LEAD CHART

Name of the Work :- CONSTRUCTION OF ADDL.CLASS ROOM TO PS.RAMACHA

RATES AS PER COMMON SSR OF


convence
charges

Lead in KM

Sl. No.

Description

SSR Sl.No.

Thicknes
s in mm

Source of
Material

MR

CT

Total

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

(-)stacking
(9)

Sand for Mortar

M-005

Bhadrachal
am

129.00

0.00

129.00

1096.23

Sand for filling& blindage

M-004

Local

10.00

0.00

10.00

90.01

Gravel

M-008

Local

5.00

0.00

5.00

40.91

R.R. Stone (OG)

M-148

Mah'bad

19.00

0.00

19.00

178.39

C.R. Stone (OG)

CSSR-A.14

Mah'bad

19.00

0.00

19.00

178.39

Rough stones 25x25x45 to 60cms

CSSR-A.76

Mah'bad

19.00

0.00

19.00

178.39

40mm OG Metal SS 5

M-055

Mah'bad

19.00

0.00

19.00

178.39

20mm M/c chips SS 5

M-053

Mah'bad

19.00

0.00

19.00

178.39

13.2/12.5 mm M/c chips (IS383-1970)

M-052

Mah'bad

19.00

0.00

19.00

178.39

10

10 mm M/c chips (IS383-1970)

M-051

Mah'bad

19.00

0.00

19.00

178.39

11

6 mm M/c chips (IS383-1970)

M-050

Mah'bad

19.00

0.00

19.00

178.39

Local

10.00

0.00

10.00

143.10

Local

1.00

0.00

1.00

0.00

Local

1.00

0.00

1.00

0.00

Mah'bad

18.00

0.00

18.00

4.09

Mah'bad

18.00

0.00

18.00

6.20

Mah'bad

18.00

0.00

18.00

4.46

Mah'bad

18.00

0.00

18.00

4.21

2nd Class Bricks of size 23x11x7cm

BMT-A.01

12
Fly Ash bricks of size 290x100x140
mm with comperssive strength of 50
kg/sq.cm

BMT-A.13

13

Fly Ash bricks of size 290x225x140


mm with comperssive strength of 50
kg/sq.cm

BMT-A.10

14

15

Polished shabad/Tandur blue slabas


15 to 18 mm thick (0.457x0.457m)

BMT-B.05

16.5

Rough shabad/Tandur blue slabas 25


mm thick (0.457x0.457m)
Polished Marble of any variety 16 to
20
mm
thick
(0.457x0.457m/0.60x.060m)

BMT-B.03

25

BMT-B.12

18

BMT-B.11

17

19

High Polished Granite 16 to 18 mm


thick up to (2.43m)black
Water

M-189

Local

0.50

0.00

0.50

0.00

20

Cement

CSSR-A.05

At site

0.00

0.00

0.00

0.00

21

High Yield Strength Deformed Bars


(Fe 415) for 8mm to 40mm dia

CSSR-A.062

At site

0.00

0.00

0.00

0.00

16
17
18

2.2925

5.1581

CERTIFICATES:1 Certified that the above leads are true and correct to the best of my knowledge

2 Certified that the quarry requries blasting for 20mm. To 6mm. Metal

3 Certified that the 20mm Metal requires Machine Crushing

4 Certified that the Work site falls with in the 16Km.Radius of the Agency Area,

Hence, 25% A.A. allowed on Labour charges.

Note:-

Assistant Engineer
RVM(SSA),Warangal

LEAD CHART

L.CLASS ROOM TO PS.RAMACHANDRAPURAM OF KURAVI (MDL) IN WARANGAL DISTRICT

RATES AS PER COMMON SSR OF 2012-2013


Initial Cost
Seignio1% towards
(-)
rage Charges
storage
stacking
(10)
(11)
(12)

Loading
Charges

Unloading
Charges

25% Agency
allowa-nce

Blasting
Charges

(13)

(14)

(13)

(14)

M/C
charges @
25%
(15)

Total
(16)

375.00

0.00

0.00

0.00

5.94

0.00

0.00

0.00

1477.17

288.00

0.00

0.00

0.00

5.94

0.00

0.00

0.00

383.95

97.00

0.00

0.00

11.88

5.94

0.00

0.00

0.00

155.73

263.00

0.00

0.00

23.76

11.88

0.00

0.00

0.00

477.03

355.00

0.00

0.00

23.76

11.88

0.00

0.00

0.00

569.03

933.33

0.00

0.00

23.76

11.88

0.00

0.00

0.00

1147.36

650.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

828.39

1234.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1412.39

1029.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1207.39

861.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1039.39

688.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

866.39

3472.00

0.00

0.00

32.68

32.68

0.00

0.00

0.00

3680.46

8000.00

0.00

0.00

74.92

74.92

0.00

0.00

0.00

8149.84

16000.00

0.00

0.00

168.57

168.57

0.00

0.00

0.00

16337.14

144.60

0.00

0.00

0.39

0.20

0.00

0.00

0.00

149.28

84.00

0.00

0.00

0.59

0.30

0.00

0.00

0.00

91.09

0.00

0.00

0.00

0.43

0.21

0.00

0.00

0.00

5.10

0.00

0.00

0.00

0.40

0.20

0.00

0.00

0.00

4.81

90.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

90.00

5500.00

0.00

0.00

0.00

39.21

0.00

0.00

0.00

5539.21

41500.00

0.00

0.00

0.00

47.00

0.00

0.00

0.00

41547.00

STACKING CHARGES:Sand , Gravel & Earth

: Rs. 5.50 / Cum

Metal (RR, CRS, 20mm, 40mm, Bond Stone)

: Rs. 8.70 / Cum

Bricks

: Rs. 10.00 / 1000 Nos

Polished Stone (Cuddapah & Shahabad )

: Rs. 8.70 / Cum

Stacking Charges of Flooring Stones to be arrived according to thickness

Dy. Executive Engineer

Executive Engineer RVM (SSA)

RVM(SSA),Warangal

Division: Warangal

10.00 / 1000 Nos

Unit per
(17)
Cum.
Cum.
Cum.
Cum.
Cum.
Cum.
Cum.
Cum.
Cum.
Cum.
Cum.
1000 Nos

1000 Nos

1000 Nos

1 Sq.m
1 Sq.m
1 Sq.m
1 Sq.m
KL
M.T
M.T

er RVM (SSA)

arangal

DETAILED AND ABSTRACT ESTIMATE


Name of the Work :- CONSTRUCTION OF ADDL,CLASS ROOM TO PS RAMCHANDRAPURAM OF
KURAVI (MDL) IN WARANGAL DISTRICT
SCHEME :- SSA-2012-13

(24'x20'x6'9")

SBC-200Kn/Sqmm
Measurements

Sl.
No.

Description of item

Nos.

1
1

1 x

0.90

0.90

Qty

1.20

Rate / Per
8

Earth work excevation and dep[ositing on bank with initia; ;ead pf 10m and initial lift of 3m
in Loamy & Clayey Soils like BC Soils. Red Earth & Ordinary Gravelly Soils (SS 20-B)
For Compound wall
1 x
1
347.40
0.45
0.45
Gate Columns

Estimate Cost of Rs.

70.349
1.944
72.293

Plain Cement Concrete corresponding to M5 grade as per IS 456 equivalent to (1:5:10)


proportion nominal mix using 40mm size HBG (IS383,11970) metal from approved quarry
For Compound wall
1 x
1
347.00
0.45
0.10
Gate Columns

1 x

0.90

0.90

0.10

15.615
0.162
15.777

Random Rubble stone masonry, in CM (1:8) prop: (Cement: Sand) using OG stones from
approved quarry including cost and conveyance of all materials like Granite stones, cement,
For Basment & above GL
1 x
1
347.00
0.38
0.80

105.488
105.488

Flush Pointing to RSS Masonry in CM(1:3) Pop: including cost and conveyance of all
materials like cement, sand, water etc., to site, including seigniorade charges, sales and
For basment
1 x
2
347.00
0.45
other taxes on all materials, all operational, incidental charges and labour charges such as
mixing motar, finishing, curing etc., complete for finished item of work(APSS 901,906)
RCC M-20 Nomial mix (Cement: fine aggregate:corase aggregate) corresponding to Table 9
of IS 456 using 20mm size graded machine crushed hard granite metal (corase aggregate)
Footings
1 x
2
0.75
0.75
0.25
from approved quarry including cost and conyvence of all materials like cement, sand, water
Pedustals
1 x and labour
2
0.60 such as0.60
etc,.
to site and including all opertional, incidental
charges
machine 0.60
mixing, laying concrete, curing etc,. complete but excluding cost of steel and its fabrication
Columns
1 x
2
0.30
0.30
2.65
charges for finished item of work, including centring, shuttring

312.300
312.300
0.281
0.432
0.477
1.190

Brick Masonry with C.M. (1:8) prop: using 2nd class bricks from approved source having
minimum crushing strength of 40 Kg/Sqcm. including cost and conveyance of all materials
For Compound wall
1 x
1
347.00
0.23
1.20

95.772

For coping

1 x

347.00

0.23

0.15

11.972

Middle brick columns

1 x

114

0.35

0.12

0.97

4.644
112.388

Plastering with CM(1:5) Prop: 12mm thick in single coat including cost and conveyance of
all materials like cement, sand, water etc., to site, seigniorage charges, sales & other taxes
For Compound wall
1 x
2
347.00
1.200

832.800

Coping alround

1 x

347.00

145.740

Extra width

2 x

114

0.12

0.42
1.200

32.832
1011.372

White cement painting to new walls and celling in two coat with Suryacem or equavalent
quality to give an even shade after thoroughly brushing the surface to remove all loose
For Compound wall
1 x
2
347.00
1.200

832.800

Coping alround

1 x

347.00

145.740

Extra width

2 x

114

0.12

0.42
1.200

10

Providing High Yield Strength Defomed (HYSD) steel bars (Fe 415 grade as per IS 17861985) of 8mm to 40mm diameters, cuttting bending, to required sizes and shapes placing in
For RCC item
Cost, Supply, fabrication and fixing of MS iron gate using MS Angles, Pipes and Squares
including cost and conveyance of all materials Fabrication, wedding and placing in position

Size 3.65x1.52@310Kg

202.05

32.832
1011.372

2882.90

200.000

310

15.50

11 Add 1% P.S.Charges
12 Add 5% VAT
13 Provison for unforeseen of items if any
Rate for 351 Rmt
Rate per 1RM

Asst Engineer
RVM(SSA) Warangal

The above said work is administratively sanctioned in the Proceedings No.


CW/1424/E1/SSA/2012-13 dt 05-07-2012 of District Collector & Chairman
RVM (SSA) Warangal under SSA - 2012-13

Dy. Executive Engineer


RVM (SSA) Warangal

The estimate is technically sancitoned for 5.30.. Lakhs (


Five Lakhs Thousends Only.) Vide Dr. No. D

Executive Engineer
RVM (SSA) Waranga

DRAPURAM OF

5'30'000=00
Rate / Per
8

Amount
9

cum

sqm

cum

324002.96

204347.71

Sqm
MT

15676.27
0.00

sancitoned for 5.30.. Lakhs ( Rupees


y.) Vide Dr. No. Dated

Executive Engineer
RVM (SSA) Warangal

###

Sl.No

Lead in
Kms

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45

1.00
2.00
3.00
4.00
5.00
6.00
7.00
8.00
9.00
10.00
11.00
12.00
13.00
14.00
15.00
16.00
17.00
18.00
19.00
20.00
21.00
22.00
23.00
24.00
25.00
26.00
27.00
28.00
29.00
30.00
31.00
32.00
33.00
34.00
35.00
36.00
37.00
38.00
39.00
40.00
41.00
42.00
43.00
44.00
45.00

CONVEYANCE CHARGES AS PER COMMON SSR 2013-14


Earth/Sand/Gr
Rubble/Size
Cement/Steel/RC
PCC
avel/Murrum/Li
Stone/Cut
C poles/A.C & G.I Slabs/Shabad
me/Surki
Stone/Coarse
Sheets/Packed
Slabs/CC &
aggregates
materials
Laterite
Blocks/Wood
0.00
9.82
21.27
31.09
40.91
50.73
60.55
70.37
80.19
90.01
99.83
109.65
119.47
129.29
139.11
148.93
158.75
168.57
178.39
188.21
198.03
207.85
217.67
227.49
237.31
247.13
256.95
266.77
276.59
286.41
294.59
302.77
310.95
319.13
327.31
335.49
343.67
351.85
360.03
368.21
376.39
384.57
392.75
400.93
409.11

0.00
9.82
21.27
31.09
40.91
50.73
60.55
70.37
80.19
90.01
99.83
109.65
119.47
129.29
139.11
148.93
158.75
168.57
178.39
188.21
198.03
207.85
217.67
227.49
237.31
247.13
256.95
266.77
276.59
286.41
294.59
302.77
310.95
319.13
327.31
335.49
343.67
351.85
360.03
368.21
376.39
384.57
392.75
400.93
409.11

0.00
6.14
13.30
19.44
25.58
31.72
37.86
44.00
50.14
56.28
62.42
68.56
74.70
80.84
86.98
93.12
99.26
105.40
111.54
117.68
123.82
129.96
136.10
142.24
148.38
154.52
160.66
166.80
172.94
179.08
184.20
189.32
194.44
199.56
204.68
209.80
214.92
220.04
225.16
230.28
235.40
240.52
245.64
250.76
255.88

0.00
14.44
31.29
45.73
60.17
74.61
89.05
103.49
117.93
132.37
146.81
161.25
175.69
190.13
204.57
219.01
233.45
247.89
262.33
276.77
291.21
305.65
320.09
334.53
348.97
363.41
377.85
392.29
406.73
421.17
433.21
445.25
457.29
469.33
481.37
493.41
505.45
517.49
529.53
541.57
553.61
565.65
577.69
589.73
601.77

Water

0.00
5.74
12.43
18.17
23.91
29.65
35.39
41.13
46.87
52.61
58.35
64.09
69.83
75.57
81.31
87.05
92.79
98.53
104.27
110.01
115.75
121.49
127.23
132.97
138.71
144.45
150.19
155.93
161.67
167.41
172.19
176.97
181.75
186.53
191.31
196.09
200.87
205.65
210.43
215.21
219.99
224.77
229.55
234.33
239.11

46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96

46.00
47.00
48.00
49.00
50.00
51.00
52.00
53.00
54.00
55.00
56.00
57.00
58.00
59.00
60.00
61.00
62.00
63.00
64.00
65.00
66.00
67.00
68.00
69.00
70.00
71.00
72.00
73.00
74.00
75.00
76.00
77.00
78.00
79.00
80.00
81.00
82.00
83.00
84.00
85.00
86.00
87.00
88.00
89.00
90.00
91.00
92.00
93.00
94.00
95.00
96.00

417.29
425.47
433.65
441.83
450.01
458.19
466.37
474.55
482.73
490.91
499.09
507.27
515.45
523.63
531.81
539.99
548.17
556.35
564.53
572.71
580.89
589.07
597.25
605.43
613.61
621.79
629.97
638.15
646.33
654.51
662.69
670.87
679.05
687.23
695.41
703.59
711.77
719.95
728.13
736.31
744.49
752.67
760.85
769.03
777.21
785.39
793.57
801.75
809.93
818.11
826.29

417.29
425.47
433.65
441.83
450.01
458.19
466.37
474.55
482.73
490.91
499.09
507.27
515.45
523.63
531.81
539.99
548.17
556.35
564.53
572.71
580.89
589.07
597.25
605.43
613.61
621.79
629.97
638.15
646.33
654.51
662.69
670.87
679.05
687.23
695.41
703.59
711.77
719.95
728.13
736.31
744.49
752.67
760.85
769.03
777.21
785.39
793.57
801.75
809.93
818.11
826.29

261.00
266.12
271.24
276.36
281.48
286.60
291.72
296.84
301.96
307.08
312.20
317.32
322.44
327.56
332.68
337.80
342.92
348.04
353.16
358.28
363.40
368.52
373.64
378.76
383.88
389.00
394.12
399.24
404.36
409.48
414.60
419.72
424.84
429.96
435.08
440.20
445.32
450.44
455.56
460.68
465.80
470.92
476.04
481.16
486.28
491.40
496.52
501.64
506.76
511.88
517.00

613.81
625.85
637.89
649.93
661.97
674.01
686.05
698.09
710.13
722.17
734.21
746.25
758.29
770.33
782.37
794.41
806.45
818.49
830.53
842.57
854.61
866.65
878.69
890.73
902.77
914.81
926.85
938.89
950.93
962.97
975.01
987.05
999.09
1011.13
1023.17
1035.21
1047.25
1059.29
1071.33
1083.37
1095.41
1107.45
1119.49
1131.53
1143.57
1155.61
1167.65
1179.69
1191.73
1203.77
1215.81

243.89
248.67
253.45
258.23
263.01
267.79
272.57
277.35
282.13
286.91
291.69
296.47
301.25
306.03
310.81
315.59
320.37
325.15
329.93
334.71
339.49
344.27
349.05
353.83
358.61
363.39
368.17
372.95
377.73
382.51
387.29
392.07
396.85
401.63
406.41
411.19
415.97
420.75
425.53
430.31
435.09
439.87
444.65
449.43
454.21
458.99
463.77
468.55
473.33
478.11
482.89

97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147

97.00
98.00
99.00
100.00
101.00
102.00
103.00
104.00
105.00
106.00
107.00
108.00
109.00
110.00
111.00
112.00
113.00
114.00
115.00
116.00
117.00
118.00
119.00
120.00
121.00
122.00
123.00
124.00
125.00
126.00
127.00
128.00
129.00
130.00
131.00
132.00
133.00
134.00
135.00
136.00
137.00
138.00
139.00
140.00
141.00
142.00
143.00
144.00
145.00
146.00
147.00

834.47
842.65
850.83
859.01
867.19
875.37
883.55
891.73
899.91
908.09
916.27
924.45
932.63
940.81
948.99
957.17
965.35
973.53
981.71
989.89
998.07
1006.25
1014.43
1022.61
1030.79
1038.97
1047.15
1055.33
1063.51
1071.69
1079.87
1088.05
1096.23
1104.41
1112.59
1120.77
1128.95
1137.13
1145.31
1153.49
1161.67
1169.85
1178.03
1186.21
1194.39
1202.57
1210.75
1218.93
1227.11
1235.29
1243.47

834.47
842.65
850.83
859.01
867.19
875.37
883.55
891.73
899.91
908.09
916.27
924.45
932.63
940.81
948.99
957.17
965.35
973.53
981.71
989.89
998.07
1006.25
1014.43
1022.61
1030.79
1038.97
1047.15
1055.33
1063.51
1071.69
1079.87
1088.05
1096.23
1104.41
1112.59
1120.77
1128.95
1137.13
1145.31
1153.49
1161.67
1169.85
1178.03
1186.21
1194.39
1202.57
1210.75
1218.93
1227.11
1235.29
1243.47

522.12
527.24
532.36
537.48
542.60
547.72
552.84
557.96
563.08
568.20
573.32
578.44
583.56
588.68
593.80
598.92
604.04
609.16
614.28
619.40
624.52
629.64
634.76
639.88
645.00
650.12
655.24
660.36
665.48
670.60
675.72
680.84
685.96
691.08
696.20
701.32
706.44
711.56
716.68
721.80
726.92
732.04
737.16
742.28
747.40
752.52
757.64
762.76
767.88
773.00
778.12

1227.85
1239.89
1251.93
1263.97
1276.01
1288.05
1300.09
1312.13
1324.17
1336.21
1348.25
1360.29
1372.33
1384.37
1396.41
1408.45
1420.49
1432.53
1444.57
1456.61
1468.65
1480.69
1492.73
1504.77
1516.81
1528.85
1540.89
1552.93
1564.97
1577.01
1589.05
1601.09
1613.13
1625.17
1637.21
1649.25
1661.29
1673.33
1685.37
1697.41
1709.45
1721.49
1733.53
1745.57
1757.61
1769.65
1781.69
1793.73
1805.77
1817.81
1829.85

487.67
492.45
497.23
502.01
506.79
511.57
516.35
521.13
525.91
530.69
535.47
540.25
545.03
549.81
554.59
559.37
564.15
568.93
573.71
578.49
583.27
588.05
592.83
597.61
602.39
607.17
611.95
616.73
621.51
626.29
631.07
635.85
640.63
645.41
650.19
654.97
659.75
664.53
669.31
674.09
678.87
683.65
688.43
693.21
697.99
702.77
707.55
712.33
717.11
721.89
726.67

148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198

148.00
149.00
150.00
151.00
152.00
153.00
154.00
155.00
156.00
157.00
158.00
159.00
160.00
161.00
162.00
163.00
164.00
165.00
166.00
167.00
168.00
169.00
170.00
171.00
172.00
173.00
174.00
175.00
176.00
177.00
178.00
179.00
180.00
181.00
182.00
183.00
184.00
185.00
186.00
187.00
188.00
189.00
190.00
191.00
192.00
193.00
194.00
195.00
196.00
197.00
198.00

1251.65
1259.83
1268.01
1276.19
1284.37
1292.55
1300.73
1308.91
1317.09
1325.27
1333.45
1341.63
1349.81
1357.99
1366.17
1374.35
1382.53
1390.71
1398.89
1407.07
1415.25
1423.43
1431.61
1439.79
1447.97
1456.15
1464.33
1472.51
1480.69
1488.87
1497.05
1505.23
1513.41
1521.59
1529.77
1537.95
1546.13
1554.31
1562.49
1570.67
1578.85
1587.03
1595.21
1603.39
1611.57
1619.75
1627.93
1636.11
1644.29
1652.47
1660.65

1251.65
1259.83
1268.01
1276.19
1284.37
1292.55
1300.73
1308.91
1317.09
1325.27
1333.45
1341.63
1349.81
1357.99
1366.17
1374.35
1382.53
1390.71
1398.89
1407.07
1415.25
1423.43
1431.61
1439.79
1447.97
1456.15
1464.33
1472.51
1480.69
1488.87
1497.05
1505.23
1513.41
1521.59
1529.77
1537.95
1546.13
1554.31
1562.49
1570.67
1578.85
1587.03
1595.21
1603.39
1611.57
1619.75
1627.93
1636.11
1644.29
1652.47
1660.65

783.24
788.36
793.48
798.60
803.72
808.84
813.96
819.08
824.20
829.32
834.44
839.56
844.68
849.80
854.92
860.04
865.16
870.28
875.40
880.52
885.64
890.76
895.88
901.00
906.12
911.24
916.36
921.48
926.60
931.72
936.84
941.96
947.08
952.20
957.32
962.44
967.56
972.68
977.80
982.92
988.04
993.16
998.28
1003.40
1008.52
1013.64
1018.76
1023.88
1029.00
1034.12
1039.24

1841.89
1853.93
1865.97
1878.01
1890.05
1902.09
1914.13
1926.17
1938.21
1950.25
1962.29
1974.33
1986.37
1998.41
2010.45
2022.49
2034.53
2046.57
2058.61
2070.65
2082.69
2094.73
2106.77
2118.81
2130.85
2142.89
2154.93
2166.97
2179.01
2191.05
2203.09
2215.13
2227.17
2239.21
2251.25
2263.29
2275.33
2287.37
2299.41
2311.45
2323.49
2335.53
2347.57
2359.61
2371.65
2383.69
2395.73
2407.77
2419.81
2431.85
2443.89

731.45
736.23
741.01
745.79
750.57
755.35
760.13
764.91
769.69
774.47
779.25
784.03
788.81
793.59
798.37
803.15
807.93
812.71
817.49
822.27
827.05
831.83
836.61
841.39
846.17
850.95
855.73
860.51
865.29
870.07
874.85
879.63
884.41
889.19
893.97
898.75
903.53
908.31
913.09
917.87
922.65
927.43
932.21
936.99
941.77
946.55
951.33
956.11
960.89
965.67
970.45

199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249

199.00
200.00
201.00
202.00
203.00
204.00
205.00
206.00
207.00
208.00
209.00
210.00
211.00
212.00
213.00
214.00
215.00
216.00
217.00
218.00
219.00
220.00
221.00
222.00
223.00
224.00
225.00
226.00
227.00
228.00
229.00
230.00
231.00
232.00
233.00
234.00
235.00
236.00
237.00
238.00
239.00
240.00
241.00
242.00
243.00
244.00
245.00
246.00
247.00
248.00
249.00

1668.83
1677.01
1685.19
1693.37
1701.55
1709.73
1717.91
1726.09
1734.27
1742.45
1750.63
1758.81
1766.99
1775.17
1783.35
1791.53
1799.71
1807.89
1816.07
1824.25
1832.43
1840.61
1848.79
1856.97
1865.15
1873.33
1881.51
1889.69
1897.87
1906.05
1914.23
1922.41
1930.59
1938.77
1946.95
1955.13
1963.31
1971.49
1979.67
1987.85
1996.03
2004.21
2012.39
2020.57
2028.75
2036.93
2045.11
2053.29
2061.47
2069.65
2077.83

1668.83
1677.01
1685.19
1693.37
1701.55
1709.73
1717.91
1726.09
1734.27
1742.45
1750.63
1758.81
1766.99
1775.17
1783.35
1791.53
1799.71
1807.89
1816.07
1824.25
1832.43
1840.61
1848.79
1856.97
1865.15
1873.33
1881.51
1889.69
1897.87
1906.05
1914.23
1922.41
1930.59
1938.77
1946.95
1955.13
1963.31
1971.49
1979.67
1987.85
1996.03
2004.21
2012.39
2020.57
2028.75
2036.93
2045.11
2053.29
2061.47
2069.65
2077.83

1044.36
1049.48
1054.60
1059.72
1064.84
1069.96
1075.08
1080.20
1085.32
1090.44
1095.56
1100.68
1105.80
1110.92
1116.04
1121.16
1126.28
1131.40
1136.52
1141.64
1146.76
1151.88
1157.00
1162.12
1167.24
1172.36
1177.48
1182.60
1187.72
1192.84
1197.96
1203.08
1208.20
1213.32
1218.44
1223.56
1228.68
1233.80
1238.92
1244.04
1249.16
1254.28
1259.40
1264.52
1269.64
1274.76
1279.88
1285.00
1290.12
1295.24
1300.36

2455.93
2467.97
2480.01
2492.05
2504.09
2516.13
2528.17
2540.21
2552.25
2564.29
2576.33
2588.37
2600.41
2612.45
2624.49
2636.53
2648.57
2660.61
2672.65
2684.69
2696.73
2708.77
2720.81
2732.85
2744.89
2756.93
2768.97
2781.01
2793.05
2805.09
2817.13
2829.17
2841.21
2853.25
2865.29
2877.33
2889.37
2901.41
2913.45
2925.49
2937.53
2949.57
2961.61
2973.65
2985.69
2997.73
3009.77
3021.81
3033.85
3045.89
3057.93

975.23
980.01
984.79
989.57
994.35
999.13
1003.91
1008.69
1013.47
1018.25
1023.03
1027.81
1032.59
1037.37
1042.15
1046.93
1051.71
1056.49
1061.27
1066.05
1070.83
1075.61
1080.39
1085.17
1089.95
1094.73
1099.51
1104.29
1109.07
1113.85
1118.63
1123.41
1128.19
1132.97
1137.75
1142.53
1147.31
1152.09
1156.87
1161.65
1166.43
1171.21
1175.99
1180.77
1185.55
1190.33
1195.11
1199.89
1204.67
1209.45
1214.23

250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273
274
275
276
277
278
279
280
281
282
283
284
285
286
287
288
289
290
291
292
293
294
295
296
297
298
299
300

250.00
251.00
252.00
253.00
254.00
255.00
256.00
257.00
258.00
259.00
260.00
261.00
262.00
263.00
264.00
265.00
266.00
267.00
268.00
269.00
270.00
271.00
272.00
273.00
274.00
275.00
276.00
277.00
278.00
279.00
280.00
281.00
282.00
283.00
284.00
285.00
286.00
287.00
288.00
289.00
290.00
291.00
292.00
293.00
294.00
295.00
296.00
297.00
298.00
299.00
300.00

2086.01
2094.19
2102.37
2110.55
2118.73
2126.91
2135.09
2143.27
2151.45
2159.63
2167.81
2175.99
2184.17
2192.35
2200.53
2208.71
2216.89
2225.07
2233.25
2241.43
2249.61
2257.79
2265.97
2274.15
2282.33
2290.51
2298.69
2306.87
2315.05
2323.23
2331.41
2339.59
2347.77
2355.95
2364.13
2372.31
2380.49
2388.67
2396.85
2405.03
2413.21
2421.39
2429.57
2437.75
2445.93
2454.11
2462.29
2470.47
2478.65
2486.83
2495.01

2086.01
2094.19
2102.37
2110.55
2118.73
2126.91
2135.09
2143.27
2151.45
2159.63
2167.81
2175.99
2184.17
2192.35
2200.53
2208.71
2216.89
2225.07
2233.25
2241.43
2249.61
2257.79
2265.97
2274.15
2282.33
2290.51
2298.69
2306.87
2315.05
2323.23
2331.41
2339.59
2347.77
2355.95
2364.13
2372.31
2380.49
2388.67
2396.85
2405.03
2413.21
2421.39
2429.57
2437.75
2445.93
2454.11
2462.29
2470.47
2478.65
2486.83
2495.01

1305.48
1310.60
1315.72
1320.84
1325.96
1331.08
1336.20
1341.32
1346.44
1351.56
1356.68
1361.80
1366.92
1372.04
1377.16
1382.28
1387.40
1392.52
1397.64
1402.76
1407.88
1413.00
1418.12
1423.24
1428.36
1433.48
1438.60
1443.72
1448.84
1453.96
1459.08
1464.20
1469.32
1474.44
1479.56
1484.68
1489.80
1494.92
1500.04
1505.16
1510.28
1515.40
1520.52
1525.64
1530.76
1535.88
1541.00
1546.12
1551.24
1556.36
1561.48

3069.97
3082.01
3094.05
3106.09
3118.13
3130.17
3142.21
3154.25
3166.29
3178.33
3190.37
3202.41
3214.45
3226.49
3238.53
3250.57
3262.61
3274.65
3286.69
3298.73
3310.77
3322.81
3334.85
3346.89
3358.93
3370.97
3383.01
3395.05
3407.09
3419.13
3431.17
3443.21
3455.25
3467.29
3479.33
3491.37
3503.41
3515.45
3527.49
3539.53
3551.57
3563.61
3575.65
3587.69
3599.73
3611.77
3623.81
3635.85
3647.89
3659.93
3671.97

1219.01
1223.79
1228.57
1233.35
1238.13
1242.91
1247.69
1252.47
1257.25
1262.03
1266.81
1271.59
1276.37
1281.15
1285.93
1290.71
1295.49
1300.27
1305.05
1309.83
1314.61
1319.39
1324.17
1328.95
1333.73
1338.51
1343.29
1348.07
1352.85
1357.63
1362.41
1367.19
1371.97
1376.75
1381.53
1386.31
1391.09
1395.87
1400.65
1405.43
1410.21
1414.99
1419.77
1424.55
1429.33
1434.11
1438.89
1443.67
1448.45
1453.23
1458.01

301
302
303
304
305
306
307
308
309
310
311
312
313
314
315
316
317
318
319
320
321
322
323
324
325
326
327
328
329
330
331
332
333
334
335
336
337
338
339
340
341
342
343
344
345
346
347
348
349
350
351

301.00
302.00
303.00
304.00
305.00
306.00
307.00
308.00
309.00
310.00
311.00
312.00
313.00
314.00
315.00
316.00
317.00
318.00
319.00
320.00
321.00
322.00
323.00
324.00
325.00
326.00
327.00
328.00
329.00
330.00
331.00
332.00
333.00
334.00
335.00
336.00
337.00
338.00
339.00
340.00
341.00
342.00
343.00
344.00
345.00
346.00
347.00
348.00
349.00
350.00
351.00

2503.19
2511.37
2519.55
2527.73
2535.91
2544.09
2552.27
2560.45
2568.63
2576.81
2584.99
2593.17
2601.35
2609.53
2617.71
2625.89
2634.07
2642.25
2650.43
2658.61
2666.79
2674.97
2683.15
2691.33
2699.51
2707.69
2715.87
2724.05
2732.23
2740.41
2748.59
2756.77
2764.95
2773.13
2781.31
2789.49
2797.67
2805.85
2814.03
2822.21
2830.39
2838.57
2846.75
2854.93
2863.11
2871.29
2879.47
2887.65
2895.83
2904.01
2912.19

2503.19
2511.37
2519.55
2527.73
2535.91
2544.09
2552.27
2560.45
2568.63
2576.81
2584.99
2593.17
2601.35
2609.53
2617.71
2625.89
2634.07
2642.25
2650.43
2658.61
2666.79
2674.97
2683.15
2691.33
2699.51
2707.69
2715.87
2724.05
2732.23
2740.41
2748.59
2756.77
2764.95
2773.13
2781.31
2789.49
2797.67
2805.85
2814.03
2822.21
2830.39
2838.57
2846.75
2854.93
2863.11
2871.29
2879.47
2887.65
2895.83
2904.01
2912.19

1566.60
1571.72
1576.84
1581.96
1587.08
1592.20
1597.32
1602.44
1607.56
1612.68
1617.80
1622.92
1628.04
1633.16
1638.28
1643.40
1648.52
1653.64
1658.76
1663.88
1669.00
1674.12
1679.24
1684.36
1689.48
1694.60
1699.72
1704.84
1709.96
1715.08
1720.20
1725.32
1730.44
1735.56
1740.68
1745.80
1750.92
1756.04
1761.16
1766.28
1771.40
1776.52
1781.64
1786.76
1791.88
1797.00
1802.12
1807.24
1812.36
1817.48
1822.60

3684.01
3696.05
3708.09
3720.13
3732.17
3744.21
3756.25
3768.29
3780.33
3792.37
3804.41
3816.45
3828.49
3840.53
3852.57
3864.61
3876.65
3888.69
3900.73
3912.77
3924.81
3936.85
3948.89
3960.93
3972.97
3985.01
3997.05
4009.09
4021.13
4033.17
4045.21
4057.25
4069.29
4081.33
4093.37
4105.41
4117.45
4129.49
4141.53
4153.57
4165.61
4177.65
4189.69
4201.73
4213.77
4225.81
4237.85
4249.89
4261.93
4273.97
4286.01

1462.79
1467.57
1472.35
1477.13
1481.91
1486.69
1491.47
1496.25
1501.03
1505.81
1510.59
1515.37
1520.15
1524.93
1529.71
1534.49
1539.27
1544.05
1548.83
1553.61
1558.39
1563.17
1567.95
1572.73
1577.51
1582.29
1587.07
1591.85
1596.63
1601.41
1606.19
1610.97
1615.75
1620.53
1625.31
1630.09
1634.87
1639.65
1644.43
1649.21
1653.99
1658.77
1663.55
1668.33
1673.11
1677.89
1682.67
1687.45
1692.23
1697.01
1701.79

352
353
354
355
356
357
358
359
360
361
362
363
364
365
366
367
368
369
370
371
372
373
374
375
376
377
378
379
380
381
382
383
384
385
386
387
388
389
390
391
392
393
394
395
396
397
398
399
400
401
402

352.00
353.00
354.00
355.00
356.00
357.00
358.00
359.00
360.00
361.00
362.00
363.00
364.00
365.00
366.00
367.00
368.00
369.00
370.00
371.00
372.00
373.00
374.00
375.00
376.00
377.00
378.00
379.00
380.00
381.00
382.00
383.00
384.00
385.00
386.00
387.00
388.00
389.00
390.00
391.00
392.00
393.00
394.00
395.00
396.00
397.00
398.00
399.00
400.00
401.00
402.00

2920.37
2928.55
2936.73
2944.91
2953.09
2961.27
2969.45
2977.63
2985.81
2993.99
3002.17
3010.35
3018.53
3026.71
3034.89
3043.07
3051.25
3059.43
3067.61
3075.79
3083.97
3092.15
3100.33
3108.51
3116.69
3124.87
3133.05
3141.23
3149.41
3157.59
3165.77
3173.95
3182.13
3190.31
3198.49
3206.67
3214.85
3223.03
3231.21
3239.39
3247.57
3255.75
3263.93
3272.11
3280.29
3288.47
3296.65
3304.83
3313.01
3321.19
3329.37

2920.37
2928.55
2936.73
2944.91
2953.09
2961.27
2969.45
2977.63
2985.81
2993.99
3002.17
3010.35
3018.53
3026.71
3034.89
3043.07
3051.25
3059.43
3067.61
3075.79
3083.97
3092.15
3100.33
3108.51
3116.69
3124.87
3133.05
3141.23
3149.41
3157.59
3165.77
3173.95
3182.13
3190.31
3198.49
3206.67
3214.85
3223.03
3231.21
3239.39
3247.57
3255.75
3263.93
3272.11
3280.29
3288.47
3296.65
3304.83
3313.01
3321.19
3329.37

1827.72
1832.84
1837.96
1843.08
1848.20
1853.32
1858.44
1863.56
1868.68
1873.80
1878.92
1884.04
1889.16
1894.28
1899.40
1904.52
1909.64
1914.76
1919.88
1925.00
1930.12
1935.24
1940.36
1945.48
1950.60
1955.72
1960.84
1965.96
1971.08
1976.20
1981.32
1986.44
1991.56
1996.68
2001.80
2006.92
2012.04
2017.16
2022.28
2027.40
2032.52
2037.64
2042.76
2047.88
2053.00
2058.12
2063.24
2068.36
2073.48
2078.60
2083.72

4298.05
4310.09
4322.13
4334.17
4346.21
4358.25
4370.29
4382.33
4394.37
4406.41
4418.45
4430.49
4442.53
4454.57
4466.61
4478.65
4490.69
4502.73
4514.77
4526.81
4538.85
4550.89
4562.93
4574.97
4587.01
4599.05
4611.09
4623.13
4635.17
4647.21
4659.25
4671.29
4683.33
4695.37
4707.41
4719.45
4731.49
4743.53
4755.57
4767.61
4779.65
4791.69
4803.73
4815.77
4827.81
4839.85
4851.89
4863.93
4875.97
4888.01
4900.05

1706.57
1711.35
1716.13
1720.91
1725.69
1730.47
1735.25
1740.03
1744.81
1749.59
1754.37
1759.15
1763.93
1768.71
1773.49
1778.27
1783.05
1787.83
1792.61
1797.39
1802.17
1806.95
1811.73
1816.51
1821.29
1826.07
1830.85
1835.63
1840.41
1845.19
1849.97
1854.75
1859.53
1864.31
1869.09
1873.87
1878.65
1883.43
1888.21
1892.99
1897.77
1902.55
1907.33
1912.11
1916.89
1921.67
1926.45
1931.23
1936.01
1940.79
1945.57

403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
421
422
423
424
425
426
427
428
429
430
431
432
433
434
435
436
437
438
439
440
441
442
443
444
445
446
447
448
449
450
451
452
453

403.00
404.00
405.00
406.00
407.00
408.00
409.00
410.00
411.00
412.00
413.00
414.00
415.00
416.00
417.00
418.00
419.00
420.00
421.00
422.00
423.00
424.00
425.00
426.00
427.00
428.00
429.00
430.00
431.00
432.00
433.00
434.00
435.00
436.00
437.00
438.00
439.00
440.00
441.00
442.00
443.00
444.00
445.00
446.00
447.00
448.00
449.00
450.00
451.00
452.00
453.00

3337.55
3345.73
3353.91
3362.09
3370.27
3378.45
3386.63
3394.81
3402.99
3411.17
3419.35
3427.53
3435.71
3443.89
3452.07
3460.25
3468.43
3476.61
3484.79
3492.97
3501.15
3509.33
3517.51
3525.69
3533.87
3542.05
3550.23
3558.41
3566.59
3574.77
3582.95
3591.13
3599.31
3607.49
3615.67
3623.85
3632.03
3640.21
3648.39
3656.57
3664.75
3672.93
3681.11
3689.29
3697.47
3705.65
3713.83
3722.01
3730.19
3738.37
3746.55

3337.55
3345.73
3353.91
3362.09
3370.27
3378.45
3386.63
3394.81
3402.99
3411.17
3419.35
3427.53
3435.71
3443.89
3452.07
3460.25
3468.43
3476.61
3484.79
3492.97
3501.15
3509.33
3517.51
3525.69
3533.87
3542.05
3550.23
3558.41
3566.59
3574.77
3582.95
3591.13
3599.31
3607.49
3615.67
3623.85
3632.03
3640.21
3648.39
3656.57
3664.75
3672.93
3681.11
3689.29
3697.47
3705.65
3713.83
3722.01
3730.19
3738.37
3746.55

2088.84
2093.96
2099.08
2104.20
2109.32
2114.44
2119.56
2124.68
2129.80
2134.92
2140.04
2145.16
2150.28
2155.40
2160.52
2165.64
2170.76
2175.88
2181.00
2186.12
2191.24
2196.36
2201.48
2206.60
2211.72
2216.84
2221.96
2227.08
2232.20
2237.32
2242.44
2247.56
2252.68
2257.80
2262.92
2268.04
2273.16
2278.28
2283.40
2288.52
2293.64
2298.76
2303.88
2309.00
2314.12
2319.24
2324.36
2329.48
2334.60
2339.72
2344.84

4912.09
4924.13
4936.17
4948.21
4960.25
4972.29
4984.33
4996.37
5008.41
5020.45
5032.49
5044.53
5056.57
5068.61
5080.65
5092.69
5104.73
5116.77
5128.81
5140.85
5152.89
5164.93
5176.97
5189.01
5201.05
5213.09
5225.13
5237.17
5249.21
5261.25
5273.29
5285.33
5297.37
5309.41
5321.45
5333.49
5345.53
5357.57
5369.61
5381.65
5393.69
5405.73
5417.77
5429.81
5441.85
5453.89
5465.93
5477.97
5490.01
5502.05
5514.09

1950.35
1955.13
1959.91
1964.69
1969.47
1974.25
1979.03
1983.81
1988.59
1993.37
1998.15
2002.93
2007.71
2012.49
2017.27
2022.05
2026.83
2031.61
2036.39
2041.17
2045.95
2050.73
2055.51
2060.29
2065.07
2069.85
2074.63
2079.41
2084.19
2088.97
2093.75
2098.53
2103.31
2108.09
2112.87
2117.65
2122.43
2127.21
2131.99
2136.77
2141.55
2146.33
2151.11
2155.89
2160.67
2165.45
2170.23
2175.01
2179.79
2184.57
2189.35

454
455
456
457
458
459
460
461
462
463
464
465
466
467
468
469
470
471
472
473
474
475
476
477
478
479
480
481
482
483
484
485
486
487
488
489
490
491
492
493
494
495
496
497
498
499
500
501
502
503
504

454.00
455.00
456.00
457.00
458.00
459.00
460.00
461.00
462.00
463.00
464.00
465.00
466.00
467.00
468.00
469.00
470.00
471.00
472.00
473.00
474.00
475.00
476.00
477.00
478.00
479.00
480.00
481.00
482.00
483.00
484.00
485.00
486.00
487.00
488.00
489.00
490.00
491.00
492.00
493.00
494.00
495.00
496.00
497.00
498.00
499.00
500.00
501.00
502.00
503.00
504.00

3754.73
3762.91
3771.09
3779.27
3787.45
3795.63
3803.81
3811.99
3820.17
3828.35
3836.53
3844.71
3852.89
3861.07
3869.25
3877.43
3885.61
3893.79
3901.97
3910.15
3918.33
3926.51
3934.69
3942.87
3951.05
3959.23
3967.41
3975.59
3983.77
3991.95
4000.13
4008.31
4016.49
4024.67
4032.85
4041.03
4049.21
4057.39
4065.57
4073.75
4081.93
4090.11
4098.29
4106.47
4114.65
4122.83
4131.01
4139.19
4147.37
4155.55
4163.73

3754.73
3762.91
3771.09
3779.27
3787.45
3795.63
3803.81
3811.99
3820.17
3828.35
3836.53
3844.71
3852.89
3861.07
3869.25
3877.43
3885.61
3893.79
3901.97
3910.15
3918.33
3926.51
3934.69
3942.87
3951.05
3959.23
3967.41
3975.59
3983.77
3991.95
4000.13
4008.31
4016.49
4024.67
4032.85
4041.03
4049.21
4057.39
4065.57
4073.75
4081.93
4090.11
4098.29
4106.47
4114.65
4122.83
4131.01
4139.19
4147.37
4155.55
4163.73

2349.96
2355.08
2360.20
2365.32
2370.44
2375.56
2380.68
2385.80
2390.92
2396.04
2401.16
2406.28
2411.40
2416.52
2421.64
2426.76
2431.88
2437.00
2442.12
2447.24
2452.36
2457.48
2462.60
2467.72
2472.84
2477.96
2483.08
2488.20
2493.32
2498.44
2503.56
2508.68
2513.80
2518.92
2524.04
2529.16
2534.28
2539.40
2544.52
2549.64
2554.76
2559.88
2565.00
2570.12
2575.24
2580.36
2585.48
2590.60
2595.72
2600.84
2605.96

5526.13
5538.17
5550.21
5562.25
5574.29
5586.33
5598.37
5610.41
5622.45
5634.49
5646.53
5658.57
5670.61
5682.65
5694.69
5706.73
5718.77
5730.81
5742.85
5754.89
5766.93
5778.97
5791.01
5803.05
5815.09
5827.13
5839.17
5851.21
5863.25
5875.29
5887.33
5899.37
5911.41
5923.45
5935.49
5947.53
5959.57
5971.61
5983.65
5995.69
6007.73
6019.77
6031.81
6043.85
6055.89
6067.93
6079.97
6092.01
6104.05
6116.09
6128.13

2194.13
2198.91
2203.69
2208.47
2213.25
2218.03
2222.81
2227.59
2232.37
2237.15
2241.93
2246.71
2251.49
2256.27
2261.05
2265.83
2270.61
2275.39
2280.17
2284.95
2289.73
2294.51
2299.29
2304.07
2308.85
2313.63
2318.41
2323.19
2327.97
2332.75
2337.53
2342.31
2347.09
2351.87
2356.65
2361.43
2366.21
2370.99
2375.77
2380.55
2385.33
2390.11
2394.89
2399.67
2404.45
2409.23
2414.01
2418.79
2423.57
2428.35
2433.13

505
506
507
508
509
510
511
512
513
514
515
516
517
518
519
520
521
522
523
524
525
526
527
528
529
530
531
532
533
534
535
536
537
538
539
540
541
542
543
544
545
546
547
548
549
550
551
552
553
554
555

505.00
506.00
507.00
508.00
509.00
510.00
511.00
512.00
513.00
514.00
515.00
516.00
517.00
518.00
519.00
520.00
521.00
522.00
523.00
524.00
525.00
526.00
527.00
528.00
529.00
530.00
531.00
532.00
533.00
534.00
535.00
536.00
537.00
538.00
539.00
540.00
541.00
542.00
543.00
544.00
545.00
546.00
547.00
548.00
549.00
550.00
551.00
552.00
553.00
554.00
555.00

4171.91
4180.09
4188.27
4196.45
4204.63
4212.81
4220.99
4229.17
4237.35
4245.53
4253.71
4261.89
4270.07
4278.25
4286.43
4294.61
4302.79
4310.97
4319.15
4327.33
4335.51
4343.69
4351.87
4360.05
4368.23
4376.41
4384.59
4392.77
4400.95
4409.13
4417.31
4425.49
4433.67
4441.85
4450.03
4458.21
4466.39
4474.57
4482.75
4490.93
4499.11
4507.29
4515.47
4523.65
4531.83
4540.01
4548.19
4556.37
4564.55
4572.73
4580.91

4171.91
4180.09
4188.27
4196.45
4204.63
4212.81
4220.99
4229.17
4237.35
4245.53
4253.71
4261.89
4270.07
4278.25
4286.43
4294.61
4302.79
4310.97
4319.15
4327.33
4335.51
4343.69
4351.87
4360.05
4368.23
4376.41
4384.59
4392.77
4400.95
4409.13
4417.31
4425.49
4433.67
4441.85
4450.03
4458.21
4466.39
4474.57
4482.75
4490.93
4499.11
4507.29
4515.47
4523.65
4531.83
4540.01
4548.19
4556.37
4564.55
4572.73
4580.91

2611.08
2616.20
2621.32
2626.44
2631.56
2636.68
2641.80
2646.92
2652.04
2657.16
2662.28
2667.40
2672.52
2677.64
2682.76
2687.88
2693.00
2698.12
2703.24
2708.36
2713.48
2718.60
2723.72
2728.84
2733.96
2739.08
2744.20
2749.32
2754.44
2759.56
2764.68
2769.80
2774.92
2780.04
2785.16
2790.28
2795.40
2800.52
2805.64
2810.76
2815.88
2821.00
2826.12
2831.24
2836.36
2841.48
2846.60
2851.72
2856.84
2861.96
2867.08

6140.17
6152.21
6164.25
6176.29
6188.33
6200.37
6212.41
6224.45
6236.49
6248.53
6260.57
6272.61
6284.65
6296.69
6308.73
6320.77
6332.81
6344.85
6356.89
6368.93
6380.97
6393.01
6405.05
6417.09
6429.13
6441.17
6453.21
6465.25
6477.29
6489.33
6501.37
6513.41
6525.45
6537.49
6549.53
6561.57
6573.61
6585.65
6597.69
6609.73
6621.77
6633.81
6645.85
6657.89
6669.93
6681.97
6694.01
6706.05
6718.09
6730.13
6742.17

2437.91
2442.69
2447.47
2452.25
2457.03
2461.81
2466.59
2471.37
2476.15
2480.93
2485.71
2490.49
2495.27
2500.05
2504.83
2509.61
2514.39
2519.17
2523.95
2528.73
2533.51
2538.29
2543.07
2547.85
2552.63
2557.41
2562.19
2566.97
2571.75
2576.53
2581.31
2586.09
2590.87
2595.65
2600.43
2605.21
2609.99
2614.77
2619.55
2624.33
2629.11
2633.89
2638.67
2643.45
2648.23
2653.01
2657.79
2662.57
2667.35
2672.13
2676.91

556
557
558
559
560
561
562
563
564
565
566
567
568
569
570
571
572
573
574
575
576
577
578
579
580
581
582
583
584
585
586
587
588
589
590
591
592
593
594
595
596
597
598
599
600
601
602
603
604
605
606

556.00
557.00
558.00
559.00
560.00
561.00
562.00
563.00
564.00
565.00
566.00
567.00
568.00
569.00
570.00
571.00
572.00
573.00
574.00
575.00
576.00
577.00
578.00
579.00
580.00
581.00
582.00
583.00
584.00
585.00
586.00
587.00
588.00
589.00
590.00
591.00
592.00
593.00
594.00
595.00
596.00
597.00
598.00
599.00
600.00
601.00
602.00
603.00
604.00
605.00
606.00

4589.09
4597.27
4605.45
4613.63
4621.81
4629.99
4638.17
4646.35
4654.53
4662.71
4670.89
4679.07
4687.25
4695.43
4703.61
4711.79
4719.97
4728.15
4736.33
4744.51
4752.69
4760.87
4769.05
4777.23
4785.41
4793.59
4801.77
4809.95
4818.13
4826.31
4834.49
4842.67
4850.85
4859.03
4867.21
4875.39
4883.57
4891.75
4899.93
4908.11
4916.29
4924.47
4932.65
4940.83
4949.01
4957.19
4965.37
4973.55
4981.73
4989.91
4998.09

