Professional Documents
Culture Documents
INTRODUCTION
For station class surge arresters Manitoba Hydros acceptance test program specifies that all units be inspected and acceptance tested upon arrival, prior to payment of the supplier. Intermediate and distribution class arresters are sample tested. The tests are 10kV watts-loss, voltage-current (V-I) response, and partial discharge as prescribed in IEEE C62.11 for Metal-Oxide Surge Arresters for AC Power Circuits (>1kV) Additionally, units rated above 66kV are field tested prior to energization for 10kV watts-losses and V-I response. Manitoba Hydros maintenance program requires that arresters be tested every eight or ten years depending on make/model and previous experience. These tests are limited to 10kV watts-loss and when practical metal oxide arresters are V-I response tested and gapped units are sparkover tested. On a yearly average Manitoba Hydro acceptance tests over 150 arresters while maintenance tests are performed on over 400 arresters. Failure rates are below 1% but significant success has been achieved in finding problem batches within an arrester order. This has prevented large numbers of substandard units from being received and more importantly, from being placed into service. This program has provided a great amount of information and history related to whole families of arrester. In many situations, this in turn has lead to quick resolution where an arrester is in question. Manitoba Hydros XPS arresters were manufactured and assembled at the ABB facility in Youngwood Pennsylvania. All voltage classes of XPS arresters are assembled in the following manner. Metal-oxide varistor (MOV) discs are series connected with metal spacers inserted to ensure electrical functionality. Aluminum end caps are at both ends of the MOV structure and are held in place by fibreglass hoops. These hoops provide mechanical support for the entire structure while preventing large pieces from escaping when an arrester fails. Tension is maintained on the hoops via a steel compression screw through the end caps which is torqued to a predetermined value. The assembled unit is encapsulated with grey silicone via injection moulding except for an area at the ends of the aluminum end caps. Prior to moulding, adhesion promoter is applied to the aluminum end caps to ensure proper bonding of the silicone to the end caps.
It is important to note that these arresters were made up of three individual pieces assembled at the factory which in effect were three separate arresters designed to function in series as one. The suspect arresters were removed from service and returned to ABB in Youngwood Pennsylvania for dissection at their manufacturing facility. Dissection showed that the silicone was not thoroughly adhering to the aluminum end caps on some arresters. This allowed the opportunity for moisture ingress to occur. Carbonized and rusted components were observed within several units as well as the presence of moisture. To address this, a red dye was added to the adhesion promoter to allow visual inspection of its application. Application of the adhesion promoter was changed from brush-on to dipping the end cap into the promoter.
138kV Limestone Construction Power Station & Ilford Station - Part Two
In September of 2006, one of three 138kV XPS arresters failed while in service at 138kV Limestone CP Station however, there was no lightning activity at the time. This unit was manufactured in 2003, had been in service for about 15 months, and had always shown acceptable test results. It was decided to send all three phases from this installation to ABB in Youngwood Pennsylvania for dissection. Several additional units that had been salvaged from Ilford Station were included in the shipment. These samples were manufactured in late 2004 and had been in service for about 15 months without incident. The failed Limestone sample was manufactured in 2003, which predated the Ilford arresters. Dissection showed some rusted internal components and the MOV discs to be largely intact. Had the discs gone into conduction mode with the system supplying the current, their appearance would have been altered and many would have been damaged. Much of the heat damage was observed to be where the fibreglass hoops follow the length of the arrester in parallel with the MOV discs. This demonstrated that the fault current travelled around the discs and not through, which is contrary to their designed mode of operation. The Limestone Station sister-arrester had been installed on the same bank at but on a different phase from the unit which experienced an in-service failure. This arrester appeared normal, had not failed, and had always shown acceptable test results. Dissection of it revealed rusted parts which correlated to moisture being able to freely move in and out of the arrester. Voids within the silicone encapsulation were also found which could provide a location for moisture to collect once inside.
2010 Doble Engineering Company -77th Annual International Doble Client Conference All Rights Reserved 2
The Ilford sample was manufactured in 2004, had not failed, and had always shown acceptable test results. Dissection of this unit revealed carbonized metal components in addition to rusted internal components. This correlated to moisture being able to freely move in and out of the arrester. Voids were also present within the silicone encapsulation of this unit. To address these findings and Manitoba Hydro concerns, several modifications were made to the manufacturing process. The steel compression screw was removed from the top aluminum end cap which in turn eliminated a possible path for moisture ingress via the threaded thru-hole. The remaining steel set screw was replaced with one plated with zinc chromate. This was to maintain its surface free of machining fluids and promote the bonding of a sealant/thread-lock between the screw and threaded thru-hole in the end cap. Additionally a program of infra-red scanning was initiated in 2007 to inspect all in service XPS arresters for signs of overheating. The scanning was to be performed when the ambient temperature was above 0C with the following temperature criteria applied. A variation of >0C to <5C requires re-scanning after six months, 5C to <10C requires off-line testing within three months, and 10C or greater requires immediate removal from service. No suspect units were reported in relation to this program
Investigative Tests
