 x 0.8 x 50 =13.2 0.33 x 1.0 x 50 =16.5 44.6

Precast beams + in-situ column with reusable formwork (no floor) 1st floor area = 117.0m2
Roof truss using prefab roof truss Roof area = 117.0m2 Total Part 1 Part 2: Wall System External wall using precast concrete blockworks Internal wall using precast concrete panel Total Part 2 Part 3: Other simplified construction solutions i) 60% beam sizes follow MS 1064 Part 10: 2001 ii) 100% of column sizing follow MS 1064 Part 10: 2001 iii) 80% of door sizing follow MS 1064 Part 4: 2001 iv) Horizontal repetition of structure = 100% Total Part 3

117.0 m2

0.8

117.0 m2 351.0 m2

1.0

87.8m 79.5m 167.3m

0.5 1.00

(87.8/167) =0.52 (79.5/167) =0.48 1.00

0.52 x 0.5 x 20 =5.2 0.48 x 1.0 x 20 =9.6

14.8

60% 100% 80% 100%

2 4

4
6 16 75.6

IBS CONTENTS SCORE OF PROJECT (Part 1 + Part 2 + Part 3)