4589.09
4597.27
4605.45
4613.63
4621.81
4629.99
4638.17
4646.35
4654.53
4662.71
4670.89
4679.07
4687.25
4695.43
4703.61
4711.79
4719.97
4728.15
4736.33
4744.51
4752.69
4760.87
4769.05
4777.23
4785.41
4793.59
4801.77
4809.95
4818.13
4826.31
4834.49
4842.67
4850.85
4859.03
4867.21
4875.39
4883.57
4891.75
4899.93
4908.11
4916.29
4924.47
4932.65
4940.83
4949.01
4957.19
4965.37
4973.55
4981.73
4989.91
4998.09

2872.20
2877.32
2882.44
2887.56
2892.68
2897.80
2902.92
2908.04
2913.16
2918.28
2923.40
2928.52
2933.64
2938.76
2943.88
2949.00
2954.12
2959.24
2964.36
2969.48
2974.60
2979.72
2984.84
2989.96
2995.08
3000.20
3005.32
3010.44
3015.56
3020.68
3025.80
3030.92
3036.04
3041.16
3046.28
3051.40
3056.52
3061.64
3066.76
3071.88
3077.00
3082.12
3087.24
3092.36
3097.48
3102.60
3107.72
3112.84
3117.96
3123.08
3128.20

6754.21
6766.25
6778.29
6790.33
6802.37
6814.41
6826.45
6838.49
6850.53
6862.57
6874.61
6886.65
6898.69
6910.73
6922.77
6934.81
6946.85
6958.89
6970.93
6982.97
6995.01
7007.05
7019.09
7031.13
7043.17
7055.21
7067.25
7079.29
7091.33
7103.37
7115.41
7127.45
7139.49
7151.53
7163.57
7175.61
7187.65
7199.69
7211.73
7223.77
7235.81
7247.85
7259.89
7271.93
7283.97
7296.01
7308.05
7320.09
7332.13
7344.17
7356.21

2681.69
2686.47
2691.25
2696.03
2700.81
2705.59
2710.37
2715.15
2719.93
2724.71
2729.49
2734.27
2739.05
2743.83
2748.61
2753.39
2758.17
2762.95
2767.73
2772.51
2777.29
2782.07
2786.85
2791.63
2796.41
2801.19
2805.97
2810.75
2815.53
2820.31
2825.09
2829.87
2834.65
2839.43
2844.21
2848.99
2853.77
2858.55
2863.33
2868.11
2872.89
2877.67
2882.45
2887.23
2892.01
2896.79
2901.57
2906.35
2911.13
2915.91
2920.69

607
608
609
610
611
612
613
614
615
616
617
618
619
620
621
622
623
624
625
626
627
628
629
630
631
632
633
634
635
636
637
638
639
640
641
642
643
644
645
646
647
648
649
650
651
652
653
654
655
656
657

607.00
608.00
609.00
610.00
611.00
612.00
613.00
614.00
615.00
616.00
617.00
618.00
619.00
620.00
621.00
622.00
623.00
624.00
625.00
626.00
627.00
628.00
629.00
630.00
631.00
632.00
633.00
634.00
635.00
636.00
637.00
638.00
639.00
640.00
641.00
642.00
643.00
644.00
645.00
646.00
647.00
648.00
649.00
650.00
651.00
652.00
653.00
654.00
655.00
656.00
657.00

5006.27
5014.45
5022.63
5030.81
5038.99
5047.17
5055.35
5063.53
5071.71
5079.89
5088.07
5096.25
5104.43
5112.61
5120.79
5128.97
5137.15
5145.33
5153.51
5161.69
5169.87
5178.05
5186.23
5194.41
5202.59
5210.77
5218.95
5227.13
5235.31
5243.49
5251.67
5259.85
5268.03
5276.21
5284.39
5292.57
5300.75
5308.93
5317.11
5325.29
5333.47
5341.65
5349.83
5358.01
5366.19
5374.37
5382.55
5390.73
5398.91
5407.09
5415.27

5006.27
5014.45
5022.63
5030.81
5038.99
5047.17
5055.35
5063.53
5071.71
5079.89
5088.07
5096.25
5104.43
5112.61
5120.79
5128.97
5137.15
5145.33
5153.51
5161.69
5169.87
5178.05
5186.23
5194.41
5202.59
5210.77
5218.95
5227.13
5235.31
5243.49
5251.67
5259.85
5268.03
5276.21
5284.39
5292.57
5300.75
5308.93
5317.11
5325.29
5333.47
5341.65
5349.83
5358.01
5366.19
5374.37
5382.55
5390.73
5398.91
5407.09
5415.27

3133.32
3138.44
3143.56
3148.68
3153.80
3158.92
3164.04
3169.16
3174.28
3179.40
3184.52
3189.64
3194.76
3199.88
3205.00
3210.12
3215.24
3220.36
3225.48
3230.60
3235.72
3240.84
3245.96
3251.08
3256.20
3261.32
3266.44
3271.56
3276.68
3281.80
3286.92
3292.04
3297.16
3302.28
3307.40
3312.52
3317.64
3322.76
3327.88
3333.00
3338.12
3343.24
3348.36
3353.48
3358.60
3363.72
3368.84
3373.96
3379.08
3384.20
3389.32

7368.25
7380.29
7392.33
7404.37
7416.41
7428.45
7440.49
7452.53
7464.57
7476.61
7488.65
7500.69
7512.73
7524.77
7536.81
7548.85
7560.89
7572.93
7584.97
7597.01
7609.05
7621.09
7633.13
7645.17
7657.21
7669.25
7681.29
7693.33
7705.37
7717.41
7729.45
7741.49
7753.53
7765.57
7777.61
7789.65
7801.69
7813.73
7825.77
7837.81
7849.85
7861.89
7873.93
7885.97
7898.01
7910.05
7922.09
7934.13
7946.17
7958.21
7970.25

2925.47
2930.25
2935.03
2939.81
2944.59
2949.37
2954.15
2958.93
2963.71
2968.49
2973.27
2978.05
2982.83
2987.61
2992.39
2997.17
3001.95
3006.73
3011.51
3016.29
3021.07
3025.85
3030.63
3035.41
3040.19
3044.97
3049.75
3054.53
3059.31
3064.09
3068.87
3073.65
3078.43
3083.21
3087.99
3092.77
3097.55
3102.33
3107.11
3111.89
3116.67
3121.45
3126.23
3131.01
3135.79
3140.57
3145.35
3150.13
3154.91
3159.69
3164.47

658
659
660
661
662
663
664
665
666
667
668
669
670
671
672
673
674
675
676
677
678
679
680
681
682
683
684
685
686
687
688
689
690
691
692
693
694
695
696
697
698
699
700
701
702
703
704
705
706
707
708

658.00
659.00
660.00
661.00
662.00
663.00
664.00
665.00
666.00
667.00
668.00
669.00
670.00
671.00
672.00
673.00
674.00
675.00
676.00
677.00
678.00
679.00
680.00
681.00
682.00
683.00
684.00
685.00
686.00
687.00
688.00
689.00
690.00
691.00
692.00
693.00
694.00
695.00
696.00
697.00
698.00
699.00
700.00
701.00
702.00
703.00
704.00
705.00
706.00
707.00
708.00

5423.45
5431.63
5439.81
5447.99
5456.17
5464.35
5472.53
5480.71
5488.89
5497.07
5505.25
5513.43
5521.61
5529.79
5537.97
5546.15
5554.33
5562.51
5570.69
5578.87
5587.05
5595.23
5603.41
5611.59
5619.77
5627.95
5636.13
5644.31
5652.49
5660.67
5668.85
5677.03
5685.21
5693.39
5701.57
5709.75
5717.93
5726.11
5734.29
5742.47
5750.65
5758.83
5767.01
5775.19
5783.37
5791.55
5799.73
5807.91
5816.09
5824.27
5832.45

5423.45
5431.63
5439.81
5447.99
5456.17
5464.35
5472.53
5480.71
5488.89
5497.07
5505.25
5513.43
5521.61
5529.79
5537.97
5546.15
5554.33
5562.51
5570.69
5578.87
5587.05
5595.23
5603.41
5611.59
5619.77
5627.95
5636.13
5644.31
5652.49
5660.67
5668.85
5677.03
5685.21
5693.39
5701.57
5709.75
5717.93
5726.11
5734.29
5742.47
5750.65
5758.83
5767.01
5775.19
5783.37
5791.55
5799.73
5807.91
5816.09
5824.27
5832.45

3394.44
3399.56
3404.68
3409.80
3414.92
3420.04
3425.16
3430.28
3435.40
3440.52
3445.64
3450.76
3455.88
3461.00
3466.12
3471.24
3476.36
3481.48
3486.60
3491.72
3496.84
3501.96
3507.08
3512.20
3517.32
3522.44
3527.56
3532.68
3537.80
3542.92
3548.04
3553.16
3558.28
3563.40
3568.52
3573.64
3578.76
3583.88
3589.00
3594.12
3599.24
3604.36
3609.48
3614.60
3619.72
3624.84
3629.96
3635.08
3640.20
3645.32
3650.44

7982.29
7994.33
8006.37
8018.41
8030.45
8042.49
8054.53
8066.57
8078.61
8090.65
8102.69
8114.73
8126.77
8138.81
8150.85
8162.89
8174.93
8186.97
8199.01
8211.05
8223.09
8235.13
8247.17
8259.21
8271.25
8283.29
8295.33
8307.37
8319.41
8331.45
8343.49
8355.53
8367.57
8379.61
8391.65
8403.69
8415.73
8427.77
8439.81
8451.85
8463.89
8475.93
8487.97
8500.01
8512.05
8524.09
8536.13
8548.17
8560.21
8572.25
8584.29

3169.25
3174.03
3178.81
3183.59
3188.37
3193.15
3197.93
3202.71
3207.49
3212.27
3217.05
3221.83
3226.61
3231.39
3236.17
3240.95
3245.73
3250.51
3255.29
3260.07
3264.85
3269.63
3274.41
3279.19
3283.97
3288.75
3293.53
3298.31
3303.09
3307.87
3312.65
3317.43
3322.21
3326.99
3331.77
3336.55
3341.33
3346.11
3350.89
3355.67
3360.45
3365.23
3370.01
3374.79
3379.57
3384.35
3389.13
3393.91
3398.69
3403.47
3408.25

709
710
711
712
713
714
715
716
717
718
719
720
721
722
723
724
725
726
727
728
729
730
731
732
733
734
735
736
737
738
739
740
741
742
743
744
745
746
747
748
749
750
751
752
753
754
755
756
757
758
759

709.00
710.00
711.00
712.00
713.00
714.00
715.00
716.00
717.00
718.00
719.00
720.00
721.00
722.00
723.00
724.00
725.00
726.00
727.00
728.00
729.00
730.00
731.00
732.00
733.00
734.00
735.00
736.00
737.00
738.00
739.00
740.00
741.00
742.00
743.00
744.00
745.00
746.00
747.00
748.00
749.00
750.00
751.00
752.00
753.00
754.00
755.00
756.00
757.00
758.00
759.00

5840.63
5848.81
5856.99
5865.17
5873.35
5881.53
5889.71
5897.89
5906.07
5914.25
5922.43
5930.61
5938.79
5946.97
5955.15
5963.33
5971.51
5979.69
5987.87
5996.05
6004.23
6012.41
6020.59
6028.77
6036.95
6045.13
6053.31
6061.49
6069.67
6077.85
6086.03
6094.21
6102.39
6110.57
6118.75
6126.93
6135.11
6143.29
6151.47
6159.65
6167.83
6176.01
6184.19
6192.37
6200.55
6208.73
6216.91
6225.09
6233.27
6241.45
6249.63

5840.63
5848.81
5856.99
5865.17
5873.35
5881.53
5889.71
5897.89
5906.07
5914.25
5922.43
5930.61
5938.79
5946.97
5955.15
5963.33
5971.51
5979.69
5987.87
5996.05
6004.23
6012.41
6020.59
6028.77
6036.95
6045.13
6053.31
6061.49
6069.67
6077.85
6086.03
6094.21
6102.39
6110.57
6118.75
6126.93
6135.11
6143.29
6151.47
6159.65
6167.83
6176.01
6184.19
6192.37
6200.55
6208.73
6216.91
6225.09
6233.27
6241.45
6249.63

3655.56
3660.68
3665.80
3670.92
3676.04
3681.16
3686.28
3691.40
3696.52
3701.64
3706.76
3711.88
3717.00
3722.12
3727.24
3732.36
3737.48
3742.60
3747.72
3752.84
3757.96
3763.08
3768.20
3773.32
3778.44
3783.56
3788.68
3793.80
3798.92
3804.04
3809.16
3814.28
3819.40
3824.52
3829.64
3834.76
3839.88
3845.00
3850.12
3855.24
3860.36
3865.48
3870.60
3875.72
3880.84
3885.96
3891.08
3896.20
3901.32
3906.44
3911.56

8596.33
8608.37
8620.41
8632.45
8644.49
8656.53
8668.57
8680.61
8692.65
8704.69
8716.73
8728.77
8740.81
8752.85
8764.89
8776.93
8788.97
8801.01
8813.05
8825.09
8837.13
8849.17
8861.21
8873.25
8885.29
8897.33
8909.37
8921.41
8933.45
8945.49
8957.53
8969.57
8981.61
8993.65
9005.69
9017.73
9029.77
9041.81
9053.85
9065.89
9077.93
9089.97
9102.01
9114.05
9126.09
9138.13
9150.17
9162.21
9174.25
9186.29
9198.33

3413.03
3417.81
3422.59
3427.37
3432.15
3436.93
3441.71
3446.49
3451.27
3456.05
3460.83
3465.61
3470.39
3475.17
3479.95
3484.73
3489.51
3494.29
3499.07
3503.85
3508.63
3513.41
3518.19
3522.97
3527.75
3532.53
3537.31
3542.09
3546.87
3551.65
3556.43
3561.21
3565.99
3570.77
3575.55
3580.33
3585.11
3589.89
3594.67
3599.45
3604.23
3609.01
3613.79
3618.57
3623.35
3628.13
3632.91
3637.69
3642.47
3647.25
3652.03

760
761
762
763
764
765
766
767
768
769
770
771
772
773
774
775
776
777
778
779
780
781
782
783
784
785
786
787
788
789
790
791
792
793
794
795
796
797
798
799
800
801
802
803
804
805
806
807
808
809
810

760.00
761.00
762.00
763.00
764.00
765.00
766.00
767.00
768.00
769.00
770.00
771.00
772.00
773.00
774.00
775.00
776.00
777.00
778.00
779.00
780.00
781.00
782.00
783.00
784.00
785.00
786.00
787.00
788.00
789.00
790.00
791.00
792.00
793.00
794.00
795.00
796.00
797.00
798.00
799.00
800.00
801.00
802.00
803.00
804.00
805.00
806.00
807.00
808.00
809.00
810.00

6257.81
6265.99
6274.17
6282.35
6290.53
6298.71
6306.89
6315.07
6323.25
6331.43
6339.61
6347.79
6355.97
6364.15
6372.33
6380.51
6388.69
6396.87
6405.05
6413.23
6421.41
6429.59
6437.77
6445.95
6454.13
6462.31
6470.49
6478.67
6486.85
6495.03
6503.21
6511.39
6519.57
6527.75
6535.93
6544.11
6552.29
6560.47
6568.65
6576.83
6585.01
6593.19
6601.37
6609.55
6617.73
6625.91
6634.09
6642.27
6650.45
6658.63
6666.81

6257.81
6265.99
6274.17
6282.35
6290.53
6298.71
6306.89
6315.07
6323.25
6331.43
6339.61
6347.79
6355.97
6364.15
6372.33
6380.51
6388.69
6396.87
6405.05
6413.23
6421.41
6429.59
6437.77
6445.95
6454.13
6462.31
6470.49
6478.67
6486.85
6495.03
6503.21
6511.39
6519.57
6527.75
6535.93
6544.11
6552.29
6560.47
6568.65
6576.83
6585.01
6593.19
6601.37
6609.55
6617.73
6625.91
6634.09
6642.27
6650.45
6658.63
6666.81

3916.68
3921.80
3926.92
3932.04
3937.16
3942.28
3947.40
3952.52
3957.64
3962.76
3967.88
3973.00
3978.12
3983.24
3988.36
3993.48
3998.60
4003.72
4008.84
4013.96
4019.08
4024.20
4029.32
4034.44
4039.56
4044.68
4049.80
4054.92
4060.04
4065.16
4070.28
4075.40
4080.52
4085.64
4090.76
4095.88
4101.00
4106.12
4111.24
4116.36
4121.48
4126.60
4131.72
4136.84
4141.96
4147.08
4152.20
4157.32
4162.44
4167.56
4172.68

9210.37
9222.41
9234.45
9246.49
9258.53
9270.57
9282.61
9294.65
9306.69
9318.73
9330.77
9342.81
9354.85
9366.89
9378.93
9390.97
9403.01
9415.05
9427.09
9439.13
9451.17
9463.21
9475.25
9487.29
9499.33
9511.37
9523.41
9535.45
9547.49
9559.53
9571.57
9583.61
9595.65
9607.69
9619.73
9631.77
9643.81
9655.85
9667.89
9679.93
9691.97
9704.01
9716.05
9728.09
9740.13
9752.17
9764.21
9776.25
9788.29
9800.33
9812.37

3656.81
3661.59
3666.37
3671.15
3675.93
3680.71
3685.49
3690.27
3695.05
3699.83
3704.61
3709.39
3714.17
3718.95
3723.73
3728.51
3733.29
3738.07
3742.85
3747.63
3752.41
3757.19
3761.97
3766.75
3771.53
3776.31
3781.09
3785.87
3790.65
3795.43
3800.21
3804.99
3809.77
3814.55
3819.33
3824.11
3828.89
3833.67
3838.45
3843.23
3848.01
3852.79
3857.57
3862.35
3867.13
3871.91
3876.69
3881.47
3886.25
3891.03
3895.81

811
812
813
814
815
816
817
818
819
820
821
822
823
824
825
826
827
828
829
830
831
832
833
834
835
836
837
838
839
840
841
842
843
844
845
846
847
848
849
850

811.00
812.00
813.00
814.00
815.00
816.00
817.00
818.00
819.00
820.00
821.00
822.00
823.00
824.00
825.00
826.00
827.00
828.00
829.00
830.00
831.00
832.00
833.00
834.00
835.00
836.00
837.00
838.00
839.00
840.00
841.00
842.00
843.00
844.00
845.00
846.00
847.00
848.00
849.00
850.00

6674.99
6683.17
6691.35
6699.53
6707.71
6715.89
6724.07
6732.25
6740.43
6748.61
6756.79
6764.97
6773.15
6781.33
6789.51
6797.69
6805.87
6814.05
6822.23
6830.41
6838.59
6846.77
6854.95
6863.13
6871.31
6879.49
6887.67
6895.85
6904.03
6912.21
6920.39
6928.57
6936.75
6944.93
6953.11
6961.29
6969.47
6977.65
6985.83
6994.01

6674.99
6683.17
6691.35
6699.53
6707.71
6715.89
6724.07
6732.25
6740.43
6748.61
6756.79
6764.97
6773.15
6781.33
6789.51
6797.69
6805.87
6814.05
6822.23
6830.41
6838.59
6846.77
6854.95
6863.13
6871.31
6879.49
6887.67
6895.85
6904.03
6912.21
6920.39
6928.57
6936.75
6944.93
6953.11
6961.29
6969.47
6977.65
6985.83
6994.01

4177.80
4182.92
4188.04
4193.16
4198.28
4203.40
4208.52
4213.64
4218.76
4223.88
4229.00
4234.12
4239.24
4244.36
4249.48
4254.60
4259.72
4264.84
4269.96
4275.08
4280.20
4285.32
4290.44
4295.56
4300.68
4305.80
4310.92
4316.04
4321.16
4326.28
4331.40
4336.52
4341.64
4346.76
4351.88
4357.00
4362.12
4367.24
4372.36
4377.48

9824.41
9836.45
9848.49
9860.53
9872.57
9884.61
9896.65
9908.69
9920.73
9932.77
9944.81
9956.85
9968.89
9980.93
9992.97
10005.01
10017.05
10029.09
10041.13
10053.17
10065.21
10077.25
10089.29
10101.33
10113.37
10125.41
10137.45
10149.49
10161.53
10173.57
10185.61
10197.65
10209.69
10221.73
10233.77
10245.81
10257.85
10269.89
10281.93
10293.97

3900.59
3905.37
3910.15
3914.93
3919.71
3924.49
3929.27
3934.05
3938.83
3943.61
3948.39
3953.17
3957.95
3962.73
3967.51
3972.29
3977.07
3981.85
3986.63
3991.41
3996.19
4000.97
4005.75
4010.53
4015.31
4020.09
4024.87
4029.65
4034.43
4039.21
4043.99
4048.77
4053.55
4058.33
4063.11
4067.89
4072.67
4077.45
4082.23
4087.01

Bricks

0.00
15.61
33.83
49.44
65.05
80.66
96.27
111.88
127.49
143.10
158.71
174.32
189.93
205.54
221.15
236.76
252.37
267.98
283.59
299.20
314.81
330.42
346.03
361.64
377.25
392.86
408.47
424.08
439.69
455.30
468.31
481.32
494.33
507.34
520.35
533.36
546.37
559.38
572.39
585.40
598.41
611.42
624.43
637.44
650.45

24.55
34.37
45.82
55.64
65.46
75.28
85.10
94.92
104.74
114.56
124.38
134.20
144.02
153.84
163.66
173.48
183.30
193.12
202.94
212.76
222.58
232.40
242.22
252.04
261.86
271.68
281.50
291.32
301.14
310.96
319.14
327.32
335.50
343.68
351.86
360.04
368.22
376.40
384.58
392.76
400.94
409.12
417.30
425.48
433.66

24.55
34.37
45.82
55.64
65.46
75.28
85.10
94.92
104.74
114.56
124.38
134.20
144.02
153.84
163.66
173.48
183.30
193.12
202.94
212.76
222.58
232.40
242.22
252.04
261.86
271.68
281.50
291.32
301.14
310.96
319.14
327.32
335.50
343.68
351.86
360.04
368.22
376.40
384.58
392.76
400.94
409.12
417.30
425.48
433.66

15.34
21.48
28.64
34.78
40.92
47.06
53.20
59.34
65.48
71.62
77.76
83.90
90.04
96.18
102.32
108.46
114.60
120.74
126.88
133.02
139.16
145.30
151.44
157.58
163.72
169.86
176.00
182.14
188.28
194.42
199.54
204.66
209.78
214.90
220.02
225.14
230.26
235.38
240.50
245.62
250.74
255.86
260.98
266.10
271.22

36.10
50.54
67.39
81.83
96.27
110.71
125.15
139.59
154.03
168.47
182.91
197.35
211.79
226.23
240.67
255.11
269.55
283.99
298.43
312.87
327.31
341.75
356.19
370.63
385.07
399.51
413.95
428.39
442.83
457.27
469.31
481.35
493.39
505.43
517.47
529.51
541.55
553.59
565.63
577.67
589.71
601.75
613.79
625.83
637.87

14.34
20.08
26.77
32.51
38.25
43.99
49.73
55.47
61.21
66.95
72.69
78.43
84.17
89.91
95.65
101.39
107.13
112.87
118.61
124.35
130.09
135.83
141.57
147.31
153.05
158.79
164.53
170.27
176.01
181.75
186.53
191.31
196.09
200.87
205.65
210.43
215.21
219.99
224.77
229.55
234.33
239.11
243.89
248.67
253.45

39.03
54.64
72.86
88.47
104.08
119.69
135.30
150.91
166.52
182.13
197.74
213.35
228.96
244.57
260.18
275.79
291.40
307.01
322.62
338.23
353.84
369.45
385.06
400.67
416.28
431.89
447.50
463.11
478.72
494.33
507.34
520.35
533.36
546.37
559.38
572.39
585.40
598.41
611.42
624.43
637.44
650.45
663.46
676.47
689.48

663.46
676.47
689.48
702.49
715.50
728.51
741.52
754.53
767.54
780.55
793.56
806.57
819.58
832.59
845.60
858.61
871.62
884.63
897.64
910.65
923.66
936.67
949.68
962.69
975.70
988.71
1001.72
1014.73
1027.74
1040.75
1053.76
1066.77
1079.78
1092.79
1105.80
1118.81
1131.82
1144.83
1157.84
1170.85
1183.86
1196.87
1209.88
1222.89
1235.90
1248.91
1261.92
1274.93
1287.94
1300.95
1313.96

441.84
450.02
458.20
466.38
474.56
482.74
490.92
499.10
507.28
515.46
523.64
531.82
540.00
548.18
556.36
564.54
572.72
580.90
589.08
597.26
605.44
613.62
621.80
629.98
638.16
646.34
654.52
662.70
670.88
679.06
687.24
695.42
703.60
711.78
719.96
728.14
736.32
744.50
752.68
760.86
769.04
777.22
785.40
793.58
801.76
809.94
818.12
826.30
834.48
842.66
850.84

441.84
450.02
458.20
466.38
474.56
482.74
490.92
499.10
507.28
515.46
523.64
531.82
540.00
548.18
556.36
564.54
572.72
580.90
589.08
597.26
605.44
613.62
621.80
629.98
638.16
646.34
654.52
662.70
670.88
679.06
687.24
695.42
703.60
711.78
719.96
728.14
736.32
744.50
752.68
760.86
769.04
777.22
785.40
793.58
801.76
809.94
818.12
826.30
834.48
842.66
850.84

276.34
281.46
286.58
291.70
296.82
301.94
307.06
312.18
317.30
322.42
327.54
332.66
337.78
342.90
348.02
353.14
358.26
363.38
368.50
373.62
378.74
383.86
388.98
394.10
399.22
404.34
409.46
414.58
419.70
424.82
429.94
435.06
440.18
445.30
450.42
455.54
460.66
465.78
470.90
476.02
481.14
486.26
491.38
496.50
501.62
506.74
511.86
516.98
522.10
527.22
532.34

649.91
661.95
673.99
686.03
698.07
710.11
722.15
734.19
746.23
758.27
770.31
782.35
794.39
806.43
818.47
830.51
842.55
854.59
866.63
878.67
890.71
902.75
914.79
926.83
938.87
950.91
962.95
974.99
987.03
999.07
1011.11
1023.15
1035.19
1047.23
1059.27
1071.31
1083.35
1095.39
1107.43
1119.47
1131.51
1143.55
1155.59
1167.63
1179.67
1191.71
1203.75
1215.79
1227.83
1239.87
1251.91

258.23
263.01
267.79
272.57
277.35
282.13
286.91
291.69
296.47
301.25
306.03
310.81
315.59
320.37
325.15
329.93
334.71
339.49
344.27
349.05
353.83
358.61
363.39
368.17
372.95
377.73
382.51
387.29
392.07
396.85
401.63
406.41
411.19
415.97
420.75
425.53
430.31
435.09
439.87
444.65
449.43
454.21
458.99
463.77
468.55
473.33
478.11
482.89
487.67
492.45
497.23

702.49
715.50
728.51
741.52
754.53
767.54
780.55
793.56
806.57
819.58
832.59
845.60
858.61
871.62
884.63
897.64
910.65
923.66
936.67
949.68
962.69
975.70
988.71
1001.72
1014.73
1027.74
1040.75
1053.76
1066.77
1079.78
1092.79
1105.80
1118.81
1131.82
1144.83
1157.84
1170.85
1183.86
1196.87
1209.88
1222.89
1235.90
1248.91
1261.92
1274.93
1287.94
1300.95
1313.96
1326.97
1339.98
1352.99

1326.97
1339.98
1352.99
1366.00
1379.01
1392.02
1405.03
1418.04
1431.05
1444.06
1457.07
1470.08
1483.09
1496.10
1509.11
1522.12
1535.13
1548.14
1561.15
1574.16
1587.17
1600.18
1613.19
1626.20
1639.21
1652.22
1665.23
1678.24
1691.25
1704.26
1717.27
1730.28
1743.29
1756.30
1769.31
1782.32
1795.33
1808.34
1821.35
1834.36
1847.37
1860.38
1873.39
1886.40
1899.41
1912.42
1925.43
1938.44
1951.45
1964.46
1977.47

859.02
867.20
875.38
883.56
891.74
899.92
908.10
916.28
924.46
932.64
940.82
949.00
957.18
965.36
973.54
981.72
989.90
998.08
1006.26
1014.44
1022.62
1030.80
1038.98
1047.16
1055.34
1063.52
1071.70
1079.88
1088.06
1096.24
1104.42
1112.60
1120.78
1128.96
1137.14
1145.32
1153.50
1161.68
1169.86
1178.04
1186.22
1194.40
1202.58
1210.76
1218.94
1227.12
1235.30
1243.48
1251.66
1259.84
1268.02

859.02
867.20
875.38
883.56
891.74
899.92
908.10
916.28
924.46
932.64
940.82
949.00
957.18
965.36
973.54
981.72
989.90
998.08
1006.26
1014.44
1022.62
1030.80
1038.98
1047.16
1055.34
1063.52
1071.70
1079.88
1088.06
1096.24
1104.42
1112.60
1120.78
1128.96
1137.14
1145.32
1153.50
1161.68
1169.86
1178.04
1186.22
1194.40
1202.58
1210.76
1218.94
1227.12
1235.30
1243.48
1251.66
1259.84
1268.02

537.46
542.58
547.70
552.82
557.94
563.06
568.18
573.30
578.42
583.54
588.66
593.78
598.90
604.02
609.14
614.26
619.38
624.50
629.62
634.74
639.86
644.98
650.10
655.22
660.34
665.46
670.58
675.70
680.82
685.94
691.06
696.18
701.30
706.42
711.54
716.66
721.78
726.90
732.02
737.14
742.26
747.38
752.50
757.62
762.74
767.86
772.98
778.10
783.22
788.34
793.46

1263.95
1275.99
1288.03
1300.07
1312.11
1324.15
1336.19
1348.23
1360.27
1372.31
1384.35
1396.39
1408.43
1420.47
1432.51
1444.55
1456.59
1468.63
1480.67
1492.71
1504.75
1516.79
1528.83
1540.87
1552.91
1564.95
1576.99
1589.03
1601.07
1613.11
1625.15
1637.19
1649.23
1661.27
1673.31
1685.35
1697.39
1709.43
1721.47
1733.51
1745.55
1757.59
1769.63
1781.67
1793.71
1805.75
1817.79
1829.83
1841.87
1853.91
1865.95

502.01
506.79
511.57
516.35
521.13
525.91
530.69
535.47
540.25
545.03
549.81
554.59
559.37
564.15
568.93
573.71
578.49
583.27
588.05
592.83
597.61
602.39
607.17
611.95
616.73
621.51
626.29
631.07
635.85
640.63
645.41
650.19
654.97
659.75
664.53
669.31
674.09
678.87
683.65
688.43
693.21
697.99
702.77
707.55
712.33
717.11
721.89
726.67
731.45
736.23
741.01

1366.00
1379.01
1392.02
1405.03
1418.04
1431.05
1444.06
1457.07
1470.08
1483.09
1496.10
1509.11
1522.12
1535.13
1548.14
1561.15
1574.16
1587.17
1600.18
1613.19
1626.20
1639.21
1652.22
1665.23
1678.24
1691.25
1704.26
1717.27
1730.28
1743.29
1756.30
1769.31
1782.32
1795.33
1808.34
1821.35
1834.36
1847.37
1860.38
1873.39
1886.40
1899.41
1912.42
1925.43
1938.44
1951.45
1964.46
1977.47
1990.48
2003.49
2016.50

1990.48
2003.49
2016.50
2029.51
2042.52
2055.53
2068.54
2081.55
2094.56
2107.57
2120.58
2133.59
2146.60
2159.61
2172.62
2185.63
2198.64
2211.65
2224.66
2237.67
2250.68
2263.69
2276.70
2289.71
2302.72
2315.73
2328.74
2341.75
2354.76
2367.77
2380.78
2393.79
2406.80
2419.81
2432.82
2445.83
2458.84
2471.85
2484.86
2497.87
2510.88
2523.89
2536.90
2549.91
2562.92
2575.93
2588.94
2601.95
2614.96
2627.97
2640.98

1276.20
1284.38
1292.56
1300.74
1308.92
1317.10
1325.28
1333.46
1341.64
1349.82
1358.00
1366.18
1374.36
1382.54
1390.72
1398.90
1407.08
1415.26
1423.44
1431.62
1439.80
1447.98
1456.16
1464.34
1472.52
1480.70
1488.88
1497.06
1505.24
1513.42
1521.60
1529.78
1537.96
1546.14
1554.32
1562.50
1570.68
1578.86
1587.04
1595.22
1603.40
1611.58
1619.76
1627.94
1636.12
1644.30
1652.48
1660.66
1668.84
1677.02
1685.20

1276.20
1284.38
1292.56
1300.74
1308.92
1317.10
1325.28
1333.46
1341.64
1349.82
1358.00
1366.18
1374.36
1382.54
1390.72
1398.90
1407.08
1415.26
1423.44
1431.62
1439.80
1447.98
1456.16
1464.34
1472.52
1480.70
1488.88
1497.06
1505.24
1513.42
1521.60
1529.78
1537.96
1546.14
1554.32
1562.50
1570.68
1578.86
1587.04
1595.22
1603.40
1611.58
1619.76
1627.94
1636.12
1644.30
1652.48
1660.66
1668.84
1677.02
1685.20

798.58
803.70
808.82
813.94
819.06
824.18
829.30
834.42
839.54
844.66
849.78
854.90
860.02
865.14
870.26
875.38
880.50
885.62
890.74
895.86
900.98
906.10
911.22
916.34
921.46
926.58
931.70
936.82
941.94
947.06
952.18
957.30
962.42
967.54
972.66
977.78
982.90
988.02
993.14
998.26
1003.38
1008.50
1013.62
1018.74
1023.86
1028.98
1034.10
1039.22
1044.34
1049.46
1054.58

1877.99
1890.03
1902.07
1914.11
1926.15
1938.19
1950.23
1962.27
1974.31
1986.35
1998.39
2010.43
2022.47
2034.51
2046.55
2058.59
2070.63
2082.67
2094.71
2106.75
2118.79
2130.83
2142.87
2154.91
2166.95
2178.99
2191.03
2203.07
2215.11
2227.15
2239.19
2251.23
2263.27
2275.31
2287.35
2299.39
2311.43
2323.47
2335.51
2347.55
2359.59
2371.63
2383.67
2395.71
2407.75
2419.79
2431.83
2443.87
2455.91
2467.95
2479.99

745.79
750.57
755.35
760.13
764.91
769.69
774.47
779.25
784.03
788.81
793.59
798.37
803.15
807.93
812.71
817.49
822.27
827.05
831.83
836.61
841.39
846.17
850.95
855.73
860.51
865.29
870.07
874.85
879.63
884.41
889.19
893.97
898.75
903.53
908.31
913.09
917.87
922.65
927.43
932.21
936.99
941.77
946.55
951.33
956.11
960.89
965.67
970.45
975.23
980.01
984.79

2029.51
2042.52
2055.53
2068.54
2081.55
2094.56
2107.57
2120.58
2133.59
2146.60
2159.61
2172.62
2185.63
2198.64
2211.65
2224.66
2237.67
2250.68
2263.69
2276.70
2289.71
2302.72
2315.73
2328.74
2341.75
2354.76
2367.77
2380.78
2393.79
2406.80
2419.81
2432.82
2445.83
2458.84
2471.85
2484.86
2497.87
2510.88
2523.89
2536.90
2549.91
2562.92
2575.93
2588.94
2601.95
2614.96
2627.97
2640.98
2653.99
2667.00
2680.01

2653.99
2667.00
2680.01
2693.02
2706.03
2719.04
2732.05
2745.06
2758.07
2771.08
2784.09
2797.10
2810.11
2823.12
2836.13
2849.14
2862.15
2875.16
2888.17
2901.18
2914.19
2927.20
2940.21
2953.22
2966.23
2979.24
2992.25
3005.26
3018.27
3031.28
3044.29
3057.30
3070.31
3083.32
3096.33
3109.34
3122.35
3135.36
3148.37
3161.38
3174.39
3187.40
3200.41
3213.42
3226.43
3239.44
3252.45
3265.46
3278.47
3291.48
3304.49

1693.38
1701.56
1709.74
1717.92
1726.10
1734.28
1742.46
1750.64
1758.82
1767.00
1775.18
1783.36
1791.54
1799.72
1807.90
1816.08
1824.26
1832.44
1840.62
1848.80
1856.98
1865.16
1873.34
1881.52
1889.70
1897.88
1906.06
1914.24
1922.42
1930.60
1938.78
1946.96
1955.14
1963.32
1971.50
1979.68
1987.86
1996.04
2004.22
2012.40
2020.58
2028.76
2036.94
2045.12
2053.30
2061.48
2069.66
2077.84
2086.02
2094.20
2102.38

1693.38
1701.56
1709.74
1717.92
1726.10
1734.28
1742.46
1750.64
1758.82
1767.00
1775.18
1783.36
1791.54
1799.72
1807.90
1816.08
1824.26
1832.44
1840.62
1848.80
1856.98
1865.16
1873.34
1881.52
1889.70
1897.88
1906.06
1914.24
1922.42
1930.60
1938.78
1946.96
1955.14
1963.32
1971.50
1979.68
1987.86
1996.04
2004.22
2012.40
2020.58
2028.76
2036.94
2045.12
2053.30
2061.48
2069.66
2077.84
2086.02
2094.20
2102.38

1059.70
1064.82
1069.94
1075.06
1080.18
1085.30
1090.42
1095.54
1100.66
1105.78
1110.90
1116.02
1121.14
1126.26
1131.38
1136.50
1141.62
1146.74
1151.86
1156.98
1162.10
1167.22
1172.34
1177.46
1182.58
1187.70
1192.82
1197.94
1203.06
1208.18
1213.30
1218.42
1223.54
1228.66
1233.78
1238.90
1244.02
1249.14
1254.26
1259.38
1264.50
1269.62
1274.74
1279.86
1284.98
1290.10
1295.22
1300.34
1305.46
1310.58
1315.70

2492.03
2504.07
2516.11
2528.15
2540.19
2552.23
2564.27
2576.31
2588.35
2600.39
2612.43
2624.47
2636.51
2648.55
2660.59
2672.63
2684.67
2696.71
2708.75
2720.79
2732.83
2744.87
2756.91
2768.95
2780.99
2793.03
2805.07
2817.11
2829.15
2841.19
2853.23
2865.27
2877.31
2889.35
2901.39
2913.43
2925.47
2937.51
2949.55
2961.59
2973.63
2985.67
2997.71
3009.75
3021.79
3033.83
3045.87
3057.91
3069.95
3081.99
3094.03

989.57
994.35
999.13
1003.91
1008.69
1013.47
1018.25
1023.03
1027.81
1032.59
1037.37
1042.15
1046.93
1051.71
1056.49
1061.27
1066.05
1070.83
1075.61
1080.39
1085.17
1089.95
1094.73
1099.51
1104.29
1109.07
1113.85
1118.63
1123.41
1128.19
1132.97
1137.75
1142.53
1147.31
1152.09
1156.87
1161.65
1166.43
1171.21
1175.99
1180.77
1185.55
1190.33
1195.11
1199.89
1204.67
1209.45
1214.23
1219.01
1223.79
1228.57

2693.02
2706.03
2719.04
2732.05
2745.06
2758.07
2771.08
2784.09
2797.10
2810.11
2823.12
2836.13
2849.14
2862.15
2875.16
2888.17
2901.18
2914.19
2927.20
2940.21
2953.22
2966.23
2979.24
2992.25
3005.26
3018.27
3031.28
3044.29
3057.30
3070.31
3083.32
3096.33
3109.34
3122.35
3135.36
3148.37
3161.38
3174.39
3187.40
3200.41
3213.42
3226.43
3239.44
3252.45
3265.46
3278.47
3291.48
3304.49
3317.50
3330.51
3343.52

3317.50
3330.51
3343.52
3356.53
3369.54
3382.55
3395.56
3408.57
3421.58
3434.59
3447.60
3460.61
3473.62
3486.63
3499.64
3512.65
3525.66
3538.67
3551.68
3564.69
3577.70
3590.71
3603.72
3616.73
3629.74
3642.75
3655.76
3668.77
3681.78
3694.79
3707.80
3720.81
3733.82
3746.83
3759.84
3772.85
3785.86
3798.87
3811.88
3824.89
3837.90
3850.91
3863.92
3876.93
3889.94
3902.95
3915.96
3928.97
3941.98
3954.99
3968.00

2110.56
2118.74
2126.92
2135.10
2143.28
2151.46
2159.64
2167.82
2176.00
2184.18
2192.36
2200.54
2208.72
2216.90
2225.08
2233.26
2241.44
2249.62
2257.80
2265.98
2274.16
2282.34
2290.52
2298.70
2306.88
2315.06
2323.24
2331.42
2339.60
2347.78
2355.96
2364.14
2372.32
2380.50
2388.68
2396.86
2405.04
2413.22
2421.40
2429.58
2437.76
2445.94
2454.12
2462.30
2470.48
2478.66
2486.84
2495.02
2503.20
2511.38
2519.56

2110.56
2118.74
2126.92
2135.10
2143.28
2151.46
2159.64
2167.82
2176.00
2184.18
2192.36
2200.54
2208.72
2216.90
2225.08
2233.26
2241.44
2249.62
2257.80
2265.98
2274.16
2282.34
2290.52
2298.70
2306.88
2315.06
2323.24
2331.42
2339.60
2347.78
2355.96
2364.14
2372.32
2380.50
2388.68
2396.86
2405.04
2413.22
2421.40
2429.58
2437.76
2445.94
2454.12
2462.30
2470.48
2478.66
2486.84
2495.02
2503.20
2511.38
2519.56

1320.82
1325.94
1331.06
1336.18
1341.30
1346.42
1351.54
1356.66
1361.78
1366.90
1372.02
1377.14
1382.26
1387.38
1392.50
1397.62
1402.74
1407.86
1412.98
1418.10
1423.22
1428.34
1433.46
1438.58
1443.70
1448.82
1453.94
1459.06
1464.18
1469.30
1474.42
1479.54
1484.66
1489.78
1494.90
1500.02
1505.14
1510.26
1515.38
1520.50
1525.62
1530.74
1535.86
1540.98
1546.10
1551.22
1556.34
1561.46
1566.58
1571.70
1576.82

3106.07
3118.11
3130.15
3142.19
3154.23
3166.27
3178.31
3190.35
3202.39
3214.43
3226.47
3238.51
3250.55
3262.59
3274.63
3286.67
3298.71
3310.75
3322.79
3334.83
3346.87
3358.91
3370.95
3382.99
3395.03
3407.07
3419.11
3431.15
3443.19
3455.23
3467.27
3479.31
3491.35
3503.39
3515.43
3527.47
3539.51
3551.55
3563.59
3575.63
3587.67
3599.71
3611.75
3623.79
3635.83
3647.87
3659.91
3671.95
3683.99
3696.03
3708.07

1233.35
1238.13
1242.91
1247.69
1252.47
1257.25
1262.03
1266.81
1271.59
1276.37
1281.15
1285.93
1290.71
1295.49
1300.27
1305.05
1309.83
1314.61
1319.39
1324.17
1328.95
1333.73
1338.51
1343.29
1348.07
1352.85
1357.63
1362.41
1367.19
1371.97
1376.75
1381.53
1386.31
1391.09
1395.87
1400.65
1405.43
1410.21
1414.99
1419.77
1424.55
1429.33
1434.11
1438.89
1443.67
1448.45
1453.23
1458.01
1462.79
1467.57
1472.35

3356.53
3369.54
3382.55
3395.56
3408.57
3421.58
3434.59
3447.60
3460.61
3473.62
3486.63
3499.64
3512.65
3525.66
3538.67
3551.68
3564.69
3577.70
3590.71
3603.72
3616.73
3629.74
3642.75
3655.76
3668.77
3681.78
3694.79
3707.80
3720.81
3733.82
3746.83
3759.84
3772.85
3785.86
3798.87
3811.88
3824.89
3837.90
3850.91
3863.92
3876.93
3889.94
3902.95
3915.96
3928.97
3941.98
3954.99
3968.00
3981.01
3994.02
4007.03

3981.01
3994.02
4007.03
4020.04
4033.05
4046.06
4059.07
4072.08
4085.09
4098.10
4111.11
4124.12
4137.13
4150.14
4163.15
4176.16
4189.17
4202.18
4215.19
4228.20
4241.21
4254.22
4267.23
4280.24
4293.25
4306.26
4319.27
4332.28
4345.29
4358.30
4371.31
4384.32
4397.33
4410.34
4423.35
4436.36
4449.37
4462.38
4475.39
4488.40
4501.41
4514.42
4527.43
4540.44
4553.45
4566.46
4579.47
4592.48
4605.49
4618.50
4631.51

2527.74
2535.92
2544.10
2552.28
2560.46
2568.64
2576.82
2585.00
2593.18
2601.36
2609.54
2617.72
2625.90
2634.08
2642.26
2650.44
2658.62
2666.80
2674.98
2683.16
2691.34
2699.52
2707.70
2715.88
2724.06
2732.24
2740.42
2748.60
2756.78
2764.96
2773.14
2781.32
2789.50
2797.68
2805.86
2814.04
2822.22
2830.40
2838.58
2846.76
2854.94
2863.12
2871.30
2879.48
2887.66
2895.84
2904.02
2912.20
2920.38
2928.56
2936.74

2527.74
2535.92
2544.10
2552.28
2560.46
2568.64
2576.82
2585.00
2593.18
2601.36
2609.54
2617.72
2625.90
2634.08
2642.26
2650.44
2658.62
2666.80
2674.98
2683.16
2691.34
2699.52
2707.70
2715.88
2724.06
2732.24
2740.42
2748.60
2756.78
2764.96
2773.14
2781.32
2789.50
2797.68
2805.86
2814.04
2822.22
2830.40
2838.58
2846.76
2854.94
2863.12
2871.30
2879.48
2887.66
2895.84
2904.02
2912.20
2920.38
2928.56
2936.74

1581.94
1587.06
1592.18
1597.30
1602.42
1607.54
1612.66
1617.78
1622.90
1628.02
1633.14
1638.26
1643.38
1648.50
1653.62
1658.74
1663.86
1668.98
1674.10
1679.22
1684.34
1689.46
1694.58
1699.70
1704.82
1709.94
1715.06
1720.18
1725.30
1730.42
1735.54
1740.66
1745.78
1750.90
1756.02
1761.14
1766.26
1771.38
1776.50
1781.62
1786.74
1791.86
1796.98
1802.10
1807.22
1812.34
1817.46
1822.58
1827.70
1832.82
1837.94

3720.11
3732.15
3744.19
3756.23
3768.27
3780.31
3792.35
3804.39
3816.43
3828.47
3840.51
3852.55
3864.59
3876.63
3888.67
3900.71
3912.75
3924.79
3936.83
3948.87
3960.91
3972.95
3984.99
3997.03
4009.07
4021.11
4033.15
4045.19
4057.23
4069.27
4081.31
4093.35
4105.39
4117.43
4129.47
4141.51
4153.55
4165.59
4177.63
4189.67
4201.71
4213.75
4225.79
4237.83
4249.87
4261.91
4273.95
4285.99
4298.03
4310.07
4322.11

1477.13
1481.91
1486.69
1491.47
1496.25
1501.03
1505.81
1510.59
1515.37
1520.15
1524.93
1529.71
1534.49
1539.27
1544.05
1548.83
1553.61
1558.39
1563.17
1567.95
1572.73
1577.51
1582.29
1587.07
1591.85
1596.63
1601.41
1606.19
1610.97
1615.75
1620.53
1625.31
1630.09
1634.87
1639.65
1644.43
1649.21
1653.99
1658.77
1663.55
1668.33
1673.11
1677.89
1682.67
1687.45
1692.23
1697.01
1701.79
1706.57
1711.35
1716.13

4020.04
4033.05
4046.06
4059.07
4072.08
4085.09
4098.10
4111.11
4124.12
4137.13
4150.14
4163.15
4176.16
4189.17
4202.18
4215.19
4228.20
4241.21
4254.22
4267.23
4280.24
4293.25
4306.26
4319.27
4332.28
4345.29
4358.30
4371.31
4384.32
4397.33
4410.34
4423.35
4436.36
4449.37
4462.38
4475.39
4488.40
4501.41
4514.42
4527.43
4540.44
4553.45
4566.46
4579.47
4592.48
4605.49
4618.50
4631.51
4644.52
4657.53
4670.54

4644.52
4657.53
4670.54
4683.55
4696.56
4709.57
4722.58
4735.59
4748.60
4761.61
4774.62
4787.63
4800.64
4813.65
4826.66
4839.67
4852.68
4865.69
4878.70
4891.71
4904.72
4917.73
4930.74
4943.75
4956.76
4969.77
4982.78
4995.79
5008.80
5021.81
5034.82
5047.83
5060.84
5073.85
5086.86
5099.87
5112.88
5125.89
5138.90
5151.91
5164.92
5177.93
5190.94
5203.95
5216.96
5229.97
5242.98
5255.99
5269.00
5282.01
5295.02

2944.92
2953.10
2961.28
2969.46
2977.64
2985.82
2994.00
3002.18
3010.36
3018.54
3026.72
3034.90
3043.08
3051.26
3059.44
3067.62
3075.80
3083.98
3092.16
3100.34
3108.52
3116.70
3124.88
3133.06
3141.24
3149.42
3157.60
3165.78
3173.96
3182.14
3190.32
3198.50
3206.68
3214.86
3223.04
3231.22
3239.40
3247.58
3255.76
3263.94
3272.12
3280.30
3288.48
3296.66
3304.84
3313.02
3321.20
3329.38
3337.56
3345.74
3353.92

2944.92
2953.10
2961.28
2969.46
2977.64
2985.82
2994.00
3002.18
3010.36
3018.54
3026.72
3034.90
3043.08
3051.26
3059.44
3067.62
3075.80
3083.98
3092.16
3100.34
3108.52
3116.70
3124.88
3133.06
3141.24
3149.42
3157.60
3165.78
3173.96
3182.14
3190.32
3198.50
3206.68
3214.86
3223.04
3231.22
3239.40
3247.58
3255.76
3263.94
3272.12
3280.30
3288.48
3296.66
3304.84
3313.02
3321.20
3329.38
3337.56
3345.74
3353.92

1843.06
1848.18
1853.30
1858.42
1863.54
1868.66
1873.78
1878.90
1884.02
1889.14
1894.26
1899.38
1904.50
1909.62
1914.74
1919.86
1924.98
1930.10
1935.22
1940.34
1945.46
1950.58
1955.70
1960.82
1965.94
1971.06
1976.18
1981.30
1986.42
1991.54
1996.66
2001.78
2006.90
2012.02
2017.14
2022.26
2027.38
2032.50
2037.62
2042.74
2047.86
2052.98
2058.10
2063.22
2068.34
2073.46
2078.58
2083.70
2088.82
2093.94
2099.06