To investigate this further, three 230kV XPS arresters which had been removed from Ralls Island Station were returned to Manitoba Hydros main shop. Waverley Service Centre is the location where new arresters are acceptance tested. Upon the arrival of these three arresters, they were stored outdoors so as to not allow them to dry-out indoors. Three months later, in August of 2009, two of the arresters were brought indoors for retesting via 10kV watts-losses, V-I response, and partial discharge activity. As found tests confirmed the Ralls Island results from three months earlier, however they were not identical. The arrester whose top section previously showed 10kV watts-losses of 554mW was now over 39W. The voltage to produce 1mA peak resistive current had been 44kV but was now reduced to only 2.8kV. Dissection of this arrester revealed rusted internal components and signs of overheating along one of the fibreglass hoops. One leg of this hoop showed evidence of tracking with the MOV discs and silicone being discoloured where the hoop was against them. This damage covered the height of the arrester. The second arrester brought indoors for tests had a bottom section that previously showed 10kV watts-losses of 127mW was now found to be 345mW. Also, the voltage to produce 1mA peak resistive current had been 58kV, which is an acceptable value, but was now at about 49kV. After 14 days of indoor storage, its 10kV watts-losses were found to be 107mW which showed the ability of the moisture to freely enter and leave the arrester. However, the voltage required to produce 1mA peak resistive current was now about 20kV. This seemed to indicate that damage had been done which was voltage dependant. For all tests the top and middle sections showed acceptable test results. Because the voltage distribution across an arrester is dependant on its capacitive and resistive currents there is no practical method of measuring the voltage across one section of a three piece unit. In order to prevent the addition of a significant capacitive or resistive load it was decided to add a source of corona at the top of the bottom section
2010 Doble Engineering Company -77th Annual International Doble Client Conference All Rights Reserved 3
in hopes of approximating the voltage. A pair of locking pliers and a length of wire provided the corona source while an ultraviolet camera was used to observe corona activity and measure its corona inception voltage. The top and middle sections were shorted, the voltage was applied, and the corona inception voltage was recorded. The short was then removed and the test voltage increased until the corona inception was observed. It was assumed that each section in a healthy arrester would show a voltage drop of about 1/3 of the total voltage. When in service a 230kV arrester would experience a line to ground voltage of about 133kV which equates to about 44kV across each section. Applying a test voltage of 41kV to the top of the arrester showed about 11kV across the bottom section while applying 123kV overall showed about 18kV across the bottom. Applying 165kV overall showed about 24kV across the bottom and applying 175kV overall showed about 33kV across the bottom. This implied that a deteriorated section will carry a reduced voltage when in service. This in turn would cause the other sections to carry an increased voltage which could be above their maximum continuous operating voltage. It was decided to use this unit to investigate the effects a deteriorated arrester would have on its infra-red images. Rated line to ground voltage was applied to the entire arrester and almost immediately the bottom unit showed heating in a very small area about 4C above the rest of the arrester. This was near the top of the bottom section and correlated to the location of a fibreglass hoop. The rest of this section showed a normal heat signature that was comparable to the top and middle sections. However, it is important to note that from the opposite side of the heat source it was not visible to the infra-red camera. This showed that a proper infra-red scan of an XPS arrester required inspection through its entire circumference. About 20 minutes after energization the heat became apparent around the circumference leading to a temperature increase of 1C on the opposite side. After 30 minutes the area of localized heating was about 7C above the rest of the arrester with the opposite side showing an increase of about 1C. After about 50 minutes the area of localized heating was about 5C above the rest of the arrester with the opposite side showing an increase of about 2 to 3C. These results imply that a problem unit could be overlooked during infra-red survey of an entire substation. Eventually it came to a point where it was impossible to apply voltage to this arrester because the damage became too extensive due to the excessive testing.
CONCLUSIONS
Moisture freely enters and exits these arresters however, once moisture is inside it appears the fibreglass hoops wick it; but the moisture will exit if it is in a locale with low humidity. This can make it difficult to diagnose those which suffer from a poor moisture barrier. Weather could have a significant impact on the longevity of a unit with a poor moisture barrier. The climate in Manitoba Canada is quite severe compared to most other places. In the winter temperatures can drop to below -40C while in the summer it can rise as high as +38C. During the spring and fall seasons there are many days and nights where the temperature fluctuates from above to below freezing. This may be a significant contributor to acceleration of any moisture ingress situation. During 10kV watts-loss testing of a multi-section arrester, one section with increased watts-losses will result in a reduction in watts-losses measured over the entire stack. Additionally, multi piece arresters which have one section suffering from moisture ingress appear to cause an increased voltage across the otherwise healthy section(s). This could cause accelerated aging of those units and subsequently lead to an in-service failure. Effective infra-red scanning of an XPS arrester which suffers from moisture ingress requires a skilled thermographer who is knowledgeable of its internal structure. Since early 2007, improvements to ABBs XPS arresters appear to have effectively addressed the locations where moisture ingress can occur. The end caps have a strong method of ensuring proper application of the adhesion promoter and the thru-holes have an effective sealing system. This appears to have addressed the problems encountered during Manitoba Hydros experience with this arrester.
2010 Doble Engineering Company -77th Annual International Doble Client Conference All Rights Reserved
REFERENCES
Instruction Manual, "Insulation Testing Practices - Field Tests on Surge Arresters," 1991, Manitoba Hydro. McDermid W, Testing of Surge Arresters by the Utility, Presented at CEA Seminar Surge Arresters for the Protection of EHV Systems, Quebec City, September 1973. McDermid W, Testing of Zinc Oxide Arresters, Minutes of the Fifty-Third Annual International Conference of DOBLE Clients, 1986, Sec. 9-201.
BIOGRAPHY
Reg J Gamblin presently works in the Insulation Engineering & Testing Department of Manitoba Hydro where he holds the position of Technical Officer. His current responsibilities include the condition assessment of generators, transformers, insulating oil, bushings, and instrument transformers. He earned a Diploma in Electrical Engineering Technology in 1998 from Red River College. Reg is a current member of the Certified Technicians and Technologists Association of Manitoba and has been a CET since 2005. He has authored and co-authored several papers which have been presented at various industry conferences on the topic of rotating machines and insulation testing. Additionally, he is currently the Chair of the Doble Arresters, Capacitors, Cables, and Accessories Committee.
2010 Doble Engineering Company -77th Annual International Doble Client Conference All Rights Reserved