4334.15
4346.19
4358.23
4370.27
4382.31
4394.35
4406.39
4418.43
4430.47
4442.51
4454.55
4466.59
4478.63
4490.67
4502.71
4514.75
4526.79
4538.83
4550.87
4562.91
4574.95
4586.99
4599.03
4611.07
4623.11
4635.15
4647.19
4659.23
4671.27
4683.31
4695.35
4707.39
4719.43
4731.47
4743.51
4755.55
4767.59
4779.63
4791.67
4803.71
4815.75
4827.79
4839.83
4851.87
4863.91
4875.95
4887.99
4900.03
4912.07
4924.11
4936.15

1720.91
1725.69
1730.47
1735.25
1740.03
1744.81
1749.59
1754.37
1759.15
1763.93
1768.71
1773.49
1778.27
1783.05
1787.83
1792.61
1797.39
1802.17
1806.95
1811.73
1816.51
1821.29
1826.07
1830.85
1835.63
1840.41
1845.19
1849.97
1854.75
1859.53
1864.31
1869.09
1873.87
1878.65
1883.43
1888.21
1892.99
1897.77
1902.55
1907.33
1912.11
1916.89
1921.67
1926.45
1931.23
1936.01
1940.79
1945.57
1950.35
1955.13
1959.91

4683.55
4696.56
4709.57
4722.58
4735.59
4748.60
4761.61
4774.62
4787.63
4800.64
4813.65
4826.66
4839.67
4852.68
4865.69
4878.70
4891.71
4904.72
4917.73
4930.74
4943.75
4956.76
4969.77
4982.78
4995.79
5008.80
5021.81
5034.82
5047.83
5060.84
5073.85
5086.86
5099.87
5112.88
5125.89
5138.90
5151.91
5164.92
5177.93
5190.94
5203.95
5216.96
5229.97
5242.98
5255.99
5269.00
5282.01
5295.02
5308.03
5321.04
5334.05

5308.03
5321.04
5334.05
5347.06
5360.07
5373.08
5386.09
5399.10
5412.11
5425.12
5438.13
5451.14
5464.15
5477.16
5490.17
5503.18
5516.19
5529.20
5542.21
5555.22
5568.23
5581.24
5594.25
5607.26
5620.27
5633.28
5646.29
5659.30
5672.31
5685.32
5698.33
5711.34
5724.35
5737.36
5750.37
5763.38
5776.39
5789.40
5802.41
5815.42
5828.43
5841.44
5854.45
5867.46
5880.47
5893.48
5906.49
5919.50
5932.51
5945.52
5958.53

3362.10
3370.28
3378.46
3386.64
3394.82
3403.00
3411.18
3419.36
3427.54
3435.72
3443.90
3452.08
3460.26
3468.44
3476.62
3484.80
3492.98
3501.16
3509.34
3517.52
3525.70
3533.88
3542.06
3550.24
3558.42
3566.60
3574.78
3582.96
3591.14
3599.32
3607.50
3615.68
3623.86
3632.04
3640.22
3648.40
3656.58
3664.76
3672.94
3681.12
3689.30
3697.48
3705.66
3713.84
3722.02
3730.20
3738.38
3746.56
3754.74
3762.92
3771.10

3362.10
3370.28
3378.46
3386.64
3394.82
3403.00
3411.18
3419.36
3427.54
3435.72
3443.90
3452.08
3460.26
3468.44
3476.62
3484.80
3492.98
3501.16
3509.34
3517.52
3525.70
3533.88
3542.06
3550.24
3558.42
3566.60
3574.78
3582.96
3591.14
3599.32
3607.50
3615.68
3623.86
3632.04
3640.22
3648.40
3656.58
3664.76
3672.94
3681.12
3689.30
3697.48
3705.66
3713.84
3722.02
3730.20
3738.38
3746.56
3754.74
3762.92
3771.10

2104.18
2109.30
2114.42
2119.54
2124.66
2129.78
2134.90
2140.02
2145.14
2150.26
2155.38
2160.50
2165.62
2170.74
2175.86
2180.98
2186.10
2191.22
2196.34
2201.46
2206.58
2211.70
2216.82
2221.94
2227.06
2232.18
2237.30
2242.42
2247.54
2252.66
2257.78
2262.90
2268.02
2273.14
2278.26
2283.38
2288.50
2293.62
2298.74
2303.86
2308.98
2314.10
2319.22
2324.34
2329.46
2334.58
2339.70
2344.82
2349.94
2355.06
2360.18

4948.19
4960.23
4972.27
4984.31
4996.35
5008.39
5020.43
5032.47
5044.51
5056.55
5068.59
5080.63
5092.67
5104.71
5116.75
5128.79
5140.83
5152.87
5164.91
5176.95
5188.99
5201.03
5213.07
5225.11
5237.15
5249.19
5261.23
5273.27
5285.31
5297.35
5309.39
5321.43
5333.47
5345.51
5357.55
5369.59
5381.63
5393.67
5405.71
5417.75
5429.79
5441.83
5453.87
5465.91
5477.95
5489.99
5502.03
5514.07
5526.11
5538.15
5550.19

1964.69
1969.47
1974.25
1979.03
1983.81
1988.59
1993.37
1998.15
2002.93
2007.71
2012.49
2017.27
2022.05
2026.83
2031.61
2036.39
2041.17
2045.95
2050.73
2055.51
2060.29
2065.07
2069.85
2074.63
2079.41
2084.19
2088.97
2093.75
2098.53
2103.31
2108.09
2112.87
2117.65
2122.43
2127.21
2131.99
2136.77
2141.55
2146.33
2151.11
2155.89
2160.67
2165.45
2170.23
2175.01
2179.79
2184.57
2189.35
2194.13
2198.91
2203.69

5347.06
5360.07
5373.08
5386.09
5399.10
5412.11
5425.12
5438.13
5451.14
5464.15
5477.16
5490.17
5503.18
5516.19
5529.20
5542.21
5555.22
5568.23
5581.24
5594.25
5607.26
5620.27
5633.28
5646.29
5659.30
5672.31
5685.32
5698.33
5711.34
5724.35
5737.36
5750.37
5763.38
5776.39
5789.40
5802.41
5815.42
5828.43
5841.44
5854.45
5867.46
5880.47
5893.48
5906.49
5919.50
5932.51
5945.52
5958.53
5971.54
5984.55
5997.56

5971.54
5984.55
5997.56
6010.57
6023.58
6036.59
6049.60
6062.61
6075.62
6088.63
6101.64
6114.65
6127.66
6140.67
6153.68
6166.69
6179.70
6192.71
6205.72
6218.73
6231.74
6244.75
6257.76
6270.77
6283.78
6296.79
6309.80
6322.81
6335.82
6348.83
6361.84
6374.85
6387.86
6400.87
6413.88
6426.89
6439.90
6452.91
6465.92
6478.93
6491.94
6504.95
6517.96
6530.97
6543.98
6556.99
6570.00
6583.01
6596.02
6609.03
6622.04

3779.28
3787.46
3795.64
3803.82
3812.00
3820.18
3828.36
3836.54
3844.72
3852.90
3861.08
3869.26
3877.44
3885.62
3893.80
3901.98
3910.16
3918.34
3926.52
3934.70
3942.88
3951.06
3959.24
3967.42
3975.60
3983.78
3991.96
4000.14
4008.32
4016.50
4024.68
4032.86
4041.04
4049.22
4057.40
4065.58
4073.76
4081.94
4090.12
4098.30
4106.48
4114.66
4122.84
4131.02
4139.20
4147.38
4155.56
4163.74
4171.92
4180.10
4188.28

3779.28
3787.46
3795.64
3803.82
3812.00
3820.18
3828.36
3836.54
3844.72
3852.90
3861.08
3869.26
3877.44
3885.62
3893.80
3901.98
3910.16
3918.34
3926.52
3934.70
3942.88
3951.06
3959.24
3967.42
3975.60
3983.78
3991.96
4000.14
4008.32
4016.50
4024.68
4032.86
4041.04
4049.22
4057.40
4065.58
4073.76
4081.94
4090.12
4098.30
4106.48
4114.66
4122.84
4131.02
4139.20
4147.38
4155.56
4163.74
4171.92
4180.10
4188.28

2365.30
2370.42
2375.54
2380.66
2385.78
2390.90
2396.02
2401.14
2406.26
2411.38
2416.50
2421.62
2426.74
2431.86
2436.98
2442.10
2447.22
2452.34
2457.46
2462.58
2467.70
2472.82
2477.94
2483.06
2488.18
2493.30
2498.42
2503.54
2508.66
2513.78
2518.90
2524.02
2529.14
2534.26
2539.38
2544.50
2549.62
2554.74
2559.86
2564.98
2570.10
2575.22
2580.34
2585.46
2590.58
2595.70
2600.82
2605.94
2611.06
2616.18
2621.30

5562.23
5574.27
5586.31
5598.35
5610.39
5622.43
5634.47
5646.51
5658.55
5670.59
5682.63
5694.67
5706.71
5718.75
5730.79
5742.83
5754.87
5766.91
5778.95
5790.99
5803.03
5815.07
5827.11
5839.15
5851.19
5863.23
5875.27
5887.31
5899.35
5911.39
5923.43
5935.47
5947.51
5959.55
5971.59
5983.63
5995.67
6007.71
6019.75
6031.79
6043.83
6055.87
6067.91
6079.95
6091.99
6104.03
6116.07
6128.11
6140.15
6152.19
6164.23

2208.47
2213.25
2218.03
2222.81
2227.59
2232.37
2237.15
2241.93
2246.71
2251.49
2256.27
2261.05
2265.83
2270.61
2275.39
2280.17
2284.95
2289.73
2294.51
2299.29
2304.07
2308.85
2313.63
2318.41
2323.19
2327.97
2332.75
2337.53
2342.31
2347.09
2351.87
2356.65
2361.43
2366.21
2370.99
2375.77
2380.55
2385.33
2390.11
2394.89
2399.67
2404.45
2409.23
2414.01
2418.79
2423.57
2428.35
2433.13
2437.91
2442.69
2447.47

6010.57
6023.58
6036.59
6049.60
6062.61
6075.62
6088.63
6101.64
6114.65
6127.66
6140.67
6153.68
6166.69
6179.70
6192.71
6205.72
6218.73
6231.74
6244.75
6257.76
6270.77
6283.78
6296.79
6309.80
6322.81
6335.82
6348.83
6361.84
6374.85
6387.86
6400.87
6413.88
6426.89
6439.90
6452.91
6465.92
6478.93
6491.94
6504.95
6517.96
6530.97
6543.98
6556.99
6570.00
6583.01
6596.02
6609.03
6622.04
6635.05
6648.06
6661.07

6635.05
6648.06
6661.07
6674.08
6687.09
6700.10
6713.11
6726.12
6739.13
6752.14
6765.15
6778.16
6791.17
6804.18
6817.19
6830.20
6843.21
6856.22
6869.23
6882.24
6895.25
6908.26
6921.27
6934.28
6947.29
6960.30
6973.31
6986.32
6999.33
7012.34
7025.35
7038.36
7051.37
7064.38
7077.39
7090.40
7103.41
7116.42
7129.43
7142.44
7155.45
7168.46
7181.47
7194.48
7207.49
7220.50
7233.51
7246.52
7259.53
7272.54
7285.55

4196.46
4204.64
4212.82
4221.00
4229.18
4237.36
4245.54
4253.72
4261.90
4270.08
4278.26
4286.44
4294.62
4302.80
4310.98
4319.16
4327.34
4335.52
4343.70
4351.88
4360.06
4368.24
4376.42
4384.60
4392.78
4400.96
4409.14
4417.32
4425.50
4433.68
4441.86
4450.04
4458.22
4466.40
4474.58
4482.76
4490.94
4499.12
4507.30
4515.48
4523.66
4531.84
4540.02
4548.20
4556.38
4564.56
4572.74
4580.92
4589.10
4597.28
4605.46

4196.46
4204.64
4212.82
4221.00
4229.18
4237.36
4245.54
4253.72
4261.90
4270.08
4278.26
4286.44
4294.62
4302.80
4310.98
4319.16
4327.34
4335.52
4343.70
4351.88
4360.06
4368.24
4376.42
4384.60
4392.78
4400.96
4409.14
4417.32
4425.50
4433.68
4441.86
4450.04
4458.22
4466.40
4474.58
4482.76
4490.94
4499.12
4507.30
4515.48
4523.66
4531.84
4540.02
4548.20
4556.38
4564.56
4572.74
4580.92
4589.10
4597.28
4605.46

2626.42
2631.54
2636.66
2641.78
2646.90
2652.02
2657.14
2662.26
2667.38
2672.50
2677.62
2682.74
2687.86
2692.98
2698.10
2703.22
2708.34
2713.46
2718.58
2723.70
2728.82
2733.94
2739.06
2744.18
2749.30
2754.42
2759.54
2764.66
2769.78
2774.90
2780.02
2785.14
2790.26
2795.38
2800.50
2805.62
2810.74
2815.86
2820.98
2826.10
2831.22
2836.34
2841.46
2846.58
2851.70
2856.82
2861.94
2867.06
2872.18
2877.30
2882.42

6176.27
6188.31
6200.35
6212.39
6224.43
6236.47
6248.51
6260.55
6272.59
6284.63
6296.67
6308.71
6320.75
6332.79
6344.83
6356.87
6368.91
6380.95
6392.99
6405.03
6417.07
6429.11
6441.15
6453.19
6465.23
6477.27
6489.31
6501.35
6513.39
6525.43
6537.47
6549.51
6561.55
6573.59
6585.63
6597.67
6609.71
6621.75
6633.79
6645.83
6657.87
6669.91
6681.95
6693.99
6706.03
6718.07
6730.11
6742.15
6754.19
6766.23
6778.27

2452.25
2457.03
2461.81
2466.59
2471.37
2476.15
2480.93
2485.71
2490.49
2495.27
2500.05
2504.83
2509.61
2514.39
2519.17
2523.95
2528.73
2533.51
2538.29
2543.07
2547.85
2552.63
2557.41
2562.19
2566.97
2571.75
2576.53
2581.31
2586.09
2590.87
2595.65
2600.43
2605.21
2609.99
2614.77
2619.55
2624.33
2629.11
2633.89
2638.67
2643.45
2648.23
2653.01
2657.79
2662.57
2667.35
2672.13
2676.91
2681.69
2686.47
2691.25

6674.08
6687.09
6700.10
6713.11
6726.12
6739.13
6752.14
6765.15
6778.16
6791.17
6804.18
6817.19
6830.20
6843.21
6856.22
6869.23
6882.24
6895.25
6908.26
6921.27
6934.28
6947.29
6960.30
6973.31
6986.32
6999.33
7012.34
7025.35
7038.36
7051.37
7064.38
7077.39
7090.40
7103.41
7116.42
7129.43
7142.44
7155.45
7168.46
7181.47
7194.48
7207.49
7220.50
7233.51
7246.52
7259.53
7272.54
7285.55
7298.56
7311.57
7324.58

7298.56
7311.57
7324.58
7337.59
7350.60
7363.61
7376.62
7389.63
7402.64
7415.65
7428.66
7441.67
7454.68
7467.69
7480.70
7493.71
7506.72
7519.73
7532.74
7545.75
7558.76
7571.77
7584.78
7597.79
7610.80
7623.81
7636.82
7649.83
7662.84
7675.85
7688.86
7701.87
7714.88
7727.89
7740.90
7753.91
7766.92
7779.93
7792.94
7805.95
7818.96
7831.97
7844.98
7857.99
7871.00
7884.01
7897.02
7910.03
7923.04
7936.05
7949.06

4613.64
4621.82
4630.00
4638.18
4646.36
4654.54
4662.72
4670.90
4679.08
4687.26
4695.44
4703.62
4711.80
4719.98
4728.16
4736.34
4744.52
4752.70
4760.88
4769.06
4777.24
4785.42
4793.60
4801.78
4809.96
4818.14
4826.32
4834.50
4842.68
4850.86
4859.04
4867.22
4875.40
4883.58
4891.76
4899.94
4908.12
4916.30
4924.48
4932.66
4940.84
4949.02
4957.20
4965.38
4973.56
4981.74
4989.92
4998.10
5006.28
5014.46
5022.64

4613.64
4621.82
4630.00
4638.18
4646.36
4654.54
4662.72
4670.90
4679.08
4687.26
4695.44
4703.62
4711.80
4719.98
4728.16
4736.34
4744.52
4752.70
4760.88
4769.06
4777.24
4785.42
4793.60
4801.78
4809.96
4818.14
4826.32
4834.50
4842.68
4850.86
4859.04
4867.22
4875.40
4883.58
4891.76
4899.94
4908.12
4916.30
4924.48
4932.66
4940.84
4949.02
4957.20
4965.38
4973.56
4981.74
4989.92
4998.10
5006.28
5014.46
5022.64

2887.54
2892.66
2897.78
2902.90
2908.02
2913.14
2918.26
2923.38
2928.50
2933.62
2938.74
2943.86
2948.98
2954.10
2959.22
2964.34
2969.46
2974.58
2979.70
2984.82
2989.94
2995.06
3000.18
3005.30
3010.42
3015.54
3020.66
3025.78
3030.90
3036.02
3041.14
3046.26
3051.38
3056.50
3061.62
3066.74
3071.86
3076.98
3082.10
3087.22
3092.34
3097.46
3102.58
3107.70
3112.82
3117.94
3123.06
3128.18
3133.30
3138.42
3143.54

6790.31
6802.35
6814.39
6826.43
6838.47
6850.51
6862.55
6874.59
6886.63
6898.67
6910.71
6922.75
6934.79
6946.83
6958.87
6970.91
6982.95
6994.99
7007.03
7019.07
7031.11
7043.15
7055.19
7067.23
7079.27
7091.31
7103.35
7115.39
7127.43
7139.47
7151.51
7163.55
7175.59
7187.63
7199.67
7211.71
7223.75
7235.79
7247.83
7259.87
7271.91
7283.95
7295.99
7308.03
7320.07
7332.11
7344.15
7356.19
7368.23
7380.27
7392.31

2696.03
2700.81
2705.59
2710.37
2715.15
2719.93
2724.71
2729.49
2734.27
2739.05
2743.83
2748.61
2753.39
2758.17
2762.95
2767.73
2772.51
2777.29
2782.07
2786.85
2791.63
2796.41
2801.19
2805.97
2810.75
2815.53
2820.31
2825.09
2829.87
2834.65
2839.43
2844.21
2848.99
2853.77
2858.55
2863.33
2868.11
2872.89
2877.67
2882.45
2887.23
2892.01
2896.79
2901.57
2906.35
2911.13
2915.91
2920.69
2925.47
2930.25
2935.03

7337.59
7350.60
7363.61
7376.62
7389.63
7402.64
7415.65
7428.66
7441.67
7454.68
7467.69
7480.70
7493.71
7506.72
7519.73
7532.74
7545.75
7558.76
7571.77
7584.78
7597.79
7610.80
7623.81
7636.82
7649.83
7662.84
7675.85
7688.86
7701.87
7714.88
7727.89
7740.90
7753.91
7766.92
7779.93
7792.94
7805.95
7818.96
7831.97
7844.98
7857.99
7871.00
7884.01
7897.02
7910.03
7923.04
7936.05
7949.06
7962.07
7975.08
7988.09

7962.07
7975.08
7988.09
8001.10
8014.11
8027.12
8040.13
8053.14
8066.15
8079.16
8092.17
8105.18
8118.19
8131.20
8144.21
8157.22
8170.23
8183.24
8196.25
8209.26
8222.27
8235.28
8248.29
8261.30
8274.31
8287.32
8300.33
8313.34
8326.35
8339.36
8352.37
8365.38
8378.39
8391.40
8404.41
8417.42
8430.43
8443.44
8456.45
8469.46
8482.47
8495.48
8508.49
8521.50
8534.51
8547.52
8560.53
8573.54
8586.55
8599.56
8612.57

5030.82
5039.00
5047.18
5055.36
5063.54
5071.72
5079.90
5088.08
5096.26
5104.44
5112.62
5120.80
5128.98
5137.16
5145.34
5153.52
5161.70
5169.88
5178.06
5186.24
5194.42
5202.60
5210.78
5218.96
5227.14
5235.32
5243.50
5251.68
5259.86
5268.04
5276.22
5284.40
5292.58
5300.76
5308.94
5317.12
5325.30
5333.48
5341.66
5349.84
5358.02
5366.20
5374.38
5382.56
5390.74
5398.92
5407.10
5415.28
5423.46
5431.64
5439.82

5030.82
5039.00
5047.18
5055.36
5063.54
5071.72
5079.90
5088.08
5096.26
5104.44
5112.62
5120.80
5128.98
5137.16
5145.34
5153.52
5161.70
5169.88
5178.06
5186.24
5194.42
5202.60
5210.78
5218.96
5227.14
5235.32
5243.50
5251.68
5259.86
5268.04
5276.22
5284.40
5292.58
5300.76
5308.94
5317.12
5325.30
5333.48
5341.66
5349.84
5358.02
5366.20
5374.38
5382.56
5390.74
5398.92
5407.10
5415.28
5423.46
5431.64
5439.82

3148.66
3153.78
3158.90
3164.02
3169.14
3174.26
3179.38
3184.50
3189.62
3194.74
3199.86
3204.98
3210.10
3215.22
3220.34
3225.46
3230.58
3235.70
3240.82
3245.94
3251.06
3256.18
3261.30
3266.42
3271.54
3276.66
3281.78
3286.90
3292.02
3297.14
3302.26
3307.38
3312.50
3317.62
3322.74
3327.86
3332.98
3338.10
3343.22
3348.34
3353.46
3358.58
3363.70
3368.82
3373.94
3379.06
3384.18
3389.30
3394.42
3399.54
3404.66

7404.35
7416.39
7428.43
7440.47
7452.51
7464.55
7476.59
7488.63
7500.67
7512.71
7524.75
7536.79
7548.83
7560.87
7572.91
7584.95
7596.99
7609.03
7621.07
7633.11
7645.15
7657.19
7669.23
7681.27
7693.31
7705.35
7717.39
7729.43
7741.47
7753.51
7765.55
7777.59
7789.63
7801.67
7813.71
7825.75
7837.79
7849.83
7861.87
7873.91
7885.95
7897.99
7910.03
7922.07
7934.11
7946.15
7958.19
7970.23
7982.27
7994.31
8006.35

2939.81
2944.59
2949.37
2954.15
2958.93
2963.71
2968.49
2973.27
2978.05
2982.83
2987.61
2992.39
2997.17
3001.95
3006.73
3011.51
3016.29
3021.07
3025.85
3030.63
3035.41
3040.19
3044.97
3049.75
3054.53
3059.31
3064.09
3068.87
3073.65
3078.43
3083.21
3087.99
3092.77
3097.55
3102.33
3107.11
3111.89
3116.67
3121.45
3126.23
3131.01
3135.79
3140.57
3145.35
3150.13
3154.91
3159.69
3164.47
3169.25
3174.03
3178.81

8001.10
8014.11
8027.12
8040.13
8053.14
8066.15
8079.16
8092.17
8105.18
8118.19
8131.20
8144.21
8157.22
8170.23
8183.24
8196.25
8209.26
8222.27
8235.28
8248.29
8261.30
8274.31
8287.32
8300.33
8313.34
8326.35
8339.36
8352.37
8365.38
8378.39
8391.40
8404.41
8417.42
8430.43
8443.44
8456.45
8469.46
8482.47
8495.48
8508.49
8521.50
8534.51
8547.52
8560.53
8573.54
8586.55
8599.56
8612.57
8625.58
8638.59
8651.60

8625.58
8638.59
8651.60
8664.61
8677.62
8690.63
8703.64
8716.65
8729.66
8742.67
8755.68
8768.69
8781.70
8794.71
8807.72
8820.73
8833.74
8846.75
8859.76
8872.77
8885.78
8898.79
8911.80
8924.81
8937.82
8950.83
8963.84
8976.85
8989.86
9002.87
9015.88
9028.89
9041.90
9054.91
9067.92
9080.93
9093.94
9106.95
9119.96
9132.97
9145.98
9158.99
9172.00
9185.01
9198.02
9211.03
9224.04
9237.05
9250.06
9263.07
9276.08

5448.00
5456.18
5464.36
5472.54
5480.72
5488.90
5497.08
5505.26
5513.44
5521.62
5529.80
5537.98
5546.16
5554.34
5562.52
5570.70
5578.88
5587.06
5595.24
5603.42
5611.60
5619.78
5627.96
5636.14
5644.32
5652.50
5660.68
5668.86
5677.04
5685.22
5693.40
5701.58
5709.76
5717.94
5726.12
5734.30
5742.48
5750.66
5758.84
5767.02
5775.20
5783.38
5791.56
5799.74
5807.92
5816.10
5824.28
5832.46
5840.64
5848.82
5857.00

5448.00
5456.18
5464.36
5472.54
5480.72
5488.90
5497.08
5505.26
5513.44
5521.62
5529.80
5537.98
5546.16
5554.34
5562.52
5570.70
5578.88
5587.06
5595.24
5603.42
5611.60
5619.78
5627.96
5636.14
5644.32
5652.50
5660.68
5668.86
5677.04
5685.22
5693.40
5701.58
5709.76
5717.94
5726.12
5734.30
5742.48
5750.66
5758.84
5767.02
5775.20
5783.38
5791.56
5799.74
5807.92
5816.10
5824.28
5832.46
5840.64
5848.82
5857.00

3409.78
3414.90
3420.02
3425.14
3430.26
3435.38
3440.50
3445.62
3450.74
3455.86
3460.98
3466.10
3471.22
3476.34
3481.46
3486.58
3491.70
3496.82
3501.94
3507.06
3512.18
3517.30
3522.42
3527.54
3532.66
3537.78
3542.90
3548.02
3553.14
3558.26
3563.38
3568.50
3573.62
3578.74
3583.86
3588.98
3594.10
3599.22
3604.34
3609.46
3614.58
3619.70
3624.82
3629.94
3635.06
3640.18
3645.30
3650.42
3655.54
3660.66
3665.78

8018.39
8030.43
8042.47
8054.51
8066.55
8078.59
8090.63
8102.67
8114.71
8126.75
8138.79
8150.83
8162.87
8174.91
8186.95
8198.99
8211.03
8223.07
8235.11
8247.15
8259.19
8271.23
8283.27
8295.31
8307.35
8319.39
8331.43
8343.47
8355.51
8367.55
8379.59
8391.63
8403.67
8415.71
8427.75
8439.79
8451.83
8463.87
8475.91
8487.95
8499.99
8512.03
8524.07
8536.11
8548.15
8560.19
8572.23
8584.27
8596.31
8608.35
8620.39

3183.59
3188.37
3193.15
3197.93
3202.71
3207.49
3212.27
3217.05
3221.83
3226.61
3231.39
3236.17
3240.95
3245.73
3250.51
3255.29
3260.07
3264.85
3269.63
3274.41
3279.19
3283.97
3288.75
3293.53
3298.31
3303.09
3307.87
3312.65
3317.43
3322.21
3326.99
3331.77
3336.55
3341.33
3346.11
3350.89
3355.67
3360.45
3365.23
3370.01
3374.79
3379.57
3384.35
3389.13
3393.91
3398.69
3403.47
3408.25
3413.03
3417.81
3422.59

8664.61
8677.62
8690.63
8703.64
8716.65
8729.66
8742.67
8755.68
8768.69
8781.70
8794.71
8807.72
8820.73
8833.74
8846.75
8859.76
8872.77
8885.78
8898.79
8911.80
8924.81
8937.82
8950.83
8963.84
8976.85
8989.86
9002.87
9015.88
9028.89
9041.90
9054.91
9067.92
9080.93
9093.94
9106.95
9119.96
9132.97
9145.98
9158.99
9172.00
9185.01
9198.02
9211.03
9224.04
9237.05
9250.06
9263.07
9276.08
9289.09
9302.10
9315.11

9289.09
9302.10
9315.11
9328.12
9341.13
9354.14
9367.15
9380.16
9393.17
9406.18
9419.19
9432.20
9445.21
9458.22
9471.23
9484.24
9497.25
9510.26
9523.27
9536.28
9549.29
9562.30
9575.31
9588.32
9601.33
9614.34
9627.35
9640.36
9653.37
9666.38
9679.39
9692.40
9705.41
9718.42
9731.43
9744.44
9757.45
9770.46
9783.47
9796.48
9809.49
9822.50
9835.51
9848.52
9861.53
9874.54
9887.55
9900.56
9913.57
9926.58
9939.59

5865.18
5873.36
5881.54
5889.72
5897.90
5906.08
5914.26
5922.44
5930.62
5938.80
5946.98
5955.16
5963.34
5971.52
5979.70
5987.88
5996.06
6004.24
6012.42
6020.60
6028.78
6036.96
6045.14
6053.32
6061.50
6069.68
6077.86
6086.04
6094.22
6102.40
6110.58
6118.76
6126.94
6135.12
6143.30
6151.48
6159.66
6167.84
6176.02
6184.20
6192.38
6200.56
6208.74
6216.92
6225.10
6233.28
6241.46
6249.64
6257.82
6266.00
6274.18

5865.18
5873.36
5881.54
5889.72
5897.90
5906.08
5914.26
5922.44
5930.62
5938.80
5946.98
5955.16
5963.34
5971.52
5979.70
5987.88
5996.06
6004.24
6012.42
6020.60
6028.78
6036.96
6045.14
6053.32
6061.50
6069.68
6077.86
6086.04
6094.22
6102.40
6110.58
6118.76
6126.94
6135.12
6143.30
6151.48
6159.66
6167.84
6176.02
6184.20
6192.38
6200.56
6208.74
6216.92
6225.10
6233.28
6241.46
6249.64
6257.82
6266.00
6274.18

3670.90
3676.02
3681.14
3686.26
3691.38
3696.50
3701.62
3706.74
3711.86
3716.98
3722.10
3727.22
3732.34
3737.46
3742.58
3747.70
3752.82
3757.94
3763.06
3768.18
3773.30
3778.42
3783.54
3788.66
3793.78
3798.90
3804.02
3809.14
3814.26
3819.38
3824.50
3829.62
3834.74
3839.86
3844.98
3850.10
3855.22
3860.34
3865.46
3870.58
3875.70
3880.82
3885.94
3891.06
3896.18
3901.30
3906.42
3911.54
3916.66
3921.78
3926.90

8632.43
8644.47
8656.51
8668.55
8680.59
8692.63
8704.67
8716.71
8728.75
8740.79
8752.83
8764.87
8776.91
8788.95
8800.99
8813.03
8825.07
8837.11
8849.15
8861.19
8873.23
8885.27
8897.31
8909.35
8921.39
8933.43
8945.47
8957.51
8969.55
8981.59
8993.63
9005.67
9017.71
9029.75
9041.79
9053.83
9065.87
9077.91
9089.95
9101.99
9114.03
9126.07
9138.11
9150.15
9162.19
9174.23
9186.27
9198.31
9210.35
9222.39
9234.43

3427.37
3432.15
3436.93
3441.71
3446.49
3451.27
3456.05
3460.83
3465.61
3470.39
3475.17
3479.95
3484.73
3489.51
3494.29
3499.07
3503.85
3508.63
3513.41
3518.19
3522.97
3527.75
3532.53
3537.31
3542.09
3546.87
3551.65
3556.43
3561.21
3565.99
3570.77
3575.55
3580.33
3585.11
3589.89
3594.67
3599.45
3604.23
3609.01
3613.79
3618.57
3623.35
3628.13
3632.91
3637.69
3642.47
3647.25
3652.03
3656.81
3661.59
3666.37

9328.12
9341.13
9354.14
9367.15
9380.16
9393.17
9406.18
9419.19
9432.20
9445.21
9458.22
9471.23
9484.24
9497.25
9510.26
9523.27
9536.28
9549.29
9562.30
9575.31
9588.32
9601.33
9614.34
9627.35
9640.36
9653.37
9666.38
9679.39
9692.40
9705.41
9718.42
9731.43
9744.44
9757.45
9770.46
9783.47
9796.48
9809.49
9822.50
9835.51
9848.52
9861.53
9874.54
9887.55
9900.56
9913.57
9926.58
9939.59
9952.60
9965.61
9978.62

9952.60
9965.61
9978.62
9991.63
10004.64
10017.65
10030.66
10043.67
10056.68
10069.69
10082.70
10095.71
10108.72
10121.73
10134.74
10147.75
10160.76
10173.77
10186.78
10199.79
10212.80
10225.81
10238.82
10251.83
10264.84
10277.85
10290.86
10303.87
10316.88
10329.89
10342.90
10355.91
10368.92
10381.93
10394.94
10407.95
10420.96
10433.97
10446.98
10459.99
10473.00
10486.01
10499.02
10512.03
10525.04
10538.05
10551.06
10564.07
10577.08
10590.09
10603.10

6282.36
6290.54
6298.72
6306.90
6315.08
6323.26
6331.44
6339.62
6347.80
6355.98
6364.16
6372.34
6380.52
6388.70
6396.88
6405.06
6413.24
6421.42
6429.60
6437.78
6445.96
6454.14
6462.32
6470.50
6478.68
6486.86
6495.04
6503.22
6511.40
6519.58
6527.76
6535.94
6544.12
6552.30
6560.48
6568.66
6576.84
6585.02
6593.20
6601.38
6609.56
6617.74
6625.92
6634.10
6642.28
6650.46
6658.64
6666.82
6675.00
6683.18
6691.36

6282.36
6290.54
6298.72
6306.90
6315.08
6323.26
6331.44
6339.62
6347.80
6355.98
6364.16
6372.34
6380.52
6388.70
6396.88
6405.06
6413.24
6421.42
6429.60
6437.78
6445.96
6454.14
6462.32
6470.50
6478.68
6486.86
6495.04
6503.22
6511.40
6519.58
6527.76
6535.94
6544.12
6552.30
6560.48
6568.66
6576.84
6585.02
6593.20
6601.38
6609.56
6617.74
6625.92
6634.10
6642.28
6650.46
6658.64
6666.82
6675.00
6683.18
6691.36

3932.02
3937.14
3942.26
3947.38
3952.50
3957.62
3962.74
3967.86
3972.98
3978.10
3983.22
3988.34
3993.46
3998.58
4003.70
4008.82
4013.94
4019.06
4024.18
4029.30
4034.42
4039.54
4044.66
4049.78
4054.90
4060.02
4065.14
4070.26
4075.38
4080.50
4085.62
4090.74
4095.86
4100.98
4106.10
4111.22
4116.34
4121.46
4126.58
4131.70
4136.82
4141.94
4147.06
4152.18
4157.30
4162.42
4167.54
4172.66
4177.78
4182.90
4188.02

9246.47
9258.51
9270.55
9282.59
9294.63
9306.67
9318.71
9330.75
9342.79
9354.83
9366.87
9378.91
9390.95
9402.99
9415.03
9427.07
9439.11
9451.15
9463.19
9475.23
9487.27
9499.31
9511.35
9523.39
9535.43
9547.47
9559.51
9571.55
9583.59
9595.63
9607.67
9619.71
9631.75
9643.79
9655.83
9667.87
9679.91
9691.95
9703.99
9716.03
9728.07
9740.11
9752.15
9764.19
9776.23
9788.27
9800.31
9812.35
9824.39
9836.43
9848.47

3671.15
3675.93
3680.71
3685.49
3690.27
3695.05
3699.83
3704.61
3709.39
3714.17
3718.95
3723.73
3728.51
3733.29
3738.07
3742.85
3747.63
3752.41
3757.19
3761.97
3766.75
3771.53
3776.31
3781.09
3785.87
3790.65
3795.43
3800.21
3804.99
3809.77
3814.55
3819.33
3824.11
3828.89
3833.67
3838.45
3843.23
3848.01
3852.79
3857.57
3862.35
3867.13
3871.91
3876.69
3881.47
3886.25
3891.03
3895.81
3900.59
3905.37
3910.15

9991.63
10004.64
10017.65
10030.66
10043.67
10056.68
10069.69
10082.70
10095.71
10108.72
10121.73
10134.74
10147.75
10160.76
10173.77
10186.78
10199.79
10212.80
10225.81
10238.82
10251.83
10264.84
10277.85
10290.86
10303.87
10316.88
10329.89
10342.90
10355.91
10368.92
10381.93
10394.94
10407.95
10420.96
10433.97
10446.98
10459.99
10473.00
10486.01
10499.02
10512.03
10525.04
10538.05
10551.06
10564.07
10577.08
10590.09
10603.10
10616.11
10629.12
10642.13

10616.11
10629.12
10642.13
10655.14
10668.15
10681.16
10694.17
10707.18
10720.19
10733.20
10746.21
10759.22
10772.23
10785.24
10798.25
10811.26
10824.27
10837.28
10850.29
10863.30
10876.31
10889.32
10902.33
10915.34
10928.35
10941.36
10954.37
10967.38
10980.39
10993.40
11006.41
11019.42
11032.43
11045.44
11058.45
11071.46
11084.47
11097.48
11110.49
11123.50

6699.54
6707.72
6715.90
6724.08
6732.26
6740.44
6748.62
6756.80
6764.98
6773.16
6781.34
6789.52
6797.70
6805.88
6814.06
6822.24
6830.42
6838.60
6846.78
6854.96
6863.14
6871.32
6879.50
6887.68
6895.86
6904.04
6912.22
6920.40
6928.58
6936.76
6944.94
6953.12
6961.30
6969.48
6977.66
6985.84
6994.02
7002.20
7010.38
7018.56

6699.54
6707.72
6715.90
6724.08
6732.26
6740.44
6748.62
6756.80
6764.98
6773.16
6781.34
6789.52
6797.70
6805.88
6814.06
6822.24
6830.42
6838.60
6846.78
6854.96
6863.14
6871.32
6879.50
6887.68
6895.86
6904.04
6912.22
6920.40
6928.58
6936.76
6944.94
6953.12
6961.30
6969.48
6977.66
6985.84
6994.02
7002.20
7010.38
7018.56

4193.14
4198.26
4203.38
4208.50
4213.62
4218.74
4223.86
4228.98
4234.10
4239.22
4244.34
4249.46
4254.58
4259.70
4264.82
4269.94
4275.06
4280.18
4285.30
4290.42
4295.54
4300.66
4305.78
4310.90
4316.02
4321.14
4326.26
4331.38
4336.50
4341.62
4346.74
4351.86
4356.98
4362.10
4367.22
4372.34
4377.46
4382.58
4387.70
4392.82

9860.51
9872.55
9884.59
9896.63
9908.67
9920.71
9932.75
9944.79
9956.83
9968.87
9980.91
9992.95
10004.99
10017.03
10029.07
10041.11
10053.15
10065.19
10077.23
10089.27
10101.31
10113.35
10125.39
10137.43
10149.47
10161.51
10173.55
10185.59
10197.63
10209.67
10221.71
10233.75
10245.79
10257.83
10269.87
10281.91
10293.95
10305.99
10318.03
10330.07

3914.93
3919.71
3924.49
3929.27
3934.05
3938.83
3943.61
3948.39
3953.17
3957.95
3962.73
3967.51
3972.29
3977.07
3981.85
3986.63
3991.41
3996.19
4000.97
4005.75
4010.53
4015.31
4020.09
4024.87
4029.65
4034.43
4039.21
4043.99
4048.77
4053.55
4058.33
4063.11
4067.89
4072.67
4077.45
4082.23
4087.01
4091.79
4096.57
4101.35

10655.14
10668.15
10681.16
10694.17
10707.18
10720.19
10733.20
10746.21
10759.22
10772.23
10785.24
10798.25
10811.26
10824.27
10837.28
10850.29
10863.30
10876.31
10889.32
10902.33
10915.34
10928.35
10941.36
10954.37
10967.38
10980.39
10993.40
11006.41
11019.42
11032.43
11045.44
11058.45
11071.46
11084.47
11097.48
11110.49
11123.50
11136.51
11149.52
11162.53

HIRE CHARGES OF MACHINERY


Hire
Fuel Charges
Crew
Charges
Charges
a)
b)
c)
d)
e)

Hire charges of Tipper 5.00 454.40


239.10
124.80
Hire charges of Tipper 10
0.00
0.00
0.00
Tonnes
capacity
Hire
charges
of Water Tanker 408.80
239.10
117.00
8000
capacityof Truck 10 424.50
Hire Ltrs
charges
239.10
117.00
Tonnes
capacity
Hire charges of FE loader 1.00
0.00
0.00
0.00
RATES FOR CONVEYANCE BY MACHINERY
1 Mincipal area allowance
2 Industrial area allowance
3 Agency area allowance
4 Allowable allowance
5 Add Overhead Charges & Contractor's Profit
A) For Earth/Gravel/Sand/Morrum/Lime/Surki (per Cum):
1 Lead up to 1 Km:
Out put
=
5.00 Cum
Rate
0.15 Hrs. hire charges of Tipper 5.00 Cum @ Rs.
454.40
0.15 Hrs. fuel charges of Tipper 5.00 Cum @ Rs.
239.10
0.15 Hrs. crew charges of Tipper 5.00 Cum @ Rs.
124.80
0.00 add area allowance at 0% on Rs.
18.72
Rate for
5.00 Cum
Rate for
1.00 Cum
0.00 add overheads and contractors profit at 0% on
24.55
Rs.
Total rate for
1.00 Cum
2

Lead up to 2 Km:
Out put
=
5.00 Cum
0.21 Hrs. hire charges of Tipper 5.00 Cum @ Rs.
0.21 Hrs. fuel charges of Tipper 5.00 Cum @ Rs.
0.21 Hrs. crew charges of Tipper 5.00 Cum @ Rs.
0.00 add area allowance at 0% on Rs.
Rate for
5.00 Cum
Rate for
1.00 Cum
0.00 add overheads and contractors profit at 0% on
Total rate for
1.00 Cum
Lead up to 3 Km:
Out put
=
5.00 Cum
0.28 Hrs. hire charges of Tipper 5.00 Cum @ Rs.
0.28 Hrs. fuel charges of Tipper 5.00 Cum @ Rs.
0.28 Hrs. crew charges of Tipper 5.00 Cum @ Rs.
0.00 add area allowance at 0% on Rs.
Rate for
5.00 Cum
Rate for
1.00 Cum
0.00 add overheads and contractors profit at 0% on
Total rate for
1.00 Cum
Lead up to 4 Km:
Out put
=
5.00 Cum
0.34 Hrs. hire charges of Tipper 5.00 Cum @ Rs.

Total

Per

818.30
0.00
764.90
780.60
0.00

Hour
Hour
Hour
Hour
Hour
0.00%
0.00%
0.00%
0.00%
0.00%

Per
Hour
Hour
Hour

Rate
454.40
239.10
124.80
26.21

Per
Hour
Hour
Hour

34.37

Hour

Rate
454.40
239.10
124.80
34.94

Per
Hour
Hour
Hour

45.82

Hour

Rate
454.40

Per
Hour

Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.

Amount
68.16
35.87
18.72
0.00
122.75
24.55
0.00
24.55

Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.

Amount
95.42
50.21
26.21
0.00
171.84
34.37
0.00
34.37

Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.

Amount
127.23
66.95
34.94
0.00
229.12
45.82
0.00
45.82

Rs.

Amount
154.50

0.34 Hrs. fuel charges of Tipper 5.00 Cum @ Rs.


0.34 Hrs. crew charges of Tipper 5.00 Cum @ Rs.
0.00 add area allowance at 0% on Rs.
Rate for
5.00 Cum
Rate for
1.00 Cum
0.00 add overheads and contractors profit at 0% on
Rs.
Total rate for
1.00 Cum
5

Lead up to 5 Km:
Out put
=
5.00 Cum
0.40 Hrs. hire charges of Tipper 5.00 Cum @ Rs.
0.40 Hrs. fuel charges of Tipper 5.00 Cum @ Rs.
0.40 Hrs. crew charges of Tipper 5.00 Cum @ Rs.
0.00 add area allowance at 0% on Rs.
Rate for
5.00 Cum
Rate for
1.00 Cum
0.00 add overheads and contractors profit at 0% on
Rs. rate for
Total
1.00 Cum
Lead for every Km from 5 to 30 Km:
Out put
=
5.00 Cum
0.06 Hrs. hire charges of Tipper 5.00 Cum @ Rs.
0.06 Hrs. fuel charges of Tipper 5.00 Cum @ Rs.
0.06 Hrs. crew charges of Tipper 5.00 Cum @ Rs.
0.00 add area allowance at 0% on Rs.
Rate for
5.00 Cum
Rate for
1.00 Cum
0.00 add overheads and contractors profit at 0% on
Total rate for
1.00 Cum
Lead for every Km beyond 30 Km:
Out put
=
5.00 Cum
0.05 Hrs. hire charges of Tipper 5.00 Cum @ Rs.
0.05 Hrs. fuel charges of Tipper 5.00 Cum @ Rs.
0.05 Hrs. crew charges of Tipper 5.00 Cum @ Rs.
0.00 add area allowance at 0% on Rs.
Rate for
5.00 Cum
Rate for
1.00 Cum
0.00 add overheads and contractors profit at 0% on
Total rate for
1.00 Cum

239.10
124.80
42.43

Hour
Hour

55.64

Hour

Rate
454.40
239.10
124.80
49.92

Per
Hour
Hour
Hour

65.46

Hour

Rate
454.40
239.10
124.80
7.49

Per
Hour
Hour
Hour

9.82

Hour

Rate
454.40
239.10
124.80
6.24

Per
Hour
Hour
Hour

8.18

B) For Rubble/Size stones/Cut stones/Coarse aggregates (per Cum):


1 Lead up to 1 Km:
Out put
=
5.00 Cum
Rate
0.15 Hrs. hire charges of Tipper 5.00 Cum @ Rs.
454.40
0.15 Hrs. fuel charges of Tipper 5.00 Cum @ Rs.
239.10
0.15 Hrs. crew charges of Tipper 5.00 Cum @ Rs.
124.80
0.00 add area allowance at 0% on Rs.
18.72
Rate for
5.00 Cum
Rate for
1.00 Cum
0.00 add overheads and contractors profit at 0% on
24.55

Per
Hour
Hour
Hour

Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.

81.29
42.43
0.00
278.22
55.64
0.00
55.64

Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.

Amount
181.76
95.64
49.92
0.00
327.32
65.46
0.00
65.46

Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.

Amount
27.26
14.35
7.49
0.00
49.10
9.82
0.00
9.82

Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.

Amount
22.72
11.96
6.24
0.00
40.92
8.18
0.00
8.18

Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.

Amount
68.16
35.87
18.72
0.00
122.75
24.55
0.00

Total rate for


2

1.00 Cum

Lead up to 2 Km:
Out put
=
5.00 Cum
0.21 Hrs. hire charges of Tipper 5.00 Cum @ Rs.
0.21 Hrs. fuel charges of Tipper 5.00 Cum @ Rs.
0.21 Hrs. crew charges of Tipper 5.00 Cum @ Rs.
0.00 add area allowance at 0% on Rs.
Rate for
5.00 Cum
Rate for
1.00 Cum
0.00 add overheads and contractors profit at 0% on
Total rate for
1.00 Cum
Lead up to 3 Km:
Out put
=
5.00 Cum
0.28 Hrs. hire charges of Tipper 5.00 Cum @ Rs.
0.28 Hrs. fuel charges of Tipper 5.00 Cum @ Rs.
0.28 Hrs. crew charges of Tipper 5.00 Cum @ Rs.
0.00 add area allowance at 0% on Rs.
Rate for
5.00 Cum
Rate for
1.00 Cum
0.00 add overheads and contractors profit at 0% on
Rs. rate for
Total
1.00 Cum
Lead up to 4 Km:
Out put
=
5.00 Cum
0.34 Hrs. hire charges of Tipper 5.00 Cum @ Rs.
0.34 Hrs. fuel charges of Tipper 5.00 Cum @ Rs.
0.34 Hrs. crew charges of Tipper 5.00 Cum @ Rs.
0.00 add area allowance at 0% on Rs.
Rate for
5.00 Cum
Rate for
1.00 Cum
0.00 add overheads and contractors profit at 0% on
Total rate for
1.00 Cum
Lead up to 5 Km:
Out put
=
5.00 Cum
0.40 Hrs. hire charges of Tipper 5.00 Cum @ Rs.
0.40 Hrs. fuel charges of Tipper 5.00 Cum @ Rs.
0.40 Hrs. crew charges of Tipper 5.00 Cum @ Rs.
0.00 add area allowance at 0% on Rs.
Rate for
5.00 Cum
Rate for
1.00 Cum
0.00 add overheads and contractors profit at 0% on
Total rate for
1.00 Cum
Lead for every Km from 5 to 30 Km:
Out put
=
5.00 Cum
0.06 Hrs. hire charges of Tipper 5.00 Cum @ Rs.
0.06 Hrs. fuel charges of Tipper 5.00 Cum @ Rs.
0.06 Hrs. crew charges of Tipper 5.00 Cum @ Rs.

Rate
454.40
239.10
124.80
26.21

Per
Hour
Hour
Hour

34.37

Hour

Rate
454.40
239.10
124.80
34.94

Per
Hour
Hour
Hour

45.82

Hour

Rate
454.40
239.10
124.80
42.43

Per
Hour
Hour
Hour

55.64

Hour

Rate
454.40
239.10
124.80
49.92

Per
Hour
Hour
Hour

65.46

Hour

Rate
454.40
239.10
124.80

Per
Hour
Hour
Hour

Rs.

24.55

Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.

Amount
95.42
50.21
26.21
0.00
171.84
34.37
0.00
34.37

Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.

Amount
127.23
66.95
34.94
0.00
229.12
45.82
0.00
45.82

Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.

Amount
154.50
81.29
42.43
0.00
278.22
55.64
0.00
55.64

Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.

Amount
181.76
95.64
49.92
0.00
327.32
65.46
0.00
65.46

Rs.
Rs.
Rs.

Amount
27.26
14.35
7.49

0.00 add area allowance at 0% on Rs.


Rate for
5.00 Cum
Rate for
1.00 Cum
0.00 add overheads and contractors profit at 0% on
Rs. rate for
Total
1.00 Cum
7

Lead for every Km beyond 30 Km:


Out put
=
5.00 Cum
0.05 Hrs. hire charges of Tipper 5.00 Cum @ Rs.
0.05 Hrs. fuel charges of Tipper 5.00 Cum @ Rs.
0.05 Hrs. crew charges of Tipper 5.00 Cum @ Rs.
0.00 add area allowance at 0% on Rs.
Rate for
5.00 Cum
Rate for
1.00 Cum
0.00 add overheads and contractors profit at 0% on
Total rate for
1.00 Cum

7.49

9.82

Hour

Rate
454.40
239.10
124.80
6.24

Per
Hour
Hour
Hour

8.18

C) For Cement/Steel/RCC poles/A.C & G.I sheets/Packed materials (per Tonne):


1 Lead up to 1 Km:
Out put
=
8.00 MT
Rate
Per
0.15 Hrs. hire charges of Tipper 5.00 Cum @ Rs.
454.40
Hour
0.15 Hrs. fuel charges of Tipper 5.00 Cum @ Rs.
239.10
Hour
0.15 Hrs. crew charges of Tipper 5.00 Cum @ Rs.
124.80
Hour
0.00 add area allowance at 0% on Rs.
18.72
Rate for
8.00 MT
Rate for
1.00 MT
0.00 add overheads and contractors profit at 0% on
15.34
Total rate for
1.00 MT
2

Lead up to 2 Km:
Out put
=
8.00 MT
0.21 Hrs. hire charges of Tipper 5.00 Cum @ Rs.
0.21 Hrs. fuel charges of Tipper 5.00 Cum @ Rs.
0.21 Hrs. crew charges of Tipper 5.00 Cum @ Rs.
0.00 add area allowance at 0% on Rs.
Rate for
8.00 MT
Rate for
1.00 MT
0.00 add overheads and contractors profit at 0% on
Rs. rate for
Total
1.00 MT
Lead up to 3 Km:
Out put
=
8.00 MT
0.28 Hrs. hire charges of Tipper 5.00 Cum @ Rs.
0.28 Hrs. fuel charges of Tipper 5.00 Cum @ Rs.
0.28 Hrs. crew charges of Tipper 5.00 Cum @ Rs.
0.00 add area allowance at 0% on Rs.
Rate for
8.00 MT
Rate for
1.00 MT
0.00 add overheads and contractors profit at 0% on
Total rate for
1.00 MT

Rate
454.40
239.10
124.80
26.21

Per
Hour
Hour
Hour

21.48

Hour

Rate
454.40
239.10
124.80
34.94

Per
Hour
Hour
Hour

28.64

Hour

Rs.
Rs.
Rs.
Rs.
Rs.

0.00
49.10
9.82
0.00
9.82

Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.

Amount
22.72
11.96
6.24
0.00
40.92
8.18
0.00
8.18

Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.

Amount
68.16
35.87
18.72
0.00
122.75
15.34
0.00
15.34

Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.

Amount
95.42
50.21
26.21
0.00
171.84
21.48
0.00
21.48

Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.

Amount
127.23
66.95
34.94
0.00
229.12
28.64
0.00
28.64

Lead up to 4 Km:
Out put
=
8.00 MT
0.34 Hrs. hire charges of Tipper 5.00 Cum @ Rs.
0.34 Hrs. fuel charges of Tipper 5.00 Cum @ Rs.
0.34 Hrs. crew charges of Tipper 5.00 Cum @ Rs.
0.00 add area allowance at 0% on Rs.
Rate for
8.00 MT
Rate for
1.00 MT
0.00 add overheads and contractors profit at 0% on
Rs. rate for
Total
1.00 MT
Lead up to 5 Km:
Out put
=
8.00 MT
0.40 Hrs. hire charges of Tipper 5.00 Cum @ Rs.
0.40 Hrs. fuel charges of Tipper 5.00 Cum @ Rs.
0.40 Hrs. crew charges of Tipper 5.00 Cum @ Rs.
0.00 add area allowance at 0% on Rs.
Rate for
8.00 MT
Rate for
1.00 MT
0.00 add overheads and contractors profit at 0% on
Total rate for
1.00 MT
Lead for every Km from 5 to 30 Km:
Out put
=
8.00 MT
0.06 Hrs. hire charges of Tipper 5.00 Cum @ Rs.
0.06 Hrs. fuel charges of Tipper 5.00 Cum @ Rs.
0.06 Hrs. crew charges of Tipper 5.00 Cum @ Rs.
0.00 add area allowance at 0% on Rs.
Rate for
8.00 MT
Rate for
1.00 MT
0.00 add overheads and contractors profit at 0% on
Rs. rate for
Total
1.00 MT
Lead for every Km beyond 30 Km:
Out put
=
8.00 MT
0.05 Hrs. hire charges of Tipper 5.00 Cum @ Rs.
0.05 Hrs. fuel charges of Tipper 5.00 Cum @ Rs.
0.05 Hrs. crew charges of Tipper 5.00 Cum @ Rs.
0.00 add area allowance at 0% on Rs.
Rate for
8.00 MT
Rate for
1.00 MT
0.00 add overheads and contractors profit at 0% on
Rs. rate for
Total
1.00 MT

Rate
454.40
239.10
124.80
42.43

Per
Hour
Hour
Hour

34.78

Hour

Rate
454.40
239.10
124.80
49.92

Per
Hour
Hour
Hour

40.92

Hour

Rate
454.40
239.10
124.80
7.49

Per
Hour
Hour
Hour

6.14

Hour

Rate
454.40
239.10
124.80
6.24

Per
Hour
Hour
Hour

5.12

D) For PCC Slabs/Shabad Slabs/CC & Laterite Blocks/Wood (per Cum):


1 Lead up to 1 Km:
Out put
=
3.40 Cum
Rate
0.15 Hrs. hire charges of Tipper 5.00 Cum @ Rs.
454.40
0.15 Hrs. fuel charges of Tipper 5.00 Cum @ Rs.
239.10
0.15 Hrs. crew charges of Tipper 5.00 Cum @ Rs.
124.80
0.00 add area allowance at 0% on Rs.
18.72

Per
Hour
Hour
Hour

Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.

Amount
154.50
81.29
42.43
0.00
278.22
34.78
0.00
34.78

Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.

Amount
181.76
95.64
49.92
0.00
327.32
40.92
0.00
40.92

Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.

Amount
27.26
14.35
7.49
0.00
49.10
6.14
0.00
6.14

Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.

Amount
22.72
11.96
6.24
0.00
40.92
5.12
0.00
5.12

Rs.
Rs.
Rs.
Rs.

Amount
68.16
35.87
18.72
0.00

Rate for
3.40 Cum
Rate for
1.00 Cum
0.00 add overheads and contractors profit at 0% on
Total rate for
1.00 Cum
2

Lead up to 2 Km:
Out put
=
3.40 Cum
0.21 Hrs. hire charges of Tipper 5.00 Cum @ Rs.
0.21 Hrs. fuel charges of Tipper 5.00 Cum @ Rs.
0.21 Hrs. crew charges of Tipper 5.00 Cum @ Rs.
0.00 add area allowance at 0% on Rs.
Rate for
3.40 Cum
Rate for
1.00 Cum
0.00 add overheads and contractors profit at 0% on
Total rate for
1.00 Cum
Lead up to 3 Km:
Out put
=
3.40 Cum
0.28 Hrs. hire charges of Tipper 5.00 Cum @ Rs.
0.28 Hrs. fuel charges of Tipper 5.00 Cum @ Rs.
0.28 Hrs. crew charges of Tipper 5.00 Cum @ Rs.
0.00 add area allowance at 0% on Rs.
Rate for
3.40 Cum
Rate for
1.00 Cum
0.00 add overheads and contractors profit at 0% on
Rs. rate for
Total
1.00 Cum
Lead up to 4 Km:
Out put
=
3.40 Cum
0.34 Hrs. hire charges of Tipper 5.00 Cum @ Rs.
0.34 Hrs. fuel charges of Tipper 5.00 Cum @ Rs.
0.34 Hrs. crew charges of Tipper 5.00 Cum @ Rs.
0.00 add area allowance at 0% on Rs.
Rate for
3.40 Cum
Rate for
1.00 Cum
0.00 add overheads and contractors profit at 0% on
Total rate for
1.00 Cum
Lead up to 5 Km:
Out put
=
3.40 Cum
0.40 Hrs. hire charges of Tipper 5.00 Cum @ Rs.
0.40 Hrs. fuel charges of Tipper 5.00 Cum @ Rs.
0.40 Hrs. crew charges of Tipper 5.00 Cum @ Rs.
0.00 add area allowance at 0% on Rs.
Rate for
3.40 Cum
Rate for
1.00 Cum
0.00 add overheads and contractors profit at 0% on
Rs. rate for
Total
1.00 Cum
Lead for every Km from 5 to 30 Km:
Out put
=
3.40 Cum

36.10

Rate
454.40
239.10
124.80
26.21

Per
Hour
Hour
Hour

50.54

Hour

Rate
454.40
239.10
124.80
34.94

Per
Hour
Hour
Hour

67.39

Hour

Rate
454.40
239.10
124.80
42.43

Per
Hour
Hour
Hour

81.83

Hour

Rate
454.40
239.10
124.80
49.92

Per
Hour
Hour
Hour

96.27

Hour

Rate

Per

Rs.
Rs.
Rs.
Rs.

122.75
36.1
0.00
36.10

Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.

Amount
95.42
50.21
26.21
0.00
171.84
50.54
0.00
50.54

Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.

Amount
127.23
66.95
34.94
0.00
229.12
67.39
0.00
67.39

Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.

Amount
154.50
81.29
42.43
0.00
278.22
81.83
0.00
81.83

Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.

Amount
181.76
95.64
49.92
0.00
327.32
96.27
0.00
96.27

Amount

0.06
0.06
0.06
0.00

Hrs. hire charges of Tipper 5.00 Cum @ Rs.


Hrs. fuel charges of Tipper 5.00 Cum @ Rs.
Hrs. crew charges of Tipper 5.00 Cum @ Rs.
add area allowance at 0% on Rs.
Rate for
3.40 Cum
Rate for
1.00 Cum
0.00 add overheads and contractors profit at 0% on
Total rate for
1.00 Cum
7

Lead for every Km beyond 30 Km:


Out put
=
3.40 Cum
0.05 Hrs. hire charges of Tipper 5.00 Cum @ Rs.
0.05 Hrs. fuel charges of Tipper 5.00 Cum @ Rs.
0.05 Hrs. crew charges of Tipper 5.00 Cum @ Rs.
0.00 add area allowance at 0% on Rs.
Rate for
3.40 Cum
Rate for
1.00 Cum
0.00 add overheads and contractors profit at 0% on
Total rate for
1.00 Cum

E) For Water (per 1000 Ltrs):


1 Lead up to 1 Km:
Out put
=
8000 Ltrs
0.15 Hrs. hire charges of water tanker
0.15 Hrs. fuel charges of water tanker
capacity
@ Rs.
0.15 Hrs.
crew
charges of water tanker
capacity
Rs.
0.00 add
area@
allowance
at 0% on Rs.
Rate for
8000 Ltrs
Rate for
1000 Ltrs
0.00 add overheads and contractors profit
Total rate for
1000 Ltrs
2

Lead up to 2 Km:
Out put
=
8000 Ltrs
0.21 Hrs. hire charges of water tanker
0.21 Hrs. fuel charges of water tanker
0.21 Hrs. crew charges of water tanker
capacity
Rs.
0.00 add
area@
allowance
at 0% on Rs.
Rate for
8000 Ltrs
Rate for
1000 Ltrs
0.00 add overheads and contractors profit
Rs. rate for
Total
1000 Ltrs

454.40
239.10
124.80
7.49

Hour
Hour
Hour

14.44

Hour

Rate
454.40
239.10
124.80
6.24

Per
Hour
Hour
Hour

12.04

8000 ltrs
8000 ltrs
8000 ltrs

Rate
408.80
239.10
117.00
17.55

at 0% on

14.34

8000 ltrs
8000 ltrs
8000 ltrs

Rate
408.80
239.10
117.00
24.57

at 0% on

20.08

Lead up to 3 Km:
Out put
=
8000 Ltrs
0.28 Hrs. hire charges of water tanker 8000 ltrs
capacity
Rs.
0.28 Hrs.
fuel@ charges
of water tanker 8000 ltrs
capacity
@
Rs.
0.28 Hrs. crew charges of water tanker 8000 ltrs
0.00 add area allowance at 0% on Rs.
Rate for
8000 Ltrs
Rate for
1000 Ltrs

Rate
408.80
239.10
117.00
32.76

Per
Hour
Hour
Hour

Per
Hour
Hour
Hour

Per
Hour
Hour
Hour

Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.

27.26
14.35
7.49
0.00
49.10
14.44
0.00
14.44

Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.

Amount
22.72
11.96
6.24
0.00
40.92
12.04
0.00
12.04

Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.

Amount
61.32
35.87
17.55
0.00
114.74
14.34
0.00
14.34

Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.

Amount
85.85
50.21
24.57
0.00
160.63
20.08
0.00
20.08

Rs.
Rs.
Rs.
Rs.
Rs.
Rs.

Amount
114.46
66.95
32.76
0.00
214.17
26.77

0.00 add overheads and contractors profit at 0% on


Rs. rate for
Total
1000 Ltrs
4

Lead up to 4 Km:
Out put
=
8000 Ltrs
0.34 Hrs. hire charges of water tanker
0.34 Hrs. fuel charges of water tanker
0.34 Hrs. crew charges of water tanker
0.00 add area allowance at 0% on Rs.
Rate for
8000 Ltrs
Rate for
1000 Ltrs
0.00 add overheads and contractors profit
Total rate for
1000 Ltrs
Lead up to 5 Km:
Out put
=
8000 Ltrs
0.40 Hrs. hire charges of water tanker
Rs.
0.40 capacity
Hrs. fuel@ charges
of water tanker
0.40 Hrs. crew charges of water tanker
0.00 add area allowance at 0% on Rs.
Rate for
8000 Ltrs
Rate for
1000 Ltrs
0.00 add overheads and contractors profit
Total rate for
1000 Ltrs
Lead for every Km from 5 to 30 Km:
Out put
=
8000 Ltrs
0.06 Hrs. hire charges of water tanker
0.06 Hrs. fuel charges of water tanker
0.06 Hrs. crew charges of water tanker
0.00 add area allowance at 0% on Rs.
Rate for
8000 Ltrs
Rate for
1000 Ltrs
0.00 add overheads and contractors profit
Total rate for
1000 Ltrs
Lead for every Km beyond 30 Km:
Out put
=
8000 Ltrs
0.05 Hrs. hire charges of water tanker
0.05 Hrs. fuel charges of water tanker
0.05 Hrs. crew charges of water tanker
capacity
Rs.
0.00 add
area@
allowance
at 0% on Rs.
Rate for
8000 Ltrs
Rate for
1000 Ltrs
0.00 add overheads and contractors profit
Total rate for
1000 Ltrs

26.77

8000 ltrs
8000 ltrs
8000 ltrs

Rate
408.80
239.10
117.00
39.78

at 0% on

32.51

8000 ltrs
8000 ltrs
8000 ltrs

Rate
408.80
239.10
117.00
46.80

at 0% on

38.25

8000 ltrs
8000 ltrs
8000 ltrs

Rate
408.80
239.10
117.00
7.02

at 0% on

5.74

8000 ltrs
8000 ltrs
8000 ltrs

Rate
408.80
239.10
117.00
5.85

at 0% on

4.78

F) For Bricks (per 1000 Nos):


1 Lead up to 1 Km:
Out put
=
3000 Nos
0.15 Hrs. hire charges of Truck 10 Tonnes capacity @

Rate
424.50

Per
Hour
Hour
Hour

Per
Hour
Hour
Hour

Per
Hour
Hour
Hour

Per
Hour
Hour
Hour

Per
Hour

Rs.
Rs.

0.00
26.77

Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.

Amount
138.99
81.29
39.78
0.00
260.06
32.51
0.00
32.51

Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.

Amount
163.52
95.64
46.80
0.00
305.96
38.25
0.00
38.25

Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.

Amount
24.53
14.35
7.02
0.00
45.90
5.74
0.00
5.74

Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.

Amount
20.44
11.96
5.85
0.00
38.25
4.78
0.00
4.78

Rs.

Amount
63.68

0.15 Hrs. fuel charges of Truck 10 Tonnes capacity @


0.15 Rs.
Hrs. crew charges of Truck 10 Tonnes capacity
0.00 add area allowance at 0% on Rs.
Rate for
3000 Nos
Rate for
1000 Nos
0.00 add overheads and contractors profit at 0% on
Total rate for
1000 Nos
2

Lead up to 2 Km:
Out put
=
3000 Nos
0.21 Hrs. hire charges of Truck 10 Tonnes capacity @
0.21 Hrs. fuel charges of Truck 10 Tonnes capacity @
0.21 Hrs. crew charges of Truck 10 Tonnes capacity
0.00 add area allowance at 0% on Rs.
Rate for
3000 Nos
Rate for
1000 Nos
0.00 add overheads and contractors profit at 0% on
Rs. rate for
Total
1000 Nos
Lead up to 3 Km:
Out put
=
3000 Nos
0.28 Hrs. hire charges of Truck 10 Tonnes capacity @
0.28 Rs.
Hrs. fuel charges of Truck 10 Tonnes capacity @
0.28 Hrs. crew charges of Truck 10 Tonnes capacity
0.00 add area allowance at 0% on Rs.
Rate for
3000 Nos
Rate for
1000 Nos
0.00 add overheads and contractors profit at 0% on
Total rate for
1000 Nos
Lead up to 4 Km:
Out put
=
3000 Nos
0.34 Hrs. hire charges of Truck 10 Tonnes capacity @
0.34 Hrs. fuel charges of Truck 10 Tonnes capacity @
0.34 Hrs. crew charges of Truck 10 Tonnes capacity
0.00 add area allowance at 0% on Rs.
Rate for
3000 Nos
Rate for
1000 Nos
0.00 add overheads and contractors profit at 0% on
Total rate for
1000 Nos
Lead up to 5 Km:
Out put
=
3000 Nos
0.40 Hrs. hire charges of Truck 10 Tonnes capacity @
0.40 Hrs. fuel charges of Truck 10 Tonnes capacity @
0.40 Hrs. crew charges of Truck 10 Tonnes capacity
@ Rs.
0.00 add
area allowance at 0% on Rs.
Rate for
3000 Nos
Rate for
1000 Nos
0.00 add overheads and contractors profit at 0% on
Total rate for
1000 Nos

239.10
117.00
17.55

Hour
Hour

39.03

Rate
424.50
239.10
117.00
24.57

Per
Hour
Hour
Hour

54.64

Rate
424.50
239.10
117.00
32.76

Per
Hour
Hour
Hour

72.86

Rate
424.50
239.10
117.00
39.78

Per
Hour
Hour
Hour

88.47

Rate
424.50
239.10
117.00
46.80

104.08

Per
Hour
Hour
Hour

Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.

35.87
17.55
0.00
117.10
39.03
0.00
39.03

Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.

Amount
89.15
50.21
24.57
0.00
163.93
54.64
0.00
54.64

Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.

Amount
118.86
66.95
32.76
0.00
218.57
72.86
0.00
72.86

Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.

Amount
144.33
81.29
39.78
0.00
265.40
88.47
0.00
88.47

Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.

Amount
169.80
95.64
46.80
0.00
312.24
104.08
0.00
104.08

Lead for every Km beyond 5 Kms up to 30 Kms:


Out put
=
3000 Nos
0.06 Hrs. hire charges of Truck 10 Tonnes capacity @
0.06 Rs.
Hrs. fuel charges of Truck 10 Tonnes capacity @
0.06 Rs.
Hrs. crew charges of Truck 10 Tonnes capacity
0.00 add area allowance at 0% on Rs.
Rate for
3000 Nos
Rate for
1000 Nos
0.00 add overheads and contractors profit at 0% on
Rs. rate for
Total
1000 Nos
Lead for every Km beyond 30 Kms:
Out put
=
3000 Nos
0.05 Hrs. hire charges of Truck 10 Tonnes capacity @
0.05 Hrs. fuel charges of Truck 10 Tonnes capacity @
0.05 Rs.
Hrs. crew charges of Truck 10 Tonnes capacity
@ Rs.
0.00 add
area allowance at 0% on Rs.
Rate for
3000 Nos
Rate for
1000 Nos
0.00 add overheads and contractors profit at 0% on
Rs. rate for
Total
1000 Nos

Rate
424.50
239.10
117.00
7.02

Per
Hour
Hour
Hour

15.61

Rate
424.50
239.10
117.00
5.85

Per
Hour
Hour
Hour

13.01

Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.

Amount
25.47
14.35
7.02
0.00
46.84
15.61
0.00
15.61

Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.

Amount
21.23
11.96
5.85
0.00
39.04
13.01
0.00
13.01

LOADING & UNLOADING CHARGES BY MANUAL MEANS (EXCLUDING IDLE HIRE CHARGES OF
A) For Earth, Sand, Morrum, Manure, Fly Ash (per Cum):
(i) Loading charges:
Out put
=
5.50 Cum
Rate
Per
Amount
a) Labour:
0.01 day Head mazdoor
320.00
day
Rs.
3.20
0.25 day Mazdoor
280.00
day
Rs.
70.00
Rs.
73.20
0.00 add area allowance at 0% on Rs.
73.20
Rs.
0.00
Total labour charges
Rs.
73.20
Rate for
5.50 Cum
Rs.
73.20
Rate for
1.00 Cum
Rs.
13.31
0.00 add overheads and contractors profit at 0% on
13.31
Rs.
0.00
Total rate for
1.00 Cum
Rs.
13.31
(ii) Unloading charges:
Out put
=
5.50 Cum
a) Labour:
0.005 day Head mazdoor
0.125 day Mazdoor
0.00 add area allowance at 0% on Rs.
Total labour charges
Rate for
5.50 Cum
Rate for
1.00 Cum
0.00 add overheads and contractors profit at 0% on
Total rate for
1.00 Cum

Rate

Per

320.00
280.00

day
day

36.60

6.65

Amount
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.

1.60
35.00
36.60
0.00
36.60
36.60
6.65
0.00
6.65

B) For Lime, Agrregate, Stone Boulder, Brick aggregate, Kankar, Building rubbish, Crushed slag,
Stone
for masonry
(i) Loading
charges:work (per Cum):
Out put

=
5.50 Cum
a) Labour:
0.02 day Head mazdoor
0.50 day Mazdoor
0.00 add area allowance at 0% on Rs.
Total labour charges
Rate for
5.50 Cum
Rate for
1.00 Cum
0.00 add overheads and contractors profit at 0% on
Total rate for
1.00 Cum

(ii) Unloading charges:


Out put
=
5.50 Cum
a) Labour:
0.01 day Head mazdoor
0.25 day Mazdoor
0.00 add area allowance at 0% on Rs.
Total labour charges
Rate for
5.50 Cum
Rate for
1.00 Cum
0.00 add overheads and contractors profit at 0% on
Rs. rate for
Total
1.00 Cum
C) For Cement (per Tonne):
(i) Loading charges:
Out put
=
10.00 MT
a) Labour:
0.06 day Head mazdoor
1.50 day Mazdoor
0.00 add area allowance at 0% on Rs.
Total labour charges
Rate for
10.00 MT
Rate for
1.00 MT
0.00 add overheads and contractors profit at 0% on
Total rate for
1.00 MT
(ii) Unloading & Stacking charges:
Out put
=
10.00 MT
a) Labour:
0.06 day Head mazdoor
1.50 day Mazdoor
0.00 add area allowance at 0% on Rs.
Total labour charges
Rate for
10.00 MT
Rate for
1.00 MT

Rate

Per

320.00
280.00

day
day

146.40

26.62

Rate

Per

320.00
280.00

day
day

73.20

13.31

Rate

Per

320.00
280.00

day
day

439.20

43.92

Rate

Per

320.00
280.00

day
day

439.20

Amount
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.

6.40
140.00
146.40
0.00
146.40
146.40
26.62
0.00
26.62

Amount
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.

3.20
70.00
73.20
0.00
73.20
73.20
13.31
0.00
13.31

Amount
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.

19.20
420.00
439.20
0.00
439.20
439.20
43.92
0.00
43.92

Amount
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.

19.20
420.00
439.20
0.00
439.20
439.20
43.92

0.00 add overheads and contractors profit at 0% on


Rs. rate for
Total
1.00 MT
D) For Structural steel, Steel bars (per Tonne):
(i) Loading charges:
Out put
=
10.00 MT
a) Labour:
0.07 day Head mazdoor
1.80 day Mazdoor
0.00 add area allowance at 0% on Rs.
Total labour charges
Rate for
10.00 MT
Rate for
1.00 MT
0.00 add overheads and contractors profit at 0% on
Total rate for
1.00 MT
(ii) Unloading & Stacking charges:
Out put
=
10.00 MT
a) Labour:
0.07 day Head mazdoor
1.80 day Mazdoor
0.00 add area allowance at 0% on Rs.
Total labour charges
Rate for
10.00 MT
Rate for
1.00 MT
0.00 add overheads and contractors profit at 0% on
Total rate for
1.00 MT
E) For Bricks of size 225 x 140 x 70mm (per 1000 Nos):
(i) Loading charges:
Out put
=
2000.00 Nos
a) Labour:
0.01 day Head mazdoor
0.25 day Mazdoor
0.00 add area allowance at 0% on Rs.
Total labour charges
Rate for
2000 Nos
Rate for
1000 Nos
0.00 add overheads and contractors profit at 0% on
Rs. rate for
Total
1000 Nos
(ii) Unloading & Stacking charges:
Out put
=
2000.00 Nos
a) Labour:
0.01 day Head mazdoor
0.25 day Mazdoor
0.00 add area allowance at 0% on Rs.

43.92

Rs.
Rs.

Rate

Per

320.00
280.00

day
day

526.40

52.64

Rate

Per

320.00
280.00

day
day

526.40

52.64

Rate

Per

320.00
280.00

day
day

73.20

36.60

Rate

Per

320.00
280.00

day
day

73.20

0.00
43.92

Amount
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.

22.40
504.00
526.40
0.00
526.40
526.40
52.64
0.00
52.64

Amount
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.

22.40
504.00
526.40
0.00
526.40
526.40
52.64
0.00
52.64

Amount
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.

3.20
70.00
73.20
0.00
73.20
73.20
36.60
0.00
36.60

Amount
Rs.
Rs.
Rs.
Rs.

3.20
70.00
73.20
0.00

Total labour charges


Rate for
2000 Nos
Rate for
1000 Nos
0.00 add overheads and contractors profit at 0% on
Rs. rate for
Total
1000 Nos

Rs.
Rs.
Rs.
Rs.
Rs.

36.60

73.20
73.20
36.60
0.00
36.60

LOADING & UNLOADING CHARGES BY MANUAL MEANS (INCLUDING IDLE HIRE CHARGES OF
A) For Earth, Sand, Morrum, Manure, Fly Ash (per Cum):
(i) Loading charges:
Out put
=
5.50 Cum
Rate
Per
Amount
a) Labour:
0.01 day Head mazdoor
320.00
day
Rs.
3.20
0.25 day Mazdoor
280.00
day
Rs.
70.00
Rs.
73.20
0.00 add area allowance at 0% on Rs.
73.20
Rs.
0.00
Total labour charges
Rs.
73.20
b) Machinery:
0.50 Hrs. hire charges of Truck 10 Tonnes capacity @ 424.50
Hour
Rs.
212.25
0.50 Hrs. fuel charges of Truck 10 Tonnes capacity @ 239.10
Hour
Rs.
119.55
0.50 Hrs. crew charges of Truck 10 Tonnes capacity 117.00
Hour
Rs.
58.50
0.00 add area allowance at 0% on Rs.
58.50
Rs.
0.00
Total machinery charges
Rs.
390.30
Total labour and machinery charges
Rs.
463.50
Rate for
5.50 Cum
Rs.
463.50
Rate for
1.00 Cum
Rs.
84.27
0.00 add overheads and contractors profit at 0% on
84.27
Rs.
0.00
Rs. rate for
Total
1.00 Cum
Rs.
84.27
(ii) Unloading charges:
Out put
=
5.50 Cum
a) Labour:
0.005 day Head mazdoor
0.125 day Mazdoor
0.00 add area allowance at 0% on Rs.
Total labour charges
b) Machinery:
0.166 Hrs. hire charges of Truck 10 Tonnes capacity @
0.166 Rs.
Hrs. fuel charges of Truck 10 Tonnes capacity @
0.166 Hrs. crew charges of Truck 10 Tonnes capacity
0.00 add area allowance at 0% on Rs.
Total machinery charges
Total labour and machinery charges
Rate for
5.50 Cum
Rate for
1.00 Cum
0.00 add overheads and contractors profit at 0% on
Rs. rate for
Total
1.00 Cum

Rate

Per

320.00
280.00

day
day

Rs.
Rs.
Rs.
Rs.
Rs.

1.60
35.00
36.60
0.00
36.60

Hour
Hour
Hour

Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.

70.47
39.69
19.42
0.00
129.58
166.18
166.18
30.21
0.00
30.21

36.60

424.50
239.10
117.00
19.42

30.21

Amount

B) For Lime, Agrregate, Stone Boulder, Brick aggregate, Kankar, Building rubbish, Crushed slag,
(i) Loading charges:
Out put
=
5.50 Cum
Rate
Per
Amount

a) Labour:
0.02 day Head mazdoor
0.50 day Mazdoor
0.00 add area allowance at 0% on Rs.
Total labour charges
b) Machinery:
0.50 Hrs. hire charges of Truck 10 Tonnes capacity @
0.50 Hrs. fuel charges of Truck 10 Tonnes capacity @
0.50 Rs.
Hrs. crew charges of Truck 10 Tonnes capacity
@ Rs.
0.00 add
area allowance at 0% on Rs.
Total machinery charges
Total labour and machinery charges
Rate for
5.50 Cum
Rate for
1.00 Cum
0.00 add overheads and contractors profit at 0% on
Rs. rate for
Total
1.00 Cum
(ii) Unloading charges:
Out put
=
5.50 Cum
a) Labour:
0.01 day Head mazdoor
0.25 day Mazdoor
0.00 add area allowance at 0% on Rs.
Total labour charges
b) Machinery:
0.25 Hrs. hire charges of Truck 10 Tonnes capacity @
0.25 Hrs. fuel charges of Truck 10 Tonnes capacity @
0.25 Hrs. crew charges of Truck 10 Tonnes capacity
0.00 add area allowance at 0% on Rs.
Total machinery charges
Total labour and machinery charges
Rate for
5.50 Cum
Rate for
1.00 Cum
0.00 add overheads and contractors profit at 0% on
Total rate for
1.00 Cum
C) For Cement (per Tonne):
(i) Loading charges:
Out put
=
10.00 MT
a) Labour:
0.06 day Head mazdoor
1.50 day Mazdoor
0.00 add area allowance at 0% on Rs.
Total labour charges
b) Machinery:
1.00 Hrs. hire charges of Truck 10 Tonnes capacity @
1.00 Hrs. fuel charges of Truck 10 Tonnes capacity @
1.00 Hrs. crew charges of Truck 10 Tonnes capacity

320.00
280.00

day
day

Rs.
Rs.
Rs.
Rs.
Rs.

6.40
140.00
146.40
0.00
146.40

Hour
Hour
Hour

Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.

212.25
119.55
58.50
0.00
390.30
536.70
536.70
97.58
0.00
97.58

146.40

424.50
239.10
117.00
58.50

97.58

Rate

Per

320.00
280.00

day
day

Rs.
Rs.
Rs.
Rs.
Rs.

3.20
70.00
73.20
0.00
73.20

Hour
Hour
Hour

Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.

106.13
59.78
29.25
0.00
195.16
268.36
268.36
48.79
0.00
48.79

73.20

424.50
239.10
117.00
29.25

48.79

Amount

Rate

Per

320.00
280.00

day
day

Rs.
Rs.
Rs.
Rs.
Rs.

19.20
420.00
439.20
0.00
439.20

Hour
Hour
Hour

Rs.
Rs.
Rs.

424.50
239.10
117.00

439.20

424.50
239.10
117.00

Amount

0.00 add area allowance at 0% on Rs.


Total machinery charges
Total labour and machinery charges
Rate for
10.00 MT
Rate for
1.00 MT
0.00 add overheads and contractors profit at 0% on
Total rate for
1.00 MT
(ii) Unloading & Stacking charges:
Out put
=
10.00 MT
a) Labour:
0.07 day Head mazdoor
1.80 day Mazdoor
0.00 add area allowance at 0% on Rs.
Total labour charges
b) Machinery:
1.00 Hrs. hire charges of Truck 10 Tonnes capacity @
1.00 Hrs. fuel charges of Truck 10 Tonnes capacity @
1.00 Hrs. crew charges of Truck 10 Tonnes capacity
0.00 add area allowance at 0% on Rs.
Total machinery charges
Total labour and machinery charges
Rate for
10.00 MT
Rate for
1.00 MT
0.00 add overheads and contractors profit at 0% on
Rs. rate for
Total
1.00 MT
D) For Structural steel, Steel bars (per Tonne):
(i) Loading charges:
Out put
=
10.00 MT
a) Labour:
0.07 day Head mazdoor
1.80 day Mazdoor
0.00 add area allowance at 0% on Rs.
Total labour charges
b) Machinery:
1.00 Hrs. hire charges of Truck 10 Tonnes capacity @
1.00 Hrs. fuel charges of Truck 10 Tonnes capacity @
1.00 Hrs. crew charges of Truck 10 Tonnes capacity
@ Rs.
0.00 add
area allowance at 0% on Rs.
Total machinery charges
Total labour and machinery charges
Rate for
10.00 MT
Rate for
1.00 MT
0.00 add overheads and contractors profit at 0% on
Rs. rate for
Total
1.00 MT
(ii) Unloading & Stacking charges:
Out put
=
10.00 MT

117.00

Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.

121.98

0.00
780.60
1219.80
1219.80
121.98
0.00
121.98

Rate

Per

320.00
280.00

day
day

Rs.
Rs.
Rs.
Rs.
Rs.

22.40
504.00
526.40
0.00
526.40

Hour
Hour
Hour

Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.

424.50
239.10
117.00
0.00
780.60
1307.00
1307.00
130.70
0.00
130.70

526.40

424.50
239.10
117.00
117.00

130.70

Amount

Rate

Per

320.00
280.00

day
day

Rs.
Rs.
Rs.
Rs.
Rs.

22.40
504.00
526.40
0.00
526.40

Hour
Hour
Hour

Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.

424.50
239.10
117.00
0.00
780.60
1307.00
1307.00
130.70
0.00
130.70

526.40

424.50
239.10
117.00
117.00

130.70

Rate

Per

Amount

Amount

a) Labour:
0.07 day Head mazdoor
1.80 day Mazdoor
0.00 add area allowance at 0% on Rs.
Total labour charges
b) Machinery:
1.00 Hrs. hire charges of Truck 10 Tonnes capacity @
1.00 Hrs. fuel charges of Truck 10 Tonnes capacity @
1.00 Rs.
Hrs. crew charges of Truck 10 Tonnes capacity
@ Rs.
0.00 add
area allowance at 0% on Rs.
Total machinery charges
Total labour and machinery charges
Rate for
10.00 MT
Rate for
1.00 MT
0.00 add overheads and contractors profit at 0% on
Rs. rate for
Total
1.00 MT
E) For Bricks of size 225 x 140 x 70mm (per 1000 Nos):
(i) Loading charges:
Out put
=
2000.00 Nos
a) Labour:
0.01 day Head mazdoor
0.25 day Mazdoor
0.00 add area allowance at 0% on Rs.
Total labour charges
b) Machinery:
0.33 Hrs. hire charges of Truck 10 Tonnes capacity @
0.33 Hrs. fuel charges of Truck 10 Tonnes capacity @
0.33 Hrs. crew charges of Truck 10 Tonnes capacity
@ Rs.
0.00 add
area allowance at 0% on Rs.
Total machinery charges
Total labour and machinery charges
Rate for
2000 Nos
Rate for
1000 Nos
0.00 add overheads and contractors profit at 0% on
Rs. rate for
Total
1000 Nos
(ii) Unloading & Stacking charges:
Out put
=
2000.00 Nos
a) Labour:
0.06 day Head mazdoor
1.50 day Mazdoor
0.00 add area allowance at 0% on Rs.
Total labour charges
b) Machinery:
1.00 Hrs. hire charges of Truck 10 Tonnes capacity @
1.00 Hrs. fuel charges of Truck 10 Tonnes capacity @
1.00 Hrs. crew charges of Truck 10 Tonnes capacity

320.00
280.00

day
day

Rs.
Rs.
Rs.
Rs.
Rs.

22.40
504.00
526.40
0.00
526.40

Hour
Hour
Hour

Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.

424.50
239.10
117.00
0.00
780.60
1307.00
1307.00
130.70
0.00
130.70

526.40

424.50
239.10
117.00
117.00

130.70

Rate

Per

320.00
280.00

day
day

Rs.
Rs.
Rs.
Rs.
Rs.

3.20
70.00
73.20
0.00
73.20

Hour
Hour
Hour

Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.

140.09
78.90
38.61
0.00
257.60
330.80
330.80
165.40
0.00
165.40

73.20

424.50
239.10
117.00
38.61

165.40

Amount

Rate

Per

320.00
280.00

day
day

Rs.
Rs.
Rs.
Rs.
Rs.

19.20
420.00
439.20
0.00
439.20

Hour
Hour
Hour

Rs.
Rs.
Rs.

424.50
239.10
117.00

439.20

424.50
239.10
117.00

Amount

0.00 add area allowance at 0% on Rs.


Total machinery charges
Total labour and machinery charges
Rate for
2000 Nos
Rate for
1000 Nos
0.00 add overheads and contractors profit at 0% on
Total rate for
1000 Nos

117.00

Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.

609.90

0.00
780.60
1219.80
1219.80
609.9
0.00
609.90

LOADING & UNLOADING CHARGES BY MECHANICAL MEANS (INCLUDING IDLE HIRE CHARGES OF
TRUCKS)
A) For Earth, Sand, Morrum, Manure, Fly Ash (per Cum):
(i) Loading charges:
Out put
=
5.50 Cum
Rate
Per
Amount
a) Machinery:
0.11 Hrs. hire charges of Tipper 10 Tonnes capacity
0.00
Hour
Rs.
0.00
0.11 Hrs. fuel charges of Tipper 10 Tonnes capacity @
0.00
Hour
Rs.
0.00
0.11 Hrs. crew charges of Tipper 10 Tonnes capacity
0.00
Hour
Rs.
0.00
@
Rs.
0.06 Hrs. hire charges of FE loader 1.00 Cum bucket
0.00
Hour
Rs.
0.00
45 Cum
0.06 capacity
Hrs. fuel @
charges
of@
FERs.
loader 1.00 Cum bucket
0.00
Hour
Rs.
0.00
0.06 Hrs. crew charges of FE loader 1.00 Cum bucket
0.00
Hour
Rs.
0.00
0.00 add area allowance at 0% on Rs.
0.00
Rs.
0.00
Total machinery charges
Rs.
0.00
Rate for
5.50 Cum
Rs.
0.00
Rate for
1.00 Cum
Rs.
0
0.00 add overheads and contractors profit at 0% on
0.00
Rs.
0.00
Total rate for
1.00 Cum
Rs.
0.00
(ii) Unloading charges:
Out put
=
5.50 Cum
a) Machinery:
0.08 Hrs. hire charges of Tipper 10 Tonnes capacity
0.08 Hrs. fuel charges of Tipper 10 Tonnes capacity @
0.08 Rs.
Hrs. crew charges of Tipper 10 Tonnes capacity
0.00 add area allowance at 0% on Rs.
Total machinery charges
Rate for
5.50 Cum
Rate for
1.00 Cum
0.00 add overheads and contractors profit at 0% on
Rs. rate for
Total
1.00 Cum

Rate

Per

0.00
0.00
0.00
0.00

Hour
Hour
Hour

0.00

Amount
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.

0.00
0.00
0.00
0.00
0.00
0.00
0
0.00
0.00

B) For Lime, Agrregate, Stone Boulder, Brick aggregate, Kankar, Building rubbish, Crushed slag,
(i) Loading charges:
Out put
=
5.50 Cum
Rate
Per
Amount
a) Machinery:
0.17 Hrs. hire charges of Tipper 10 Tonnes capacity
0.00
Hour
Rs.
0.00
0.17 Hrs. fuel charges of Tipper 10 Tonnes capacity @
0.00
Hour
Rs.
0.00
0.17 Hrs. crew charges of Tipper 10 Tonnes capacity
0.00
Hour
Rs.
0.00
@ Rs.
0.12 Hrs.
hire charges of FE loader 1.00 Cum bucket
0.00
Hour
Rs.
0.00
capacity
@
45
Cum
@
Rs.
0.12 Hrs. fuel charges of FE loader 1.00 Cum bucket
0.00
Hour
Rs.
0.00
0.12 Hrs. crew charges of FE loader 1.00 Cum bucket
0.00
Hour
Rs.
0.00
0.00 add area allowance at 0% on Rs.
0.00
Rs.
0.00
Total machinery charges
Rs.
0.00

Rate for
5.50 Cum
Rate for
1.00 Cum
0.00 add overheads and contractors profit at 0% on
Total rate for
1.00 Cum

0.00

Rs.
Rs.
Rs.
Rs.

0.00
0
0.00
0.00

Name of the Work :- Construction of Permanent Social Welfare Residential School complex at Mittapally (V) Siddipet (M) Med
(Under SCSP)
DATA
Overheads
14%
COMMON STANDARD SCHEDULE OF RATES FOR THE YEAR 2013-2014
0%
AGENCY / MUNICIPAL / L

ALLOWANCE

Sl.No

Total length of compound wall


total length of water supply pipe line
total length of external drainage pipe line

0 Rmt
0 Rmt
0 Rmt

Total length of internal roads

0 Rmt
LABOUR CHARGES
SSR Sl.No. Initial Rate Final Rate

Description

1
2
3
4
5
6
7
8
9
10

1st class mason


2nd class mason
1st class Brick Layer
2nd class Brick layer
1st class Painter
2nd class Painter
Head mazdoor
Man mazdoor
Woman mazdoor
Cost of binding wire

I-11
43
I-11
44
I-35
46
VII-10
III-3
III-4
CSSR-A.03

11

Labour charges for fixing flush door shutter of


any thickness fixing the door shutter to the
frame and fixtures to the door shutter

BMM-V.23

BRICK MASONRY

315.00
285.00
315.00
285.00
350.00
300.00
285.00
285.00
250.00
55.00
265.00

SCAFFOLDING CHARGES
rate per
sqm

Unit

315.00
285.00
315.00
285.00
350.00
300.00
285.00
285.00
250.00
55.00

per
per
per
per
per
per
per
per
per
per

265.00

per

(0.23M
THICK)

a) For Superstructure in FF over the rate of foundation


and basement

982

45.89

199.52

b) For Superstructure in SF over the rate of FF


superstructure

983

66.10

287.39

c) For Superstructure in 3rd floor over the rate 2nd


floor superstructre

984

86.32

375.30

d) Add for every additional floor over 2nd floor

985

0.00

0.00

Scaffolding for Plastering of walls,ceiling or painting


of roof timber,or walls where height is more than
3Mt.

1st and 2nd


986
45.90
10
2nd and 3rd
987
66.10
10
3rd and 4th
988
86.30
10
989
0.00
10
Add for every additional floor over 4th floor
CENTERING CHARGES (Providing Centring, shuttering and scaffolding with props and steel centering plates as per the approve
plan and other accessories as per the norms and stability calculations including cost and conveyance of all accessories Using Cashew

Sl

NAME OF THE STRUCTURAL MEMBER

Unit of
Material Hire charges
Measurem
ent

Labour charges

1
2
6
3
4
HIRE CHARGES FOR CENTERING & SCAFFOLDING - Unsupported height up to 3.66 M using Casurina Bellies, Bambo
Runners, Wood Posts, Steel Centering Plates etc.,
A
B
C
D
E
F
G
H
I

FOOTINGS
PEDESTALS
PLINTH BEAMS
LINTELS
CHAJJAS - SUNSHADES
COLUMNS
BEAMS
SLABS - Up to 150 mm thick
SLABS - above 150 mm - Up to 300 mm thick

per 1 cum
per 1 cum
per 1 cum
per 1 cum
per 1 sqm
per 1 cum
per 1 cum
per 1 sqm
per 1 sqm

Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.

62.00
74.00
1048.00
890.00
176.00
134.00
1347.00
151.00
157.00

Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.

J
K

SLABS - above 300 mm thick


WAFFLE - (GRID) SLABS (Rib Beams with
Slabs)

per 1 sqm
per 1 sqm

Rs.
Rs.

164.00
555.00

Rs.
Rs.

389.00
L
PERGOLA SLABS (Only Rib Beams)
per 1 sqm
Rs.
Rs.
1532.00
M
ARCH BEAMS - up to 1.5 M Span
per 1 cum
Rs.
Rs.
1553.00
N
ARCH BEAMS - above 1.5 M Span
per 1 cum
Rs.
Rs.
2890.00
O
DOME SLABS
per 1 cum
Rs.
Rs.
220.00
P
HELICAL STAIRCASES
per 1 sqm
Rs.
Rs.
HIRE CHARGES FOR CENTERING & SCAFFOLDING - Unsupported Height up to 7.32 M - Steel scaffolding pipes, jack
plates,
brackets, steel Centering Plates, etc.,
FOOTINGS
A
per 1 cum
Rs.
62.00
Rs.
PEDESTALS
B
per 1 cum
Rs.
74.00
Rs.
PLINTH
BEAMS
C
per 1 cum
Rs.
1048.00
Rs.
LINTELS
D
per 1 cum
Rs.
1603.00
Rs.
CHAJJAS
SUNSHADES
E
per 1 sqm
Rs.
317.00
Rs.
COLUMNS
F
per 1 cum
Rs.
241.00
Rs.
BEAMS
G
per 1 cum
Rs.
2427.00
Rs.
SLABS - Up to 150 mm thick
H
per 1 sqm
Rs.
273.00
Rs.
SLABS - above 150 mm - Up to 300 mm thick
I
per 1 sqm
Rs.
283.00
Rs.
SLABS - above 300 mm thick
J
per 1 sqm
Rs.
296.00
Rs.
WAFFLE - (GRID) SLABS (Rib Beams with Slabs)per 1 sqm
K
Rs.
1000.00
Rs.
PERGOLA
SLABS
(Only
Rib
Beams)
L
per 1 sqm
Rs.
701.00
Rs.
ARCH BEAMS - up to 1.5 M Span
M
per 1 cum
Rs.
2760.00
Rs.
ARCH
BEAMS
above
1.5
M
Span
N
per 1 cum
Rs.
2799.00
Rs.
DOME SLABS
O
per 1 cum
Rs.
5207.00
Rs.
HELICAL
STAIRCASES
P
per 1 sqm
Rs.
397.00
Rs.
Sl
NAME OF THE STRUCTURAL MEMBER
Unit of
Material Hire charges
Labour charges
Measurem
ent
1
A
B
C
D

2
FOOTINGS
PEDESTALS
PLINTH BEAMS
LINTELS

6
per 1 cum
per 1 cum
per 1 cum
per 1 cum

3
Rs.
Rs.
Rs.
Rs.

4
62.00
74.00
1048.00
619.00

Rs.
Rs.
Rs.
Rs.

CHAJJAS - SUNSHADES
122.00
E
per 1 sqm
Rs.
Rs.
COLUMNS
93.00
F
per 1 cum
Rs.
Rs.
BEAMS
936.00
G
per 1 cum
Rs.
Rs.
SLABS - Up to 150 mm thick
105.00
H
per 1 sqm
Rs.
Rs.
SLABS
above
150
mm
Up
to
300
mm
thick
109.00
I
per 1 sqm
Rs.
Rs.
SLABS - above 300 mm thick
114.00
J
per 1 sqm
Rs.
Rs.
WAFFLE - (GRID) SLABS (Rib Beams with Slabs)per 1 sqm
386.00
K
Rs.
Rs.
PERGOLA SLABS (Only Rib Beams)
270.00
L
per 1 sqm
Rs.
Rs.
ARCH BEAMS - up to 1.5 M Span
1065.00
M
per 1 cum
Rs.
Rs.
ARCH
BEAMS
above
1.5
M
Span
1080.00
N
per 1 cum
Rs.
Rs.
DOME SLABS
2009.00
O
per 1 cum
Rs.
Rs.
HELICAL
STAIRCASES
153.00
P
per 1 sqm
Rs.
Rs.
HIRE CHARGES FOR ACCESS SCAFFOLDING - up to 3.66 M using Casurina Bellies, Bamboos, Wooden Reapers, Run
Plates
etc.,- for
BRICK MASONRY/STONE MASONRY /WALL
PUTTY/TEXTURE
PAINTS
etc- 1 sqm
1st
Floor
A
per 1 sqm
Rs.
8.99
Rs.
2nd - Floor
B
per 1 sqm
Rs.
8.99
Rs.
3rd - Floor
C
per 1 sqm
Rs.
8.99
Rs.
4th - Floor
D
per 1 sqm
Rs.
8.99
Rs.
5th - Floor
E
per 1 sqm
Rs.
8.99
Rs.
Sl
NAME OF THE STRUCTURAL MEMBER
Unit of
Material Hire charges
Labour charges
Measurem
ent

1
2
6
3
4
HIRE CHARGES FOR ACCESS SCAFFOLDING - up to 3.66 M using Casurina Bellies, Bamboos, Wooden Reapers, Run
Plates
etc.,- for
PLASTERING TO WALLS - 1 sqm
1st
Floor
A
per 1 sqm
Rs.
0.90
Rs.
2nd - Floor
B
per 1 sqm
Rs.
0.90
Rs.
3rd - Floor
C
per 1 sqm
Rs.
0.90
Rs.
4th - Floor
D
per 1 sqm
Rs.
0.90
Rs.
5th
Floor
E
per 1 sqm
Rs.
0.90
Rs.
HIRE CHARGES FOR STAGE SCAFFOLDING - up to 3.66 M using Casurina Bellies, Bamboos, Wooden Reapers, Runn
Plates
etc.,- for
CEILING PLASTERING - 1 sqm
1st
Floor
A
per 1 sqm
Rs.
2.11
Rs.
2nd - Floor
B
per 1 sqm
Rs.
2.11
Rs.
3rd
Floor
C
per 1 sqm
Rs.
2.11
Rs.
4th - Floor
D
per 1 sqm
Rs.
2.11
Rs.
5th - Floor
E
per 1 sqm
Rs.
2.11
Rs.

CENTERING & SCAFFOLDING CHARGES- FLOOR WISE RATES for Steel scaffoldin

Lintels

Unit

per 1 cum

Chajjas - Sun
Shades
per 1 sqm

Columns

per 1 cum

1st - Floor
Material Hire for any Floor
Labour Charges for 1st Floor
Total Hire Charges (H+L)
LABOUR CHARGES for Further Floors
2nd - Floor
3rd - Floor

H
L
T

1266.00
424.00
1690.00

250.00
424.00
674.00

190.00
424.00
614.00

L
L

466.00
509.00

466.00
509.00

466.00
509.00

4th - Floor
5th - Floor

L
551.00
551.00
551.00
L
594.00
594.00
594.00
CENTERING & SCAFFOLDING CHARGES- FLOOR WISE RATES for Casurina Ballies, Bamboos, Wooden R

Lintels

Unit

per 1 cum

Chajjas - Sun
Shades
per 1 sqm

Columns

per 1 cum

1st - Floor
Material Hire for any Floor
Labour Charges for 1st Floor
Total Hire Charges (H+L)
LABOUR CHARGES for Further Floors
2nd - Floor
3rd - Floor
4th - Floor
5th - Floor

Sl.
No
1

H
L
T

279.00
361.00
640.00

55.00
361.00
416.00

42.00
361.00
403.00

L
L
L
L

397.00
433.00
469.00
505.00

397.00
433.00
469.00
505.00

397.00
433.00
469.00
505.00

total
MATERIAL RATES OF MISCELLANEOUS BUILDING ITEMS
Description of Item
SSR Sl. No
Unit
Rate
2

1
2
3

White Cement
Surya Cem or Equivalent Quality
Water proof Cement paint of Superior Quality

BMS-W.68
BMT.J.27
BMT.J.24

Kg
Kg
Kg

25.00
20.60
41.00

4
5
6

Snowcem or Equv. Quality


Oil Bound Distemper POWDER
Oil Bound Washable Distemper Acrylic based

BMT.J.26
BMT.J.20
BMT.J.21

Kg
Ltr
Kg

44.24
35.00
70.00

7
8
9
10

Wood Primer
Red Oxide Primer Paint Grade - I
Cement Primer Grade - I
Synthetic enamel paint 1st quality (All Shades)

BMT.J.05
BMT.J.03
BMT.J.01
BMT.J.30

Ltr
Ltr
Kg
Ltr

117.00
105.00
117.00
199.00

11
11
12
13
14
15
16
17

Plastic emulsion paint


Impervious Water proofing compound
Rabbit wire mesh (Chicken Mesh)
Cement Jally 50mm thick
White Glazed Tiles of any Size 1st. Quality
Glazed Colour Tiles of any size 1st quality
Ceramic tiles 7.3mm thick
Fantasy Glazed Tiles of size 200mm x 152mm

BMT.J.22
BMT.H.01
BMT.F.28
BMS.W.17
BMT.C.06
BMT.C.07
BMT.C.01
BMT.C.05

Ltr
Kg
Sqmt.
Sqmt.
Sqmt.
Sqmt.
Sqmt.
Sqmt.

211.00
24.00
13.00
352.00
314.00
372.00
419.00
543.00

18

S&F Vinyl Flooring with Tiles 1.5mm thick in rolls

19

Decorated white background glazed tiles 200mm x BMT.C.03


152mm

Sqmt.

514.00

20

Decorated colour background glazed tiles 200mm x BMT.C.04


300mm

Sqmt.

573.00

21

Polished Marble Slabs of any variety 16 to 20 mm BMT.B.12


thick (size 0.457 x 0.457 M / 0.6 x 0.6 M)

Sqmt.

638.00

22

High polished Granite 16 to 18 mm thick up to 8' 00" BMT.B.10


(2.43M) other than black and regular colours

Sqmt.

2240.00

23

High polished Granite 16 to 18 mm thick up to 8' 00" BMT.B.11


(2.43M) black

Sqmt.

1904.00

24

Vitrified polish floor tiles 600 x 600 mm of 8 to 10 BMT.C.15


mm thickness Premium colour 1 st quality

Sqmt.

944.00

25

Vitrified polish floor tiles 600 x 600 mm of 8 to 10 BMT.C.16


mm thickness normal colour 1 st quality

Sqmt.

810.00

26

Vitrified polish floor tiles 400 x 400 mm of 8 to 10 BMT.C.17


mm thickness normal colour 1 st quality

Sqmt.

607.00

27
28
29
30

AC Sheet Corrugated 6mm thick


Mastic Pad 0.60 x 1.20 Mts, 25.4mm thick
Mastic Pad 0.60 x 1.20 Mts, 12.7mm thick
Supplying & fixing collapsible steel shutters with
vertical, double channel of 20 x10x2 mm of 100 mm
centre ,Bracers with flat iron 40x40x6 mm with 38
mm dia steel pulleys, the top, bottom and side
vertical frames of the collapsible gate with
65x65mmx8mm MS Angle and middle guide rail at
site height with 65mmx8mm MS flat for the pulleys
to guide and fixed with necessary hold fasts, bolts,
nuts, rivets, locking arrangements, stoppers, handles,
all accessories all fixtures and painted with one coat
of approved steel primer etc., complete for finished
item of work as per special spn 1105

BMT.E.17
BMS.W.20
BMS.W.21
BMT-F.30

Sqmt.
Sqmt.
Sqmt.
Sqmt.

194.00
869.00
498.00
1855.00

31

Supply & fixing of Rolling shutter made of 80 x 1.25 BMT-F.29


mm machine rolled CRCA
laths, interlocked
together through their entire length and jointed
together at the ends by end-locks, mounted on
specially designed pipe shaft of 50mm dia nominal
bore MS B class pipe with brackets, plates, guide
channels, stoppers, bottom locking plates and
arrangements for inside & outside locking with pushpull operations including cost of hood cover and
springs complete, painted with one coat of approved
steel primer, locks, ball bearings, all accessories etc
complete for finished item of work as per special
spn: 1108

Sqmt.

2120.00

DATA
Name of the Work :- Construction of Permanent Social Welfare Residential School complex at Mittapally (V) Siddipet (M) Med
Qty
Rate
Per
CEMENT MORTAR (1:2)
Material
Cost of Sand
1.05 Cum
1477.17
1
Cost of Cement
720 Kgs
5539.21
1000
Man Power
Light Mazdoor
0.20 Nos
250.00
1
Rate per cu.m.
CEMENT MORTAR (1:3)
Material
Cost of Sand
Cost of Cement
Man Power
Light Mazdoor

1.05 Cum
480 Kgs

1477.17
5539.21

1
1000

0.20 Nos

250.00

1.05 Cum
360 Kgs

1477.17
5539.21

1
1000

0.20 Nos

250.00

1.05 Cum
288 Kgs

1477.17
5539.21

1
1000

0.20 Nos

250.00

1.05 Cum
240 Kgs

1477.17
5539.21

1
1000

0.20 Nos

250.00

1.05 Cum
180 Kgs

1477.17
5539.21

1
1000

0.20 Nos

250.00

Rate per cu.m.


CEMENT MORTAR (1:4)
Material
Cost of Sand
Cost of Cement
Man Power
Light Mazdoor
Rate per cu.m.
CEMENT MORTAR (1:5)
Material
Cost of Sand
Cost of Cement
Man Power
Light Mazdoor
Rate per cu.m.
CEMENT MORTAR (1:6)
Material
Cost of Sand
Cost of Cement
Man Power
Light Mazdoor
Rate per cu.m.
CEMENT MORTAR (1:8)
Material
Cost of Sand
Cost of Cement
Man Power
Light Mazdoor
Rate per cu.m.

Cost andConvenyance of 20mm to 6mm HBG


Graded Metal / (Trap Metal)
20mm
12mm
10mm
6mm
Rate per 1 cu.m.

0.6
0.15
0.15
0.10

Cum
Cum
Cum
Cum

1412.39
1207.39
1039.39
866.39

1
1
1
1

Hire charges of machinery


SL. No

Description of machinery

Units

1 concrete mixer300/200 (diesel)

Hour

2 Batchingplant 0.5 cum

Hour

3 needle vibrator 40 mm (petrol)

Hour

Hire charges

52.40
119.10
7.70

fuel charges

63.30
100.70
12.70

crew charges

156.00
239.60
112.30

Sl. No.
1

Description

Quantity

Rate (Rs.)

Per Unit

Earth work excavation and depositing on bank with


initial lead of 10m and initial lift of 3m in Loamy &
Clayey Soils like BC Soils, Red Earth & Ordinary
Gravelly Soils ( SS 20-B) including all operational
incidental labour charges such as shoring, strutting,
sheeting, planking and dewatering including cost of
hire charges of T & P, labour charges etc., complete
for finished item of work including seignerage
charges excluding dewatering charges etc., complete
for Foundation of Building.(APSS No. 308)

Light Mazdoor
Add 75% for excavation of foundation of building
add seigniorage charges
Add 14% over heads

0.364 Nos
1 cu.m.

250.00
68.250

1
1

1 cum
159.25 cu.m.

0.00
0.14

1
1

0.364 Nos
1 cu.m.
1 cum

250.00
109.200
22.00

1
1
1

Rate per 1 cu.m.


a) Earth work excavation and depositing on bank with
initial lead of 10m and initial lift of 3m in Loamy &
Clayey Soils like BC Soils, Red Earth & Ordinary
Gravelly Soils ( SS 20-B) including all operational
incidental labour charges such as shoring, strutting,
sheeting, planking and dewatering including cost of
hire charges of T & P, labour charges etc., complete
for finished item of work including seignerage
charges excluding dewatering charges etc., complete
for Pipe line where the depth is more than 1.5
times width.(APSS No. 308)

Light Mazdoor
Add 120 % for excavation of Pipe line
add seigniorage charges

Add 14% over heads

222.20 cu.m.

0.14

250.00
22.00

1
1

0.14

0.052 Nos
13.00

250.00
0.14

1
1

1 cu.m.
0.052 Nos
168.73 cu.m.

155.73
250.00
0.14

1
1
1

Rate per 1 cu.m.


C) Earth work excavation and depositing on bank with
initial lead of 10m and initial lift of 3m in Loamy &
Clayey Soils like BC Soils, Red Earth & Ordinary
Gravelly Soils ( SS 20-B) including all operational
incidental labour charges such as shoring, strutting,
sheeting, planking and dewatering including cost of
hire charges of T & P, labour charges etc., complete
for finished item of work including seignerage
charges excluding dewatering charges etc., complete
for Septic tank soak pit and sump.(APSS No. 308)

Light Mazdoor
add seigniorage charges

0.364 nos
1 cum

Add 14% over heads


2

113.00

Rate per 1 cu.m.


Filling with useful available excavated earth
(excluding rock) in trenches, sides of foundations
and basement with initial lead in layers not
exceeding 15cm thick, consolidating each deposited
layer by watering and ramming including cost and
conveyence of water to work site and all operational,
incidental, labour charges, hire charges of T & P etc.,
complete for finished item of work. (APSS NO. 309
& 310)

Light Mazdoor
Add 14% over heads
3

Rate per 1 cu.m.


Filling with Gravel in trenches, sides of foundations
and basement with initial lead in layers not
exceeding 15cm thick, consolidating each deposited
layer by watering and ramming including cost and
conveyence of water to the work site and all
operational, incidental, labour charges, seignorage
charges, hire charges of T & P etc., complete for
finished item of work. (APSS NO. 309 & 310)

Cost of Gravel
Light Mazdoor
Add 14% over heads
Rate per Cu.m.

Filling with Sand Cushion under footings with


initial lead in layers not exceeding 15cm thick,
consolidating each deposited layer by watering and
ramming including cost and conveyence of water to
the work site and all operational & incidental
charges, labour charges, seignorage charges, hire and
opertaional charges of T & P etc., complete for
finished item of work. (APSS NO. 309 & 310)

Cost of Sand
Light Mazdoor
Add 14% over heads
5

1 cu.m.
0.052 Nos
1491.99 cu.m.

1477.17
285.00
0.14

1
1
1

cu.m.
cu.m.
Kgs.
KL

828.39
1477.17
5539.21
90.00

1
1
1000
1

1 Hour
0%

271.70
156.00

1
1

0.1 Nos.
1.39 Nos.
2886.86 cu.m.

315.00
250.00
0.14

1
1
1

Rate per Cu.m.


Plain Cement Concrete corresponding to M5
grade as per IS 456 equivalent to (1:5:10)
proportion nominal mix (cement: fine aggregate:
Coarse aggregate) using 40mm size Hard Blasted
Granite (IS383, 1970) metal from approved quarry
including cost and conveyance of all materials like
cement, sand, coarse aggregate, water etc. to site,
including seigniorage charges, sales & other taxes on
all materials, all operational, incidental, and labour
charges such as mixing, laying and ramming
concrete in layers in position not exceeding 15cm,
finishing top surface, curing concrete, etc., complete
for finished item of work for Foundations and
Flooring Bed (APSS No. 402)

material
Metal 40mm
Sand
Cement
Water
Machinery
concrete mixer300/200 (diesel)
LA oncrew charges
Labour
1st class mason
Light Mazdoor
Add 14% over heads

0.9
0.45
129.6
1.2

Rate per Cu.m.

Plain Cement Concrete corresponding to M5


grade as per IS 456 equivalent to (1:5:10)
proportion nominal mix (cement: fine aggregate:
Coarse aggregate) using 40mm size Hard Blasted
Granite (IS383, 1970) metal from approved quarry
including cost and conveyance of all materials like
cement, sand, coarse aggregate, water etc. to site,
including seigniorage charges, sales & other taxes on
all materials, all operational, incidental, and labour
charges such as mixing, laying and ramming
concrete in layers in position not exceeding 15cm,
finishing top surface, curing concrete, etc., complete
for finished item of work for Foundations and
Flooring Bed (APSS No. 402)

material
Metal 40mm
Sand
Cement
Water
Machinery
concrete mixer300/200 (diesel)
LA oncrew charges
Labour
1st class mason
Light Mazdoor
Add 14% over heads

0.9
0.45
129.6
1.2

cu.m.
cu.m.
Kgs.
KL

828.39
1477.17
5539.21
90.00

1
1
1000
1

0 Hour
0%

271.70
0.00

1
1

0.1 Nos.
2.36 Nos.
2857.66 cu.m.

315.00
250.00
0.14

1
1
1

0.9 cu.m.
0.45 cu.m.

828.39
1477.17

1
1

Rate per Cu.m.

Plain Cement Concrete corresponding to M7.5


grade as per IS 456 equivalent to (1:4:8)
proportion nominal mix (cement: fine aggregate:
Coarse aggregate) using 40mm size Hard Blasted
Granite (IS383, 1970) metal from approved quarry
including cost and conveyance of all materials like
cement, sand, coarse aggregate, water etc. to site,
including seigniorage charges, sales & other taxes on
all materials, all operational, incidental, and labour
charges such as mixing, laying and ramming
concrete in layers in position not exceeding 15cm,
finishing top surface, curing concrete, etc.,
complete for finished item of work for Foundations
(APSS No. 402)

material
Metal 40mm
Sand

Cement
Water
Machinery
concrete mixer300/200 (diesel)
LA oncrew charges
Labour
1st class mason
Light Mazdoor
Add 14% over heads
7

162 Kgs.
1.2 KL

5539.21
90.00

1000
1

1 Hour
0%

271.70
156.00

1
1

0.1 cu.m.
1.39 Nos.
3114.98 cu.m.

315.00
285.00
0.14

1
1
1

cu.m.
cu.m.
Kgs.
KL

1271.09
1477.17
5539.21
90.00

1
1
1000
1

1 Hour
0%

271.70
156.00

1
1

0.1 cu.m.
1.39 Nos.

315.00
285.00

1
1

FF
3333.94
134.00
1177.00
0.00
42.77
4687.70
656.28
5344.00

SF
3333.94
134.00
1284.00
0.00
85.53
4837.47
677.25
5514.75

Rate per Cu.m.


Plain Cement Concrete corresponding to M5
grade as per IS 456 equivalent to (1:5:10)
proportion nominal mix (cement: fine aggregate:
Coarse aggregate) using 20mm size Hard Blasted
Granite (IS383, 1970) Machine Crushed graded
metal from approved quarry including cost and
conveyance of all materials like cement, sand, coarse
aggregate, water etc. to site, including seigniorage
charges, sales & other taxes on all materials, all
operational, incidental, and labour charges such as
mixing, laying concrete, finishing top surface, curing
concrete, etc., complete for finished item of work
for Dummy Columns. (APSS No. 402)

materal
Graded Metal 20mm to 6mm
Sand
Cement
Water
Machinery
concrete mixer300/200 (diesel)
LA oncrew charges
Labour
1st class mason
Light Mazdoor

0.9
0.45
129.6
1.2

Rate for other Floors


Basic Rate of P.C.C(1:5:10) per Cum.
Hire charges on centering material
Labour charges for centering
La on centering labour charges
Lift Charges per Cum.
Add 14% over heads
Rate per cu.m.

0%

0.14
Total

GF
3333.94
134.00
1070.00
0.00
0.00
4537.94
635.31
5173.25

Plain Cement Concrete corresponding to M10


grade as per IS 456 equivalent to (1:3:6)
proportion nominal mix (cement: fine aggregate:
Coarse aggregate) using 20mm size Hard Blasted
Granite (IS383, 1970) Machine Crushed graded
metal from from approved quarry including cost and
conveyance of all materials like cement, sand, coarse
aggregate, water etc. to site, including seigniorage
charges, sales & other taxes on all materials, all
operational, incidental and labour charges such as
mixing, laying, curing concrete, etc., complete for
finished item of work for Bed Blocks and Hold
Fasts (APSS No. 402)

Material
Graded Metal 20 to 6 mm
Sand
Cement
Water
Machinery
concrete mixer300/200 (diesel)
LA oncrew charges
Labour
1st class mason
Light Mazdoor

0.9
0.45
220
1.2

cu.m.
cu.m.
Kgs.
KL

1271.09
1477.17
5539.21
90.00

1
1
1000
1

1 Hour
0%

271.70
156.00

1
1

0.1 cu.m.
1.39 Nos.

315.00
250.00

1
1

FF
3786.03
62.00
409.20
0.00
37.90
4295.13
601.32
4896.50

SF
3786.03
62.00
446.40
0.00
75.80
4370.23
611.83
4982.10

Basic rate per Cum.


Rate for other Floors
Basic Rate of P.C.C(1:3:6) per Cum.
Hire charges on centering material
Labour charges for centering
La on centering labour charges
Lift Charges per Cum.

0%

Add 14% over heads


Rate per cu.m.

0.14
Total

GF
3786.03
62.00
372.00
0.00
0.00
4220.03
590.80
4810.85

Plain Cement Concrete corresponding to M10


grade as per IS 456 equivalent to (1:3:6)
proportion nominal mix (cement: fine aggregate:
Coarse aggregate) using 20mm size Hard Blasted
Granite (IS383, 1970) Machine Crushed graded
metal from from approved quarry including cost and
conveyance of all materials like cement, sand, coarse
aggregate, water etc. to site, including seigniorage
charges, sales & other taxes on all materials, all
operational, incidental and labour charges such as
mixing, laying, curing concrete, etc., complete for
finished item of work for Bed Blocks and Hold
Fasts (APSS No. 402)

Material
Graded Metal 20 to 6 mm
Sand
Cement
Water
Machinery
concrete mixer300/200 (diesel)
LA oncrew charges
Labour
1st class mason
Light Mazdoor

0.9
0.45
220
1.2

cu.m.
cu.m.
Kgs.
KL

1271.09
1477.17
5539.21
90.00

1
1
1000
1

0 Hour
0%

271.70
0.00

1
1

0.1 cu.m.
2.36 Nos.

315.00
250.00

1
1

FF
3756.83
62.00
409.20
0.00
62.15
4290.18
600.63
4890.85

SF
3756.83
62.00
446.40
0.00
124.30
4389.53
614.53
5004.10

Basic rate per Cum.


Rate for other Floors
Basic Rate of P.C.C(1:3:6) per Cum.
Hire charges on centering material
Labour charges for centering
La on centering labour charges
Lift Charges per Cum.

0%

Add 14% over heads


Rate per cu.m.

0.14
Total

GF
3756.83
62.00
372.00
0.00
0.00
4190.83
586.72
4777.60

10

Plain Cement Concrete corresponding to M15


grade as per IS 456 equivalent to (1:2:4)
proportion nominal mix (cement: fine aggregate:
Coarse aggregate) using 20mm size Hard Blasted
Granite (IS383, 1970) Machine Crushed graded
metal from approved quarry including cost and
conveyance of all materials like cement, sand, coarse
aggregate, water etc. to site, including seigniorage
charges, sales & other taxes on all materials, all
operational, incidental and labour charges such as
mixing, laying, curing concrete, etc., complete for
finished item of work (APSS No. 402)

Material
Graded Metal 20mm to 6mm
Sand
Cement
Water
Machinery
concrete mixer300/200 (diesel)
LA oncrew charges
Labour
1st class mason
men &women Mazdoor
Basic rate per Cum.
Rate for other Floors
Basic Rate of P.C.C(1:2:4) per Cum.
Hire charges on centering material
Labour charges for centering
La on centering labour charges
Lift Charges per Cum.
Add 14% over heads
Rate per cu.m.
Plain Cement Concrete M20 Design Mix ( by weigh
batching ) using 20mm size (SS5) hard blasted
granite machine crushed graded metal (Coarse
aggregate) from approved quarry, using a minimum
quantity of 350 kgs. of cement per 1 cum of concrete
including cost and conveyance of all materials like
cement, fine aggregate (Sand), coarse aggregate,
water etc., to site and cost of seigniorage charges on
all materials including steel centering, shuttering,
machine mixing, laying concrete, lift charges, curing
etc., complete for finished item of work for steps
(APSS No. 402 )

11

Material
Graded Metal 20mm to 6mm

0.9
0.45
331.2
1.2

cu.m.
cu.m.
Kgs.
KL

1271.09
1477.17
5539.21
90.00

1
1
1000
1

1 Hour
0%

271.70
156.00

1
1

0.1 cu.m.
1.39 Nos.

315.00
285.00

1
1

FF
4450.64
62.00
409.20
0.00
42.77
4964.61
695.05
5659.70

SF
4450.64
62.00
446.40
0.00
85.53
5044.57
706.24
5750.85

1271.09

0%

0.14
Total

GF
4450.64
62.00
372.00
0.00
0.00
4884.64
683.85
5568.50

0.8 cu.m.

Sand
Cement
Water
Machinery
Batchingplant 0.5 cum
needle vibrator 40 mm (petrol)
LA on crew charges
Labour
1st class Masons
Man and Mazdoor
12

Basic rate per Cum.


Rate for other Floors
Basic Rate of P.C.C(1:1.5:3) per Cum.
Hire charges on centering material
Labour charges for centering
La on centering labour charges
Lift Charges per Cum.
Add 14% over heads
Rate per cu.m.

13

0.4 cu.m.
350 kgs
1.2 KL

1477.17
5539.21
90.00

1
1000
1

1.333 Hour
1.333 Hour
0%

459.40
132.70
469.08

1
1
1

0.1 Nos.
1.39 Nos.

315.00
250.00

1
1

FF
4822.73
62.00
409.20
0.00
37.90
5331.83
746.46
6078.30

SF
4822.73
62.00
446.40
0.00
75.80
5406.93
756.97
6163.95

Kgs
Cum
Cum
Cum
cu.m.
Nos
Nos

5539.21
477.03
569.03
1147.36
1477.17
315.00
250.00

1000
1
1
1
1
1
1

2366.96 cu.m.

0.14

0%

0.14
Total

GF
4822.73
62.00
372.00
0.00
0.00
5256.73
735.94
5992.70

Random Rubble stone masonry, in CM (1:8)


prop: (Cement: Sand) using Hard blasted
Granite stones from approved quarry including
cost and conveyance of all materials like
Granite stones, cement, sand, water, etc., to
site including seigniorage charges, sales &
other taxes on all materials, all operational,
incidental, and labour charges such as cutting
stones to required size and shape, mixing of
cement mortar, constructing masonry, curing
etc., complete for finished item of work for
foundation and basement (APSS No. 601 &
615)

cost of cement
RR Stone
CR
Through stones 25 x 25x 45 to 60 cms
Sand
1st Class Mason
Light Mazdoor

59.4
0.5
0.44
0.16
0.33
1.2
2.0

14
Add 14% over heads
Rate per cu.m.
Coursed Rubble stone masonry 2nd sort, in CM (1:6) prop: (Cement: Sand) using hard blasted granite stones
1000
cost of cement
76.8 Kgs
5539.21
CR Stone
0.94 Cum
569.03
1
Through stones 25 x 25x 45 to 60 cms
0.16 Cum
1147.36
1
Sand
0.32 cu.m.
1477.17
1

1st Class Mason


Light Mazdoor
Add 14% over heads

1.5 Nos
2.32 Nos

315.00
250.00

1
1

0.14

Kgs
cu.m.
Nos.
Nos.

5539.21
1477.17
285.00
285.00

1000
1
1
1

47.75 cu.m.

0.14

cu.m.
cu.m.
kgs
KL

1271.09
1477.17
5539.21
90.00

1
1
1000
1

1.333 Hour
1.333 Hour
0%

459.40
132.70
469.08

1
1
1

2669.07 cu.m.

Rate per cu.m.


Flush Pointing to CRS Masonry in CM(1:3)
Prop: including cost and conveyance of all
materials like cement, sand, water etc., to site,
including seigniorage charges, sales & other
taxes on all materials, all operational, incidental
charges and labour charges such as mixing
mortar, finishing, curing, etc., complete for
finished item of work. (APSS 901,906)

a) cost of cement
Sand
1st Class Mason
Man mazdoor
Add 14% over heads
b)

1.44
0.003
0.05
0.074

Rate per 1 Sqmt.


Vibrated Reinforced Cement Concrete M 20
Design Mix ( by weigh batching ) using 20mm size
(SS5) hard blasted granite machine crushed graded
metal (Coarse aggregate) from approved quarry,
using a minimum quantity of 350 kgs. of cement per
1 cum of concreteincluding cost and conveyance of
all materials like cement, fine aggregate (Sand),
coarse aggregate, water etc., to site and cost of
seigniorage charges on all materials including
centering using Cashewrina Ballies and Wooden
runners & staging including all bracings, cross
members etc., shuttering , machine mixing, laying
concrete, vibrating,lift charges, curing etc., complete
but excluding cost of steel and its fabrication
charges for finished item of work for foundation,
plinth , pedastals(below plinth)(APSS No. 402 &
403)

Material
Graded Metal 20mm to 6mm
Sand
Cement
c) Water
Machinery
Batchingplant 0.5 cum
needle vibrator 40 mm (petrol)
LA on crew charges

0.8
0.4
350
1.2

15

manpower
1st Class Mason
2nd Class Mason
Man Mazdoor
Basic rate per Cum.
VRCC M20 grade design mix for footings
Basic Rate per Cum.
Centering Charges per Cum.
Add La charges on labour on centering
Add 14% over heads
Rate per cu.m.
VRCC M20 design mix for plinth beams
Basic Rate per Cum.
Centering Charges per Cum.
Add La charges on labour on centering
Add 14% over heads
a)
Rate per cu.m.
VRCC M20 for pedestals
Basic Rate per Cum.
Centering Charges per Cum.
Add La charges on labour on centering
Add 14% over heads
Rate per cu.m.

0.133 Nos.
0.267 Nos.
4.6 Nos.

315.00
285.00
285.00

1
1
1

1 cu.m.
1 cu.m.
0%
6306.72 cu.m.

5872.72
434.00
372.00
0.14

1
1

1 cu.m.
1 cu.m.
0%
7818.72 cu.m.

5872.72
1946.00
898.00
0.14

1
1

1 cu.m.
1 cu.m.
0%
6538.72 cu.m.

5872.72
666.00
592.00
0.14

1
1

cu.m.
cu.m.
kgs
KL

1271.09
1477.17
5539.21
90.00

1
1
1000
1

1 Hour

271.70

Vibrated Reinforced Cement Concrete M 20


Design Mix ( by weigh batching ) using 20mm size
(SS5) hard blasted granite machine crushed graded
metal (Coarse aggregate) from approved quarry,
using a minimum quantity of 350 kgs. of cement per
1 cum of concreteincluding cost and conveyance of
all materials like cement, fine aggregate (Sand),
coarse aggregate, water etc., to site and cost of
seigniorage charges on all materials including
centering using Cashewrina Ballies and Wooden
runners & staging including all bracings, cross
members etc., shuttering , machine mixing, laying
concrete, vibrating,lift charges, curing etc., complete
but excluding cost of steel and its fabrication
charges for finished item of work for foundation,
plinth , pedastals(below plinth)(APSS No. 402 &
403)

Material
Graded Metal 20mm to 6mm
Sand
Cement
c) Water
Machinery
concrete mixer300/200 (diesel)

0.9
0.45
400
1.2

15

needle vibrator 40 mm (petrol)


LA on crew charges
manpower
1st Class Mason
2nd Class Mason
Man Mazdoor
Basic rate per Cum.
VRCC M20 grade design mix for footings
Basic Rate per Cum.
Centering Charges per Cum.
Add La charges on labour on centering
Add 14% over heads
Rate per cu.m.
VRCC M20 design mix for plinth beams
Basic Rate per Cum.
Centering Charges per Cum.
Add La charges on labour on centering
Add 14% over heads
a)
Rate per cu.m.
VRCC M20 for pedestals
Basic Rate per Cum.
Centering Charges per Cum.
Add La charges on labour on centering
Add 14% over heads
Rate per cu.m.

1 Hour
0%

132.70
351.90

1
1

0.133 Nos.
0.667 Nos.
1.2 Nos.

315.00
285.00
250.00

1
1
1

1 cu.m.
1 cu.m.
0%
5502.78 cu.m.

5068.78
434.00
372.00
0.14

1
1

1 cu.m.
1 cu.m.
0%
7014.78 cu.m.

5068.78
1946.00
592.00
0.14

1
1

1 cu.m.
1 cu.m.
0%
5734.78 cu.m.

5068.78
666.00
372.00
0.14

1
1

0.8 cu.m.
0.4 cu.m.

1271.09
1477.17

1
1

Vibrated Reinforced Cement Concrete M 20


Design Mix ( by weigh batching / Mixer ) using
20mm size (SS5) hard granite machine crushed
graded metal (Coarse aggregate) from approved
quarry, using a minimum quantity of 350 kgs. of
cement per 1 cum of concreteincluding cost and
conveyance of all materials like cement, fine
aggregate (Sand), coarse aggregate, water etc., to site
and cost of seigniorage charges on all materials
including centering using Cashewrina Ballies
and Wooden runners & staging including all
bracings, cross members etc., shuttering , machine
mixing, laying concrete, vibrating,lift charges, curing
etc., complete but excluding cost of steel and its
fabrication charges for finished item of work (APSS
No. 402 & 403) For coloumns , Lintels, Water
tanks, Rcc walls in building

Material
Graded Metal 20mm to 6mm
Sand

Cement
b) Water
Machinery
Batchingplant 0.5 cum
needle vibrator 40 mm (petrol)
LA on crew charges
manpower
1st Class Mason
2nd Class Mason
Man Mazdoor

350 kgs
1.2 KL

5539.21
90.00

1000
1

1.333 Hour
1.333 Hour
0%

459.40
132.70
469.08

1
1
1

0.167 Nos.
0.167 Nos.
5.6 Nos.

315.00
285.00
250.00

1
1
1

SF
5943.93
134.00
1284.00
0.00
300.04
7661.97
1072.68

Basic rate per Cum.


For columns / RCC walls and Water tanks
16
Rate for other Floors
Rate as worked out above per Cum.
Hire charges on centering material
Labour charges for centering
La on centering labour charges
Lift charges @ 10% extra on each floor
Add 14% over heads
Rate per cu.m.
For Lintels
Rate for other Floors
Rate as worked out above per Cum.
Hire charges on centering material
a) Labour charges for centering
La on centering labour charges
Lift charges @ 10% extra on each floor
Add 14% over heads
Rate per cu.m.

0%

GF
5943.93
134.00
1070.00
0.00

0.14

7147.93
1000.71

FF
5943.93
134.00
1177.00
0.00
150.02
7404.95
1036.69

Total

8148.65

8441.65

8734.70

0%

GF
5943.93
890.00
762.00
0.00

0.14
Total

7595.93
1063.43
8659.40

FF
5943.93
890.00
838.20
0.00
150.02
7822.15
1095.10
8917.30

SF
5943.93
890.00
914.40
0.00
300.04
8048.37
1126.77
9175.15

Vibrated Reinforced Cement Concrete M 20


Design Mix ( by weigh batching / Mixer ) using
20mm size (SS5) hard granite machine crushed
graded metal (Coarse aggregate) from approved
quarry, using a minimum quantity of 350 kgs. of
cement per 1 cum of concreteincluding cost and
conveyance of all materials like cement, fine
aggregate (Sand), coarse aggregate, water etc., to site
and cost of seigniorage charges on all materials
including centering using Cashewrina Ballies
and Wooden runners & staging including all
bracings, cross members etc., shuttering , machine
mixing, laying concrete, vibrating,lift charges, curing
etc., complete but excluding cost of steel and its
fabrication charges for finished item of work (APSS
No. 402 & 403) For coloumns , Lintels, Water
tanks, Rcc walls in building

Material
Graded Metal 20mm to 6mm
Sand
Cement
b) Water
Machinery
concrete mixer300/200 (diesel)
needle vibrator 40 mm (petrol)
LA on crew charges
manpower
1st Class Mason
2nd Class Mason
Man Mazdoor

0.9
0.45
400
1.2

cu.m.
cu.m.
kgs
KL

1271.09
1477.17
5539.21
90.00

1
1
1000
1

1 Hour
1 Hour
0%

271.70
132.70
351.90

1
1
1

0.167 Nos.
0.167 Nos.
4.7 Nos.

315.00
285.00
250.00

1
1
1

SF
5811.99
134.00
1284.00
0.00
255.04
7485.03
1047.90

Basic rate per Cum.


For columns / RCC walls and Water tanks
16
Rate for other Floors
Rate as worked out above per Cum.
Hire charges on centering material
Labour charges for centering
La on centering labour charges
Lift charges @ 10% extra on each floor
Add 14% over heads
Rate per cu.m.
For Lintels
Rate for other Floors
Rate as worked out above per Cum.
Hire charges on centering material

0%

GF
5811.99
134.00
1070.00
0.00

0.14

7015.99
982.24

FF
5811.99
134.00
1177.00
0.00
127.52
7250.51
1015.07

Total

7998.25

8265.60

8532.95

GF
5811.99
890.00

FF
5811.99
890.00

SF
5811.99
890.00

a) Labour charges for centering


La on centering labour charges
Lift charges @ 10% extra on each floor
Add 14% over heads
Rate per cu.m.

0%

762.00
0.00

838.20
0.00
150.02
7690.21
1076.63
8766.85

914.40
0.00
300.04
7916.43
1108.30
9024.75

0.14
Total

7463.99
1044.96
8509.00

cu.m.
cu.m.
kgs
KL

1271.09
1525.26
5843.92
100.00

1
1
1000
1

0.308 Hour
0.308 Hour
0%

459.40
132.70
108.39

1
1
1

0.067 Nos.
0.133 Nos.
3.077 Nos.

315.00
285.00
285.00

1
1
1

FF
4910.67
1347.00
987.80
0.00
93.60
7339.07
1027.47

SF
4910.67
1347.00
1077.60
0.00
187.19
7522.46
1053.14

Vibrated Reinforced Cement Concrete M 20


Design Mix ( by weigh batching ) using 20mm size
(SS5) hard blasted granite machine crushed graded
metal (Coarse aggregate) from approved quarry,
using a minimum quantity of 350 kgs. of cement per
1 cum of concrete including cost and conveyance of
all materials like cement, fine aggregate (Sand),
coarse aggregate, water etc., to site and cost of
seigniorage charges on all materials including
centering using Cashewrina Ballies and Wooden
runners & staging including all bracings, cross
members etc., shuttering , machine mixing, laying
concrete, vibrating,lift charges, curing etc., complete
but excluding cost of steel and its fabrication
charges for finished item of work (APSS No. 402 &
403) For beams and slabs

Material
Graded Metal 20mm to 6mm
Sand
b) Cement
Water
Machinery
Batchingplant 0.5 cum
needle vibrator 40 mm (petrol)
LA on crew charges
manpower
1st Class Mason
2nd Class Mason
Man Mazdoor
Basic rate per Cum.
For roof beams
Rate for other Floors
c) Rate as worked out above per Cum.
Hire charges on centering material
Labour charges for centering
La on centering labour charges
Lift charges @ 10% extra on each floor
Add 14% over heads

0.8
0.4
350
1.2

0%

GF
4910.67
1347.00
898.00
0.00

0.14

7155.67
1001.79

Rate per cu.m.

Total

8157.50

8366.55

8575.60

4910.67

FF
368.30
151.00
111.10
0.00
7.02
637.42
89.24
726.70

SF
368.30
151.00
121.20
0.00
14.04
654.54
91.64
746.20

4910.67

FF
491.07
151.00
111.10
0.00
9.36
762.53
106.75
869.30

SF
491.07
151.00
121.20
0.00
18.72
781.99
109.48
891.50

4910.67

FF
540.17
151.00
111.10
0.00
10.30
812.57
113.76
926.35

SF
540.17
151.00
121.20
0.00
20.59
832.96
116.61
949.60

4910.67

FF
564.73
151.00
111.10

SF
564.73
151.00
121.20

VRCC M20 design mix for Slabs 75mm thick


Cost of VRCC for 75 mm thick slab
d) Rate for other Floors
Rate as worked out above per Cum.
Hire charges on centering material
Labour charges for centering
La on centering labour charges
Lift charges @ 10% extra on each floor
Add 14% over heads
Rate per 1 Sqmts.

0.075 cu.m.

0%

GF
368.30
151.00
101.00
0.00

0.14
Total

620.30
86.84
707.15

VRCC M20 design mix for Slabs 100mm thick


Cost of VRCC for 100 mm thick slab
e) Rate for other Floors
Rate as worked out above per Cum.
Hire charges on centering material
Labour charges for centering
La on centering labour charges
Lift charges @ 10% extra on each floor
Add 14% over heads
Rate per 1 Sqmts.
VRCC M20 design mix for Slabs of 110mm thick
Cost of VRCC for 110 mm thick slab
Rate for other Floors
f) Rate as worked out above per Cum.
Hire charges on centering material
Labour charges for centering
La on centering labour charges
Lift charges @ 10% extra on each floor
Add 14% over heads
Rate per 1 Sqmts.

0.1 cu.m.

0%

GF
491.07
151.00
101.00
0.00

0.14
Total

743.07
104.03
847.10

0.11 cu.m.

0%

GF
540.17
151.00
101.00
0.00

0.14
Total

792.17
110.90
903.10

VRCC M20 design mix for Slabs of 115mm thick


Cost of VRCC for 115 mm thick slab
g) Rate for other Floors
Rate as worked out above per Cum.
Hire charges on centering material
Labour charges for centering

0.115 cu.m.
GF
564.73
151.00
101.00

La on centering labour charges


Lift charges @ 10% extra on each floor
Add 14% over heads
Rate per 1 Sqmts.

0%

0.00

0.14
Total

816.73
114.34
931.10

0.00
10.76
837.59
117.26
954.85

0.00
21.53
858.46
120.18
978.65

4910.67

FF
589.28
151.00
111.10
0.00
11.23
862.61
120.77
983.40

SF
589.28
151.00
121.20
0.00
22.46
883.94
123.75
1007.70

4910.67

FF
613.83
151.00
111.10
0.00
11.70
887.63
124.27
1011.95

SF
613.83
151.00
121.20
0.00
23.40
909.43
127.32
1036.80

4910.67

FF
687.49
151.00
111.10
0.00
13.10
962.69
134.78
1097.50

SF
687.49
151.00
121.20
0.00
26.21
985.90
138.03
1123.95

4910.67

FF
564.73
151.00

SF
564.73
151.00

VRCC M20 design mix for Slabs of 120mm thick


Cost of VRCC for 120 mm thick slab

0.12 cu.m.

h)
Rate for other Floors
Rate as worked out above per Cum.
Hire charges on centering material
Labour charges for centering
LA on centering labour charges
Lift charges @ 10% extra on each floor
Add 14% over heads
Rate per 1 Sqmts.
VRCC M20 for Slabs 125mm thick
Cost of VRCC for 125 mm thick slab
i) Rate for other Floors
Rate as worked out above per Cum.
Hire charges on centering material
Labour charges for centering
LA on centering labour charges
Lift charges @ 10% extra on each floor
Add 14% over heads
Rate per 1 Sqmts.
VRCC M20 for Slabs 140 mm thick
Cost of VRCC for 140 mm thick slab
Rate for other Floors
j) Rate as worked out above per Cum.
Hire charges on centering material
Labour charges for centering
LA on centering labour charges
Lift charges @ 10% extra on each floor
Add 14% over heads
Rate per 1 Sqmts.

0%

GF
589.28
151.00
101.00
0.00

0.14
Total

841.28
117.78
959.10

0.125 cu.m.

0%

GF
613.83
151.00
101.00
0.00

0.14
Total

865.83
121.22
987.10

0.14 cu.m.

0%

GF
687.49
151.00
101.00
0.00

0.14
Total

939.49
131.53
1071.05

VRCC M20 design mix for Slabs of 115mm thick


Cost of VRCC for 115 mm thick slab
Rate for other Floors
k) Rate as worked out above per Cum.
Hire charges on centering material

0.115 cu.m.
GF
564.73
151.00

Labour charges for centering


La on centering labour charges
Lift charges @ 10% extra on each floor
Add 14% over heads
Rate per 1 Sqmts.
VRCC M20 for Slabs 150 mm thick
Cost of VRCC for 150 mm thick slab
Rate for other Floors
l) Rate as worked out above per Cum.
Hire charges on centering material
Labour charges for centering
LA on centering labour charges
Lift charges @ 10% extra on each floor
Add 14% over heads
Rate per 1 Sqmts.
VRCC M20 for Slabs

Rate for other Floors


m) Rate as worked out above per Cum.
Hire charges on centering material
Labour charges for centering
LA on centering labour charges
Lift charges @ 10% extra on each floor
Add 14% over heads
Rate per 1 Sqmts.

0.14
Total

816.73
114.34
931.10

0.15 cu.m.

0%

GF
736.60
151.00
101.00
0.00

0.14
Total

988.60
138.40
1127.05

111.10
0.00
10.76
837.59
117.26
954.85

121.20
0.00
21.53
858.46
120.18
978.65

4910.67

FF
736.60
151.00
111.10
0.00
14.04
1012.74
141.78
1154.55

SF
736.60
151.00
121.20
0.00
28.08
1036.88
145.16
1182.05

0.165 cu.m.

4910.67

0%

GF
810.26
157.00
105.00
0.00

FF
810.26
157.00
115.50
0.00
15.44
1098.20
153.75
1252.00

SF
810.26
157.00
126.00
0.00
30.89
1124.15
157.38
1281.55

0.14
Total

1072.26
150.12
1222.40

4910.67

FF
859.37
157.00
115.50
0.00
16.38
1148.25
160.75
1309.00

SF
859.37
157.00
126.00
0.00
32.76
1175.13
164.52
1339.65

4910.67

175mm thick

Cost of VRCC for 175 mm thick slab


Rate for other Floors
n) Rate as worked out above per Cum.
Hire charges on centering material
Labour charges for centering
LA on centering labour charges
Lift charges @ 10% extra on each floor
Add 14% over heads
Rate per 1 Sqmts.
VRCC M20 for Slabs

101.00
0.00

165mm thick

Cost of VRCC for 165 mm thick slab

VRCC M20 for Slabs

0%

0.175 cu.m.

0%

GF
859.37
157.00
105.00
0.00

0.14
Total

1121.37
156.99
1278.40

180mm thick

Cost of VRCC for 180 mm thick slab

0.18 cu.m.

Rate for other Floors


o) Rate as worked out above per Cum.
Hire charges on centering material
Labour charges for centering
LA on centering labour charges
Lift charges @ 10% extra on each floor
Add 14% over heads
Rate per 1 Sqmts.
VRCC M20 for Slabs

0.14
Total

1145.92
160.43
1306.40

FF
883.92
157.00
115.50
0.00
16.85
1173.27
164.26
1337.55

SF
883.92
157.00
126.00
0.00
33.69
1200.61
168.09
1368.75

4910.67

FF
982.13
157.00
115.50
0.00
18.72
1273.35
178.27
1451.65

SF
982.13
157.00
126.00
0.00
37.44
1302.57
182.36
1484.95

4910.67

FF
1104.90
157.00
115.50
0.00
21.06
1398.46
195.78
1594.25

SF
1104.90
157.00
126.00
0.00
42.12
1430.02
200.20
1630.25

200mm thick

Cost of VRCC for 200 mm thick slab

17

0%

GF
883.92
157.00
105.00
0.00

Rate for other Floors


Rate as worked out above per Cum.
Hire charges on centering material
Labour charges for centering
LA on centering labour charges
Lift charges @ 10% extra on each floor
Add 14% over heads
Rate per 1 Sqmts.
VRCC M20 for Slabs of 225 mm thick
Cost of VRCC for 225 mm thick slab
Rate for other Floors
Rate as worked out above per Cum.
a) Hire charges on centering material
Labour charges for centering
LA on centering labour charges
Lift charges @ 10% extra on each floor
Add 14% over heads
Rate per 10 Sqmts.

0.2 cu.m.

0%

GF
982.13
157.00
105.00
0.00

0.14
Total

1244.13
174.18
1418.35

0.225 cu.m.

0%

GF
1104.90
157.00
105.00
0.00

0.14
Total

1366.90
191.37
1558.30

Vibrated Reinforced Cement Concrete M 20


Design Mix ( by weigh batching ) using 20mm size
(SS5) hard blasted granite machine crushed graded
metal (Coarse aggregate) from approved quarry,
using a minimum quantity of 350 kgs. of cement per
1 cum of concrete including cost and conveyance of
all materials like cement, fine aggregate (Sand),
coarse aggregate, water etc., to site and cost of
seigniorage charges on all materials including
centering using Cashewrina Ballies and Wooden
runners & staging including all bracings, cross
members etc., shuttering , machine mixing, laying
concrete, vibrating,lift charges, curing etc., complete
but excluding cost of steel and its fabrication
charges for finished item of work (APSS No. 402 &
403) For beams and slabs

Material
Graded Metal 20mm to 6mm
Sand
b) Cement
Water
Machinery
concrete mixer300/200 (diesel)
needle vibrator 40 mm (petrol)
LA on crew charges
manpower
1st Class Mason
2nd Class Mason
Man Mazdoor

0.9
0.45
400
1.2

Basic rate per Cum.


For roof beams
Rate for other Floors
c) Rate as worked out above per Cum.
Hire charges on centering material
Labour charges for centering
La on centering labour charges
Lift charges @ 10% extra on each floor
Add 14% over heads
Rate per cu.m.

cu.m.
cu.m.
kgs
KL

1271.09
1477.17
5539.21
90.00

1
1
1000
1

0.267 Hour
0.267 Hour
0%

271.70
132.70
93.96

1
1
1

0.067 Nos.
0.133 Nos.
2.5 Nos.

315.00
285.00
250.00

1
1
1

FF
4924.38
1347.00
987.80
0.00
68.40
7327.58
1025.86
8353.45

SF
4924.38
1347.00
1077.60
0.00
136.80
7485.78
1048.01
8533.80

4924.38

FF
369.33

SF
369.33

0%

GF
4924.38
1347.00
898.00
0.00

0.14
Total

7169.38
1003.71
8173.10

VRCC M20 design mix for Slabs 75mm thick


Cost of VRCC for 75 mm thick slab
d) Rate for other Floors
Rate as worked out above per Cum.

0.075 cu.m.
GF
369.33

Hire charges on centering material


Labour charges for centering
La on centering labour charges
Lift charges @ 10% extra on each floor
Add 14% over heads
Rate per 1 Sqmts.

0%

151.00
101.00
0.00

0.14
Total

621.33
86.99
708.35

151.00
111.10
0.00
5.13
636.56
89.12
725.70

151.00
121.20
0.00
14.04
655.57
91.78
747.35

4924.38

FF
491.07
151.00
111.10
0.00
6.84
760.01
106.40
866.45

SF
491.07
151.00
121.20
0.00
18.72
781.99
109.48
891.50

4924.38

FF
541.68
151.00
111.10
0.00
7.52
811.30
113.58
924.90

SF
541.68
151.00
121.20
0.00
15.05
828.93
116.05
945.00

4924.38

FF
566.30
151.00
111.10
0.00
7.87
836.27
117.08
953.40

SF
566.30
151.00
121.20
0.00
15.25
853.75
119.53
973.30

VRCC M20 design mix for Slabs 100mm thick


Cost of VRCC for 100 mm thick slab
e) Rate for other Floors
Rate as worked out above per Cum.
Hire charges on centering material
Labour charges for centering
La on centering labour charges
Lift charges @ 10% extra on each floor
Add 14% over heads
Rate per 1 Sqmts.
VRCC M20 design mix for Slabs of 110mm thick
Cost of VRCC for 110 mm thick slab
Rate for other Floors
f) Rate as worked out above per Cum.
Hire charges on centering material
Labour charges for centering
La on centering labour charges
Lift charges @ 10% extra on each floor
Add 14% over heads
Rate per 1 Sqmts.

0.1 cu.m.

0%

GF
491.07
151.00
101.00
0.00

0.14
Total

743.07
104.03
847.10

0.11 cu.m.

0%

GF
541.68
151.00
101.00
0.00

0.14
Total

793.68
111.12
904.85

VRCC M20 design mix for Slabs of 115mm thick


Cost of VRCC for 115 mm thick slab
g) Rate for other Floors
Rate as worked out above per Cum.
Hire charges on centering material
Labour charges for centering
La on centering labour charges
Lift charges @ 10% extra on each floor
Add 14% over heads
Rate per 1 Sqmts.
VRCC M20 design mix for Slabs of 120mm thick

0.115 cu.m.

0%

GF
566.30
151.00
101.00
0.00

0.14
Total

818.30
114.56
932.90

Cost of VRCC for 120 mm thick slab

0.12 cu.m.

4924.38

FF
590.93
151.00
111.10
0.00
8.21
861.24
120.57
981.85

SF
590.93
151.00
121.20
0.00
16.42
879.55
123.14
1002.70

4924.38

FF
615.55
151.00
111.10
0.00
8.55
886.20
124.07
1010.30

SF
615.55
151.00
121.20
0.00
17.10
904.85
126.68
1031.55

4924.38

FF
689.41
151.00
111.10
0.00
9.58
961.09
134.55
1095.65

SF
689.41
151.00
121.20
0.00
19.15
980.76
137.31
1118.10

4924.38

FF
738.66
151.00
111.10
0.00
10.26
1011.02
141.54
1152.60

SF
738.66
151.00
121.20
0.00
20.52
1031.38
144.39
1175.80

h)
Rate for other Floors
Rate as worked out above per Cum.
Hire charges on centering material
Labour charges for centering
LA on centering labour charges
Lift charges @ 10% extra on each floor
Add 14% over heads
Rate per 1 Sqmts.
VRCC M20 for Slabs 125mm thick
Cost of VRCC for 125 mm thick slab
i) Rate for other Floors
Rate as worked out above per Cum.
Hire charges on centering material
Labour charges for centering
LA on centering labour charges
Lift charges @ 10% extra on each floor
Add 14% over heads
Rate per 1 Sqmts.
VRCC M20 for Slabs 140 mm thick
Cost of VRCC for 140 mm thick slab
Rate for other Floors
j) Rate as worked out above per Cum.
Hire charges on centering material
Labour charges for centering
LA on centering labour charges
Lift charges @ 10% extra on each floor
Add 14% over heads
Rate per 1 Sqmts.

VRCC M20 for Slabs 150 mm thick


Cost of VRCC for 150 mm thick slab
Rate for other Floors
l) Rate as worked out above per Cum.
Hire charges on centering material
Labour charges for centering
LA on centering labour charges
Lift charges @ 10% extra on each floor
Add 14% over heads
Rate per 1 Sqmts.

0%

GF
590.93
151.00
101.00
0.00

0.14
Total

842.93
118.01
960.95

0.125 cu.m.

0%

GF
615.55
151.00
101.00
0.00

0.14
Total

867.55
121.46
989.05

0.14 cu.m.

0%

GF
689.41
151.00
101.00
0.00

0.14
Total

941.41
131.80
1073.25

0.15 cu.m.

0%

GF
738.66
151.00
101.00
0.00

0.14
Total

990.66
138.69
1129.35

VRCC M20 for Slabs

165mm thick

Cost of VRCC for 165 mm thick slab


Rate for other Floors
m) Rate as worked out above per Cum.
Hire charges on centering material
Labour charges for centering
LA on centering labour charges
Lift charges @ 10% extra on each floor
Add 14% over heads
Rate per 1 Sqmts.
VRCC M20 for Slabs

0%

GF
812.52
157.00
105.00
0.00

0.14
Total

1074.52
150.43
1225.00

4924.38

FF
812.52
157.00
115.50
0.00
11.29
1096.31
153.48
1249.80

SF
812.52
157.00
126.00
0.00
22.57
1118.09
156.53
1274.65

4924.38

FF
861.77
157.00
115.50
0.00
11.97
1146.24
160.47
1306.75

SF
861.77
157.00
126.00
0.00
23.94
1168.71
163.62
1332.35

4924.38

FF
886.39
157.00
115.50
0.00
12.31
1171.20
163.97
1335.20

SF
886.39
157.00
126.00
0.00
24.62
1194.01
167.16
1361.20

4924.38

FF
984.88
157.00
115.50
0.00

SF
984.88
157.00
126.00
0.00

175mm thick

Cost of VRCC for 175 mm thick slab


Rate for other Floors
n) Rate as worked out above per Cum.
Hire charges on centering material
Labour charges for centering
LA on centering labour charges
Lift charges @ 10% extra on each floor
Add 14% over heads
Rate per 1 Sqmts.
VRCC M20 for Slabs

0.175 cu.m.

0%

GF
861.77
157.00
105.00
0.00

0.14
Total

1123.77
157.33
1281.10

180mm thick

Cost of VRCC for 180 mm thick slab


Rate for other Floors
o) Rate as worked out above per Cum.
Hire charges on centering material
Labour charges for centering
LA on centering labour charges
Lift charges @ 10% extra on each floor
Add 14% over heads
Rate per 1 Sqmts.
VRCC M20 for Slabs

Rate for other Floors


Rate as worked out above per Cum.
Hire charges on centering material
Labour charges for centering
LA on centering labour charges

0.18 cu.m.

0%

GF
886.39
157.00
105.00
0.00

0.14
Total

1148.39
160.77
1309.20

200mm thick

Cost of VRCC for 200 mm thick slab

17

0.165 cu.m.

0.2 cu.m.

0%

GF
984.88
157.00
105.00
0.00

Lift charges @ 10% extra on each floor


Add 14% over heads
Rate per 1 Sqmts.
VRCC M20 for Slabs of 225 mm thick
Cost of VRCC for 225 mm thick slab
Rate for other Floors
Rate as worked out above per Cum.
a) Hire charges on centering material
Labour charges for centering
LA on centering labour charges
Lift charges @ 10% extra on each floor
Add 14% over heads
Rate per 10 Sqmts.

13.68
1271.06
177.95
1449.05

27.36
1295.24
181.33
1476.60

4924.38

FF
1107.98
157.00
115.50
0.00
15.39
1395.87
195.42
1591.30

SF
1107.98
157.00
126.00
0.00
30.78
1421.76
199.05
1620.85

cu.m.
cu.m.
kgs
KL

1271.09
1477.17
5539.21
90.00

1
1
1000
1

1.333 Hour
0%

459.40
319.39

1
1

0.167 Nos.
0.167 Nos.
5.6 Nos.

315.00
285.00
250.00

1
1
1

1246.88
174.56
1421.45

0.14
Total

0.225 cu.m.

0%

GF
1107.98
157.00
105.00
0.00

0.14
Total

1369.98
191.80
1561.80

Reinforced Cement Concrete M 20 Design Mix


( by weigh batching ) using 20mm size (SS5) hard
blasted granite machine crushed graded metal
(Coarse aggregate) from approved quarry, using a
minimum quantity of 350 kgs. of cement per 1 cum
of concrete including cost and conveyance of all
materials like cement, fine aggregate (Sand), coarse
aggregate, water etc., to site and cost of seigniorage
charges on all materials including centering using
Cashewrina Ballies and Wooden runners &
staging including all bracings, cross members etc.,
shuttering , machine mixing, laying concrete, lift
charges, curing etc., complete but excluding cost of
steel and its fabrication charges for finished item of
work (APSS No. 402 & 403)

18

Material
Graded Metal 20mm to 6mm
Sand
Cement
Water
Machinery
Batchingplant 0.5 cum
LA on crew charges
manpower
1st Class Mason
2nd Class Mason
Man Mazdoor

0.8
0.4
350
1.2

Basic rate per Cum


For Lintels

Rate for other Floors


Rate as worked out above per Cum.
a) Hire charges on centering material
Labour charges for centering
La on centering labour charges
Lift charges @ 10% extra on each floor
Add 14% over heads
Rate per Cum.

0%

GF
5767.04
890.00
762.00
0.00

FF
5767.04
890.00
838.20
0.00
150.02
7645.26
1070.34
8715.65

SF
5767.04
890.00
914.40
0.00
300.04
7871.48
1102.01
8973.50

0.14
Total

7419.04
1038.67
8457.75

cu.m.
cu.m.
kgs
KL

1271.09
1477.17
5539.21
90.00

1
1
1000
1

1 Hour
0%

271.70
239.60

1
1

0.167 Nos.
0.167 Nos.
4.7 Nos.

315.00
285.00
250.00

1
1
1

FF
5679.29
890.00
838.20
0.00
127.52
7535.01
1054.90

SF
5679.29
890.00
914.40
0.00
255.04
7738.73
1083.42

Reinforced Cement Concrete M 20 Design Mix


( by weigh batching ) using 20mm size (SS5) hard
blasted granite machine crushed graded metal
(Coarse aggregate) from approved quarry, using a
minimum quantity of 350 kgs. of cement per 1 cum
of concrete including cost and conveyance of all
materials like cement, fine aggregate (Sand), coarse
aggregate, water etc., to site and cost of seigniorage
charges on all materials including centering using
Cashewrina Ballies and Wooden runners &
staging including all bracings, cross members etc.,
shuttering , machine mixing, laying concrete, lift
charges, curing etc., complete but excluding cost of
steel and its fabrication charges for finished item of
work (APSS No. 402 & 403)

18

Material
Graded Metal 20mm to 6mm
Sand
Cement
Water
Machinery
concrete mixer300/200 (diesel)
LA on crew charges
manpower
1st Class Mason
2nd Class Mason
Man Mazdoor
Basic rate per Cum
For Lintels
Rate for other Floors
Rate as worked out above per Cum.
a) Hire charges on centering material
Labour charges for centering
La on centering labour charges
Lift charges @ 10% extra on each floor
Add 14% over heads

0.9
0.45
400
1.2

0%

GF
5679.29
890.00
762.00
0.00

0.14

7331.29
1026.38

Rate per Cum.

Total

8357.70

8589.95

8822.20

cu.m.
cu.m.
kgs
KL

1271.09
1525.26
5843.92
100.00

1
1
1000
1

0.308 Hour
0%

239.60
73.80

1
1

0.067 Nos.
0.133 Nos.
3.077 Nos.

315.00
285.00
285.00

1
1
1

0.0625 cu.m.

4802.10

FF
300.13
176.00
128.70
0.00
5.85

SF
300.13
176.00
140.40
0.00
11.70

Reinforced cement concrete with M 20 grade


Design mix ( by weigh batching ) using 20mm size
(SS 5) machine crushed hard blasted granite graded
metal (coarse aggregate) from approved quarry
using a minimum quantity of 350 Kg of cement per 1
Cum of concrete including cost and conveyance of
all materials like cement, fine aggregate (sand)
,coarse aggregate, water etc. to site and cost of
seigniorage charges on all materials including
centering using Cashewrina Ballies and Wooden
runners & staging including all bracings, cross
members etc., shuttering, machine mixing, laying
concrete, 7.5cm thick at fixed end and 5cm thick at
free end with an average thickness of 6.25cm
including labour charges for mixing, laying,
curing etc., complete but excluding cost of steel
and its fabrication charges for finished item of work

for sun-shades of any width as per approved plan


/ design and of average thickness of 62.50mm
( thickness at support 75mm and thickness at
edge 50mm) (APSS No. 402, 403)
material
Graded Metal 20mm to 6mm
Sand
Cement
b) Water
Machinery
Batchingplant 0.5 cum
LA on crew charges
manpower
1st Class Mason
2nd Class Mason
Man Mazdoor
Basic rate per Cu.m
Chajja / Sunshade
Cost of RCC for 62.5 mm thick sunshade
Rate for other Floors
b) Rate as worked out above per Cum.
Hire charges on centering material
Labour charges for centering
La on centering labour charges
Lift charges @ 10% extra on each floor

0.8
0.4
350
1.2

0%

GF
300.13
176.00
117.00
0.00

Add 14% over heads


Rate per Sqmt.
for platforms of 50 mm thick
Cost of RCC for 50 mm thick platform

18

Rate for other Floors


Rate as worked out above per Cum.
Hire charges on centering material
Labour charges for centering
La on centering labour charges
Lift charges @ 10% extra on each floor
Add 14% over heads
Rate per Sqmt.

593.13
83.04
676.20

0.14
Total

0.05 cu.m.

0%

GF
240.10
151.00
101.00
0.00

0.14
Total

492.10
68.89
561.00

610.68
85.50
696.20

628.23
87.95
716.20

4802.10

FF
240.10
151.00
111.10
0.00
4.68
506.88
70.96
577.85

SF
240.10
151.00
121.20
0.00
9.36
521.66
73.03
594.70

4802.10

FF
120.05
151.00
111.10
0.00
2.34
384.49
53.83
438.35

SF
120.05
151.00
121.20
0.00
4.68
396.93
55.57
452.55

19
for shelves of 25 mm thick
Cost of RCC for 25 mm thick shelves
Rate for other Floors
Rate as worked out above per Cum.
Hire charges on centering material
Labour charges for centering
La on centering labour charges
Lift charges @ 10% extra on each floor
Add 14% over heads
Rate per Sqmt.
Reinforced cement concrete with M 20 grade
Design mix ( by weigh batching ) using 20mm size
(SS 5) machine crushed hard blasted granite graded
metal (coarse aggregate) from approved quarry
using a minimum quantity of 350 Kg of cement per 1
Cum of concrete including cost and conveyance of
all materials like cement, fine aggregate (sand)
,coarse aggregate, water etc. to site and cost of
seigniorage charges on all materials including
centering using Cashewrina Ballies and Wooden
runners & staging including all bracings, cross
members etc., shuttering, machine mixing, laying
concrete, 7.5cm thick at fixed end and 5cm thick at
free end with an average thickness of 6.25cm
including labour charges for mixing, laying,
curing etc., complete but excluding cost of steel
and its fabrication charges for finished item of work

0.025 cu.m.

0%

GF
120.05
151.00
101.00
0.00

0.14
Total

372.05
52.09
424.15

for sun-shades of any width as per approved plan


/ design and of average thickness of 62.50mm
( thickness at support 75mm and thickness at
edge 50mm) (APSS No. 402, 403)
material
Graded Metal 20mm to 6mm
Sand
Cement
b) Water
Machinery
concrete mixer300/200 (diesel)
LA on crew charges
manpower
1st Class Mason
2nd Class Mason
Man Mazdoor

0.9
0.45
400
1.2

Basic rate per Cu.m


Chajja / Sunshade
Cost of RCC for 62.5 mm thick sunshade
Rate for other Floors
b) Rate as worked out above per Cum.
Hire charges on centering material
Labour charges for centering
La on centering labour charges
Lift charges @ 10% extra on each floor
Add 14% over heads
Rate per Sqmt.
for platforms of 50 mm thick
Cost of RCC for 50 mm thick platform

18

Rate for other Floors


Rate as worked out above per Cum.
Hire charges on centering material
Labour charges for centering
La on centering labour charges
Lift charges @ 10% extra on each floor
Add 14% over heads
Rate per Sqmt.

cu.m.
cu.m.
kgs
KL

1271.09
1477.17
5539.21
90.00

1
1
1000
1

0.267 Hour
0%

271.70
63.97

1
1

0.067 Nos.
0.133 Nos.
2.5 Nos.

315.00
285.00
250.00

1
1
1

0.0625 cu.m.

4888.95

FF
305.56
176.00
128.70
0.00
4.28
614.54
86.04
700.60

SF
305.56
176.00
140.40
0.00
8.55
630.51
88.27
718.80

4802.10

FF
240.10
151.00
111.10
0.00
4.68
506.88
70.96
577.85

SF
240.10
151.00
121.20
0.00
9.36
521.66
73.03
594.70

4802.10

FF
120.05
151.00
111.10

SF
120.05
151.00
121.20

0%

GF
305.56
176.00
117.00
0.00

0.14
Total

598.56
83.80
682.40

0.05 cu.m.

0%

GF
240.10
151.00
101.00
0.00

0.14
Total

492.10
68.89
561.00

19
for shelves of 25 mm thick
Cost of RCC for 25 mm thick shelves
Rate for other Floors
Rate as worked out above per Cum.
Hire charges on centering material
Labour charges for centering

0.025 cu.m.
GF
120.05
151.00
101.00

La on centering labour charges


Lift charges @ 10% extra on each floor
Add 14% over heads
Rate per Sqmt.

0%

0.00

0.00
2.34
384.49
53.83
438.35

0.00
4.68
396.93
55.57
452.55

0.14
Total

372.05
52.09
424.15

Kgs
cu.m.
Nos.
Nos.
Nos.
Nos.

5.84
1525.26
315.00
285.00
285.00
250.00

1
1
1
1
1
1

36 kgs
512 Nos
0.2 cu.m.

5539.21
3680.46
1477.17

1000
1000
1

315.00
285.00
250.00

1
1
1

FF
3086.94
39.96
342.27

SF
3086.94
39.96
443.07

Pointing to Cuddapah / Shahabad slabs in


CM(1:3) Prop: including cost and conveyance of all
materials like cement, sand, water etc., to site,
including seigniorage charges, sales & other taxes on
all materials, all operational, incidental charges and
labour charges such as mixing mortar, finishing,
curing, etc., complete for finished item of work.
(APSS 901,906)

20

cost of cement for Cement Mortar (1:3)


cost of sand for Cement Mortar (1:3)
1st Class Mason
2nd Class Mason
Man mazdoor
Woman mazdoor
Rate per 1 Sqmt.
Brick Masonry in superstructure with CM (1:8)
prop: using second class bricks from approved
source having minimum crushing strength of 40
Kg/Sqcm. including cost and conveyance of all
materials like cement, sand, bricks, water etc., to site,
including seigniorage charges, sales & other taxes on
all materials, all operational, incidental and labour
charges such as mixing cement mortar, constructing
masonry, scaffolding charges, lift charges, curing,
etc., complete for finished item of work. (APSS No.
501 & 504).

0.96
0.002
0.048
0.112
0.05
0.11

wall thickness
Material
Cement
Second class Bricks
sand for mortor
B Labour
1st class mason
2nd class mason
Man Mazdoor

0.225

Basic Rate per Cum.


Rate for other Floors
Basic rate per Cum
Hire charges of stage scafflding per cum
Labour charges for stage scaffolding per cum

0.24 Nos.
0.56 Nos.
1.89 Nos.
GF
3086.94
39.96
241.51

Add LA on Labour for scaffolding


Lift charges @ 10% extra on each floor
21

Add 14% over heads


Rate per Cum.
Reinforced Brick Masonry 11.5cm (4 1/2") thick
for partition walls in CM (1:4) prop: using second
class bricks from approved source having minimum
crushing strength of 40 Kg/Sqcm. and placing 2nos.
of 6mm dia MS bars embedded in every 3rd layer
with free ends of reinforcement keyed into mortar
joints of the main brick work whereever applicable
including cost and conveyance of all materials like
cement, sand, bricks, water etc., to site, seigniorage
charges, sales & other taxes on all materials, all
operational, incidental and labour charges such as
mixing cement mortar, constructing masonry,
scaffolding charges, lift charges, curing, etc., but
excluding cost and conveyance of steel and its
fabrication charges complete for finished item of
work. (APSS No. 501 & 504).

wall thickness
Material
Cement
Second class Bricks
sand for mortor
B Labour
1st class mason
2nd class mason
Man Mazdoor

0%

0.00

0.00
70.77
3539.94
495.59
4035.55

0.00
141.54
3711.51
519.61
4231.15

0.14
Total

3368.41
471.58
3840.00

7.56 kgs
51.2 Nos
0.021 cu.m.

5843.92
4069.96
1525.26

1000
1000
1

0.06 Nos.
0.06 Nos.
0.275 Nos.

315.00
285.00
285.00

1
1
1

GF
398.97
8.99
54.34

FF
398.97
8.99
77.01

SF
398.97
8.99
99.69

0%

0.00

0.14
Total

462.30
64.72
527.05

0.00
11.44
496.41
69.50
565.95

0.00
22.88
530.53
74.27
604.80

0.115

Basic Rate per One Sqmt.


Rate for other Floors
Basic rate per sqm
Hire charges of stage scafflding per cum
Labour charges for stage scaffolding per cum
Add LA on Labour for scaffolding
Lift charges @ 10% extra on each floor
Add 14% over heads
Rate per One Sqmt.

21

22

Brick Masonry in superstructure with CM (1:8) prop:


using Fly ASH Bricks of size 290x225x140mm
with compressive of 50 Kgs / Sqcm from approved
source including cost and conveyance of all materials
like cement, sand, fly ash bricks, water etc., to site,
including seigniorage charges, sales & other taxes on
all materials, all operational, incidental and labour
charges such as mixing cement mortar, constructing
masonry, scaffolding charges, lift charges, curing,
etc., complete for finished item of work. (APSS No.
501 & 504).

Wall thickness
Material
Fly Ash Bricks 290x225x140mm
Cement for Cement Mortar (1:8)
Sand for Cement Mortar (1:8)
Labour
1st class mason
2nd class mason
Man Mazdoor
Woman Mazdoor
Basic Rate per Cum.
Rate for other Floors
Basic rate per Cum
Hire charges of stage scafflding per cum
Labour charges for stage scaffolding per cum
Add LA on Labour for scaffolding
Lift charges @ 10% extra on each floor
Add 14% over heads
Rate per Cum.

0.225
110 Nos
18 Kgs
0.1 cu.m.

20872.18
5.84
1525.26

1000
1
1

315.00
285.00
285.00
250.00

1
1
1
1

GF
3672.59
39.96
241.51

FF
3672.59
39.96
342.27

SF
3672.59
39.96
443.07

0%

0.00

0.14
Total

3954.06
553.57
4507.65

0.00
111.90
4166.72
583.34
4750.10

0.00
223.80
4379.42
613.12
4992.55

20872.18

1000

0.42
0.92
0.7
2.1

cu.m.
Nos.
Nos.
Nos.

Brick Masonry in superstructure with CM (1:6) prop:


using Fly ASH Bricks of size 290x225x140mm
with compressive of 50 Kgs / Sqcm from approved
source including cost and conveyance of all materials
like cement, sand, fly ash bricks, water etc., to site,
including seigniorage charges, sales & other taxes on
all materials, all operational, incidental and labour
charges such as mixing cement mortar, constructing
masonry, scaffolding charges, lift charges, curing,
etc., complete for finished item of work. for
basement (APSS No. 501 & 504).

Wall thickness
Material
Fly Ash Bricks 290x225x140mm

0.225
110 Nos

Cement for Cement Mortar (1:8)


Sand for Cement Mortar (1:8)
Labour
1st class mason
2nd class mason
Man Mazdoor
Woman Mazdoor

24 Kgs
0.1 cu.m.

5.84
1525.26

1
1

cu.m.
Nos.
Nos.
Nos.

315.00
285.00
285.00
250.00

1
1
1
1

24 Nos
7.2 Kgs
0.02 cu.m.

10832.08
5.84
1525.26

1000

0.06 cu.m.
0.06 Nos.
0.275 Nos.

315.00
285.00
285.00

1
1
1

GF
446.90
8.99
54.34

FF
446.90
8.99
77.01

SF
446.90
8.99
99.69

0%

0.00

0.14
Total

510.23
71.43
581.70

0.00
11.44
544.34
76.21
620.55

0.00
22.88
578.46
80.98
659.45

0.42
0.92
0.7
2.1
total

23

Add 14% over heads

0.14
Basic Rate per Cum.

Reinforced Fly Ash Brick Masonry 10cm thick for


partition walls in CM (1:4) prop: Fly Bricks of size
290x100x140mm with compressive of 50 Kgs /
Sqcm from approved source and placing 2nos. of
6mm dia MS bars embedded in every 3rd layer with
free ends of reinforcement keyed into mortar joints
of the main brick work whereever applicable
including cost and conveyance of all materials like
cement, sand, bricks, water etc., to site, seigniorage
charges, sales & other taxes on all materials, all
operational, incidental and labour charges such as
mixing cement mortar, constructing masonry,
scaffolding charges, lift charges, curing, etc., but
excluding cost and conveyance of steel and its
fabrication charges complete for finished item of
work. (APSS No. 501 & 509).

24

Material
Fly Ash Bricks 290x100x140mm
Cement for Cement Mortar (1:4)
Sand for Cement Mortar (1:4)
Labour
1st class mason
2nd class mason
Man Mazdoor
Basic Rate per One Sqmt.
Rate for other Floors
Basic rate per sqm
Hire charges of stage scafflding per cum
Labour charges for stage scaffolding per cum
Add LA on Labour for scaffolding
Lift charges @ 10% extra on each floor
Add 14% over heads
Rate per One Sqmt.

Providing High Yield Strength Deformed (HYSD)


steel bars (Fe 415 grade as per IS 1786-1985) of
8mm to 40mm diameters, cutting, bending, to
required sizes and shapes placing in position with
cover blocks of approved size and binding wire of
20SWG, forming grills for reinforcement work as
per approved designs and drawings including cost
and conveyance of bars from approved sources to
site of work, including cost and conveyance of
binding wire, cover blocks, chairs, overlaps, spacers,
dowels, wastage etc., and all operational, incidental,
and labour charges such as cutting, bending, placing
in position, tying etc., and sales & other taxes,on cost
of all materials complete for finished item of work
(APSS No.126) in all floors.

Material
Cost of steel including 5% wastage and overlaps

25

cost of binding wire


Labour
Blacksmith/Tin Smith/Rivetor
Light mazdoor

1.05 MT

41552.64

6 Kg

55.00

10 Nos
10 Nos

315.00
285.00

1
1

GF
49960.27

FF
49960.27
600.00

SF
49960.27
1200.00

49960.27
6994.44
56954.75

50560.27
7078.44
57638.75

51160.27
7162.44
58322.75

Rate per MT
Rate for other Floors
Basic rate per MT
Lift Charges per MT @10% extra on labour per floor

Add 14% over heads


Rate per One MT
Providing Mild Steel Bars (Fe 250 grade as per IS
432) of 6mm diameter, cutting, bending, to required
sizes and shapes placing in position with cover
blocks of approved size and binding wire of 20SWG,
forming grills for reinforcement work as per
approved designs and drawings including cost and
conveyance of bars from approved sources to site of
work, including cost and conveyance of binding
wire, cover blocks, chairs, overlaps, spacers, dowels,
wastage etc., and all operational, incidental, and
labour charges such as cutting, bending, placing in
position, tying etc., and sales & other taxes,on cost
of all materials complete for finished item of work
(APSS No.126) in all floors.

Material

0.14
Total

Cost of Mild steel


cost of binding wire
Labour
Blacksmith/Tin Smith/Rivetor
Light mazdoor

1.05 MT
6 Kg

41552.64
55.00

1
1

10 Nos
10 Nos

315.00
285.00

1
1

GF
49960.27

FF
49960.27
600.00

SF
49960.27
1200.00

49960.27
6994.44
56954.75

50845.27
7118.34
57963.65

51161.27
7162.58
58323.90

3.17 kgs
0.011 cu.m.

5843.92
580.45

1000
1

1.92 kgs
0.004 cu.m.

5843.92
580.45

1000
1

0.063 Nos.
0.147 Nos.
0.39 Nos.

315.00
285.00
285.00

1
1
1

GF
211.34
2.11
11.08

FF
211.34
2.11
15.57

SF
211.34
2.11
20.05

0%

0.00

0.14
Total

224.53
31.43
255.96

0.00
17.29
246.31
34.48
280.79

0.00
34.58
268.08
37.53
305.61

Rate per MT
Rate for other Floors
Basic rate per MT
Lift Charges per MT @10% extra on labour per floor

Add 14% over heads


26

Rate per One MT


Ornamental Plastering 12mm thick in two coats
with base coat of 8mm thick in CM (1:5) and top
coat of 4mm thick in CM (1:3) dubara sponge
finish including cost and conveyance of all materials
like cement, sand, water etc., to site, seigniorage
charges, sales & other taxes on all materials,all
operational, incidental and labour charges such as
mixing mortar, scaffolding charges, lift charges,
including cutting of Grooves wherever necessary as
directed by Engineer - in - charge, finishing, curing,
etc., complete for Even Surfaces of Wall for
finished item of work. (APSS 901,903 & 904)

Material
Base coat 8mm thick in C.M. (1:5)
Cement
cost of sand for Plastering
Top Coat 4mm thick in C.M. (1:3)
Cement
cost of sand for Plastering
Labour
1st Class Mason
2nd Class Mason
Light mazdoor
Basic rate per 1 Sqmt.
Rate for other Floors
Basic rate per 1 Sqmt.
Hire charges of stage scafflding per sqm
Labour charges for stage scaffolding per sqm
Add LA on Labour for scaffolding
Lift charges @ 10% extra on each floor
Add 14% over heads
Rate per 1 Sqmt.

0.14
Total

27

Plastering 12mm thick in two coats with base coat


of 8mm thick in CM (1:6) and top coat of 4mm
thick in CM (1:4) dubara sponge finish including
cost and conveyance of all materials like cement,
sand, water etc., to site, seigniorage charges, sales &
other taxes on all materials,all operational, incidental
and labour charges such as mixing mortar,
scaffolding charges, lift charges, including cutting of
Grooves wherever necessary as directed by Engineer
- in - charge, finishing, curing, etc., complete for
Even Surfaces of Wall for finished item of work.
(APSS 901,903 & 904)

Material
Base coat 8mm thick in C.M. (1:6)
Cement
cost of sand for Plastering
Top Coat 4mm thick in C.M. (1:4)
Cement
cost of sand for Plastering
Labour
1st Class Mason
2nd Class Mason
Light mazdoor
Basic rate per 1 Sqmt.
Rate for other Floors
Basic rate per 1 Sqmt.
Hire charges of access scafflding pers qm
Labour charges for access scaffolding per sqm
Add LA on Labour for scaffolding
Lift charges @ 10% extra on each floor
Add 14% over heads
28

Rate per 1 Sqmt.


Plastering 20mm thick in two coats with base coat
of 16mm thick in CM (1:6) and top coat of 4mm
thick in CM (1:4) dubara sponge finish including
cost and conveyance of all materials like cement,
sand, water etc., to site, seigniorage charges, sales &
other taxes on all materials, all operational,
incidental and labour charges such as mixing
mortar,scaffolding
charges,
lift
charges,
finishing,including cutting of Grooves wherever
necessary as directed by Engineer - in - charge,
curing, etc., complete for Uneven Surfaces of
Brick Wall for finished item of work. (APSS
901,903 & 904)

2.64 kgs
0.011 cu.m.

5843.92
580.45

1000
1

1.44 kgs
0.004 cu.m.

5843.92
580.45

1000
1

0.063 Nos.
0.147 Nos.
0.39 Nos.

315.00
285.00
285.00

1
1
1

GF
205.44
0.90
5.43

FF
205.44
0.90
7.70

SF
205.44
0.90
9.97

0%

0.00

0.14
Total

211.77
29.65
241.45

0.00
17.29
231.33
32.39
263.75

0.00
34.58
250.89
35.12
286.05

29

Base coat 16 mm thick in C.M. (1:6)


Cement
cost of sand for Plastering
Top Coat 4mm thick in C.M. (1:4)
Cement
cost of sand for Plastering
Labour
1st Class Mason
2nd Class Mason
Light mazdoor
Basic rate per 1 Sqmt.
Rate for other Floors
Basic rate per 1 Sqmt.
Hire charges of access scafflding pers qm
Labour charges for access scaffolding per sqm
Add LA on Labour for scaffolding
Lift charges @ 10% extra on each floor
Add 14% over heads
Rate per 1 Sqmt.
Plastering with CM(1:5) Prop: 12mm thick in
single coat including cost and conveyance of all
materials like cement, sand, water etc., to site,
including seigniorage charges, sales & other taxes on
all materials, all operational, incidental charges and
labour charges such as mixing mortar, finishing,
curing, etc., complete for finished item of work.
(APSS 901,906)

30

cost of cement for Cement Mortar (1:5)


sand for Cement Plastering (1:5)
1st Class Mason
Man mazdoor
Rate per 1 Sqmt.
Rate for other Floors
Basic rate per 1 Sqmt.
Hire charges of access scafflding pers qm
Labour charges for access scaffolding per sqm
Add LA on Labour for scaffolding
Lift charges @ 10% extra on each floor
Add 14% over heads
Rate per 1 Sqmt.

4.32 kgs
0.018 cu.m.

5843.92
580.45

1000
1

1.44 kgs
0.004 cu.m.

5843.92
580.45

1000
1

0.063 Nos.
0.147 Nos.
0.39 Nos.

315.00
285.00
285.00

1
1
1

GF
219.32
0.90
5.43

FF
219.32
0.90
7.70

SF
219.32
0.90
9.97

0%

0.00

0.14
Total

225.65
31.59
257.25

0.00
17.29
245.21
34.33
279.55

0.00
34.58
264.77
37.07
301.85

5.84
580.45
315.00
285.00

1
1
1
1

GF
80.20
0.90
5.43

FF
80.20
0.90
7.70

SF
80.20
0.90
9.97

0%

0.00

0.14
Total

86.53
12.11
98.65

0.00
4.63
93.43
13.08
106.55

0.00
9.25
100.32
14.04
114.40

4.32
0.015
0.06
0.096

kg
cu.m.
Nos.
Nos.

Plastering with CM(1:4) Prop: 20mm thick in


single coat including cost and conveyance of all
materials like cement, sand, water etc., to site,
including seigniorage charges, sales & other taxes on
all materials, all operational, incidental charges and
labour charges such as mixing mortar, finishing,
curing, etc., complete for finished item of work.
(APSS 901,906)

31

cost of cement for Cement Mortar (1:4)


sand for Cement Plastering (1:4)
1st Class Mason
Man mazdoor
Rate per 1 Sqmt.
Rate for other Floors
Basic rate per 1 Sqmt.
Hire charges of access scafflding pers qm
Labour charges for access scaffolding per sqm
Add LA on Labour for scaffolding
Lift charges @ 10% extra on each floor
Add 14% over heads
Rate per 1 Sqmt.

7.56
0.021
0.094
0.16

kg
cu.m.
Nos.
Nos.

5.84
580.45
315.00
285.00

1
1
1
1

GF
131.55
0.90
5.43

FF
131.55
0.90
7.70

SF
131.55
0.90
9.97

0%

0.00

0.14
Total

137.88
19.30
157.20

0.00
7.52
147.67
20.67
168.35

0.00
15.04
157.46
22.04
179.50

5.84
580.45
24.00
315.00
285.00
285.00

1
1
1
1
1
1

Providing impervious coat over RCC roof slab to


required slopes with CM (1:3) prop. 20mm thick
(average) mixed with water proofing compound
manufactured by reputed manufacturers as approved
by Engineer-in-charge at 1Kg/bag of cement, laid
over roof slab when it is green, finished smooth with
a floating coat of neat cement and thread lining at
regular intervals of 45cmx45cm including cost and
conveyance of all materials like cement, sand, water
proofing compound, water etc., to site, seigniorage
charges, sales & other taxes on all materials, all
operational, incidental and labour charges such as
mixing mortar, laying, rounding off at junctions of
wall and slab, rendering smooth with thread lining,
curing, lift charges, etc., complete for finished item
of work (APSS No. 901 & 903).

cost of cement for Cement Mortar (1:3)


sand for Cement Plastering(1:3)
Water proof compound
1st Class Mason
2nd Class Mason
Man Mazdoor
Basic rate per 1 Sqmt.

10.08
0.021
0.2
0.066
0.154
0.37

kg
cu.m.
Kgs
Nos.
Nos.
Nos.

Rate for other Floors


Basic rate per 1 Sqmt.
Lift charges @ 10% extra on each floor

GF
245.99

FF
245.99
14.93
260.92
36.53
297.45

SF
245.99
29.87
275.86
38.62
314.50

457.08

5.46 Kgs
0.012 cum

5843.92
1525.26

1000
1

0.1 day

0.00

315.00
285.00
285.00
153.51

1
1
1

FF
708.04

SF
708.04

245.99
34.44
280.45

Add 14% over heads

0.14
Rate per 1 Sqmt.
Say
FALSE
32
set over a base coat of CM (1:8), 12mm thick (joints
Flooring with
of stone must be flushed) over C.C. bed already laid
or R.C.C. roof slab only after it is properly cured,
cleaned, moistered and where necessary treated with
neat grey cement slurry of honey like consistency
spred at3.3 kgs of cement for 1 sqm. and jointed with
neat cement paste to full depth, including cost and
conveyance of all materials like cement, sand, water,
flooring stones etc. to site, seigniorage charges, sales
and other taxes on all materials, all operational,
incidental and labour charges such as dressing of
flooring stones to the required sizes, mixing of
cement mortar, laying, jointing, curing, lift charges
etc., complete for finished item of work.(APSS
No.703 & 701)

Flooring with Polished Bethamcherla pure (marble


type) white stone minimum 25 mm thick (0.254M x
0.254M) set over a base coat of CM (1:8), 12mm
thick (joints of stone must be flushed) over C.C. bed
already laid or R.C.C. roof slab only after it is
properly cured, cleaned, moistered and where
necessary treated with neat grey cement slurry of
honey lik

Material
Cost of Polished Bethamcherla pure (marble type)
white stone minimum 25 mm thick (0.254M x
0.254M)
Cement for Morter and slurry
Coarse sand for mortor(C.M. 1:8)
Machinery
Machine charges for rubbuing/polishing floor
LA charges on crew charges
Labour
1st Class Mason
2nd Class Mason
Man Mazdoor
Add water charges @1% on labour
Basic rate per 1 Sqmt.
Rate for other Floors
Basic rate per 1 Sqmt.

1.1 Sqmt.

0%
0.31 Nos.
0.11 Nos.
0.086 Nos.
1%
GF
708.04

33

Lift charges @ 10% extra on each floor


708.04
99.13
807.20

Add 14% over heads

0.14
Rate per 1 Sqmt.
Total
laid over existing CC bed or roof slab set over a base
Flooring with
coat of CM (1:8), 12mm thick and pointing with
CM(1:3) to full depth of flooring slabs dully filling
joints neatly , including cost and conveyance of all
materials like flooring stones, cement, sand, water,
etc. to site, seigniorage charges, sales and other taxes
on all materials, all operational, incidental and labour
charges such as mixing of cement mortar, laying,
pointing, curing, lift charges etc., complete for
finished item of work.(APSS No.703 & 701)

15.50
723.54
101.30
824.85

31.01
739.05
103.47
842.55

319.67
5.84
1525.26
94.40
315.00
285.00
285.00
250.00

10
1
1
1
1
1
1
1

FF
343.16
18.43
361.59
50.62
412.25

SF
343.16
36.86
380.02
53.20
433.25

Flooring with Rough Kadapa slabs of minimum 40


mm thick, size not less than (0.457 x 457M)laid
over existing CC bed or roof slab set over a base coat
of CM (1:8), 12mm thick and pointing with CM(1:3)
to full depth of flooring slabs dully filling joints
neatly , including cost and conveyance of all
materials like flooring stones, cement, sand,

34

Rough Kadapa slab


cost of cement for Cement Mortar (1:8)
sand for Cement Mortar (1:8)
Pointing with CM (1:3)
1st Class Mason
2nd Class Mason
Man Mazdoor
Woman Mazdoor
Basic rate per 1 Sqmt.
Rate for other Floors
Basic rate per 1 Sqmt.
Lift charges @ 10% extra on each floor

1.05
2.16
0.012
1
0.096
0.224
0.22
0.11

Add 14% over heads

0.14
Total

Rate per 1 Sqmt.

Sqmt.
kg
cu.m.
Sqmt.
Nos.
Nos.
Nos.
Nos.
GF
343.16
343.16
48.04
391.25

with length
Providing
equal to
skirting
flooring
to stones
internal
set walls
over a12.5
baseCm high with
coat of CM (1:3), 12mm thick with cement slurry of
honey like consistency spread @ 3.3 Kgs per sqm
and jointed with neat cement paste mixed with
pigment of matching shade to full depth (joints of
stone should be flushed), including cost and
conveyance of all materials like cement, sand, water,
flooring stones etc. to site, seigniorage charges, sales
and other taxes on all materials, all operational,
incidental and labour charges such as dressing of
flooring stones to the required sizes, mixing of
cement mortar, laying, jointing, curing, lift charges
etc., complete for finished item of work.(APSS
No.701 & 707)

Providing skirting to internal walls 12.5 Cm high


withPolished Bethamcherla pure (marble type) white
stone minimum 25 mm thick (0.254M x 0.254M)
with length equal to flooring stones set over a base
coat of CM (1:3), 12mm thick with cement slurry of
honey like consistency spread @ 3.3 Kgs per sqm
and jointed with neat cement paste mixed with
pigment of matching shade to full depth (joints of
stone

Material
Cost of Polished Bethamcherla pure (marble type)
white stone minimum 25 mm thick (0.254M x
0.254M)
sand for Cement Mortar (1:3)
cement for Cement Mortar (1:3) base coat
Cement for slurry
Labour
1st Class Mason
2nd Class Mason
Man Mazdoor
Add water charges @1% on labour
Basic rate per 1 Sqmt.
Rate for other Floors
Basic rate per 1 Sqmt.
Lift charges @ 10% extra on each floor
Add 14% over heads
Rate per 1 Sqmt.

1.1 Sqmt.

457.08

0.012 cu.m.
5.76 Kgs
3.3 Kgs

1525.26
5843.92
5843.92

1
1000
1000

0.096 Nos.
0.224 Nos.
0.31 Nos.
1%

315.00
285.00
285.00
182.43

1
1
1

FF
758.29
18.43
776.72
108.74
885.50

SF
758.29
36.85
795.14
111.32
906.50

GF
758.29

0.14
Total

758.29
106.16
864.50

35

in Single piece with the edges flat nosed


Supplying
and setand fixing of
over a base coat of CM (1:3), 12mm thick, and
fixing in position with neat cement paste including
cost and conveyance of all materials like cement,
sand, water, stones etc. to site, seigniorage charges,
sales and other taxes on all materials, all operational,
incidental and labour charges such as dressing of
stones to the required sizes, mixing of cement
mortar, fixing in position, curing, lift charges etc.,
complete for finished item of work For raisers
(APSS No.701 & 707)

Supplying and fixing of Polished Black Kadapa slabs


minimum of 15 mm thick (0.457M x 0.457M) in
Single piece with the edges flat nosed and set over a
base coat of CM (1:3), 12mm thick, and fixing in
position with neat cement paste including cost and
conveyance of all materials like cement, sand, water,
stones etc. to site, seigniorage charges, s

For Raisers of 0.15 Mt. Height


Material
Cost of Polished Shahbad stone
sand for Cement Mortar (1:3)
cement for Cement Mortar (1:3) base coat
Cement for slurry
Labour
1st Class Mason
2nd Class Mason
Man Mazdoor
Flat nosing edges as per BMM-V.14
Add water charges @1% on labour
Basic rate per 1 Sqmt.
Rate for other Floors
Basic rate per 1 Sqmt.
Lift charges @ 10% extra on each floor
Add 14% over heads
36

1.1
0.012
5.76
3.3

Sqmt.
cu.m.
Kgs
Kgs

249.14
1525.26
5843.92
5843.92

1
1
1000
1000

0.096
0.224
0.31
13.33
1%

Nos.
Nos.
Nos.
Rmt.

315.00
285.00
285.00
12.00
182.43

1
1
1
1

FF
689.52
18.43
707.95
99.11
807.06

SF
689.52
36.85
726.37
101.69
828.06

GF
689.52

0.14
Rate per Sqmt.

689.52
96.53
786.05

in Single piece with the edges flat nosed


Supplying
and setand fixing of
over a base coat of CM (1:8), 12mm thick, and
fixing in position with neat cement paste including
cost and conveyance of all materials like cement,
sand, water, stones etc. to site, seigniorage charges,
sales and other taxes on all materials, all operational,
incidental and labour charges such as dressing of
stones to the required sizes, mixing of cement
mortar, fixing in position, curing, lift charges etc.,
complete for finished item of work for Treads
(APSS No.701 & 707)

Supplying and fixing of Polished Black Kadapa slabs


minimum of 15 mm thick (0.457M x 0.457M) in
Single piece with the edges flat nosed and set over a
base coat of CM (1:8), 12mm thick, and fixing in
position with neat cement paste including cost and
conveyance of all materials like cement, sand, water,
stones etc. to site, seigniorage charges, s

Treads of 0.30 Mt wide


Cost of Polished Shahbad stone
Cement for jointing
Coarse sand for mortor(C.M. 1:8)
Machinery
Machine charges for rubbuing/polishing floor

37

LA charges on crew charges


Labour
1st Class Mason
2nd Class Mason
Man Mazdoor
Flat nosing edges

1.1 Sqmt.
5.46 Kgs
0.012 cum
0.1 day

249.14
5843.92
1525.26

1
1000
1

0.00

315.00
285.00
285.00
12.00

1
1
1
1

FF
557.81
15.35
573.16
80.24
653.40

SF
557.81
30.70
588.51
82.39
670.90

0%
0.31
0.11
0.086
6.67

Basic rate per 1 Sqmt.


Rate for other Floors
Basic rate per 1 Sqmt.
Lift charges @ 10% extra on each floor
Add 14% over heads
Rate per Sqmt.

Nos.
Nos.
Nos.
Rmt.
GF
557.81

0.14
Say

557.81
78.09
635.90

In - situ - Granolithic Concrete Flooring 20mm


thick with CC(1:1:2) Prop: using 6mm to 12mm
size HBG machine crushed metal laid
monolithically over 100mm thick CC flooring bed
(1:5:10) with 40mm HBG metal in alternate
panels of size not exceeding 1.50m x 1.50m and
finishing the top surface to required smoothness and
slopes, thread lining as directed by the Engineer - in charge including cost and conveyance of all
materials like cement, sand, water, etc. to site,
seigniorage charges, sales and other taxes on all
materials, all operational, incidental and labour
charges such as mixing of cement concrete, laying,
curing, lift charges etc., complete for finished item of
work (APSS No.701 & 710)

6mm to 12mm HBG metal


Sand
Cement
PCC bed (1:5:10) 100mm thick
1st Class Mason
2nd Class Mason
Manand women Mazdoor

0.017
0.0085
12
0.10
0.125
0.006
0.3

cum
cum
Kgs
cum
Nos.
Nos.
Nos.

1101.20
1525.26
5843.92
2886.86
315.00
285.00
285.00

1
1
1000
1
1
1
1

38
Add 14% over heads

0.14

517.08

Rate per 1 Sqmt.


Flooring with Ceramic Tiles of 7.3mm thick 1st.
quality of any shade as approved by Engineer - in
- charge set over a base coat of CM (1:8), 12mm
thick laid over flooring bed / V.R.C.C. slab, with
neat cement slurry of honey like consistency spread
at the rate of 3.3 Kgs of cement per Sq.m and jointed
with neat white cement paste to full depth mixed
with pigment of matching shade including cost and
conveyance of all materials like cement, sand, water,
ceramic tiles etc. to site, seigniorage charges, sales
and other taxes on all materials, all operational,
incidental and labour charges such as mixing of
cement mortar, laying, curing, lift charges etc.,
complete for finished item of work.(APSS No.701 &
707) in All Floors

Material
Ceramic Tiles
Sand
Cement
Grey Cement for slurry

1.05
0.012
2.16
3.3

Sqmt.
cum
Kgs
Kgs

419.00
1525.26
5843.92
5843.92

1
1
1000
1000

39

White Cement for pointing


Labour
1st Class Mason
2nd Class Mason
Man Mazdoor
Add water charges @1% on labour
Basic rate per 1 Sqmt.
Rate for other Floors
Basic rate per 1 Sqmt.
Lift charges @ 10% extra on each floor
Add 14% over heads

0.2 Kgs

25.00

0.096 Nos.
0.224 Nos.
0.33 Nos.
1%

315.00
285.00
285.00
188.13

1
1
1

FF
685.17
19.00
704.17
98.58
802.80

SF
685.17
38.00
723.17
101.24
824.45

Sqmt
Kgs
Kgs
Kgs
Cum

314.00
5843.92
25.00
5.84
1525.26

1
1000
1
1
1

0.077 Nos.
0.08 Nos.

315.00
285.00

1
1

FF
432.13
4.71
436.84
61.16
498.00

SF
432.13
9.41
441.54
61.82
503.40

GF
685.17
685.17
95.92
781.10

0.14

Rate per Sqmt.


Dadooing to walls with white glazed tiles 1st.
quality of any size of brand as approved by
Engineer - in - charge and set over a base coat of
CM (1:5), 12mm thick and neat cement paste at the
rate of 3.3 Kg/Sqmt. and jointed with white cement
paste mixed with pigment of matching shade
including cost and conveyance of all materials like
cement, sand, water, tiles, etc. to site, seigniorage
charges, sales and other taxes on all materials, C921
such as mixing of cement mortar, laying in position,
curing, lift charges etc., complete for finished item of
work (APSS No.701 & 707) in All Floors

40

white glazed tiles


Grey cement
White cement
Cement for Cement Mortar CM (1:5)
Sand Mortar CM (1:5)
Labour
1st Class Mason
Man Mazdoor
Basic rate per 1 Sqmt.
Rate for other Floors
Basic rate per 1 Sqmt.
Lift charges @ 10% extra on each floor
Add 14% over heads

1.05
0.33
0.6
3.45
0.012

GF
432.13

0.14
Rate per Sqmt.

432.13
60.50
492.65

Whiting to new walls and ceiling in two coats


with Surya cem or equavalent quality to give an
even shade after thoroughly brushing the surface to
remove all loose powdered materials including cost
and conveyance of all materials and water to site,
sales & other taxes, all operational, incidental and
labour charges such as cleaning the surface, painting,
curing etc., complete for finished item of work for
internal walls. (APSS No.901 & 908) in All Floors

41

Surya Cem
Painter
Man Mazdoor
sundries including brushes,ladders, etc.,
Add 14% over heads
Rater per 1 Sqmt. for all floors

0.2 kgs
0.021 Nos.
0.032 Nos.
1%
0.14

20.60
294.00
285.00
19.41

1
1
1

19.61

Painting to New walls with two coats of Snowcem


cement paint of superior quality of approved brand
and shade over base coat of cement primer grade -I
making three coats in all to give an even shade
after thoroughly brushing the surface to remove all
loose powdered materials, including cost and
conveyance of all materials, including cost and
conveyance of all materials, cost of brushes, water to
site, etc., sales & other taxes, all operational,
incidental and labour charges such as scaffolding
charges, lift charges, curing etc., complete for
finished item of work in all floors for External
Walls.(APSS No. 912) in All Floors

42

Material
Cement Primer Grade I
Snowcem Paint
Labour for Priming Coat
1st class painter
2nd class painter
Labour for Two Coats
1st class painter
2nd class painter
Man and women mazdoor
Add 14% over heads
Rater per 1 Sqmt. for all floors

43

0.1 Kgs
0.35 Kgs

117.00
44.24

1
1

0.021 Nos.
0.049 Nos.

350.00
300.00

1
1

0.015 Nos.
0.035 Nos.
0.15 Nos.

350.00
300.00
285.00

1
1
1

0.14

107.73

Painting to New Iron work with two coats of ready


mixed synthetic enamel paint first quality all shades
over an existing steel primer including cost and
conveyance of all materials to site, sales & other
taxes, incidental, operational and all labour charges
etc., complete for finished item of work. (APSS No.
1201, 1207 & 1212).in All Floors

Cost of Synthetic Enamel Paint


1st Class Painter
2nd Class Painter

0.11 Ltr
0.033 Nos.
0.077 Nos.

Add 14% over heads


Rater per 1 Sqmt. for all floors

0.14

199.00
350.00
300.00

1
1
1

56.54

Supply and fixing of 110mm dia ISI mark PVC


rain water spouts of 2.5 Kg/cm2 pressure
including Cost of necessary pvc bends, shoes and
M.S.clamps and all other accessories and fixing in
position including cost and conveyance of all
materials to site , seigniorage charges sales and other
taxes on all materials, all operational, incidental and
labour cahrges such as fixing in alignment etc.,
complete for finished item of work.(APSS NO1328)
in All Floors

Cost of 110mm dia PVC Pipe.(page 274)


Cost of P.V.C.Bend 391 BMW-G.57
Cost PVC shoe 397 BMW-G.63
Cost of Clips 440 BMW-G.106
Plumber 1st Class
Plumber 2nd class
Man Mazdoor

3.00
1.00
1.00
3.00
0.30
0.70
1.00

Add 14% over heads

0.14

Rmt.
No.
No.
Nos.
Nos.
Nos.
No.

70.00
1
75.00
1
64.00
1
16.00
1
315.00
1
285.00
1
285.00
1
Rate per 3 Rmt.

44
Rate per Rmt.

325.33

Reinforced cement mortar Facia 5 cm thick in


CM (1:3) for drop walls, Fins & staircase railing
with rabbit wire mesh & nominal reinforcement as
directed by Engineer-in-charge with dubara spong
finishing including cost & conveyence of all
materials to site, including seigniorage charges, sales
and other taxes on all materials and all operational,
incidental charges such as labour charges, like
mixing cement mortar, scaffolding charges, lift
charges, curing, for making 50 mm thick RCM
Paradah walls (RCM Drop walls) including tying
Rabbit (chicken) wire mesh to the existing mild steel
/ HYSD Steel reinforcement applying mortar lumps,
finishing, plastering to both faces, sponge finishing
etc complete for finished item of work but excluding
cost of steel and its fabrication charges in All Floors

45

materials
Costof rabit wire mesh
43 Grade cement
Cost of coarse sand
Labour
1st Class Mason
Miller operator
Man Mazdoor
Hire charges of miller

1.33 Sqmt
31.91 Kgs
0.06 Cum
0.80
1.00
1.00
0.20

Nos.
Nos.
Nos.
Hour

13.00
5843.92
1525.26

1
1000
1

315.00
315.00
285.00
89.00

1
1
1
1

FF
1162.03
86.98
1249.01
174.86
1423.90

SF
1162.03
173.96
1335.99
187.04
1523.05

117.00
117.00

1
1

Basic rate per 1 Sqmt.

46

Rate for other Floors


Basic rate per 1 Sqmt.
Lift charges @ 10% extra on each floor
Add 14% over heads

GF
1162.03

0.14
Rate per Sqmt.

1162.03
162.68
1324.75

47
Painting to New wood work with two coats of
ready mixed synthetic enamel paint first quality all
shades to give an even shade over base coat Primer
with Luppam finishing after thoroughly brushing
the surface to remove all remains including cost and
conveyance of all materials to site, sales & other
taxes, all operational, incidental and labour charges
etc., complete for finished item of work.(3 coats)
(APSS No. 1201 & 1212).in All Floors

PRIMARY COAT
Luppam finish
Ready mixed primer

0.1 Kg.
0.07 lit

Ist class painter


2nd class painter
TWO COATS OF PAINTING
Synthetic enamel paint
1st class painter
2nd class painter

48

0.021 Nos.
0.049 Nos.

350.00
300.00

1
1

0.12 lit
0.036 Nos.
0.084 Nos.

199.00
350.00
300.00

1
1
1

Add 14% over heads


Rate per 1 Sqmt. for all Floors
Supply and Fixing of 50mm thick Jali including cost
and conveyance of all materials to site, sales & other
taxes, all operational, incidental and labour charges
etc., complete for finished item of work in All
Floors.

0.14

103.62

Rate as per SSR


Add 14% over heads

1 Sqmt
0.14

352.00
352.00

1 Sqmt
0.14

1855.00
1855.00

Sqmt
Nos.
Nos.
Nos.

194.00
13.00
0.50
0.20

1
1
1
1

0.043 Nos.

315.00

Rate per Sqmt.


Supplying & fixing collapsible steel shutters with
vertical, double channel of 20 x10x2 mm of 100 mm
centre ,Bracers with flat iron 40x40x6 mm with 38
mm dia steel pulleys, the top, bottom and side
vertical frames of the collapsible gate with
65x65mmx8mm MS Angle and middle guide rail at
site height with 65mmx8mm MS flat for the pulleys
to guide and fixed with necessary hold fasts, bolts,
nuts, rivets, locking arrangements, stoppers, handles,
all accessories all fixtures and painted with one coat
of approved steel primer etc., complete for finished
item of work as per special spn 1105

Rate as per SSR BMT-F.30


Add 14% over heads
Rate per Sqmt.
Supply and Fixing AC Sheet Corrugated 6mm thick
including Labour Charges for fixing AC Sheets
including cost of J bolts bitumen washers etc with or
without ridges complete including cost and
conveyance of all materials to site, sales and other
taxes, all labour charges etc., complete for finished
item of work

49

Unit =
A ) material
cost of 6mm thick corregated AC sheets
8mm dia G.I.J bolts & nuts
G.I washersBitumen washers
Bitumen washers
B) labour
Carpenter II class

1 Sqmt
1.05
2.2
2.2
2.2

Man Mazdoor
Sundries including 50 x 6 mm Iron wind ties and
white lead etc.,
Rate per 1 Sqmt. for all Floors
Add 14% over heads
50

0.054 Nos.

285.00

0.14
Rate per one Sqmt

Supply and Fixing MS Purlins 50mm dia including


Labour Charges for fixing complete including cost
and conveyance of all materials to site, sales and
other taxes, all labour charges etc., complete for
finished item of work

51

Cost of MS Pipe 50mm dia asper (BMT-F.04)

5.1 Kgs.

47.00

Fabrication, Cutting and Fixing charges


(BMM-V.16)

5.1 Kgs.

16.00

Add 14% over heads

0.14

321.30

0.1 Kgs
0.09 Ltr

117.00
211.00

1
1

0.021 Nos.
0.049 Nos.

350.00
300.00

1
1

0.036 Nos.
0.084 Nos.

350.00
300.00

1
1

Rate per Rmt.


Painting to New walls with two coats of Plastic
Emulsion paint of superior quality of approved
brand and shade over base coat of cement primer
grade -I making three coats in all to give an even
shade after thoroughly brushing the surface to
remove all loose powdered materials, including cost
and conveyance of all materials, including cost and
conveyance of all materials, cost of brushes, water to
site, etc., sales & other taxes, all operational,
incidental and labour charges such as scaffolding
charges, lift charges, curing etc., complete for
finished item of work in all floors for Walls.(APSS
No. 912) in All Floors

52

53

54

Cement Primer Grade I


Plastic Emulsion Paint
Labour for Priming Coat
1st class painter
2nd class painter
Labour for Two Coats
1st class painter
2nd class painter
Add 14% over heads
Rater per 1 Sqmt. for all floors

0.14

90.54

Providing expansion joint treatment with ploy


sulphide compound of approved make of finsihed
size 25 x 12 mm including making of 25mm x 12mm
groove and primer coat over finished groove with
finishing of edges true to straight line and level over
the finished surface of expansion joint including cost
and convenyance of all materials to site, all
incidental , operational , labour charges etc.,
complete for finished item of work as per approved
drawing ( for all floors on top slab i.e, in the flooring
and for internal vertical joints of grooves in dadooing
surface).

As per market rate


Add 14% over heads
Rate per 1 Rmt
Providing and Fixing of 24 guage alluminium sheet
over expansion joint groove of width 15cm fixed to
walls / columns at one edge and resting over the
other blcok walls / columns concealing expansion
joint with slotted holes for free edge of aluminium
sheet to faciliate free movement of aluminium sheet
over the finished surface of expansion joint and wall
face using sheet metal screws with nylon receiver
complete including cost and convenyance of all
materials to site, all incidental , operational labour
charges etc.,, complete for finsihed item of work as
per approved drawing ( for all floors for vertical
joints and bottom of slab).

1.00 RM
0.14

290.00
290.00

Cost of alluminium sheet 24 Gauge BMS-W.18

1.00 Sqm

265.00

Add for labour charges including cost


of nails, making holes to wall and in aluminium
sheet etc..

6.60 Rm

10.00

Add 14% over heads


Rate per 1 Sqm
Providing and Fixing of expansion joint filler
board for Buildings , Columns , Beams and Slabs
Armour Board " sillfill including cost and
convenyance of all materials to site, all incidental,
operational , labour charges etc., complete for
finished item of work as per approved drawing for
all floors

0.14

331.00

Rate as per SSR BMT-U.05


Add 14% over heads

1.00 Sqm
0.14

327.00
327.00

Supply and Fixing of 230mm wide PVC water bar at


expansion joint over roof slab including cost , all
taxes and convenyance of all materials to site and all
labour charges , cutting and fixing charges etc.,
complete for finsihed item of work.

Market rate
Labour charges for fixing

1.00 RM

220.00

Add 14% over heads

0.14

250.00

Making Green Chalk Board of size 3.00Mx1.20Mts


including border with plastering in CM (1:2) 12mm
thick as base coat and 3mm thick top coat with
cement green oxide powder in (1:1) prop. and
making border of 50x20mm thick alround the chalk
board over existing plastered surface and painting
the chalk board surface with chalk board paint as per
direction of Engineer-in-Charge including cost and
conveyance of all materials, sales and other taxes on
cost of materials and all operational, incidental and
labour charges etc., complete for finished item of
work (APSS No.1603)

56

57

base coat in cm 1:2


Cost of of sand for CM (1:2)
cost of cement for CM 1:2)
1st Class Mason
2nd Class Mason
Man mazdoor
Woman mazdoor
Basic rate per 10 Sqmt.
20mm thick plastering in CM(1:2)
Cost of of sand for CM (1:2)
cost of cement for CM 1:2)
1st Class Mason
2nd Class Mason
Man mazdoor
Woman mazdoor
Basic rate per 10 Sqmt.
Top Coat in CM(1:1)
Cost of Cement
Cost of Black Oxide
1st Class Mason
2nd Class Mason
Man mazdoor
Woman mazdoor

0.15
108
0.33
0.77
0.5
1.1

Cu.m.
Kgs
Nos.
Nos.
Nos.
Nos.

580.45
5.84
315.00
285.00
285.00
285.00

1
1
1
1
1
1

0.21
151.2
0.66
1.54
0.5
3.2

Cu.m.
Kgs
Nos.
Nos.
Nos.
Nos.

580.45
5.84
315.00
285.00
285.00
285.00

1
1
1
1
1
1

3.15
15
0.33
0.77
0.5
1.1

Kgs
Kgs
Nos.
Nos.
Nos.
Nos.

5.84
88
315.00
285.00
285.00
285.00

1
1
1
1
1
1

58

DATA FOR GREEN BOARD


Cost of Base Coat in CM (1:2)
Cost of Top Coat
20mm thick Plastering in CM (1:2)
Cost of chalk Board paint

4.03
3.6
0.43
4.03

Rate per Each Board


rate per sqmt
Add 14% over heads

0.14

Sqmts.
Sqmts.
Sqmts.
Sqmts.

1497.19
2117.8
2706.2
384.4

10
10
10
10

454.75
rate per sqmt

Providing and laying of cinder concrete in cement


cinder mix (1 :15) prop. Using 12.5 mm nominal
size cinder laid in layers and compacted as directed
for filling sunken floors including cost and
conveyence of all materials, water to the work site,
seinerage charges and all operational, incidental
labour charges such as mixing cement & cinder etc.
complete for finished item of work.

59

cost of cinder meterial BMT-A.17


43 Grade cement
1st Class Mason
Man mazdoor
Add 14% over heads
Rate per 1 cum
Supply of Concare antyi Corrosiion admixture
inhibitor liquid as per central electro chemical
research institute developed specification(BMT- H
61
Add 14% over heads
Rate per 1 Lit.
Proviging plinth protection with a bed of 100mm
thick PCC (1:5:10) using 40mm size HBG metal and
on top of PCC, 20 mm thick granolithic concrete
flooring with CC (1:1:2) prop; machine crushed
metal of size 6mm to 12 mm laid monolithically
already laid in alternate panels and finishing the top
surface to required smoothness and slopes inculing
grooves, thread lining as cost and coveyance of all
materials to site including seignorage charges, sales
& other taxes and all materials and operatinal &
incidental and labour charges like mixing of cement
concrete, laying ,curing lift charges etc., complete
including of CC bedfor finished item of work (APSS
No.701 & 710)

1.00
95.00
0.10
2.36

cum
Kgs
Nos.
Nos.

0.14

1 Lr
0.14

495.00
5843.92
315.00
285.00

1
1000
1
1

6MM To 12MM HBG metal

60

Sand
cement
PCC BED (1:5:10) 100mm thick
1 st class Mason
2 nd class mason
Man mazdoor
women mazdoor
Rate per 10 sqm
Rate per 1 sqm
Add 14% over heads

0.17 Cum
0.085 Cum
120 Kgs
1.0 Cum
1.25 Nos
0.06 Nos
2.5 Nos
0.5 Nos

1101.20
1525.26
5843.92
2886.86
315.00
285.00
285.00
250.00

1 cum
1 cum
1000 kgs
1 cum
each
each
each
each

0.14
Rate per 1 sqm

Construction of Rain water harvesting structure as


per the approved drawing and design of size 2.0 m x
1.5 m x 2.0 m including earth work excavation of
filling of 40 mm size HBG metal up to 50% of
volume, filling of 20 mm size 15% of colume.
construction of side walls in brickmasonry in CM
(1:6) 230 mm thick and 450 mm height, plastering
the side walls in (1:6) 16 mm thick base coat and top
coat of 4 mm thick with dubara sponge tinish,
providing coir mat to avoid spillage of water
including cost and conveyance of all materials to site
and all albour charges etc., complete for finished
item of work.

61

Earth work excavation 375.00 each


2.0 x 1.50 x 2.00 = 6.00 Cum
Cost of 40 mm
2.00 x 1.50 x 1.00 = 3.00 Cum
Cost of 20 mm
2.00 x 1.50 x 0.40 = 1.20 cum
Cost of sand filings
2.00 x 1.50 x 0.30 = 0.90 cum
B.W CM (1:6) Prop
6.08 x 0.23 x 0.45 = 0.60 cum
Plastring 20 mm in two coats
7.00 x 0.23 = 1.61 Sqm
Add 14% over heads
Each
Supplying , laying , aligning & jointing of RCC
Hume Pipes of 300mm dia NP2 class including all
necessary fixtures like collars of respective diameter
including cost and convenyance of all materilas to
site, sales and othe taxes on all materials , lifting,
placing and fixing in position for finished item of
work.

6 Cum

91.00

3 Cum

1027.87

1.2 Cum

1522.87

0.9 Cum

1425.26

0.63 Cum

3368.41

1.61 sqm

225.65

0.14

62

As per SSR Item No : (page 238)


Add collars (page 239)
Labour charges for laying & jointing
(Rs. 11.22 per 25mm dia).page 225
Rate per 10 Rmt.
Rate per 1 Rmt.
Add 14% over heads

10 Rmt
3 Nos
10 Rmt

348.00
86.00
171.60

1
1
1

0.14
Rate per 1 Rmt.

63
Flooringwith 16 to 18mm thick high polished granite
stone slabs of black colour approved by the engineerincharge laid over RCC slab or bed alredy laid and
set over base coat of
CM (1:8) 20mm thick
including neat cement , slurry of honey like
consistency spread at the rate of 3.30kg per sqm and
joined with neat white cement paste mixed with
pisment of matching shade to ful allmaterials to
work site depth including cost and conveyence of
and all materials to work site and operational ,
incidentallabour and lift charges and seignorage
charges etc., complete for finshed item of work for
platform in kitchen/diniing (SS 701 & special)

64

Materials
High polished granite 16 to 18mm thick
corese sand for C.M. 1:8
Cement for CM1: 8 base coat
Cement for slurry
Cement for joining
Labour
1 st class mason
2nd class mason
Man Mazdoor

10.50
0.20
36.00
33.00
6.00

Sqm
Cum
Kgs
Kgs
Kgs

3.00 Nos
1.00 Nos
8.00 Nos

2033
1525.26
5843.92
5843.92
5843.92

1 sqm
1 cum
1000 kgs
1000 kgs
1000 kgs

315.00 each
285.00 each
285.00 each

65
Rete per 1 sqm
Add 14% over heads
Rete per 1 sqm

0.14

Half Rounding the edges of granite slab including


polishing all labour charges, hire charegs of tools and
plants All incidental charges etc., complete for
finished item of work as directed by the engineer
incharge
As per SSR BMM-V.10
64

Add 14% over heads


Rate per RM

1 RMT
0.14

220.00

Manufacture, supply, & delivery of 50mm outer


dia HDPE pipes conforming to IS 4984 - 1995
at 6Kg/Sqcm. including cost and conveyance of
all materials to site, all labour charges, sales
and other taxes on all materials etc., complete
for finished item of work for All Floors.
1 RMT
10%

Intial Cost
Add for Excise Duty at 10%

55.00
51.00

Total
Add 14% over heads

0.14
total rate per Rmt.

Supply and application of one coat of Altek / Sai


Coat / Neon water based cement primer and two
coats of Altek Flora / Sai Coat / Neon / Indocem
/PMCC /ESSAR super track for internal walls
(Emulsion ) Paint including all taxes, cost and
conveyance of all materials to site, all operational,
incidental charges and labour charges etc., complete
for finished item of work.

Rate as per item No.402 of Building SSR 2012-13


(Item code No.BMT-J-36)

1 Sqm

95.00

205.00

Rate per 1 Sqmt.


Add 14% over heads
Rate per 1 Sqmt.

0.00
Total

Supply and application of one coat of water based


cement primer and one coat of Deco / PMCC Orient
base exterior texture and two coats of Altek
Harmony (Emulsion Paint exterior grade) inclusive
of all taxes,
including cost and conveyance of all
materials to site, all operational, incidental charges
and labour charges etc., complete for finished item of
work.

Rate as per item No.412 of Building SSR 2012-13


(Item code No.BMT-J-46)

1 Sqm

Rate per 1 Sqmt.


Add 14% over heads
Rate per 1 Sqmt.

0.00
Total
total rate per Rmt.

,Laying jointing of HDPE pipes as per BIS No. 7634


part -II/75 and specials /fittings including excavation
of trenches up to 0.5 mts depth in all soils except
rock requires blasting and refilling trenches after
laying and jointing of pipes as per ssr item no.12 (b)
complete for finished item of work

Intial Cost
Add 14% over heads

1 RMT

17.38

0.14
total rate per Rmt.

Asst Engineer / Asst Executive Engineer (APEWIDC) Dy. Executive Engineer (APEWIDC)
Section :......................
Sub - Division: .............................

Executive Engineer (APEWID


Division:.............................

Superintending Engineer (APEWIDC)


Circle: .........................

apally (V) Siddipet (M) Medak District

013-2014

NCY / MUNICIPAL / LALI


ALLOWANCE

Unit
day
day
day
day
day
day
day
day
day
Kg
Sqmt.

0.115 thick
cu.m.

399.04

cu.m.

574.78

cu.m.

750.61

cu.m.

0.00

Sqmt.
Sqmt.
Sqmt.
Sqmt.
ing plates as per the approved shuttering
f all accessories Using Cashewrina Ballies

Labour charges

Centring Charges for


2012-13

4
5
ng Casurina Bellies, Bamboos, Wooden Reapers,
labour

1st floor
total
409.20
651.20
987.80
838.20
128.70
1177.00
987.80
111.10
115.50

471.20
725.20
2035.80
1728.20
304.70
1311.00
2334.80
262.10
272.50

2nd floor
3rd floor
labour
total
labour
446.40
508.40
483.60
710.40
784.40
769.60
1077.60
2125.60
1167.40
914.40
1804.40
990.60
140.40
316.40
152.10
1284.00
1418.00
1391.00
1077.60
2424.60
1167.40
121.20
272.20
131.30
126.00
283.00
136.50

372.00
592.00
898.00
762.00
117.00
1070.00
898.00
101.00
105.00

Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.

434.00
666.00
1946.00
1652.00
293.00
1204.00
2245.00
252.00
262.00

109.00
370.00

Rs.
Rs.

273.00
925.00

119.90
407.00

283.90
962.00

130.80
444.00

294.80
999.00

141.70
481.00

259.00
Rs.
648.00
1020.00
Rs.
2552.00
1035.00
Rs.
2588.00
1650.00
Rs.
4540.00
126.00
Rs.
346.00
Steel scaffolding pipes, jack Props, wallers, Foot
372.00
Rs.
434.00
592.00
Rs.
666.00
898.00
Rs.
1946.00
1207.00
Rs.
2810.00
185.00
Rs.
502.00
1695.00
Rs.
1936.00
1421.00
Rs.
3848.00
160.00
Rs.
433.00
166.00
Rs.
449.00
173.00
Rs.
469.00
585.00
Rs.
1585.00
410.00
Rs.
1111.00
1616.00
Rs.
4376.00
1639.00
Rs.
4438.00
2613.00
Rs.
7820.00
199.00
Rs.
596.00
Labour charges
Centring Charges for
2012-13

284.90
1122.00
1138.50
1815.00
138.60

673.90
2654.00
2691.50
4705.00
358.60

310.80
1224.00
1242.00
1980.00
151.20

699.80
2756.00
2795.00
4870.00
371.20

336.70
1326.00
1345.50
2145.00
163.80

5
372.00
592.00
898.00
596.00

Rs.
Rs.
Rs.
Rs.

434.00
666.00
1946.00
1215.00

92.00
Rs.
214.00
836.00
Rs.
929.00
701.00
Rs.
1637.00
79.00
Rs.
184.00
82.00
Rs.
191.00
86.00
Rs.
200.00
289.00
Rs.
675.00
203.00
Rs.
473.00
797.00
Rs.
1862.00
809.00
Rs.
1889.00
1289.00
Rs.
3298.00
98.00
Rs.
251.00
boos, Wooden Reapers, Runners, Wood Posts, Wall
- 1 sqm
54.34
Rs.
63.33
77.01
Rs.
86.00
99.69
Rs.
108.68
122.36
Rs.
131.35
145.04
Rs.
154.03
Labour charges
Centring Charges for
2012-13

4
5
boos, Wooden Reapers, Runners, Wood Posts, Wall
5.43
Rs.
6.33
7.70
Rs.
8.60
9.97
Rs.
10.87
12.24
Rs.
13.14
14.50
Rs.
15.40
os, Wooden Reapers, Runners, Wood Posts, Wall
11.08
Rs.
13.19
15.57
Rs.
17.68
20.05
Rs.
22.16
24.54
Rs.
26.65
29.03
Rs.
31.14

E RATES for Steel scaffolding pipes, jack Props, Steel Centering Plates,etc., for unsupported height 7.32 M

Beams

per 1 cum

Slabs Above 150


Slabs - Up To
Mm - Up To
150 mm Thick
300 mm
Thick
per 1 sqm

per 1 sqm

Slabs - Above
300 mm Thick
per 1 sqm

Waffle Slabs
(Rib Beams
With Slabs)
per 1 sqm

Pergola
Slabs
(Only Rib
Beams)
per 1 sqm

Arch
Arch Beams
Beams - Above 1.5
Up To 1.5
M Span
M Span
per 1 cum per 1 cum

1916.00
424.00
2340.00

215.00
424.00
639.00

223.00
424.00
647.00

234.00
424.00
658.00

789.00
424.00
1213.00

553.00
424.00
977.00

2179.00
424.00
2603.00

2210.00
424.00
2634.00

466.00
509.00

466.00
509.00

466.00
509.00

466.00
509.00

466.00
509.00

466.00
509.00

466.00
509.00

466.00
509.00

551.00
551.00
551.00
551.00
551.00
551.00
551.00
551.00
594.00
594.00
594.00
594.00
594.00
594.00
594.00
594.00
Ballies, Bamboos, Wooden Reapers, Runners, Wood Posts, Wall plates, Steel Centering Plates,etc., for unsupported height 3.66 M

MS

Beams

per 1 cum

Slabs Above 150


Slabs - Up To
Mm - Up To
150 mm Thick
300 mm
Thick
per 1 sqm

per 1 sqm

Slabs - Above
300 mm Thick
per 1 sqm

Waffle Slabs
(Rib Beams
With Slabs)
per 1 sqm

Pergola
Slabs
(Only Rib
Beams)
per 1 sqm

Arch
Arch Beams
Beams - Above 1.5
Up To 1.5
M Span
M Span
per 1 cum per 1 cum

422.00
361.00
783.00

47.00
361.00
408.00

49.00
361.00
410.00

51.00
361.00
412.00

174.00
361.00
535.00

122.00
361.00
483.00

480.00
361.00
841.00

486.00
361.00
847.00

397.00
433.00
469.00
505.00

397.00
433.00
469.00
505.00

397.00
433.00
469.00
505.00

397.00
433.00
469.00
505.00

397.00
433.00
469.00
505.00

397.00
433.00
469.00
505.00

397.00
433.00
469.00
505.00

397.00
433.00
469.00
505.00

apally (V) Siddipet (M) Medak District


Per
Amount

Cum
Kgs

1551.03
3988.23

Day

50.00
5589.26

Cum
Kgs

1551.03
2658.82

Day

50.00
4259.85

Cum
Kgs

1551.03
1994.12

Day

50.00
3595.14

Cum
Kgs

1551.03
1595.29

Day

50.00
3196.32

Cum
Kgs

1551.03
1329.41

Day

50.00
2930.44

Cum
Kgs

1551.03
997.06

Day

50.00
2598.09

Cum
Cum
Cum
Cum
Total

847.43
181.11
155.91
86.64
1271.09

total
271.70
459.40
132.70
0.00

Per Unit

Amount (Rs.)

Day
cu.m.

91.00
68.25

cum
cu.m.
Total

0.00
22.30
181.55

Day
cu.m.
cum

91.00
109.20
22.00

cu.m.
Total

31.11
253.35

nos
cum

91.00
22.00
113.00
15.82
128.85

Total

Nos
Total

13.00
1.82
14.85

cu.m.
Nos
cu.m.
Total

155.73
13.00
23.62
192.40

cu.m.
Nos
cu.m.
Total

1477.17
14.82
208.88
1700.90

cu.m.
cu.m.
Kgs.
KL

745.55
664.73
717.88
108.00

Hour

271.70
0.00

Each
Each
cu.m.

31.50
347.50
404.16
3291.05

Total

cu.m.
cu.m.
Kgs.
KL

745.55
664.73
717.88
108.00

Hour

0.00
0.00

Each
Each
cu.m.

31.50
590.00
400.07
3257.75

Total

cu.m.
cu.m.

745.55
664.73

Kgs.
KL

897.35
108.00

Hour

271.70
0.00

cu.m.
Each
cu.m.

31.50
396.15
436.10
3551.10

Total

cu.m.
cu.m.
Kgs.
KL

1143.98
664.73
717.88
108.00

Hour

271.70
0.00

cu.m.
Each

31.50
396.15

Total

3333.94
TF
3333.94
134.00
1391.00
0.00
128.30
4987.23
698.21
5685.45

cu.m.
cu.m.
Kgs.
KL

1143.98
664.73
1218.63
108.00

Hour

271.70
0.00

Each
Each
Total

31.50
347.50
3786.03
TF
3786.03
62.00
483.60
0.00
113.70
4445.33
622.35
5067.70

cu.m.
cu.m.
Kgs.
KL

1143.98
664.73
1218.63
108.00

Hour

0.00
0.00

Each
Each
Total

31.50
590.00
3756.83
TF
3756.83
62.00
483.60
0.00
186.45
4488.88
628.44
5117.35

cu.m.
cu.m.
Kgs.
KL

1143.98
664.73
1834.59
108.00

Hour

271.70
0.00

cu.m.
Each
Total

31.50
396.15
4450.64
TF
4450.64
62.00
483.60
0.00
128.30
5124.54
717.44
5842.00

cu.m.

1016.87

cu.m.
kgs
KL

590.87
1938.72
108.00

Hour
Hour

612.38
176.89
0.00

Each
Each

31.50
347.50
4822.73
TF
4822.73
62.00
483.60
0.00
113.70
5482.03
767.48
6249.55

Kgs
Cum
Cum
Cum
cu.m.
Each
Each
cu.m.

rd blasted granite stones


Kgs
Cum
Cum
cu.m.

329.03
238.52
250.37
183.58
487.47
378.00
500.00
2366.96
331.37
2698.35

425.41
534.89
183.58
472.69

Each
Each

472.50
580.00
2669.07
373.67
3042.75

cu.m.

Kgs
cu.m.
Each
Each
cu.m.
Or say

7.98
4.43
14.25
21.09
47.75
6.68
54.45

cu.m.
cu.m.
kgs
KL

1016.87
590.87
1938.72
108.00

Hour
Hour

612.38
176.89
0.00

Each
Each
Each
Total

41.90
76.10
1311.00
5872.72

cu.m.
cu.m.

Say

5872.72
434.00
0.00
882.94
7189.70

Say

5872.72
1946.00
0.00
1094.62
8913.35

Say

5872.72
666.00
0.00
915.42
7454.15

cu.m.

cu.m.
cu.m.
cu.m.

cu.m.
cu.m.
cu.m.

cu.m.
cu.m.
kgs
KL

1143.98
664.73
2215.68
108.00

Hour

271.70

Hour

132.70
0.00

Each
Each
Each
Total

41.90
190.10
300.00
5068.78

cu.m.
cu.m.

Say

5068.78
434.00
0.00
770.39
6273.20

Say

5068.78
1946.00
0.00
982.07
7996.90

Say

5068.78
666.00
0.00
802.87
6537.70

cu.m.

cu.m.
cu.m.
cu.m.

cu.m.
cu.m.
cu.m.

cu.m.
cu.m.

1016.87
590.87

kgs
KL

1938.72
108.00

Hour
Hour

612.38
176.89
0.00

Each
Each
Each
Total

52.61
47.60
1400.00
5943.93

TF
5943.93
134.00
1391.00
0.00
450.06
7918.99
1108.66
9027.70
TF
5943.93
890.00
990.60
0.00
450.06
8274.59
1158.44
9433.05

cu.m.
cu.m.
kgs
KL

1143.98
664.73
2215.68
108.00

Hour
Hour

271.70
132.70
0.00

Each
Each
Each
Total

52.61
47.60
1175.00
5811.99

TF
5811.99
134.00
1391.00
0.00
382.56
7719.55
1080.74
8800.30
TF
5811.99
890.00

990.60
0.00
450.06
8142.65
1139.97
9282.65

cu.m.
cu.m.
kgs
KL

1016.87
610.10
2045.37
120.00

Hour
Hour

141.50
40.87
0.00

Each
Each
Each
Total

21.11
37.91
876.95
4910.67
TF
4910.67
1347.00
1167.40
0.00
280.79
7705.86
1078.82

8784.70

cu.m.

368.30
TF
368.30
151.00
131.30
0.00
21.06
671.66
94.03
765.70

cu.m.

491.07
TF
491.07
151.00
131.30
0.00
28.08
801.45
112.20
913.65

cu.m.

540.17
TF
540.17
151.00
131.30
0.00
30.89
853.36
119.47
972.85

cu.m.

564.73
TF
564.73
151.00
131.30

0.00
32.29
879.32
123.10
1002.45

cu.m.

589.28
TF
589.28
151.00
131.30
0.00
33.69
905.27
126.74
1032.05

cu.m.

613.83
TF
613.83
151.00
131.30
0.00
35.10
931.23
130.37
1061.65

cu.m.

687.49
TF
687.49
151.00
131.30
0.00
39.31
1009.10
141.27
1150.40

cu.m.

564.73
TF
564.73
151.00

131.30
0.00
32.29
879.32
123.10
1002.45

cu.m.

736.60
TF
736.60
151.00
131.30
0.00
42.12
1061.02
148.54
1209.60

cu.m.

810.26
TF
810.26
157.00
136.50
0.00
46.33
1150.09
161.01
1311.15

cu.m.

859.37
TF
859.37
157.00
136.50
0.00
49.14
1202.01
168.28
1370.30

cu.m.

883.92

TF
883.92
157.00
136.50
0.00
50.54
1227.96
171.91
1399.90

cu.m.

982.13
TF
982.13
157.00
136.50
0.00
56.16
1331.79
186.45
1518.25

cu.m.

1104.90
TF
1104.90
157.00
136.50
0.00
63.18
1461.58
204.62
1666.25

cu.m.
cu.m.
kgs
KL

1143.98
664.73
2215.68
108.00

Hour
Hour

72.54
35.43
0.00

Each
Each
Each
Total

21.11
37.91
625.00
4924.38
TF
4924.38
1347.00
1167.40
0.00
205.20
7643.98
1070.16
8714.15

cu.m.

369.33
TF
369.33

151.00
131.30
0.00
21.06
672.69
94.18
766.90

cu.m.

492.44
TF
491.07
151.00
131.30
0.00
28.08
801.45
112.20
913.65

cu.m.

541.68
TF
541.68
151.00
131.30
0.00
22.57
846.55
118.52
965.10

cu.m.

566.30
TF
566.30
151.00
131.30
0.00
23.60
872.20
122.11
994.35

cu.m.

590.93
TF
590.93
151.00
131.30
0.00
24.62
897.85
125.70
1023.55

cu.m.

615.55
TF
615.55
151.00
131.30
0.00
25.65
923.50
129.29
1052.80

cu.m.

689.41
TF
689.41
151.00
131.30
0.00
28.73
1000.44
140.06
1140.55

cu.m.

738.66
TF
738.66
151.00
131.30
0.00
30.78
1051.74
147.24
1199.00

cu.m.

812.52
TF
812.52
157.00
136.50
0.00
33.86
1139.88
159.58
1299.50

cu.m.

861.77
TF
861.77
157.00
136.50
0.00
35.91
1191.18
166.76
1357.95

cu.m.

886.39
TF
886.39
157.00
136.50
0.00
36.94
1216.83
170.36
1387.20

cu.m.

984.88
TF
984.88
157.00
136.50
0.00

41.04
1319.42
184.72
1504.15

cu.m.

1107.98
TF
1107.98
157.00
136.50
0.00
46.17
1447.65
202.67
1650.35

cu.m.
cu.m.
kgs
KL

1016.87
590.87
1938.72
108.00

Hour

612.38
0.00

Each
Each
Each

52.61
47.60
1400.00
5767.04

TF
5767.04
890.00
990.60
0.00
450.06
8097.70
1133.68
9231.40

cu.m.
cu.m.
kgs
KL

1143.98
664.73
2215.68
108.00

Hour

271.70
0.00

Each
Each
Each

52.61
47.60
1175.00
5679.29
TF
5679.29
890.00
990.60
0.00
382.56
7942.45
1111.94

9054.40

cu.m.
cu.m.
kgs
KL

1016.87
610.10
2045.37
120.00

Hour

73.80
0.00

Each
Each
Each
Total

21.11
37.91
876.95
4802.10

cu.m.

300.13
TF
300.13
176.00
152.10
0.00
17.55

645.78
90.41
736.20

cu.m.

240.10
TF
240.10
151.00
131.30
0.00
14.04
536.44
75.10
611.55

cu.m.

120.05
TF
120.05
151.00
131.30
0.00
7.02
409.37
57.31
466.70

cu.m.
cu.m.
kgs
KL

1143.98
664.73
2215.68
108.00

Hour

72.54
0.00

Each
Each
Each
Total

21.11
37.91
625.00
4888.95

cu.m.

305.56
TF
305.56
176.00
152.10
0.00
12.83
646.49
90.51
737.00

cu.m.

240.10
TF
240.10
151.00
131.30
0.00
14.04
536.44
75.10
611.55

cu.m.

120.05
TF
120.05
151.00
131.30

0.00
7.02
409.37
57.31
466.70

Kgs
cu.m.
Each
Each
Each
Each

5.61

Total

15.12
31.92
14.25
27.50
94.40

kgs
Nos
cu.m.

199.41
1884.40
295.43

Each
Each
Each

75.60
159.60
472.50
3086.94
TF
3086.94
39.96
543.82

0.00
212.31
3883.03
543.62
4426.70

kgs
Nos
cu.m.

44.18
208.38
32.03

Each
Each
Each

18.90
17.10
78.38
398.97
TF
398.97
8.99
122.36
0.00
34.31
564.63
79.05
643.70

Nos
Kgs
cu.m.

2295.94
105.12
152.53

cu.m.
Each
Each
Each

132.30
262.20
199.50
525.00
3672.59
TF
3672.59
39.96
543.82
0.00
335.70
4592.07
642.89
5235.00

Nos

2295.94

Kgs
cu.m.

140.16
152.53

cu.m.
Each
Each
Each

132.30
262.20
199.50
525.00
3707.63
519.07
4226.70

Nos
Kgs
cu.m.

259.97
42.05
30.51

cu.m.
Each
Each

18.90
17.10
78.38
446.90
TF
446.90
8.99
122.36
0.00
34.31
612.56
85.76
698.35

MT

43630.27

Kg

330.00

Nos
Nos
Total
TF
49960.27
1800.00
51760.27
7246.44
59006.75

3150.00
2850.00
49960.27

MT
Kg

43630.27
330.00

Nos
Nos

3150.00
2850.00
49960.27

Total
TF
49960.27
1800.00
51760.27
7246.44
59006.75

kgs
cu.m.

18.53
6.38

kgs
cu.m.

11.22
2.32

Each
Each
Each

19.85
41.90
111.15
211.34
TF
211.34
2.11
24.54
0.00
51.87
289.86
40.58
330.44

kgs
cu.m.

15.43
6.38

kgs
cu.m.

8.42
2.32

Each
Each
Each

19.85
41.90
111.15
205.44
TF
205.44
0.90
12.24
0.00
51.87
270.45
37.86
308.35

kgs
cu.m.

25.25
10.45

kgs
cu.m.

8.42
2.32

Each
Each
Each

19.85
41.90
111.15
219.32
TF
219.32
0.90
12.24
0.00
51.87
284.33
39.81
324.15

kg
cu.m.
Each
Each
Total
TF
80.20
0.90
12.24
0.00
13.88
107.22
15.01
122.25

25.23
8.71
18.90
27.36
80.20

kg
cu.m.
Each
Each
Total
TF
131.55
0.90
12.24

44.15
12.19
29.61
45.60
131.55

0.00
22.56
167.25
23.42
190.70

kg
cu.m.
Kgs
Each
Each
Each

58.87
12.19
4.80
20.79
43.89
105.45
245.99

TF
245.99
44.80
290.79
40.71
331.50

Sqmt.

502.79

Kgs
cum

31.91
18.30

day

0.00
0.00

Each
Each
Each

97.65
31.35
24.51
1.54
708.04
TF
708.04

46.51
754.55
105.64
860.20

Sqmt.
kg
cu.m.
Sqmt.
Each
Each
Each
Each

33.57
12.61
18.30
94.40
30.24
63.84
62.70
27.50
343.16
TF
343.16
55.28
398.44
55.78
454.25

Sqmt.

502.79

cu.m.
Kgs
Kgs

18.30
33.66
19.28

Each
Each
Each

30.24
63.84
88.35
1.82
758.29
TF
758.29
55.28
813.57
113.90
927.50

Sqmt.
cu.m.
Kgs
Kgs

274.05
18.30
33.66
19.28

Each
Each
Each
Rmt.

30.24
63.84
88.35
159.96
1.82
689.52
TF
689.52
55.28
744.80
104.27
849.07

Sqmt.
Kgs
cum

274.05
31.91
18.30

day

0.00
0.00

Each
Each
Each
Rmt.

97.65
31.35
24.51
80.04
557.81
TF
557.81
46.05
603.86
84.54
688.40

cum
cum
Kgs
cum
Each
Each
Each

Total

Sqmt.
cum
Kgs
Kgs

18.72
12.96
70.13
288.69
39.38
1.71
85.50
517.08
72.39
589.50

439.95
18.30
12.62
19.28

Kgs

5.00

Each
Each
Each

30.24
63.84
94.05
1.88
685.17
TF
685.17
57.00
742.17
103.90
846.10

Sqmt
Kgs
Kgs
Kgs
Cum

329.70
1.93
15.00
20.15
18.30

Each
Each

24.26
22.80
432.13
TF
432.13
14.12
446.25
62.48
508.75

kgs
Each
Each

Total

4.12
6.17
9.12
0.19
19.61
2.75
22.40

to be verified
Kgs
Kgs

11.70
15.48

Each
Each

7.35
14.70

Each
Each
Each

5.25
10.50
42.75
107.73
15.08
122.85

Total

Ltr
Each
Each

Total

21.89
11.55
23.10
56.54
7.92
64.50

Total

210.00
75.00
64.00
48.00
94.50
199.50
285.00
976.00
325.33
45.55
370.90

Rmt
No
No
No
Each
Each
Each
Rate per 3 Rmt.

Sqmt
Kgs
Cum

17.29
186.48
88.47

Each
Each
Each
Hour

252.00
315.00
285.00
17.80
1162.03
TF
1162.03
260.94
1422.97
199.22
1622.20

Kg
Lt

11.70
8.19

Each
Each

7.35
14.70

lit
Each
Each

Total

23.88
12.60
25.20
103.62
14.51
118.15

Total

352.00
49.28
401.30

Total

1855.00
259.70
2114.70

Sqmt

Sqmt

Sqmt
Each
Each
Each

203.70
28.60
1.10
0.44

Each

13.55

Each

15.39
0.00
262.78
262.78
36.79
299.60

Kgs.

239.70

Kgs.

81.60
321.30
44.98
366.30

Kgs
Ltr

11.70
18.99

Each
Each

7.35
14.70

Each
Each

12.60
25.20
90.54
12.68
103.25

Total

RM

290.00
40.60
330.60

Sqm

265.00

Rm

66.00

331.00
46.34
377.35

Sqm

327.00
45.78

toal

372.80

RM

220.00
30.00
250.00
35.00
285.00

toal

Cu.m.
Kgs
Each
Each
Each
Each

87.07
630.72
103.95
219.45
142.5
313.5
1497.19

Cu.m.
Kgs
Each
Each
Each
Each

121.89
883.01
207.9
438.9
142.5
912
2706.2

Kgs
Kgs
Each
Each
Each
Each

18.4
1320
103.95
219.45
142.5
313.5

2117.8
Sqmts.
Sqmts.
Sqmts.
Sqmts.
Total
Say

603.37
762.41
116.37
154.91
1637.06
1637.1
454.75
63.67
518.45

cum
Kgs
Each
Each

495.00
555.17
31.50
672.60
1754.27
245.60
1999.90
243.00

34.02
277.05

Rate per 1 sqm

187.2
129.65
701.27
2886.86
393.75
17.1
712.5
125
5153.33
515.33
72.15
587.50

Cum

546.00

Cum

3083.61

Cum

1827.44

Cum

1282.73

Cum

2122.10

sqm

363.30
9225.18
1291.53
10516.75

Rmt
Nos
Rmt

Rate per 1 Rmt.

3480.00
258.00
1716.00
5454.00
545.40
76.36
621.80

Sqm
Cum
Kgs
Kgs
Kgs

21346.50
305.05
210.38
192.85
35.06

Nos
Nos
Nos

945.00
285.00
2280.00
25599.84
2559.98
358.40
2918.40

RMT
total

220.00
30.80
250.80

RMT

total rate per Rmt.

Sqm

55.00
5.10
60.10
8.41
68.55

95.00
Total

Sqm

95.00
0.00
95.00

205.00
Total

total rate per Rmt.

205.00
0.00
205.00
68.55

RMT
total rate per Rmt.

Executive Engineer (APEWIDC)


Division:.............................

17.38
2.43
19.85

3rd floor
total
545.60
843.60
2215.40
1880.60
328.10
1525.00
2514.40
282.30
293.50
305.70
1036.00
725.70
2858.00
2898.50
5035.00
383.80

Dome
Slabs

Helical
Stairca
ses

per 1 cum per 1


sqm
4111.00 313.00
424.00 424.00
4535.00 737.00
466.00 466.00
509.00 509.00

551.00 551.00
594.00 594.00
rted height 3.66 M
Dome
Slabs

Helical
Stairca
ses

per 1 cum per 1


sqm
905.00 69.00
361.00 361.00
1266.00 430.00
397.00
433.00
469.00
505.00

397.00
433.00
469.00
505.00

DETAILED AND ABSTRACT ESTIMATE


Name of the Work :- CONSTRUCTION OF ADDL,CLASS ROOM TO NPS KOTHA THANDA OF
KURAVI (MDL) IN WARANGAL DISTRICT
SCHEME :- SSA-2012-13

(20'x16'x10')

SBC-200Kn/Sqmm
Measurements

Sl.
No.

Description of item

Nos.

1
1

Estimate Cost of Rs.


Qty
7

Rate / Per
8

10'60'000=00
Amount
9

Earth work excevation and dep[ositing on bank with initia; ;ead pf 10m and initial lift of 3m
in Loamy & Clayey Soils like BC Soils. Red Earth & Ordinary Gravelly Soils (SS 20-B)
including all operational incidental labour charges etc., complete for Foundation of Building

For Columns 1 to 10 (F1)

1 x

10

1.80

1.80

1.50

48.600

For Columns 11 to 15 (F2)

1 x

1.50

1.50

1.50

16.875

For steps

1 x

6.55

1.20

0.15

1.179
66.654

Below plinth beam


L/W Room in between Columns

2 x

2.87

0.60

0.60

8.251

C/W Room in between Columns

1 x

4.57

0.60

0.60

3.290

C/W Var in between Columns

1 x

2.93

0.60

0.60

2.110
13.651
80.305

For Columns 1 to 10 (F1)

1 x

10

1.80

1.80

0.15

For Columns 11 to 15 (F2)

1 x

1.50

1.50

0.15

2634.65 cum

17250.37

2460.10 cum

47625.81

5323.90 cum

47435.95

1.688

Plain Cement Concrete corresponding to M5 grade as per IS 456 equivalent to (1:5:10)


proportion nominal mix using 40mm size HBG (IS383,11970) metal from approved quarry
including cost and conveyance of all materials and labour charges in layers in position not
exceeding 15cm, finishing top surface, curing concrete, etc., complete for finished item of
work for Foundations and Flooring Bed (APSS No. 402)

L/W Room & Var in between Columns

3 x

2.87

0.45

0.15

2.325

C/W Room in between Columns

1 x

4.80

0.45

0.15

1.620

C/W Var in between Columns

1 x

3.00

0.45

0.15

1.013

In side Room below Sh,Stone

1 x

6.10

4.87

0.15

8.912

In side var below Sh,Stone

1 x

6.10

3.00

0.15

5.490

For steps

1 x

6.55

1.20

0.15

1.179
19.359

Vibrated reinforced cementconcrete corresponding M20 Design Mix (machine mix) using
20mm size HBG (SS5) HBG machin crushed graded metal from approved quarry,using
aminimum quantity of 330 kgs of cement per 1cum of concrete, including cost and
conveyance of all materials to site and including seigniorage charges, sales & other taxes on
all materials, all operational, incidental, and labour charges such as centering, shuttering,
scaffolding, lift charges, machine mixing, laying concrete, vibrating, curing concrete etc,
complete but excluding cost of steel and its fabrication charges for finished item of work
(APSS No.402 & 403)

Column Footings,
Footing

F1 type 10 columns

1 x

10

1.50

1.50

0.300

Footing

F2 type 3 col

1 x

1.20

1.20

0.300

6.750
2.160
8.910

11001.81

4.860
6.548

137.00 cum

Plain Cement Concrete corresponding to M5 grade as per IS 456 equivalent to (1:4:8)


proportion nominal mix using 40mm size HBG (IS383,11970) metal from approved quarry
including cost and conveyance of all materials and labour charges in layers in position not
exceeding 15cm, finishing top surface, curing concrete, etc., complete for finished item of
work for Foundations and Flooring Bed (APSS No. 402)

Column Pedastels,
P1& P2 Col 1 to 15

1 x

15

0.60

0.60

0.60

3.240

3.240
c

5528.90 cum

17913.64

5969.60 cum

44951.45

6722.90 cum

35323.46

6095.10 cum

10785.31

457.70 sqm

7291.16

Columns below plinth beam


C1 for 1 to 10

1 x

10

0.30

0.38

1.50

1.710

C2 for 11 to 15

1 x

0.30

0.30

1.50

0.675

Columns over plinth beam to Roof

2.385

C1 for 1 to 10

1 x

10

0.30

0.30

3.30

2.970

C2 for 11 to 15

1 x

0.30

0.45

3.30

2.228

Deduction:-Lintal portion on Col No 6 and


10
Deduction:-Lintal portion on Col No 10 to
15

1 x

0.38

0.30

0.23

-0.052

1 x

0.30

0.30

0.23

-0.104
5.145

Plinth Beam

7.530

col no 1 to 5 and 6 to 10 and 11 to 15

1 x

6.56

0.30

0.30

1.771

col no 1 to 11 and 2 to 12 and 3 to 13


and 4 to 14 and 5 to 15
Deductions:- col portions

1 x

8.64

0.30

0.30

3.888

1 x

15

0.30

0.30

0.30

-0.405
5.254

Lintelas
For Varandah bressmar beam (10 to 15)

1 x

12.89

0.23

0.23

0.682

For Varandah bressmar beam (6-11 and


10-15)
over door

1 x

3.38

0.23

0.23

0.358

1 x

1.50

0.23

0.23

0.159

over window

1 x

1.80

0.23

0.23

0.571
1.770

Sun shades (0.60m wide 0.0625m avg,


thick
Frent side varandah (On Col No 11 to 15)
Varandha sides (On Col No 6 to 11 and
10 to 15)
over windows

1 x

12.89

0.60 -

7.734

1 x

3.23

0.60 -

3.876

1 x

1.80

0.60 -

4.320
15.930

Roof Beams
col no 1 to 5 and 6 to 10 and 11 to 15

1 x

12.89

0.23

0.30

2.668

col no 1-6-11 and 3-8-13 and 5-10-15

1 x

8.71

0.30

0.30

2.352

col no 2 to 7, 4 to 9

1 x

5.48

0.30

0.38

1.249

Deductions:- col portions

1 x

11

0.30

0.30

0.30

-0.297

1 x

0.30

0.30

0.38

-0.137

1 x

13.50

col portions
h

Roof slab 115mm thick

Providing impervious coat over RCC roof slab to required slopes with CM (1:3) prop. 12mm
thick (average) mixed with water proofing compound at 1Kg/bag of cement, laid over roof
slab when it green, finished smooth with a floating coat of neat cement inculding cost and
conveyance of all materials and labour chares such as mixing mortar, laying,rounding off at
junctions of wall and slab, curing, lift charges,etc., complete for finished item of work.

Over slab
6

1 x

13.50

9.15 -

9.15 -

5.836

5694.90 cum

33232.99

123.525

650.25 Sqm

80322.13

123.525

136.90 Sqm

16910.57

3971.25 cum

3788.57

Plain Cement Concrete corresponding to M5 grade as per IS 456 equivalent to (1:5:10)


proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 20mm size HBG
(SS5) metal from approved quarry including cost and conveyance of all materials etc.,
complete for finished item of work for dummy columns.
C1 Type Columns

1 x

10

0.38

0.30

0.60

0.684

C2 Type Columns

1 x

0.30

0.30

0.60

0.270
0.954

Refilling with useful a vailable excavated earth (excluding rock) in trenches, sides of
foundations and basement with initial lead in layers not exceeding 15cm thick, consolidating
each deposited layer by watering and ramming including all operational, incidental, labour
charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 &
310)
Total Excavated earth quantity
Deductions:- Pcc 1:4:8

80.305

VRCC Footings

-8.910

Pedastals

-3.240

Columns up to ground level

-2.385

-6.548

-21.083
Net qty
9

80.305

Filling with Gravel in trenches, sides of foundations and basement with initial lead in layers
not exceeding 15cm thick, consolidating each deposited layer by watering and ramming
including all operational, incidental, labour charges, hire charges of T & P etc., complete for
finished item of work. (APSS NO. 309 & 310)

11.20 cum

899.42

103.98 cum

13450.50

1953.15 cum

50230.14

2882.90 cum

75675.47

-42.165

Inside of room (Below plinth beam)

1 x

13.10

7.90

1.20

124.188

Inside of room ( plinth beam level)

1 x

2.83

4.80

0.30

16.301

inside of varandah

1 x

2.83

2.93

0.30

9.950
-21.083
129.357

10 Random Rubble stone masonry, in CM (1:8) prop: (Cement: Sand) using OG stones from
approved quarry including cost and conveyance of all materials like Granite stones, cement,
sand, water, etc., to site including seigniorage charges, sales & other taxes on all
materials, all operational, incidental, and labour charges such as cutting stones to required
size and shape, mixing of cement mortar, constructing masonry, curing etc., complete for
finished item of work for foundation and basement (APSS No. 601 & 615)

L/W Room

2 x

2.83

0.45

1.50

15.282

C/W Room

1 x

4.80

0.45

1.50

6.480

C/W Var

1 x

2.93

0.45

1.50

3.956
25.718

11 Brick Masonry with C.M. (1:8) prop: using 2nd class bricks from approved source having
minimum crushing strength of 40 Kg/Sqcm. including cost and conveyance of all materials
like cement, sand, bricks, water etc., to site, including seigniorage charges, sales & other
taxes on all materials, all operational, incidental and labour charges such as mixing cement
mortar, constructing masonry, curing, etc., complete for finished item of work for
Superstructure. (APSS No. 501 & 504).

L/W Room

2 x

2.83

0.23

3.30

17.184

C/W Room

1 x

4.80

0.23

3.30

10.930

L/W over varandah bassmar beam

1 x

2.83

0.23

0.97

1.263

C/W over varandah bassmar beam

1 x

2.93

0.23

0.97

1.307

Steps - 1

1 x

3.45

1.20

0.15

0.621

Steps - 2

1 x

3.15

0.90

0.15

0.425

Steps - 3

1 x

2.85

0.60

0.15

0.257

Steps - 4

1 x

2.55

0.30

0.15

0.115

Deductions:- Door

1 x

1.20

0.23

2.10

-1.159

Windows

1 x

1.50

0.23

1.35

-2.795

Ventiletors

1 x

1.20

0.23

0.30

-0.166

ventiletars

1 x

1.50

0.23

0.30

-0.621

Lintel over door

1 x

1.80

0.23

0.23

-0.190

Lintel over window

1 x

2.10

0.23

0.23

-0.667

Bed blocks of door

2 x

0.23

0.23

0.15

-0.063

bed blocks of window

6 x

0.23

0.23

0.15

-0.190
26.250

11 Supply and Fixing of 50mm thick Jali including cost and conveyance of all materials to site,
sales & other taxes, all operational, incidental and lanbour charges etc., for finished otem of
work.
Ventilaters over door and windows

1 x

1.20

0.30

0.72

500.00

360.00

Ventilaters over door and windows

1 x

1.50

0.30

2.70

500.00

1350.00

12 Supplying and Fixing of of 18 mm gauge MS plain sheet Door with frame made of "L"
angular sedtion of 40x40x6mm with bottom 12mm square rod connecting the two verticals
of the frame and inner frame of double leaf shutter with MS "L" angle of 35x435x4mm and
welded with 2 Nos, of 25x25x3mm angle and 1 No 0x4mm flat for each leaf and welded with
6 Nos of 125mm (5") long MS powder coated hinges, 1 No of 12" long MS powder coated
Aldrop, 2 Nos of 8" MS powder coated tower bolts and 6 Nos of 9" hold fasts of 40x40x6mm
and 2Nos of 5" powder coated handles, 2 Nos of door stoppers including red oxide paint
sales and other taxes on cost of all materials, cost and conveyance charges etc., complete
for a finished item of work.Doors with shutters of Size 1.20x2.10 mts
D1 - 1.20 x 2.1

1 x

2.000

5659 Nos

11318.00

6.000

5962 Nos

35772.00

13 Supplying and Fixing of of 18 mm gauge MS plain sheet Window with frame made of "L"
angular sedtion of 35x35x4mm with bottom 12mm square rod at 100mm in center and
shutter with MS "L" angle of 25x25x3mm and shutter are made of 18 gauge Ms plan sheet
and welded with 4 Nos, of 225mm long hold fasts of 40x40x6mm and along with the
following fixtures for each shutter such as 2Nos of 100mm long MS powder coated hingrs,
2Nos of 100mm powder coated tower bolts and 1 No of 125,mm MS powder coated Handles,
1 No of MS wind appliance including red oxide paint sales and other taxes on cost of all
materials, cost and conveyance charges etc., complete for a finished item of work.Window
with shutters of Size 1.50x1.35 mts

W - 1.50 x 1.35

1 x

16 Plastering 20mm thick in two coats with base coat of 16mm thick in CM (1:6) and top coat
of 4mm thick in CM (1:4) dubara sponge finish including cost and conveyance of all
materials like cement, sand, water etc., to site, seigniorage charges, sales & other taxes on
all materials,all operational, incidental and labour charges such as mixing mortar, scaffolding
charges, lift charges, including cutting of Grooves wherever necessary as directed by
Engineer - in - charge, finishing, curing, etc., complete for Surfaces of Wall for finished
item of work. (APSS 901,903 & 904)

Out side B/s and class room frent L/W

1 x

12.90

3.900

Offsets

2 x

L/W Front side

1 x

0.15

3.900

4.680

12.90

1.200

15.480

Out side C/W of Room

1 x

5.33

3.900

41.574

Out side C/W of Varandah

1 x

3.00

1.200

7.200

C/R Col Fase in Var

1 x

0.30

2.100

1.260

Var Col Up to Lintal level (around)

1 x

1.20

2.100

12.600

Deductions:- Doors

1 x

1.20

2.100

-5.040

Windows

1 x

1.50

1.350

-12.150

Ventiletors

1 x

1.20

0.45

-1.080

Ventiletors

1 x

1.50

0.45

100.620

-4.050
161.094

17 Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:5) and top coat of
4mm thick in CM (1:3) dubara sponge finish including cost and conveyance of all materials
like cement, sand, water etc., to site, seigniorage charges, sales & other taxes on all
materials,all operational, incidental and labour charges such as mixing mortar, scaffolding
charges, lift charges, including cutting of Grooves wherever necessary as directed by
Engineer - in - charge, finishing, curing, etc., complete for Surfaces of Wall for finished
item of work. (APSS 901,903 & 904)

Inside room L/W

1 x

6.10

3.300

40.260

C/W

1 x

L/W Front Varandah

1 x

4.88

3.300

32.208

12.43

1.200

C/W Varandah

14.916

1 x

3.00

1.200

7.200

Steps

1 x

3.45

1.950

6.728

Deductions:- Black board

1 x

2.40

1.35

-6.480

Doors

1 x

1.20

2.10

-5.040

202.05

32549.04

Windows

1 x

1.50

1.35

-12.150

Ventiletors

1 x

1.20

0.30

-0.720

ventiletars

1 x

1.50

0.30

-2.700
94.832

190.05 Sqm

18022.73

95.06 Sqm

16626.82

25.35 Rmt

1829.00

34.380

48.65 Sqm

1672.59

6.480

253.4 Sqm

1642.03

18 Ornamental Plastering to ceiling 12mm thick single coat with in CM (1:4) finish including
cost and conveyance of all materials like cement, sand, water etc., to site, seigniorage
charges, sales & other taxes on all materials,all operational, incidental and labour charges
such as mixing mortar, scaffolding charges, lift charges, including cutting of Grooves
wherever necessary as directed by Engineer - in - charge, finishing, curing, etc., complete
for finished item of work. (APSS 901,903 & 904)

class room celling

1 x

6.10

4.87

59.41

Varandah celling

1 x

6.10

3.00

36.60

class room middil beam sides

2 x

4.87

Slab projections:- L/W side F/B

1 x

13.50

0.30

8.10

C/W sides

1 x

8.56

0.30

5.14

Arounde the slabe edjes

1 x

45.30

Varandah sunshade T/B Frent side

1 x

14.10

1.43

20.16

Varandah sunshade T/B sides

1 x

3.23

1.43

9.24

sunshade over windows

1 x

1.80

1.43

Dummy Columns

1 x

10

1.36

0.60

8.16

Dummy Columns

1 x

1.20

0.60

3.60

Dummy Columns Top

1 x

10

0.30

0.38

Dummy Columns Top

1 x

0.30

0.30

0.380

0.115

7.40

5.21

10.30

1.14
0.45
174.91

Providing water patty of eith CM (1:3)


12mm thick 50mm width including cost
and conveynce of all materials and labour
charges etc.,
Bottom of Front side chajja

1 x

14.09

14.09

1 x

3.23

6.46

Bottom of window chajja


(0.6+1.8+0.6=3)

1 x

3.15

Alround salb

1 x

45.30

6.30
45.30
72.15

20 Painting to MS Doors and windows with two coat of ready mixed synthetic enamel paint first
quality all shades over an existing primer with Suryacem or equavalent quality inculuding
cost and conveyance of all materials to site, sales & OTHER TAXES SUCH AS CLENING the
surface, painting, curing etc., complete for finished item of work for internal wals (APSS No.
1201,1207 & 1212)
For Doors

2 x

1.20

2.10

10.080

For Windows

6 x

1.50

1.35

24.300

21 Formation of black board plastring 22mm thick sponge finishing in Cm(1:3) prop, 16mm
thick 1st coat and Cm (1:2) prop 6mm thick 2nd coat including cost and conveyance of all
materials and labour charges etc, complet
Class Room

1 x

2.4

1.35

22 White cement painting to new walls and celling in two coat with Suryacem or equavalent
quality to give an even shade after thoroughly brushing the surface to remove all loose
powdered materials inculuding cost and conveyance of all materials and water to site, sales
& OTHER TAXES SUCH AS CLENING the surface, painting, curing etc., complete for finished
item of work for internal wals (APSS No. 1201,1207 & 1212)
Inside room L/W

2 x

6.10

3.30

80.520

C/W

2 x

L/W Front Varandah

1 x

4.87

3.30

64.284

12.43

1.20

Room celling

2 x

6.10

4.87

14.916
118.828

Varandah celling

2 x

6.10

3.00

Room beam sides

2 x

Out side:- B/s

1 x

4.87

0.38

12.90

3.90

50.310

Offsets

2 x

0.15

3.90

4.680

L/W Frount side

1 x

12.90

1.20

15.480

C/W of Room

1 x

5.48

3.90

42.744

C/W of Varandah

1 x

3.23

1.20

7.752

Slab projections:- L/W side F/B

1 x

13.49

0.30

C/sides

1 x

8.56

0.30

slab edgings around

1 x

45.30

Varandha sunshades F/S

1 x

14.10

1.43

20.163

C/sides

1 x

3.23

1.43

9.238

For Windows

1 x

1.80

1.43

Deductions:- Black board

1 x

2.40

1.35

-6.480

Doors

2 x

1.20

2.10

-10.080

Windows

6 x

1.50

1.35

-24.300

Ventilators v

2 x

1.20

0.45

-2.160

Ventilators V

6 x

1.50

0.45

-8.100

36.600
7.402

8.094
5.136
0.12

5.210

10.296

450.533

15.50 Sqm

6983.26

380.60 Sqm

38483.99

24 Flooring with polished shabad / Tandur blue Slabas 15 to 18 mm thick (0.475M X 0.457 M)
set over a base coat of CM (1:8), 12mm thick (Joints of stone must be flushed) over C.C.
bed already laid or R.C.C roof slab only after it is properly cured. Cleaned, moistered and
where necessary treated with neat grey cement slury of honey like consistency spred at 3.3
kgs of cement for 1 sqm and jointed with neat cement paste to full depth, including cost and
conveyance of all materials and labour charges such as dressing of flooring stones to the
required sizes mixing of cement mortar, laying joining, curing lift

Inside Room

1 x

6.10

4.87

59.414

At Verandah

1 x

12.90

3.23

41.667

Bottom of door

1 x

1.05

0.23

0.483

Deduct coloumns

1 x

0.30

0.30

-0.450
101.114

25 Providing High Yield Strength Defomed (HYSD) steel bars (Fe 415 grade as per IS 17861985) of 8mm to 40mm diameters, cuttting bending, to required sizes and shapes placing in
position with cover blocks of approved size and binding wire of 20 SWG, forming grills for
reinforcement work as per approved designs and drawings including cost and conveyance of
bars from approved sources to site of work including cost and conveyance of binding wire
cover blocks, chairs, overlaps, spacers, dowels wastage etc., and all operational, incidental
and labour charges such as cutting bending placing in position, tying etc, and sales & other
taxes on cost of all materials complete for finished item of work (APSS No126) in all floors

Qty as per RCC item

5.750

55247.55 MT

317673.41

26 Supply & Fixing of 25mm dia 2mm thick (ISI Marked) concealed PVC pipe with all
accessories fixing in roof slab with all required accessories including masonary work and all
labour charges etc., complete for run of mains etc.

In Roof Slab

36.00

46.90 Rmt

1688.40

12.000

51.50 Rmt

618.00

10.000

319.70 Points

27 Supply and fixing of 25mm dia 1.5mm thick PVC pipe (ISI Mark) concealed in wall with all
required accessories including masonary work for light fan and separate plug point with well
seasoned TW box including all labour charges etc., complete make:
In walls
28 Wiring with 2 runs of 14/0.3mm (1.0 Sq.mm) Fire retardant (FR) PVC insulated flexble
copper cable (ISI MARK) in existing pipe with 6A switch, Ceiling rose and 3mm thick hylam
sheet covering to switch control box incluidng all labour charges etc., comp
For class room

3197.00

29 Supply and fixing of batten holder / slanting holder in lieu of ceiling rose of light point
complete with all connections and all labour charges with 40W bulb (for new installation)
Makes: Gold Medal / Million / Vimal
For class room

8.000

38.25 Rmt

306.00

30 Supply and transportation and fixing of 4X40 watt patti type tube light luminate powder
coated CRCA sheet steel housing with copper chowk and all standard accessories make for
40 Watt tube and varmished teak woood round blocks with flexable 3 core wire e

For class room

4.000

288.00 Each

1152.00

30 Supply of 1200 mm (48") sweep 230V, A.C 50 HZ Celling fan with 3 Blades and double ball
bearings with all standard accessories. Makes Crompton Aura / Bakak R Gold / Havells
Festiva / Usha Primium.

4.000

1858.40 Each

7433.60

30 Supply and erecting Electronic type regulator for celling fans 1200 mm sweep complet
erectred on existing board.

4.000

246.00 Each

984.00

33 L.S. for unforseen item of work

166.84
1013917.45

34 Add 1.50% cost of Q.C. charges

15208.76

35 Add 3% Cost of P.S. Charges

30873.79
Total

Asst Engineer
RVM(SSA) Warangal

The above said work is administratively sanctioned in the Proceedings No.


CW/1424/E1/SSA/2012-13 dt 05-07-2012 of District Collector & Chairman
RVM (SSA) Warangal under SSA - 2012-13

Rs

1060000.00

Dy. Executive Engineer


RVM (SSA) Warangal

The estimate is technically sancitoned for 5.30.. Lakhs ( Rupees


Five Lakhs Thousends Only.) Vide Dr. No. Dated

Executive Engineer
RVM (SSA) Warangal

DETAILED AND ABSTRACT ESTIMATE


Name of the Work :- CONSTRUCTION OF ADDL,CLASS ROOM TO PS RAMCHANDRAPURAM OF
KURAVI (MDL) IN WARANGAL DISTRICT
SCHEME :- SSA-2012-13

(24'x20'x6'9")

SBC-200Kn/Sqmm
Measurements

Sl.
No.

Description of item

Nos.

1
1

Estimate Cost of Rs.


Qty
7

Rate / Per
8

Earth work excevation and dep[ositing on bank with initia; ;ead pf 10m and initial lift of 3m
in Loamy & Clayey Soils like BC Soils. Red Earth & Ordinary Gravelly Soils (SS 20-B)
including all operational incidental labour charges etc., complete for Foundation of Building

For Columns 1-2-3-4-5-6 (F1)

1 x

1.80

1.80

1.50

29.160

For Columns 7-8-9 (F2)

1 x

1.50

1.50

1.50

10.125

For steps

1 x

3.45

1.20

0.15

0.621
39.906

Below plinth beam


L/W Room in between Columns

2 x

2.87

0.60

0.30

2.063

C/W Room in between Columns

1 x

4.57

0.60

0.30

1.645

C/W Var in between Columns

1 x

2.93

0.60

0.30

1.055
4.763
44.669

For Columns 1-2-3-4-5-6 (F1)

1 x

1.80

1.80

0.15

For Varandha Col 7-8-9 (F2)

1 x

1.50

1.50

0.15

2.916
1.013
3.929

#REF!

Plain Cement Concrete corresponding to M5 grade as per IS 456 equivalent to (1:4:8)


proportion nominal mix using 40mm size HBG (IS383,11970) metal from approved quarry
including cost and conveyance of all materials and labour charges in layers in position not
exceeding 15cm, finishing top surface, curing concrete, etc., complete for finished item of
work for Foundations and Flooring Bed (APSS No. 402)

#REF!

Plain Cement Concrete corresponding to M5 grade as per IS 456 equivalent to (1:5:10)


proportion nominal mix using 40mm size HBG (IS383,11970) metal from approved quarry
including cost and conveyance of all materials and labour charges in layers in position not
exceeding 15cm, finishing top surface, curing concrete, etc., complete for finished item of
work for Foundations and Flooring Bed (APSS No. 402)

L/W Room & Var in between Columns

2 x

2.95

0.45

0.10

0.530

C/W Room in between Columns

2 x

4.80

0.45

0.10

0.864

C/W Var in between Columns

1 x

3.00

0.45

0.10

0.270

In side Room below Sh,Stone

1 x

6.10

4.87

0.15

4.456

In side var below Sh,Stone

1 x

6.10

3.00

0.15

2.745

For steps

1 x

3.45

1.20

0.15

0.621
8.865

#REF!

Vibrated reinforced cementconcrete corresponding M20 Design Mix (machine mix) using
20mm size HBG (SS5) HBG machin crushed graded metal from approved quarry,using
aminimum quantity of 330 kgs of cement per 1cum of concrete, including cost and
conveyance of all materials to site and including seigniorage charges, sales & other taxes on
all materials, all operational, incidental, and labour charges such as centering, shuttering,
scaffolding, lift charges, machine mixing, laying concrete, vibrating, curing concrete etc,
complete but excluding cost of steel and its fabrication charges for finished item of work
(APSS No.402 & 403)

Column Footings,
Footing

F1 type 6 col

1 x

1.50

1.50

0.300

4.050

Footing

F2 type 3 col

1 x

1.20

1.20

0.300

1.296
5.346

P1& P2 Col 1 to 9

1 x

0.60

0.60

0.60

1.944
1.944

5323.90

Column Pedastels,
5528.90

Columns below plinth beam


C1 for 1-2-3-4-5amd 6

1 x

0.30

0.38

0.75

0.513

C2 for 7-8-9

1 x

0.30

0.30

0.75

0.203

Columns over plinth beam to Roof

0.716

C1 for 1-2-3-4-5amd 6

1 x

0.30

0.30

3.30

0.891

C2 for 7-8-9

1 x

0.30

0.45

3.30

2.673

Deduction:-Lintal portion on Col No 4 and


6

1 x

0.38

0.23

0.23

-0.040
3.524

Plinth Beam

4.239

col no 1 to 3 and 4 to 6 and 7 to 9

1 x

6.56

0.30

0.30

1.771

col no 1 to 7 and 2 to 8 and 3 to 9

1 x

8.64

0.30

0.30

2.333

Deductions:- col portions

1 x

0.30

0.30

0.30

-0.243
3.861

For Varandah bressmar beam (7-8-9)

1 x

6.55

0.23

0.23

0.346

For Varandah bressmar beam (4-7 and 69)


over door

1 x

3.38

0.23

0.23

0.358

1 x

1.80

0.23

0.15

0.124

over window

1 x

2.10

0.23

0.15

0.217

Sun shades (0.60m wide 0.0625m avg,


thick
Frent side varandah (On Col No 7 to 9)
Varandha sides (On Col No 4 to 7 and 6
to 9)
over windows

1 x

7.75

0.60 -

4.650

1 x

3.23

0.60 -

3.876

1 x

2.10

0.60 -

2.520
11.046

6722.90

Lintelas

1.046
f

5969.60

6095.10

457.70

Beams
col no 1 to 3 and 4 to 6 and 7 to 9

1 x

6.56

0.23

0.30

1.358

col no 1-4-7 and 3-6-9

1 x

8.64

0.30

0.30

1.555

col no 2 to 5

1 x

5.48

0.30

0.38

0.625

Deductions:- col portions

1 x

0.30

0.30

0.30

-0.162

1 x

0.30

0.30

0.38

-0.068

col portions

3.307

5694.80

Roof slab 115mm thick

Providing impervious coat over RCC roof slab to required slopes with CM (1:3) prop. 12mm
thick (average) mixed with water proofing compound at 1Kg/bag of cement, laid over roof
slab when it green, finished smooth with a floating coat of neat cement inculding cost and
conveyance of all materials and labour chares such as mixing mortar, laying,rounding off at
junctions of wall and slab, curing, lift charges,etc., complete for finished item of work.

Over slab
6

1 x

1 x

9.16

9.16

7.15 -

7.15 -

65.494

692.00

65.494

136.90

Plain Cement Concrete corresponding to M5 grade as per IS 456 equivalent to (1:5:10)


proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 20mm size HBG
(SS5) metal from approved quarry including cost and conveyance of all materials etc.,
complete for finished item of work for dummy columns.
C1 Type Columns

1 x

0.38

0.30

0.60

C2 Type Columns

1 x

0.30

0.30

0.60

0.410
0.162
0.572

3971.25

Refilling with useful a vailable excavated earth (excluding rock) in trenches, sides of
foundations and basement with initial lead in layers not exceeding 15cm thick, consolidating
each deposited layer by watering and ramming including all operational, incidental, labour
charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 &
310)
Total Excavated earth quantity
Deductions:- Pcc 1:4:8

44.669

VRCC Footings

-5.346

Pedastals

-1.944

-3.929

Columns up to ground level

-0.716
-11.934
Net qty

44.669

Filling with Gravel in trenches, sides of foundations and basement with initial lead in layers
not exceeding 15cm thick, consolidating each deposited layer by watering and ramming
including all operational, incidental, labour charges, hire charges of T & P etc., complete for
finished item of work. (APSS NO. 309 & 310)

11.20

-23.868

Inside of room (Below plinth beam)

1 x

5.81

7.88

0.30

13.735

Inside of room ( plinth beam level)

1 x

2.83

4.80

0.30

8.150

inside of varandah

1 x

2.83

2.93

0.30

2.488
-11.934
12.439

103.98

10 Random Rubble stone masonry, in CM (1:8) prop: (Cement: Sand) using OG stones from
approved quarry including cost and conveyance of all materials like Granite stones, cement,
sand, water, etc., to site including seigniorage charges, sales & other taxes on all
materials, all operational, incidental, and labour charges such as cutting stones to required
size and shape, mixing of cement mortar, constructing masonry, curing etc., complete for
finished item of work for foundation and basement (APSS No. 601 & 615)

L/W Room

2 x

2.83

0.45

0.60

3.056

C/W Room

1 x

4.80

0.45

0.60

2.592

C/W Var

1 x

2.93

0.45

0.60

1.582
7.231

1953.15

11 Brick Masonry with C.M. (1:8) prop: using 2nd class bricks from approved source having
minimum crushing strength of 40 Kg/Sqcm. including cost and conveyance of all materials
like cement, sand, bricks, water etc., to site, including seigniorage charges, sales & other
taxes on all materials, all operational, incidental and labour charges such as mixing cement
mortar, constructing masonry, curing, etc., complete for finished item of work for
Superstructure. (APSS No. 501 & 504).

L/W Room

2 x

2.83

0.23

3.30

8.592

C/W Room

1 x

4.80

0.23

3.30

7.286

L/W over varandah bassmar beam

1 x

2.83

0.23

0.97

1.263

C/W over varandah bassmar beam

1 x

2.93

0.23

0.97

1.307

Steps - 1

1 x

3.45

1.20

0.15

0.621

Steps - 2

1 x

3.15

0.90

0.15

0.425

Steps - 3

1 x

2.85

0.60

0.15

0.257

Steps - 4

1 x

2.55

0.30

0.15

0.115

Deductions:- Door

1 x

1.20

0.23

2.10

-0.580

Windows

1 x

1.50

0.23

1.35

-1.397

Ventiletors

1 x

1.20

0.23

0.30

-0.166

ventiletars

1 x

1.50

0.23

0.30

-0.207

Lintel over door

1 x

1.80

0.23

0.23

-0.095

Lintel over window

1 x

2.10

0.23

0.23

-0.667

Bed blocks of door

1 x

0.23

0.23

0.15

-0.032

bed blocks of window

3 x

0.23

0.23

0.15

-0.095
16.628

11 Supply and Fixing of 50mm thick Jali including cost and conveyance of all materials to site,
sales & other taxes, all operational, incidental and lanbour charges etc., for finished otem of
work.
Ventilaters over door and windows

1 x

1.20

0.30

1.44

Ventilaters over door and windows

1 x

1.50

0.30

1.80

12 Supplying and Fixing of of 18 mm gauge MS plain sheet Door with frame made of "L"
angular sedtion of 40x40x6mm with bottom 12mm square rod connecting the two verticals
of the frame and inner frame of double leaf shutter with MS "L" angle of 35x435x4mm and
welded with 2 Nos, of 25x25x3mm angle and 1 No 0x4mm flat for each leaf and welded with
6 Nos of 125mm (5") long MS powder coated hinges, 1 No of 12" long MS powder coated
Aldrop, 2 Nos of 8" MS powder coated tower bolts and 6 Nos of 9" hold fasts of 40x40x6mm
and 2Nos of 5" powder coated handles, 2 Nos of door stoppers including red oxide paint
sales and other taxes on cost of all materials, cost and conveyance charges etc., complete
for a finished item of work.Doors with shutters of Size 1.20x2.10 mts
D1 - 1.20 x 2.1

1 x

1.000

13 Supplying and Fixing of of 18 mm gauge MS plain sheet Window with frame made of "L"
angular sedtion of 35x35x4mm with bottom 12mm square rod at 100mm in center and
shutter with MS "L" angle of 25x25x3mm and shutter are made of 18 gauge Ms plan sheet
and welded with 4 Nos, of 225mm long hold fasts of 40x40x6mm and along with the
following fixtures for each shutter such as 2Nos of 100mm long MS powder coated hingrs,
2Nos of 100mm powder coated tower bolts and 1 No of 125,mm MS powder coated Handles,
1 No of MS wind appliance including red oxide paint sales and other taxes on cost of all
materials, cost and conveyance charges etc., complete for a finished item of work.Window
with shutters of Size 1.50x1.35 mts

W - 1.50 x 1.35

1 x

3.000

2882.90

16 Plastering 20mm thick in two coats with base coat of 16mm thick in CM (1:6) and top coat
of 4mm thick in CM (1:4) dubara sponge finish including cost and conveyance of all
materials like cement, sand, water etc., to site, seigniorage charges, sales & other taxes on
all materials,all operational, incidental and labour charges such as mixing mortar, scaffolding
charges, lift charges, including cutting of Grooves wherever necessary as directed by
Engineer - in - charge, finishing, curing, etc., complete for Surfaces of Wall for finished
item of work. (APSS 901,903 & 904)

Out side B/s and class room frent L/W

1 x

6.56

3.900

51.168

Offsets

3 x

0.15

3.900

3.510

L/W Front side

1 x

6.56

1.200

7.872

Out side C/W of Room

1 x

5.33

3.900

41.574

Out side C/W of Varandah

1 x

3.00

1.200

7.200

C/R Col Fase in Var

1 x

0.30

2.100

1.260

Var Col Up to Lintal level (around)

1 x

1.20

2.100

7.560

Deductions:- Doors

1 x

1.20

2.100

-2.520

Windows

1 x

1.50

1.350

-6.075

Ventiletors

1 x

1.20

0.45

-1.080

Ventiletors

1 x

1.50

0.45

-1.350
109.119

202.05

17 Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:5) and top coat of
4mm thick in CM (1:3) dubara sponge finish including cost and conveyance of all materials
like cement, sand, water etc., to site, seigniorage charges, sales & other taxes on all
materials,all operational, incidental and labour charges such as mixing mortar, scaffolding
charges, lift charges, including cutting of Grooves wherever necessary as directed by
Engineer - in - charge, finishing, curing, etc., complete for Surfaces of Wall for finished
item of work. (APSS 901,903 & 904)

Inside room L/W

1 x

6.10

3.300

40.260

C/W

1 x

4.88

3.300

32.208

L/W Front Varandah

1 x

6.10

1.200

7.320

C/W Varandah

1 x

3.00

1.200

7.200

Steps

1 x

3.45

1.950

6.728

Deductions:- Black board

1 x

2.40

1.35

-6.480

Doors

1 x

1.20

2.10

-2.520

Windows

1 x

1.50

1.35

-6.075

Ventiletors

1 x

1.20

0.30

-0.720

ventiletars

1 x

1.50

0.30

-0.900
87.236

18 Ornamental Plastering to ceiling 12mm thick single coat with in CM (1:4) finish including
cost and conveyance of all materials like cement, sand, water etc., to site, seigniorage
charges, sales & other taxes on all materials,all operational, incidental and labour charges
such as mixing mortar, scaffolding charges, lift charges, including cutting of Grooves
wherever necessary as directed by Engineer - in - charge, finishing, curing, etc., complete
for finished item of work. (APSS 901,903 & 904)

class room celling

1 x

6.10

4.87

29.71

Varandah celling

1 x

6.10

3.00

18.30

class room middil beam sides

1 x

4.87

0.380

3.70

190.05

Slab projections:- L/W side F/B

1 x

C/W sides

1 x

Arounde the slabe edjes

1 x

Varandah sunshade T/B Frent side

5.50

9.16

0.30

6.55

0.30

32.62

1 x

7.75

1.43

11.08

Varandah sunshade T/B sides

1 x

3.23

1.43

9.24

sunshade over windows

1 x

2.10

1.43

6.01

Dummy Columns

1 x

1.36

0.60

4.90

Dummy Columns

1 x

1.20

0.60

2.16

Dummy Columns Top

1 x

0.30

0.38

Dummy Columns Top

1 x

0.30

0.30

3.93
0.115

3.75

0.68
0.27
99.22

95.06

20 Painting to MS Doors and windows with two coat of ready mixed synthetic enamel paint first
quality all shades over an existing primer with Suryacem or equavalent quality inculuding
cost and conveyance of all materials to site, sales & OTHER TAXES SUCH AS CLENING the
surface, painting, curing etc., complete for finished item of work for internal wals (APSS No.
1201,1207 & 1212)
For Doors

1 x

1.20

2.10

5.040

For Windows

3 x

1.50

1.35

12.150
17.190

48.65

6.480

253.4

21 Formation of black board plastring 22mm thick sponge finishing in Cm(1:3) prop, 16mm
thick 1st coat and Cm (1:2) prop 6mm thick 2nd coat including cost and conveyance of all
materials and labour charges etc, complet
Class Room

1 x

2.4

1.35

22 White cement painting to new walls and celling in two coat with Suryacem or equavalent
quality to give an even shade after thoroughly brushing the surface to remove all loose
powdered materials inculuding cost and conveyance of all materials and water to site, sales
& OTHER TAXES SUCH AS CLENING the surface, painting, curing etc., complete for finished
item of work for internal wals (APSS No. 1201,1207 & 1212)
Inside room L/W

1 x

6.10

3.30

40.260

C/W

1 x

4.87

3.30

32.142

L/W Front Varandah

1 x

6.10

Room celling

1 x

6.10

4.87

59.414

Varandah celling

1 x

6.10

3.00

18.300

Room beam sides

1 x

4.87

0.38

3.701

Out side:- B/s

1 x

6.55

3.90

25.545

Offsets

3 x

0.15

3.90

3.510

L/W Frount side

1 x

6.55

1.20

7.860

C/W of Room

1 x

5.33

3.90

41.574

C/W of Varandah

1 x

3.23

1.20

7.752

Slab projections:- L/W side F/B

1 x

9.16

0.30

C/sides

1 x

6.55

0.30

slab edgings around

1 x

32.16

Varandha sunshades F/S

1 x

9.76

1.43

13.957

C/sides

1 x

3.23

1.43

9.238

For Windows

1 x

2.10

1.43

6.006

Deductions:- Black board

1 x

2.40

1.35

-6.480

Doors

1 x

1.20

2.10

-5.040

Windows

3 x

1.50

1.35

-12.150

1.20

7.320

5.496
3.930
0.12

3.698

Ventilators v

2 x

1.20

0.45

-2.160

Ventilators V

2 x

1.50

0.45

-2.700
261.173

15.50

24 Flooring with polished shabad / Tandur blue Slabas 15 to 18 mm thick (0.475M X 0.457 M)
set over a base coat of CM (1:8), 12mm thick (Joints of stone must be flushed) over C.C.
bed already laid or R.C.C roof slab only after it is properly cured. Cleaned, moistered and
where necessary treated with neat grey cement slury of honey like consistency spred at 3.3
kgs of cement for 1 sqm and jointed with neat cement paste to full depth, including cost and
conveyance of all materials and labour charges such as dressing of flooring stones to the
required sizes mixing of cement mortar, laying joining, curing lift

Inside Room

1 x

6.10

4.87

29.707

At Verandah

1 x

6.10

3.23

19.703

Bottom of door

1 x

1.20

0.23

0.276

Deduct coloumns

1 x

0.30

0.30

-0.270
49.416

380.60

2.350

55247.55

20.00

46.90

10.000

51.50

4.000

319.70

2.000

51.50

2.000

288.00

1.000

1858.40

25 Providing High Yield Strength Defomed (HYSD) steel bars (Fe 415 grade as per IS 17861985) of 8mm to 40mm diameters, cuttting bending, to required sizes and shapes placing in
position with cover blocks of approved size and binding wire of 20 SWG, forming grills for
reinforcement work as per approved designs and drawings including cost and conveyance of
bars from approved sources to site of work including cost and conveyance of binding wire
cover blocks, chairs, overlaps, spacers, dowels wastage etc., and all operational, incidental
and labour charges such as cutting bending placing in position, tying etc, and sales & other
taxes on cost of all materials complete for finished item of work (APSS No126) in all floors

Qty as per RCC item


26 Supply & Fixing of 25mm dia 2mm thick (ISI Marked) concealed PVC pipe with all
accessories fixing in roof slab with all required accessories including masonary work and all
labour charges etc., complete for run of mains etc.

In Roof Slab
27 Supply and fixing of 25mm dia 1.5mm thick PVC pipe (ISI Mark) concealed in wall with all
required accessories including masonary work for light fan and separate plug point with well
seasoned TW box including all labour charges etc., complete make:
In walls
28 Wiring with 2 runs of 14/0.3mm (1.0 Sq.mm) Fire retardant (FR) PVC insulated flexble
copper cable (ISI MARK) in existing pipe with 6A switch, Ceiling rose and 3mm thick hylam
sheet covering to switch control box incluidng all labour charges etc., comp
For class room
29 Supply and fixing of batten holder / slanting holder in lieu of ceiling rose of light point
complete with all connections and all labour charges with 40W bulb (for new installation)
Makes: Gold Medal / Million / Vimal
For class room
30 Supply and transportation and fixing of 4X40 watt patti type tube light luminate powder
coated CRCA sheet steel housing with copper chowk and all standard accessories make for
40 Watt tube and varmished teak woood round blocks with flexable 3 core wire e

For class room


30 Supply of 1200 mm (48") sweep 230V, A.C 50 HZ Celling fan with 3 Blades and double ball
bearings with all standard accessories. Makes Crompton Aura / Bakak R Gold / Havells
Festiva / Usha Primium.

30 Supply and erecting Electronic type regulator for celling fans 1200 mm sweep complet
erectred on existing board.

1.000

246.00

33 L.S. for unforseen item of work


34 Add 1.50% cost of Q.C. charges
35 Add 3% Cost of P.S. Charges
Total

Asst Engineer
RVM(SSA) Warangal

The above said work is administratively sanctioned in the Proceedings No.


CW/1424/E1/SSA/2012-13 dt 05-07-2012 of District Collector & Chairman
RVM (SSA) Warangal under SSA - 2012-13

Dy. Executive Engineer


RVM (SSA) Warangal

The estimate is technically sancitoned for 5.30.. Lakhs


( Rupees Five Lakhs Thousends Only.) Vide Dr. No.
Dated

Executive Engineer
RVM (SSA) Warangal

NDRAPURAM OF

5'30'000=00
Rate / Per
8

Amount
9

cum

#REF!

cum

#REF!

cum

#REF!

cum

28461.57

cum

10748.18

cum

25306.90

cum

25957.12

cum

6373.34

sqm

5055.75

cum

18835.21

Sqm

45321.85

Sqm

8966.13

cum

2273.14

cum

500.29

cum

1293.39

cum

14122.45

cum

47936.06

Nos

5000.00

Nos

15000.00

22047.49

Sqm

16579.11

9432.02

Sqm

836.29

Sqm

1642.03

Sqm

4048.18

Sqm

18807.73

MT

129831.74

Rmt

938.00

Rmt

515.00

Points

1278.80

Rmt

103.00

Each

576.00

Each

1858.40

Each

246.00
-1211.45
#REF!
#REF!
#REF!

Rs

y sancitoned for 5.30.. Lakhs


usends Only.) Vide Dr. No.

Executive Engineer
RVM (SSA) Warangal

#REF!

COMPLETION REPORT

Name of the Work: CONSTRUCTION OF ADDL. CLASS ROOM TO PS KASNA THANDA, MARIPEDA(M), WARANGAL DIS

Sl.
No.
1

Description of the Item

As per Sanctioned Estimate

Quantity

Rate

Per

Earth Work in Excavation and depositing on bank with


initial lead of 10.00 mt and lift of 2.00 mt in loamy and
clayey soils like BC red earth and OG soils (SS 20-B)
including all operational incidental labour charges such
as shoring, shuttering, sheeting, planking and dewatering
including cost of hire charges of T&P, labour charges etc
complete for finished item of work including seignorage
cgarges excluding dewatering charges etc, complete for
foundation of Building (APSS NO. 308)

39.703

137.00 CuM

Plain Cement Concrete corresponding to M5 grade as


per IS 456 equivalent to (1:4:8) prop.nominal mix Using
40mm size Hard Blasted Granite (IS 383,1970) metal
from approved quarry including cost and conveyance of
all materials like cement,sand,carse aggregate, water etc
to site, including segnorage charges, sales and other
taxes on all materials, all operational, incidental and
labour charges such as mixing, laying and ramming
concrete in layersin position not exceeding 15cms,
finishing top surface, curing concrete, etc completefor
finished item of work for foundations and flooring bed
(APSS No. 402)

3.576

2818.00 CuM

Plain Cement Concrete corresponding to M5 grade as


per IS 456 equivalent to (1:5:10) prop.nominal mix Using
40mm size Hard Blasted Granite (IS 383,1970) metal
from approved quarry including cost and conveyance of
all materials like cement,sand,carse aggregate, water etc
to site, including segnorage charges, sales and other
taxes on all materials, all operational, incidental and
labour charges such as mixing, laying and ramming
concrete in layersin position not exceeding 15cms,
finishing top surface, curing concrete, etc completefor
finished item of work for foundations and flooring bed
(APSS No. 402)

6.054

2643.50 CuM

Random Rubble Stone Massonry in CM (1:8) prop using


hard granite stone from approved quarry including C/c of
all materials and L/C etc complete

9.525

2124.15 CuM

5
Vibrated Reinforced Cement Concrete M20 Design Mix
(By Weigh Batching) using 20mm size (SS5) hard
blasted granite machine crushed graded metal (Coarse
Aggregate) from approved quarry, using a minimum
quantity of 350 Kgs of cement per 1 cum of concrete
including cost and conveyance of all materials like
cement , fine aggregate (sand), coarse aggregate, water
etc to site nad cost of seignorage charges on all
materials including centering using cashewrina ballies
and wooden runners & staging including all bracings,
cross members etc, shuttering, machine mixing, laying
concrete, vibrating, lift charges, curing etc., complete but
excluding cost of steel and fabrication charges for
finished item of work (APSS No. 402&403)
a)
Column Footings

3.981

5503.30 CuM

1.944

5708.30 CuM

Columns

3.857

6149.00 CuM

Plinth Beam

3.877

6902.30 CuM

3.414
61.809

5874.20 CuM
670.85 SqM

1.126

6274.50 CuM

10.872

468.90 SqM

b) Column Pedastals
c)

d)

e) Beams
f) Rof Slab 100mm thick
g) Lintels
h)
Sun Shades (0.60M wide 0.0625 mtrs avg thick)

6
Providing impervious coat over RCC roof slab to required
slopes with CM (1:3) prop. 20mm thick (average) mixed
with water proofing compound manufactured by reputed
manufacturers as approved by Engineer-in-Charge at
1Kg/bag of cement, laid over roof slab when it is green,
finished smooth with a floating coat of neat cement and
thread lining at materials like cement, sand, water
proofing compound, water etc., to site, seignorage
charges, sales & other taxes on all materials, all
operational, incidental, and labour charges such as
mixing mortar, laying, rounding off junctions of wall and
slab, rendering smooth with thread lining, curing, lift
charges etc, complete for finished item of work

61.809

140.50 SqM

Plain Cement Concrete corresponding to M5 grade as


per IS 456 equivalent to (1:5:10) prop.nominal mix Using
20mm size Hard Blasted Granite (IS 383,1970) metal
from approved quarry including cost and conveyance of
all materials like cement,sand,carse aggregate, water etc
to site, including segnorage charges, sales and other
taxes on all materials, all operational, incidental and
labour charges such as mixing, laying and ramming
concrete in layersin position not exceeding 15cms,
finishing top surface, curing concrete, etc completefor
finished item of work for Dummy Columns

0.572

4173.05 CuM

Filling with useful available excavated earth (excluding


rock) in trenches, sides of foundations and basements
with initial lead in layers not exceeding 15Cms thick
consolidating each deposited layer by watering and
ramming including cost and conveyance of water to work
site all operational, incidental, labour charges,
seignorage charges, hire charges of T&P etc, complete
for finished item of work (APSS No. 309& 310)

36.130

11.20 CuM

Filling with gravel in trenches, sides of foundations and


basements with initial lead in layers not exceeding
15Cms thick consolidating each deposited layer by
watering and ramming including cost and conveyance of
water to work site all operational, incidental, labour
charges, seignorage charges, hire charges of T&P etc,
complete for finished item of work (APSS No. 309& 310)

18.780

103.98 CuM

10

Brick Massonry in super structure in CM (1:8) prop using


II class bricks from approved source having minimum
crushing strength of 40 Kg/SqCm including Cost and
conveyance of all materials and labour charges et
complete for finished item of work (APSS 501&504)

16.966

3165.70 CuM

11 Suppliying and Fixing of MS Doors of size


1.20MtsX2.10Mts including C/C of all materials and L/C
etc complete

1.000

4000.00 No

12 Suppliying and Fixing of MS Windows of size


1.50MtsX1.35 Mts including C/C of all materials and L/C
etc complete

3.000

3000.00 No

13 Supplying and fixing of ventilators using 10mm dia


square rods including C/C of all materials to site etc
complete 1.20Mx0.45M

1.000

461.00 No

14 Supplying and fixing of ventilators using 10mm dia


square rods including C/C of all materials to site etc
complete 1.50Mx0.45M

1.000

565.00 No

0.206

4105.60 CuM

Plastering 20mm thick in two coats with base coat of


16mm thick in CM (1:6) and top coat 4mm thick in CM
(1:4) with dubara sponge finish including cost and
conveyance of all materials like cement, sand, water etc.,
to site, seignorage charges, sales & other taxes on all
114.620
materials, all operational, incidental and Labour charges
such as mixing mortar, finishing, scaffolding, lift charges
including cutting of grooves wherever necessary as
directed by Engineer -in-charge curing etc complete for
finished item of work

207.35 SqM

15

16

Plain Cement Concrete corresponding to M10 grade as


per IS 456 equivalent to (1:3:6) prop.nominal mix Using
20mm size Hard Blasted Granite (IS 383,1970) metal
from approved quarry including cost and conveyance of
all materials like cement,sand,carse aggregate, water etc
to site, including segnorage charges, sales and other
taxes on all materials, all operational, incidental and
labour charges such as mixing, laying and ramming
concrete in layersin position not exceeding 15cms,
finishing top surface, curing concrete, etc completefor
finished item of work for bed blocks and Hold Fasts
(APSS No. 402)

17 Plastering 12mm thick in two coats with base coat of


8mm thick in CM (1:6) and top coat 4mm thick in CM
(1:4) with dubara sponge finish including cost and
conveyance of all materials and Labour charges etc
complete

98.214

193.65 SqM

18

19

Ornamental Plastering to ceiling 12mm thick in CM (1:4)


with dubara sponge finish including cost and conveyance
of all materials like cement, sand, water etc., to site,
seignorage charges, sales & other taxes on all materials,
all operational, incidental and Labour charges such as
mixing mortar, finishing, scaffolding, lift charges including
cutting of grooves wherever necessary as directed by
Engineer -in-charge curing etc complete for finished item
of work

94.890

98.86 SqM

Providing Water Patti with CM (1:3) 12mm thick 50mm


width including C/C of all materilas and L/c Etc complete

52.260

24.50 Rmt

17.190

48.65 SqM

4.860

259.20 SqM

301.780

15.50 SqM

0.000

SqM

20 Painting to new Iron work with two coats of ready mixed


synthetic enamel paint first quality all shades over an
existing primer including cost and conveyance of all
materials to site, and labour charges etc complete for
finished item of work (APSS No.1201,1207 & 121) in all
floors
21 Formation of Black Boards plastering 22mm thick sponge
finish in CM (1:3) prop. 16mm thick 1st coat and in CM
(1:2) prop. 6mm thick 2nd coat including curing all water
leads cost and conveyance of all materials and Labour
charges etc complete
22 Whiting to new walls and ceiling in two coats with Surya
cem or equivalent quality to give an even shade after
thoroughly brushing the surface to remove all loose
powdered materials including cost and conveyance of all
materials and water to work site including all Labour
charges etc complete
23

Painting to new walls with two coats of snowcem cement


paint of superior quality approved brand and shade over
base coat of cement primer grade-1 making three coats
in all to give an even shade after thoroughly brushing the
surface to remove all loose powdered materials including
cost and conveyance of all materials, cost of brushes,
water to site, etc sales & other taxes on all materials, all
operational, incidental and Labour charges such as
mixing mortar, finishing, scaffolding, lift charges including
cutting of grooves wherever necessary as directed by
Engineer -in-charge curing etc complete for finished item
of work

24
Flooring with 25.40mm thick polished shabad stone
(Thandur Blue 1st variety) of size 0.457MX0.457M set
over a base coat of CM (1:8) 12mm thick (Joints of stone
must be flushed) over CC bed already laid or RCC roof
slab only after it is properly cured, Cleaned Moistured
and where necessary treated with neat grey cement
slurry of honey like consistency spread at 3.3 kgs of
cement per 1 square meter and jointed with neat cement
paste to full depth including Cost and Conveyance of all
materials like cement, sand, water, flooring stones etc to
site, seignorage charges, sales and other taxes on all
materials, all operational incidental and labour charges
such as dressing of flooring stones to the required sizes,
mixing of cement mortar, laying, jointing, curing, lift
charges etc complete for finished item of work (APSS
No. 703 & 701)

50.868

25 Providing High Yield strength deformed (HYSD) steel


bars (Fe415 grade as per IS - 1786 - 1985) of 8mm to
40mm dia cutting, bending to required szes and shapes
placing in position with cover blocks of approved size and
binding wire of 20SWG forming grills

2.380

385.35 SqM

55247.55 MT

26
S/F of 25.4mm dia 2mm thick PVC pipe including C/C of
all materials and L/C etc complete

10.000

46.90 Rmt

S/F of 25.4mm dia 1.50mm thick PVC pipe including C/C


of all materials and L/C etc complete

4.000

51.50 Rmt

27

28 Wiring with 2 runs of 14/0.30mm (1.0SqMM) firee


resistant (FR) PVC insulated fixible copper cable ISI
Mark in existing pipe with 6 A for Class rooms Etc
complete

4.000

29 S&F Batten Holder/ Slanting Holder in lieu of ceiling rose


of lights point complete with all connections and all L/C
with 40W bulb (for new installation ) Makes Gold
Medal/Millian/Vimal etc ) for Class room

2.000

38.25 Each

30 Supply and Transportation and fixing of 4"X40W Patti


type tube light luminine powder coated CRCA sheet steel
housing with copper chowk and all standard accessaries
make for 40W tube and warnished teak wood round
blocks with flexible 3 core wire etc

2.000

288.00 Each

319.70 Pts

31 Supply of 1200mm (48") sweep 230V AC 50 HZ ceiling


fan with 3 blades and double bearing with all standard
accessaries
32 Supply and erecting electronic type regulator for ceiling
fans 1200 sweep complete erected on existing board etc
for class room
33 Add LS for U/S Items

1.000

1858.40 Each

1.000

246.00 Each

34 Add 1.50% QC Chages


35 Add 3% P.S. Charges

As per Sanctioned Estimate


As per Work Done
Difference

Asst. Engineer
RVM(SSA), Warangal

Dy. Executive Engineer


RVM(SSA), Warangal

PLETION REPORT

DA, MARIPEDA(M), WARANGAL DIST


Scheme: SSA 2012-13

ctioned Estimate

Amount

Estd. Cost: 5.30 Lakhs


As per Work Done

Quantity

Rate

Per

Difference

Amount

Excess

Less

5439.00

39.320

137.00 CuM

5386.84

0.00

52.16

10077.00

3.570

2818.00 CuM

10060.26

0.00

16.74

16004.00

6.438

2643.50 CuM

17018.85

1014.85

0.00

20233.00

3.560

2124.15 CuM

7561.97

0.00

Remarks

Executed
as per the
12671.03
site
conditions

0.00

0.00

Executed
as per the
0.00
site
conditions

21909.00

4.600

5503.30 CuM

25315.18

3406.18

11097.00

1.940

5708.30 CuM

11074.10

0.00

22.90

0.00

Executed
as per the
49.50
site
conditions
Executed
as per the
2056.67
site
conditions

23717.00

3.849

6149.00 CuM

23667.50

26760.00

3.579

6902.30 CuM

24703.33

0.00

20055.00
41465.00

3.250
67.320

5874.20 CuM
670.85 SqM

19091.15
45161.62

0.00
3696.62

7065.00

1.382

6274.50 CuM

8671.36

1606.36

5098.00

10.980

468.90 SqM

5148.52

50.52

963.85
0.00 Executed
as per the
0.00
site
conditions
Executed
as per the
0.00
site
conditions

8684.00

67.320

2387.00

140.50 SqM

9458.46

774.46

0.00

4173.05 CuM

0.00

0.00

2387.00

404.00

25.065

11.20 CuM

280.73

0.00

123.27

1952.00

16.060

103.98 CuM

1669.92

0.00

282.08

53709.00

16.120

4000.00

1.000

9000.00

51031.08

0.00

2677.92

5659.00 No

5659.00

1659.00

0.00

3.000

5962.00 No

17886.00

8886.00

0.00

461.00

0.000

461.00 No

0.00

0.00

461.00

565.00

0.000

565.00 No

0.00

0.00

565.00

846.00

0.189

4105.60 CuM

775.96

0.00

70.04

23766.00

106.670

207.35 SqM

22118.02

0.00

1647.98

0.00

Executed
as per the
1009.55
site
conditions

19019.00

93.000

3165.70 CuM

193.65 SqM

18009.45

9381.00

86.710

1280.00

98.86 SqM

8572.15

0.00

808.85

24.50 Rmt

0.00

0.00

1280.00

836.00

17.190

48.65 SqM

836.29

0.29

0.00

1260.00

3.240

259.20 SqM

839.81

0.00

420.19

4678.00

145.310

15.50 SqM

2252.31

0.00

0.00

149.520

76.10 SqM

11378.47

11378.47

Executed
as per the
2425.69
site
conditions

0.00

19602.00

131489.00

469.00

206.00

1279.00

50.560

385.35 SqM

2.714 55247.55 MT

46.90 Rmt

51.50 Rmt

319.70 Pts

19483.30

0.00

118.70

149941.85

18452.85

0.00

0.00

Executed
as per the
469.00
site
conditions

0.00

0.00

Executed
as per the
206.00
site
conditions

0.00

0.00

1279.00

0.00

77.00

38.25 Each

0.00

0.00

77.00

576.00

288.00 Each

0.00

0.00

576.00

1858.00

1858.40 Each

0.00

0.00

1858.00

246.00

246.00 Each

0.00

0.00

246.00

228.00
507177.00
7608.00
15215.00

0
523053.48
7846.00
15692

0.00
50925.60
238.00
477.00

228.00
35049.12
0.00
0.00

530000.00

546591.48

51640.60

35049.12

530000.00
546591.48
-16591.48

Executive Engineer
M(SSA), Warangal

As per Excess
As per Less
Difference

51640.60
35049.12
-16591.48